ML070600252: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Oconee Inspection / Activity Plan 03/01/2007
{{#Wiki_filter:Page 1 of 3                                                                                      Oconee 03/01/2007    10:01:49                                                                Inspection / Activity Plan Report 22 03/01/2007 - 09/30/2008 Unit                                                                                                                          No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                    Title                                        on Site       Start    End              Type OL RQ         - REQUALIFICATION INSPECTION                                                                                 2 1, 2, 3        IP 7111111B              Licensed Operator Requalification Program                                                            03/26/2007 03/30/2007 Baseline Inspections PSB1-RP       - RP PRE-INSP VISIT/ISFSI                                                                                   1 1, 2, 3       IP 7112101               Access Control to Radiologically Significant Areas                                                   04/10/2007 04/12/2007 Baseline Inspections EB3-ISI       - UNIT 2 INSERVICE INSPECTION                                                                               1 2          IP 7111108P              Inservice Inspection Activities - PWR                                                                04/23/2007 04/27/2007 Baseline Inspections 95002         - 95002 SUP INSPECT (MSPI, SSF, U3RBES)                                                                     4 1, 2, 3       IP 95002                 Inspection For One Degraded Cornerstone Or Any Three White Inputs In A Strategic Perform              04/30/2007 05/04/2007 Supplemental Program PSB1-RP        - RP OCCUPATIONAL BASELINE INSP WK1                                                                          2 1, 2, 3       IP 7112101               Access Control to Radiologically Significant Areas                                                   04/30/2007 05/04/2007 Baseline Inspections 1, 2, 3       IP 7112102               ALARA Planning and Controls                                                                           04/30/2007 05/04/2007 Baseline Inspections 1, 2, 3       IP 7112202               Radioactive Material Processing and Transportation                                                   04/30/2007 05/04/2007 Baseline Inspections 1, 2, 3       IP 71151                 Performance Indicator Verification                                                                   04/30/2007 05/04/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)                                                                           1 2           IP 2515/166             Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]                     05/06/2007 05/11/2007 Safety Issues EB3SGISI       - UNIT 2 STEAM GENERATOR ISI                                                                                 1 2          IP 7111108P              Inservice Inspection Activities - PWR                                                                05/07/2007 05/11/2007 Baseline Inspections PSB1-RP       - RP OCCUPATIONAL BASELINE INSP WK2                                                                         3 1, 2, 3       IP 7112101               Access Control to Radiologically Significant Areas                                                   05/14/2007 05/18/2007 Baseline Inspections 1, 2, 3       IP 7112102               ALARA Planning and Controls                                                                           05/14/2007 05/18/2007 Baseline Inspections 1, 2, 3       IP 7112202               Radioactive Material Processing and Transportation                                                   05/14/2007 05/18/2007 Baseline Inspections 1, 2, 3       IP 71151                 Performance Indicator Verification                                                                   05/14/2007 05/18/2007 Baseline Inspections PB1-PI&R       - BIENNIAL PI&R INSPECTION                                                                                   5 1, 2, 3        IP 71152B                Identification and Resolution of Problems                                                            07/09/2007 07/13/2007 Baseline Inspections 1, 2, 3       IP 71152B               Identification and Resolution of Problems                                                             07/23/2007 07/27/2007 Baseline Inspections 60855.1       - OPERATIONAL ISFSI RESIDENT INSPECTION                                                                     1 1             IP 60855.1               Operation of an Independent Spent Fuel Storage Installation at Operating Plants                       07/09/2007 07/13/2007 Other Routine OL PREP       - INITIAL EXAM PREPARATION                                                                                   4 1                 V23266               OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES                                                           08/06/2007 08/10/2007 Not Applicable PSB1-EP        - EP INSP                                                                                                    1 1, 2, 3       IP 7111402               Alert and Notification System Testing                                                                 08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3       IP 7111403               Emergency Response Organization Augmentation Testing                                                 08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3       IP 7111404               Emergency Action Level and Emergency Plan Changes                                                     08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3       IP 7111405               Correction of Emergency Preparedness Weaknesses and Deficiencies                                     08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3        IP 71151-EP01            Drill/Exercise Performance                                                                            08/06/2007 08/10/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.                                                Package: ML070600231 Document: ML070600252 This report shows only on-site and announced inspection procedures.
