ML19317F308: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
                                                                          '
m                                        ~
m                                        ~
: 1) UKE POWER COMPANY
: 1) UKE POWER COMPANY Powen Dutz.otxo 422 SouTu Catuncar Srnest, CHARLOTTE, N. C. 2820 A. C. Tit a ns                                      .                            P. O. Box 2170
  ,          ,
     $smeon wcs Pettiotav Pecs,veten n=o Tamasmisteow July 17, 1974 Mr. Norman C. Moseley, Director Directorate of Regulatory Operations U. S. Atomic Energy Commission Region II - Suite 818 230 Peachtree Street, Northwest Atlanta, Georgia 30303                              .
Powen Dutz.otxo 422 SouTu Catuncar Srnest, CHARLOTTE, N. C. 2820 A. C. Tit a ns                                      .                            P. O. Box 2170
     $smeon wcs Pettiotav Pecs,veten n=o Tamasmisteow
                                                                                                        <
July 17, 1974 Mr. Norman C. Moseley, Director Directorate of Regulatory Operations U. S. Atomic Energy Commission Region II - Suite 818 230 Peachtree Street, Northwest Atlanta, Georgia 30303                              .
Re:      RO:II:FJ 50-287/74-6
Re:      RO:II:FJ 50-287/74-6


Line 33: Line 28:
Duke Power Company does not consider any information contained in RO Inspection Report 50-287/74-6 to be proprietary.
Duke Power Company does not consider any information contained in RO Inspection Report 50-287/74-6 to be proprietary.
Very trul: yours,
Very trul: yours,
* _1s A. C. Thies        gf          . d. [                                    -
_1s A. C. Thies        gf          . d. [                                    -
ACT:vr Attachment                                                                  .\
ACT:vr Attachment                                                                  .\
s S
s S
8001100[7y
8001100[7y


                                                                    --
  . .
                                                                      '
              ,
                                         ~g                              .-
                                         ~g                              .-
        .
           -        -                        DUKE POWER COMPANY OCONEE UNIT 3 RESPONSE TO RO INSPECTION REPORT 50-287/74-6 I.A.      Inadequate Identification of Baseline Calibration Blocks r
                                                                            -
           -        -                        DUKE POWER COMPANY OCONEE UNIT 3 RESPONSE TO RO INSPECTION REPORT 50-287/74-6
                                                        .
                                                                                .
I.A.      Inadequate Identification of Baseline Calibration Blocks r
The calibration blocks used for the Oconee Unit 3 piping baseline inspection were supplied by B&W in 1970 as part of the original oconee Unit 1 baseline inspection program. Since Appendix B to 10CFR50 was issued af ter the cali-bration blocks had been supplied to Oconee, records and data did not meet all requirements of Criterion XII. Furthermore, the blocks were modified, but appropriate changes were not made to the drawings.
The calibration blocks used for the Oconee Unit 3 piping baseline inspection were supplied by B&W in 1970 as part of the original oconee Unit 1 baseline inspection program. Since Appendix B to 10CFR50 was issued af ter the cali-bration blocks had been supplied to Oconee, records and data did not meet all requirements of Criterion XII. Furthermore, the blocks were modified, but appropriate changes were not made to the drawings.
To correct this situation, new drawings of the calibration blocks have been made. A spectrographic analysis has been made on each of the blocks where records of an analysis could not be found., The revised drawings and the chemical analysis data were included in a revision to the Preoperational Inspection Manual on June 28, 1974. Identification numbers will be added to the blocks to assure proper control prior to July 19, 1974.
To correct this situation, new drawings of the calibration blocks have been made. A spectrographic analysis has been made on each of the blocks where records of an analysis could not be found., The revised drawings and the chemical analysis data were included in a revision to the Preoperational Inspection Manual on June 28, 1974. Identification numbers will be added to the blocks to assure proper control prior to July 19, 1974.
!
l l
l
l    ,
:
!
                      .
l l    ,
                .
,
                                                                          -
4 Y
4 Y


