{{#Wiki_filter:DRAFT COPY - CONTENTS SUBJECT TO CHANGE TO | {{#Wiki_filter:DRAFT COPY - CONTENTS SUBJECT TO CHANGE TO CONFORM WITH REGULATORY GUIDE FORMAT AND AS NECESSARY BY STAFF DG-1145: COMBINED LICENSE APPLICATIONS FOR NUCLEAR POWER PLANTS (LWR EDITION) | ||
Table of | Table of Contents A. Introduction B. Discussion C. Regulatory Position Part I: Standard Format and Content of Combined License Applications for Nuclear Power Plants - Light Water Reactor Edition I.1 Introduction and General Description of Plant I.2 Site Characteristics I.3 Design of Structures, Systems, Components, and Equipment I.4 Reactor I.5 Reactor Coolant System and Connected Systems I.6 Engineered Safety Features I.7 Instrumentation and Controls I.8 Electrical Power I.9 Auxiliary Systems I.10 Steam and Power Conversion I.11 Radioactive Waste Management I.12 Radiation Protection I.13 Conduct of Operations I.14 Verification Programs I.15 Transient and Accident Analyses I.16 Technical Specifications I.17 Quality Assurance & Reliability Assurance I.18 Human Factors Engineering I.19 Probabilistic Risk Assessment Information and Severe Accidents Part II: Additional Technical Information II.1 Probabilistic Risk Assessment II.2 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) | ||
II.3 Environmental Report Updated June 2, 2006 | |||
DRAFT COPY - CONTENTS SUBJECT TO CHANGE TO CONFORM WITH REGULATORY GUIDE FORMAT AND AS NECESSARY BY STAFF Part III: Applications Referencing Certified Designs And/or Early Site Permits III.1 Information Needed for a COL Application Referencing a Certified Design III.2 Information Needed for a COL Application Referencing a Certified Design and an Early Site Permit III.3 Finality of an Environmental Impact Statement Associated with an Early Site Permit III.4 Combined License Action Items III.5 Design Acceptance Criteria III.6 COL Application Timing III.7 ITAAC for COL Applications referencing a Certified Design and/or Early Site Permit Part IV: Miscellaneous Topics IV.1 COL Application Acceptance Review Checklist IV.2 Submittal Guidance IV.3 General Description of Change Processes IV.4 Operational Programs IV.5 General and Financial Information IV.6 Site Redress Plan and Limited Work Authorization IV.7 Pre-Application Activities IV.8 Generic Issues IV.9 Deleted (incorporated into Section C.I.1) | |||
IV.10 Regulatory Treatment of Non-Safety Systems IV.11 Responses to Public Comments on Work-in-Progress sections of DG-1145 IV.12 Applicability of Industry Guidance D. Implementation Regulatory Analysis Appendices Updated June 2, 2006}} | |||
Revision as of 20:53, 23 November 2019
| ML060800737 | |
| Person / Time | |
|---|---|
| Issue date: | 03/16/2006 |
| From: | NRC/NRR/ADRA/DNRL/NRBA |
| To: | |
| Shared Package | |
| ML060800103 | List: |
| References | |
| DG-1145 | |
| Download: ML060800737 (2) | |
Text
DRAFT COPY - CONTENTS SUBJECT TO CHANGE TO CONFORM WITH REGULATORY GUIDE FORMAT AND AS NECESSARY BY STAFF DG-1145: COMBINED LICENSE APPLICATIONS FOR NUCLEAR POWER PLANTS (LWR EDITION)
Table of Contents A. Introduction B. Discussion C. Regulatory Position Part I: Standard Format and Content of Combined License Applications for Nuclear Power Plants - Light Water Reactor Edition I.1 Introduction and General Description of Plant I.2 Site Characteristics I.3 Design of Structures, Systems, Components, and Equipment I.4 Reactor I.5 Reactor Coolant System and Connected Systems I.6 Engineered Safety Features I.7 Instrumentation and Controls I.8 Electrical Power I.9 Auxiliary Systems I.10 Steam and Power Conversion I.11 Radioactive Waste Management I.12 Radiation Protection I.13 Conduct of Operations I.14 Verification Programs I.15 Transient and Accident Analyses I.16 Technical Specifications I.17 Quality Assurance & Reliability Assurance I.18 Human Factors Engineering I.19 Probabilistic Risk Assessment Information and Severe Accidents Part II: Additional Technical Information II.1 Probabilistic Risk Assessment II.2 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC)
II.3 Environmental Report Updated June 2, 2006
DRAFT COPY - CONTENTS SUBJECT TO CHANGE TO CONFORM WITH REGULATORY GUIDE FORMAT AND AS NECESSARY BY STAFF Part III: Applications Referencing Certified Designs And/or Early Site Permits III.1 Information Needed for a COL Application Referencing a Certified Design III.2 Information Needed for a COL Application Referencing a Certified Design and an Early Site Permit III.3 Finality of an Environmental Impact Statement Associated with an Early Site Permit III.4 Combined License Action Items III.5 Design Acceptance Criteria III.6 COL Application Timing III.7 ITAAC for COL Applications referencing a Certified Design and/or Early Site Permit Part IV: Miscellaneous Topics IV.1 COL Application Acceptance Review Checklist IV.2 Submittal Guidance IV.3 General Description of Change Processes IV.4 Operational Programs IV.5 General and Financial Information IV.6 Site Redress Plan and Limited Work Authorization IV.7 Pre-Application Activities IV.8 Generic Issues IV.9 Deleted (incorporated into Section C.I.1)
IV.10 Regulatory Treatment of Non-Safety Systems IV.11 Responses to Public Comments on Work-in-Progress sections of DG-1145 IV.12 Applicability of Industry Guidance D. Implementation Regulatory Analysis Appendices Updated June 2, 2006