L-2007-526, 2006-2007 Annual Report for Storm Water Discharges Associated with Industrial Activities, Diablo Canyon Power Plant (Dcpp), Facility Wdid No. 340I018248: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Pacific Gas and Electric Company'Diablo Canyon Power Plant P 0. Box 56 Avila Beach, CA 93424 PG&E Letter DCL-2007-526 June 21, 2007 California Regional Water Quality Control Board Central Coast Region 895 Aerovista, Suite #101 San Luis Obispo, CA 93401-7906 Attn: Storm Water Division Certified/Return Receipt#7007-0220-0004-6735-9783 2006-2007 Annual Report for Storm Water Discharges Associated with Industrial Activities, Diablo Canyon Power Plant (DCPP), Facility WDID No. 3401018248 Enclosed is the DCPP Annual Report for Storm Water Discharges Associated with Industrial Activities for the Reporting Period July 1, 2006 through June 30, 2007.The report has been completed in accordance with DCPP's commitment to implement provisions of the State General Industrial Storm Water Permit (General Permit) as outlined in PG&E letter DCL-2006-556 dated November 09, 2006 to the Regional Water Quality Control Board Central Coast Region.If you have any questions or concerns regarding the enclosed report, please contact Trevor Rebel of my staff at (805) 545-3607.Sincerely, J~ames R. cker Vice President  
{{#Wiki_filter:Pacific Gas and ElectricCompany' Diablo Canyon Power Plant P 0. Box 56 Avila Beach, CA 93424 PG&E Letter DCL-2007-526 Certified/Return Receipt
-Diablo Canyon Operations and Station Director Enclosure 2007526/tdr/kmo J---75 PG&E Letter DCL-2007-526 CCRWQCB Storm Water Division June 21, 2007 Page 2 cc: w/enclosure:
                                                                #7007-0220-0004-6735-9783 June 21, 2007 California Regional Water Quality Control Board Central Coast Region 895 Aerovista, Suite #101 San Luis Obispo, CA 93401-7906 Attn: Storm Water Division 2006-2007 Annual Report for Storm Water Discharges Associated with Industrial Activities, Diablo Canyon Power Plant (DCPP), Facility WDID No. 3401018248 Enclosed is the DCPP Annual Report for Storm Water Discharges Associated with Industrial Activities for the Reporting Period July 1, 2006 through June 30, 2007.
Resident Inspector, Terry Jackson U.S. Nuclear Regulatory Commission Diablo Canyon Power Plant 104/5 Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Dr., Suite 400 Arlington, TX 76011-4005 Director, Division of Reactor Projects U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Dr., Suite 400 Arlington, TX 76011-4005 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Peter von Langen Environmental Scientist CCRWQCB 895 Aerovista, #101 San Luis Obispo, CA 93401-7906 California Department of Fish and Game 20 Lower Ragsdale, Suite 100 Monterey, California 93490 cc: w/o enclosure:
The report has been completed in accordance with DCPP's commitment to implement provisions of the State General Industrial Storm Water Permit (General Permit) as outlined in PG&E letter DCL-2006-556 dated November 09, 2006 to the Regional Water Quality Control Board Central Coast Region.
State of California STATE WATER RESOURCES CONTROL BOARD 2006-2007 ANNUAL REPORT FOR STORM WATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITIES Reporting Period July 1, 2006 through June 30, 2007 An annual report is required to be submitted to your local Regional Water Quality Control Board (Regional Board) by July 1 of each year. This document must be certified and signed, under penalty of perjury, by the appropriate official of your company. Many of the Annual Report questions require an explanation.
If you have any questions or concerns regarding the enclosed report, please contact Trevor Rebel of my staff at (805) 545-3607.
Please provide explanations on a separate sheet as an attachment.
Sincerely, J~ames R. cker Vice President- Diablo Canyon Operationsand Station Director Enclosure 2007526/tdr/kmo J---75
Retain a copy of the completed Annual Report for your records.Please circle or highlight any information contained in Items A, B, and C below that is new or revised so we can update our records. Please remember that a Notice of Termination and new Notice of Intent are required whenever a facility operation is relocated or changes ownership.
 
If you have any questions, please contact your Regional Board Industrial Storm Water Permit Contact.The names, telephone numbers and e-mail addresses of the Regional Board contacts, as well as the Regional Board office addresses can be found at http://www.waterboards.ca.gov/stormwtr/contact.html.
PG&E Letter DCL-2007-526 CCRWQCB Storm Water Division June 21, 2007 Page 2 cc: w/enclosure:   Resident Inspector, Terry Jackson U.S. Nuclear Regulatory Commission Diablo Canyon Power Plant 104/5 Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Dr., Suite 400 Arlington, TX 76011-4005 Director, Division of Reactor Projects U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Dr., Suite 400 Arlington, TX 76011-4005 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 cc: w/o enclosure: Peter von Langen Environmental Scientist CCRWQCB 895 Aerovista, #101 San Luis Obispo, CA 93401-7906 California Department of Fish and Game 20 Lower Ragsdale, Suite 100 Monterey, California 93490
To find your Regional Board information, match the first digit of your WDID number with the corresponding number that appears in parenthesis on the first line of each Regional Board office.GENERAL INFORMATION:
 
A. Facility Information:
State of California STATE WATER RESOURCES CONTROL BOARD 2006-2007 ANNUAL REPORT FOR STORM WATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITIES Reporting Period July 1, 2006 through June 30, 2007 An annual report is required to be submitted to your local Regional Water Quality Control Board (Regional Board) by July 1 of each year. This document must be certified and signed, under penalty of perjury, by the appropriate official of your company. Many of the Annual Report questions require an explanation. Please provide explanations on a separate sheet as an attachment. Retain a copy of the completed Annual Report for your records.
Facility Business Name: Diablo Canyon Power Plant (DCPP)Physical Address: 9 Miles North West of Avila Beach Facility WDID No: 3401018248 Contact Person: Trevor D. Rebel e-mail: tdr5(apqe.com State: CA Zip: 93424 Phone: 805.545.3607 City: Avila Beach Standard Industrial Classification (SIC) Code(s) 4911 B. Facility Operator Information:
Please circle or highlight any information contained in Items A, B, and C below that is new or revised so we can update our records. Please remember that a Notice of Termination and new Notice of Intent are required whenever a facility operation is relocated or changes ownership.
Operator Name: Pacific Gas and Electric Company Mailing Address: P.O. Box 56 City: Avila Beach Contact Person: Trevor D. Rebel e-mail: tdr5(,p~qe.com State: CA Zip: 93424 Phone: 805.545.3607 C. Facility Billing Information:
If you have any questions, please contact your Regional Board Industrial Storm Water Permit Contact.
Operator Name: Pacific Gas and Electric Company -DCPP Mailing Address: P.O. Box 56 City: Avila Beach Contact Person: Bryan K. Cunningham e-mail: bkc3cWDae.com State: CA Zip: 93424 Phone: 805.545.4439 2006-2007 ANNUAL REPORT SPECIFIC INFORMA TION MONITORING AND REPORTING PROGRAM D. SAMPLING AND ANALYSIS EXEMPTIONS AND REDUCTIONS
The names, telephone numbers and e-mail addresses of the Regional Board contacts, as well as the Regional Board office addresses can be found at http://www.waterboards.ca.gov/stormwtr/contact.html.
: 1. For the reporting period, was your facility exempt from collecting and analyzing samples from two storm events in accordance with sections B.12 or 15 of the General Permit?E- YES Go to Item D.2 NO Go to Section E 2. Indicate the reason your facility is exempt from collecting and analyzing samples from two storm events. Attach a copy of the first page of the appropriate certification if you check boxes ii, iii, iv, or v.i. -] Participating in an Approved Group Monitoring Plan Group Name: ii Submitted No Exposure Certification (NEC) Date Submitted:
To find your Regional Board information, match the first digit of your WDID number with the corresponding number that appears in parenthesis on the first line of each Regional Board office.
Re-evaluation Date: / /Does facility continue to satisfy NEC conditions?
GENERAL INFORMATION:
YES NO iii. LI Submitted Sampling Reduction Certification (SRC) Date Submitted:  
A. FacilityInformation:                                                 Facility WDID No: 3401018248 Facility Business Name: Diablo Canyon Power Plant (DCPP)           Contact Person: Trevor D. Rebel Physical Address: 9 Miles North West of Avila Beach                 e-mail: tdr5(apqe.com City: Avila Beach                                                  State: CA Zip: 93424     Phone: 805.545.3607 Standard Industrial Classification (SIC) Code(s)   4911 B. Facility OperatorInformation:
/Re-evaluation Date: / I Does facility continue to satisfy SRC conditions?
Operator Name: Pacific Gas and Electric Company                     Contact Person: Trevor D. Rebel Mailing Address: P.O. Box 56                                       e-mail: tdr5(,p~qe.com City: Avila Beach                                                  State: CA Zip: 93424     Phone: 805.545.3607 C. FacilityBilling Information:
R YES -1 NO iv. I Received Regional Board Certification Certification Date: v. [] Received Local Agency Certification Certification Date: 3. If you checked boxes i or iii above, were you scheduled to sample one storm event during the reporting year?[I YES Go to Section E [I NO Go to Section F 4. If you checked boxes ii, iv, or v, go to Section F.E. SAMPLING AND ANALYSIS RESULTS 1. How many storm events did you sample? 2 If less than 2, attach explanation (if you checked item D.2.i or iii.above, only attach explanation if you answer "0").2. Did you collect storm water samples from the first storm of the wet season that produced a discharge during scheduled facility operating hours? (Section B.5 of the General Permit)LI YES NO attach explanation (Please note that if you do not sample the first storm event, you are still required to sample 2 storm events)3. How many storm water discharge locations are at your facility?
Operator Name: Pacific Gas and Electric Company - DCPP             Contact Person: Bryan K. Cunningham Mailing Address: P.O. Box 56                                       e-mail: bkc3cWDae.com City: Avila Beach                                                  State: CA Zip: 93424     Phone: 805.545.4439
18 2006-2007.
 
ANNUAL REPORT 4. For each storm event sampled, did you collect and analyze a sample from each of the facility's' storm water discharge locations?
2006-2007 ANNUAL REPORT SPECIFIC INFORMA TION MONITORING AND REPORTING PROGRAM D. SAMPLING AND ANALYSIS EXEMPTIONS AND REDUCTIONS
: 5. Was sample collection or analysis reduced in accordance with Section B.7.d of the General Permit?If "YES", attach documentation supporting your determination that two or more drainage areas are substantially identical.
: 1. For the reporting period, was your facility exempt from collecting and analyzing samples from two storm events in accordance with sections B.12 or 15 of the General Permit?
Date facility's drainage areas were last evaluated 6/2/07 6. Were all samples collected during the first hour of discharge?
E-         YES       Go to Item D.2                                           NO         Go to Section E
: 7. Was all storm water sampling preceded by three (3)working days without a storm water discharge?
: 2. Indicate the reason your facility is exempt from collecting and analyzing samples from two storm events. Attach a copy of the first page of the appropriate certification if you check boxes ii, iii, iv, or v.
: 8. Were there any discharges of storm water that had been temporarily stored or contained? (such as from a pond)9. Did you collect and analyze samples of temporarily stored or contained storm water discharges from two storm events?(or one storm event if you checked item D.2.i or iii. above)-YES, go to Item E.6 Z NO n YES S II F NO, attach explanation LI YES NO, attach explanation
: i.     -] Participating in an Approved Group Monitoring Plan                 Group Name:
[j YES NO, attach explanation YES [ NO,gotoltemE.10 Z YES 0 NO, attach explanation
ii   Submitted No Exposure Certification (NEC)                         Date Submitted:
: 10. Section B.5. of the General Permit requires you to analyze storm water samples for pH, Total Suspended Solids (TSS), Specific Conductance (SC), Total Organic Carbon (TOC) or Oil and Grease (O&G), other pollutants likely to be present in storm water discharges in significant quantities, and analytical parameters listed in Table D of the General Permit.a. Does Table D contain any additional parameters related to your facility's SIC code(s)?b. Did you analyze all storm water samples for the applicable parameters listed in Table D?l\ YES [:] NO, Goto Item E.11 0 YES li NO c. If you did not analyze all storm water samples for the applicable Table D parameters, check one of the following reasons: In prior sampling years, the parameter(s) have not been detected in significant quantities from two consecutive sampling events. Attach explanation The parameter(s) is not likely to be present in storm water discharges and authorized non-storm water discharges in significant quantities based upon the facility operator's evaluation.
Re-evaluation Date:       /     /
Attach explanation Other. Attach explanation
Does facility continue to satisfy NEC conditions?                 YES                   NO iii. LI   Submitted Sampling Reduction Certification (SRC)                   Date Submitted:                       /
: 11. For each storm event sampled, attach a copy of the laboratory analytical reports and report the sampling and analysis results using Form 1 or its equivalent.
Re-evaluation Date:       /     I Does facility continue to satisfy SRC conditions?           R     YES               -1 NO iv. I   Received Regional Board Certification                             Certification Date:
The following must be provided for each sample collected:
: v.   []   Received Local Agency Certification                               Certification Date:
0 S S S 0 Date and time of sample collection Name and title of sampler Parameters tested Name of analytical testing laboratory Discharge location identification
: 3. If you checked boxes i or iii above, were you scheduled to sample one storm event during the reporting year?
* Testing results" Test methods used* Test detection limits* Date of testing* Copies of the laboratory analytical results 2006-2007 ANNUAL REPORT F. QUARTERLY VISUAL OBSERVATIONS
[I       YES       Go to Section E                                   [I     NO         Go to Section F
: 1. Authorized Non-Storm Water Discharges Section B.3.b of the General Permit requires quarterly visual observations of all authorized non-storm water discharges and their sources.a. Do authorized non-storm water discharges occur at your facility?YES NO GotoltemF.2
: 4. If you checked boxes ii, iv, or v, go to Section F.
: b. Indicate whether you visually observed all authorized non-storm water discharges and their sources during the quarters when they were discharged.
E. SAMPLING AND ANALYSIS RESULTS
Attach an explanation for any "NO" answers. Indicate "N/A" for quarters without any authorized non-storm water discharges.
: 1. How many storm events did you sample? 2             If less than 2, attach explanation (if you checked item D.2.i or iii.
July-September
above, only attach explanation ifyou answer "0").
[-] YES NO [: N/A October-December E YES [] NO [] N/A January-March 12 YES L] NO -]N/A April-June EYES OI NO LI N/A c. Use Form 2 to report quarterly visual observations of authorized non-storm water discharges or provide the following information:
: 2. Did you collect storm water samples from the first storm of the wet season that produced a discharge during scheduled facility operating hours? (Section B.5 of the General Permit)
: i. name of each authorized non-storm water discharge ii. date and time of observation iii. source and location of each authorized non-storm water discharge iv. characteristics of the discharge at its source and impacted drainage area/discharge location v. name, title, and signature of observer vi. any new or revised BMPs necessary to reduce or prevent pollutants in authorized non-storm water discharges.
LI         YES                                                               NO     attach explanation (Please note that if you do not sample the first storm event, you are still required to sample 2 storm events)
Provide new or revised BMP implementation date.2. Unauthorized Non-Storm Water Discharges Section B.3.a of the General Permit requires quarterly visual observations of all drainage areas to detect the presence of unauthorized non-storm water discharges and their sources.a. Indicate whether you visually observed all drainage areas to detect the presence of unauthorized non- storm water discharges and their sources. Attach an explanation for any "NO" answers.July-September E] YES " NO October-December
: 3. How many storm water discharge locations are at your facility? 18
[n YES -- NO January-March
 
