{{#Wiki_filter:Quad Cities Unit 2                Core Operating Limits Report Page 1 Cycle 18                                    Rev. 0 Core Operating Limits Report for Quad Cities Unit 2, Cycle 18 Revision 0
{{#Wiki_filter:Quad Cities Unit 2                Core Operating Limits Report Page 1 Cycle 18                                    Rev. 0 Core Operating Limits Report for Quad Cities Unit 2, Cycle 18 Revision 0
[f GNF Proprietary Information ]]
[f GNF Proprietary Information ))
[f enclosed by double brackets ]]
[f enclosed by double brackets ))


Quad Cities Unit 2                              Core Operating Limits Report              Page 2 Cycle 18                                                  Rev. 0 Table of Contents
Quad Cities Unit 2                              Core Operating Limits Report              Page 2 Cycle 18                                                  Rev. 0 Table of Contents
Line 31: Line 31:
: 8. Modes of Operation ....................................                                    28
: 8. Modes of Operation ....................................                                    28
: 9. Methodology ....................................                                          29
: 9. Methodology ....................................                                          29
[f GNF Proprietary Information ]]
[f GNF Proprietary Information ))
[[ enclosed by double brackets J]
(( enclosed by double brackets J]


Quad Cities Unit 2                Core Operating Limits Report                                        Page 3 Cycle 18                                          Rev. 0 List of Tables Table 4-1 MAPLHGR for bundle(s):
Quad Cities Unit 2                Core Operating Limits Report                                        Page 3 Cycle 18                                          Rev. 0 List of Tables Table 4-1 MAPLHGR for bundle(s):
ATRM9-P9DATB381 -13GZ-SPC100T-9WR-144-T6-3919 ATRM9-P9DATB383-11GZ-SPC100T-9WR-144-T6-3918 .......................................... 8 Table 4-2 MAPLHGR for bundle(s):
ATRM9-P9DATB381 -13GZ-SPC100T-9WR-144-T6-3919 ATRM9-P9DATB383-11GZ-SPC100T-9WR-144-T6-3918 .......................................... 8 Table 4-2 MAPLHGR for bundle(s):
GE14-P 1ODNAB389-18GZ-10OT-145-T6-2650 GE14-PlODNAB418-16GZ-10OT-145-T6-2646 GE14-Pl ODNAB406-16GZ-10OT-145-T6-2508 GE14-P 1ODNAB409-15GZ-10OT-145-T6-2507 ........................................................ 8 Table 4-3 MAPLHGR SLO multiplier for GE and FANP Fuel ............................................ 8 Table 5-1 MCPR Option A Based Operating Limits ........................................................ 10 Table 5-2 MCPR Option B Based Operating Limits ........................................................ 11 Table 5-3 MCPR(P) for GE and FANP Fuel .................................................................. 12 Table 5-4 MCPR(F) Limits for GE and FANP Fuel DLO or SLO Operation .......................... 13 Table 5-5 MCPR(F) Limits for GE and FANP Fuel with TCV Stuck Closed DLO or SLO Operation ...................................................................            13 Table 6-1: LHGR Limit for GE14-P10DNAB418-16GZ-1OOT-145-T6-2646 ......................... 14 Table 6-2: LHGR Limit for: GE14-P1ODNAB418-16GZ-100T-145-T6-2646, Lattice 5972 ...... 15 Table 6-3: LHGR Limit for: GE14-PlODNAB418-16GZ-10OT-145-T6-2646, Lattice 5973....... 16 Table 6-4: LHGR Limit for GE14-PlODNAB389-18GZ-IOOT-145-T6-2650 ......................... 17 Table 6-5: LHGR Limit for GE14-PlODNAB389-18GZ-10OT-145-T6-2650, Lattice 5996 ........ 17 Table 6-6: LHGR Limit for GE14-PlODNAB389-18GZ-100T-145-T6-2650, Lattice 5997 ........ 18 Table 6-7: LHGR Limit for GE14-PlODNAB409-15GZ-10OT-145-T6-2507 ......................... 19 Table 6-8: LHGR Limit for GE14-P10DNAB409-15GZ-10OT-145-T6-2507, Lattice 5255 ........ 19 Table 6-9: LHGR Limit for GE14-PIODNAB409-15GZ-IOOT-145-T6-2507, Lattice 5256 ........ 20 Table 6-10: LHGR Limit for GE14-PlODNAB409-15GZ-10OT-145-T6-2507, Lattice 5257 ...... 20 Table 6-11: LHGR Limit for GE14-PlODNAB409-15GZ-10OT-145-T6-2507, Lattice 5258 ...... 21 Table 6-12: LHGR Limit for GE14-PlODNAB406-16GZ-10OT-145-T6-2508 ......................... 22 Table 6-13: LHGR Limit for GE14-P10DNAB406-16GZ-10OT-145-T6-2508, Lattice 5261 ...... 22 Table 6-14: LHGR Limit for GE14-PIODNAB406-16GZ-10OT-145-T6-2508, Lattice 5262 ...... 23 Table 6-15: LHGR Limit for GE14-Pl0DNAB406-16GZ-10OT-145-T6-2508, Lattice 5263 ...... 23 Table 6-16: LHGR Limit for GE14-PlODNAB406-16GZ-100T-145-T6-2508, Lattice 5264 ...... 24 Table 6-17: LHGR Limit for FANP ATRM-9 Fuel ATRM9-P9DATB383-1 1GZ-SPC1 OOT-9WR-144-T6-3918 ATRM9-P9DATB381 -13GZ-SPCI OOT-9WR-144-T6-3919 .......................................... 24 Table 6-18 LHGRFAC(P) for GE and FANP Fuel ............................................................ 25 Table 6-19 LHGRFAC(F) Multipliers, all cases except TCV Stuck Closed ........................... 26 Table 6-20 LHGRFAC(F) Multipliers for TCV Stuck Closed .............................................. 26 Table 6-21 LHGR SLO multiplier for GE and FANP Fuel ................................................. 26
GE14-P 1ODNAB389-18GZ-10OT-145-T6-2650 GE14-PlODNAB418-16GZ-10OT-145-T6-2646 GE14-Pl ODNAB406-16GZ-10OT-145-T6-2508 GE14-P 1ODNAB409-15GZ-10OT-145-T6-2507 ........................................................ 8 Table 4-3 MAPLHGR SLO multiplier for GE and FANP Fuel ............................................ 8 Table 5-1 MCPR Option A Based Operating Limits ........................................................ 10 Table 5-2 MCPR Option B Based Operating Limits ........................................................ 11 Table 5-3 MCPR(P) for GE and FANP Fuel .................................................................. 12 Table 5-4 MCPR(F) Limits for GE and FANP Fuel DLO or SLO Operation .......................... 13 Table 5-5 MCPR(F) Limits for GE and FANP Fuel with TCV Stuck Closed DLO or SLO Operation ...................................................................            13 Table 6-1: LHGR Limit for GE14-P10DNAB418-16GZ-1OOT-145-T6-2646 ......................... 14 Table 6-2: LHGR Limit for: GE14-P1ODNAB418-16GZ-100T-145-T6-2646, Lattice 5972 ...... 15 Table 6-3: LHGR Limit for: GE14-PlODNAB418-16GZ-10OT-145-T6-2646, Lattice 5973....... 16 Table 6-4: LHGR Limit for GE14-PlODNAB389-18GZ-IOOT-145-T6-2650 ......................... 17 Table 6-5: LHGR Limit for GE14-PlODNAB389-18GZ-10OT-145-T6-2650, Lattice 5996 ........ 17 Table 6-6: LHGR Limit for GE14-PlODNAB389-18GZ-100T-145-T6-2650, Lattice 5997 ........ 18 Table 6-7: LHGR Limit for GE14-PlODNAB409-15GZ-10OT-145-T6-2507 ......................... 19 Table 6-8: LHGR Limit for GE14-P10DNAB409-15GZ-10OT-145-T6-2507, Lattice 5255 ........ 19 Table 6-9: LHGR Limit for GE14-PIODNAB409-15GZ-IOOT-145-T6-2507, Lattice 5256 ........ 20 Table 6-10: LHGR Limit for GE14-PlODNAB409-15GZ-10OT-145-T6-2507, Lattice 5257 ...... 20 Table 6-11: LHGR Limit for GE14-PlODNAB409-15GZ-10OT-145-T6-2507, Lattice 5258 ...... 21 Table 6-12: LHGR Limit for GE14-PlODNAB406-16GZ-10OT-145-T6-2508 ......................... 22 Table 6-13: LHGR Limit for GE14-P10DNAB406-16GZ-10OT-145-T6-2508, Lattice 5261 ...... 22 Table 6-14: LHGR Limit for GE14-PIODNAB406-16GZ-10OT-145-T6-2508, Lattice 5262 ...... 23 Table 6-15: LHGR Limit for GE14-Pl0DNAB406-16GZ-10OT-145-T6-2508, Lattice 5263 ...... 23 Table 6-16: LHGR Limit for GE14-PlODNAB406-16GZ-100T-145-T6-2508, Lattice 5264 ...... 24 Table 6-17: LHGR Limit for FANP ATRM-9 Fuel ATRM9-P9DATB383-1 1GZ-SPC1 OOT-9WR-144-T6-3918 ATRM9-P9DATB381 -13GZ-SPCI OOT-9WR-144-T6-3919 .......................................... 24 Table 6-18 LHGRFAC(P) for GE and FANP Fuel ............................................................ 25 Table 6-19 LHGRFAC(F) Multipliers, all cases except TCV Stuck Closed ........................... 26 Table 6-20 LHGRFAC(F) Multipliers for TCV Stuck Closed .............................................. 26 Table 6-21 LHGR SLO multiplier for GE and FANP Fuel ................................................. 26
[[ GNF Proprietary Information ]
(( GNF Proprietary Information ]
[[ enclosed by double brackets]]
(( enclosed by double brackets))


Quad Cities Unit 2                Core Operating Limits Report                            Page 4 Cycle 18                                      Rev. 0
Quad Cities Unit 2                Core Operating Limits Report                            Page 4 Cycle 18                                      Rev. 0
Line 62: Line 62:
: 15. Exelon Letter, NF-MW:02-0081, "Approval of GE Evaluation of Dresden and Quad Cities Extended Final Feedwater Temperature Reduction," Carlos de la Hoz to Doug Wise and Alex Misak, August 27, 2002:
: 15. Exelon Letter, NF-MW:02-0081, "Approval of GE Evaluation of Dresden and Quad Cities Extended Final Feedwater Temperature Reduction," Carlos de la Hoz to Doug Wise and Alex Misak, August 27, 2002:
1[GNF Proprietary Information ]
1[GNF Proprietary Information ]
[[ enclosed by double brackets ]
(( enclosed by double brackets ]


Quad Cities Unit 2              Core Operating Limits Report                        Page 5 Cycle 18                                  Rev. 0
Quad Cities Unit 2              Core Operating Limits Report                        Page 5 Cycle 18                                  Rev. 0
Line 68: Line 68:
: 17. Exelon Letter, NF-MW:03-069, "Dresden and Quad Cities Operation with one TSV OOS,"
: 17. Exelon Letter, NF-MW:03-069, "Dresden and Quad Cities Operation with one TSV OOS,"
Candice Chou to Alex Misak and Doug Wise, July 28, 2003.
Candice Chou to Alex Misak and Doug Wise, July 28, 2003.
[[GNF Proprietary Information]]
((GNF Proprietary Information))
[[enclosed by double brackets ]
((enclosed by double brackets ]


