.: * . j 3/4.8 ELECTRICAL POWER SYSTEMS ) | |||
SURVEILLANCE REQUIREMENTS (Continued) | |||
: 2. For the 69 kV SMECO offsite power circuit, within one hour of substitution for a 500 kV offsite power circuit, and at least once per 8 hours thereafter during use by verifying correct breaker alignments and indicated power availability; and 6 E FOEuNrr .ToTERVAL | |||
: b. Demonstrated OPERABLE at least once per -18 ;rsrthe during shutdown i by manually transferring unit power supply from the normal circuit to the alternate circuit. | |||
4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE: | |||
: a. At least once per 31 days on a 3TAGGERED TEST BASIS by: | |||
: 1. Verifying the fuel level in the day fuel tank. | |||
: 2. Verifying the fuel level in the fuel storage tank. | |||
: 3. Verifying the fuel transfer pump can be started and transfers fuel from the storage system to the day tank. | |||
: 4. Verifying the diesel starts and accelerates to at least 900 rpm with generator voltage and and 60 1 1.2 Hz, respectively., frequency at 41601420 volts | |||
: 5. Verifying the generator is synchronized, loaded to 31250 kW, and operates for E 60 minutes. | |||
: 6. Verifying the diesel generator is aligned to provide standby power to the associated emergency busses. | |||
: 7. Verifying that the automatic load sequencer timer is OPERABLE with the interval between each load block within i 10% of its design interval. | |||
: b. At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank is within the acceptable limits specified in Table 1 of ASTM D975-81 when checked for viscosity, water and sediment. | |||
All engine starts for the purpose of this Surveillance Requirement i | |||
may be preceded by an engine prelube period and/or other warmup procedures recommended by the manufacturer so that mechanical wear and stress on the diesel engine is minimized. | |||
CALVERT CLIFFS - UNIT 1 3/4 8-4 Amendment No. -l& | |||
9406130247 940608 PDR P | |||
ADOCK 05000317 PDR | |||
.. .- 1 A'ITACIIMENT (2) | |||
I l | |||
UNIT 2 TECHNICAL SPECIFICATION MARKED-UP PAGE 3/48-4 | |||
r- | |||
/ - , | |||
3/4.8 ELECTRICAL POWER SYSTEMS | |||
, SURVEILLANCE REQUIREMENTS (Continued) f | |||
: 2. For the 69 kV 1.200 offsite power circuit, within one hour of , | |||
substitution for a 500 kV offsite power circuit, and at least l' once per 8 hours thereafter during use by verifying correct breaker alignments and indicated power availability; and REFusuwr raTeAv6L | |||
: b. Demonstrated OPERABLE at least once per 18 :: th: during shutdown l by manually transferring unit power supply from the normal circuit to the alternate circuit. , | |||
4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE: : | |||
: a. At least once per 31 days on a STAGGERED TEST BASIS by: ; | |||
: 1. Verifying the fuel level in the day fuel tank. , | |||
: 2. Verifying the fuel level in the fuel storage tank. | |||
: 3. Verifying the fuel transfer pump can be started and transfers ! | |||
fuel from the storage system to the day tank. - | |||
: 4. Verifying the diesel starts and accelerates to at least 900 ! | |||
rpm with generator voltage and 4160 1 420 volts and 6011.2 Hz, respectively., frequency at | |||
: 5. Verifying the generator is synchronized, loaded to 21250 kW, and operates for E 60 minutes. | |||
: 6. Verifying the diesel generator is aligned to provide standby j power to the associated emergency busses. ; | |||
i | |||
: 7. Verifying that the automatic load sequencer timer is OPERABLE with the interval between each load block within i 10% of its design interval. l l | |||
: b. At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank is within the acceptable limits l specified in Table 1 of ASTM D975-81 when checked for viscosity, l water and sediment. l l | |||
l 1 | |||
l All engine starts for the purpose of this Surveillance Requirement t may be preceded by an engine prelube period and/or other wannup procedures reconnended by the manufacturer so that mechanical wear and stress on the diesel engine is minimized. | |||
CALVERT CLIFFS - UNIT 2 3/4 8-4 Amendment No. -149- ,}} | |||
Revision as of 20:47, 25 July 2020
| ML20069H623 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 06/08/1994 |
| From: | BALTIMORE GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20069H621 | List: |
| References | |
| NUDOCS 9406130247 | |
| Download: ML20069H623 (3) | |
Text
.