[u YES E] NO April-June EYES [L NO b. Based upon the quarterly visual observations, were any unauthorized non-storm water discharges detected?,s] YES f- NO Go to Item F.2.d c. Have each of the unauthorized non-storm water discharges been eliminated or permitted?
2006-2007.
YES LI NO Attach explanation
ANNUAL REPORT
: 4. For each storm event sampled, did you collect and analyze a sample from each of the facility's' storm water discharge locations?       -    YES, go to Item E.6    Z    NO
: 5. Was sample collection or analysis reduced in accordance with Section B.7.d of the General Permit?                                 n    YESS    FII  NO, attach explanation If "YES", attach documentation supporting your determination that two or more drainage areas are substantially identical.
Date facility's drainage areas were last evaluated 6/2/07
: 6. Were all samples collected during the first hour of discharge?           LI    YES          NO, attach explanation
: 7. Was all storm water sampling preceded by three (3) working days without a storm water discharge?                             [j    YES          NO, attach explanation
: 8. Were there any discharges of storm water that had been temporarily stored or contained? (such as from a pond)                           YES      [    NO,gotoltemE.10
: 9. Did you collect and analyze samples of temporarily stored or contained storm water discharges from two storm events?
(or one storm event if you checked item D.2.i or iii. above)             Z      YES     0    NO, attach explanation
: 10. Section B.5. of the General Permit requires you to analyze storm water samples for pH, Total Suspended Solids (TSS), Specific Conductance (SC), Total Organic Carbon (TOC) or Oil and Grease (O&G), other pollutants likely to be present in storm water discharges in significant quantities, and analytical parameters listed in Table D of the General Permit.
: a. Does Table D contain any additional parameters related to your facility's SIC code(s)?                             l\    YES      [:]  NO, Goto Item E.11
: b. Did you analyze all storm water samples for the applicable parameters listed in Table D?                             0     YES       li NO
: c. If you did not analyze all storm water samples for the applicable Table D parameters, check one of the following reasons:
In prior sampling years, the parameter(s) have not been detected in significant quantities from two consecutive sampling events. Attach explanation The parameter(s) is not likely to be present in storm water discharges and authorized non-storm water discharges in significant quantities based upon the facility operator's evaluation. Attach explanation Other. Attach explanation
: 11. For each storm event sampled, attach a copy of the laboratory analytical reports and report the sampling and analysis results using Form 1 or its equivalent. The following must be provided for each sample collected:
0   Date and time of sample collection
* Testing results S    Name and title of sampler                                         "      Test methods used S    Parameters tested
* Test detection limits S    Name of analytical testing laboratory
* Date of testing 0    Discharge location identification
* Copies of the laboratory analytical results
 
2006-2007 ANNUAL REPORT F. QUARTERLY VISUAL OBSERVATIONS
: 1. Authorized Non-Storm Water Discharges Section B.3.b of the General Permit requires quarterly visual observations of all authorized non-storm water discharges and their sources.
: a. Do authorized non-storm water discharges occur at your facility?
v*      YES                               NO     GotoltemF.2
: b. Indicate whether you visually observed all authorized non-storm water discharges and their sources during the quarters when they were discharged. Attach an explanation for any "NO" answers. Indicate "N/A" for quarters without any authorized non-storm water discharges.
July-September       [-] YES         NO   [: N/A           October-December     E   YES   []   NO   [] N/A January-March       12 YES     L] NO       -]N/A           April-June           EYES     OI NO     LI N/A
: c. Use Form 2 to report quarterly visual observations of authorized non-storm water discharges or provide the following information:
: i. name of each authorized non-storm water discharge ii. date and time of observation iii. source and location of each authorized non-storm water discharge iv. characteristics of the discharge at its source and impacted drainage area/discharge location
: v. name, title, and signature of observer vi. any new or revised BMPs necessary to reduce or prevent pollutants in authorized non-storm water discharges. Provide new or revised BMP implementation date.
: 2. Unauthorized Non-Storm Water Discharges Section B.3.a of the General Permit requires quarterly visual observations of all drainage areas to detect the presence of unauthorized non-storm water discharges and their sources.
: a. Indicate whether you visually observed all drainage areas to detect the presence of unauthorized non- storm water discharges and their sources. Attach an explanation for any "NO" answers.
July-September       E] YES     "   NO                     October-December     [n YES     -- NO January-March       [u YES     E] NO                       April-June           EYES     [L NO
: b. Based upon the quarterly visual observations, were any unauthorized non-storm water discharges detected?
            ,s]   YES                         f-     NO     Go to Item F.2.d
: c. Have each of the unauthorized non-storm water discharges been eliminated or permitted?
YES                         LI     NO   Attach explanation
: d. Use Form 3 to report quarterly unauthorized non-storm water discharge visual observations or provide the following information:
: d. Use Form 3 to report quarterly unauthorized non-storm water discharge visual observations or provide the following information:
: i. name of each unauthorized non-storm water discharge ii. date and time of observation iii. source and location of each unauthorized non-storm water discharge iv. characteristics of the discharge at its source and impacted drainage area/discharge location v. name, title, and signature of observer vi. any corrective actions necessary to eliminate the source of each unauthorized non-storm water discharge and to clean impacted drainage areas. Provide date unauthorized non-storm water discharge(s) was eliminated or scheduled to be eliminated.
: i. name of each unauthorized non-storm water discharge ii. date and time of observation iii. source and location of each unauthorized non-storm water discharge iv. characteristics of the discharge at its source and impacted drainage area/discharge location
: v. name, title, and signature of observer vi. any corrective actions necessary to eliminate the source of each unauthorized non-storm water discharge and to clean impacted drainage areas. Provide date unauthorized non-storm water discharge(s) was eliminated or scheduled to be eliminated.
 
2006-2007 ANNUAL REPORT G. MONTHLY WET SEASON VISUAL OBSERVATIONS Section B.4.a of the General Permit requires you to conduct monthly visual observations of storm water discharges at all storm water discharge locations during the wet season. These observations shall occur during the first hour of discharge or, in the case of temporarily stored or contained storm water, at the time of discharge.
2006-2007 ANNUAL REPORT G. MONTHLY WET SEASON VISUAL OBSERVATIONS Section B.4.a of the General Permit requires you to conduct monthly visual observations of storm water discharges at all storm water discharge locations during the wet season. These observations shall occur during the first hour of discharge or, in the case of temporarily stored or contained storm water, at the time of discharge.
: 1. Indicate below whether monthly visual observations of storm water discharges occurred at all discharge locations.
: 1. Indicate below whether monthly visual observations of storm water discharges occurred at all discharge locations.
Attach an explanation for any "NO" answers. Include in this explanation whether any eligible storm events occurred during scheduled facility operating hours that did not result in a storm water discharge, and provide the date, time, name and title of the person who observed that there was no storm water discharge.
Attach an explanation for any "NO" answers. Include in this explanation whether any eligible storm events occurred during scheduled facility operating hours that did not result in a storm water discharge, and provide the date, time, name and title of the person who observed that there was no storm water discharge.
YES 1: October November December January I-I NO D D February March April May YES 0 NO D D E]D 2. Report monthly wet season visual observations using Form 4 or provide the following information:
YES               NO                                            YES              NO 1:                                                             0 October                                                         February D
a.b.C.d.date, time, and location of observation name and title of observer characteristics of the discharge (i.e., odor, color, etc.) and source of any pollutants observed any new or revised BMPs necessary to reduce or prevent pollutants in storm water discharges.
I-I                                                                               E]
Provide new or revised BMP implementation date.ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION (ACSCE)H. ACSCE CHECKLIST Section A.9 of the General Permit requires the facility operator to conduct one ACSCE in each reporting period (July 1-June 30). Evaluations must be conducted within 8-16 months of each other. The SWPPP and monitoring program shall be revised and implemented, as necessary, within 90 days of the evaluation.
November D
The checklist below includes the minimum steps necessary to complete a ACSCE. Indicate whether you have performed each step below. Attach an explanation for any "NO" answers.1. Have you inspected all potential pollutant sources and industrial activities areas? YES The following areas should be inspected:
March D
M NO* areas where spills and leaks have occurred
December                                                        April D
* buildin during the last year 0 materik* outdoor wash and rinse areas 0 vehicle* process/manufacturing areas 9 truck p.* loading, unloading, and transfer areas 0 rooftop* waste storage/disposal areas
January                                                          May                   D
* vehicle" dust/particulate generating areas
: 2. Report monthly wet season visual observations using Form 4 or provide the following information:
* non-st(* erosion areas 2. Have you reviewed your SWPPP to assure that its BMPs address existing potential pollutant sources and industrial activities areas?3.. Have you inspected the entire facility to verify that the SWPPP's site map is up-to-date?
: a. date, time, and location of observation
The following site map items should be verified: g repair, remodeling, and construction Il storage areas/equipment storage areas arking and access areas equipment areas fueling/maintenance areas rm water discharge generating areas YES YES Zl NO[ NO" facility boundaries" outline of all storm water drainage areas* areas impacted by run-on* storm water discharges locations" storm water collection and conveyance system* structural control measures such as catch basins, berms, containment areas, oil/water separators, etc.
: b. name and title of observer C. characteristics of the discharge (i.e., odor, color, etc.) and source of any pollutants observed
2006-2007 ANNUAL REPORT 4. Have you reviewed all General Permit compliance records generated since the last annual evaluation?
: d. any new or revised BMPs necessary to reduce or prevent pollutants in storm water discharges.
E YES F] NO The following records should be reviewed: " quarterly authorized non-storm water discharge visual observations
Provide new or revised BMP implementation date.
* monthly storm water discharge visual observation
ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION (ACSCE)
* records of spills/leaks and associated clean-up/response activities
H. ACSCE CHECKLIST Section A.9 of the General Permit requires the facility operator to conduct one ACSCE in each reporting period (July 1-June 30). Evaluations must be conducted within 8-16 months of each other. The SWPPP and monitoring program shall be revised and implemented, as necessary, within 90 days of the evaluation. The checklist below includes the minimum steps necessary to complete a ACSCE. Indicate whether you have performed each step below. Attach an explanation for any "NO" answers.
* quarterly unauthorized non-storm water discharge visual observations
: 1. Have you inspected all potential pollutant sources and industrial activities areas?               YES       M    NO The following areas should be inspected:
* Sampling and Analysis records* preventative maintenance inspection and maintenance records 5. Have you reviewed the major elements of the SWPPP to assure compliance with the General Permit?The following SWPPP items should be reviewed: 0 YES El, NO 0 0 0 pollution prevention team list of significant materials description of potential pollutant sources* assessment of potential pollutant sources" identification and description of the BMPs to be implemented for each potential pollutant source 6. Have you reviewed your SWPPP to assure that a) the BMPs are adequate in reducing or preventing pollutants in storm water discharges and authorized non-storm water discharges, and b) the BMPs are being implemented?
* areas where spills and leaks have occurred
0 YES[] NO The following BMP categories should be reviewed: 0 0 0 0 0 good housekeeping practices spill response employee training erosion control quality assurance preventative maintenance material handling and storage practices waste handling/storage structural BMPs 7. Has all material handling equipment and equipment needed to implement the SWPPP been inspected?
* buildin g repair, remodeling, and construction during the last year                                           0   materik Il storage areas
M YES FI- NO 1. ACSCE EVALUATION REPORT The facility operator is required to provide an evaluation report that includes: 0 0 0 identification of personnel performing the evaluation the date(s) of the evaluation necessary SWPPP revisions* schedule for implementing SWPPP revisions" any incidents of non-compliance and the corrective actions taken Use Form 5 to report the results of your evaluation or develop an equivalent form.J. ACSCE CERTIFICATION The facility operator is required to certify compliance with the Industrial Activities Storm Water General Permit. To certify compliance, both the SWPPP and Monitoring Program must be up to date and be fully implemented.
* outdoor wash and rinse areas                                   0   vehicle /equipment storage areas
Based upon your ACSCE, do you certify compliance with the Industrial Activities Storm Water General Permit?[n YES F NO If you answered "NO" attach an explanation to the ACSCE Evaluation Report why you are not in compliance with the Industrial Activities Storm Water General Permit.
* process/manufacturing areas                                     9   truck p.arking and access areas
* loading, unloading, and transfer areas                         0   rooftop equipment areas
* waste storage/disposal areas
* vehicle fueling/maintenance areas
        "   dust/particulate generating areas
* non-st( rm water discharge generating areas
* erosion areas
: 2. Have you reviewed your SWPPP to assure that its BMPs address existing potential pollutant sources and industrial activities areas?                                       YES        Zl NO 3.. Have you inspected the entire facility to verify that the SWPPP's site map is up-to-date? The following site map items should be verified:                                   YES       [   NO
        "   facility boundaries                                     " storm water collection and conveyance system
        "   outline of all storm water drainage areas
* structural control measures such as catch basins, berms,
* areas impacted by run-on                                    containment areas, oil/water separators, etc.
* storm water discharges locations
 
2006-2007 ANNUAL REPORT
: 4. Have you reviewed all General Permit compliance records generated since the last annual evaluation?                                                         E   YES         F] NO The following records should be reviewed:
        "   quarterly authorized non-storm water
* quarterly unauthorized non-storm water discharge discharge visual observations                                    visual observations
* monthly storm water discharge visual
* Sampling and Analysis records observation
* preventative maintenance inspection and
* records of spills/leaks and associated                           maintenance records clean-up/response activities
: 5. Have you reviewed the major elements of the SWPPP to assure compliance with the General Permit?                                                       0    YES          El, NO The following SWPPP items should be reviewed:
0   pollution prevention team
* assessment of potential pollutant sources 0    list of significant materials                                "     identification and description of the BMPs to be 0    description of potential pollutant sources                        implemented for each potential pollutant source
: 6. Have you reviewed your SWPPP to assure that a) the BMPs are adequate in reducing or preventing pollutants in storm water discharges and authorized non-storm water discharges, and b) the BMPs are being implemented?                         0   YES         [] NO The following BMP categories should be reviewed:
0   good housekeeping practices                                       preventative maintenance 0    spill response                                                     material handling and storage practices 0    employee training                                                waste handling/storage 0    erosion control                                                    structural BMPs 0    quality assurance
: 7. Has all material handling equipment and equipment needed to implement the SWPPP been inspected?                                                       M   YES         FI- NO
: 1. ACSCE EVALUATION REPORT The facility operator is required to provide an evaluation report that includes:
0   identification of personnel performing the evaluation
* schedule for implementing SWPPP revisions 0    the date(s) of the evaluation                                     "     any incidents of non-compliance and the 0    necessary SWPPP revisions                                              corrective actions taken Use Form 5 to report the results of your evaluation or develop an equivalent form.
J. ACSCE CERTIFICATION The facility operator is required to certify compliance with the Industrial Activities Storm Water General Permit. To certify compliance, both the SWPPP and Monitoring Program must be up to date and be fully implemented.
Based upon your ACSCE, do you certify compliance with the Industrial Activities Storm Water General Permit?                                                         [n YES           F   NO If you answered "NO" attach an explanation to the ACSCE Evaluation Report why you are not in compliance with the Industrial Activities Storm Water General Permit.
 