Quad Cities Unit 2                Core Operating Limits Report                          Page 6 Cycle 18                                      Rev. 0
Quad Cities Unit 2                Core Operating Limits Report                          Page 6 Cycle 18                                      Rev. 0
: 2. Definitions APLHGR              Average planar linear heat generation rate APRM                Average power range monitor ATRM9                ATRIUM-9B fuel BOC                Beginning of cycle DLO                Dual loop operation EOC                End of cycle EOOS                Equipment out of service EOR                End of rated conditions (i.e cycle exposure at 100% power, 100% flow, all-rods-out)
: 2. Definitions APLHGR              Average planar linear heat generation rate APRM                Average power range monitor ATRM9                ATRIUM-9B fuel BOC                Beginning of cycle DLO                Dual loop operation EOC                End of cycle EOOS                Equipment out of service EOR                End of rated conditions (i.e cycle exposure at 100% power, 100% flow, all-rods-out)
FANP                Framatome Advanced Nuclear Power FWHOOS              Feedwater heater out of service GE14                GE14C fuel GNF                  Global Nuclear Fuel ICF                Increased core flow LHGR                Linear heat generation rate LHGRFAC(F)          Flow dependent LHGR multiplier LHGRFAC(P)          Power dependent LHGR multiplier LPRM                Local power range monitor MAPFAC(F)          Flow dependent MAPLHGR multiplier MAPFAC(P)          Power dependent MAPLHGR multiplier MAPLHGR            Maximum average planar linear heat generation rate MCPR                Minimum critical power ratio MCPR(F)            Flow dependent MCPR MCPR(P)              Power dependent MCPR OLMCPR              Operating limit minimum critical power ratio PLUOOS              Power load unbalance out of service PROOS                Pressure regulator out of service RBM                  Rod block monitor SLMCPR              Safety limit minimum critical power ratio SLO                  Single loop operation SRVOOS              Safety-relief valve out of service TBPOOS              Turbine bypass valve out of service TCV                  Turbine control valve TIP                  Transversing Incore Probe
FANP                Framatome Advanced Nuclear Power FWHOOS              Feedwater heater out of service GE14                GE14C fuel GNF                  Global Nuclear Fuel ICF                Increased core flow LHGR                Linear heat generation rate LHGRFAC(F)          Flow dependent LHGR multiplier LHGRFAC(P)          Power dependent LHGR multiplier LPRM                Local power range monitor MAPFAC(F)          Flow dependent MAPLHGR multiplier MAPFAC(P)          Power dependent MAPLHGR multiplier MAPLHGR            Maximum average planar linear heat generation rate MCPR                Minimum critical power ratio MCPR(F)            Flow dependent MCPR MCPR(P)              Power dependent MCPR OLMCPR              Operating limit minimum critical power ratio PLUOOS              Power load unbalance out of service PROOS                Pressure regulator out of service RBM                  Rod block monitor SLMCPR              Safety limit minimum critical power ratio SLO                  Single loop operation SRVOOS              Safety-relief valve out of service TBPOOS              Turbine bypass valve out of service TCV                  Turbine control valve TIP                  Transversing Incore Probe
[[ GNF Proprietary Information ]]
(( GNF Proprietary Information ))
[[enclosed by double brackets ]]
((enclosed by double brackets ))


Quad Cities Unit 2                  Core Operating Limits Report                            Page 7 Cycle 18                                      Rev. 0
Quad Cities Unit 2                  Core Operating Limits Report                            Page 7 Cycle 18                                      Rev. 0
Line 82: Line 82:
MCPR(P) and MCPR(F) values are independent of scram time.
MCPR(P) and MCPR(F) values are independent of scram time.
For thermal limit monitoring above 100% rated power or 100% rated core flow, the 100% rated power and the 100% core flow values, respectively, can be used unless otherwise indicated in the applicable table.
For thermal limit monitoring above 100% rated power or 100% rated core flow, the 100% rated power and the 100% core flow values, respectively, can be used unless otherwise indicated in the applicable table.
[[ GNF Proprietary Information ]
(( GNF Proprietary Information ]
[[enclosed by double brackets]]
((enclosed by double brackets))


Quad Cities Unit 2                  Core Operating Limits Report                        Page 8 Cycle 18                                          Rev. 0
Quad Cities Unit 2                  Core Operating Limits Report                        Page 8 Cycle 18                                          Rev. 0
Line 92: Line 92:
GE14-PI ODNAB389-18GZ-1 OOT-145-T6-2650 GE14-PIODNAB418-16GZ-1OOT-145-T6-2646 GE14-PI ODNAB406-16GZ-1OOT-145-T6-2508 GE14-PI ODNAB409-15GZ-I OT-145-T6-2507 (References 3 and 4)
GE14-PI ODNAB389-18GZ-1 OOT-145-T6-2650 GE14-PIODNAB418-16GZ-1OOT-145-T6-2646 GE14-PI ODNAB406-16GZ-1OOT-145-T6-2508 GE14-PI ODNAB409-15GZ-I OT-145-T6-2507 (References 3 and 4)
Avg. Planar Exposure        MAPLHGR (GWd/MT)            (kW/ft) 0.00            11.68 16.00            11.68 22.05            11.34 55.12            8.19 63.50            6.97 70.00            4.36 Table 4-3 MAPLHGR SLO multiplier for GE and FANP Fuel (Reference 3) lFuel Type    I Multiplier ATRM9              0.84 GE14        J    0.77
Avg. Planar Exposure        MAPLHGR (GWd/MT)            (kW/ft) 0.00            11.68 16.00            11.68 22.05            11.34 55.12            8.19 63.50            6.97 70.00            4.36 Table 4-3 MAPLHGR SLO multiplier for GE and FANP Fuel (Reference 3) lFuel Type    I Multiplier ATRM9              0.84 GE14        J    0.77
[[ GNF Proprietary Information ]]
(( GNF Proprietary Information ))
[[ enclosed by double brackets ]]
(( enclosed by double brackets ))


Quad Cities Unit 2                  Core Operating Limits Report                            Page 9 Cycle 18                                        Rev. 0
Quad Cities Unit 2                  Core Operating Limits Report                            Page 9 Cycle 18                                        Rev. 0
Line 104: Line 104:
To utilize the MCPR limits for the Option B scram speed, the core average scram insertion time for 20% insertion must be less than or equal to 0.694 seconds (Reference 6). If the core average scram insertion time does not meet the Option B criteria, but is within the Option A criteria, the appropriate MCPR value may be determined from a linear interpolation between the Option A and B limits with standard mathematical rounding to two decimal places. When performing a linear interpolation to determine MCPR limits, ensure that the time used for Option A is 0.900 seconds.
To utilize the MCPR limits for the Option B scram speed, the core average scram insertion time for 20% insertion must be less than or equal to 0.694 seconds (Reference 6). If the core average scram insertion time does not meet the Option B criteria, but is within the Option A criteria, the appropriate MCPR value may be determined from a linear interpolation between the Option A and B limits with standard mathematical rounding to two decimal places. When performing a linear interpolation to determine MCPR limits, ensure that the time used for Option A is 0.900 seconds.
5.4. Recirculation Pump Motor Generator Settings Cycle 18 was analyzed with a maximum core flow runout of 110%; therefore the recirculation pump motor generator scoop tube mechanical and electrical stops must be set to maintain core flow less than 110% (107.8 Mlb/hr) for all runout events (Reference 5). This value is consistent with the analyses of References 3 and 8.
5.4. Recirculation Pump Motor Generator Settings Cycle 18 was analyzed with a maximum core flow runout of 110%; therefore the recirculation pump motor generator scoop tube mechanical and electrical stops must be set to maintain core flow less than 110% (107.8 Mlb/hr) for all runout events (Reference 5). This value is consistent with the analyses of References 3 and 8.
[[GNF Proprietary Information]]
((GNF Proprietary Information))
enclosed by double brackets]]
enclosed by double brackets))


Quad Cities Unit 2                Core Operating Limits Report                    Page 10 Cycle 18                                    Rev. 0 Table 5-1 MCPR Option A Based Operating Limits (References 3 and 8)
Quad Cities Unit 2                Core Operating Limits Report                    Page 10 Cycle 18                                    Rev. 0 Table 5-1 MCPR Option A Based Operating Limits (References 3 and 8)
Cycle Exposure
Cycle Exposure
                                                         < EOR - 2110 > EOR - 2110 EOOS Combination        Fuel Type      MWd/MT      MWd/MT ATRM9          1.50        1.61 BASE                GE14          1.55        1.65 ATRM9          1.51        1.62 BASE SLO              GE14          1.56        1.66 ATRM9          1.57        1.61 PLUOOS              GE14          1.63        1.65 ATRM9          1.58        1.62 PLUMOS SLO              GE14          1.64        1.66 ATRM9          1.67        1.69 TBPOOS              GE14          1.73        1.75 ATRM9          1.68        1.70 TBPOOS SLO              GE14          1.74        1.76 ATRM9          1.52        1.61 TCV SLOW CLOSURE            GE14          1.58        1.65 ATRM9          1.53        1.62 TCV SLOW CLOSURE SLO          GE14          1.59        1.66 ATRM9          1.50        1.61 TCV STUCK CLOSED            GE14          1.55        1.65 ATRM9          1.51        1.62 TCV STUCK CLOSED SLO          GE14          1.56        1.66
                                                         < EOR - 2110 > EOR - 2110 EOOS Combination        Fuel Type      MWd/MT      MWd/MT ATRM9          1.50        1.61 BASE                GE14          1.55        1.65 ATRM9          1.51        1.62 BASE SLO              GE14          1.56        1.66 ATRM9          1.57        1.61 PLUOOS              GE14          1.63        1.65 ATRM9          1.58        1.62 PLUMOS SLO              GE14          1.64        1.66 ATRM9          1.67        1.69 TBPOOS              GE14          1.73        1.75 ATRM9          1.68        1.70 TBPOOS SLO              GE14          1.74        1.76 ATRM9          1.52        1.61 TCV SLOW CLOSURE            GE14          1.58        1.65 ATRM9          1.53        1.62 TCV SLOW CLOSURE SLO          GE14          1.59        1.66 ATRM9          1.50        1.61 TCV STUCK CLOSED            GE14          1.55        1.65 ATRM9          1.51        1.62 TCV STUCK CLOSED SLO          GE14          1.56        1.66
[[ GNF Proprietary Information ]]
(( GNF Proprietary Information ))
[[ enclosed by double brackets ]]
(( enclosed by double brackets ))


Quad Cities Unit 2                Core Operating Limits Report                Page 11 Cycle 18                                      Rev. 0 Table 5-2 MCPR Option B Based Operating Limits (References 3 and 8)
Quad Cities Unit 2                Core Operating Limits Report                Page 11 Cycle 18                                      Rev. 0 Table 5-2 MCPR Option B Based Operating Limits (References 3 and 8)
Cycle Exposure
Cycle Exposure
                                                         <EOR-2110 >EOR-2110 EOOS Combination        Fuel Type        MWd/MT      MWd/MT ATRM9          1.45        1.45 BASE              GE14C          1.45        1.48 ATRM9          1.46        1.46 BASE SLO            GE14C          1.46        1.49 ATRM9          1.45        1.45 PLUOOS              GE14C          1.46        1.48 ATRM9          1.46        1.46 PLUOOS SLO            GE14C          1.47        1.49 ATRM9          1.50        1.52 TBPOOS              GE14C          1.56        1.58 ATRM9          1.51        1.53 TBPOOS SLO            GE14C          1.57        1.59 ATRM9          1.45        1.45 TCV SLOW CLOSURE            GE14C          1.45        1.48 ATRM9          1.46        1.46 TCV SLOW CLOSURE SLO GE14C                    1.46        1.49 ATRM9          1.45        1.45 TCV STUCK CLOSED          GE14C          1.45        1.48 ATRM9          1.46        1.46 TCV STUCK CLOSED SLO GE14C                    1.46        1.49
                                                         <EOR-2110 >EOR-2110 EOOS Combination        Fuel Type        MWd/MT      MWd/MT ATRM9          1.45        1.45 BASE              GE14C          1.45        1.48 ATRM9          1.46        1.46 BASE SLO            GE14C          1.46        1.49 ATRM9          1.45        1.45 PLUOOS              GE14C          1.46        1.48 ATRM9          1.46        1.46 PLUOOS SLO            GE14C          1.47        1.49 ATRM9          1.50        1.52 TBPOOS              GE14C          1.56        1.58 ATRM9          1.51        1.53 TBPOOS SLO            GE14C          1.57        1.59 ATRM9          1.45        1.45 TCV SLOW CLOSURE            GE14C          1.45        1.48 ATRM9          1.46        1.46 TCV SLOW CLOSURE SLO GE14C                    1.46        1.49 ATRM9          1.45        1.45 TCV STUCK CLOSED          GE14C          1.45        1.48 ATRM9          1.46        1.46 TCV STUCK CLOSED SLO GE14C                    1.46        1.49
[[ GNF Proprietary Information ]]
(( GNF Proprietary Information ))
[I enclosed by double brackets ]]
[I enclosed by double brackets ))


