{{#Wiki_filter:Palisades Nuclear Plant Operated by Nuclear Management Company, LLC November 2,2006 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50 255 License No.
{{#Wiki_filter:Palisades Nuclear Plant Operated by Nuclear Management Company, LLC November 2,2006 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50 255 License No. DPR-20 Reactor Pressure Vessel Head Replacement Proiect Deferment Nuclear Management Company, LLC (NMC) met with the Nuclear Regulatory Commission (NRC) on December 21, 2005, to discuss the Palisades Nuclear Plant (PNP) reactor pressure vessel head replacement project. At the meeting NMC presented plans for performing a replacement of the reactor pressure vessel head at PNP during the 2007 refueling outage. Subsequent to this meeting it was decided to defer the reactor pressure vessel head replacement project to beyond the 2007 refueling outage.
DPR-20 Reactor Pressure Vessel Head Replacement Proiect Deferment Nuclear Management Company, LLC (NMC) met with the Nuclear Regulatory Commission (NRC) on December 21, 2005, to discuss the Palisades Nuclear Plant (PNP) reactor pressure vessel head replacement project.
The susceptibility category for the PNP reactor head is high susceptibility, as defined by the First Revised Order, EA-03-009, "Issuance of First Revised Order (EA-03-009)
At the meeting NMC presented plans for performing a replacement of the reactor pressure vessel head at PNP during the 2007 refueling outage. Subsequent to this meeting it was decided to defer the reactor pressure vessel head replacement project to beyond the 2007 refueling outage.
Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors." Per the high susceptibility category, inspections are performed in accordance with Section IV.C.(1), of the First Revised Order. Therefore, future outage inspections will continue to be conducted per Section IV.C.(I) of the First Revised Order until the reactor head is replaced at PNP.
The susceptibility category for the PNP reactor head is high susceptibility, as defined by the First Revised Order, EA-03-009, "Issuance of First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors." Per the high susceptibility category, inspections are performed in accordance with Section IV.C.(1), of the First Revised Order. Therefore, future outage inspections will continue to be conducted per Section IV.C.(I) of the First Revised Order until the reactor head is replaced at PNP. Summarv of Commitments commitments and no revisions to existing commitments. Site Vice-President, Palisades Nuclear Plant Nuclear Management Company, LLC CC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC 27780 Blue Star Memorial Highway Covert, Michigan 49043-9530 Telephone: 269.764.2000}}
Summarv of Commitments commitments and no revisions to existing commitments.
Site Vice-President, Palisades Nuclear Plant Nuclear Management Company, LLC CC     Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC 27780 Blue Star Memorial Highway   Covert, Michigan 49043-9530 Telephone: 269.764.2000}}

Revision as of 12:28, 23 November 2019

Reactor Pressure Vessel Head Replacement Project Deferment
ML063060176
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/02/2006
From: Harden P
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-03-009
Download: ML063060176 (1)


Text

Palisades Nuclear Plant Operated by Nuclear Management Company, LLC November 2,2006 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50 255 License No. DPR-20 Reactor Pressure Vessel Head Replacement Proiect Deferment Nuclear Management Company, LLC (NMC) met with the Nuclear Regulatory Commission (NRC) on December 21, 2005, to discuss the Palisades Nuclear Plant (PNP) reactor pressure vessel head replacement project. At the meeting NMC presented plans for performing a replacement of the reactor pressure vessel head at PNP during the 2007 refueling outage. Subsequent to this meeting it was decided to defer the reactor pressure vessel head replacement project to beyond the 2007 refueling outage.

The susceptibility category for the PNP reactor head is high susceptibility, as defined by the First Revised Order, EA-03-009, "Issuance of First Revised Order (EA-03-009)

Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors." Per the high susceptibility category, inspections are performed in accordance with Section IV.C.(1), of the First Revised Order. Therefore, future outage inspections will continue to be conducted per Section IV.C.(I) of the First Revised Order until the reactor head is replaced at PNP.

Summarv of Commitments commitments and no revisions to existing commitments.

Site Vice-President, Palisades Nuclear Plant Nuclear Management Company, LLC CC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC 27780 Blue Star Memorial Highway Covert, Michigan 49043-9530 Telephone: 269.764.2000