ML060340010: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:-cc .-- 0-c ' | {{#Wiki_filter:-cc | ||
.-- 0-c ' | |||
K e w a w e Nuclear Power Plant Operated by Nuclear Management Company. LLC NRC-03-096 September 18.2003 U.S. Nuclear Regulatory Commission ATTN: Dowment Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR43 RESPONSE TO REGULATORY ISSUE | |||
==SUMMARY== | ==SUMMARY== | ||
2003-14 Regulatory Issue Summary (RIS) 2003.14. "Preparation and Scheduling of Operator Licensing Examinations." was issued on August 27,2003. The RIS asked that within 30 days licensees voluntarily submit schedular information concerning examination preparation for CYs 2004 through 2007. initial operator license examinations for CYs 2004 through 2007, and generic fundamentals examinations in CYs 2004 and 2005. Attached is a completed NRC Form 536 that provides the requested information for Kewaunee Thomas Coutu Site Vice President, Kewaunee Nuclear Power Plant Nuclear Management Company, LLC Enclosure cc: Chief, Operator Licensing Branch. USNRC Region 111 Senior Resident Inspector, Kewaunee, USNRC N490 Highway 42 Kewaunee, Wisconsin 54216-9510 TeleDhOrI.9: | 2003-14 Regulatory Issue Summary (RIS) 2003.14. "Preparation and Scheduling of Operator Licensing Examinations." was issued on August 27,2003. The RIS asked that within 30 days licensees voluntarily submit schedular information concerning examination preparation for CYs 2004 through 2007. initial operator license examinations for CYs 2004 through 2007, and generic fundamentals examinations in CYs 2004 and 2005. | ||
920.388.2560 | Attached is a completed NRC Form 536 that provides the requested information for Kewaunee Thomas Coutu Site Vice President, Kewaunee Nuclear Power Plant Nuclear Management Company, LLC Enclosure cc: Chief, Operator Licensing Branch. USNRC Region 111 Senior Resident Inspector, Kewaunee, USNRC N490 Highway 42 Kewaunee, Wisconsin 54216-9510 TeleDhOrI.9:920.388.2560 | ||
. )IRC FORM 6Z4 | |||
NO.3l59-0131 | . | ||
)IRC FORM 6Z4 U.S. NUCLEAR REGUUTORY COMMISSION WPROWDBYOklB. NO.3l59-0131 OWES' oIIsIf2U SlrmJ Eillnm1.6 bumn u Io comply wllh I h h wlunlmy hlarmmB cdledkn mq4Me PGY b WxmIkm d k M n b u u d b p n M d p l OPERATOR LICENSING EXAMINATION DATA | |||
%2!&4 cyvras " | :Kam NRC REGION Kewaunee Nuclear Power Plant Docket 50-305 I11 Operator License DPR-43 PROPOSED NUMBER - | ||
WI 54216- | cy 2004 | ||
- | |||
cy 2005 | |||
- | |||
cy 2006 | |||
- | |||
cy 2007 ESTIMATE0 NUMBER OF LICENSEEPREPARED 1 1 UUMlNATlWS EsnmTEo NUMBER OF NRCPREPARED 1 MAMINATIONS | |||
~ | |||
PROPOSED NUMBER %2!&4 cyvras 6-" cyulo7 NUMBER OF REACTOR OPERATORS 5 6 6 | |||
~ ~ | |||
NUMBER OF SENIOR REACTOR | |||
- | |||
OPERATORS NSTANT NUMBER OF SENIOR REACTOR 1 3 I 3 | |||
- | |||
OPERATORS UPGRADE 1 3 3 NUMBER OF SENIOR REACTOR OPERATORS UMmO - 0 0 0 PROPOSED DATES week of PRIMARY DATE 02/02/04 and Sept. 2005 Sept. 2007 02/09/04 ALTERNATE DATE Oct. 2005 Oct. 2007 | |||
:.~ | |||
PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE | |||
~ ~ | |||
CY PROPOSED 4?&6 NUMBER MARCH JUNE SEFTEMB DECEMBER MARCH JUNE SEPTEMB | |||
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION | |||
__ Ill . | |||
801 WARRENVLLE ROAD L I S & ILLINOIS 60532.4351 March 2, 2004 Mr. Thomas Coutu Site Vice President Kewaunee Nuclear Plant Nuclear Management Company, LLC N490 Hwy 42 Kewaunee. WI 54216-9511 | |||
==SUBJECT:== | ==SUBJECT:== | ||
KEWAUNEE NUCLEAR POWER PLANT CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS | KEWAUNEE NUCLEAR POWER PLANT CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS | ||
==Dear Mr. Coutu:== | ==Dear Mr. Coutu:== | ||
In a letter dated September 18, 2003, your staff responded to NRC Regulatory Issue Summary (RIS) 2003-14, "Preparation and Scheduling of Operator Licensing Examinations." Initial license examinations were requested during the month of September 2005, and during the month of September 2007. | |||
Due to a heavy work schedule, we were not able to accommodate your request for a September 2005 examination, nor were we able to use the alternate date of October 2005 as requested in the RIS response. However, we are able to provide an examination during the weeks of November 7 and 14, 2005. This date has been confirmed in a telephone conversation between Mr. D. McNeil of my staff and Mr. W. Godes, General Supervisor Operator Training. | In a letter dated September 18, 2003, your staff responded to NRC Regulatory Issue Summary (RIS) 2003-14, "Preparation and Scheduling of Operator Licensing Examinations." Initial license examinations were requested during the month of September 2005, and during the month of September 2007. Due to a heavy work schedule, we were not able to accommodate your request for a September 2005 examination, nor were we able to use the alternate date of October 2005 as requested in the RIS response. However, we are able to provide an examination during the weeks of November 7 and 14, 2005. This date has been confirmed in a telephone conversation between Mr. D. McNeil of my staff and Mr. W. Godes, General Supervisor Operator Training. The examination requested for October 2007 will be scheduled as we approach that date. | ||
The examination requested for October 2007 will be scheduled as we approach that date. On-site validation of the examinations will occur at Kewaunee Nuclear Power Plant approximately 3 weeks before the examination administration date. In the unlikely event that we are unable to support the examinations during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements tu administer the examinations at a mutually acceptable date. | On-site validation of the examinations will occur at Kewaunee Nuclear Power Plant approximately 3 weeks before the examination administration date. In the unlikely event that we are unable to support the examinations during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements tu administer the examinations at a mutually acceptable date. | ||
As indicated in your RIS response letter, my staff will develop the February 2004 examination and your staff will develop the November 2005 and September 2007 examinations. | As indicated in your RIS response letter, my staff will develop the February 2004 examination and your staff will develop the November 2005 and September 2007 examinations. Your response to the RIS indicated that there will be 12 candidates for each of the November 2005 and September 2007 examinations. Please inform us if the number of candidates decreases below 10 as this will impact the examination schedule. | ||
Your response to the RIS indicated that there will be 12 candidates for each of the November 2005 and September 2007 examinations. | A supplementary letter will be sent to the training department approximately 120 days prior to the initial examination informing them of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you | ||
Please inform us if the number of candidates decreases below 10 as this will impact the examination schedule. | |||
A supplementary letter will be sent to the training department approximately 120 days prior to the initial examination informing them of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. D. McNeil of my staff at 630-829-9737. | T. Coutu have in the training program. If you have any questions concerning this information, please contact Mr. D. McNeil of my staff at 630-829-9737. | ||