2006-2007 ANNUAL REPORT ATTACHMENT  
2006-2007 ANNUAL REPORT ATTACHMENT  


==SUMMARY==
==SUMMARY==
Answer the questions below to help you determine what should be attached to this annual report. Answer NA (Not Applicable) to questions 2-4 if you are not required to provide those attachments.
Answer the questions below to help you determine what should be attached to this annual report. Answer NA (Not Applicable) to questions 2-4 if you are not required to provide those attachments.
: 1. Have you attached Forms 1,2,3,4, and 5 or their equivalent?
: 1. Have you attached Forms 1,2,3,4, and 5 or their equivalent?             [* YES (Mandatory)
: 2. If you conducted sampling and analysis, have you attached the laboratoryanalytical reports?3. If you checked box II, Ill, IV, or V in item D.2 of this Annual Report, have you attached the first page of the appropriate certifications?
: 2. If you conducted sampling and analysis, have you attached the laboratoryanalytical reports?                                                 YES        ]NO          -  NA
: 4. Have you attached an explanation for each "NO" answer in items E.1, E.2, E.5-E.7, E.9, E.10.c, F.1.b, F.2.a, F.2.c, G.1, H.1-H.7, or J?YES (Mandatory)
: 3. If you checked box II, Ill, IV, or V in item D.2 of this Annual Report, have you attached the first page of the appropriate certifications?                                             L'- YES      -  NO          ZNA
YES L'- YES YES]NO-NO DNO-NA ZNA-NA ANNUAL REPORT CERTIFICATION I am duly authorized to sign reports required by the INDUSTRIAL ACTIVITIES STORM WATER GENERAL PERMIT (see Standard Provision C.9) and I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information submitted.
: 4. Have you attached an explanation for each "NO" answer in items E.1, E.2, E.5-E.7, E.9, E.10.c, F.1.b, F.2.a, F.2.c, G.1, H.1-H.7, or J?                                                           YES     DNO            -NA ANNUAL REPORT CERTIFICATION I am duly authorized to sign reports required by the INDUSTRIAL ACTIVITIES STORM WATER GENERAL PERMIT (see Standard Provision C.9) and I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those person directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Based on my inquiry of the person or persons who manage the system, or those person directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete.
Printed Name:       James R. Becker Signat&uýe...
I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Date:  G Title:   Vice President - Diablo Canyon Operations and Station Director
Printed Name: James R. Becker Signat&uýe...
 
Title: Vice President  
2006-2007 ANNUAL REPORT DESCRIPTION OF BASIC ANZALYTICAL                                   PARAMETERS The Industrial Activities Storm Water General Permit (General Permit) requires you to analyze storm water samples for at least four parameters. These are pH, Total Suspended Solids (TSS), Specific Conductance (SC),and Total Organic Carbon (TOC). Oil and Grease (O&G) may be substituted for TOC. In addition, you must monitor for any other pollutants whichyou believe to be present in your storm water discharge as a result of industrial activity and analytical parameters listed in Table D of the General Permit. There are no numeric limitations for the parameters you test for.
-Diablo Canyon Operations and Station Director Date: G 2006-2007 ANNUAL REPORT DESCRIPTION OF BASIC ANZALYTICAL PARAMETERS The Industrial Activities Storm Water General Permit (General Permit) requires you to analyze storm water samples for at least four parameters.
The four parameters which the General Permit requires to be tested are considered indicatorparameters. In other words, regardless of what type of facility you operate, these parameters are nonspecific and general enough to usually provide some indication whether pollutants are present in your storm water discharge. The following briefly explains what each of these parameters mean:
These are pH, Total Suspended Solids (TSS), Specific Conductance (SC),and Total Organic Carbon (TOC). Oil and Grease (O&G) may be substituted for TOC. In addition, you must monitor for any other pollutants whichyou believe to be present in your storm water discharge as a result of industrial activity and analytical parameters listed in Table D of the General Permit. There are no numeric limitations for the parameters you test for.The four parameters which the General Permit requires to be tested are considered indicator parameters.
pH is a numeric measure of the hydrogen-ion concentration. The neutral, or acceptable, range is within 6.5 to 8.5. At values less than 6.5, the water is considered acidic; above 8.5 it is considered alkaline or basic. An example of an acidic substance is vinegar, and a alkaline or basic substance is liquid antacid. Pure rainfall tends to have a pH of a little less than 7. There may be sources of materials or industrial activities which could increase or decrease the pH of your storm water discharge. If the pH levels of your storm water discharge are high or low, you should conduct a thorough evaluation of all potential pollutant sources at your site.
In other words, regardless of what type of facility you operate, these parameters are nonspecific and general enough to usually provide some indication whether pollutants are present in your storm water discharge.
Total Suspended Solids (TSS) is a measure of the undissolved solids that are present in your storm water discharge.
The following briefly explains what each of these parameters mean: pH is a numeric measure of the hydrogen-ion concentration.
Sources of TSS include sediment from, erosion of exposed land, and dirt from impervious (i.e. paved) areas. Sediment by itself can be very toxic to aquatic life because it covers feeding and breeding grounds, and can smother organisms living on the bottom of a water body. Toxic chemicals and other pollutants also adhere to sediment particles. This provides a medium by which toxic or other pollutants end up in our water ways and ultimately in human and aquatic life. TSS levels vary in runoff from undisturbed land. It has been shown that TSS levels increase significantly due to land development.
The neutral, or acceptable, range is within 6.5 to 8.5. At values less than 6.5, the water is considered acidic; above 8.5 it is considered alkaline or basic. An example of an acidic substance is vinegar, and a alkaline or basic substance is liquid antacid. Pure rainfall tends to have a pH of a little less than 7. There may be sources of materials or industrial activities which could increase or decrease the pH of your storm water discharge.
Specific Conductance (SC) is a numerical expression of the ability of the water to carry an electric current. SC can be used to assess the degree of mineralization, salinity, or estimate the total dissolved solids concentration of a water sample.
If the pH levels of your storm water discharge are high or low, you should conduct a thorough evaluation of all potential pollutant sources at your site.Total Suspended Solids (TSS) is a measure of the undissolved solids that are present in your storm water discharge.
Because of air pollution, most rain water has a SC a little above zero. A high SC could affect the usability of waters for drinking, irrigation, and other commercial or industrial use.
Sources of TSS include sediment from, erosion of exposed land, and dirt from impervious (i.e. paved) areas. Sediment by itself can be very toxic to aquatic life because it covers feeding and breeding grounds, and can smother organisms living on the bottom of a water body. Toxic chemicals and other pollutants also adhere to sediment particles.
Total Organic Carbon (TOC) is a measure of the total organic matter present in water. (All organic matter contains carbon)
This provides a medium by which toxic or other pollutants end up in our water ways and ultimately in human and aquatic life. TSS levels vary in runoff from undisturbed land. It has been shown that TSS levels increase significantly due to land development.
This test is sensitive and able to detect small concentrations of organic matter. Organic matter is naturally occurring in animals, plants, and man. Organic matter may also be man made (so called synthetic organics). Synthetic organics include pesticides, fuels, solvents, and paints. Natural organic matter utilizes the oxygen in a receiving water to biodegrade. Too much organic matter could place a significant oxygen demand on the water, and possibly impact its quality. Synthetic organics either do not biodegrade or biodegrade very slowly. Synthetic organics are a source of toxic chemicals that can have adverse affects at very low concentrations. Some of these chemicals bioaccumulate in aquatic life. If your levels of TOC are high, you should evaluate all sources of natural or synthetic organics you may use at your site.
Specific Conductance (SC) is a numerical expression of the ability of the water to carry an electric current. SC can be used to assess the degree of mineralization, salinity, or estimate the total dissolved solids concentration of a water sample.Because of air pollution, most rain water has a SC a little above zero. A high SC could affect the usability of waters for drinking, irrigation, and other commercial or industrial use.Total Organic Carbon (TOC) is a measure of the total organic matter present in water. (All organic matter contains carbon)This test is sensitive and able to detect small concentrations of organic matter. Organic matter is naturally occurring in animals, plants, and man. Organic matter may also be man made (so called synthetic organics).
Oil and Grease (O&G) is a measure of the amount of oil and grease present in your storm water discharge. At very low concentrations, O&G can cause a sheen (that floating "rainbow") on the surface of water (1 qt. of oil can pollute 250,000 gallons of water). O&G can adversely affect aquatic life and create unsightly floating material and film on water, thus making it undrinkable. Sources of O&G include maintenance shops, vehicles, machines and roadways.
Synthetic organics include pesticides, fuels, solvents, and paints. Natural organic matter utilizes the oxygen in a receiving water to biodegrade.
If you have any questions regarding whether or not your constituent concentrations are too high, please contact your local Regional Board office. The United States Environmental Protection Agency (USEPA) has published stormwater discharge benchmarks for a number of parameters. These benchmarks may be helpful when evaluating whether additional BMPs are appropriate. These benchmarks can be accessed at our website at http://www.waterboards.ca.gov. It is contained in the Sampling and Analysis Reduction Certification.
Too much organic matter could place a significant oxygen demand on the water, and possibly impact its quality. Synthetic organics either do not biodegrade or biodegrade very slowly. Synthetic organics are a source of toxic chemicals that can have adverse affects at very low concentrations.
See Storm Water Contacts at http://www.waterboards.ca.gov/stormwtr/contact.html
Some of these chemicals bioaccumulate in aquatic life. If your levels of TOC are high, you should evaluate all sources of natural or synthetic organics you may use at your site.Oil and Grease (O&G) is a measure of the amount of oil and grease present in your storm water discharge.
 
At very low concentrations, O&G can cause a sheen (that floating "rainbow")
SIDE A FORM 1-SAMPLING & ANALYSIS RESULTS FIRST STORM EVENT
on the surface of water (1 qt. of oil can pollute 250,000 gallons of water). O&G can adversely affect aquatic life and create unsightly floating material and film on water, thus making it undrinkable.
"   Ifanalytical results are less than the detection limit (or non detectable), show the value as less than              0    When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example: <.05)                                                               meters, etc.), indicate PA" in the appropriate test method used box.
Sources of O&G include maintenance shops, vehicles, machines and roadways.If you have any questions regarding whether or not your constituent concentrations are too high, please contact your local Regional Board office. The United States Environmental Protection Agency (USEPA) has published stormwater discharge benchmarks for a number of parameters.
"    Ifyou did not analyze for a required parameter, do not report "0". Instead, leave the appropriate box blank          =    Make additional copies of this form as necessary.
These benchmarks may be helpful when evaluating whether additional BMPs are appropriate.
NAME OF PERSON COLLECTING SAMPLE(S):                    Trevor Rebel                          TITLE:  Environmental Specialist                      SIGNATURE:            C  . _/(,iL-ANALYTICAL RESULTS DESCRIBE                                                                                                                  For First Storm Event DISCHARGE                  DATE/TIME                TIME LOCATION                OF SAMPLE            DISCHARGE Example: NW Out Fall          COLLECTION              STARTED                                BASIC PARAMETERS                                                        OTHER PARAMETERS PH          TSS          SC              O&G                          Fe Marine Refuel                    11-26-06 Facility Runoff                    20:30                20:20                7.6        390          480              ND                          17 003                              11-26-06 Yard Storm Drain                  20:22                20:20                6.9        580          3400              8.0                          23 004                              11-26-06 Yard Storm Drain                  20:43              21:15 (1)            -7.3          250          1000              ND                           11 to Retention Basin 005                              11-26-06 Yard Storm Drain                   21:00                20:45                9.1        660          2100              10                          14 TEST REPORTING UNITS:                                                     pH Units      mgIl      umho/cm            mgIl                        mgI        _
These benchmarks can be accessed at our website at http://www.waterboards.ca.gov.
0.1          5            1               5                          0.1 TEST METHOD DETECTION LIMIT:
It is contained in the Sampling and Analysis Reduction Certification.
EPA          EPA          SM              EPA                        EPA TEST METHOD USED:                                                           150.1       160.2        2510            1664                      200.7 ANALYZED BY (SELF/LAB):----------                                            LAB         LAB           LAB             LAB                         LAB ITS - I otal Suspended Solos                               SC - Specitic Conductance                   (O&{3 - (Oil & Grease                       I UU - T otal Organic C~arbon (1) Point sampled pre-released as explained in comments under Section E, Number 2.
See Storm Water Contacts at http://www.waterboards.ca.gov/stormwtr/contact.html SIDE A FORM 1-SAMPLING  
 
& ANALYSIS RESULTS FIRST STORM EVENT" If analytical results are less than the detection limit (or non detect the numerical value of the detection limit (example:  
SIDE A FORM 1-SAMPLING & ANALYSIS RESULTS FIRST STORM EVENT
<.05)" If you did not analyze for a required parameter, do not report "0".able), show the value as less than 0 When analysis is done using portable analysis (such as portable pH meters, SC meters, etc.), indicate PA" in the appropriate test method used box.Instead, leave the appropriate box blank = Make additional copies of this form as necessary.
"     Ifanalytical results are less than the detection limit (or non detectable), show the value as less than
TITLE: Environmental Specialist SIGNATURE:
* When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example: <.05)                                                            meters, etc.), indicate "PA" in the appropriate test method used box.
C ._/(,iL-NAME OF PERSON COLLECTING SAMPLE(S):
* If you did not analyze for a required parameter, do not report "0V. Instead, leave the appropriate box blank
Trevor Rebel ANALYTICAL RESULTS DESCRIBE For First Storm Event DISCHARGE DATE/TIME TIME LOCATION OF SAMPLE DISCHARGE Example: NW Out Fall COLLECTION STARTED BASIC PARAMETERS OTHER PARAMETERS PH TSS SC O&G Fe Marine Refuel 11-26-06 Facility Runoff 20:30 20:20 7.6 390 480 ND 17 003 11-26-06 Yard Storm Drain 20:22 20:20 6.9 580 3400 8.0 23 004 11-26-06 Yard Storm Drain 20:43 21:15 (1) -7.3 250 1000 ND 11 to Retention Basin 005 11-26-06 Yard Storm Drain 21:00 20:45 9.1 660 2100 10 14 TEST REPORTING UNITS: pH Units mgIl umho/cm mgIl mgI _0.1 5 1 5 0.1 TEST METHOD DETECTION LIMIT: EPA EPA SM EPA EPA TEST METHOD USED: 150.1 160.2 2510 1664 200.7 LAB LAB LAB LAB LAB ANALYZED BY (SELF/LAB):----------
ITS -I otal Suspended Solos SC -Specitic Conductance (1) Point sampled pre-released as explained in comments under Section E, Number 2.(O&{3 -(Oil & Grease I UU -T otal Organic C~arbon SIDE A FORM 1-SAMPLING
& ANALYSIS RESULTS FIRST STORM EVENT" If analytical results are less than the detection limit (or non detectable), show the value as less than
* When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example:
<.05) meters, etc.), indicate "PA" in the appropriate test method used box.* If you did not analyze for a required parameter, do not report "0V. Instead, leave the appropriate box blank
* Make additional copies of this form as necessary.
* Make additional copies of this form as necessary.
NAME OF PERSON COLLECTING SAMPLE(S):
NAME OF PERSON COLLECTING SAMPLE(S):                     Trevor Rebel                         TITLE:   Environmental Specialist                 SIGNATURE:     _
Trevor Rebel TITLE: Environmental Specialist SIGNATURE:
ANALYTICAL RESULTS DESCRIBE                                                                                                             For First Storm Event DISCHARGE                 DATE/TIME                 TIME LOCATION               OF SAMPLE             DISCHARGE Example: NW Out Fall           COLLECTION               STARTED                                 BASIC PARAMETERS                                                     OTHER PARAMETERS PH         TSS           SC         O&G                           Fe           Pb 006                               11-26-06 Yard Storm Drain                   21:10                 20:30               9.3           57           170         ND                         2.1           n/a (At Discharge) 006                               11-26-06 Range Immediate                     21:56                 21:00               8.4         100           150         ND                         2.7           .14 Outlet 008                               11-26-06 Yard Storm Drain                   21:39                 20:45               6.8           18           940         ND                         1.2           n/a 009                               11-26-06 Yard Storm Drain                   22:30             20:30 (1)               7.0         11           450         ND                         0.8           n/a TEST REPORTING UNITS:                                                       pH Units       mg/I       umho/cm       mg/I                       mg/I         mg/I 0.1           5             1           5                         0.1           .001 TEST METHOD DETECTION LIMIT:
_ANALYTICAL RESULTS DESCRIBE For First Storm Event DISCHARGE DATE/TIME TIME LOCATION OF SAMPLE DISCHARGE Example: NW Out Fall COLLECTION STARTED BASIC PARAMETERS OTHER PARAMETERS PH TSS SC O&G Fe Pb 006 11-26-06 Yard Storm Drain 21:10 20:30 9.3 57 170 ND 2.1 n/a (At Discharge) 006 11-26-06 Range Immediate 21:56 21:00 8.4 100 150 ND 2.7 .14 Outlet 008 11-26-06 Yard Storm Drain 21:39 20:45 6.8 18 940 ND 1.2 n/a 009 11-26-06 Yard Storm Drain 22:30 20:30 (1) 7.0 11 450 ND 0.8 n/a TEST REPORTING UNITS: pH Units mg/I umho/cm mg/I mg/I mg/I 0.1 5 1 5 0.1 .001 TEST METHOD DETECTION LIMIT: EPA EPA SM EPA EPA EPA TEST METHOD USED: 150.1 160.2 2510 1664 200.7 200.8 LAB LAB LAB LAB LAB LAB ANALYZED BY (SELF/LAB):____
EPA         EPA           SM         EPA                         EPA           EPA TEST METHOD USED:                                                           150.1       160.2         2510         1664                       200.7         200.8 ANALYZED BY (SELF/LAB):____                                                   LAB          LAB          LAB        LAB                        LAB            LAB I So - I uLIl Suspernudu Suolids                                 - Specific Conductance                 uO& - Oil & Grease                       I  - Total Organic Carbon (1) Sample obtained greater than 1 hour after discharge started as explained in comments under Section E, Number 6.
I So -I uLIl Suspernudu Suolids -Specific Conductance uO& -Oil & Grease (1) Sample obtained greater than 1 hour after discharge started as explained in comments under Section E, Number 6.I -Total Organic Carbon SIDE A FORM 1-SAMPLING  
 