Quad Cities Unit 2                  Core Operating Limits Report                                                        Page 12 Cycle 18                                        Rev. 0 Table 5-3 MCPR(P) for GE and FANP Fuel (Reference 8)
Quad Cities Unit 2                  Core Operating Limits Report                                                        Page 12 Cycle 18                                        Rev. 0 Table 5-3 MCPR(P) for GE and FANP Fuel (Reference 8)
Line 138: Line 138:
1.00 00
1.00 00
                                 > 60  3.75    2.97    2.554
                                 > 60  3.75    2.97    2.554
[[ GNF Proprietary Information ]]
(( GNF Proprietary Information ))
[[ enclosed by double brackets ]]
(( enclosed by double brackets ))


Quad Cities Unit 2                Core Operating Limits Report                Page 13 Cycle 18                                    Rev. 0 Table 54 MCPR(F) Limits for GE and FANP Fuel DLO or SLO Operation (Reference 10)
Quad Cities Unit 2                Core Operating Limits Report                Page 13 Cycle 18                                    Rev. 0 Table 54 MCPR(F) Limits for GE and FANP Fuel DLO or SLO Operation (Reference 10)
Line 146: Line 146:
Flow      1 MCPR(F)
Flow      1 MCPR(F)
(% rated)          Limit 110.0            1.27 108.9            1.27 0.00            1.97
(% rated)          Limit 110.0            1.27 108.9            1.27 0.00            1.97
[[ GNF Proprietary Information ]]
(( GNF Proprietary Information ))
f[enclosed by double brackets ]]
f[enclosed by double brackets ))


Quad Cities Unit 2                  Core Operating Limits Report                        Page 14 Cycle 18                                      Rev. 0
Quad Cities Unit 2                  Core Operating Limits Report                        Page 14 Cycle 18                                      Rev. 0
Line 154: Line 154:
The LHGRFAC(F) is determined from Table 6-19 or 6-20. The SLO multiplication factor can be found in Table 6-21.
The LHGRFAC(F) is determined from Table 6-19 or 6-20. The SLO multiplication factor can be found in Table 6-21.
Table 6-1: LHGR Limit for GE14-PIODNAB418-16GZ-1OOT-145-T6-2646 (Reference 9)
Table 6-1: LHGR Limit for GE14-PIODNAB418-16GZ-1OOT-145-T6-2646 (Reference 9)
Lattices 5963, 5970, 5971, 5974 and 5975 Composite Limit kWM 5963:    P1 ODNAL071 -NOG-10OT-T6-5963 5970:  PIODNAL465-16G7.0-IDOT-T6-5970 5971:    PlODNAL465-13G7.0/3G6.0-IOOT-T6-5971 5974:  P1 ODNAL071 -NOG-1OOT-V-T6-5974 5975:  PIODNAL071-16GE-IOOT-V-T6-5975 U02 Pellet Burnup                Composite Limit (GWdIMTU)                          (kWft) 0.0                              13.4 If                                                          ]]
Lattices 5963, 5970, 5971, 5974 and 5975 Composite Limit kWM 5963:    P1 ODNAL071 -NOG-10OT-T6-5963 5970:  PIODNAL465-16G7.0-IDOT-T6-5970 5971:    PlODNAL465-13G7.0/3G6.0-IOOT-T6-5971 5974:  P1 ODNAL071 -NOG-1OOT-V-T6-5974 5975:  PIODNAL071-16GE-IOOT-V-T6-5975 U02 Pellet Burnup                Composite Limit (GWdIMTU)                          (kWft) 0.0                              13.4 If                                                          ))
[[ GNF Proprietary Information ]]
(( GNF Proprietary Information ))
[[ enclosed in double brackets ]]
(( enclosed in double brackets ))


Quad Cities Unit 2                  Core Operating Limits Report              Page 15 Cycle 18                                      Rev. 0 Table 6-2: LHGR Limit for: GE14-PIODNAB418-16GZ-IOOT-145-T6-2646, Lattice 5972 (Reference 9)
Quad Cities Unit 2                  Core Operating Limits Report              Page 15 Cycle 18                                      Rev. 0 Table 6-2: LHGR Limit for: GE14-PIODNAB418-16GZ-IOOT-145-T6-2646, Lattice 5972 (Reference 9)
Lattice 5972 Composite Limit kWMft P1 ODNAL461 -12G7.013G6.0-1OOT-E-T6-5972 U02 Pellet Burnup              Composite Limit (GWdIMTU)                      (kW/ft) 0.0000                      13.4000 11                                            ]]
Lattice 5972 Composite Limit kWMft P1 ODNAL461 -12G7.013G6.0-1OOT-E-T6-5972 U02 Pellet Burnup              Composite Limit (GWdIMTU)                      (kW/ft) 0.0000                      13.4000 11                                            ))
if GNF Proprietary Information 3]
if GNF Proprietary Information 3]
[[ enclosed in double brackets ]]
(( enclosed in double brackets ))


Quad Cities Unit 2                Core Operating Limits Report              Page 16 Cycle 18                                    Rev. 0 Table 6-3: LHGR Limit for: GE14-PIODNAB418-16GZ-1OOT-145-T6-2646, Lattice 5973 (Reference 9)
Quad Cities Unit 2                Core Operating Limits Report              Page 16 Cycle 18                                    Rev. 0 Table 6-3: LHGR Limit for: GE14-PIODNAB418-16GZ-1OOT-145-T6-2646, Lattice 5973 (Reference 9)
Lattice 5973 Composite Limit kW/ft P1 ODNAL461-12G7.013G6.0-1 OOT-V-T6-5973 U02 Pellet Burnup            Composite Limit (GWdIMTU)                      (kWlft) 0.0000                      13.4000 1                                              I]L
Lattice 5973 Composite Limit kW/ft P1 ODNAL461-12G7.013G6.0-1 OOT-V-T6-5973 U02 Pellet Burnup            Composite Limit (GWdIMTU)                      (kWlft) 0.0000                      13.4000 1                                              I]L
[[ GNF Proprietary Information ]]
(( GNF Proprietary Information ))
[I enclosed in double brackets ]]
[I enclosed in double brackets ))


Quad Cities Unit 2                  Core Operating Limits Report                Page 17 Cycle 18                                      Rev. 0 Table 6-4: LHGR Limit for GE14-PIODNAB389-18GZ-IOOT-145-T6-2650 (Reference 9)
Quad Cities Unit 2                  Core Operating Limits Report                Page 17 Cycle 18                                      Rev. 0 Table 6-4: LHGR Limit for GE14-PIODNAB389-18GZ-IOOT-145-T6-2650 (Reference 9)
Lattices 5963, 5994, 5995, 5998 and 5999 Composite Limit kWMft 5963:  PIODNAL071-NOG-1OOT-T6-5963 5994:  P1 ODNAL430-17G8.0I1 G3.0-1OOT-T6-5994 5995:  PIODNAL431-9G8.018G6.011G3.0-IOOT-T6-5995 5998:  PIODNAL071-NOG-IOOT-V-T6-5998 5999:  P1 ODNAL071-1 8GE-1 OOT-V-T6-5999 U02 Pellet Burnup                  Composite Limit (GWd/MTU)                          IkWlft) 0.0                                13.4
Lattices 5963, 5994, 5995, 5998 and 5999 Composite Limit kWMft 5963:  PIODNAL071-NOG-1OOT-T6-5963 5994:  P1 ODNAL430-17G8.0I1 G3.0-1OOT-T6-5994 5995:  PIODNAL431-9G8.018G6.011G3.0-IOOT-T6-5995 5998:  PIODNAL071-NOG-IOOT-V-T6-5998 5999:  P1 ODNAL071-1 8GE-1 OOT-V-T6-5999 U02 Pellet Burnup                  Composite Limit (GWd/MTU)                          IkWlft) 0.0                                13.4
[[                                                     ]]
((                                                     ))
Table 6-5: LHGR Limit for GE14-PIODNAB389-18GZ-IOOT-145-T6-2650, Lattice 5996 (Reference 9)
Table 6-5: LHGR Limit for GE14-PIODNAB389-18GZ-IOOT-145-T6-2650, Lattice 5996 (Reference 9)
Lattice 5996 Composite Limit kWMft P1 ODNAL430-7G8.018G6.0-1 OOT-E-T6-5996 U02 Pellet Burnup            Composite Limit (GWd/MTU)                      (kW/ft) 0.0000                      13.4000
Lattice 5996 Composite Limit kWMft P1 ODNAL430-7G8.018G6.0-1 OOT-E-T6-5996 U02 Pellet Burnup            Composite Limit (GWd/MTU)                      (kW/ft) 0.0000                      13.4000
[(GNF Proprietary Information]]
[(GNF Proprietary Information))
[[enclosed in double brackets ]]
((enclosed in double brackets ))


Quad Cities Unit 2                  Core Operating Limits Report              Page 18 Cycle 18                                      Rev. 0 Table 6-6: LHGR Limit for GE14-PIODNAB389-I8GZ-IOOT-145-T6-2650, Lattice 5997 (Reference 9)
Quad Cities Unit 2                  Core Operating Limits Report              Page 18 Cycle 18                                      Rev. 0 Table 6-6: LHGR Limit for GE14-PIODNAB389-I8GZ-IOOT-145-T6-2650, Lattice 5997 (Reference 9)
Lattice 5997 Composite Limit kW/ft P1 ODNAL430-7G8.018G6.0-1 OOT-V-T6-5997 U02 Pellet Burnup              Composite Limit (GWd/MTU)                      (kW/ft) 0.0000                      13.4000
Lattice 5997 Composite Limit kW/ft P1 ODNAL430-7G8.018G6.0-1 OOT-V-T6-5997 U02 Pellet Burnup              Composite Limit (GWd/MTU)                      (kW/ft) 0.0000                      13.4000
[[                                               ]]
((                                               ))
[[ GNF Proprietary Information ]]
(( GNF Proprietary Information ))
[[ enclosed in double brackets ]]
(( enclosed in double brackets ))


Quad Cities Unit 2                Core Operating Limits Report                Page 19 Cycle 18                                      Rev. 0 Table 6-7: LHGR Limit for GE14-Pl ODNAB409-1 5GZ-1 OOT-145-T6-2507 (References 7 and 9)
Quad Cities Unit 2                Core Operating Limits Report                Page 19 Cycle 18                                      Rev. 0 Table 6-7: LHGR Limit for GE14-Pl ODNAB409-1 5GZ-1 OOT-145-T6-2507 (References 7 and 9)
Lattices 5254, 5259, and 5260 Composite Limit kWMft 5254: PIODNAL071-NOG-IOOT-T6-5254 5259: P1ODNAL071-NOG-100T-V-T6-5259 5260: P1ODNAL071-15GE-10OT-V-T6-5260 U02 Pellet Burnup            Composite Limit (GWd/MTU)                      (kW/ft) 0.0                            13.4
Lattices 5254, 5259, and 5260 Composite Limit kWMft 5254: PIODNAL071-NOG-IOOT-T6-5254 5259: P1ODNAL071-NOG-100T-V-T6-5259 5260: P1ODNAL071-15GE-10OT-V-T6-5260 U02 Pellet Burnup            Composite Limit (GWd/MTU)                      (kW/ft) 0.0                            13.4
[[                                                 ]]
((                                                 ))
Table 6-8: LHGR Limit for GE14-PIODNAB409-15GZ-IOOT-145-T6-2507, Lattice 5255 (Reference 7)
Table 6-8: LHGR Limit for GE14-PIODNAB409-15GZ-IOOT-145-T6-2507, Lattice 5255 (Reference 7)
Lattice 5255 Composite Limit kWlft P1 ODNAL457-1 OG7.015G6.0-10OT-T6-5255 U02 Pellet Burnup              Composite Limit (GWd/MTU)                          (kW/ft) 0.0000                        13.4000
Lattice 5255 Composite Limit kWlft P1 ODNAL457-1 OG7.015G6.0-10OT-T6-5255 U02 Pellet Burnup              Composite Limit (GWd/MTU)                          (kW/ft) 0.0000                        13.4000
[I                                                  ]]
[I                                                  ))
[[ GNF Proprietary Information ]]
(( GNF Proprietary Information ))
[[ enclosed in double brackets ]]
(( enclosed in double brackets ))


