ML19337B628: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:0 | {{#Wiki_filter:0 e | ||
e | |||
;- , | ;- , | ||
C~ ' ; TOLEDO | C~ ' ; TOLEDO | ||
: EDISON September 29, 1980 Acranc P. CRouSE Docket No. 50-346 UU'" | : EDISON September 29, 1980 Acranc P. CRouSE Docket No. 50-346 UU'" | ||
License No. NPF-3 to191259-5221 Serial No. 652 Mr. Harold R. Denton, Director | License No. NPF-3 to191259-5221 Serial No. 652 Mr. Harold R. Denton, Director | ||
| Line 34: | Line 30: | ||
Yours very truly, f f .i :^ | Yours very truly, f f .i :^ | ||
RPC/ljk , | RPC/ljk , | ||
Attachment cc: Mr. Norman Haller., Director Of fice of Management Program Analysis Encl:, 2 Mr. Luis Reyes NRC Resident Inspector Encl: 1 | Attachment cc: Mr. Norman Haller., Director Of fice of Management Program Analysis Encl:, 2 Mr. Luis Reyes NRC Resident Inspector Encl: 1 8010080 THE TCLEGO EDI3ON COMPANY 233 EDISON PLAZA 300 MADISON AVENUE TOi.EDO, OH'O 43652}} | ||
8010080 THE TCLEGO EDI3ON COMPANY 233 EDISON PLAZA 300 MADISON AVENUE TOi.EDO, OH'O 43652}} | |||
Revision as of 13:18, 31 January 2020
| ML19337B628 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 09/29/1980 |
| From: | Crouse R TOLEDO EDISON CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19337B629 | List: |
| References | |
| 652, NUDOCS 8010080233 | |
| Download: ML19337B628 (1) | |
Text
0 e
- - ,
C~ ' ; TOLEDO
- EDISON September 29, 1980 Acranc P. CRouSE Docket No. 50-346 UU'"
License No. NPF-3 to191259-5221 Serial No. 652 Mr. Harold R. Denton, Director
- Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Mr. Denton:
Attached please find 15 copies of the Primary Reactor Containment Integrated Leakage Rate Test report for the Davis-Besse Nuclear Power Station Unit 1, which is being submitted to the Nuclear Regulatory Commission in accordance with Appendix J of 10CFR Part 50.
The results of the test show that the actual measured containment vessel leakage, when the containment vessel is pressurized to the peak calculated accident pressure, is less than 75% of the maximum allowable leakage assumed in safety analyses. The containment vessel has, therefore, been assessed ~as being fully capable of performing its intended function in the operation of the Davis-Besse Nuclear Power Station Unit 1.
Yours very truly, f f .i :^
RPC/ljk ,
Attachment cc: Mr. Norman Haller., Director Of fice of Management Program Analysis Encl:, 2 Mr. Luis Reyes NRC Resident Inspector Encl: 1 8010080 THE TCLEGO EDI3ON COMPANY 233 EDISON PLAZA 300 MADISON AVENUE TOi.EDO, OH'O 43652