ML20129G132: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 1: | Line 1: | ||
{{Adams | |||
| number = ML20129G132 | |||
| issue date = 09/25/1996 | |||
| title = Corrected Attachment 1 to Insp Repts 50-445/96-10 & 50-446/96-10 | |||
| author name = | |||
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) | |||
| addressee name = | |||
| addressee affiliation = | |||
| docket = 05000445, 05000446 | |||
| license number = | |||
| contact person = | |||
| document report number = 50-445-96-10, 50-446-96-10, NUDOCS 9610070111 | |||
| package number = ML20129G137 | |||
| document type = INSPECTION REPORT, NRC-GENERATED, TEXT-INSPECTION & AUDIT & I&E CIRCULARS | |||
| page count = 1 | |||
}} | |||
See also: [[see also::IR 05000446/1996010]] | |||
=Text= | |||
{{#Wiki_filter:. | |||
*. | |||
- | |||
. | |||
. | |||
* | |||
' | |||
ATTACHMENT 1 | |||
PARTIAL LIST OF PERSONS CONTACTED | |||
Licensee D. R. Alps, Security Manager | |||
D. R. Moore, Operations Manager | |||
A. H. Saunders, NSSS System Engineering Supervisor | |||
J. A. Taylor, Procurement Engineering Manager | |||
C. L. Terry, Group Vice President, Nuclear Production | |||
NRC P. L. Campbell, Mechanical Engineer | |||
T. J. Polich, Project Manager | |||
L. J. Smith, Acting Branch Chief, Division of Reactor Projects | |||
INSPECTION PROCEDURES USED | |||
71707 Plant Operations | |||
71750 Plant Support Activities | |||
37551 Onsite Engineering | |||
62707 Maintenance Observation | |||
93702 Prompt Onsite Response to Events at Operating Power Reactors | |||
92903 Followup - Engineering | |||
ITEMS OPENED, CLOSED. AND DISCUSSED | |||
Opened | |||
50-446/9610-01 IFl training and performance of check valve maintenance | |||
50-446/9610-02 URI inservice testing program scope | |||
9610070111 960925 | |||
PDR ADOCK 05000445 | |||
G PDR | |||
}} | |||
Revision as of 10:30, 4 September 2020
| ML20129G132 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/25/1996 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20129G137 | List: |
| References | |
| 50-445-96-10, 50-446-96-10, NUDOCS 9610070111 | |
| Download: ML20129G132 (1) | |
See also: IR 05000446/1996010
Text
.
- .
-
.
.
'
ATTACHMENT 1
PARTIAL LIST OF PERSONS CONTACTED
Licensee D. R. Alps, Security Manager
D. R. Moore, Operations Manager
A. H. Saunders, NSSS System Engineering Supervisor
J. A. Taylor, Procurement Engineering Manager
C. L. Terry, Group Vice President, Nuclear Production
NRC P. L. Campbell, Mechanical Engineer
T. J. Polich, Project Manager
L. J. Smith, Acting Branch Chief, Division of Reactor Projects
INSPECTION PROCEDURES USED
71707 Plant Operations
71750 Plant Support Activities
37551 Onsite Engineering
62707 Maintenance Observation
93702 Prompt Onsite Response to Events at Operating Power Reactors
92903 Followup - Engineering
ITEMS OPENED, CLOSED. AND DISCUSSED
Opened
50-446/9610-01 IFl training and performance of check valve maintenance
50-446/9610-02 URI inservice testing program scope
9610070111 960925
PDR ADOCK 05000445
G PDR