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice." a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). | In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice." a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at httD://w.nrc.qovlreadinq-rmladams.html (the Public Electronic Reading Room) | ||
ADAMS is accessible from the NRC Web site at httD://w.nrc.qovlreadinq-rmladams.html (the Public Electronic Reading Room) | Sincerely, | ||
Sincerely, / Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: D. Graham, Director, Bureau of Field Operations Chairman, Wisconsin Public Service Commission State Liaison Officer have in the training program. If you have any questions concerning this information, please contact Mr. | / | ||
D. McNeil of my staff at 630-829-9737. | Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: D. Graham, Director, Bureau of Field Operations Chairman, Wisconsin Public Service Commission State Liaison Officer | ||
T. Coutu have in the training program. If you have any questions concerning this information, please contact Mr. D. McNeil of my staff at 630-829-9737. | |||
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). . ADAMS is accessible from the NRC Web site at http://www.nrc,aov/readinq-rm/adams.html (the Public Electronic Reading Room). | In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). . ADAMS is accessible from the NRC Web site at http://www.nrc,aov/readinq-rm/adams.html (the Public Electronic Reading Room). | ||
Sincerely, Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. | Sincerely, Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: D. Graham, Director, Bureau of Field Operations Chairman, Wisconsin Public Service Commission State Liaison Officer ADAMS Distribution: | ||
50-305 License No. DPR-43 cc: D. Graham, Director, Bureau of Field Operations Chairman, Wisconsin Public Service Commission State Liaison Officer ADAMS Distribution: | WDR DFT JGLI DCT RidsNrrDipmlipb GEG HBC JFL DRPlll DRSlll PLBI JRKI M. A. Bies (concurrence copy) | ||
WDR DFT JGLI DCT RidsNrrDipmlipb GEG HBC JFL DRPlll DRSlll PLBI JRKI M. A. Bies (concurrence copy) | |||
-, - -- | -, | ||
920.388.2560 | - | ||
/;". | - - | ||
~- ~- CY2005 - CY - | ' | ||
DPR-43 Senior Reactor and Reactor ODerator Initial Examinations In accordance with the guidelines NUREG 1021, | \& | ||
Revision 9, I hereby request that the NRC Region 111 author the written portion of the Operator Initial License Exam to be administered this November 2005. This would include both Reactor Operator and Senior Reactor Operator segments. Kewaunee Nuclear Power Plant staff would develop both the simulator and walk-through segments. | 1 Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC July 6,'2004 NRC-04-072 RIS 2004-10 10 CFR 55 U.S. Nuclear Regulatory Commission AlTN: Document Control Desk Washington, D.C. 20555 Kewaunee Nuclear Power Plant Docket 50-305 License No. DPR-43 Response To Reoulatow Issue Summaw 2004-10 Regulatory Issue Summary (RIS) 2004-10, 'Preparatidn and Scheduling of Operator Licensing Examinations," was issued on June 14,2004. The RIS requested that within 30 days, licensees voluntarily submit schedular information concerning examination preparation for calendar years (CYs) 2005 through 2008, initial operator license examinations for CYs 2005 through 2008, and generic fundamentals examinations in CYs 2005 and 2006. | ||
Enclosed is a completed NRC Form 536 that provides the requested information for the Kewaunee Nuclear Power Plant. | |||
I declare under penalty of perjury that the foregoing is true and accurate. Executed on July 6,2004. | |||
Thomas Coutu Site Vice President, Kewaunee Nuclear Power Plant Nuclear Management Company, LLC Enclosure (1) cc: Administrator, Region 111, USNRC Senior Resldent Inspector, Kewaunee, USNRC N490 Highway42 Kewaunee, Wisconsin 54216-9511 Telephone: 920.388.2560 | |||
/;".Ib y / 77('Al.2 | |||
RC FORM 636 U.S. NUC~REGULATORYCOMMISSIONlAPPROVE0 BYOMB: NO.3150-0151 EXPIRES: oininM nml acr- ARCREGION Kewaunee Nuclear Power Plant Docket No. 50-305 Region 111 License No. DPR-43 | |||
~- ~- | |||
PROPOSED NUMBER - | |||
CY2005 - | |||
CY 2006 - | |||
CY 2007 CY308 ESTIMTEDNUMBER OF LICENSEE-PREPARED MAMINATIONS ESTIMATED NUMBER OF NRCPREPARED MAMINATIONS PROPOSED NUMBER - | |||
cy 2005 C y 2 0 06 c y 2 07 CYaO8 NUMBEROFREACTOR OPERATORS I 2 1 NUMBER OF SENIOR REACTOR | |||
- | |||
OPERATORS INSTANT I 5 1 3 1 NUMBER OF SENIOR REACTOR | |||
- | |||
OPERATORS UPGRADE PROPOSED DATES I I PRIMARY DATE Sept. 2005 Oct. 2007 ALTERNATE DATE , O c t . 2005 Nov. 2007 I I I I E. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED ----- | |||
CY mnLi I cy - 2006 | |||
-... | |||
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBE ESTIMATED NUMBER OF CANDIDATES 9 | |||
Kewaunee Nuclear Power Plant Committed to Nuclear Excsllenca Operated by Nuclear Management Company, LLC February 10,2005 NRC-05419 10 CFR 55.40 Regional Administrator, Region 111 U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532 - 4352 Kewaunee Nuclear Power Plant Docket 50-305 License No. DPR-43 Senior Reactor and Reactor ODerator Initial Examinations In accordance with the guidelines NUREG 1021, Operating License Examination Standard for Power Reactors, Revision 9, I hereby request that the NRC Region 111 author the written portion of the Operator Initial License Exam to be administered this November 2005. This would include both Reactor Operator and Senior Reactor Operator segments. Kewaunee Nuclear Power Plant staff would develop both the simulator and walk-through segments. | |||
You may direct any questions or comments regarding this matter to Mr. Stephen Johnson at (920) 388-8723 or Mr. Jeffrey L. Stoeger at (920) 388-8265. | You may direct any questions or comments regarding this matter to Mr. Stephen Johnson at (920) 388-8723 or Mr. Jeffrey L. Stoeger at (920) 388-8265. | ||
Craig W. Lambert Site Vice-president, Kewaunee Plant Nuclear Power Plant Nuclear Management Company, LLC cc: Resident Inspector, Kewaunee, USNRC John Palmer, NMC - Kewaunee Nuclear Power Plant Jeff Stoeger, NMC - Kewaunee Nuclear Power Plant Stephen Johnson, NMC - Kewaunee Nuclear Power Plant UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 2443 WARRENVILLE ROAD, SUITE 2 IO LISLE, ILLINOIS 60532-4352 April 8, 2005 Mr. Craig W. Lambert Site Vice President Kewaunee Nuclear Power Plant Nuclear Management Company, LLC N490 Hwy 42 Kewaunee, WI 54216-9511 | Craig W. Lambert Site Vice-president, Kewaunee Plant Nuclear Power Plant Nuclear Management Company, LLC cc: Resident Inspector, Kewaunee, USNRC John Palmer, NMC - Kewaunee Nuclear Power Plant Jeff Stoeger, NMC - Kewaunee Nuclear Power Plant Stephen Johnson, NMC - Kewaunee Nuclear Power Plant | ||
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 2443 WARRENVILLE ROAD, SUITE 2 IO LISLE, ILLINOIS 60532-4352 April 8, 2005 Mr. Craig W. Lambert Site Vice President Kewaunee Nuclear Power Plant Nuclear Management Company, LLC N490 Hwy 42 Kewaunee, WI 54216-9511 | |||
==SUBJECT:== | ==SUBJECT:== | ||
