ML20138E972: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 1: | Line 1: | ||
{{Adams | |||
| number = ML20138E972 | |||
| issue date = 10/21/1985 | |||
| title = Forwards Safety Insp Repts 50-254/85-24 & 50-265/85-27 on 850801-0930.No Violation Noted | |||
| author name = Chrissotimos N | |||
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) | |||
| addressee name = Reed C | |||
| addressee affiliation = COMMONWEALTH EDISON CO. | |||
| docket = 05000254, 05000265 | |||
| license number = | |||
| contact person = | |||
| document report number = NUDOCS 8510250153 | |||
| package number = ML17195B064 | |||
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE | |||
| page count = 2 | |||
}} | |||
See also: [[see also::IR 05000801/2009030]] | |||
=Text= | |||
{{#Wiki_filter:. - ._ - ._ | |||
.. | |||
23/7145 | |||
. | |||
. | |||
. | |||
OCT 211925 | |||
Docket No. 50-254 | |||
Docket No. 50-265 | |||
Commonwealth Edison Company | |||
ATTN: Mr. Cordell Reed | |||
Vice President | |||
Post Office Box 767 | |||
Chicago, IL 60690 | |||
Gentlemen: | |||
This refers to the routine safety inspection conducted by Messrs. A. L. Madison | |||
and A. D. Morrongf ello of this office on August I through September 30,1985, of | |||
activities at Quad Cities Nuclear Power Station, Units 1 and 2, authorized by NRC | |||
Operating Licenses No. DPR-29 and No. DPR-30, and to the discussion of our findings | |||
with Mr. N. J. Kalivianakis at the conclusion of the inspection. | |||
The enclosed copy of our inspection report identifies areas examined during | |||
the inspection. Within these areas, the inspection consisted of a selective | |||
examination of procedures and representative records, observations, and | |||
interviews with personnel. | |||
No violations with NRC requirements were identified during tne course of this | |||
inspection. | |||
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of | |||
this letter and the enclosed inspection report will be placed in the NRC's | |||
Public Document Room. | |||
We will gladly discuss any questions you have concerning this inspection. | |||
Sincerely, | |||
" original signed by I. N. Jackiw" | |||
N. J. Chrissotimos, Chief | |||
Projects Branch 2 | |||
Enclosure: Inspection Reports | |||
No. 50-254/85024 DRP ; | |||
No. 50-265/85027 DRP | |||
8510250153 851CM21 | |||
PDR ADOCK 05000254 | |||
G PDR , | |||
, | |||
See Attached List For Distribution | |||
TBCI t | |||
-------------------------------y- | |||
_ _ . | |||
.- - | |||
'Coninonwealth Edison Company 2 | |||
Distribution | |||
cc w/enclosura: | |||
l D. L. Farrar, Director | |||
! of Nuclear Licensing | |||
{ N. Kalivianakis, Station Manager | |||
l DCS/RSB (RIDS) | |||
l | |||
' | |||
Licensing Fee Management Branch | |||
Resident Inspector, RIII | |||
Phyllis Dunton, Attorney | |||
General's Office, Environmental | |||
Control Division | |||
I | |||
R RIII ', | |||
W k]hg Lanc' syn n RIIL_ | |||
Chris ot //}imos | |||
.j | |||
10/I8/85 | |||
}} | |||
Revision as of 20:55, 7 September 2020
| ML20138E972 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 10/21/1985 |
| From: | Chrissotimos N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML17195B064 | List: |
| References | |
| NUDOCS 8510250153 | |
| Download: ML20138E972 (2) | |
See also: IR 05000801/2009030
Text
. - ._ - ._
..
23/7145
.
.
.
OCT 211925
Docket No. 50-254
Docket No. 50-265
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. A. L. Madison
and A. D. Morrongf ello of this office on August I through September 30,1985, of
activities at Quad Cities Nuclear Power Station, Units 1 and 2, authorized by NRC
Operating Licenses No. DPR-29 and No. DPR-30, and to the discussion of our findings
with Mr. N. J. Kalivianakis at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations with NRC requirements were identified during tne course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
" original signed by I. N. Jackiw"
N. J. Chrissotimos, Chief
Projects Branch 2
Enclosure: Inspection Reports
No. 50-254/85024 DRP ;
No. 50-265/85027 DRP
8510250153 851CM21
PDR ADOCK 05000254
G PDR ,
,
See Attached List For Distribution
TBCI t
y-
_ _ .
.- -
'Coninonwealth Edison Company 2
Distribution
cc w/enclosura:
l D. L. Farrar, Director
! of Nuclear Licensing
{ N. Kalivianakis, Station Manager
l DCS/RSB (RIDS)
l
'
Licensing Fee Management Branch
Resident Inspector, RIII
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
I
R RIII ',
W k]hg Lanc' syn n RIIL_
Chris ot //}imos
.j
10/I8/85