ML19319B914: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:
-ggc,;,;,fu 195                                      #_
-ggc,;,;,fu 195                                      #_
v.s. nuctL AR nacutATORv couuission                occxtr Nuunt n                    i
v.s. nuctL AR nacutATORv couuission                occxtr Nuunt n                    i
                                                                                                                                                                '
: n. . u
: n. . u
                                                                                                       ^
                                                                                                       ^
50-346
50-346 NTICOISTRIBUTION FOR PART 50 DOCKET MATERI AL ro: B . C . RI,'S CHE                                  FROM: TOLEDO EDISON                                        DATE OF DOCUMENT TOLEDO,0HIO                                                2/24/77 L.E. ROE                                            DATE RECEIVED 2/28/77 3 LETTER                      Cf40TORIZED              PROP                        lt4!'UT FORM                  NUMOER CF CCPICS RECE:VED 3OftlGIN A L            QU NC L ASSIFIE D OcCav                                          l                                                                    1 SIGNED CY. RECEIVED ccscHIPTION                                                                ENCLCSURE                                                                  !
      '
                                                                                                                            ' " " " ' "
                  ,
NTICOISTRIBUTION FOR PART 50 DOCKET MATERI AL ro: B . C . RI,'S CHE                                  FROM: TOLEDO EDISON                                        DATE OF DOCUMENT TOLEDO,0HIO                                                2/24/77 L.E. ROE                                            DATE RECEIVED 2/28/77 3 LETTER                      Cf40TORIZED              PROP                        lt4!'UT FORM                  NUMOER CF CCPICS RECE:VED 3OftlGIN A L            QU NC L ASSIFIE D OcCav                                          l                                                                    1 SIGNED CY. RECEIVED ccscHIPTION                                                                ENCLCSURE                                                                  !
                                                                                                                                                        '
LT't. SUMMARIZING THE EXTENSIVE INVESTIGATION THAT LED TO THE SELECTION OF A 0.15g ACCELERAT13N MAXIMUM POSSIBLE EARTHQUAKE (SAFE SHUTDOWN EARTH QUAKE) AT BEDROCK FOR THE DESIGN.......
LT't. SUMMARIZING THE EXTENSIVE INVESTIGATION THAT LED TO THE SELECTION OF A 0.15g ACCELERAT13N MAXIMUM POSSIBLE EARTHQUAKE (SAFE SHUTDOWN EARTH QUAKE) AT BEDROCK FOR THE DESIGN.......
gT M R E E E
gT M R E E E
( "'
( "'
ACKNOWLEDGED PLANr NA!!E:          DAVIS BESSE
ACKNOWLEDGED PLANr NA!!E:          DAVIS BESSE i
                                                                                                                                                          !
i FAL'ETY                                  FCR ACTIONilNFOR?.91 TION                t mrTon                  SAB 3/7/77                  -
i i
                        -
                                                                                                                                                          !
FAL'ETY                                  FCR ACTIONilNFOR?.91 TION                t mrTon                  SAB 3/7/77                  -
VASSALLO                            Aggyc.mn An.                                                          l
VASSALLO                            Aggyc.mn An.                                                          l
/ ASSIG:CD AD:                                                                                                                                            '
/ ASSIG:CD AD:                                                                                                                                            '
I/JagCJL_ QUI'g e                                STOLZ                                npAMen m'Tve.
I/JagCJL_ QUI'g e                                STOLZ                                npAMen m'Tve.
                                                                                                                                                            '
'                                                ENGLE                              FROJECT IGNA_GER:
'                                                ENGLE                              FROJECT IGNA_GER:
         ' PRO.f?CI MANAGER:
         ' PRO.f?CI MANAGER:
_%.!C d S_ST. ;
_%.!C d S_ST. ;
            .
HYLTON_                              LIC. ASST. :
HYLTON_                              LIC. ASST. :
t
t
Line 50: Line 38:
INTERNAL DISTRIBUTION                                                                          i
INTERNAL DISTRIBUTION                                                                          i
           'P C F7D                              SY3!E':S CAFETY                I    PLANT SYSTE'!S                            SITE SAFETY &
           'P C F7D                              SY3!E':S CAFETY                I    PLANT SYSTE'!S                            SITE SAFETY &
     ,jNRC FDR                                    HEINEMAN                  /          T"DXSCO                                  q"/IRQ_EnLYSIS flI & E                (2)                    SCHROEDER                1/ BT, ' AROYA                                      DHHICN & MI LL7R 10 ELD                                                            f/ LATNAs
     ,jNRC FDR                                    HEINEMAN                  /          T"DXSCO                                  q"/IRQ_EnLYSIS flI & E                (2)                    SCHROEDER                1/ BT, ' AROYA                                      DHHICN & MI LL7R 10 ELD                                                            f/ LATNAs COSSICK & STAF7                        ENGI!"'ERING              I/l        IPPOLITO                                  E N V TJLo I G .