KEWAUNEE NUCLEAR POWER PLANT - OPERATOR LICENSE EXAMINATION REQUEST | KEWAUNEE NUCLEAR POWER PLANT - OPERATOR LICENSE EXAMINATION REQUEST | ||
==Dear Mr. Lambert:== | ==Dear Mr. Lambert:== | ||
Your February 10, 2005, letter requested that NRC Region 111 author the written portion of the Operator Initial License Examination to be administered in November 2005. Due to personnel limitations we will be unable to accommodate your request. I have discussed this with Mr. J. Stroeger of your staff and understand that other arrangements have been made for writing of the examination. | Your February 10, 2005, letter requested that NRC Region 111 author the written portion of the Operator Initial License Examination to be administered in November 2005. Due to personnel limitations we will be unable to accommodate your request. I have discussed this with Mr. J. Stroeger of your staff and understand that other arrangements have been made for writing of the examination. | ||
Should there be any questions concerning this matter please contact me at (630) 829-9631, or Mr. Bruce Palagi, the chief examiner for the 2005 examination, at (630) 829- | Should there be any questions concerning this matter please contact me at (630) 829-9631, or Mr. Bruce Palagi, the chief examiner for the 2005 examination, at (630) 829-9611. | ||
Sincerely, Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 See Attached Distribution | |||
C. Lambert cc' J Cowan, Executive Vice President, Chief Nuclear Officer Plant Manager Manager, Regulatory Affairs J. Rogoff, Vice President, Counsel & Secretary D. Molzahn, Nuclear Asset Manager, Wisconsin Public Service Corporation L. Weyers, Chairman, President and CEO, Wisconsin Public Service Corporation D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin J. Palmer, Kewaunee Training Manager | |||
Mr. Craig W. Lambert Site Vice President Kewaunee Nuclear Power Plant Nuclear Management Company, LLC N490 Hwy 42 Kewaunee, WI 54216-9511 | |||
==SUBJECT:== | ==SUBJECT:== | ||
KEWAUNEE NUCLEAR POWER PLANT - OPERATOR LICENSE EXAMINATION REQUEST | KEWAUNEE NUCLEAR POWER PLANT - OPERATOR LICENSE EXAMINATION REQUEST | ||
==Dear Mr. Lambert:== | ==Dear Mr. Lambert:== | ||
Your February 10, 2005, letter requested that NRC Region Ill author the written portion of the Operator Initial License Examination to be administered in November 2005. Due to personnel limitations we will be unable to accommodate your request. | |||
I have discussed this with Mr. J. Stroeger of your staff and understand that other arrangements have been made for writing of the examination. | Your February 10, 2005, letter requested that NRC Region Ill author the written portion of the Operator Initial License Examination to be administered in November 2005. Due to personnel limitations we will be unable to accommodate your request. I have discussed this with Mr. J. Stroeger of your staff and understand that other arrangements have been made for writing of the examination. | ||
Should there be any questions concerning this matter please contact me at (630) 829-9631, or Mr. Bruce Palagi, the chief examiner for the 2005 examination, at (630) 829- | Should there be any questions concerning this matter please contact me at (630) 829-9631, or Mr. Bruce Palagi, the chief examiner for the 2005 examination, at (630) 829-9611. | ||
@+ DATE 04/%/05 04/ $105 | Sincerely, Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety OFFICE Rlll Id Rlll 12 I I NAME 6Palagi:tr K RLanksbury@+ | ||
DATE 04/%/05 04/ $105 | |||
Mr. Craig W. Lambert Site Vice President Kewaunee Nuclear Power Plant Nuclear Management Company, LLC N490 Hwy 42 Kewaunee, WI 54216-9511 | |||
==SUBJECT:== | ==SUBJECT:== | ||
KEWAUNEE NUCLEAR POWER PLANT - OPERATOR LICENSE EXAMINATION REQUEST | KEWAUNEE NUCLEAR POWER PLANT - OPERATOR LICENSE EXAMINATION REQUEST | ||
==Dear Mr Lambert:== | ==Dear Mr Lambert:== | ||
Your February 10, 2005, letter requested that NRC Region 111 author the written portion of the Operator Initial License Examination to be administered in November 2005. Due to personnel limitations we will be unable to accommodate your request. I have discussed this with Mr. J. Stroeger of your staff and understand that other arrangements have been made for writing of the examination. | Your February 10, 2005, letter requested that NRC Region 111 author the written portion of the Operator Initial License Examination to be administered in November 2005. Due to personnel limitations we will be unable to accommodate your request. I have discussed this with Mr. J. Stroeger of your staff and understand that other arrangements have been made for writing of the examination. | ||
Should there be any questions you have concerning this matter please contact me at (630) 829-9631, or Mr. Bruce Palagi, the chief examiner for the 2005 examination, at (630) 829- | Should there be any questions you have concerning this matter please contact me at (630) 829-9631, or Mr. Bruce Palagi, the chief examiner for the 2005 examination, at (630) 829-9611 . | ||
& Secretary D. Molzahn, Nuclear Asset Manager, Wisconsin Public Service Corporation L. Weyers, Chairman, President and CEO, Wisconsin Public Service Corporation D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin J. Palmer, Kewaunee Training Manager | Sincerely, Roger D. Lanksbuty, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 See Attached Distribution DOCUMENT NAME: KEW 04 05 DRS.wpd OFFICE Rlll w Rlll I I I NAME BPalagi:tr RLanksbury DATE 04/7/05 041 105 | ||
WDR CFL RidsNrrDipmlipb GEG KGO JFL DRPlll DRSlll PLBI JRKI MABI UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 July 14, 2005 Mr. Michael G. Gaffney Site Vice President Kewaunee Nuclear Power Plant Nuclear Management Company, LLC N490 Hwy 42 Kewaunee, WI 54216 | |||
C. Lambert cc: J. Cowan, Executive Vice President, Chief Nuclear Officer Plant Manager Manager, Regulatory Affairs J. Rogoff, Vice President, Counsel & Secretary D. Molzahn, Nuclear Asset Manager, Wisconsin Public Service Corporation L. Weyers, Chairman, President and CEO, Wisconsin Public Service Corporation D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin J. Palmer, Kewaunee Training Manager ADAMS Distribution: | |||
WDR CFL RidsNrrDipmlipb GEG KGO JFL DRPlll DRSlll PLBI JRKI MABI | |||
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 July 14, 2005 Mr. Michael G. Gaffney Site Vice President Kewaunee Nuclear Power Plant Nuclear Management Company, LLC N490 Hwy 42 Kewaunee, WI 54216 | |||
==Dear Mr. Gaffney:== | ==Dear Mr. Gaffney:== | ||
In a telephone conversation on July 11, 2005, between Mr. Bruce Palagi and Mr. Frank Winks, arrangements were made for the administration of licensing examinations at the Kewaunee Nuclear Power Plant the weeks November 7.2005, and November 14,2005. In addition, the NRC will make an examination validation visit to your facility the week of October 17, 2005. As agreed during the telephone conversation. your staff will prepare the examinations based on the guidelines in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered. | |||