-09/30/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 3 03/01/2007 10:01:49 Report 22 2 OL RQ-REQUALIFICATION INSPECTION Baseline Inspections 03/26/2007 03/30/2007 1, 2, 3 7111111B IP Licensed Operator Requalification Program 1 PSB1-RP-RP PRE-INSP VISIT/ISFSI Baseline Inspections 04/10/2007 04/12/2007 1, 2, 3 7112101 IP A ccess Control to Radiologically Significant Areas 1 EB3-ISI-UNIT 2 INSERVICE INSPECTION Baseline Inspections 04/23/2007 04/27/2007 2  7111108P IP Inservice Inspection Activities - PWR 4 95002-95002 SUP INSPECT (MSPI, SSF, U3RBES)
 
Supplemental Progra m 04/30/2007 05/04/2007 1, 2, 3 95002 IP Inspection For One Degraded Cornerstone Or Any Three White Inputs In A Strategic Perfor m 2 PSB1-RP-RP OCCUPATIONAL BASELINE INSP WK1 Baseline Inspections 04/30/2007 05/04/2007 1, 2, 3 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 04/30/2007 05/04/2007 1, 2, 3 7112102 IP A LARA Planning and Controls Baseline Inspections 04/30/2007 05/04/2007 1, 2, 3 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 04/30/2007 05/04/2007 1, 2, 3 71151 IP Performance Indicator Verification 1 EB1-SUMP-PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)
Page 2 of 3                                                                                      Oconee 03/01/2007    10:01:49                                                                Inspection / Activity Plan Report 22 03/01/2007 - 09/30/2008 Unit                                                                                                          No. of Staff    Planned Dates          Inspection Number      Inspection Activity                                                    Title                        on Site        Start    End            Type PSB1-EP        - EP INSP                                                                                    1 1, 2, 3       IP 71151-EP02            ERO Drill Participation                                                              08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3        IP 71151-EP03            Alert & Notification System                                                          08/06/2007 08/10/2007 Baseline Inspections OL EXAM        - INITIAL EXAM WEEK 1                                                                        4 1                V23266                OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES                                          08/27/2007 08/31/2007 Not Applicable OL EXAM        - INITIAL EXAM WEEK 2                                                                        3 1                V23266                OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES                                          09/10/2007 09/14/2007 Not Applicable EB3-ISI        - UNIT 3 INSERVICE INSPECTION                                                                1 3        IP 7111108P              Inservice Inspection Activities - PWR                                                10/29/2007 11/02/2007 Baseline Inspections EB3SGISI      - UNIT 3 STEAM GENERATOR ISI                                                                1 3        IP 7111108P              Inservice Inspection Activities - PWR                                                11/05/2007 11/09/2007 Baseline Inspections EB1-CDBI      - COMPONENT DESIGN BASES INSPECTION                                                          8 1, 2, 3        IP 7111121              Component Design Bases Inspection                                                    01/14/2008 01/18/2008 Baseline Inspections 1, 2, 3        IP 7111121              Component Design Bases Inspection                                                    01/28/2008 02/01/2008 Baseline Inspections 1, 2, 3        IP 7111121              Component Design Bases Inspection                                                    02/11/2008 02/15/2008 Baseline Inspections 1, 2, 3        IP 7111121              Component Design Bases Inspection                                                    02/25/2008 02/29/2008 Baseline Inspections PSB1-EP        - EP EXERCISE                                                                                3 1, 2, 3        IP 7111401              Exercise Evaluation                                                                  03/10/2008 03/14/2008 Baseline Inspections 1, 2, 3        IP 7111404              