_
COSSICK & STAF7                        ENGI!"'ERING              I/l        IPPOLITO                                  E N V TJLo I G .
MIPC                              . MACARRY                                KIpg Qgn                                  EREST a      CASE                          /      UC;;*X:                                                                        SALLARD HANAUER                        /      SII5'EIL                        1,  OPERATING REACTORS                        SPAliOLER IL%RLESS                        /      PAULICKI
MIPC                              . MACARRY                                KIpg Qgn                                  EREST a      CASE                          /      UC;;*X:                                                                        SALLARD HANAUER                        /      SII5'EIL                        1,  OPERATING REACTORS                        SPAliOLER IL%RLESS                        /      PAULICKI
                                                                          '
                                                                               / STELLO SI"'E TEC:1.
                                                                               / STELLO SI"'E TEC:1.
PROJECT MA!'AGEliENT                  REACTOR SAFETY                      OPERATING TECH.                  / GA}''t!LL BOYD                            /      ROSS                                EISE!;IiUT                                STEPP                _
PROJECT MA!'AGEliENT                  REACTOR SAFETY                      OPERATING TECH.                  / GA}''t!LL BOYD                            /      ROSS                                EISE!;IiUT                                STEPP                _
P. COLLINS                      /      NOVAK                                SLMO                                      HULMAN HOUSTO"                        /      ROSZTCCZY                            BAER PETERSON                        /      CHECK                                EUTLER                              ,    SITE ANALYS!3
P. COLLINS                      /      NOVAK                                SLMO                                      HULMAN HOUSTO"                        /      ROSZTCCZY                            BAER PETERSON                        /      CHECK                                EUTLER                              ,    SITE ANALYS!3 MELT 2                                                                      can!ES                          c'        VOLUJR
_
                                                                                                                   /, BU'?CH HELTEMES                              AT & I SROVHOLT                                SALTZMAN
MELT 2                                                                      can!ES                          c'        VOLUJR
                                                                                                                   /, BU'?CH
                                                                                                                            '
HELTEMES                              AT & I SROVHOLT                                SALTZMAN
                                                                                                                       ' J. COLLINS RUU3I'RG                                                            /_KPECFR EXTERN AL DISTRIBUTION                                                          . CONTROL NU?1BE R PORT CLINTON.}D.          NAT M \3:                            Brio 0lsU N 4EN_.lta T. L/ 1                                            l TIC:
                                                                                                                       ' J. COLLINS RUU3I'RG                                                            /_KPECFR EXTERN AL DISTRIBUTION                                                          . CONTROL NU?1BE R PORT CLINTON.}D.          NAT M \3:                            Brio 0lsU N 4EN_.lta T. L/ 1                                            l TIC:
[[[LPDR; NSIC:
[[[LPDR; NSIC:
REG V.IE LAlnF.
REG V.IE LAlnF.
UL_RIKSON (ORUL)
UL_RIKSON (ORUL) 2050
                                                                                      '.
2050
                                                                                                                                         '        N i
                                                                                                                                         '        N i
j ASLB                                                                                                                            \      M A --
j ASLB                                                                                                                            \      M A --
CONJULTANTS: _
CONJULTANTS: _
                                                       ~
                                                       ~
                                                                        ._
hCRS):[aCYSuc.!nng/dE! T /# 3 N /J, P4stC e nHM 195 2 70) 8 0 012$06{
hCRS):[aCYSuc.!nng/dE! T /# 3 N /J,
                                                                                    '
                                                                                                                                    .
                                                                                                                                                  ,
                ,-                                -
                                                                                              .                                                  ,,.
                                                                    %
P4stC e nHM 195 2 70) 8 0 012$06{
g
g