& ANALYSIS RESULTS FIRST STORM EVENT* If analytical results are less than the detection limit (or non detectable), show the value as less than
SIDE A FORM 1-SAMPLING & ANALYSIS RESULTS FIRST STORM EVENT
* When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example:  
* If analytical results are less than the detection limit (or non detectable), show the value as less than
<.05) meters, etc.), indicate "PA" in the appropriate test method used box." If you did not analyze for a required parameter, do not report "0". Instead, leave the appropriate box blank 0 Make additional copies of this form as necessary.
* When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example: <.05)                                                             meters, etc.), indicate "PA" in the appropriate test method used box.
NAME OF PERSON COLLECTING SAMPLE(S):
"   If you did not analyze for a required parameter, do not report "0". Instead, leave the appropriate box blank       0   Make additional copies of this form as necessary.
Trevor Rebel TITLE: Environmental Specialist SIGNATURE:
NAME OF PERSON COLLECTING SAMPLE(S):                     Trevor Rebel                           TITLE: Environmental Specialist                 SIGNATURE:           Z:7i     1L..
Z:7i 1L..ANALYTICAL RESULTS DESCRIBE For First Storm Event DISCHARGE DATE/TIME TIME LOCATION OF SAMPLE DISCHARGE Example: NW Out Fall COLLECTION STARTED BASIC PARAMETERS OTHER PARAMETERS PH TSS Sc O&G Fe 011 11-26-06 Yard Storm Drain 21:32 20:45 7.3 38 230 ND 2.0 013 11-26-06 Yard Storm Drain 21:21 20:45 8.5 760 320 ND 16 015 11-26-06 Yard Storm Drain 21:26 20:45 8.2 190 180 ND 8.8 023 11-26-06 Yard Storm Drain 20:25 20:20 6.7 210 940 ND 10 TEST REPORTING UNITS: pH Units mgI1 umho/cm mgIl mgIl 0.1 5 1 5 0.1 TEST METHOD DETECTION LIMIT: EPA EPA SM EPA EPA TEST METHOD USED: 150.1 160.2 2510 1664 200.7 LAB LAB LAB LAB LAB ANALYZED BY (SELF/LAB):  
ANALYTICAL RESULTS DESCRIBE                                                                                                               For First Storm Event DISCHARGE                   DATE/TIME               TIME LOCATION                   OF SAMPLE           DISCHARGE Example: NW Out Fall           COLLECTION             STARTED                                 BASIC PARAMETERS                                                   OTHER PARAMETERS PH         TSS           Sc         O&G                           Fe 011                               11-26-06 Yard Storm Drain                   21:32                 20:45               7.3         38           230           ND                         2.0 013                               11-26-06 Yard Storm Drain                   21:21                 20:45               8.5         760           320           ND                         16 015                               11-26-06 Yard Storm Drain                   21:26                 20:45               8.2         190           180           ND                         8.8 023                               11-26-06 Yard Storm Drain                   20:25                 20:20               6.7         210           940           ND                         10 TEST REPORTING UNITS:                                                       pH Units       mgI1       umho/cm         mgIl                       mgIl 0.1           5             1           5                         0.1 TEST METHOD DETECTION LIMIT:
-------TSS -Total Susoended Solids SC -Soecific Conductance O&G -Oil & Grease TOC -Total Organic Carbon... .........
EPA         EPA           SM         EPA                         EPA TEST METHOD USED:                                                           150.1       160.2         2510         1664                       200.7 LAB         LAB           LAB         LAB                         LAB
F ....... ..v SIDE B FORM 1-SAMPLING  
                                                                                                            -                        -              ---
& ANALYSIS RESULTS SECOND STORM EVENT" If analytical results are less than the detection limit (or non detectable), show the value as less than
                                                                                  -            -
* When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example:  
ANALYZED BY (SELF/LAB):
<.05) meters, etc.), indicate "PA" in the appropriate test method used box." If you did not analyze for a required parameter, do not report V0". Instead, leave the appropriate box blank
TSS - Total Susoended Solids
...   ......... F .......   ..
SC - Soecific Conductance                  O&G - Oil & Grease                      TOC - Total Organic v     Carbon
 
SIDE B FORM 1-SAMPLING & ANALYSIS RESULTS SECOND STORM EVENT
"   Ifanalytical results are less than the detection limit (or non detectable), show the value as less than
* When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example: <.05)                                                             meters, etc.), indicate "PA" in the appropriate test method used box.
"   If you did not analyze for a required parameter, do not report V0".Instead, leave the appropriate box blank
* Make additional copies of this form as necessary.
* Make additional copies of this form as necessary.
NAME OF PERSON COLLECTING SAMPLE(S):
NAME OF PERSON COLLECTING SAMPLE(S):                     Trevor Rebel                         TITLE: Environmental Specialist                     SIGNATURE:
Trevor Rebel TITLE: Environmental Specialist SIGNATURE:
                                                * &deg; ANALYTICAL RESULTS DESCRIBE                                                                                                               For Second Storm Event DISCHARGE                 DATE/TIME               TIME LOCATION               OF SAMPLE             DISCHARGE Example: NW Out Fall         COLLECTION               STARTED                                 BASIC PARAMETERS                                                     OTHER PARAMETERS PH         TSS           Sc           O&G                           Fe Marine Refuel                     2-7-07 Facility Runoff                   14:34                 14:25               7.8         230           240           ND                           10 003                               2-7-07 Yard Storm Drain                   14:27                 14:25               7.3         330           610             8                           18 004                               2-7-07 Yard Storm Drain                   14:38               14:40 (1)             7.0         44           480           ND                           1.9 to Retention Basin 005                               2-7-07 Yard Storm Drain                   14:42                 14:30               7.8         86           630           ND                         2.7 TEST REPORTING UNITS:                                                     pH Units       mgIl       umho/cm         mglI                       mgII 0.1           5             1             5                         0.1 TEST METHOD DETECTION LIMIT:
* &deg;ANALYTICAL RESULTS DESCRIBE For Second Storm Event DISCHARGE DATE/TIME TIME LOCATION OF SAMPLE DISCHARGE Example: NW Out Fall COLLECTION STARTED BASIC PARAMETERS OTHER PARAMETERS PH TSS Sc O&G Fe Marine Refuel 2-7-07 Facility Runoff 14:34 14:25 7.8 230 240 ND 10 003 2-7-07 Yard Storm Drain 14:27 14:25 7.3 330 610 8 18 004 2-7-07 Yard Storm Drain 14:38 14:40 (1) 7.0 44 480 ND 1.9 to Retention Basin 005 2-7-07 Yard Storm Drain 14:42 14:30 7.8 86 630 ND 2.7 TEST REPORTING UNITS: pH Units mgIl umho/cm mglI mgII 0.1 5 1 5 0.1 TEST METHOD DETECTION LIMIT: EPA EPA SM EPA EPA TEST METHOD USED: 150.1 160.2 2510 1664 200.7 LAB LAB LAB LAB LAB ANALYZED BY (SELF/LAB):  
EPA         EPA           SM           EPA                         EPA TEST METHOD USED:                                                           150.1       160.2         2510           1664                       200.7 ANALYZED BY (SELF/LAB):                                                     LAB          LAB          LAB          LAB                          LAB
--ITS -I otal Suspenaea Solids SC -Specitic Conductance (1) Point sampled pre-released as explained in comments under Section E, Number 2.rO&G -Oil & Grease TOC -Total Organic Carbon SIDE B FORM 1-SAMPLING  
                                                                                --
& ANALYSIS RESULTS SECOND STORM EVENT" If analytical results are less than the detection limit (or non detectable), show the value as less than = When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example:
ITS - I otal Suspenaea Solids                               SC - Specitic Conductance                   rO&G - Oil & Grease                      TOC - Total Organic Carbon (1) Point sampled pre-released as explained in comments under Section E, Number 2.
<.05) meters, etc.), indicate "PA" in the appropriate test method used box." If you did not analyze for a required parameter, do not report "0". Instead, leave the appropriate box blank 0 .Make additional copies of this form as necessary.
 
NAME OF PERSON COLLECTING SAMPLE(S):
SIDE B FORM 1-SAMPLING & ANALYSIS RESULTS SECOND STORM EVENT
Trevor Rebel TITLE: Environmental Specialist SIGNATURE:
"     Ifanalytical results are less than the detection limit (or non detectable), show the value as less than the numerical value of the detection limit (example: <.05)                                                        =   When analysis is done using portable analysis (such as portable pH meters, SC meters, etc.), indicate "PA" in the appropriate test method used box.
_ _ -_______ANALYTICAL RESULTS DESCRIBE For Second Storm Event DISCHARGE DATE/TIME TIME LOCATION OF SAMPLE DISCHARGE Example: NW Out Fall COLLECTION STARTED BASIC PARAMETERS OTHER PARAMETERS PH TSS SC O&G Fe Pb 006 2-7-07 Yard Storm Drain -14:49 14:25 8.3 44 120 ND 2.0 .004 (At Discharge) 006 2-7-07 Range Immediate 14:56 14:40 8.0 40 130 ND 1.2 .13 Outlet 008 2-7-07 Yard Storm Drain 14:30 14:25 (1) 6.7 33 2100 ND 1.6 n/a 009 2-7-07 Yard Storm Drain 14:45 14:25 (1) 6.6 18 130 ND 0.17 n/a TEST REPORTING UNITS: pH Units mg/I umho/cm mglI mgIl mgIl 0.1 5 1 5 0.1 .001 TEST METHOD DETECTION LIMIT: 0115010 EPA EPA SM EPA EPA EPA TEST METHOD USED: 150.1 160.2 2510 1664 200.7 200.8 LAB LAB LAB LAB LAB LAB ANALYZED BY SELF/LAB: ()- a uSapl upta uenby toried C s T -SDpecific Caonductance s&G -Oil ('i) Sample taken by trained Chemistry Technician Dean Novotny under the supervision of Trevor Rebel.& Grease TOC -Total Organic Carbon SIDE B FORM 1-SAMPLING  
"     If you did not analyze for a required parameter, do not report "0". Instead, leave the appropriate box blank       0 . Make additional copies of this form as necessary.
& ANALYSIS RESULTS-SECOND STORM EVENT" If analytical results are less than the detection limit (or non detectable), show the value as less than
NAME OF PERSON COLLECTING SAMPLE(S):                     Trevor Rebel                           TITLE: Environmental Specialist                   SIGNATURE:     _   _     -_______
* When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example:  
ANALYTICAL RESULTS DESCRIBE                                                                                                               For Second Storm Event DISCHARGE                 DATE/TIME                 TIME LOCATION                 OF SAMPLE           DISCHARGE Example: NW Out Fall           COLLECTION             STARTED                                   BASIC PARAMETERS                                                     OTHER PARAMETERS PH         TSS         SC           O&G                           Fe           Pb 006                               2-7-07 Yard Storm Drain                   - 14:49               14:25                 8.3           44         120           ND                         2.0           .004 (At Discharge) 006                               2-7-07 Range Immediate                     14:56               14:40                 8.0           40         130           ND                           1.2           .13 Outlet 008                               2-7-07 Yard Storm Drain                     14:30             14:25 (1)               6.7           33         2100           ND                           1.6           n/a 009                               2-7-07 Yard Storm Drain                     14:45             14:25 (1)               6.6           18         130           ND                         0.17           n/a TEST REPORTING UNITS:                                                         pH Units     mg/I       umho/cm       mglI                         mgIl         mgIl 0.1           5           1             5                         0.1           .001 TEST METHOD DETECTION LIMIT:                                                   0115010 EPA         EPA         SM           EPA                         EPA           EPA TEST METHOD USED:                                                             150.1       160.2       2510         1664                       200.7         200.8 LAB         LAB         LAB           LAB                         LAB           LAB ANALYZED BY SELF/LAB:
<.05) meters, etc.), indicate "PA" in the appropriate test method used box." If you did not analyze for a required parameter, do not report "0". Instead, leave the appropriate box blank
()- Sample
('i)      a uSapl taken      toried trained C upta byuenby            s T Chemistry                        - SDpecificunder Technician Dean Novotny                the s&G Caonductance                      - Oil & Grease supervision of Trevor Rebel.                                 TOC - Total Organic Carbon
 