Quad Cities Unit 2                Core Operating Limits Report                Page 20 Cycle 18                                    Rev. 0 Table 6-9: LHGR Limit for GE14-PIODNAB409-15GZ-10OT-145-T6-2507, Lattice 5256 (Reference 7)
Quad Cities Unit 2                Core Operating Limits Report                Page 20 Cycle 18                                    Rev. 0 Table 6-9: LHGR Limit for GE14-PIODNAB409-15GZ-10OT-145-T6-2507, Lattice 5256 (Reference 7)
Lattice 5256 Composite Limit kWMft P1 ODNAL457-1 OG7.0/4G6.0-10OT-T6-5256 U02 Pellet Burnup            Composite Limit (GWd/MTU)                      (kW/ft) 0.0000                      13.4000
Lattice 5256 Composite Limit kWMft P1 ODNAL457-1 OG7.0/4G6.0-10OT-T6-5256 U02 Pellet Burnup            Composite Limit (GWd/MTU)                      (kW/ft) 0.0000                      13.4000
[I                                              1]]
[I                                              1))
Table 6-10: LHGR Limit for GE14-PIODNAB409-15GZ-10OT-145-T6-2507, Lattice 5257 (Reference 7)
Table 6-10: LHGR Limit for GE14-PIODNAB409-15GZ-10OT-145-T6-2507, Lattice 5257 (Reference 7)
Lattice 5257 Composite Limit kW/ft P1 ODNAL446-1 OG7.0/4G6.0-1OOT-E-T6-5257 U02 Pellet Burnup            Composite Limit (GWd/MTU)                      (kW/ft) 0.0000                      13.4000
Lattice 5257 Composite Limit kW/ft P1 ODNAL446-1 OG7.0/4G6.0-1OOT-E-T6-5257 U02 Pellet Burnup            Composite Limit (GWd/MTU)                      (kW/ft) 0.0000                      13.4000
[1                                              1]
[1                                              1]
[[ GNF Proprietary Information ]]
(( GNF Proprietary Information ))
[[ enclosed in double brackets ]]
(( enclosed in double brackets ))


Quad Cities Unit 2                Core Operating Limits Report              Page 21 Cycle 18                                    Rev. 0 Table 6-11: LHGR Limit for GE14-PIODNAB409-15GZ-10OT-145-T6-2507, Lattice 5258 (Reference 7)
Quad Cities Unit 2                Core Operating Limits Report              Page 21 Cycle 18                                    Rev. 0 Table 6-11: LHGR Limit for GE14-PIODNAB409-15GZ-10OT-145-T6-2507, Lattice 5258 (Reference 7)
Lattice 5258 Composite Limit kWlft P1 ODNAL446-1 OG7.0/4G6.0-1 OOT-V-T6-5258 U02 Pellet Burnup              Composite Limit (GWd/MTU)                      (kW/ft) 0.0000                      13.4000
Lattice 5258 Composite Limit kWlft P1 ODNAL446-1 OG7.0/4G6.0-1 OOT-V-T6-5258 U02 Pellet Burnup              Composite Limit (GWd/MTU)                      (kW/ft) 0.0000                      13.4000
[[ GNF Proprietary Information]]
(( GNF Proprietary Information))
[[ enclosed in double brackets JJ
(( enclosed in double brackets JJ


Quad Cities Unit 2                  Core Operating Limits Report                Page 22 Cycle 18                                        Rev. 0 Table 6-12: LHGR Limit for GE14-PIODNAB406-16GZ-1OOT-145-T6-2508 (References 7 and 9)
Quad Cities Unit 2                  Core Operating Limits Report                Page 22 Cycle 18                                        Rev. 0 Table 6-12: LHGR Limit for GE14-PIODNAB406-16GZ-1OOT-145-T6-2508 (References 7 and 9)
Lattices 5254, 5259, and 5265 Composite Limit kWlft 5254: PIODNAL071-NOG-IOOT-T6-5254 5259: PIODNAL071-NOG-IOOT-V-T6-5259 5265: P1 ODNAL071-16GE-10OT-V-T6-5265 U02 Pellet Burnup                  Composite Limit (GWd/MTU)                          (kW/ft) 0.0                              13.4 If                                                        I]
Lattices 5254, 5259, and 5265 Composite Limit kWlft 5254: PIODNAL071-NOG-IOOT-T6-5254 5259: PIODNAL071-NOG-IOOT-V-T6-5259 5265: P1 ODNAL071-16GE-10OT-V-T6-5265 U02 Pellet Burnup                  Composite Limit (GWd/MTU)                          (kW/ft) 0.0                              13.4 If                                                        I]
Table 6-13: LHGR Limit for GE14-PIODNAB406-16GZ-1OOT-145-T6-2508, Lattice 5261 (Reference 7)
Table 6-13: LHGR Limit for GE14-PIODNAB406-16GZ-1OOT-145-T6-2508, Lattice 5261 (Reference 7)
Lattice 5261 Composite Limit kWMft P1 ODNAL452-12G7.014G6.0- OOT-T6-5261 U02 Pellet Burnup                Composite Limit (GWd/MTU)                          (kWlft) 0.0000                        13.4000 If                                                    ]]
Lattice 5261 Composite Limit kWMft P1 ODNAL452-12G7.014G6.0- OOT-T6-5261 U02 Pellet Burnup                Composite Limit (GWd/MTU)                          (kWlft) 0.0000                        13.4000 If                                                    ))
[[ GNF Proprietary Information ]]
(( GNF Proprietary Information ))
[[ enclosed in double brackets ]]
(( enclosed in double brackets ))


Quad Cities Unit 2                Core Operating Limits Report              Page 23 Cycle 18                                      Rev. 0 Table 6-14: LHGR Limit for GE14-PIODNAB406-16GZ-IOOT-145-T6-2508, Lattice 5262 (Reference 7)
Quad Cities Unit 2                Core Operating Limits Report              Page 23 Cycle 18                                      Rev. 0 Table 6-14: LHGR Limit for GE14-PIODNAB406-16GZ-IOOT-145-T6-2508, Lattice 5262 (Reference 7)
Line 216: Line 216:
Table 6-15: LHGR Limit for GE14-PIODNAB406-16GZ-10OT-145-T6-2508, Lattice 5263 (Reference 7)
Table 6-15: LHGR Limit for GE14-PIODNAB406-16GZ-10OT-145-T6-2508, Lattice 5263 (Reference 7)
Lattice 5263 Composite Limit kWMft P1 ODNAL444-12G7.012G6.0-1 OOT-E-T6-5263 U02 Pellet Burnup              Composite Limit (GWd/MTU)                      (kW/ft) 0.0000                      13.4000
Lattice 5263 Composite Limit kWMft P1 ODNAL444-12G7.012G6.0-1 OOT-E-T6-5263 U02 Pellet Burnup              Composite Limit (GWd/MTU)                      (kW/ft) 0.0000                      13.4000
[                                                1]]
[                                                1))
[[ GNF Proprietary Information ]]
(( GNF Proprietary Information ))
[[ enclosed in double brackets ]]
(( enclosed in double brackets ))


Quad Cities Unit 2                  Core Operating Limits Report                Page 24 Cycle 18                                      Rev. 0 Table 6-16: LHGR Limit for GE14-PIODNAB406-16GZ-10OT-145-T6-2508, Lattice 5264 (Reference 7)
Quad Cities Unit 2                  Core Operating Limits Report                Page 24 Cycle 18                                      Rev. 0 Table 6-16: LHGR Limit for GE14-PIODNAB406-16GZ-10OT-145-T6-2508, Lattice 5264 (Reference 7)
Lattice 5264 Composite Limit kW/ft P1 ODNAL444-12G7.012G6.0-1OOT-V-T6-5264 U02 Pellet Burnup              Composite Limit (GWd/MTU)                        (kWlft) 0.0000                        13.4000
Lattice 5264 Composite Limit kW/ft P1 ODNAL444-12G7.012G6.0-1OOT-V-T6-5264 U02 Pellet Burnup              Composite Limit (GWd/MTU)                        (kWlft) 0.0000                        13.4000
[[                                                   1]
((                                                   1]
Table 6-17: LHGR Limit for FANP ATRM-9 Fuel ATRM9-P9DATB383-11 GZ-SPCIOOT-9WR-144-T6-3918 ATRM9-P9DATB381-13GZ-SPCIOOT-9WR-144-T6-3919 (Reference 11)
Table 6-17: LHGR Limit for FANP ATRM-9 Fuel ATRM9-P9DATB383-11 GZ-SPCIOOT-9WR-144-T6-3918 ATRM9-P9DATB381-13GZ-SPCIOOT-9WR-144-T6-3919 (Reference 11)
Nodal Exposure            LHGR Limit (GWd/MTU)                (kW/ft) 0.00                  14.40 15.00                  14.40 i      64.30                    7.90
Nodal Exposure            LHGR Limit (GWd/MTU)                (kW/ft) 0.00                  14.40 15.00                  14.40 i      64.30                    7.90
[[ GNF Proprietary Information ]]
(( GNF Proprietary Information ))
[[ enclosed in double brackets ]]
(( enclosed in double brackets ))


Quad Cities Unit 2                Core Operating Limits Report      Page 25 Cycle 18                                    Rev. 0 Table 6-18 LHGRFAC(P) for GE and FANP Fuel (Reference 8)
Quad Cities Unit 2                Core Operating Limits Report      Page 25 Cycle 18                                    Rev. 0 Table 6-18 LHGRFAC(P) for GE and FANP Fuel (Reference 8)
[[ GNF Proprietary Information ]]
(( GNF Proprietary Information ))
[[ enclosed in double brackets ]]
(( enclosed in double brackets ))


Quad Cities Unit 2                Core Operating Limits Report                  Page 26 Cycle 18                                      Rev. 0 Table 6-19 LHGRFAC(F) Multipliers, all cases except TCV Stuck Closed (Reference 8)
Quad Cities Unit 2                Core Operating Limits Report                  Page 26 Cycle 18                                      Rev. 0 Table 6-19 LHGRFAC(F) Multipliers, all cases except TCV Stuck Closed (Reference 8)
Line 238: Line 238:
(% rated)    I Multiplier 100.00              1.00 98.30              1.00 80.00            0.86 50.00            0.63 40.00            0.50 30.00            0.41 0.00            0.14 Table 6-21 LHGR SLO multiplier for GE and FANP Fuel (Reference 3)
(% rated)    I Multiplier 100.00              1.00 98.30              1.00 80.00            0.86 50.00            0.63 40.00            0.50 30.00            0.41 0.00            0.14 Table 6-21 LHGR SLO multiplier for GE and FANP Fuel (Reference 3)
J Fuel Type        Mulplierl ATRM9      l      0.84 GE14            0.77    l
J Fuel Type        Mulplierl ATRM9      l      0.84 GE14            0.77    l
[[GNF Proprietary Information l]
((GNF Proprietary Information l]
[[enclosed in double brackets ]]
((enclosed in double brackets ))


Quad Cities Unit 2                    Core Operating Limits Report                            Page 27 Cycle 18                                          Rev. 0
Quad Cities Unit 2                    Core Operating Limits Report                            Page 27 Cycle 18                                          Rev. 0
Line 250: Line 250:
The allowable value is clamped with a maximum value not to exceed the allowable value for a recirculation loop drive flow (Wd) of 100%
The allowable value is clamped with a maximum value not to exceed the allowable value for a recirculation loop drive flow (Wd) of 100%
Wd  - percent of recirculation loop drive flow required to produce a rated core flow of 98 Mlb/hr.
Wd  - percent of recirculation loop drive flow required to produce a rated core flow of 98 Mlb/hr.
[[ GNF Proprietary Information ]]
(( GNF Proprietary Information ))
[f enclosed in double brackets ]]
[f enclosed in double brackets ))


Quad Cities Unit 2                    Core Operating Limits Report                          Page 28 Cycle 18                                        Rev. 0
Quad Cities Unit 2                    Core Operating Limits Report                          Page 28 Cycle 18                                        Rev. 0
Line 264: Line 264:
8 The  cycle specific stability analysis may impose restrictions on the Power-to-Flow map and/or restrict the applicable temperature for feedwater temperature reduction. See Reference 16.
8 The  cycle specific stability analysis may impose restrictions on the Power-to-Flow map and/or restrict the applicable temperature for feedwater temperature reduction. See Reference 16.
9 For operation with a Turbine Stop Valve out-of-service (TSV OOS), the TCV Stuck Closed limits should be applied (Reference 17). TSV OOS and TCV Stuck Closed is not an analyzed out-of-service combination.
9 For operation with a Turbine Stop Valve out-of-service (TSV OOS), the TCV Stuck Closed limits should be applied (Reference 17). TSV OOS and TCV Stuck Closed is not an analyzed out-of-service combination.
[[GNF Proprietary Information ]J
((GNF Proprietary Information ]J
[[enclosed in double brackets ]]
((enclosed in double brackets ))