                              -
.
u    .Inory        Fip Cy]
u    .Inory        Fip Cy]
      -              .
              .
                                                   #                              Totsoa fh          %,,
                                                   #                              Totsoa fh          %,,
c ac t    % EDISON
c ac t    % EDISON 9        LOWELL E. ROE Docket No. 50-346                                    2819773r 3, ua r..
                                          ,
9        LOWELL E. ROE Docket No. 50-346                                    2819773r 3, ua r..
h w,,    y g q,y s> ass.sw Serial No. 227                            ,
h w,,    y g q,y s> ass.sw Serial No. 227                            ,
                                                       ""cd,          -''    V    V ,2c,., % '
                                                       ""cd,          -''    V    V ,2c,., % '
                                                                                            '
February 24, 1977                                %4i,',' d\'                /~L p.-'
February 24, 1977                                %4i,',' d\'                /~L p.-'
                                                                          .
:
L-      m,.n        '
L-      m,.n        '
m.
m.
Mr. Benard C. Rusche, Director                                      \c<      ogg c' g 4
Mr. Benard C. Rusche, Director                                      \c<      ogg c' g 4 Office of Nuclear Reactor Regulation United States Nuclear Regulatory Comission
                                                                                                .. ,
Office of Nuclear Reactor Regulation United States Nuclear Regulatory Comission
                                                                           \-          "''
                                                                           \-          "''
Q a3 Washington, D. C.      20S55                                                  _
Q a3 Washington, D. C.      20S55                                                  _
Line 110: Line 70:
           "Because of changes in the regulatory approach to selection of seismic design bases, the Committee believes that an acceleration of 0.20g would be more appropriate for the SSE acceleration at a site such as this in the Central Stable Region. The Applicant presented the results of preliminary cal.ulations concerning the safety margins of the plant for an SSE acceleration of 0.20g.                  The Committee recomends that the NRC Staff review this aspect of the design in detail and assure itself that significant margins exist in all systems required to accomplish safe shutdown of the reactor and continued shutdown heat removal, in the event of an SSE at this higher level."
           "Because of changes in the regulatory approach to selection of seismic design bases, the Committee believes that an acceleration of 0.20g would be more appropriate for the SSE acceleration at a site such as this in the Central Stable Region. The Applicant presented the results of preliminary cal.ulations concerning the safety margins of the plant for an SSE acceleration of 0.20g.                  The Committee recomends that the NRC Staff review this aspect of the design in detail and assure itself that significant margins exist in all systems required to accomplish safe shutdown of the reactor and continued shutdown heat removal, in the event of an SSE at this higher level."
Based on the discussions at the 201st ACRS meeting and the ACRS letter of January 14, 1977, we submitted to you under date of January 27, 1977, a " Report of Seismic Design Review" which provided this detailed analysis for a Seismic Event of 0.20g acceleration.
Based on the discussions at the 201st ACRS meeting and the ACRS letter of January 14, 1977, we submitted to you under date of January 27, 1977, a " Report of Seismic Design Review" which provided this detailed analysis for a Seismic Event of 0.20g acceleration.
   ~In this Report, we summarized the extensive investigation that led to the sele.: tion of a 0.15g acceleration Maximum Possible Earthquake (Safe Shutdown Earthqc 'te) at bedrock for the Davis-Besse Unit 1 design. This sumary was included to show that this is a very conservative seismic design basis since the Maximum Possible Earthquake was modeled conservatively after the maximum historic earthquake within the site region (the strong intensity MM VII Anna earthquake of 8 March 1937) even though available evidence indicates that
   ~In this Report, we summarized the extensive investigation that led to the sele.: tion of a 0.15g acceleration Maximum Possible Earthquake (Safe Shutdown Earthqc 'te) at bedrock for the Davis-Besse Unit 1 design. This sumary was included to show that this is a very conservative seismic design basis since the Maximum Possible Earthquake was modeled conservatively after the maximum historic earthquake within the site region (the strong intensity MM VII Anna earthquake of 8 March 1937) even though available evidence indicates that 2050 THE TOLECO ED! SON COMPANY  EDISCN PLAZA      300 MADISCN AVENUE        TCLECO. CHIO 43652
                                                .
                                                                                        .
2050 THE TOLECO ED! SON COMPANY  EDISCN PLAZA      300 MADISCN AVENUE        TCLECO. CHIO 43652