Emergency Action Level and Emergency Plan Changes                                    03/10/2008 03/14/2008 Baseline Inspections 1, 2, 3        IP 71151-EP01           Drill/Exercise Performance                                                           03/10/2008 03/14/2008 Baseline Inspections 1, 2, 3        IP 71151-EP02            ERO Drill Participation                                                              03/10/2008 03/14/2008 Baseline Inspections 1, 2, 3        IP 71151-EP03            Alert & Notification System                                                          03/10/2008 03/14/2008 Baseline Inspections EB3-ISI        - U-1 INSERVICE INSPECTION                                                                  1 1              IP 7111108P              Inservice Inspection Activities - PWR                                                04/07/2008 04/11/2008 Baseline Inspections PSB1-RP        - RADIATION PROTECTION PREINSPECTION VISIT                                                  1 1, 2, 3        IP 7112101              Access Control to Radiologically Significant Areas                                    06/16/2008 06/18/2008 Baseline Inspections EB3 - MR      - MAINT RULE                                                                                1 1, 2, 3        IP 7111112B              Maintenance Effectiveness                                                            06/23/2008 06/27/2008 Baseline Inspections EB2-TFP        - TRIENNIAL FIRE PROTECTION                                                                  5 1, 2, 3        IP 7111105T              Fire Protection [Triennial]                                                          07/01/2008 07/03/2008 Baseline Inspections 1, 2, 3        IP 7111105T              Fire Protection [Triennial]                                                          07/21/2008 07/25/2008 Baseline Inspections 1, 2, 3        IP 7111105T              Fire Protection [Triennial]                                                          08/04/2008 08/08/2008 Baseline Inspections PSB1-RP        - RADIATION PROTECTION PUBLIC BASELINE                                                      4 1, 2, 3        IP 7112101              Access Control to Radiologically Significant Areas                                    07/14/2008 07/18/2008 Baseline Inspections 1, 2, 3        IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment                        07/14/2008 07/18/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
Safety Issues 05/06/2007 05/11/2007 2   2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02
]1 EB3SGISI-UNIT 2 STEAM GENERATOR ISI Baseline Inspections 05/07/2007 05/11/2007 2  7111108P IP Inservice Inspection Activities - PWR 3 PSB1-RP-RP OCCUPATIONAL BASELINE INSP WK2 Baseline Inspections 05/14/2007 05/18/2007 1, 2, 3 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 05/14/2007 05/18/2007 1, 2, 3 7112102 IP A LARA Planning and Controls Baseline Inspections 05/14/2007 05/18/2007 1, 2, 3 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 05/14/2007 05/18/2007 1, 2, 3 71151 IP Performance Indicator Verification 5 PB1-PI&R-BIENNIAL PI&R INSPECTION Baseline Inspections 07/09/2007 07/13/2007 1, 2, 3 71152B IP Identification and Resolution of Problems Baseline Inspections 07/23/2007 07/27/2007 1, 2, 3 71152B IP Identification and Resolution of Problems 1 60855.1-OPERATIONAL ISFSI RESIDENT INSPECTION Other Routine 07/09/2007 07/13/2007 1     60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 4 OL PREP-INITIAL EXAM PREPARATION Not Applicable 08/06/2007 08/10/2007 1     V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 1 PSB1-EP-EP INSP Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111402 IP A lert and Notification System Testing Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 71151-EP01 IP Drill/Exercise Performance This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Oconee Inspection / Activity Plan 03/01/2007
 
