IR 05000373/2006013: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:September 25, 2005Mr. Christopher M. CranePresident and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555SUBJECT:LASALLE COUNTY STATION, UNITS 1 AND 2NRC PHYSICAL SECURITY BASELINE INSPECTION REPORTNO. 05000373/2006013(DRS); 05000374/2006013(DRS)
{{#Wiki_filter:ber 25, 2005
 
==SUBJECT:==
LASALLE COUNTY STATION, UNITS 1 AND 2 NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT NO. 05000373/2006013(DRS); 05000374/2006013(DRS)


==Dear Mr. Crane:==
==Dear Mr. Crane:==
On August 25, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a securitybaseline inspection at your LaSalle County Station, Units 1 and 2. The inspection covered oneor more of the key attributes of the security cornerstone of the NRC's Reactor OversightProcess. The enclosed inspection report documents the inspection results, which were discussed on August 25, 2006, with Mr. D. Enright, and other members of your staff.The inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your license.
On August 25, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your LaSalle County Station, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on August 25, 2006, with Mr. D. Enright, and other members of your staff.
 
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
 
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
 
No findings of significance were identified.
 
EXEMPT FROM PUBLIC DISCLOSURE May be exempt from public release under the Freedom of Information Act (5 U.S.C. 552)
Exemption number: 5 Nuclear Regulatory Commission review required before Enclosure Contains .
public release    Upon Separation This Page is Decontrolled.
 
Name and organization of person making determination.
 
D. Funk, RIII/DRS/PSB Date of determination: 08/31/06 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.


The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.No findings of significance were identified. EXEMPT FROM PUBLIC DISCLOSUREMay be exempt from public release under the Freedom ofInformation Act (5 U.S.C. 552)Exemption number: 5  Nuclear Regulatory Commission review required before public releaseName and organization of person making determination.D. Funk, RIII/DRS/PSB  Date of determination: 08/31/06  Enclosure Contains . Upon Separation This Page is Decontrolled. C. Crane-2-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter andits enclosure will be available electronically for public inspection in the NRC Public DocumentRoom, or from the Publicly Available Records (PARS) component of NRC's document system(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (thePublic Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will notbe available for public inspection.Should you have any questions concerning this inspection, we will be pleased to discuss themwith you.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,
Sincerely,
/RA/Kenneth Riemer, ChiefPlant Support Branch Division of Reactor SafetyDocket Nos. 50-373; 50-374License Nos. NPF-11; NPF-18Nonpublic Enclosure: Inspection Report 05000373/2006013(DRS); 05000374/2006013(DRS)
/RA/
w/Attachment: Supplemental Information( )See Attached Distribution Enclosure Contains . Upon Separation This Page is Decontrolle
Kenneth Riemer, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Nonpublic Enclosure: Inspection Report 05000373/2006013(DRS);
05000374/2006013(DRS)
w/Attachment: Supplemental Information ( )
See Attached Distribution Enclosure Contains .
Upon Separation This Page is Decontrolled.
}}
}}

Revision as of 13:44, 23 November 2019

IR 05000373-06-013, IR 05000374-06-013, on 08/21/2006 - 08/25/2006, LaSalle County Station, Units 1 and 2, Access Control and Security Training - Cover Letter
ML062700440
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 09/25/2005
From: Kenneth Riemer
Division of Reactor Safety II
To: Crane C
Exelon Generation Co, Exelon Nuclear
References
IR-06-013
Download: ML062700440 (5)


Text

ber 25, 2005

SUBJECT:

LASALLE COUNTY STATION, UNITS 1 AND 2 NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT NO. 05000373/2006013(DRS); 05000374/2006013(DRS)

Dear Mr. Crane:

On August 25, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your LaSalle County Station, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on August 25, 2006, with Mr. D. Enright, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

EXEMPT FROM PUBLIC DISCLOSURE May be exempt from public release under the Freedom of Information Act (5 U.S.C. 552)

Exemption number: 5 Nuclear Regulatory Commission review required before Enclosure Contains .

public release Upon Separation This Page is Decontrolled.

Name and organization of person making determination.

D. Funk, RIII/DRS/PSB Date of determination: 08/31/06 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Kenneth Riemer, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Nonpublic Enclosure: Inspection Report 05000373/2006013(DRS);

05000374/2006013(DRS)

w/Attachment: Supplemental Information ( )

See Attached Distribution Enclosure Contains .

Upon Separation This Page is Decontrolled.