                          --
- Mr. Bancrd C. Ruscht, L.cc.ctor Pigg Two February 24, 1977 the Anna earthquakes are caused by local structural features in the Anna area, and thus should not be transposed to the Davis-Besse site. This conservatism was emphasized because logical analysis of existing data supports a strong intensity MM VI as being an appropriate design basis enrthquake for the Daits-Besse site.
                                                            ,
- Mr. Bancrd C. Ruscht, L.cc.ctor Pigg Two February 24, 1977
  .
the Anna earthquakes are caused by local structural features in the Anna area, and thus should not be transposed to the Davis-Besse site. This conservatism was emphasized because logical analysis of existing data supports a strong intensity MM VI as being an appropriate design basis enrthquake for the Daits-Besse site.
We also showed that using the Crifunac and Brady (1975) approach relating acceleration to intensity, that the calculated hor izontal vibratory acceler-ation for a strong intensity MM VII earthquake 13 0.187g and not the value of 0.20g discussed in the 201st ACR0 meeting and contained in the ACRS lettar of January 14, 1977.
We also showed that using the Crifunac and Brady (1975) approach relating acceleration to intensity, that the calculated hor izontal vibratory acceler-ation for a strong intensity MM VII earthquake 13 0.187g and not the value of 0.20g discussed in the 201st ACR0 meeting and contained in the ACRS lettar of January 14, 1977.
The discussion at the 201st ACRS meeting concerning a 0.20g horizontal accel-eration as a seismic design bases for Davis-Bcsse Unit I was all within the context of this acceleration being applied at the ground surface in free field with deconvolution down to foundation rock level. Our detail analysis of a 0.20g Seismic Event contained in our Report was based on this premise as was our preliminary calculations presented at the 201st ACRS meeting which the ACRS referenced in their 'etter of January 14, 1977.
The discussion at the 201st ACRS meeting concerning a 0.20g horizontal accel-eration as a seismic design bases for Davis-Bcsse Unit I was all within the context of this acceleration being applied at the ground surface in free field with deconvolution down to foundation rock level. Our detail analysis of a 0.20g Seismic Event contained in our Report was based on this premise as was our preliminary calculations presented at the 201st ACRS meeting which the ACRS referenced in their 'etter of January 14, 1977.