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by August 1, 2005. The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 to ES-201 will be due by September 26, 2005. Pursuant to 10 CFR 55.40(b)(3), of the Code of Federal Regulations (IO CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402. and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g.. system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. | In a telephone conversation on July 11, 2005, between Mr. Bruce Palagi and Mr. Frank Winks, arrangements were made for the administration of licensing examinations at the Kewaunee Nuclear Power Plant the weeks November 7.2005, and November 14,2005. In addition, the NRC will make an examination validation visit to your facility the week of October 17, 2005. | ||
As agreed during the telephone conversation. your staff will prepare the examinations based on the guidelines in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered. | |||
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by August 1, 2005. The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 to ES-201 will be due by September 26, 2005. | |||
Pursuant to 10 CFR 55.40(b)(3), of the Code of Federal Regulations (IO CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. | |||
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402. and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g.. system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. | |||
Appendix E of NUREG-I021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. | Appendix E of NUREG-I021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. | ||
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024). | |||
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30,2006. The public reporting burden for this collection is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (l-6 F33). | M. Gaffney To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024). | ||
The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. Thank you for your cooperation in this matter. Mr. Winks has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Bruce Palagi at 630-829- | and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. | ||
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30,2006. The public reporting burden for this collection is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (l-6 F33). U S . Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSl@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503-0001. | |||
Hiknori Peterson, Chief Operations Branch | The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. | ||
If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Paperwork Reduction | Thank you for your cooperation in this matter. Mr. Winks has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707. | ||
20503-0001. | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice." a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at httd/www.nrc.aov/readinq-rm/adams.html. | ||
The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. Thank you for your cooperation in this matter. Mr. | / | ||
Winks has been advised of the policies and guidelines referenced in this letter. | Hiknori Peterson, Chief Operations Branch Divisionof Reactor Safety Docket No. 50-305 License No. DPR-43 See Attached Distribution | ||
If you have any questions regarding the NRC's examination procedures and guidelines, please contact Bruce Palagi at 630-829- | |||
M.Gaffney To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), | |||
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. | |||
WDR CFL RidsNrrDipmlipb GEG KGO SXB3 DRPlll DRSlll PLBI JRKI DCT MABI | This letter contains information collections that are subject to the Paperwork Reduction A d of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30,2006. The public reporting burden for this collection is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSI @nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503-0001. | ||
The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. | |||
05-484 KPS/LIC/GR: | Thank you for your cooperation in this matter. Mr. Winks has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707. | ||
R1 Docket No. 50-305 License No. DPR-43 DOMINION ENERGY KEWAUNEE, INC. KEWAUNEE POWER STATION REVISED EXAMINATION OUTLJNES DUE DATE In a letter regarding operator-licensing examinations from the Nuclear Regulatory Commission (NRC), Region 111, dated July 14, 2005, the NRC stated that to meet the stated examination schedule the Kewaunee Power Station (KPS) staff needed to furnish the NRC Region 111 staff with the examination outlines by August 1, 2005. During a telephone conversation on July 28,2005 between Mr. Frank Winks of KPS and Mr. Bruce Palagi of NRC Region 111, the date was clarified to be August 8, 2005. If you have any questions regarding this matter please contact Mr. | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at htto://www.nrc.sov/readina-rm/adams.html. | ||
Franks Winks at 920-388-8303. Very truly yours, Michael G. Gaffney Site Vice President, Kewaunee Power Station Commitments made by this letter: | Sincerely, | ||
/a/ | |||
WI 54216-951 I AUG 1 2 2005 U. S. Nuclear Regulatory Commission | Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 See Attached Distribution DOCUMENT NAME: G:\DRS\Work in Prooress\KEW " 07 05 DRS.wDd OFFICIAL RECORD COPY | ||
Document Control Desk Washington, DC 20555 | |||
M. Gaffney cc: J. Cowan. Executive Vice President Chief Nuclear Officer Plant Manager Manager, Regulatory Affairs J. Rogoff, Vice President, Counsel & Secretary D. Molzahn, Nuclear Asset Manager, Wisconsin Public Service Corporation L. Weyers. Chairman, President and CEO, Wisconsin Public Service Corporation D.Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin J. Palmer, Training Department | |||
NONE cc: Mr. J. L. Caldwell Administrator Region Ill US. Nuclear Regulatory Commission 2443 Warrenville Road Suite 21 0 Lisle, IL 60532-4352 Mr. J. F. Stang Project Manager | |||
M. Gaffney 4 ADAMS Distribution: | |||
WDR CFL RidsNrrDipmlipb GEG KGO SXB3 DRPlll DRSlll PLBI JRKI DCT MABI | |||
Dominion Energy Kcwauncc, Inc. | |||
N490 Highway 42. Kewaunre, WI 54216-951I Dominiona AUG 0 2 2005 U. S. Nuclear Regulatory Commission Serial No. 05-484 Attention: Document Control Desk KPS/LIC/GR: R1 Washington, DC 20555 Docket No. 50-305 License No. DPR-43 DOMINION ENERGY KEWAUNEE, INC. | |||
KEWAUNEE POWER STATION REVISED EXAMINATION OUTLJNES DUE DATE In a letter regarding operator-licensing examinations from the Nuclear Regulatory Commission (NRC), Region 111, dated July 14, 2005, the NRC stated that to meet the stated examination schedule the Kewaunee Power Station (KPS) staff needed to furnish the NRC Region 111 staff with the examination outlines by August 1, 2005. During a telephone conversation on July 28,2005 between Mr. Frank Winks of KPS and Mr. | |||
Bruce Palagi of NRC Region 111, the date was clarified to be August 8, 2005. | |||
If you have any questions regarding this matter please contact Mr. Franks Winks at 920-388-8303. | |||
Very truly yours, Michael G. Gaffney Site Vice President, Kewaunee Power Station Commitments made by this letter: None | |||
Serial No. 05-484 Page 2 of 2 cc : Mr. J. L. Caldwell Administrator, Region U. S. Nuclear Regulatory Commission Region 111 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352 Mr. J. F. Stang Project Manager U S . Nuclear Regulatory Commission Mail Stop 0-8-H-4a Washington, D. C. 20555 Mr. S. C. Burton NRC Senior Resident Inspector Kewaunee Power Station Public Service Commission of Wisconsin Electric Division P.O. Box 7854 Madison, WI 53707 | |||