Quad Cities Unit 2                Core Operating Limits Report                          Page 29 Cycle 18                                      Rev. 0
Quad Cities Unit 2                Core Operating Limits Report                          Page 29 Cycle 18                                      Rev. 0
Line 287: Line 287:
: 16. ANF-1125(P)(A) and Supplements 1 and 2, "ANFB Critical Power Correlation," April 1990.
: 16. ANF-1125(P)(A) and Supplements 1 and 2, "ANFB Critical Power Correlation," April 1990.
[I GNF Proprietary Information ]
[I GNF Proprietary Information ]
[I enclosed in double brackets]]
[I enclosed in double brackets))


Quad Cities Unit 2              Core Operating Limits Report                        Page 30 Cycle 18                                    Rev. 0
Quad Cities Unit 2              Core Operating Limits Report                        Page 30 Cycle 18                                    Rev. 0
Line 301: Line 301:
: 24. EMF-85-74(P), Revision 0. Supplement 1 (P)(A) and Supplement 2 (P)(A), "RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model," Siemens Power Corporation, February 1998.
: 24. EMF-85-74(P), Revision 0. Supplement 1 (P)(A) and Supplement 2 (P)(A), "RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model," Siemens Power Corporation, February 1998.
: 25. NEDC-32981 P, Revision 0, 'GEXL96 Correlation for ATRIUM-9B Fuel," September 2000.
: 25. NEDC-32981 P, Revision 0, 'GEXL96 Correlation for ATRIUM-9B Fuel," September 2000.
[[ GNF Proprietary Information]
(( GNF Proprietary Information]
[[enclosed in double brackets]]
((enclosed in double brackets))


Attachment A GNF Proprietary Information Affidavit
Attachment A GNF Proprietary Information Affidavit

Revision as of 22:53, 24 March 2020

Core Operating Limits Report for Quad Cities Unit 2, Cycle 18, Revision 0
ML040890045
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 03/16/2004
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML040890045 (34)


Text

Quad Cities Unit 2 Core Operating Limits Report Page 1 Cycle 18 Rev. 0 Core Operating Limits Report for Quad Cities Unit 2, Cycle 18 Revision 0

[f GNF Proprietary Information ))

[f enclosed by double brackets ))

Quad Cities Unit 2 Core Operating Limits Report Page 2 Cycle 18 Rev. 0 Table of Contents

1. References ..................................... 4
2. Definitions ..................................... 6
3. General Information .................................... 7
4. Average Planar Linear Heat Generation Rate ..................................... 8
5. Operating Limit Minimum Critical Power Ratio .................................... 9 5.1. Manual Flow Control MCPR Limits .... 9.............................

5.1.1. Power-Dependent MCPR ... 9.............................

5.1.2. Flow - Dependent MCPR ..................................... 9 5.2. Automatic Flow Control MCPR Limits ..................................... 9 5.3. Scram Time ..................................... 9 5.4. Recirculation Pump Motor Generator Settings ..................................... 9

6. Linear Heat Generation Rate .................................... 14
7. Rod Block Monitor .................................... 27
8. Modes of Operation .................................... 28
9. Methodology .................................... 29

[f GNF Proprietary Information ))

(( enclosed by double brackets J]

Quad Cities Unit 2 Core Operating Limits Report Page 3 Cycle 18 Rev. 0 List of Tables Table 4-1 MAPLHGR for bundle(s):

ATRM9-P9DATB381 -13GZ-SPC100T-9WR-144-T6-3919 ATRM9-P9DATB383-11GZ-SPC100T-9WR-144-T6-3918 .......................................... 8 Table 4-2 MAPLHGR for bundle(s):

GE14-P 1ODNAB389-18GZ-10OT-145-T6-2650 GE14-PlODNAB418-16GZ-10OT-145-T6-2646 GE14-Pl ODNAB406-16GZ-10OT-145-T6-2508 GE14-P 1ODNAB409-15GZ-10OT-145-T6-2507 ........................................................ 8 Table 4-3 MAPLHGR SLO multiplier for GE and FANP Fuel ............................................ 8 Table 5-1 MCPR Option A Based Operating Limits ........................................................ 10 Table 5-2 MCPR Option B Based Operating Limits ........................................................ 11 Table 5-3 MCPR(P) for GE and FANP Fuel .................................................................. 12 Table 5-4 MCPR(F) Limits for GE and FANP Fuel DLO or SLO Operation .......................... 13 Table 5-5 MCPR(F) Limits for GE and FANP Fuel with TCV Stuck Closed DLO or SLO Operation ................................................................... 13 Table 6-1: LHGR Limit for GE14-P10DNAB418-16GZ-1OOT-145-T6-2646 ......................... 14 Table 6-2: LHGR Limit for: GE14-P1ODNAB418-16GZ-100T-145-T6-2646, Lattice 5972 ...... 15 Table 6-3: LHGR Limit for: GE14-PlODNAB418-16GZ-10OT-145-T6-2646, Lattice 5973....... 16 Table 6-4: LHGR Limit for GE14-PlODNAB389-18GZ-IOOT-145-T6-2650 ......................... 17 Table 6-5: LHGR Limit for GE14-PlODNAB389-18GZ-10OT-145-T6-2650, Lattice 5996 ........ 17 Table 6-6: LHGR Limit for GE14-PlODNAB389-18GZ-100T-145-T6-2650, Lattice 5997 ........ 18 Table 6-7: LHGR Limit for GE14-PlODNAB409-15GZ-10OT-145-T6-2507 ......................... 19 Table 6-8: LHGR Limit for GE14-P10DNAB409-15GZ-10OT-145-T6-2507, Lattice 5255 ........ 19 Table 6-9: LHGR Limit for GE14-PIODNAB409-15GZ-IOOT-145-T6-2507, Lattice 5256 ........ 20 Table 6-10: LHGR Limit for GE14-PlODNAB409-15GZ-10OT-145-T6-2507, Lattice 5257 ...... 20 Table 6-11: LHGR Limit for GE14-PlODNAB409-15GZ-10OT-145-T6-2507, Lattice 5258 ...... 21 Table 6-12: LHGR Limit for GE14-PlODNAB406-16GZ-10OT-145-T6-2508 ......................... 22 Table 6-13: LHGR Limit for GE14-P10DNAB406-16GZ-10OT-145-T6-2508, Lattice 5261 ...... 22 Table 6-14: LHGR Limit for GE14-PIODNAB406-16GZ-10OT-145-T6-2508, Lattice 5262 ...... 23 Table 6-15: LHGR Limit for GE14-Pl0DNAB406-16GZ-10OT-145-T6-2508, Lattice 5263 ...... 23 Table 6-16: LHGR Limit for GE14-PlODNAB406-16GZ-100T-145-T6-2508, Lattice 5264 ...... 24 Table 6-17: LHGR Limit for FANP ATRM-9 Fuel ATRM9-P9DATB383-1 1GZ-SPC1 OOT-9WR-144-T6-3918 ATRM9-P9DATB381 -13GZ-SPCI OOT-9WR-144-T6-3919 .......................................... 24 Table 6-18 LHGRFAC(P) for GE and FANP Fuel ............................................................ 25 Table 6-19 LHGRFAC(F) Multipliers, all cases except TCV Stuck Closed ........................... 26 Table 6-20 LHGRFAC(F) Multipliers for TCV Stuck Closed .............................................. 26 Table 6-21 LHGR SLO multiplier for GE and FANP Fuel ................................................. 26

(( GNF Proprietary Information ]

(( enclosed by double brackets))

Quad Cities Unit 2 Core Operating Limits Report Page 4 Cycle 18 Rev. 0

1. References
1. Exelon Generation Company, LLC and MidAmerican Energy Company, Docket No. 50-265, Quad Cities Nuclear Power Station, Unit 2, Facility Operating License, License No.

DPR-30.

2. Letter from D. M. Crutchfield to All Power Reactor Licensees and Applicants, Generic Letter 88-16; Concerning the Removal of Cycle-Specific Parameter Limits from Tech Specs, October 3, 1988.
3. GNF Document, 0000-0024-0751-SRLR, Revision 0, "Supplemental Reload Licensing Report for Quad Cities Unit 2 Reload 17 Cycle 18", January 2004. (TODI NF0400018 Revision 0)
4. GNF Document, J1 1-03918-SRLR, Rev. 2, "Supplemental Reload Licensing Report for Quad Cities 2 Reload 16 Cycle 17,' October 2003. (TODI NFMO200001 Sequence 1)
5. Exelon TODI, TODI NF0300068, Revision 0, "Quad Cities 2 Cycle 18 FRED (to GNF)",

August 27, 2003.

6. Exelon TODI, TODI QDC-03-28.01, 'OPL-3 for Quad Cities Unit 2 Cycle 18", September 22, 2003.
7. GNF Engineering Calculation, e-Matrix 0000-0005-9064, "GE14 LHGR Limits with Gd Suppression for Quad Cities 2, Cycle 17, Bundles 2507 and 2508," July 1, 2002.
8. GE Document, GE-NE-J11-03912-00-01-R2, "Dresden 2 and 3 Quad Cities I and 2 Equipment Out-Of-Service and Legacy Fuel Transient Analysis" September 2003. (TODI NFMO100091 Sequence 02)
9. GNF Letter, FRL-EXN-EE2-04-002, "Quad Cities Unit 2 Cycle 18 Fresh Fuel Peak Pellet LHGR Limits," F. Lindquist to F. Trikur, January 16, 2004.
10. Exelon Calculation Note, BNDQ:02-001, Revision 0, "Determination of Generic MCPRF Limits," May 17, 2002.
11. FANP Document, EMF-2563(P) Revision 1, "Fuel Mechanical Design Report Exposure Extension for ATRIUM-9B Fuel Assemblies at Dresden, Quad Cities, and LaSalle Units,,

August 2001 (TODI NFM0100107 Sequence 0).

12. GE Document, GE DRF C51-00217-O1, "Instrument Setpoint Calculation Nuclear Instrumentation, Rod Block Monitor, Commonwealth Edison Company, Quad Cities 1 &

2," December 14, 1999.

13. Exelon Letter, NF-MW:02-0413, "Approval of GE Evaluation of Dresden and Quad Cities Pressure Regulator Out of Service Analysis", Carlos de la Hoz to Doug Wise and Alex Misak, October 22, 2002.
14. GE Design Basis Document, D1-0012.03, Revision 0, "Fuel-Rod Thermal-Mechanical Performance Limits for GE14C," May 2000.
15. Exelon Letter, NF-MW:02-0081, "Approval of GE Evaluation of Dresden and Quad Cities Extended Final Feedwater Temperature Reduction," Carlos de la Hoz to Doug Wise and Alex Misak, August 27, 2002:

1[GNF Proprietary Information ]

(( enclosed by double brackets ]

Quad Cities Unit 2 Core Operating Limits Report Page 5 Cycle 18 Rev. 0

16. GE Document, GE-NE-0000-0023-3737-RO, 'ICA Stability Evaluation for Quad Cities Unit 2 Cycle 18," January 2004 (TODI NF0400017 Revision 0).
17. Exelon Letter, NF-MW:03-069, "Dresden and Quad Cities Operation with one TSV OOS,"

Candice Chou to Alex Misak and Doug Wise, July 28, 2003.