Revision as of 05:26, 1 February 2020

Suggests Approach to Be Used to Determine Rock Motion at Davis-Besse Site
ML19319B914
Person / Time
Site: Davis Besse, North Anna  Dominion icon.png
Issue date: 02/24/1977
From: Roe L
TOLEDO EDISON CO.
To: Rusche B
Office of Nuclear Reactor Regulation
References
227, NUDOCS 8001290649
Download: ML19319B914 (4)


Text

{{#Wiki_filter:- _ _ __ -ggc,;,;,fu 195 #_ v.s. nuctL AR nacutATORv couuission occxtr Nuunt n i

n. . u
                                                                                                      ^

50-346 NTICOISTRIBUTION FOR PART 50 DOCKET MATERI AL ro: B . C . RI,'S CHE FROM: TOLEDO EDISON DATE OF DOCUMENT TOLEDO,0HIO 2/24/77 L.E. ROE DATE RECEIVED 2/28/77 3 LETTER Cf40TORIZED PROP lt4!'UT FORM NUMOER CF CCPICS RECE:VED 3OftlGIN A L QU NC L ASSIFIE D OcCav l 1 SIGNED CY. RECEIVED ccscHIPTION ENCLCSURE  ! LT't. SUMMARIZING THE EXTENSIVE INVESTIGATION THAT LED TO THE SELECTION OF A 0.15g ACCELERAT13N MAXIMUM POSSIBLE EARTHQUAKE (SAFE SHUTDOWN EARTH QUAKE) AT BEDROCK FOR THE DESIGN....... gT M R E E E ( "' ACKNOWLEDGED PLANr NA!!E: DAVIS BESSE i i FAL'ETY FCR ACTIONilNFOR?.91 TION t mrTon SAB 3/7/77 - VASSALLO Aggyc.mn An. l / ASSIG:CD AD: ' I/JagCJL_ QUI'g e STOLZ npAMen m'Tve. ' ENGLE FROJECT IGNA_GER:

       ' PRO.f?CI MANAGER:

_%.!C d S_ST. ; HYLTON_ LIC. ASST. : t

 ~

INTERNAL DISTRIBUTION i

         'P C F7D                               SY3!E':S CAFETY                I     PLANT SYSTE'!S                            SITE SAFETY &
   ,jNRC FDR                                    HEINEMAN                  /          T"DXSCO                                   q"/IRQ_EnLYSIS flI & E                 (2)                    SCHROEDER                 1/ BT, ' AROYA                                       DHHICN & MI LL7R 10 ELD                                                             f/ LATNAs COSSICK & STAF7                        ENGI!"'ERING              I/l        IPPOLITO                                  E N V TJLo I G .

MIPC . MACARRY KIpg Qgn EREST a CASE / UC;;*X: SALLARD HANAUER / SII5'EIL 1, OPERATING REACTORS SPAliOLER IL%RLESS / PAULICKI

                                                                             / STELLO SI"'E TEC:1.

PROJECT MA!'AGEliENT REACTOR SAFETY OPERATING TECH. / GA}t!LL BOYD / ROSS EISE!;IiUT STEPP _ P. COLLINS / NOVAK SLMO HULMAN HOUSTO" / ROSZTCCZY BAER PETERSON / CHECK EUTLER , SITE ANALYS!3 MELT 2 can!ES c' VOLUJR

                                                                                                                  /, BU'?CH HELTEMES                               AT & I SROVHOLT                                SALTZMAN
                                                                                                                     ' J. COLLINS RUU3I'RG                                                             /_KPECFR EXTERN AL DISTRIBUTION                                                          . CONTROL NU?1BE R PORT CLINTON.}D.          NAT M \3:                            Brio 0lsU N 4EN_.lta T. L/ 1                                             l TIC:

[[[LPDR; NSIC: REG V.IE LAlnF. UL_RIKSON (ORUL) 2050

                                                                                                                                        '        N i

j ASLB \ M A -- CONJULTANTS: _

                                                     ~

hCRS):[aCYSuc.!nng/dE! T /# 3 N /J, P4stC e nHM 195 2 70) 8 0 012$06{ g

u .Inory Fip Cy]

                                                 #                               Totsoa fh          %,,

c ac t  % EDISON 9 LOWELL E. ROE Docket No. 50-346 2819773r 3, ua r.. h w,, y g q,y s> ass.sw Serial No. 227 ,

                                                     ""cd,           -    V    V ,2c,., % '

February 24, 1977 %4i,',' d\' /~L p.-' L- m,.n ' m. Mr. Benard C. Rusche, Director \c< ogg c' g 4 Office of Nuclear Reactor Regulation United States Nuclear Regulatory Comission

                                                                         \-          "

Q a3 Washington, D. C. 20S55 _

                                                                                         ,p Ecar Mr. Rusche:

During the 201st Advisory Comittee on Reactor Safeguards (ACRS) meeting at which the application by The Toledo Edison Company and The Cleveland Electric Illuminating Company for a license to operate the Davis-Besse Nuclear Power Station Unit I was reviewed, considerable discussion took place between the NRC staff members and the ACRS concerning seismic design bases. The ACRS letter of January 14, 1977 reporting the results of their review contained a paragraph concerning seismic design bases stating:

         "Because of changes in the regulatory approach to selection of seismic design bases, the Committee believes that an acceleration of 0.20g would be more appropriate for the SSE acceleration at a site such as this in the Central Stable Region. The Applicant presented the results of preliminary cal.ulations concerning the safety margins of the plant for an SSE acceleration of 0.20g.                   The Committee recomends that the NRC Staff review this aspect of the design in detail and assure itself that significant margins exist in all systems required to accomplish safe shutdown of the reactor and continued shutdown heat removal, in the event of an SSE at this higher level."