SIDE B FORM 1-SAMPLING & ANALYSIS RESULTS
                                                                                      -SECOND STORM EVENT
"     Ifanalytical results are less than the detection limit (or non detectable), show the value as less than
* When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example: <.05)                                                               meters, etc.), indicate "PA" in the appropriate test method used box.
"     If you did not analyze for a required parameter, do not report "0". Instead, leave the appropriate box blank
* Make additional copies of this form as necessary.
* Make additional copies of this form as necessary.
NAME OF PERSON COLLECTING SAMPLE(S):
NAME OF PERSON COLLECTING SAMPLE(S):                     Trevor Rebel                         TITLE:   Environmental Specialist                     SIGNATURE:           (   T       4 ANALYTICAL RESULTS DESCRIBE                                                                                                               For Second Storm Event DISCHARGE                   DATE/TIME               TIME LOCATION                 OF SAMPLE           DISCHARGE Example: NW Out Fall           COLLECTION             STARTED                               BASIC PARAMETERS                                                       OTHER PARAMETERS PH         TSS           SC           O&G                         Fe 011                               2-7-07 Yard Storm Drain                   15:12                 14:40               7.5         30           190           ND                         1.3 013                               2-7-07 Yard Storm Drain                   15:03                 14:40               7.8         200           260           ND                         4.8 015                               2-7-07 Yard Storm Drain                   15:07                 14:40               8.0         86           140           ND                         2.6 7
Trevor Rebel TITLE: Environmental Specialist SIGNATURE: ( T 4 ANALYTICAL RESULTS DESCRIBE For Second Storm Event DISCHARGE DATE/TIME TIME LOCATION OF SAMPLE DISCHARGE Example: NW Out Fall COLLECTION STARTED BASIC PARAMETERS OTHER PARAMETERS PH TSS SC O&G Fe 011 2-7-07 Yard Storm Drain 15:12 14:40 7.5 30 190 ND 1.3 013 2-7-07 Yard Storm Drain 15:03 14:40 7.8 200 260 ND 4.8 015 2-7-07 Yard Storm Drain 15:07 14:40 8.0 86 140 ND 2.6 7 023 2-7-07 Yard Storm Drain 14:30 14:25 6.9 180 370 ND 3.1 TEST REPORTING UNITS: pH Units mgIl umho/cm mg/I mgIl 0.1 5 1 5 0.1 TEST METHOD DETECTION LIMIT: EPA EPA SM EPA EPA TEST METHOD USED: 150.1 160.2 2510 1664 200.7 LAB LAB LAB LAB LAB ANALYZED BY (SELF/LAB):-ITotal S3uspended SoliIds SC -Specific Conductance U&(G -Oil & G~rease I UC -I otal Organic C~aroon FORM 2-QUARTERLY VISUAL OBSERVATIONS OF AUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)* Quarterly dry weather visual observations are required of each authorized NSWD." Observe each authorized NSWD source, impacted drainage area, and discharge location." Authorized NSWDs must meet the conditions provided in Section D (pages 5-6), of the General Permit." Make additional copies of this form as necessary.
023                               2-7-07 Yard Storm Drain                   14:30                 14:25               6.9         180           370           ND                         3.1 TEST REPORTING UNITS:                                                       pH Units     mgIl       umho/cm         mg/I                       mgIl 0.1           5             1             5                         0.1 TEST METHOD DETECTION LIMIT:
QUARTER: Observers Name: JULY-SEPT.
EPA         EPA           SM           EPA                         EPA TEST METHOD USED:                                                           150.1       160.2         2510           1664                       200.7 LAB         LAB           LAB           LAB                         LAB ANALYZED BY (SELF/LAB):
D7 YES Title: WERE ANY AUTHORIZED NSWDS If YES, complete See Comment F.1.b DISCHARGED DURING THIS QUARTER? reverse side of w7 NO this form.Signature:
I13*3 - ITotal S3uspended SoliIds                             SC - Specific Conductance                   U&(G - Oil & G~rease                       I UC - I otal Organic C~aroon
QUARTER: Observers Name: Trevor Rebel OCT.-DEC. YES OCT.DEC.YESIf YES, complete Title: Environmental Specialist WERE ANY AUTHORIZED NSWDs reverse side of DATE: DISCHARGED DURING THIS QUARTER? reethis form.12/21/06 Signature:
 
_______________-________NO ti om QUARTER: Observers Name: Trevor Rebel JAN.-MARCH YES JAN.MARC YESIf YES, complete Title: Environmental Specialist WERE ANY AUTHORIZED NSWDs If s, om DATE: 03/29/07 DISCHARGED DURING THIS QUARTER? reverhis form.03/29/07 Signature:
FORM 2-QUARTERLY VISUAL OBSERVATIONS OF AUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)
____________________L NO ti om QUARTER: Observers Name: Trevor Rebel APRIL-JUNE YES Title: Environmental Specialist WERE ANY AUTHORIZED NSWDs EIf YES, complete DATE: DISCHARGED DURING THIS QUARTER? reNOrthis form.*06/04/07 Signature:
* Quarterly dry weather visual observations are required of each authorized NSWD. " Authorized NSWDs must meet the conditions provided in Section D (pages 5-6),
NO this form SIDE B FORM 2-QUARTERLY VISUAL OBSERVATIONS OF AUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)DATE /TIME OF SOURCE AND NAME OF DESCRIBE AUTHORIZED NSWD DESCRIBE ANY REVISED OR NEW OBSERVATION LOCATION OF AUTHORIZED CHARACTERISTICS BMPs AND PROVIDE THEIR AUTHORIZED NSWD Indicate whether authorized NSWD is clear, cloudy, or IMPLEMENTATION DATE NSWD discolored, causing staining, contains floating objects or an oil sheen, has odors, etc.EXAMPLE: EXAMPLE: At the NSWD At the NSWD Drainage Air conditioner Units Air conditioner Source Area and Discharge on Building C condensate Location Admin Building Landscape water Clean and Clear Clean and Clear None 12/21/06 Landscape water to 004 07:30 Training Building Landscape water Clean and clear Clean and Clear None 12/21/06 Landscape water to 004 07:30 Air Compressor.
"   Observe each authorized NSWD source, impacted drainage area, and                    of the General Permit.
Air Compressor Clean and clear Clean and Clear None 12/21/06 Condensates Condensates To 004 10:00 SWRO facility pump Saltwater pump Clean and clear Clean and Clear None 12/21/06 leak off drains to leak off 005 10:30 Potable water Fresh water Clean and Clear Clean and Clear None 12/21/06 system to 006 at approximately lgpm 13:00 SIDE B FORM 2-QUARTERLY VISUAL OBSERVATIONS OF AUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)DATE /TIME OF SOURCE AND NAME OF DESCRIBE AUTHORIZED NSWD DESCRIBE ANY REVISED OR NEW OBSERVATION LOCATION OF AUTHORIZED CHARACTERISTICS BMPs AND PROVIDE THEIR AUTHORIZED NSWD Indicate whether authorized NSWD is clear, cloudy, IMPLEMENTATION DATE NSWD or discolored, causing staining, contains floating objects or an oil sheen, has odors, etc.EXAMPLE: EXAMPLE: At the NSWD At the NSWD Drainage Air conditioner Units Air conditioner Source Area and Discharge on Building C condensate Location Admin Building Landscape water Clean and clear Clean and Clear None 03/29/07 Landscape water to 004 07:30 Training Building Landscape water Clean and clear Clean and Clear None 03/29/07 Landscape water to 004 07:35 Air Compressor Air Compressor Clean and clear Clean and Clear None 03/29/07 Condensates Condensates To 004 10:00 SWRO facility pump Saltwater pump Clean and clear Clean and Clear None 03/29/07 leak off drains to leak off 005 07:25 Potable water Potable Clean and Clear Clean and Clear None 03/29/07 system to 006 at water/natural spring approximately 1 gpm 11:00 SIDE B FORM 2-QUARTERLY VISUAL OBSERVATIONS OF AUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)DATE /TIME OF SOURCE AND NAME OF DESCRIBE AUTHORIZED NSWD DESCRIBE ANY REVISED OR NEW OBSERVATION LOCATION OF AUTHORIZED CHARACTERISTICS BMPs AND PROVIDE THEIR AUTHORIZED NSWD Indicate whether authorized NSWD is clear, cloudy, or IMPLEMENTATION DATE NSWD discolored, causing staining, contains floating objects or an oil sheen, has odors, etc.EXAMPLE: EXAMPLE: At the NSWD At the NSWD Drainage Air conditioner Units Air conditioner Source Area and Discharge on Building C condensate Location Admin Building Landscape water Clean and clear Clean and Clear None 06/04/07 Landscape water to 004 07:00 Training Building Landscape water Clean and clear Clean and Clear None 06/04/07 Landscape water to 004 07:05 Air Compressor Air Compressor Clean and clear Clean and Clear None 06/04/07 Condensates Condensates To 004 11:00 SWRO facility pump Saltwater pump Clean and clear Clean and Clear None 06/04/07 leak off drains to leak off 005 06:45 Potable water Potable Clean and Clear Clean and Clear None 06/04/07 system to 006 at water/naturarspring approximately lgpm 14:00 SIDE A FORM 3-QUARTERLY VISUAL OBSERVATIONS OF UNAUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)" Unauthorized NSWDs are discharges (such as wash or rinse waters) that do not meet the conditions provided in Section D (pages 5-6) of the General Permit.* Quarterly visual observations are required to observe current and detect prior unauthorized NSWDs.* Quarterly visual observations are required during dry weather and at all facility drainage areas.* Each unauthorized NSWD source, impacted drainage area, and discharge location must be identified and observed.* Unauthorized NSWDs that can not be eliminated within 90 days of observation must be reported to the Regional Board in accordance with Section A.10.e of the General Permit." Make additional copies of this form as necessary.
discharge location.                                                              "  Make additional copies of this form as necessary.
QUARTER: JULY-SEPT.
QUARTER:
If YES to Observers Name: WERE UNAUTHORIZED either Not Appicable NSWDs OBSERVED?
JULY-SEPT.
DYES EINO question, Title: complete See comment F.2.a WERE THERE INDICATIONS OF reverse PRIOR UNAUTHORIZED NSWDs? ElYES E]NO side.Signature:
Observers Name:
QUARTER: OCT.-DEC.
Title:
If YES to Observers Name: Trevor Rebel WERE UNAUTHORIZED either DATE/TIME OF NSWDs OBSERVED?
D7   YES WERE ANY AUTHORIZED NSWDS                                 If YES, complete DISCHARGED DURING THIS QUARTER?                           reverse side of See Comment F.1.b w7     NO   this form.
YES NO question, OBSERVATIONS Title: Environmental Specialist complete WERE THERE INDICATIONS OF reverse 12/21/06 16:00 Signature:
Signature:
__ _ _ _ _ PRIOR UNAUTHORIZED NSWDs? Z YES NO side.QUARTER: JAN.-MARCH If YES to Observers Name: Trevor Rebel WERE UNAUTHORIZED either DATE/TIME OF NSWDs OBSERVED?
QUARTER:
ElYES Z NO question, OBSERVATIONS Title: Environmental Specialist complete WERE THERE INDICATIONS OF reverse 03/29/07 17:00 PRIOR UNAUTHORIZED NSWDs? ElYES Z NO side.QUARTER: APRIL-JUNE If YES to Observers Name: Trevor Rebel WERE UNAUTHORIZED either DATE/TIME OF NSWDs OBSERVED?
Observers Name:     Trevor Rebel OCT.-DEC.                                                                                                                         [*    YES OCT.DEC.YESIf                                                                                             YES, complete Title:   Environmental Specialist                     WERE ANY AUTHORIZED NSWDs                                 reverse side of DATE:                                                                               DISCHARGED DURING THIS QUARTER?                           reethis form.
EYES Z NO question, OBSERVATIONS Title: Environmental Specialist complete WERE THERE INDICATIONS OF reverse 06i/04/07 16:00 gnature: PRIOR UNAUTHORIZED NSWDs? E YES Z NO side.
12/21/06                 Signature: _______________-________NO                                                                             ti   om QUARTER:
SIDE B FORM 3 QUARTERLY VISUAL OBSERVATIONS OF UNAUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)OBSERVATION NAME OF SOURCE AND DESCRIBE UNAUTHORIZED NSWD CHARACTERISTICS DESCRIBE CORRECTIVE DATE UNAUTHORIZED LOCATION Indicate whether unauthorized NSWD is clear, cloudy, ACTIONS TO ELIMINATE (FROM NSWD OF discolored, causing stains; contains floating objects or an oil UNAUTHORIZED NSWD AND REVERSE SIDE) UNAUTHORIZED sheen, has odors, etc. TO CLEAN IMPACTED NSWD DRAINAGE AREAS.PROVIDE UNAUTHORIZED EXAMPLE: EXAMPLE: AT THE UNAUTHORIZED NSWD ELIMINATION DATE.Vehicle Wash NW Corner of AT THE UNAUTHORIZED NSWD AREA AND Water Parking Lot NSWD SOURCE DISCHARGE LOCATION Rinsing vehicles for West of Warehouse Clean and Clear. No sheen, Clean and Clear. No sheen, Hoses removed.12/21/06 the removal of salt. B in discharge path no odor. no odor. Area was, and remains clean.006. No residue or evidence of 13:00 contamination.
Observers Name:     Trevor Rebel JAN.-MARCH                                                                                                                         [*    YES JAN.MARC                                                                                         YESIf YES, complete Title:   Environmental Specialist                     WERE ANY AUTHORIZED NSWDs                                 If     s, om DATE:
No rinsing signage posted.Fully eliminated as of 2-28-07/ /: AM[-PM I I-AM-PM/ !: IAM 1-1PM FORM 4-MONTHLY VISUAL OBSERVATIONS OF STORM WATER DISCHARGES SIDE A* Storm water discharge visual observations are required for at least one storm event per month between October 1 and May 31." Visual observations must be conducted during the first hour of discharge at all discharge locations.
03/29/07                                                                         DISCHARGED DURING THIS QUARTER?                           reverhis form.
* Discharges of temporarily stored or contained storm water must be observed at the time of discharge.
03/29/07                 Signature: ____________________L                                                                           NO     ti   om QUARTER:
S S Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
Observers Name:     Trevor Rebel APRIL-JUNE                                                                                                                             YES Title:   Environmental Specialist                     WERE ANY AUTHORIZED NSWDs                               EIf YES, complete DATE:                                                                               DISCHARGED DURING THIS QUARTER?                                 form.
Make additional copies of this form as necessary.
reNOrthis NO    this form
Until a monthly visual observation is made, record any eligible storm events that do not result in a storm water discharge and note the date, time, name, and title of who observed there was no storm water discharge.
  *06/04/07                 Signature:
#1 Boat #2 003 #3 004 #4 005 Observation Date: October _ 2006 Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain Drainage Location Description Retention Basin Observers Name: NONE NONE NONE NONE Observation Time Title: Time Discharge Began Signature:
 
Were Pollutants Observed (If yes, complete reverse side)#1 Boat #2 003 #3 004 #4 005 Drainage Location Description Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain DranagLoatonesciptonRetention Basin Observers Name_ NONE NONE NONE NONE Observation Time Title: ______Time Discharge Began Signature:
SIDE B FORM 2-QUARTERLY VISUAL OBSERVATIONS OF AUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)
Were Pollutants Observed (If yes, complete reverse side)#1 Boat #2 003 #3 004 #-4 005 Observation Date: December 8 2006 # ot# 0 304# 0 Drainage Location Description Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain DranagLoatonesciptonRetention Basin Observers Name: Trevor Rebel 1 15:18 15:10 15:20 15:25 Observation Time Title: Environmental Specialist 15:10 15:10 Pre Release 15:20-- A2t / _ Time Discharge Began Signature:
DATE /TIME OF   SOURCE AND               NAME OF                 DESCRIBE AUTHORIZED NSWD                       DESCRIBE ANY REVISED OR NEW OBSERVATION     LOCATION OF           AUTHORIZED                         CHARACTERISTICS                           BMPs AND PROVIDE THEIR AUTHORIZED               NSWD         Indicate whether authorized NSWD is clear, cloudy, or       IMPLEMENTATION DATE NSWD                               discolored, causing staining, contains floating objects or an oil sheen, has odors, etc.
(,'V-X/ -Were Pollutants Observed No (If yes, complete reverse side) No_ _ _No No oM_ No___#1 Boat #2 003 #3 004 .#4 005 DrainageoLocationnDescription7Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain Drainage Location DescriptionBasin Observers Name: Trevor Rebel 11:30 11:20 12:15 (1) 12:30 Observation Time Title: Environmental Specialist 11:20 11:20 Pre Release 11:40 Time Discharge Began Signature:
EXAMPLE:             EXAMPLE:                 At the NSWD             At the NSWD Drainage Air conditioner Units Air conditioner             Source                 Area and Discharge on Building C         condensate                                               Location Admin Building       Landscape water       Clean and Clear               Clean and Clear                     None 12/21/06   Landscape water to 004 07:30 Training Building     Landscape water         Clean and clear               Clean and Clear                     None 12/21/06   Landscape water to 004 07:30 Air Compressor.       Air Compressor         Clean and clear               Clean and Clear                     None 12/21/06   Condensates           Condensates To 004 10:00 SWRO facility pump   Saltwater pump         Clean and clear               Clean and Clear                     None 12/21/06   leak off drains to   leak off 005 10:30 Potable water         Fresh water           Clean and Clear               Clean and Clear                     None 12/21/06   system to 006 at approximately lgpm 13:00
,-? VL Were Pollutants Observed No No Yes No (If yes, complete reverse side) --------(1) Jim Kelly, Senior Biologist, performed 004 visual inspection in January.
 