((GNF Proprietary Information))

((enclosed by double brackets ]

Quad Cities Unit 2 Core Operating Limits Report Page 6 Cycle 18 Rev. 0

2. Definitions APLHGR Average planar linear heat generation rate APRM Average power range monitor ATRM9 ATRIUM-9B fuel BOC Beginning of cycle DLO Dual loop operation EOC End of cycle EOOS Equipment out of service EOR End of rated conditions (i.e cycle exposure at 100% power, 100% flow, all-rods-out)

FANP Framatome Advanced Nuclear Power FWHOOS Feedwater heater out of service GE14 GE14C fuel GNF Global Nuclear Fuel ICF Increased core flow LHGR Linear heat generation rate LHGRFAC(F) Flow dependent LHGR multiplier LHGRFAC(P) Power dependent LHGR multiplier LPRM Local power range monitor MAPFAC(F) Flow dependent MAPLHGR multiplier MAPFAC(P) Power dependent MAPLHGR multiplier MAPLHGR Maximum average planar linear heat generation rate MCPR Minimum critical power ratio MCPR(F) Flow dependent MCPR MCPR(P) Power dependent MCPR OLMCPR Operating limit minimum critical power ratio PLUOOS Power load unbalance out of service PROOS Pressure regulator out of service RBM Rod block monitor SLMCPR Safety limit minimum critical power ratio SLO Single loop operation SRVOOS Safety-relief valve out of service TBPOOS Turbine bypass valve out of service TCV Turbine control valve TIP Transversing Incore Probe

(( GNF Proprietary Information ))

((enclosed by double brackets ))

Quad Cities Unit 2 Core Operating Limits Report Page 7 Cycle 18 Rev. 0

3. General Information Power and flow dependent limits are listed for various power and flow levels. Linear interpolation is to be used to find intermediate values.

Rated core flow is 98 Mlb/hr. Operation up to 108% rated flow is licensed for this cycle. Licensed rated thermal power is 2957 MWth.

MCPR(P) and MCPR(F) values are independent of scram time.

For thermal limit monitoring above 100% rated power or 100% rated core flow, the 100% rated power and the 100% core flow values, respectively, can be used unless otherwise indicated in the applicable table.

(( GNF Proprietary Information ]

((enclosed by double brackets))

Quad Cities Unit 2 Core Operating Limits Report Page 8 Cycle 18 Rev. 0

4. Average Planar Linear Heat Generation Rate The MAPLHGR values for the most limiting lattice (excluding natural uranium) of each fuel type as a function of average planar exposure is given in Tables 4-1 and 4-2. During single loop operation, these limits are multiplied by the SLO multiplier listed in Table 4-3.

Table 4-1 MAPLHGR for bundle(s):

ATRM9-P9DATB381 -13GZ-SPC1 OOT-9WR-144-T6-3919 ATRM9-P9DATB383-1 I GZ-SPCI OOT-9WR-144-T6-3918 (Reference 4)

Avg. Planar Exposure MAPLHGR (GWdIMT) (kWlft) 0.00 13.52 17.25 13.52 70.00 J 7.84 Table 4-2 MAPLHGR for bundle(s):

GE14-PI ODNAB389-18GZ-1 OOT-145-T6-2650 GE14-PIODNAB418-16GZ-1OOT-145-T6-2646 GE14-PI ODNAB406-16GZ-1OOT-145-T6-2508 GE14-PI ODNAB409-15GZ-I OT-145-T6-2507 (References 3 and 4)

Avg. Planar Exposure MAPLHGR (GWd/MT) (kW/ft) 0.00 11.68 16.00 11.68 22.05 11.34 55.12 8.19 63.50 6.97 70.00 4.36 Table 4-3 MAPLHGR SLO multiplier for GE and FANP Fuel (Reference 3) lFuel Type I Multiplier ATRM9 0.84 GE14 J 0.77

(( GNF Proprietary Information ))

(( enclosed by double brackets ))

Quad Cities Unit 2 Core Operating Limits Report Page 9 Cycle 18 Rev. 0

5. Operating Limit Minimum Critical Power Ratio 5.1. Manual Flow Control MCPR Limits The OLMCPR is determined for a given power and flow condition by evaluating the power-dependent MCPR and the flow-dependent MCPR and selecting the greater of the two.

5.1.1. Power-Dependent MCPR For operation at less than 38.5% core thermal power, the OLMCPR as a function of core thermal power is shown in Table 5-3. For operation at greater than 38.5% core thermal power, the OLMCPR as a function of core thermal power is determined by multiplying the applicable rated condition OLMCPR limit shown in Table 5-1 or 5-2 by the applicable MCPR multiplier K(P) given in Table 5-3. For operation at exactly 38.5% core thermal power, the OLMCPR as a function of core thermal power is the higher of either of the two methods evaluated at 38.5%

core thermal power.

5.1.2. Flow - Dependent MCPR Tables 5-4 and 5-5 give the MCPR(F) limit as a function of the flow based on the applicable plant condition. The MCPR(F) limit determined from these tables is the flow dependent OLMCPR.

5.2. Automatic Flow Control MCPR Limits Automatic Flow Control MCPR Limits are not provided 5.3. Scram Time Option A and Option B refer to scram speeds.

Option A scram speed is the Improved Technical Specification scram speed. The core average scram speed insertion time for 20% insertion must be less than or equal to the Technical Specification scram speed to utilize Option A MCPR limits. Reload analyses performed by (GNF) for cycle 18 Option A MCPR limits utilized a 20% core average insertion time of 0.900 seconds (Reference 6).

To utilize the MCPR limits for the Option B scram speed, the core average scram insertion time for 20% insertion must be less than or equal to 0.694 seconds (Reference 6). If the core average scram insertion time does not meet the Option B criteria, but is within the Option A criteria, the appropriate MCPR value may be determined from a linear interpolation between the Option A and B limits with standard mathematical rounding to two decimal places. When performing a linear interpolation to determine MCPR limits, ensure that the time used for Option A is 0.900 seconds.

5.4. Recirculation Pump Motor Generator Settings Cycle 18 was analyzed with a maximum core flow runout of 110%; therefore the recirculation pump motor generator scoop tube mechanical and electrical stops must be set to maintain core flow less than 110% (107.8 Mlb/hr) for all runout events (Reference 5). This value is consistent with the analyses of References 3 and 8.

((GNF Proprietary Information))

enclosed by double brackets))

Quad Cities Unit 2 Core Operating Limits Report Page 10 Cycle 18 Rev. 0 Table 5-1 MCPR Option A Based Operating Limits (References 3 and 8)

Cycle Exposure

< EOR - 2110 > EOR - 2110 EOOS Combination Fuel Type MWd/MT MWd/MT ATRM9 1.50 1.61 BASE GE14 1.55 1.65 ATRM9 1.51 1.62 BASE SLO GE14 1.56 1.66 ATRM9 1.57 1.61 PLUOOS GE14 1.63 1.65 ATRM9 1.58 1.62 PLUMOS SLO GE14 1.64 1.66 ATRM9 1.67 1.69 TBPOOS GE14 1.73 1.75 ATRM9 1.68 1.70 TBPOOS SLO GE14 1.74 1.76 ATRM9 1.52 1.61 TCV SLOW CLOSURE GE14 1.58 1.65 ATRM9 1.53 1.62 TCV SLOW CLOSURE SLO GE14 1.59 1.66 ATRM9 1.50 1.61 TCV STUCK CLOSED GE14 1.55 1.65 ATRM9 1.51 1.62 TCV STUCK CLOSED SLO GE14 1.56 1.66

(( GNF Proprietary Information ))

(( enclosed by double brackets ))

Quad Cities Unit 2 Core Operating Limits Report Page 11 Cycle 18 Rev. 0 Table 5-2 MCPR Option B Based Operating Limits (References 3 and 8)

Cycle Exposure

<EOR-2110 >EOR-2110 EOOS Combination Fuel Type MWd/MT MWd/MT ATRM9 1.45 1.45 BASE GE14C 1.45 1.48 ATRM9 1.46 1.46 BASE SLO GE14C 1.46 1.49 ATRM9 1.45 1.45 PLUOOS GE14C 1.46 1.48 ATRM9 1.46 1.46 PLUOOS SLO GE14C 1.47 1.49 ATRM9 1.50 1.52 TBPOOS GE14C 1.56 1.58 ATRM9 1.51 1.53 TBPOOS SLO GE14C 1.57 1.59 ATRM9 1.45 1.45 TCV SLOW CLOSURE GE14C 1.45 1.48 ATRM9 1.46 1.46 TCV SLOW CLOSURE SLO GE14C 1.46 1.49 ATRM9 1.45 1.45 TCV STUCK CLOSED GE14C 1.45 1.48 ATRM9 1.46 1.46 TCV STUCK CLOSED SLO GE14C 1.46 1.49

(( GNF Proprietary Information ))

[I enclosed by double brackets ))

Quad Cities Unit 2 Core Operating Limits Report Page 12 Cycle 18 Rev. 0 Table 5-3 MCPR(P) for GE and FANP Fuel (Reference 8)

Core Core Thermal Power (% of rated)

EOOS Combination Flow 0 25 l 38.5 38.5 45 l 60 l 70 l 70 l 100

(%of rated Operating Limit MCPR Operating Limit MCPR Multiplier, Kp Base 3.14 2.56 2.25 1.32 1.28 1.15 A dt~SM*9, 1.00

> 60 3.74 2.96 2.54  ; ' . , . _ .....  : .. l F__

Base SLO

_ __ __ _ _ _ >60 3.15 3.75 2.57 2.97 2

2.55 _ _

1.32 1.28 1.15  : d I'm 1.00 PLUQOS< 60 5.50 3.74 2.79 a 1.64 1.45 1.26 1.11 1.00 PLUOOS SLO >60 5.71 4.5 23.04 1.64 1.45 1.26 1.11 1.00 TBPOOS <60 5.50 3.74 2137 2.79 h1.28 1.15 1.00

> 60 6.73 4.58 3.423 TBPOOS SLO <60 5.51 3.5 237 1.415 > a

.1.00 TCV Slow Closure

,6060

> 6.7 4 5.50 4.59 3.74 3.4 32_

279 l 1.64 1.45 1.26 1.11 1.00 TCV Slow Closure SLO < 60 5.51 3.75 20 1.64 _ 1.45 1.26 111 1.00 TCVTCVStuck Closued Stuck ClosedSLO

_____Stuck __Closed _____ < 60 31 3.14

.7 31 2.7 6 2.56 2.6 2.26 2.5 2.75 l 1.32 1 1._S 1.29

. 3 2 1.28 1.28 m 45 1.15 1.26_ < j1.00 1*1 1 .

1.00 00

> 60 3.75 2.97 2.554

(( GNF Proprietary Information ))

(( enclosed by double brackets ))

Quad Cities Unit 2 Core Operating Limits Report Page 13 Cycle 18 Rev. 0 Table 54 MCPR(F) Limits for GE and FANP Fuel DLO or SLO Operation (Reference 10)

Flow MCPR(F)

(% rated) Limit 110.0 1.22 100.0 1.22 0.0 1.86 Table 5-5 MCPR(F) Limits for GE and FANP Fuel with TCV Stuck Closed DLO or SLO Operation (Reference 10)

Flow 1 MCPR(F)

(% rated) Limit 110.0 1.27 108.9 1.27 0.00 1.97

(( GNF Proprietary Information ))

f[enclosed by double brackets ))

Quad Cities Unit 2 Core Operating Limits Report Page 14 Cycle 18 Rev. 0

6. Linear Heat Generation Rate The maximum LHGR shall not exceed the zero exposure limit of 13.4 (kW/ft) for the following fuel bundles (Reference 14):

GE14-Pl ODNAB409-15GZ-1 OOT-145-T6-2507 GE14-Pl ODNAB406-16GZ-1 OOT-145-T6-2508 GE14-P1 ODNAB418-16GZ-1OOT-145-T6-2646 GE14-Pl ODNAB389-18GZ-1 OOT-145-T6-2650 The linear heat generation rate (LHGR) limit is the product of the exposure dependent LHGR limit from Tables 6-1 through 6-17 and the minimum of: the power dependent LHGR Factor, LHGRFAC(P), the flow dependent LHGR Factor, LHGRFAC(F), or the single loop operation (SLO) multiplication factor where applicable. The LHGRFAC(P) is determined from Table 6-18.

The LHGRFAC(F) is determined from Table 6-19 or 6-20. The SLO multiplication factor can be found in Table 6-21.