-09/30/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 3 03/01/2007 10:01:49 Report 22 1 PSB1-EP-EP INSP Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 71151-EP02 IP ERO Drill Participation Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 71151-EP03 IP A lert & Notification System 4 OL EXAM-INITIAL EXAM WEEK 1 Not Applicable 08/27/2007 08/31/2007 1    V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 3 OL EXAM-INITIAL EXAM WEEK 2 Not Applicable 09/10/2007 09/14/2007 1    V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 1 EB3-ISI-UNIT 3 INSERVICE INSPECTION Baseline Inspections 10/29/2007 11/02/2007 3 7111108P IP Inservice Inspection Activities - PWR 1 EB3SGISI-UNIT 3 STEAM GENERATOR ISI Baseline Inspections 11/05/2007 11/09/2007 3 7111108P IP Inservice Inspection Activities - PWR 8 EB1-CDBI-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 01/14/2008 01/18/2008 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 01/28/2008 02/01/2008 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 02/11/2008 02/15/2008 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 02/25/2008 02/29/2008 1, 2, 3 7111121 IP Component Design Bases Inspection 3 PSB1-EP-EP EXERCISE Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 7111401 IP Exercise Evaluation Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 71151-EP02 IP ERO Drill Participation Baseline Inspections 03/10/2008 03/14/2008 1, 2, 3 71151-EP03 IP A lert & Notification System 1 EB3-ISI-U-1 INSERVICE INSPECTION Baseline Inspections 04/07/2008 04/11/2008 1    7111108P IP Inservice Inspection Activities - PWR 1 PSB1-RP-RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections 06/16/2008 06/18/2008 1, 2, 3 7112101 IP A ccess Control to Radiologically Significant Areas 1 EB3 - MR-MAINT RULE Baseline Inspections 06/23/2008 06/27/2008 1, 2, 3 7111112B IP Maintenance Effectiveness 5 EB2-TFP-TRIENNIAL FIRE PROTECTION Baseline Inspections 07/01/2008 07/03/2008 1, 2, 3 7111105T IP Fire Protection [Triennial]
Page 3 of 3                                                                                   Oconee 03/01/2007     10:01:49                                                             Inspection / Activity Plan Report 22 03/01/2007 - 09/30/2008 Unit                                                                                                                        No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                  Title                                          on Site       Start    End            Type PSB1-RP       - RADIATION PROTECTION PUBLIC BASELINE                                                                     4 1, 2, 3       IP 7112201               Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems                             07/14/2008 07/18/2008 Baseline Inspections 1, 2, 3       IP 7112203               Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P             07/14/2008 07/18/2008 Baseline Inspections 1, 2, 3       IP 71151-OR01           Occupational Exposure Control Effectiveness                                                         07/14/2008 07/18/2008 Baseline Inspections 1, 2, 3       IP 71151-PR01           RETS/ODCM Radiological Effluent                                                                     07/14/2008 07/18/2008 Baseline Inspections EB1-MODS - MODIFICATIONS-10CFR50.59                                                                                       4 1, 2, 3       IP 7111102               Evaluation of Changes, Tests, or Experiments                                                         08/11/2008 08/15/2008 Baseline Inspections 1, 2, 3       IP 7111117B             Permanent Plant Modifications                                                                       08/11/2008 08/15/2008 Baseline Inspections OL PREP       - INITIAL EXAM PREP                                                                                         2 1                V23286                OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES                                                      08/18/2008 08/22/2008 Not Applicable OL EXAM        - INITIAL EXAM WEEK 1                                                                                       3 1                V23286               OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES                                                       09/08/2008 09/12/2008 Not Applicable OL EXAM        - INITIAL EXAM WEEK 2                                                                                      3 1                 V23286               OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES                                                       09/22/2008 09/26/2008 Not Applicable This report does not include INPO and OUTAGE activities.