FORM 4-MONTHLY VISUAL OBSERVATIONS OF S* Storm water discharge visual observations are required for at least one storm event per month between October 1 and May 31.* Visual observations must be conducted during the first hour of discharge at all discharge locations.
SIDE B FORM 2-QUARTERLY VISUAL OBSERVATIONS OF AUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)
* Discharges of temporarily stored or contained storm water must be observed at the time of discharge.
DATE /TIME OF   SOURCE AND               NAME OF                 DESCRIBE AUTHORIZED NSWD                     DESCRIBE ANY REVISED OR NEW OBSERVATION     LOCATION OF           AUTHORIZED                       CHARACTERISTICS                         BMPs AND PROVIDE THEIR AUTHORIZED               NSWD           Indicate whether authorized NSWD is clear, cloudy,       IMPLEMENTATION DATE NSWD                                 or discolored, causing staining, contains floating objects or an oil sheen, has odors, etc.
SIDE A TORM WATER DISCHARGES 0 Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
EXAMPLE:             EXAMPLE:                 At the NSWD             At the NSWD Drainage Air conditioner Units Air conditioner               Source               Area and Discharge on Building C         condensate                                               Location Admin Building       Landscape water         Clean and clear               Clean and Clear                 None 03/29/07   Landscape water to 004 07:30 Training Building     Landscape water         Clean and clear               Clean and Clear                 None 03/29/07   Landscape water to 004 07:35 Air Compressor       Air Compressor         Clean and clear               Clean and Clear                 None 03/29/07   Condensates           Condensates To 004 10:00 SWRO facility pump   Saltwater pump         Clean and clear               Clean and Clear                 None 03/29/07   leak off drains to   leak off 005 07:25 Potable water         Potable                 Clean and Clear               Clean and Clear                 None 03/29/07   system to 006 at     water/natural spring approximately 1gpm 11:00
Make additional copies of this form as necessary.
 
Until a monthly visual observation is made, record any eligible storm events that do not result in a storm water discharge and note the date, time, name, and title of who observed there was no storm water discharge.
SIDE B FORM 2-QUARTERLY VISUAL OBSERVATIONS OF AUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)
#5 006 #6 Range #7 007 #8 008 Observation Date: October 2006 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)
DATE /TIME OF   SOURCE AND               NAME OF                 DESCRIBE AUTHORIZED NSWD                         DESCRIBE ANY REVISED OR NEW OBSERVATION     LOCATION OF           AUTHORIZED                       CHARACTERISTICS                                 BMPs AND PROVIDE THEIR AUTHORIZED               NSWD           Indicate whether authorized NSWD is clear, cloudy, or           IMPLEMENTATION DATE NSWD                               discolored, causing staining, contains floating objects or an oil sheen, has odors, etc.
Observers Name: NONE NONE NONE NONE Observation Time Title: Time Discharge Began Signature:
EXAMPLE:             EXAMPLE:                 At the NSWD             At the NSWD Drainage Air conditioner Units Air conditioner               Source               Area and Discharge on Building C         condensate                                                 Location Admin Building       Landscape water     Clean and clear             Clean and Clear               None 06/04/07   Landscape water to 004 07:00 Training Building     Landscape water     Clean and clear             Clean and Clear               None 06/04/07   Landscape water to 004 07:05 Air Compressor       Air Compressor       Clean and clear             Clean and Clear               None 06/04/07   Condensates           Condensates To 004 11:00 SWRO facility pump   Saltwater pump       Clean and clear             Clean and Clear               None 06/04/07   leak off drains to   leak off 005 06:45 Potable water         Potable             Clean and Clear             Clean and Clear               None 06/04/07   system to 006 at     water/naturarspring approximately lgpm 14:00
Were Pollutants Observed (If yes, complete reverse side)#5 006 #6 Range #7 007 #8 008 Observation Date: November 2006 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)
 
Observers Name: NONE NONE NONE NONE Observation Time Title: Time Discharge Began Signature:
SIDE A FORM 3-QUARTERLY VISUAL OBSERVATIONS OF UNAUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)
Were Pollutants Observed (If yes, complete reverse side)#5 006 #6 Range #7 007 #8 008 Observation Date: December 8 2006 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)
"   Unauthorized NSWDs are discharges (such as wash or rinse waters) that do not meet the conditions provided in Section D (pages 5-6) of the General Permit.
Observers Name: Trevor Rebel 15:30 No Discharge No Discharge 15:56 Observation Time Title: Environmental Specialist 15:20 No Discharge No Discharge 15:30 Time Discharge Began Signature:
* Quarterly visual observations are required to observe current and detect prior unauthorized NSWDs.
_ Were Pollutants Observed No N/A N/A No ZS](If yes, complete reverse side)#5 006 #6 Range #7 007 #8 008 Observation Date: January 4 2007 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)
* Quarterly visual observations are required during dry weather and at all facility drainage areas.
Observers Name: Trevor Rebel 11:58 12:00 No Discharge 12:20 (1)Observation Time Title: Environmental Specialist 11:30 11:45 No Discharge 11:30 Time Discharge Began Signature:
* Each unauthorized NSWD source, impacted drainage area, and discharge location must be identified and observed.
Were Pollutants Observed No No N/A No S(If yes, complete reverse tide)(1) Dean Novotny, Chemistry Technician, performed 008 visual inspection in January FORM 4-MONTHLY VISUAL OBSERVATIONS OF SIDE A STORM WATER DISCHARGES
* Unauthorized NSWDs that can not be eliminated within 90 days of observation must be reported to the Regional Board in accordance with Section A.10.e of the General Permit.
.Storm water discharge visual observations are required for at least one storm event per month between October 1 and May 31." Visual observations must be conducted during the first hour of discharge at all discharge locations.
"   Make additional copies of this form as necessary.
* Discharges of temporarily stored or contained storm water must be observed at the time of discharge.
QUARTER: JULY-SEPT.                                                                                                                         If YES to Observers Name:                                           WERE UNAUTHORIZED                               either Not Appicable                                                                                 NSWDs OBSERVED?               DYES EINO       question, Title:                                                                                                     complete See comment F.2.a                                                                           WERE THERE INDICATIONS OF                       reverse PRIOR UNAUTHORIZED NSWDs?     ElYES E]NO     side.
Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
Make additional copies of this form as necessary.
Until a monthly visual observation is made, record any eligible storm events that do not result in a storm water discharge and note the date, time, name, and title of who observed there was no storm water discharge.
#9 009 #10 010 #11 011 #12 012 Observation Date: October 2006 Description Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Observers Name:. NONE NONE NONE NONE Observation Time Title: Time Discharge Began Signature:
Were Pollutants Observed (If yes, complete reverse side)#9 009 #10 010 #11 011 #12 012 Observation Date: November 2006 Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: NONE NONE NONE NONE Observation Time Title: Time Discharge Began Signature:
Were Pollutants Observed (If yes, complete reverse side)#9 009 #10 010 #11 011 #12 012 Observation Date: December 8 2006 Description Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Observers Name: Trevor Rebel 15:45 (1) 15:3.6 16:00 No Discharge Observation Time Title: Environmental Specialist 15:20 15:20 15:30 No Discharge rn7A Time Discharge Began Signature:
Were Pollutants Observed No No Yes F7 No (If yes, complete reverse side) _ _#9 009 #10 010 #11 011 #12 012 Observation Date: January 4 2007 Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: Trevor Rebel 12:10 (2) 12:02 12:20 12:25 Observation Time Title: EnvirOnmental Specialist 11:20 11:30 11:30 12:25 Time Discharge Began Signat ure:__________
Were Pollutants Observed No No Yes No (If yes, complete reverse side) No No Yes No (1) Trained Chemistry Engineer Clint Gans performed 009 inspection in December.(2) Dean Novotny, Trained Chemistry Technician, performed 009 visual inspection in January.
FORM 4-MONTHLY VISUAL OBSERVATIONS OF SIDE A STORM WATER DISCHARGES" Storm water discharge visual observations are required for at least one storm event per month between October 1 and May 31." Visual observations must be conducted during the first hour of discharge at all discharge locations.
* Discharges of temporarily stored or contained storm water must be observed at the time of discharge.
S S Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
Make additional copies of this form as necessary.
Until a monthly visual observation is made, record any eligible storm events that do not result in a storm water discharge and note the date, time, name, and title of who observed there was no storm water discharge.
#13 013 #14 014 #15 015 #16 020 Observation Date: October 2006 Description Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm DrainageocationDscriptio Drainr Observers Name: NONE NONE NONE NONE Observation Time Title: Time Discharge Began Signature:
Were Pollutants Observed (If yes, complete reverse side)#13 013 #14 014 #15 015 #16 020 Observation Date: November 2006 Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm Drainage Location Description Drainr Observers Name: NONE NONE NONE NONE Observation Time Title: Time Discharge Began Signature:
Were Pollutants Observed (If yes, complete reverse side)#13 013 #14 014 #15 015 #16 020 Observation Date: December 8 2006 Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm Drainage Location Description Drainr Observers Name: Trevor Rebel 15:41 No Discharge 15:45 15:11 Observation Time Title: Environmental Specialist 15:30 No Discharge 15:20 15:10 Time Discharge Began Signature:
____Were Pollutants Observed No No No No SIf yes, complete reverse side) No_ NoNo_____No
#13 013. #14 014 #15 015 #16 020 Observation Date: January 4 2007 Description Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm Drainr Observers Name:, Trevor Rebel 12:06 No Discharge 12:08 11:22 Observation Time Title: Environmental Specialist 11:30 No Discharge 11:30 11:20 j6/~Time Discharge Began Signature:
Were Pollutants Observed No No No No (If yes, complete reverse side) No No No No FORM 4-MONTHLY VISUAL OBSERVATIONS OF SIDE A STORM WATER DISCHARGES" Storm water discharge visual observations are required for at least one storm event per month between October 1 and May 31.* Visual observations must be conducted during the first hour of discharge at all discharge locations." Discharges of temporarily stored or contained storm water must be observed at the time of discharge.
Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
Make additional copies of this form as necessary.
Until a monthly visual observation is made, record any eligible storm events that do not result in a storm water discharge and note the date, time, name, and title of who observed there was no storm water discharge.
#17 021 #18 023 ObservationDrainage Location Description Yard Storm Drain Yard Storm Drain Observers Name: NONE NONE Observation Time Title: Time Discharge Began Signature:
Were Pollutants Observed (If yes, complete reverse side)#17 021 #18 023 Observation Date: November 2006 Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: NONE NONE Observation Time Title: Time Discharge Began Signature:
Were Pollutants Observed (if yes, complete reverse side)#17 021 #18 023 Observation Date: December 8 2006 Yard Storm Drain Yard Storm Drain Drainage Location Description YadSomDinarStmDan Observers Name: Trevor Rebel No Discharge 15:14 Observation Time Title: Environmental Specialist No Discharge 15:10 Time Discharge Began Signature:. , Were Pollutants Observed N/A NoZ (If yes, complete reverse side)#17 021 #18 023 Observation Date: January 4 2007 Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: Trevor Rebel No Discharge 11:23 Observation Time Title: Environmental Specialist No Discharge 11:20 Time Discharge Began.Signature:
Were Pollutants Observed N/A No (If yes, complete reverse side) I SIDE B FORM 4-MONTHLY VISUAL OBSERVATIONS OF STORM WATER DISCHARGES DATEITIME OF DRAINAGE AREA DESCRIBE STORM WATER DISCHARGE IDENTIFY AND DESCRIBE SOURCE(S)
OF DESCRIBE ANY REVISED OR NEW OBSERVATION DESCRIPTION CHARACTERISTICS POLLUTANTS BMPs AND THEIR DATE OF (From Reverse Side) IMPLEMENTATION Indicate whether storm water discharge is clear, EXAMPLE: Discharge from cloudy, or discolored; causing staining; containing EXAMPLE: Oil sheen caused by oil dripped by material storage Area #2 floating objects or an oil sheen, has odors, etc. trucks in vehicle maintenance area.011 Discharge Foam on top of the water. Foam from recent paving operations in None.12/08/06 the 500kV yard.16:00 004 Retention Basin Some foam on top of the water leading to Foam from recent paving operations in None.01/04/07 the 004 settlement basin. No foam parking lots within the 004 path.discharging to ocean.12:15 011 Discharge Foam on top of the water. Foam from recent paving operations in None.01/04/07 Less foam than was observed at same the 500kV yard.location on 12-8-06.12:20 EAM flPM/1/: AM flPM FORM 4-MONTHLY VISUAL OBSERVATIONS OF STORM WATER DISCHARGES SIDE A" Storm water discharge visual observations are required for at least one storm event per month between October 1 and May 31." Visual observations must be conducted during the first hour of discharge at all discharge locations." Discharges of temporarily stored or contained storm water must be observed at the time of discharge.
S S Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
Make additional copies of this form as necessary.
Until a monthly visual observation is made, record any eligible storm events that do not result in a storm water discharge and note the date, time, name, and title of who observed there was no storm water discharge.
#1 Boat #2 003 #3 004 #4 005 ObsDrainage Locatio Description00 Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain Drainage______
LocationDescription Retention Basin Observers Name: Trevor Rebel 14:34 14.:27 14:38 14:42 Observation Time Title: Environmental Specialist 14:25 14:25 14:40 14:30 Time Discharge Began _ _ _ _ _Signature:
-' 4- Were Pollutants Observed No No No No_____________________________________ (If yes, complete reverse side) _____________
____________
_____________
___________
#1 Boat '#2 003 #3 004 #4 005 Observation Date: March 20 2007 Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain Drainage Location DescriptionRentoBai Observers Name: Trevor Rebel 13:25 13:15 13:37 13:34 Observation Time Title: Environmental Snecialist 13:10 13:10 13:20 13:20~~~AI ~~~Time Discharge Began__ _ _ _ __ _ _ _ _ _ _Sig atre: __ ___ __ Were Pollutants Observed NoNoNoN (If yes, complete reverse side)#1 Boat #2 003 #3 004 #4 005 ObDrainage Locatio Description0 Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain DrainageLocationDescriptio Retention Basin Observers Name: Trevor Rebel 18:29 18:25 18:33 18:38 Observation Time Title: Environmental Specialist 18:15 18:15 18:30 18:15 Time Discharge Began ____________
Signa tue: __ __ __ Were Pollutants Observed No No No No (If yes, complete reverse side) ____________
___________
#1 Boat #2 003 #3 004 '#4 005 Drainvatge Locatio Descriptio Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain DrainageocationDscriptio Retention Basin Observers Name: _ ____NONE NONE NONE NONE Observation Time ____________
Title: _______Time Discharge Began ___________
Signature:
Signature:
__________________
QUARTER: OCT.-DEC.                                                                                                                          If YES to Observers Name:    Trevor Rebel                          WERE UNAUTHORIZED                              either DATE/TIME OF                                                                                  NSWDs OBSERVED?                      YES  NO  question, OBSERVATIONS                      Title:      Environmental Specialist                                                                      complete WERE THERE INDICATIONS OF                      reverse 12/21/06  16:00                Signature:  __        _        _  _        _            PRIOR UNAUTHORIZED NSWDs?        Z  YES  NO  side.
Were Pollutants Observed______________________________________ (If yes, complete reverse side) ____________
QUARTER: JAN.-MARCH                                                                                                                          If YES to Observers Name:    Trevor Rebel                          WERE UNAUTHORIZED                              either DATE/TIME OF                                                                                  NSWDs OBSERVED?                ElYES Z      NO question, OBSERVATIONS                     Title:      Environmental Specialist                                                                      complete WERE THERE INDICATIONS OF                       reverse 03/29/07    17:00                                                                            PRIOR UNAUTHORIZED NSWDs?      ElYES    Z  NO side.
____________
QUARTER: APRIL-JUNE                                                                                                                          If YES to Observers Name:    Trevor Rebel                          WERE UNAUTHORIZED                              either DATE/TIME OF                                                                                  NSWDs OBSERVED?                EYES      Z  NO question, OBSERVATIONS                      Title:      Environmental Specialist                                                                      complete WERE THERE INDICATIONS OF                      reverse 06i/04/07    16:00                  gnature:                                                PRIOR UNAUTHORIZED NSWDs?      E YES    Z  NO side.
____________
 