Dominion Energy Kovaunec, Inc. | |||
N 4 9 0 Highway 42, Kewaunce. WI 54216-951 I Dominion" AUG 1 2 2005 U. S.Nuclear Regulatory Commission Serial No. 05-484A Attention: Document Control Desk KPSILICIGR: RO Washington, DC 20555 Docket No. 50-305 License No. DPR-43 DOMINION ENERGY KEWAUNEE, INC. | |||
KEWAUNEE POWER STATION RESPONSE TO REQUEST TO FURNISH EXAMINATION OUTLINES In response to a letter from the NRC dated July 14, 2005 regarding the administration of licensing examinations at the Kewaunee Power Station, examination outlines were hand delivered to Mr. Bruce Palagi and Mr. Hironori Peterson at Region 111 on August 8,2005. | |||
If you have any questions, please contact Frank Winks at (920) 388-8303 Very truly yours, Commitments made by this letter: NONE cc: Mr. J. L. Caldwell Administrator Region Ill US. Nuclear Regulatory Commission 2443 Warrenville Road Suite 21 0 Lisle, IL 60532-4352 Mr. J. F. Stang Project Manager U S . Nuclear Regulatory Commission Mail Stop 0-8-H-4a Washington, D. C.20555 Mr. S. C. Burton NRC Senior Resident Inspector Kewaunee Power Station | |||
SEP 2 2 2005 Regional Administrator, Region 111 Serial No. 05-636 U. S. Nuclear Regulatory Commission KPS/LIC/GR: RO 2443 Warrenville Road, Suite 21 0 Docket No. 50-305 Lisle, IL 60532-4352 License No. DPR-43 DOMINION ENERGY KEWAUNEE, INC. | |||
KEWAUNEE POWER STATION RESPONSE TO FURNISH WRITTEN EXAMINATIONS, OPERATING TESTS, AND SUPPORTING REFERENCE MATERIALS In response to a letter from the NRC dated July 14, 2005 regarding the administration of licensing examinations at the Kewaunee Power Station, enclosed are the written examinations, operating tests, and the supporting reference materials identified in NUREG-1021 Revision 9, Attachment 2 to ES-201. | |||
NUREG-1021 physical security requirements state that the enclosed examination materials must be withheld from public disclosure until after the examinations are complete. | |||
If you have questions or require additional information, please feel free to contact Mr. | If you have questions or require additional information, please feel free to contact Mr. | ||
Frank Winks at 920-388-8303. | Frank Winks at 920-388-8303. | ||
Very truly yours, Y Michael G. Gaffney Site Vice President, Kewaunee Power Station Enclosures Commitments made by this letter: | Very truly yours, Y | ||
Michael G. Gaffney Site Vice President, Kewaunee Power Station Enclosures Commitments made by this letter: NONE | |||
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2 4 4 3 WARRENVILLE ROAD, SUITE 2 IO LISLE, ILLINOIS 60532-4352 November 8, 2005 Mr. David A. Christian Senior Vice President and Chief Nuclear Officer lnnsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 | |||
==SUBJECT:== | ==SUBJECT:== | ||
OPERATOR LICENSING EXAMINATION APPROVAL | OPERATOR LICENSING EXAMINATION APPROVAL | ||
==Dear Mr. Christian:== | ==Dear Mr. Christian:== | ||
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Kewaunee Power Station. The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and will separately provide a list of approved applicants to Mr. George F. Winks, 111, Kewaunee Training Manager. Note that any examination waivers have been addressed in separate correspondence. | The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Kewaunee Power Station. | ||
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," during the week of November 14, 2005. The NRC staff will administer the operating tests during the week of November 14, 2005. Please contact Mr Bruce B. Palagi. at 630-829- | The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and will separately provide a list of approved applicants to Mr. George F. Winks, 111, Kewaunee Training Manager. Note that any examination waivers have been addressed in separate correspondence. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice." a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at httD://www.nrc.qov/readins-rm/adams.html. Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: M. Gaffney, Site Vice President C. Funderburk, Director, Nuclear Licensing T. Breene. Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin G. F. Winks, 111, Training Manager | The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," during the week of November 14, 2005. The NRC staff will administer the operating tests during the week of November 14, 2005. | ||
Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: M. Gaffney, Site Vice President C. Funderburk. Director, Nuclear Licensing T. Breene, Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner. Chairman, Town of Carlton J. Kitsembel. | Please contact Mr Bruce B. Palagi. at 630-829-9611, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant. | ||
Public Service Commission of Wisconsin G. F. Winks, 111, Training Manager | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice." a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access | ||
HKN JFS2 RidsNrrDipmlipb GEG KGO SXB3 DRPlll DRSlll PLBl JRKl ROPreDOrtS@.nrC.aOV DCT MA01 }} | |||
D. Christian and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at httD://www.nrc.qov/readins-rm/adams.html. | |||
Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: M. Gaffney, Site Vice President C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene. Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin G. F. Winks, 111, Training Manager | |||
D. Christian and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at httD://www.nrc.aovlreadina-rm/adams.html. | |||
Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: M. Gaffney, Site Vice President C. Funderburk. Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner. Chairman, Town of Carlton J. Kitsembel. Public Service Commission of Wisconsin G. F. Winks, 111, Training Manager DOCUMENT NAME: G:\DRS\Work in Progress\KEW 10-05 DRS.wpd 0 Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive | |||
D. Christian ADAMS Distribution: | |||
HKN JFS2 RidsNrrDipmlipb GEG KGO SXB3 DRPlll DRSlll PLBl JRKl ROPreDOrtS@.nrC.aOV DCT MA01}} | |||
Revision as of 22:39, 23 November 2019
| ML060340010 | |
| Person / Time | |
|---|---|
| Site: | Kewaunee |
| Issue date: | 11/14/2005 |
| From: | Palagi B NRC/RGN-III/DRS/OLB |
| To: | |
| Shared Package | |
| ML060060458 | List: |
| References | |
| 50-305/05-301 50-305/05-301 | |
| Download: ML060340010 (27) | |
Text
-cc
.-- 0-c '
K e w a w e Nuclear Power Plant Operated by Nuclear Management Company. LLC NRC-03-096 September 18.2003 U.S. Nuclear Regulatory Commission ATTN: Dowment Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR43 RESPONSE TO REGULATORY ISSUE
SUMMARY
2003-14 Regulatory Issue Summary (RIS) 2003.14. "Preparation and Scheduling of Operator Licensing Examinations." was issued on August 27,2003. The RIS asked that within 30 days licensees voluntarily submit schedular information concerning examination preparation for CYs 2004 through 2007. initial operator license examinations for CYs 2004 through 2007, and generic fundamentals examinations in CYs 2004 and 2005.