Baseline Inspections 07/21/2008 07/25/2008 1, 2, 3 7111105T IP Fire Protection [Triennial]
Baseline Inspections 08/04/2008 08/08/2008 1, 2, 3 7111105T IP Fire Protection [Triennial]
4 PSB1-RP-RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Oconee Inspection / Activity Plan 03/01/2007
-09/30/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 3 of 3 03/01/2007 10:01:49 Report 22 4 PSB1-RP-RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 71151-PR01 IP RETS/ODCM Radiological Effluent 4 EB1-MODS-MODIFICATIONS-10CFR50.59 Baseline Inspections 08/11/2008 08/15/2008 1, 2, 3 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 08/11/2008 08/15/2008 1, 2, 3 7111117B IP Permanent Plant Modifications 2 OL PREP-INITIAL EXAM PREP Not Applicable 08/18/2008 08/22/2008 1     V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES 3 OL EXAM-INITIAL EXAM WEEK 1 Not Applicable 09/08/2008 09/12/2008 1     V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES 3 OL EXAM-INITIAL EXAM WEEK 2 Not Applicable 09/22/2008 09/26/2008 1    V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Revision as of 09:03, 23 November 2019

Inspection/Activity Plan 03/01/2007 - 09/30/2008
ML070600252
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/01/2007
From:
NRC/RGN-II
To:
Shared Package
ML070600231 List:
References
Download: ML070600252 (3)


Text

Page 1 of 3 Oconee 03/01/2007 10:01:49 Inspection / Activity Plan Report 22 03/01/2007 - 09/30/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL RQ - REQUALIFICATION INSPECTION 2 1, 2, 3 IP 7111111B Licensed Operator Requalification Program 03/26/2007 03/30/2007 Baseline Inspections PSB1-RP - RP PRE-INSP VISIT/ISFSI 1 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 04/10/2007 04/12/2007 Baseline Inspections EB3-ISI - UNIT 2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/23/2007 04/27/2007 Baseline Inspections 95002 - 95002 SUP INSPECT (MSPI, SSF, U3RBES) 4 1, 2, 3 IP 95002 Inspection For One Degraded Cornerstone Or Any Three White Inputs In A Strategic Perform 04/30/2007 05/04/2007 Supplemental Program PSB1-RP - RP OCCUPATIONAL BASELINE INSP WK1 2 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 04/30/2007 05/04/2007 Baseline Inspections 1, 2, 3 IP 7112102 ALARA Planning and Controls 04/30/2007 05/04/2007 Baseline Inspections 1, 2, 3 IP 7112202 Radioactive Material Processing and Transportation 04/30/2007 05/04/2007 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 04/30/2007 05/04/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2) 1 2 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 05/06/2007 05/11/2007 Safety Issues EB3SGISI - UNIT 2 STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 05/07/2007 05/11/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP WK2 3 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 05/14/2007 05/18/2007 Baseline Inspections 1, 2, 3 IP 7112102 ALARA Planning and Controls 05/14/2007 05/18/2007 Baseline Inspections 1, 2, 3 IP 7112202 Radioactive Material Processing and Transportation 05/14/2007 05/18/2007 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 05/14/2007 05/18/2007 Baseline Inspections PB1-PI&R - BIENNIAL PI&R INSPECTION 5 1, 2, 3 IP 71152B Identification and Resolution of Problems 07/09/2007 07/13/2007 Baseline Inspections 1, 2, 3 IP 71152B Identification and Resolution of Problems 07/23/2007 07/27/2007 Baseline Inspections 60855.1 - OPERATIONAL ISFSI RESIDENT INSPECTION 1 1 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 07/09/2007 07/13/2007 Other Routine OL PREP - INITIAL EXAM PREPARATION 4 1 V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 08/06/2007 08/10/2007 Not Applicable PSB1-EP - EP INSP 1 1, 2, 3 IP 7111402 Alert and Notification System Testing 08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3 IP 7111403 Emergency Response Organization Augmentation Testing 08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3 IP 71151-EP01 Drill/Exercise Performance 08/06/2007 08/10/2007 Baseline Inspections This report does not include INPO and OUTAGE activities. Package: ML070600231 Document: ML070600252 This report shows only on-site and announced inspection procedures.