___________
SIDE B FORM 3 QUARTERLY VISUAL OBSERVATIONS OF UNAUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)
FORM 4-MONTHLY VISUAL OBSERVATIONS OF SIDE A STORM WATER DISCHARGES" Storm water discharge visual observations are required for at least one storm event per month between October 1 and May 31." Visual observations must be conducted during the first hour of discharge at all discharge locations.
OBSERVATION          NAME OF            SOURCE AND      DESCRIBE UNAUTHORIZED NSWD CHARACTERISTICS                        DESCRIBE CORRECTIVE DATE        UNAUTHORIZED            LOCATION          Indicate whether unauthorized NSWD is clear, cloudy,            ACTIONS TO ELIMINATE (FROM                NSWD                  OF        discolored, causing stains; contains floating objects or an oil  UNAUTHORIZED NSWD AND REVERSE SIDE)                          UNAUTHORIZED                        sheen, has odors, etc.                            TO CLEAN IMPACTED NSWD                                                                                DRAINAGE AREAS.
* Discharges of temporarily stored or contained storm water must be observed at the time of discharge." Indicate "None" in the first column of this form if you did not conduct a monthly visual observation." Make additional copies of this form as necessary." Until a monthly visual observation is made, record any eligible storm events that do not result in a storm water discharge and note the date, time, name, and title of who observed there was no storm water discharge.
PROVIDE UNAUTHORIZED EXAMPLE:            EXAMPLE:                                              AT THE UNAUTHORIZED            NSWD ELIMINATION DATE.
#5 006 #6 Range #7 007 #8 008 Observation Date: February 7 2007 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)
Vehicle Wash        NW Corner of         AT THE UNAUTHORIZED                NSWD AREA AND Water                Parking Lot                NSWD SOURCE                DISCHARGE LOCATION Rinsing vehicles for West of Warehouse  Clean and Clear. No sheen,     Clean and Clear. No sheen,      Hoses removed.
Observers Name: Trevor Rebel 14:49 14:56 No Discharge 14:30 Observation Time Title: Environmental Specialist 14:25 14:40 No Discharge 14:25---- Discharge Began Signature:
12/21/06      the removal of salt. B in discharge path no odor.                        no odor.                        Area was, and remains clean.
_______ __- Were Pollutants Observed No No No 19 No (If yes, complete reverse side)#5 006 #6 Range #7 007 #8 008 Observation Date: March 20 2007 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)
006.                                                                                No residue or evidence of 13:00                                                                                                                contamination.
Observers Name: Trevor Rebel 13:45 13:40 No Discharge 14:05 Observation Time Title: Environmental Specialist 13:20 13:20 No Discharge 13:20 Time Discharge Began Signa ture:__ Were Pollutants Observed No NO NO No Signature: (If yes, complete reverse side N o#5 006 #6 Range #7 007 #8 008 Observation Date: April 19 2007 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)
No rinsing signage posted.
Observers Name: Trevor Rebel 18:47 4-20 06:58 No Discharge 4-20 07:18 Observation Time Title: Environmental Specialist 18:30 4-20 00:00 No Discharge 4-20 00:00-AA1, fTime Discharge Began Signature: .fVL.,'.." Were Pollutants Observed No No NoZ NoZ (if yes, complete reverse side)#5 006 #6 Range #7 007 #8 008 Observation Date: May 2007 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)
Fully eliminated as of 2-28-07
Observers Name: NONE NONE NONE NONE Observation Time Title: Time Discharge Began Signature:
  /    /
Were Pollutants Observed (If yes, complete reverse side)
: AM
FORM 4-MONTHLY VISUAL OBSERVATIONS OF S* Storm water discharge visual observations are required for at least one storm event per month between October 1 and May 31." Visual observations must be conducted during the first hour of discharge at all discharge locations." Discharges of temporarily stored or contained storm water must be observed at the time of discharge.
[-PM I    I
SIDE A TORM WATER DISCHARGES 0 Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
            -AM
Make additional copies of this form as necessary.
            -PM
Until a monthly visual observation is made, record any eligible storm events that do not result in a storm water discharge and note the date, time, name, and title of who observed there was no storm water discharge.
  /    !
#9 009 #10 010 #11 011 #12 012 Observation Date: February 7 2007 Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: Trevor Rebel 14:45 14:55 15:12 15:20 Observation Time Title: Environmental Specialist 14:25 14:25 14:40 14:40 Time Discharge Began Signature:
:    IAM 1-1PM
___________..__.
 
_ Were Pollutants Observed No No No No (If yes, complete reverse side) o[ o[ o[ o[#9 009 #10 010 #11 011 #12 012 Observation Date: March 20 2007 Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: Trevor Rebel 13:10 13:48 14!10 14:15 Observation Time Title: Environmental Specialist 13:10 13:20 13:20 14:15 Time Discharge Began Signature:
FORM 4-MONTHLY VISUAL OBSERVATIONS OF                                                                                    SIDE A STORM WATER DISCHARGES
rWere Pollutants Observed No No No No (If yes, complete reverse side) No No No_ _____#9 009 #10 010 #11 011 #12 012 Observation Date: April 19 2007 Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: Trevor Rebel 18:19 4-20 07:04 4-20 07:12 4-20 07:26 Observation Time Title: Environmental Soecialist 18:15 4-20 00:00 4-20 00:00 4-20 00:00 Time Discharge Began Signature:
* Storm water discharge visual observations are required for at least one storm          S    Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
Were Pollutants Observed No No No No (If yes, complete reverse side) No _ _ _ _ _ _ NoNoNo#9 009 #10 010 #11 011 #12 012 Observation Date: May 2007 Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: NONE NONE NONE NONE Observation Time Title: Time Discharge Began Signature:
event per month between October 1 and May 31.                                          S    Make additional copies of this form as necessary.
Were Pollutants Observed (If yes, complete reverse side)
    "    Visual observations must be conducted during the first hour of discharge                    Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations.                                                                  water discharge and note the date, time, name, and title of who observed there was no storm water
FORM 4-MONTHLY VISUAL OBSERVATIONS OF SIDE A STORM WATER DISCHARGES" Storm water discharge visual observations are required for at least one storm 0 Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
* Discharges of temporarily stored or contained storm water must be observed                  discharge.
event per month between October 1 and May 31. 0 Make additional copies of this form as necessary.
at the time of discharge.
                                                                                          #1 Boat                      #2 003                            #3 004                        #4 005 Observation Date: October        _    2006                                              Marine Refuel Station        Yard Storm Drain                 Yard Storm Drain to          Yard Storm Drain Drainage Location Description                                                                 Retention Basin Observers Name:                                                                                 NONE                            NONE                            NONE                        NONE Observation Time Title:
Time Discharge Began Signature:                                               Were Pollutants Observed (Ifyes, complete reverse side)
                                                                                          #1 Boat                      #2 003                          #3 004                        #4 005 Drainage Location Description  Marine Refuel Station        Yard Storm Drain                Yard Storm Drain to            Yard Storm Drain DranagLoatonesciptonRetention Basin Observers Name_                                                                                  NONE                            NONE                            NONE                        NONE Observation Time Title: ______
Time Discharge Began Signature:                                               Were Pollutants Observed (If yes, complete reverse side)
                                                                                          #1 Boat                      #2 003                            #3 004                        #-4 005
                                                                                          #  ot#                              0                          304#                              0 Observation Date: December          8 2006 Drainage Location Description  Marine Refuel Station        Yard Storm Drain                 Yard Storm Drain to            Yard Storm Drain DranagLoatonesciptonRetention                  Basin Observers     Name: Trevor Rebel                                                                  115:18                          15:10                          15:20                        15:25 Observation Time Title:   Environmental Specialist                                                                  15:10                          15:10                      Pre Release                      15:20
                                --A2t  /    _          Time Discharge Began Signature:             (,'V-X/          -              Were Pollutants Observed                                                                                 No No___
(Ifyes, complete reverse side)             No_ _    _No                    No                            oM_
                                                                                          #1 Boat                      #2 003                          #3 004                        .#4 005 DrainageoLocationnDescription7Marine    Refuel Station        Yard Storm Drain                Yard Storm Drain to            Yard Storm Drain Drainage Location DescriptionBasin Observers Name: Trevor Rebel                                                                      11:30                          11:20                        12:15 (1)                      12:30 Observation Time Title:  Environmental Specialist                                                                  11:20                            11:20                      Pre Release                    11:40 Time Discharge Began Signature:          ,-? VL                          Were Pollutants Observed                No                                No                            Yes                          No (If yes, complete reverse side)                  --------
(1) Jim Kelly, Senior Biologist, performed 004 visual inspection in January.
 
FORM 4-MONTHLY VISUAL OBSERVATIONS OF                                                                                      SIDE A S TORM WATER DISCHARGES
* Storm water discharge visual observations are required for at least one storm                  Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
event per month between October 1 and May 31.                                              0    Make additional copies of this form as necessary.
* Visual observations must be conducted during the first hour of discharge                        Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations.                                                                    water discharge and note the date, time, name, and title of who observed there was no storm water
* Discharges of temporarily stored or contained storm water must be observed                      discharge.
at the time of discharge.
                                                                                          #5 006                        #6 Range                        #7 007                        #8 008 Observation Date: October            2006                                                Yard Storm Drain               Immediate Outlet                Storm Water                  Yard Storm Drain Drainage Location Description     (At Discharge)
Observers Name:                                                                                     NONE                            NONE                          NONE                          NONE Observation Time Title:
Time Discharge Began Signature:                                             Were Pollutants Observed (Ifyes, complete reverse side)
                                                                                          #5 006                        #6 Range                        #7 007                        #8 008 Observation Date: November              2006                                              Yard Storm Drain               Immediate Outlet                Storm Water                  Yard Storm Drain Drainage Location Description     (At Discharge)
Observers Name:                                                                                     NONE                            NONE                          NONE                          NONE Observation Time Title:
Time Discharge Began Signature:                                             Were Pollutants Observed (Ifyes, complete reverse side)
                                                                                          #5 006                        #6 Range                        #7 007                        #8 008 Observation Date: December        8  2006                                              Yard Storm Drain               Immediate Outlet                Storm Water                  Yard Storm Drain Drainage Location Description     (At Discharge)
Observers Name: Trevor Rebel                                                                         15:30                    No Discharge                    No Discharge                      15:56 Observation Time Title: Environmental Specialist                                                                    15:20                     No Discharge                    No Discharge                      15:30 Time Discharge Began Signature:             _                              Were Pollutants Observed                   No                               N/A                              N/A                            No ZS]
(Ifyes, complete reverse side)
                                                                                            #5 006                        #6 Range                        #7 007                        #8 008 Observation Date: January        4  2007                                                 Yard Storm Drain             Immediate Outlet                Storm Water                  Yard Storm Drain Drainage Location Description     (At Discharge)
Observers Name: Trevor Rebel                                                                        11:58                          12:00                      No Discharge                    12:20 (1)
Observation Time Title:  Environmental Specialist                                                                    11:30                            11:45                    No Discharge                      11:30 Time Discharge Began Signature:                                              Were Pollutants Observed                    No                              No                              N/A                          No S(If yes, complete reverse    tide)
(1) Dean Novotny, Chemistry Technician, performed 008 visual inspection in January
 
FORM 4-MONTHLY VISUAL OBSERVATIONS OF                                                                                  SIDE A STORM WATER DISCHARGES
      . Storm water discharge visual observations are required for at least one storm              Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
event per month between October 1 and May 31.                                              Make additional copies of this form as necessary.
    "  Visual observations must be conducted during the first hour of discharge                    Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations.                                                                water discharge and note the date, time, name, and title of who observed there was no storm water
* Discharges of temporarily stored or contained storm water must be observed                  discharge.
at the time of discharge.
                                                                                          #9 009                      #10 010                          #11 011                        #12 012 Observation Date: October            2006                                  Description Yard Storm Drain            Yard Storm Drain                Yard Storm Drain              Yard Storm Drain Observers Name:.                                                                                NONE                             NONE                          NONE                          NONE Observation Time Title:
Time Discharge Began Signature:                                            Were Pollutants Observed (If yes, complete reverse side)
                                                                                          #9 009                      #10 010                          #11 011                        #12 012 Observation Date: November              2006                                            Yard Storm Drain            Yard Storm Drain                Yard Storm Drain              Yard Storm Drain Drainage Location Description Observers Name:                                                                                NONE                            NONE                          NONE                          NONE Observation Time Title:
Time Discharge Began Signature:                                            Were Pollutants Observed (Ifyes, complete reverse side)
                                                                                          #9 009                      #10 010                          #11 011                        #12 012 Observation Date: December        8  2006                                Description Yard Storm Drain            Yard Storm Drain                Yard Storm Drain              Yard Storm Drain Observers Name:    Trevor Rebel                                                              15:45 (1)                          15:3.6                        16:00                  No Discharge Observation Time Title:  Environmental Specialist                                                                15:20                            15:20                          15:30                  No Discharge rn7A                        Time Discharge Began Signature:                                            Were Pollutants Observed                No                                No                            Yes F7                      No (If yes, complete reverse side)                              _                                                              _
                                                                                          #9 009                      #10 010                          #11 011                        #12 012 Observation Date: January      4    2007                                              Yard Storm Drain            Yard Storm Drain                Yard Storm Drain              Yard Storm Drain Drainage Location Description Observers Name:    Trevor Rebel                                                              12:10 (2)                          12:02                          12:20                        12:25 Observation Time Title:  EnvirOnmental Specialist                                                                11:20                            11:30                          11:30                        12:25 Time Discharge Began Signat          ure:__________                        Were Pollutants Observed                No                              No                            Yes                          No (If yes, complete reverse side)        No                              No                            Yes                          No (1) Trained Chemistry Engineer Clint Gans performed 009 inspection in December.
(2) Dean Novotny, Trained Chemistry Technician, performed 009 visual inspection in January.
 