Attached is a completed NRC Form 536 that provides the requested information for Kewaunee Thomas Coutu Site Vice President, Kewaunee Nuclear Power Plant Nuclear Management Company, LLC Enclosure cc: Chief, Operator Licensing Branch. USNRC Region 111 Senior Resident Inspector, Kewaunee, USNRC N490 Highway 42 Kewaunee, Wisconsin 54216-9510 TeleDhOrI.9:920.388.2560
.
)IRC FORM 6Z4 U.S. NUCLEAR REGUUTORY COMMISSION WPROWDBYOklB. NO.3l59-0131 OWES' oIIsIf2U SlrmJ Eillnm1.6 bumn u Io comply wllh I h h wlunlmy hlarmmB cdledkn mq4Me PGY b WxmIkm d k M n b u u d b p n M d p l OPERATOR LICENSING EXAMINATION DATA
- Kam NRC REGION Kewaunee Nuclear Power Plant Docket 50-305 I11 Operator License DPR-43 PROPOSED NUMBER -
cy 2004
-
cy 2005
-
cy 2006
-
cy 2007 ESTIMATE0 NUMBER OF LICENSEEPREPARED 1 1 UUMlNATlWS EsnmTEo NUMBER OF NRCPREPARED 1 MAMINATIONS
~
PROPOSED NUMBER %2!&4 cyvras 6-" cyulo7 NUMBER OF REACTOR OPERATORS 5 6 6
~ ~
NUMBER OF SENIOR REACTOR
-
OPERATORS NSTANT NUMBER OF SENIOR REACTOR 1 3 I 3
-
OPERATORS UPGRADE 1 3 3 NUMBER OF SENIOR REACTOR OPERATORS UMmO - 0 0 0 PROPOSED DATES week of PRIMARY DATE 02/02/04 and Sept. 2005 Sept. 2007 02/09/04 ALTERNATE DATE Oct. 2005 Oct. 2007
- .~
PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE
~ ~
CY PROPOSED 4?&6 NUMBER MARCH JUNE SEFTEMB DECEMBER MARCH JUNE SEPTEMB
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION
__ Ill .
801 WARRENVLLE ROAD L I S & ILLINOIS 60532.4351 March 2, 2004 Mr. Thomas Coutu Site Vice President Kewaunee Nuclear Plant Nuclear Management Company, LLC N490 Hwy 42 Kewaunee. WI 54216-9511
SUBJECT:
KEWAUNEE NUCLEAR POWER PLANT CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS
Dear Mr. Coutu:
In a letter dated September 18, 2003, your staff responded to NRC Regulatory Issue Summary (RIS) 2003-14, "Preparation and Scheduling of Operator Licensing Examinations." Initial license examinations were requested during the month of September 2005, and during the month of September 2007. Due to a heavy work schedule, we were not able to accommodate your request for a September 2005 examination, nor were we able to use the alternate date of October 2005 as requested in the RIS response. However, we are able to provide an examination during the weeks of November 7 and 14, 2005. This date has been confirmed in a telephone conversation between Mr. D. McNeil of my staff and Mr. W. Godes, General Supervisor Operator Training. The examination requested for October 2007 will be scheduled as we approach that date.
On-site validation of the examinations will occur at Kewaunee Nuclear Power Plant approximately 3 weeks before the examination administration date. In the unlikely event that we are unable to support the examinations during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements tu administer the examinations at a mutually acceptable date.
As indicated in your RIS response letter, my staff will develop the February 2004 examination and your staff will develop the November 2005 and September 2007 examinations. Your response to the RIS indicated that there will be 12 candidates for each of the November 2005 and September 2007 examinations. Please inform us if the number of candidates decreases below 10 as this will impact the examination schedule.
A supplementary letter will be sent to the training department approximately 120 days prior to the initial examination informing them of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you
T. Coutu have in the training program. If you have any questions concerning this information, please contact Mr. D. McNeil of my staff at 630-829-9737.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice." a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at httD://w.nrc.qovlreadinq-rmladams.html (the Public Electronic Reading Room)
Sincerely,
/
Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: D. Graham, Director, Bureau of Field Operations Chairman, Wisconsin Public Service Commission State Liaison Officer
T. Coutu have in the training program. If you have any questions concerning this information, please contact Mr. D. McNeil of my staff at 630-829-9737.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). . ADAMS is accessible from the NRC Web site at http://www.nrc,aov/readinq-rm/adams.html (the Public Electronic Reading Room).
Sincerely, Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: D. Graham, Director, Bureau of Field Operations Chairman, Wisconsin Public Service Commission State Liaison Officer ADAMS Distribution:
WDR DFT JGLI DCT RidsNrrDipmlipb GEG HBC JFL DRPlll DRSlll PLBI JRKI M. A. Bies (concurrence copy)
-,
-
- -
'
\&
1 Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC July 6,'2004 NRC-04-072 RIS 2004-10 10 CFR 55 U.S. Nuclear Regulatory Commission AlTN: Document Control Desk Washington, D.C. 20555 Kewaunee Nuclear Power Plant Docket 50-305 License No. DPR-43 Response To Reoulatow Issue Summaw 2004-10 Regulatory Issue Summary (RIS) 2004-10, 'Preparatidn and Scheduling of Operator Licensing Examinations," was issued on June 14,2004. The RIS requested that within 30 days, licensees voluntarily submit schedular information concerning examination preparation for calendar years (CYs) 2005 through 2008, initial operator license examinations for CYs 2005 through 2008, and generic fundamentals examinations in CYs 2005 and 2006.
Enclosed is a completed NRC Form 536 that provides the requested information for the Kewaunee Nuclear Power Plant.
I declare under penalty of perjury that the foregoing is true and accurate. Executed on July 6,2004.