Page 2 of 3 Oconee 03/01/2007 10:01:49 Inspection / Activity Plan Report 22 03/01/2007 - 09/30/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1-EP - EP INSP 1 1, 2, 3 IP 71151-EP02 ERO Drill Participation 08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3 IP 71151-EP03 Alert & Notification System 08/06/2007 08/10/2007 Baseline Inspections OL EXAM - INITIAL EXAM WEEK 1 4 1 V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 08/27/2007 08/31/2007 Not Applicable OL EXAM - INITIAL EXAM WEEK 2 3 1 V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 09/10/2007 09/14/2007 Not Applicable EB3-ISI - UNIT 3 INSERVICE INSPECTION 1 3 IP 7111108P Inservice Inspection Activities - PWR 10/29/2007 11/02/2007 Baseline Inspections EB3SGISI - UNIT 3 STEAM GENERATOR ISI 1 3 IP 7111108P Inservice Inspection Activities - PWR 11/05/2007 11/09/2007 Baseline Inspections EB1-CDBI - COMPONENT DESIGN BASES INSPECTION 8 1, 2, 3 IP 7111121 Component Design Bases Inspection 01/14/2008 01/18/2008 Baseline Inspections 1, 2, 3 IP 7111121 Component Design Bases Inspection 01/28/2008 02/01/2008 Baseline Inspections 1, 2, 3 IP 7111121 Component Design Bases Inspection 02/11/2008 02/15/2008 Baseline Inspections 1, 2, 3 IP 7111121 Component Design Bases Inspection 02/25/2008 02/29/2008 Baseline Inspections PSB1-EP - EP EXERCISE 3 1, 2, 3 IP 7111401 Exercise Evaluation 03/10/2008 03/14/2008 Baseline Inspections 1, 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 03/10/2008 03/14/2008 Baseline Inspections 1, 2, 3 IP 71151-EP01 Drill/Exercise Performance 03/10/2008 03/14/2008 Baseline Inspections 1, 2, 3 IP 71151-EP02 ERO Drill Participation 03/10/2008 03/14/2008 Baseline Inspections 1, 2, 3 IP 71151-EP03 Alert & Notification System 03/10/2008 03/14/2008 Baseline Inspections EB3-ISI - U-1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 04/07/2008 04/11/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION PREINSPECTION VISIT 1 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 06/16/2008 06/18/2008 Baseline Inspections EB3 - MR - MAINT RULE 1 1, 2, 3 IP 7111112B Maintenance Effectiveness 06/23/2008 06/27/2008 Baseline Inspections EB2-TFP - TRIENNIAL FIRE PROTECTION 5 1, 2, 3 IP 7111105T Fire Protection [Triennial] 07/01/2008 07/03/2008 Baseline Inspections 1, 2, 3 IP 7111105T Fire Protection [Triennial] 07/21/2008 07/25/2008 Baseline Inspections 1, 2, 3 IP 7111105T Fire Protection [Triennial] 08/04/2008 08/08/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION PUBLIC BASELINE 4 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 07/14/2008 07/18/2008 Baseline Inspections 1, 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 07/14/2008 07/18/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Oconee 03/01/2007 10:01:49 Inspection / Activity Plan Report 22 03/01/2007 - 09/30/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1-RP - RADIATION PROTECTION PUBLIC BASELINE 4 1, 2, 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 07/14/2008 07/18/2008 Baseline Inspections 1, 2, 3 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 07/14/2008 07/18/2008 Baseline Inspections 1, 2, 3 IP 71151-OR01 Occupational Exposure Control Effectiveness 07/14/2008 07/18/2008 Baseline Inspections 1, 2, 3 IP 71151-PR01 RETS/ODCM Radiological Effluent 07/14/2008 07/18/2008 Baseline Inspections EB1-MODS - MODIFICATIONS-10CFR50.59 4 1, 2, 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 08/11/2008 08/15/2008 Baseline Inspections 1, 2, 3 IP 7111117B Permanent Plant Modifications 08/11/2008 08/15/2008 Baseline Inspections OL PREP - INITIAL EXAM PREP 2 1 V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES 08/18/2008 08/22/2008 Not Applicable OL EXAM - INITIAL EXAM WEEK 1 3 1 V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES 09/08/2008 09/12/2008 Not Applicable OL EXAM - INITIAL EXAM WEEK 2 3 1 V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES 09/22/2008 09/26/2008 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.