Table 6-1: LHGR Limit for GE14-PIODNAB418-16GZ-1OOT-145-T6-2646 (Reference 9)

Lattices 5963, 5970, 5971, 5974 and 5975 Composite Limit kWM 5963: P1 ODNAL071 -NOG-10OT-T6-5963 5970: PIODNAL465-16G7.0-IDOT-T6-5970 5971: PlODNAL465-13G7.0/3G6.0-IOOT-T6-5971 5974: P1 ODNAL071 -NOG-1OOT-V-T6-5974 5975: PIODNAL071-16GE-IOOT-V-T6-5975 U02 Pellet Burnup Composite Limit (GWdIMTU) (kWft) 0.0 13.4 If ))

(( GNF Proprietary Information ))

(( enclosed in double brackets ))

Quad Cities Unit 2 Core Operating Limits Report Page 15 Cycle 18 Rev. 0 Table 6-2: LHGR Limit for: GE14-PIODNAB418-16GZ-IOOT-145-T6-2646, Lattice 5972 (Reference 9)

Lattice 5972 Composite Limit kWMft P1 ODNAL461 -12G7.013G6.0-1OOT-E-T6-5972 U02 Pellet Burnup Composite Limit (GWdIMTU) (kW/ft) 0.0000 13.4000 11 ))

if GNF Proprietary Information 3]

(( enclosed in double brackets ))

Quad Cities Unit 2 Core Operating Limits Report Page 16 Cycle 18 Rev. 0 Table 6-3: LHGR Limit for: GE14-PIODNAB418-16GZ-1OOT-145-T6-2646, Lattice 5973 (Reference 9)

Lattice 5973 Composite Limit kW/ft P1 ODNAL461-12G7.013G6.0-1 OOT-V-T6-5973 U02 Pellet Burnup Composite Limit (GWdIMTU) (kWlft) 0.0000 13.4000 1 I]L

(( GNF Proprietary Information ))

[I enclosed in double brackets ))

Quad Cities Unit 2 Core Operating Limits Report Page 17 Cycle 18 Rev. 0 Table 6-4: LHGR Limit for GE14-PIODNAB389-18GZ-IOOT-145-T6-2650 (Reference 9)

Lattices 5963, 5994, 5995, 5998 and 5999 Composite Limit kWMft 5963: PIODNAL071-NOG-1OOT-T6-5963 5994: P1 ODNAL430-17G8.0I1 G3.0-1OOT-T6-5994 5995: PIODNAL431-9G8.018G6.011G3.0-IOOT-T6-5995 5998: PIODNAL071-NOG-IOOT-V-T6-5998 5999: P1 ODNAL071-1 8GE-1 OOT-V-T6-5999 U02 Pellet Burnup Composite Limit (GWd/MTU) IkWlft) 0.0 13.4

(( ))

Table 6-5: LHGR Limit for GE14-PIODNAB389-18GZ-IOOT-145-T6-2650, Lattice 5996 (Reference 9)

Lattice 5996 Composite Limit kWMft P1 ODNAL430-7G8.018G6.0-1 OOT-E-T6-5996 U02 Pellet Burnup Composite Limit (GWd/MTU) (kW/ft) 0.0000 13.4000

[(GNF Proprietary Information))

((enclosed in double brackets ))

Quad Cities Unit 2 Core Operating Limits Report Page 18 Cycle 18 Rev. 0 Table 6-6: LHGR Limit for GE14-PIODNAB389-I8GZ-IOOT-145-T6-2650, Lattice 5997 (Reference 9)

Lattice 5997 Composite Limit kW/ft P1 ODNAL430-7G8.018G6.0-1 OOT-V-T6-5997 U02 Pellet Burnup Composite Limit (GWd/MTU) (kW/ft) 0.0000 13.4000

(( ))

(( GNF Proprietary Information ))

(( enclosed in double brackets ))

Quad Cities Unit 2 Core Operating Limits Report Page 19 Cycle 18 Rev. 0 Table 6-7: LHGR Limit for GE14-Pl ODNAB409-1 5GZ-1 OOT-145-T6-2507 (References 7 and 9)

Lattices 5254, 5259, and 5260 Composite Limit kWMft 5254: PIODNAL071-NOG-IOOT-T6-5254 5259: P1ODNAL071-NOG-100T-V-T6-5259 5260: P1ODNAL071-15GE-10OT-V-T6-5260 U02 Pellet Burnup Composite Limit (GWd/MTU) (kW/ft) 0.0 13.4

(( ))

Table 6-8: LHGR Limit for GE14-PIODNAB409-15GZ-IOOT-145-T6-2507, Lattice 5255 (Reference 7)

Lattice 5255 Composite Limit kWlft P1 ODNAL457-1 OG7.015G6.0-10OT-T6-5255 U02 Pellet Burnup Composite Limit (GWd/MTU) (kW/ft) 0.0000 13.4000

[I ))

(( GNF Proprietary Information ))

(( enclosed in double brackets ))

Quad Cities Unit 2 Core Operating Limits Report Page 20 Cycle 18 Rev. 0 Table 6-9: LHGR Limit for GE14-PIODNAB409-15GZ-10OT-145-T6-2507, Lattice 5256 (Reference 7)

Lattice 5256 Composite Limit kWMft P1 ODNAL457-1 OG7.0/4G6.0-10OT-T6-5256 U02 Pellet Burnup Composite Limit (GWd/MTU) (kW/ft) 0.0000 13.4000

[I 1))

Table 6-10: LHGR Limit for GE14-PIODNAB409-15GZ-10OT-145-T6-2507, Lattice 5257 (Reference 7)

Lattice 5257 Composite Limit kW/ft P1 ODNAL446-1 OG7.0/4G6.0-1OOT-E-T6-5257 U02 Pellet Burnup Composite Limit (GWd/MTU) (kW/ft) 0.0000 13.4000

[1 1]

(( GNF Proprietary Information ))

(( enclosed in double brackets ))

Quad Cities Unit 2 Core Operating Limits Report Page 21 Cycle 18 Rev. 0 Table 6-11: LHGR Limit for GE14-PIODNAB409-15GZ-10OT-145-T6-2507, Lattice 5258 (Reference 7)

Lattice 5258 Composite Limit kWlft P1 ODNAL446-1 OG7.0/4G6.0-1 OOT-V-T6-5258 U02 Pellet Burnup Composite Limit (GWd/MTU) (kW/ft) 0.0000 13.4000

(( GNF Proprietary Information))

(( enclosed in double brackets JJ

Quad Cities Unit 2 Core Operating Limits Report Page 22 Cycle 18 Rev. 0 Table 6-12: LHGR Limit for GE14-PIODNAB406-16GZ-1OOT-145-T6-2508 (References 7 and 9)

Lattices 5254, 5259, and 5265 Composite Limit kWlft 5254: PIODNAL071-NOG-IOOT-T6-5254 5259: PIODNAL071-NOG-IOOT-V-T6-5259 5265: P1 ODNAL071-16GE-10OT-V-T6-5265 U02 Pellet Burnup Composite Limit (GWd/MTU) (kW/ft) 0.0 13.4 If I]

Table 6-13: LHGR Limit for GE14-PIODNAB406-16GZ-1OOT-145-T6-2508, Lattice 5261 (Reference 7)

Lattice 5261 Composite Limit kWMft P1 ODNAL452-12G7.014G6.0- OOT-T6-5261 U02 Pellet Burnup Composite Limit (GWd/MTU) (kWlft) 0.0000 13.4000 If ))

(( GNF Proprietary Information ))

(( enclosed in double brackets ))

Quad Cities Unit 2 Core Operating Limits Report Page 23 Cycle 18 Rev. 0 Table 6-14: LHGR Limit for GE14-PIODNAB406-16GZ-IOOT-145-T6-2508, Lattice 5262 (Reference 7)

Lattice 5262 Composite Limit kWMft P1 ODNAL452-12G7.012G6.0- OOT-T6-5262 U02 Pellet Burnup Composite Limit (GWd/MTU) (kW/ft) 0.0000 13.4000 It 1]

Table 6-15: LHGR Limit for GE14-PIODNAB406-16GZ-10OT-145-T6-2508, Lattice 5263 (Reference 7)

Lattice 5263 Composite Limit kWMft P1 ODNAL444-12G7.012G6.0-1 OOT-E-T6-5263 U02 Pellet Burnup Composite Limit (GWd/MTU) (kW/ft) 0.0000 13.4000

[ 1))

(( GNF Proprietary Information ))

(( enclosed in double brackets ))

Quad Cities Unit 2 Core Operating Limits Report Page 24 Cycle 18 Rev. 0 Table 6-16: LHGR Limit for GE14-PIODNAB406-16GZ-10OT-145-T6-2508, Lattice 5264 (Reference 7)

Lattice 5264 Composite Limit kW/ft P1 ODNAL444-12G7.012G6.0-1OOT-V-T6-5264 U02 Pellet Burnup Composite Limit (GWd/MTU) (kWlft) 0.0000 13.4000

(( 1]

Table 6-17: LHGR Limit for FANP ATRM-9 Fuel ATRM9-P9DATB383-11 GZ-SPCIOOT-9WR-144-T6-3918 ATRM9-P9DATB381-13GZ-SPCIOOT-9WR-144-T6-3919 (Reference 11)

Nodal Exposure LHGR Limit (GWd/MTU) (kW/ft) 0.00 14.40 15.00 14.40 i 64.30 7.90

(( GNF Proprietary Information ))

(( enclosed in double brackets ))

Quad Cities Unit 2 Core Operating Limits Report Page 25 Cycle 18 Rev. 0 Table 6-18 LHGRFAC(P) for GE and FANP Fuel (Reference 8)

(( GNF Proprietary Information ))

(( enclosed in double brackets ))

Quad Cities Unit 2 Core Operating Limits Report Page 26 Cycle 18 Rev. 0 Table 6-19 LHGRFAC(F) Multipliers, all cases except TCV Stuck Closed (Reference 8)

Flow LHGRFAC(F)

(% rated) Multiplier 100.00 1.00 80.00 1.00 50.00 0.77 40.00 0.64 30.00 0.55 0.00 0.28 Table 6-20 LHGRFAC(F) Multipliers for TCV Stuck Closed (Reference 8)

Flow 1LHGRFAC(F)

(% rated) I Multiplier 100.00 1.00 98.30 1.00 80.00 0.86 50.00 0.63 40.00 0.50 30.00 0.41 0.00 0.14 Table 6-21 LHGR SLO multiplier for GE and FANP Fuel (Reference 3)

J Fuel Type Mulplierl ATRM9 l 0.84 GE14 0.77 l

((GNF Proprietary Information l]

((enclosed in double brackets ))

Quad Cities Unit 2 Core Operating Limits Report Page 27 Cycle 18 Rev. 0

7. Rod Block Monitor The Rod Block Monitor Upscale Instrumentation Setpoints are determined from the relationships shown below (Reference 12):

ROD BLOCK MONITOR UPSCALE TRIP FUNCTION ALLOWABLE VALUE Two Recirculation Loop 0.65 Wd + 56.1%

Operation Loop_0.65____+_51.4%

Single Recirculation Loop 0.65 Wd + 51.4%

Operation __ _ _ __ _ _ _I__ _

The setpoint may be lower/higher and will still comply with the rod withdrawal error (RWE) analysis because RWE is analyzed unblocked.

The allowable value is clamped with a maximum value not to exceed the allowable value for a recirculation loop drive flow (Wd) of 100%

Wd - percent of recirculation loop drive flow required to produce a rated core flow of 98 Mlb/hr.

(( GNF Proprietary Information ))

[f enclosed in double brackets ))

Quad Cities Unit 2 Core Operating Limits Report Page 28 Cycle 18 Rev. 0

8. Modes of Operation The allowed Modes of Operation with the combinations of EOOS are as described below:

Operating Regio EOOS Options1' Standard MELLLA ICF Coastdown" Base, Option A or B Yes Yes Yes Yes Base SLO, Option A or B Yes Yes No Yes TBPOOS, Option A or B Yes Yes Yes Yes TBPOOS SLO, Option A or B Yes Yes No Yes PLUOOS 4, Option A or B Yes Yes Yes Yes PLUOOS SLO_,Option A or B Yes Yes No Yes TCV Slow Closureo, Option A or B Yes Yes Yes Yes TCV Slow Closure SLOW, Option A or B Yes Yes No Yes TCV Stuck Close&d, Option A or B Yes Yes Yes Yes TCV Stuck Closed SLOW, Option A or B Yes Yes No Yes 1 Each OOS Option may be combined with up to 18 TIP channels OOS (provided the requirements for utilizing SUBTIP methodology are met) with all TIPS available at startup from a refuel outage, a 120OF reduction in feedwater temperature throughout the cycle, which is subject to the restrictions in Reference 15 (Final Feedwater Temperature Reduction or Feedwater Heaters OOS), and up to 50% of the LPRMs OOS with an LPRM calibration frequency of 2500 Effective Full Power Hours (EFPH) (2000 EFPH +25%).