Thomas Coutu Site Vice President, Kewaunee Nuclear Power Plant Nuclear Management Company, LLC Enclosure (1) cc: Administrator, Region 111, USNRC Senior Resldent Inspector, Kewaunee, USNRC N490 Highway42 Kewaunee, Wisconsin 54216-9511 Telephone: 920.388.2560
/;".Ib y / 77('Al.2
RC FORM 636 U.S. NUC~REGULATORYCOMMISSIONlAPPROVE0 BYOMB: NO.3150-0151 EXPIRES: oininM nml acr- ARCREGION Kewaunee Nuclear Power Plant Docket No. 50-305 Region 111 License No. DPR-43
~- ~-
PROPOSED NUMBER -
CY2005 -
CY 2006 -
CY 2007 CY308 ESTIMTEDNUMBER OF LICENSEE-PREPARED MAMINATIONS ESTIMATED NUMBER OF NRCPREPARED MAMINATIONS PROPOSED NUMBER -
cy 2005 C y 2 0 06 c y 2 07 CYaO8 NUMBEROFREACTOR OPERATORS I 2 1 NUMBER OF SENIOR REACTOR
-
OPERATORS INSTANT I 5 1 3 1 NUMBER OF SENIOR REACTOR
-
OPERATORS UPGRADE PROPOSED DATES I I PRIMARY DATE Sept. 2005 Oct. 2007 ALTERNATE DATE , O c t . 2005 Nov. 2007 I I I I E. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED -----
CY mnLi I cy - 2006
-...
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBE ESTIMATED NUMBER OF CANDIDATES 9
Kewaunee Nuclear Power Plant Committed to Nuclear Excsllenca Operated by Nuclear Management Company, LLC February 10,2005 NRC-05419 10 CFR 55.40 Regional Administrator, Region 111 U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532 - 4352 Kewaunee Nuclear Power Plant Docket 50-305 License No. DPR-43 Senior Reactor and Reactor ODerator Initial Examinations In accordance with the guidelines NUREG 1021, Operating License Examination Standard for Power Reactors, Revision 9, I hereby request that the NRC Region 111 author the written portion of the Operator Initial License Exam to be administered this November 2005. This would include both Reactor Operator and Senior Reactor Operator segments. Kewaunee Nuclear Power Plant staff would develop both the simulator and walk-through segments.
You may direct any questions or comments regarding this matter to Mr. Stephen Johnson at (920) 388-8723 or Mr. Jeffrey L. Stoeger at (920) 388-8265.
Craig W. Lambert Site Vice-president, Kewaunee Plant Nuclear Power Plant Nuclear Management Company, LLC cc: Resident Inspector, Kewaunee, USNRC John Palmer, NMC - Kewaunee Nuclear Power Plant Jeff Stoeger, NMC - Kewaunee Nuclear Power Plant Stephen Johnson, NMC - Kewaunee Nuclear Power Plant
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 2443 WARRENVILLE ROAD, SUITE 2 IO LISLE, ILLINOIS 60532-4352 April 8, 2005 Mr. Craig W. Lambert Site Vice President Kewaunee Nuclear Power Plant Nuclear Management Company, LLC N490 Hwy 42 Kewaunee, WI 54216-9511
SUBJECT:
KEWAUNEE NUCLEAR POWER PLANT - OPERATOR LICENSE EXAMINATION REQUEST
Dear Mr. Lambert:
Your February 10, 2005, letter requested that NRC Region 111 author the written portion of the Operator Initial License Examination to be administered in November 2005. Due to personnel limitations we will be unable to accommodate your request. I have discussed this with Mr. J. Stroeger of your staff and understand that other arrangements have been made for writing of the examination.
Should there be any questions concerning this matter please contact me at (630) 829-9631, or Mr. Bruce Palagi, the chief examiner for the 2005 examination, at (630) 829-9611.
Sincerely, Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 See Attached Distribution
C. Lambert cc' J Cowan, Executive Vice President, Chief Nuclear Officer Plant Manager Manager, Regulatory Affairs J. Rogoff, Vice President, Counsel & Secretary D. Molzahn, Nuclear Asset Manager, Wisconsin Public Service Corporation L. Weyers, Chairman, President and CEO, Wisconsin Public Service Corporation D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin J. Palmer, Kewaunee Training Manager
Mr. Craig W. Lambert Site Vice President Kewaunee Nuclear Power Plant Nuclear Management Company, LLC N490 Hwy 42 Kewaunee, WI 54216-9511
SUBJECT:
KEWAUNEE NUCLEAR POWER PLANT - OPERATOR LICENSE EXAMINATION REQUEST
Dear Mr. Lambert:
Your February 10, 2005, letter requested that NRC Region Ill author the written portion of the Operator Initial License Examination to be administered in November 2005. Due to personnel limitations we will be unable to accommodate your request. I have discussed this with Mr. J. Stroeger of your staff and understand that other arrangements have been made for writing of the examination.
Should there be any questions concerning this matter please contact me at (630) 829-9631, or Mr. Bruce Palagi, the chief examiner for the 2005 examination, at (630) 829-9611.
Sincerely, Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety OFFICE Rlll Id Rlll 12 I I NAME 6Palagi:tr K RLanksbury@+
DATE 04/%/05 04/ $105
Mr. Craig W. Lambert Site Vice President Kewaunee Nuclear Power Plant Nuclear Management Company, LLC N490 Hwy 42 Kewaunee, WI 54216-9511
SUBJECT:
KEWAUNEE NUCLEAR POWER PLANT - OPERATOR LICENSE EXAMINATION REQUEST
Dear Mr Lambert:
Your February 10, 2005, letter requested that NRC Region 111 author the written portion of the Operator Initial License Examination to be administered in November 2005. Due to personnel limitations we will be unable to accommodate your request. I have discussed this with Mr. J. Stroeger of your staff and understand that other arrangements have been made for writing of the examination.
Should there be any questions you have concerning this matter please contact me at (630) 829-9631, or Mr. Bruce Palagi, the chief examiner for the 2005 examination, at (630) 829-9611 .
Sincerely, Roger D. Lanksbuty, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 See Attached Distribution DOCUMENT NAME: KEW 04 05 DRS.wpd OFFICE Rlll w Rlll I I I NAME BPalagi:tr RLanksbury DATE 04/7/05 041 105
C. Lambert cc: J. Cowan, Executive Vice President, Chief Nuclear Officer Plant Manager Manager, Regulatory Affairs J. Rogoff, Vice President, Counsel & Secretary D. Molzahn, Nuclear Asset Manager, Wisconsin Public Service Corporation L. Weyers, Chairman, President and CEO, Wisconsin Public Service Corporation D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin J. Palmer, Kewaunee Training Manager ADAMS Distribution:
WDR CFL RidsNrrDipmlipb GEG KGO JFL DRPlll DRSlll PLBI JRKI MABI
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 July 14, 2005 Mr. Michael G. Gaffney Site Vice President Kewaunee Nuclear Power Plant Nuclear Management Company, LLC N490 Hwy 42 Kewaunee, WI 54216
Dear Mr. Gaffney:
In a telephone conversation on July 11, 2005, between Mr. Bruce Palagi and Mr. Frank Winks, arrangements were made for the administration of licensing examinations at the Kewaunee Nuclear Power Plant the weeks November 7.2005, and November 14,2005. In addition, the NRC will make an examination validation visit to your facility the week of October 17, 2005.
As agreed during the telephone conversation. your staff will prepare the examinations based on the guidelines in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by August 1, 2005. The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 to ES-201 will be due by September 26, 2005.