                                                                                    .. . -- -        - _ _ _ _ _ _ _ _ _
s                              s' Ltr to Duke Power Company fm.N. C. Moseley                                                          '
_
                                                                                                                                <
__
                                                                  ,
  -.  .                                                                .
s                              s'
        -.
                                                                                  *            *
          , ,      .
                                                              .
                                                                                              %
Ltr to Duke Power Company fm.N. C. Moseley                                                          '
                                                                                                                              .
dtd      AUG 2 1974
dtd      AUG 2 1974
               '        Ltr to N. C. Moseley fm Duke Power Company dtd July 17, 1974 DISTRIBUTION:
               '        Ltr to N. C. Moseley fm Duke Power Company dtd July 17, 1974 DISTRIBUTION:
H. D. Thornburg, RO
H. D. Thornburg, RO RO:lig (4)
                                                                -
RO:lig (4)
Directorate of Licensing (4) g RPDRCentral Files Local PDR                            -
Directorate of Licensing (4) g RPDRCentral Files Local PDR                            -
NSIC DTIE, OR                                      -
NSIC DTIE, OR                                      -
State
State D
                                                                              .
                  *                *
                .
                      .
D
                                                            .
4 O                                                                      e e
4 O                                                                      e e
-
            -
                                                                                                  -.--
7}}
7}}

Revision as of 07:01, 1 February 2020

Responds to NRC 740626 Ltr Re Violation Noted in Insp Rept 50-287/74-06.Corrective Actions:New Drawings of Calibr Blocks Made & Spectrographic Analysis Made
ML19317F308
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 07/17/1974
From: Thies A
DUKE POWER CO.
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19317F305 List:
References
NUDOCS 8001100674
Download: ML19317F308 (3)


Text

.

m ~

1) UKE POWER COMPANY Powen Dutz.otxo 422 SouTu Catuncar Srnest, CHARLOTTE, N. C. 2820 A. C. Tit a ns . P. O. Box 2170

$smeon wcs Pettiotav Pecs,veten n=o Tamasmisteow July 17, 1974 Mr. Norman C. Moseley, Director Directorate of Regulatory Operations U. S. Atomic Energy Commission Region II - Suite 818 230 Peachtree Street, Northwest Atlanta, Georgia 30303 .

Re: RO:II:FJ 50-287/74-6

Dear Mr. Moseley:

Please find attached our response to Iten I.A contained in RO Inspection Report 50-287/74-6.

Duke Power Company does not consider any information contained in RO Inspection Report 50-287/74-6 to be proprietary.

Very trul: yours,

_1s A. C. Thies gf . d. [ -

ACT:vr Attachment .\

s S

8001100[7y

~g .-

- - DUKE POWER COMPANY OCONEE UNIT 3 RESPONSE TO RO INSPECTION REPORT 50-287/74-6 I.A. Inadequate Identification of Baseline Calibration Blocks r

The calibration blocks used for the Oconee Unit 3 piping baseline inspection were supplied by B&W in 1970 as part of the original oconee Unit 1 baseline inspection program. Since Appendix B to 10CFR50 was issued af ter the cali-bration blocks had been supplied to Oconee, records and data did not meet all requirements of Criterion XII. Furthermore, the blocks were modified, but appropriate changes were not made to the drawings.

To correct this situation, new drawings of the calibration blocks have been made. A spectrographic analysis has been made on each of the blocks where records of an analysis could not be found., The revised drawings and the chemical analysis data were included in a revision to the Preoperational Inspection Manual on June 28, 1974. Identification numbers will be added to the blocks to assure proper control prior to July 19, 1974.

l l

l ,

4 Y

s s' Ltr to Duke Power Company fm.N. C. Moseley '

dtd AUG 2 1974

' Ltr to N. C. Moseley fm Duke Power Company dtd July 17, 1974 DISTRIBUTION:

H. D. Thornburg, RO RO:lig (4)

Directorate of Licensing (4) g RPDRCentral Files Local PDR -

NSIC DTIE, OR -

State D

4 O e e

7