2 The base case condition requires the opening profile for the Turbine Bypass Valves provided in Reference 6 to be met. The base case condition also supports 1 Turbine Bypass Valve OOS (TBPOOS) if the assumed opening profile (Reference 6) for the remaining group of Turbine Bypass Valves is met. If the opening profile is not met (with 8 or 9 operating Turbine Bypass Valves), or if more than one Turbine Bypass Valve is OOS, utilize the TBPOOS condition.

3 Coastdown operation is defined as any cycle exposure beyond the full power, all rods out condition with plant power slowly lowering to a lesser value while core flow is held constant. Up to a 15% overpower is analyzed per Reference 8.

4 If the Base Case limit set (DLO only) is being used and the PLU is taken OOS for a surveillance and the surveillance is done at Ž80% rated reactor power and Ž80% rated reactor flow, an administrative limit of 0.99 on FDLRX/MFLPD and 0.95 on MFLCPR for Option A or 0.99 on MFLCPR for Option B can be used instead of the PLUOOS (DLO) thermal limit set.

5 Operation up to 108% rated core flow is licensed for this cycle.

6For operation with a pressure regulator out-of-service (PROOS), the TCV Slow Closure limits should be applied (Reference 3) and the operational notes from Reference 13 reviewed. PROOS and TCV Slow Closure is not an analyzed out-of-service combination.

7 A single MSIV may be taken OOS (shut) under any and all OOS Options, so long as core thermal power is maintained <75% of 2957 MWth (Reference 3).

8 The cycle specific stability analysis may impose restrictions on the Power-to-Flow map and/or restrict the applicable temperature for feedwater temperature reduction. See Reference 16.

9 For operation with a Turbine Stop Valve out-of-service (TSV OOS), the TCV Stuck Closed limits should be applied (Reference 17). TSV OOS and TCV Stuck Closed is not an analyzed out-of-service combination.

((GNF Proprietary Information ]J

((enclosed in double brackets ))

Quad Cities Unit 2 Core Operating Limits Report Page 29 Cycle 18 Rev. 0

9. Methodology The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
1. NEDE-24011-P-A-14 (Revision 14), "General Electric Standard Application for Reactor Fuel (GESTAR-I1)," June 2000.
2. Commonwealth Edison Topical Report NFSR-0085, Revision 0, "Benchmark of BWR Nuclear Design Methods," November 1990.
3. Commonwealth Edison Topical Report NFSR-0085, Supplement 1 Revision 0, 'Benchmark of BWR Nuclear Design Methods - Quad Cities Gamma Scan Comparisons," April 1991.
4. Commonwealth Edison Topical Report NFSR-0085, Supplement 2 Revision 0, 'Benchmark of BWR Nuclear Design Methods - Neutronic Licensing Analyses," April 1991.
5. XN-NF-80-19(P)(A), Volume 1 and Supplements 1 and 2, "Exxon Nuclear Methodology for Boiling Water Reactors - Neutronic Methods for Design and Analysis," March 1983.
6. XN-NF-80-19(P)(A), Volume 1 Supplement 3, Supplement 3 Appendix F, and Supplen~ent 4, "Advanced Nuclear Fuels Methodology for Boiling Water Reactors: Benchmark Results for CASMO-3GIMICROBURN-B Calculation Methodology," November 1990.
7. XN-NF-80-19(P)(A), Volumes 2, 2A, 2B, and 2C, 'Exxon Nuclear Methodology for Boiling Water Reactors: EXEM BWR ECCS Evaluation Model," September 1982.
8. XN-NF-80-19(P)(A), Volume 3 Revision 2, "Exxon Nuclear Methodology for Boiling Water Reactors, THERMEX: Thermal Limits Methodology Summary Description," January 1987.
9. XN-NF-80-19(P)(A), Volume 4 Revision 1, "Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads," June 1986.
10. XN-NF-85-67(P)(A), Revision 1, "Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel," September 1986.
11. XN-NF-82-06(P)(A), Revision I and Supplements 2, 4, and 5, "Qualification of Exxon Nuclear Fuel for Extended Burnup," October 1986.
12. XN-NF-82-06(P)(A), Supplement 1 Revision 2, "Qualification of Exxon Nuclear Fuel for Extended Burnup,' Supplement 1, "Extended Burnup Qualification of ENC 9x9 BWR Fuel,"

May 1988.

13. ANF-89-14(P)(A), Revision 1 and Supplements 1 & 2, "Advanced Nuclear Fuels Corporation Generic Mechanical Design for Advanced Nuclear Fuels Corporation 9X9 - IX and 9x9 - 9X BWR Reload Fuel," October 1991.
14. ANF-89-98(P)(A), Revision 1 and Supplement 1, "Generic Mechanical Design Criteria for BWR Fuel Designs," May 1995.
15. XN-NF-79-71(P)(A), Revision 2 and Supplements 1, 2, and 3, "Exxon Nuclear Plant Transient Methodology for Boiling Water Reactors," March 1986.
16. ANF-1125(P)(A) and Supplements 1 and 2, "ANFB Critical Power Correlation," April 1990.

[I GNF Proprietary Information ]

[I enclosed in double brackets))

Quad Cities Unit 2 Core Operating Limits Report Page 30 Cycle 18 Rev. 0

17. ANF-1125(P)(A), Supplement 1 Appendix E, "ANFB Critical Power Correlation Determination of ATRIUM-9B Additive Constant Uncertainties," September 1998.
18. ANF-524(P)(A), Revision 2 and Supplements 1 and 2, 'ANF Critical Power Methodology for Boiling Water Reactors," November 1990.
19. ANF-913(P)(A), Volume 1 Revision 1 and Volume 1 Supplements 2, 3, and 4, "COTRANSA2:

A Computer Program for Boiling Water Reactor Transient Analyses," August 1990.

20. ANF-91-048(P)(A), 'Advanced Nuclear Fuels Corporation Methodology for Boiling Water Reactors EXEM BWR Evaluation Model," January 1993.
21. ANF-91-048(P)(A), Supplements 1 and 2, "BWR Jet Pump Model Revision for RELAX,"

October 1997.

22. Commonwealth Edison Company Topical Report NFSR-0091, 'Benchmark of CASMO/MICROBURN BWR Nuclear Design Methods," Revision 0 and Supplements on Neutronics Licensing Analysis (Supplement 1) and La Salle County Unit 2 benchmarking (Supplement 2), December 1991, March 1992, and May 1992, respectively.
23. EMF-1125(P)(A), Supplement 1 Appendix C, "ANFB Critical Power Correlation Application for Co-Resident Fuel," August 1997.
24. EMF-85-74(P), Revision 0. Supplement 1 (P)(A) and Supplement 2 (P)(A), "RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model," Siemens Power Corporation, February 1998.
25. NEDC-32981 P, Revision 0, 'GEXL96 Correlation for ATRIUM-9B Fuel," September 2000.

(( GNF Proprietary Information]

((enclosed in double brackets))

Attachment A GNF Proprietary Information Affidavit

Affidavit Affidavit 1, Jens G. M. Andersen, state as follows:

(1) I am Fellow and project manager, TRACG Development, Global Nuclear Fuel -

Americas, L.L.C. ("GNF-A") and have been delegated the function of reviewing the information described in paragraph (2) which is sought to be withheld, and have been authorized to apply for its withholding.

(2) The information sought to be withheld is contained in the attachment, "Core Operating Limits Report for Quad Cities Unit 2 Cycle 18". GNF proprietary information is indicated by enclosing it in double brackets. In each case, the superscript notation 13) refers to Paragraph (3) of this affidavit, which provides the basis for the proprietary determination.

(3) In making this application for withholding of proprietary information of which it is the owner or licensee, GNF-A relies upon the exemption from disclosure set forth in the Freedom of Information Act ("FOIA"), 5 USC Sec. 552(b)(4), and the Trade Secrets Act, 18 USC Sec. 1905, and NRC regulations 10 CFR 9.17(a)(4) and 2.790(a)(4) for "trade secrets and commercial or financial information obtained from a person and privileged or confidential" (Exemption 4). The material for which exemption from disclosure is here sought is all "confidential commercial information," and some portions also qualify under the narrower definition of "trade secret," within the meanings assigned to those terms for purposes of FOIA Exemption 4 in, respectively, Critical Mass Energy Project v. Nuclear Regulatorv Commission. 975F2d871 (DC Cir. 1992), and Public Citizen Health Research Group v. FDA, 704F2d1280 (DC Cir. 1983).

(4) Some examples of categories of information which fit into the definition of proprietary information are:

a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-A's competitors without license from GNF-A constitutes a competitive economic advantage over other companies;
b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product;
c. Information which reveals cost or price information, production capacities, budget levels, or commercial strategies of GNF-A, its customers, or its suppliers;
d. Information which reveals aspects of past, present, or future GNF-A customer-funded development plans and programs, of potential commercial value to GNF-A;
e. Information which discloses patentable subject matter for which it may be desirable to obtain patent protection.

Affidavit The information sought to be withheld is considered to be proprietary for the reasons set forth in paragraphs (4)a. and (4)b., above.

(5) To address the 10 CFR 2.790 (b) (4), the information sought to be withheld is being submitted to NRC in confidence. The information is of a sort customarily held in confidence by GNF-A, and is in fact so held. Its initial designation as proprietary information, and the subsequent steps taken to prevent its unauthorized disclosure, are as set forth in (6) and (7) following. The information sought to be withheld has, to the best of my knowledge and belief, consistently been held in confidence by GNF-A, no public disclosure has been made, and it is not available in public sources. All disclosures to third parties including any required transmittals to NRC, have been made, or must be made, pursuant to regulatory provisions or proprietary agreements which provide for maintenance of the information in confidence.

(6) Initial approval of proprietary treatment of a document is made by the manager of the originating component, the person most likely to be acquainted with the value and sensitivity of the information in relation to industry knowledge, or subject to the terms under which it was licensed to GNF-A. Access to such documents within GNF-A is limited on a "need to know" basis.

(7) The procedure for approval of external release of such a document typically requires review by the staff manager, project manager, principal scientist or other equivalent authority, by the manager of the cognizant marketing function (or his delegate), and by the Legal Operation, for technical content, competitive effect, and determination of the accuracy of the proprietary designation. Disclosures outside GNF-A are limited to regulatory bodies, customers, and potential customers, and their agents, suppliers, and licensees, and others with a legitimate need for the information, and then only in accordance with appropriate regulatory provisions or proprietary agreements.

(8) The information identified in paragraph (2) is classified as proprietary because it contains details of GNF-A's fuel design and licensing methodology.

The development of the methods used in these analyses, along with the testing, development and approval of the supporting methodology was achieved at a significant cost, on the order of several million dollars, to GNF-A or its licensor.

(9) Public disclosure of the information sought to be withheld is likely to cause substantial harm to GNF-A's competitive position and foreclose or reduce the availability of profit-making opportunities. The fuel design and licensing methodology is part of GNF-A's comprehensive BWR safety and technology base, and its commercial value extends beyond the original development cost.

The value of the technology base goes beyond the extensive physical database and analytical methodology and includes development of the expertise to determine and apply the appropriate evaluation process. In addition, the technology base includes the value derived from providing analyses done with NRC-approved methods.

The research, development, engineering, analytical, and NRC review costs comprise a substantial investment of time and money by GNF-A or its licensor.

Affidavit The precise value of the expertise to devise an evaluation process and apply the correct analytical methodology is difficult to quantify, but it clearly is substantial.

GNF-A's competitive advantage will be lost if its competitors are able to use the results of the GNF-A experience to normalize or verify their own process or if they are able to claim an equivalent understanding by demonstrating that they can arrive at the same or similar conclusions.

The value of this information to GNF:A would be lost if the information were disclosed to the public. Making such information available to competitors without their having been required to undertake a similar expenditure of resources would unfairly provide competitors with a windfall, and deprive GNF-A of the oppdrtunity to exercise its competitive advantage to seek an adequate return on its large investment in developing and obtaining these very valuable analytical tools.

I declare under penalty of perjury that the foregoing affidavit and the matters stated therein are true and correct to the best of my knowledge. information, and belief.

Executed at Wilmington, North Carolina, this 19th day of February, 2004.

4-l.- n1 LAdoA.IrI Jens G. M. Andersen Global Nuclear Fuel - Americas, LLC