ML052770147: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 43: | Line 43: | ||
==Enclosure:== | ==Enclosure:== | ||
ML052770320 NRC-001 OFFICE PDII-1/PM PDII-1/LA PDII-1/SC NAME LOlshan CHawes EMarinos DATE 10/ 19 /05 10/ 19 /05 10/ 20 /05 | ML052770320 NRC-001 OFFICE PDII-1/PM PDII-1/LA PDII-1/SC NAME LOlshan CHawes EMarinos DATE 10/ 19 /05 10/ 19 /05 10/ 20 /05 LIST OF ATTENDEES MEETING TO DISCUSS THE OCONEE TORNADO MITIGATION METHOD SUBMITTAL SEPTEMBER 27, 2005 NRC DUKE E. Hackett J. Robertson J. Tatum S. Newman C. Doutt L. Kanipe M. Stutzke G. Davenport L. Olshan G. McAninch M. Ernstes (by phone) | ||
LIST OF ATTENDEES MEETING TO DISCUSS THE OCONEE TORNADO MITIGATION METHOD SUBMITTAL SEPTEMBER 27, 2005 NRC DUKE E. Hackett J. Robertson J. Tatum S. Newman C. Doutt L. Kanipe M. Stutzke G. Davenport L. Olshan G. McAninch M. Ernstes (by phone) | |||
ENCLOSURE 1 | ENCLOSURE 1 | ||
Revision as of 13:43, 14 March 2020
| ML052770147 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 10/20/2005 |
| From: | Olshan L NRC/NRR/DLPM/LPD2 |
| To: | Duke Energy Corp |
| Olshan L N, NRR/DLPM, 415-1419 | |
| Shared Package | |
| ML052770118 | List: |
| References | |
| TAC MC4608, TAC MC4609, TAC MC4610 | |
| Download: ML052770147 (5) | |
Text
October 20, 2005 LICENSEE: DUKE ENERGY CORPORATION FACILITY: OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3
SUBJECT:
SUMMARY
OF SEPTEMBER 27, 2005, MEETING WITH DUKE ENERGY ON THE TORNADO MITIGATION METHOD SUBMITTAL (TAC NOS. MC4608, MC4609, AND MC4610)
On September 27, 2005, the Nuclear Regulatory Commission (NRC) met with Duke Energy Corporation (the licensee) to discuss the Oconee tornado mitigation method submittal that is being prepared by the licensee. Enclosure 1 is a list of attendees. Enclosure 2 is the handouts provided by the licensee during the meeting.
The licensee stated that it is using a two-phase approach. The first phase involves the submittal of the proposed methodology and licensing basis by the end of December 2005.
After NRC approval of the methodology and licensing basis, the licensee will update the Oconee Updated Final Safety Analysis Report. The second phase is the evaluation of station hardware upgrades for possible implementation in 2006 or 2007. The station hardware upgrades that are being evaluated include a new high-head station auxiliary service water system, installation of physical barriers, and upgraded power supplies.
The proposed methodology would not consider tornado wind speeds greater than 200 miles per hour based on probability considerations. Other events, such as tornado-induced main steam line breaks and loss-of-coolant, accidents, and tornadoes that affect both the Oconee Station and the Keowee Hydro units, would also not be considered in the proposed methodology. The NRC staff expressed concern with this approach for eliminating consideration of certain wind speeds and events, and stated that it would further evaluate this approach and discuss it with NRC management.
CONTACT: Leonard N. Olshan, NRR 301-415-1419 lno@nrc.gov
The licensee and the NRC staff agreed to have another meeting prior to the submittal of the methodology and tentatively scheduled it for the week of October 31, 2005.
Please direct any inquiries to Leonard N. Olshan, at 301-415-1419, or lno@nrc.gov.
/RA/
Leonard N. Olshan, Senior Project Manager, Section1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287
Enclosures:
- 1. List of Attendees
- 2. Slide Presentation cc w/encls: See next page
Enclosure:
ML052770320 NRC-001 OFFICE PDII-1/PM PDII-1/LA PDII-1/SC NAME LOlshan CHawes EMarinos DATE 10/ 19 /05 10/ 19 /05 10/ 20 /05 LIST OF ATTENDEES MEETING TO DISCUSS THE OCONEE TORNADO MITIGATION METHOD SUBMITTAL SEPTEMBER 27, 2005 NRC DUKE E. Hackett J. Robertson J. Tatum S. Newman C. Doutt L. Kanipe M. Stutzke G. Davenport L. Olshan G. McAninch M. Ernstes (by phone)
ENCLOSURE 1
Oconee Nuclear Station, Units 1, 2, and 3 cc:
Ms. Lisa F. Vaughn Mr. R. L. Gill, Jr.
Duke Energy Corporation Manager - Nuclear Regulatory 526 South Church Street Issues and Industry Affairs P. O. Box 1006 Duke Energy Corporation Mail Code = EC07H 526 S. Church St.
Charlotte, North Carolina 28201-1006 Mail Stop EC05P Charlotte, NC 28202 Manager, LIS NUS Corporation Division of Radiation Protection 2650 McCormick Dr., 3rd Floor NC Dept of Environment, Health, & Natural Clearwater, FL 34619-1035 Resources 3825 Barrett Dr.
Senior Resident Inspector Raleigh, NC 27609-7721 U.S. Nuclear Regulatory Commission 7812B Rochester Highway Mr. Peter R. Harden, IV Seneca, SC 29672 VP-Customer Relations and Sales Westinghouse Electric Company Mr. Henry Porter, Director 6000 Fairview Road Division of Radioactive Waste Management 12th Floor Bureau of Land and Waste Management Charlotte, NC 28210 Dept. of Health and Env. Control 2600 Bull St. Mr. Henry Barron Columbia, SC 29201-1708 Group Vice President, Nuclear Generation and Chief Nuclear Officer Mr. Michael A. Schoppman P.O. Box 1006-EC07H Framatome ANP Charlotte, NC 28201-1006 1911 North Ft. Myer Dr.
Suite 705 Mr. B. G. Davenport Rosslyn, VA 22209 Regulatory Compliance Manager Oconee Nuclear Site Ms. Karen E. Long Duke Energy Corporation Assistant Attorney General ON03RC NC Department of Justice 7800 Rochester Highway P.O. Box 629 Seneca, SC 29672 Raleigh, NC 27602