.: * . j 3/4.8 ELECTRICAL POWER SYSTEMS )
SURVEILLANCE REQUIREMENTS (Continued)
- 2. For the 69 kV SMECO offsite power circuit, within one hour of substitution for a 500 kV offsite power circuit, and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter during use by verifying correct breaker alignments and indicated power availability; and 6 E FOEuNrr .ToTERVAL
- b. Demonstrated OPERABLE at least once per -18 ;rsrthe during shutdown i by manually transferring unit power supply from the normal circuit to the alternate circuit.
4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE:
- a. At least once per 31 days on a 3TAGGERED TEST BASIS by:
- 1. Verifying the fuel level in the day fuel tank.
- 2. Verifying the fuel level in the fuel storage tank.
- 3. Verifying the fuel transfer pump can be started and transfers fuel from the storage system to the day tank.
- 4. Verifying the diesel starts and accelerates to at least 900 rpm with generator voltage and and 60 1 1.2 Hz, respectively., frequency at 41601420 volts
- 5. Verifying the generator is synchronized, loaded to 31250 kW, and operates for E 60 minutes.
- 6. Verifying the diesel generator is aligned to provide standby power to the associated emergency busses.
- 7. Verifying that the automatic load sequencer timer is OPERABLE with the interval between each load block within i 10% of its design interval.
- b. At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank is within the acceptable limits specified in Table 1 of ASTM D975-81 when checked for viscosity, water and sediment.
All engine starts for the purpose of this Surveillance Requirement i
may be preceded by an engine prelube period and/or other warmup procedures recommended by the manufacturer so that mechanical wear and stress on the diesel engine is minimized.
CALVERT CLIFFS - UNIT 1 3/4 8-4 Amendment No. -l&
9406130247 940608 PDR P
ADOCK 05000317 PDR
.. .- 1 A'ITACIIMENT (2)
I l
UNIT 2 TECHNICAL SPECIFICATION MARKED-UP PAGE 3/48-4
r-
/ - ,
3/4.8 ELECTRICAL POWER SYSTEMS
, SURVEILLANCE REQUIREMENTS (Continued) f
- 2. For the 69 kV 1.200 offsite power circuit, within one hour of ,
substitution for a 500 kV offsite power circuit, and at least l' once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter during use by verifying correct breaker alignments and indicated power availability; and REFusuwr raTeAv6L
- b. Demonstrated OPERABLE at least once per 18 :: th: during shutdown l by manually transferring unit power supply from the normal circuit to the alternate circuit. ,
4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE: :
- a. At least once per 31 days on a STAGGERED TEST BASIS by: ;
- 1. Verifying the fuel level in the day fuel tank. ,
- 2. Verifying the fuel level in the fuel storage tank.
- 3. Verifying the fuel transfer pump can be started and transfers !
fuel from the storage system to the day tank. -
- 4. Verifying the diesel starts and accelerates to at least 900 !
rpm with generator voltage and 4160 1 420 volts and 6011.2 Hz, respectively., frequency at
- 5. Verifying the generator is synchronized, loaded to 21250 kW, and operates for E 60 minutes.
- 6. Verifying the diesel generator is aligned to provide standby j power to the associated emergency busses. ;
i
- 7. Verifying that the automatic load sequencer timer is OPERABLE with the interval between each load block within i 10% of its design interval. l l
- b. At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank is within the acceptable limits l specified in Table 1 of ASTM D975-81 when checked for viscosity, l water and sediment. l l
l 1
l All engine starts for the purpose of this Surveillance Requirement t may be preceded by an engine prelube period and/or other wannup procedures reconnended by the manufacturer so that mechanical wear and stress on the diesel engine is minimized.
CALVERT CLIFFS - UNIT 2 3/4 8-4 Amendment No. -149- ,