Pursuant to 10 CFR 55.40(b)(3), of the Code of Federal Regulations (IO CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402. and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g.. system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-I021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
M. Gaffney To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024).
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30,2006. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (l-6 F33). U S . Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSl@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503-0001.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. Mr. Winks has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice." a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at httd/www.nrc.aov/readinq-rm/adams.html.
/
Hiknori Peterson, Chief Operations Branch Divisionof Reactor Safety Docket No. 50-305 License No. DPR-43 See Attached Distribution
M.Gaffney To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction A d of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30,2006. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSI @nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503-0001.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. Mr. Winks has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at htto://www.nrc.sov/readina-rm/adams.html.
Sincerely,
/a/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 See Attached Distribution DOCUMENT NAME: G:\DRS\Work in Prooress\KEW " 07 05 DRS.wDd OFFICIAL RECORD COPY
M. Gaffney cc: J. Cowan. Executive Vice President Chief Nuclear Officer Plant Manager Manager, Regulatory Affairs J. Rogoff, Vice President, Counsel & Secretary D. Molzahn, Nuclear Asset Manager, Wisconsin Public Service Corporation L. Weyers. Chairman, President and CEO, Wisconsin Public Service Corporation D.Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin J. Palmer, Training Department
M. Gaffney 4 ADAMS Distribution:
WDR CFL RidsNrrDipmlipb GEG KGO SXB3 DRPlll DRSlll PLBI JRKI DCT MABI
Dominion Energy Kcwauncc, Inc.
N490 Highway 42. Kewaunre, WI 54216-951I Dominiona AUG 0 2 2005 U. S. Nuclear Regulatory Commission Serial No.05-484 Attention: Document Control Desk KPS/LIC/GR: R1 Washington, DC 20555 Docket No. 50-305 License No. DPR-43 DOMINION ENERGY KEWAUNEE, INC.
KEWAUNEE POWER STATION REVISED EXAMINATION OUTLJNES DUE DATE In a letter regarding operator-licensing examinations from the Nuclear Regulatory Commission (NRC), Region 111, dated July 14, 2005, the NRC stated that to meet the stated examination schedule the Kewaunee Power Station (KPS) staff needed to furnish the NRC Region 111 staff with the examination outlines by August 1, 2005. During a telephone conversation on July 28,2005 between Mr. Frank Winks of KPS and Mr.
Bruce Palagi of NRC Region 111, the date was clarified to be August 8, 2005.
If you have any questions regarding this matter please contact Mr. Franks Winks at 920-388-8303.
Very truly yours, Michael G. Gaffney Site Vice President, Kewaunee Power Station Commitments made by this letter: None
Serial No.05-484 Page 2 of 2 cc : Mr. J. L. Caldwell Administrator, Region U. S. Nuclear Regulatory Commission Region 111 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352 Mr. J. F. Stang Project Manager U S . Nuclear Regulatory Commission Mail Stop 0-8-H-4a Washington, D. C. 20555 Mr. S. C. Burton NRC Senior Resident Inspector Kewaunee Power Station Public Service Commission of Wisconsin Electric Division P.O. Box 7854 Madison, WI 53707
Dominion Energy Kovaunec, Inc.
N 4 9 0 Highway 42, Kewaunce. WI 54216-951 I Dominion" AUG 1 2 2005 U. S.Nuclear Regulatory Commission Serial No. 05-484A Attention: Document Control Desk KPSILICIGR: RO Washington, DC 20555 Docket No. 50-305 License No. DPR-43 DOMINION ENERGY KEWAUNEE, INC.
KEWAUNEE POWER STATION RESPONSE TO REQUEST TO FURNISH EXAMINATION OUTLINES In response to a letter from the NRC dated July 14, 2005 regarding the administration of licensing examinations at the Kewaunee Power Station, examination outlines were hand delivered to Mr. Bruce Palagi and Mr. Hironori Peterson at Region 111 on August 8,2005.
If you have any questions, please contact Frank Winks at (920) 388-8303 Very truly yours, Commitments made by this letter: NONE cc: Mr. J. L. Caldwell Administrator Region Ill US. Nuclear Regulatory Commission 2443 Warrenville Road Suite 21 0 Lisle, IL 60532-4352 Mr. J. F. Stang Project Manager U S . Nuclear Regulatory Commission Mail Stop 0-8-H-4a Washington, D. C.20555 Mr. S. C. Burton NRC Senior Resident Inspector Kewaunee Power Station
SEP 2 2 2005 Regional Administrator, Region 111 Serial No.05-636 U. S. Nuclear Regulatory Commission KPS/LIC/GR: RO 2443 Warrenville Road, Suite 21 0 Docket No. 50-305 Lisle, IL 60532-4352 License No. DPR-43 DOMINION ENERGY KEWAUNEE, INC.
KEWAUNEE POWER STATION RESPONSE TO FURNISH WRITTEN EXAMINATIONS, OPERATING TESTS, AND SUPPORTING REFERENCE MATERIALS In response to a letter from the NRC dated July 14, 2005 regarding the administration of licensing examinations at the Kewaunee Power Station, enclosed are the written examinations, operating tests, and the supporting reference materials identified in NUREG-1021 Revision 9, Attachment 2 to ES-201.
NUREG-1021 physical security requirements state that the enclosed examination materials must be withheld from public disclosure until after the examinations are complete.
If you have questions or require additional information, please feel free to contact Mr.
Frank Winks at 920-388-8303.
Very truly yours, Y
Michael G. Gaffney Site Vice President, Kewaunee Power Station Enclosures Commitments made by this letter: NONE
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2 4 4 3 WARRENVILLE ROAD, SUITE 2 IO LISLE, ILLINOIS 60532-4352 November 8, 2005 Mr. David A. Christian Senior Vice President and Chief Nuclear Officer lnnsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
OPERATOR LICENSING EXAMINATION APPROVAL
Dear Mr. Christian:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Kewaunee Power Station.
The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and will separately provide a list of approved applicants to Mr. George F. Winks, 111, Kewaunee Training Manager. Note that any examination waivers have been addressed in separate correspondence.
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," during the week of November 14, 2005. The NRC staff will administer the operating tests during the week of November 14, 2005.
Please contact Mr Bruce B. Palagi. at 630-829-9611, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice." a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access
D. Christian and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at httD://www.nrc.qov/readins-rm/adams.html.
Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: M. Gaffney, Site Vice President C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene. Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin G. F. Winks, 111, Training Manager
D. Christian and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at httD://www.nrc.aovlreadina-rm/adams.html.
Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: M. Gaffney, Site Vice President C. Funderburk. Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner. Chairman, Town of Carlton J. Kitsembel. Public Service Commission of Wisconsin G. F. Winks, 111, Training Manager DOCUMENT NAME: G:\DRS\Work in Progress\KEW 10-05 DRS.wpd 0 Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive
D. Christian ADAMS Distribution:
HKN JFS2 RidsNrrDipmlipb GEG KGO SXB3 DRPlll DRSlll PLBl JRKl ROPreDOrtS@.nrC.aOV DCT MA01