Based on the discussions at the 201st ACRS meeting and the ACRS letter of January 14, 1977, we submitted to you under date of January 27, 1977, a " Report of Seismic Design Review" which provided this detailed analysis for a Seismic Event of 0.20g acceleration.

 ~In this Report, we summarized the extensive investigation that led to the sele.: tion of a 0.15g acceleration Maximum Possible Earthquake (Safe Shutdown Earthqc 'te) at bedrock for the Davis-Besse Unit 1 design. This sumary was included to show that this is a very conservative seismic design basis since the Maximum Possible Earthquake was modeled conservatively after the maximum historic earthquake within the site region (the strong intensity MM VII Anna earthquake of 8 March 1937) even though available evidence indicates that 2050 THE TOLECO ED! SON COMPANY  EDISCN PLAZA      300 MADISCN AVENUE        TCLECO. CHIO 43652

- Mr. Bancrd C. Ruscht, L.cc.ctor Pigg Two February 24, 1977 the Anna earthquakes are caused by local structural features in the Anna area, and thus should not be transposed to the Davis-Besse site. This conservatism was emphasized because logical analysis of existing data supports a strong intensity MM VI as being an appropriate design basis enrthquake for the Daits-Besse site. We also showed that using the Crifunac and Brady (1975) approach relating acceleration to intensity, that the calculated hor izontal vibratory acceler-ation for a strong intensity MM VII earthquake 13 0.187g and not the value of 0.20g discussed in the 201st ACR0 meeting and contained in the ACRS lettar of January 14, 1977. The discussion at the 201st ACRS meeting concerning a 0.20g horizontal accel-eration as a seismic design bases for Davis-Bcsse Unit I was all within the context of this acceleration being applied at the ground surface in free field with deconvolution down to foundation rock level. Our detail analysis of a 0.20g Seismic Event contained in our Report was based on this premise as was our preliminary calculations presented at the 201st ACRS meeting which the ACRS referenced in their 'etter of January 14, 1977. The letter of February 17, 1977 from Mr. R. F. Fraley, ACRS Executive Director, to you now states that this seismic design review of the detail design of the Davis-Besse Unit 1 should be based en a Seismic Event of 0.20g horizontal acceleration applied directly at the bedrock foundation level. We feel that this only adds another layer of redundant conservatism heaped upon an already unnecessary redundance of conservatism. It is our understanding that at the extensive discussions and presentations at the February 8 and 9,1977 ACRS Seismic Activity Subconnittee meeting there were some who challenged the applicability of deconvolution at sites where there is a shallow soil profile euch as at the Davis-Besse site. We believe this is what has led the ACRS to change, what was clearly inferred by us in their January 14, 1977 letter, as a 0.20g horizontal acceleration at the ground surface in free field with deconvolution to bedrock foundation level, to a 0.20g horizontal acceleration applied directly to the bedrock foundation level. If there is any credence to accept as a seismic design bases, the transposition of the Anna March 8, 1937 earthquake directly to the Davis-Besse site (which we strongly feel a disciplined scientific approach would not allow) then it should result in the corresponding rock " outcrop" motion at Davis-Besse being the same as that at Anna. Consequently, if such transposition is required, we have examined a more realistic approach to arrive at the rock motion corre-sponding to that at Anna. This, however, does not diminish our belief that the Anna earthquakes are caused by local structural features in the Anna area, and thus should not be transposed to the Davis-Besse site. The geologic - ofile in the epicentral region of the Anna earthquakes consists of a bedrock valley filled with over 200 ft. of alluvial and fluvial deposits. The geologic profile at the Davis-Besse site consists of 25 ft. of stiff glacial deposits and compacted fill over flat-lying bedrock.}}