FORM 4-MONTHLY VISUAL OBSERVATIONS OF                                                                                  SIDE A STORM WATER DISCHARGES
  "  Storm water discharge visual observations are required for at least one storm              Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
event per month between October 1 and May 31.                                          S    Make additional copies of this form as necessary.
  "  Visual observations must be conducted during the first hour of discharge              S    Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations.                                                                water discharge and note the date, time, name, and title of who observed there was no storm water
* Discharges of temporarily stored or contained storm water must be observed                  discharge.
at the time of discharge.
                                                                                        #13 013                      #14 014                          #15 015                      #16 020 Observation Date: October            2006                                  Description Yard Storm Drain            Storm Water Runoff              Yard Storm Drain              Intake Deck Storm DrainageocationDscriptio                                                                                                    Drainr Observers Name:                                                                                NONE                            NONE                            NONE                          NONE Observation Time Title:
Time Discharge Began Signature:                                            Were Pollutants Observed (Ifyes, complete  reverse side)
                                                                                        #13 013                      #14 014                          #15 015                      #16 020 Observation Date: November            2006                                            Yard Storm Drain            Storm Water Runoff              Yard Storm Drain              Intake Deck Storm Drainage Location Description                                                                                                Drainr Observers Name:                                                                                NONE                            NONE                            NONE                          NONE Observation Time Title:
Time Discharge Began Signature:                                            Were Pollutants Observed (If yes, complete reverse side)
                                                                                        #13 013                      #14 014                          #15 015                      #16 020 Observation Date: December        8 2006                                              Yard Storm Drain            Storm Water Runoff              Yard Storm Drain              Intake Deck Storm Drainage Location Description                                                                                              Drainr Observers Name: Trevor Rebel                                                                    15:41                    No Discharge                          15:45                        15:11 Observation Time Title:  Environmental Specialist                                                                15:30                    No Discharge                          15:20                        15:10 Time Discharge Began Signature:  ____Were                                          Pollutants Observed                No                            No                              No                            No SIf yes, complete reverse side)            No_                          NoNo_____No
                                                                                        #13 013.                    #14 014                          #15 015                      #16 020 Observation Date: January      4  2007                                    Description Yard Storm Drain            Storm Water Runoff              Yard Storm Drain              Intake Deck Storm Drainr Observers Name:, Trevor Rebel                                                                  12:06                    No Discharge                          12:08                        11:22 Observation Time Title:  Environmental Specialist                                                                11:30                    No Discharge                          11:30                        11:20 j6/~Time                                  Discharge Began Signature:                                            Were Pollutants Observed                  No                            No                              No                            No No                            No                              No                            No (If yes, complete reverse side)
 
FORM 4-MONTHLY VISUAL OBSERVATIONS OF                                                                                  SIDE A STORM WATER DISCHARGES
  "  Storm water discharge visual observations are required for at least one storm              Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
event per month between October 1 and May 31.                                              Make additional copies of this form as necessary.
* Visual observations must be conducted during the first hour of discharge                    Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations.                                                                water discharge and note the date, time, name, and title of who observed there was no storm water
  "  Discharges of temporarily stored or contained storm water must be observed                  discharge.
at the time of discharge.
                                                                                        #17 021                    #18 023 ObservationDrainage                                              Location Description  Yard Storm Drain            Yard Storm Drain Observers Name:                                                                                NONE                            NONE Observation Time Title:
Time Discharge Began Signature:                                            Were Pollutants Observed (Ifyes, complete reverse side)
                                                                                        #17 021                    #18 023 Observation Date: November              2006                                            Yard Storm Drain            Yard Storm Drain Drainage Location Description Observers Name:                                                                                NONE                            NONE Observation Time Title:
Time Discharge Began Signature:                                            Were Pollutants Observed (if yes, complete reverse side)
                                                                                        #17 021                    #18 023 Observation Date: December          8  2006                                            Yard Storm Drain            Yard Storm Drain Drainage Location Description    YadSomDinarStmDan Observers Name: Trevor Rebel                                                                No Discharge                        15:14 Observation Time Title: Environmental Specialist                                                              No Discharge                        15:10 Time Discharge Began Signature:.                    ,                      Were Pollutants Observed                  N/A                          NoZ (Ifyes, complete reverse side)
                                                                                        #17 021                    #18 023 Observation Date: January        4  2007                                              Yard Storm Drain            Yard Storm Drain Drainage Location Description Observers Name: Trevor Rebel                                                                No Discharge                        11:23 Observation Time Title: Environmental Specialist                                                              No Discharge                        11:20 Time Discharge Began.
Signature:                                            Were Pollutants Observed                  N/A                          No (If yes, complete reverse side) I
 
SIDE B FORM 4-MONTHLY VISUAL OBSERVATIONS OF STORM WATER DISCHARGES DATEITIME OF          DRAINAGE AREA            DESCRIBE STORM WATER DISCHARGE                  IDENTIFY AND DESCRIBE SOURCE(S) OF        DESCRIBE ANY REVISED OR NEW OBSERVATION              DESCRIPTION                        CHARACTERISTICS                                      POLLUTANTS                    BMPs AND THEIR DATE OF (From Reverse Side)                                                                                                                                  IMPLEMENTATION Indicate whether storm water discharge is clear, EXAMPLE: Discharge from  cloudy, or discolored; causing staining; containing EXAMPLE: Oil sheen caused by oil dripped by material storage Area #2 floating objects or an oil sheen, has odors, etc. trucks in vehicle maintenance area.
011 Discharge      Foam on top of the water.                          Foam from recent paving operations in      None.
12/08/06                                                                                    the 500kV yard.
16:00 004 Retention Basin    Some foam on top of the water leading to            Foam from recent paving operations in      None.
01/04/07                                the 004 settlement basin. No foam                  parking lots within the 004 path.
discharging to ocean.
12:15 011 Discharge      Foam on top of the water.                          Foam from recent paving operations in      None.
01/04/07                                Less foam than was observed at same                the 500kV yard.
location on 12-8-06.
12:20 EAM flPM
    /1/
:  AM flPM
 
FORM 4-MONTHLY VISUAL OBSERVATIONS OF                                                                                                    SIDE A STORM WATER DISCHARGES
  "      Storm water discharge visual observations are required for at least one storm                        S    Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
event per month between October 1 and May 31.                                                              Make additional copies of this form as necessary.
  "      Visual observations must be conducted during the first hour of discharge                              S    Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations.                                                                                water discharge and note the date, time, name, and title of who observed there was no storm water
      " Discharges of temporarily stored or contained storm water must be observed                                  discharge.
at the time of discharge.
                                                                                                    #1 Boat                          #2 003                            #3 004                      #4 005 ObsDrainage                                      Locatio Description00Marine                  Refuel Station      Yard Storm Drain                  Yard Storm Drain to          Yard Storm Drain Drainage______
LocationDescription                                                                                Retention Basin Observers Name: Trevor Rebel                                                                                      14:34                            14.:27                          14:38                        14:42 Observation Time Title:    Environmental Specialist                                                                                14:25                              14:25                          14:40                        14:30 Time Discharge Began                                                                                          _      _      _    _  _
Signature:                    -'        4-                Were Pollutants Observed                                  No                                No                            No                            No
_____________________________________  (If yes, complete reverse side)          _____________                      ____________                    _____________                  ___________
                                                                                                    #1 Boat                        '#2 003                            #3 004                      #4 005 Observation Date: March                20 2007                                                        Marine Refuel Station Yard Storm Drain                            Yard Storm Drain to          Yard Storm Drain Drainage Location DescriptionRentoBai Observers Name: Trevor Rebel                                                                                      13:25                              13:15                          13:37                        13:34 Observation Time Title:    Environmental Snecialist                                                                                13:10                              13:10                          13:20                        13:20
                                          ~~~AI
                                              ~~~Time            Discharge Began__                                                                  _    _  _    __        _    _    _    _  _  _
Sig        atre:__      ___    __    Were Pollutants Observed                                  NoNoNoN (If yes, complete reverse side)
                                                                                                      #1 Boat                          #2 003                            #3 004                      #4 005 ObDrainage                                        Locatio Description0            Marine Refuel Station            Yard Storm Drain                  Yard Storm Drain to          Yard Storm Drain DrainageLocationDescriptio                                                                Retention Basin Observers Name: Trevor Rebel                                                                                      18:29                              18:25                          18:33                        18:38 Observation Time Title:    Environmental Specialist                                                                                18:15                              18:15                          18:30                        18:15 Time Discharge Began                      ____________
Signa            tue:              __      __  __      Were Pollutants Observed                                  No                                No                            No                            No (If yes, complete reverse side)                                                                              ____________                  ___________
                                                                                                      #1 Boat                          #2 003                            #3 004                      '#4 005 Drainvatge Locatio Descriptio              Marine Refuel Station            Yard Storm Drain                  Yard Storm Drain to          Yard Storm Drain DrainageocationDscriptio                                                                                      Retention Basin Observers Name:          _      ____NONE                                                                                                          NONE                              NONE                        NONE Observation Time                          ____________
Title:  _______
Time Discharge Began                      ___________
Signature:      __________________                        Were Pollutants Observed
______________________________________ (If yes, complete reverse side)            ____________                      ____________                    ____________                  ___________
 
FORM 4-MONTHLY VISUAL OBSERVATIONS OF                                                                                    SIDE A STORM WATER DISCHARGES
  "  Storm water discharge visual observations are required for at least one storm          "    Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
event per month between October 1 and May 31.                                          "    Make additional copies of this form as necessary.
  "  Visual observations must be conducted during the first hour of discharge                "    Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations.                                                                  water discharge and note the date, time, name, and title of who observed there was no storm water
* Discharges of temporarily stored or contained storm water must be observed                    discharge.
at the time of discharge.
                                                                                        #5 006                        #6 Range                        #7 007                        #8 008 Observation Date: February            7  2007                                          Yard Storm Drain              Immediate Outlet                Storm Water                  Yard Storm Drain Drainage Location Description  (At Discharge)
Observers Name: Trevor Rebel                                                                      14:49                            14:56                      No Discharge                      14:30 Observation Time Title:  Environmental Specialist                                                                  14:25                          14:40                      No Discharge                      14:25
              ----            *Time                          Discharge Began Signature: _______                            __-      Were Pollutants Observed                No                                No                            No 19                            No (Ifyes, complete reverse side)
                                                                                        #5 006                        #6 Range                        #7 007                        #8 008 Observation Date: March            20  2007                                          Yard Storm Drain              Immediate Outlet                Storm Water                  Yard Storm Drain Drainage Location Description  (At Discharge)
Observers Name: Trevor Rebel                                                                      13:45                            13:40                    No Discharge                      14:05 Observation Time Title:  Environmental Specialist                                                                  13:20                            13:20                    No Discharge                      13:20 Time Discharge Began Signa            ture:__                                Were Pollutants Observed                No                                NO                            NO                              No Signature:                              (If yes, complete reverse side          N                                  o
                                                                                        #5 006                        #6 Range                        #7 007                        #8 008 Observation    Date: April      19 2007                                                Yard Storm Drain              Immediate Outlet                Storm Water                  Yard Storm Drain Drainage Location Description  (At Discharge)
Observers Name: Trevor Rebel                                                                      18:47                        4-20 06:58                    No Discharge                    4-20 07:18 Observation Time Title:  Environmental Specialist                                                                  18:30                        4-20 00:00                    No Discharge                    4-20 00:00
                      -    AA1,              fTime            Discharge Began Signature:              .fVL.,'.."                    Were Pollutants Observed                No                                No                            NoZ                              NoZ (if yes, complete reverse side)
                                                                                        #5 006                        #6 Range                        #7 007                        #8 008 Observation Date: May                2007                                              Yard Storm Drain              Immediate Outlet                Storm Water                  Yard Storm Drain Drainage Location Description  (At Discharge)
Observers Name:                                                                                  NONE                              NONE                          NONE                          NONE Observation Time Title:
Time Discharge Began Signature:                                              Were Pollutants Observed (If yes, complete reverse side)
 
FORM 4-MONTHLY VISUAL OBSERVATIONS OF                                                                                  SIDE A S TORM WATER DISCHARGES
* Storm water discharge visual observations are required for at least one storm              Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
event per month between October 1 and May 31.                                              Make additional copies of this form as necessary.
  "  Visual observations must be conducted during the first hour of discharge              0    Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations.                                                                water discharge and note the date, time, name, and title of who observed there was no storm water
  "  Discharges of temporarily stored or contained storm water must be observed                  discharge.
at the time of discharge.
                                                                                        #9 009                      #10 010                          #11 011                      #12 012 Observation Date: February        7  2007                                              Yard Storm Drain            Yard Storm Drain                Yard Storm Drain              Yard Storm Drain Drainage Location Description Observers Name: Trevor Rebel                                                                    14:45                          14:55                          15:12                        15:20 Observation Time Title: Environmental Specialist                                                                  14:25                          14:25                          14:40                        14:40 Time Discharge Began Signature:  ___________..__.                    _      (If yes,Pollutants Were    complete Observed reverse side)        Noo[                            Noo[                            Noo[                          Noo[
                                                                                        #9 009                      #10 010                          #11 011                      #12 012 Observation Date: March        20  2007                                              Yard Storm Drain            Yard Storm Drain                Yard Storm Drain              Yard Storm Drain Drainage Location Description Observers Name: Trevor Rebel                                                                    13:10                          13:48                          14!10                        14:15 Observation Time Title: Environmental Specialist                                                                  13:10                            13:20                          13:20                        14:15 Time Discharge Began Signature:        rWere                                      Pollutants Observed              No                              No                              No                            No (Ifyes, complete  reverse side)        No                              No                              No_                            _____
                                                                                        #9 009                      #10 010                          #11 011                      #12 012 Observation Date: April      19    2007                                                Yard Storm Drain            Yard Storm Drain                  Yard Storm Drain            Yard Storm Drain Drainage Location Description Observers Name: Trevor Rebel                                                                    18:19                        4-20 07:04                      4-20 07:12                    4-20 07:26 Observation Time Title: Environmental Soecialist                                                                  18:15                        4-20 00:00                      4-20 00:00                    4-20 00:00 Time Discharge Began Signature:                                            Were Pollutants Observed                No                              No                              No                            No
_    _  _
(Ifyes, complete reverse side)          No                              NoNoNo                _    _  _
                                                                                        #9 009                      #10 010                          #11 011                      #12 012 Observation Date: May            2007                                                  Yard Storm Drain            Yard Storm Drain                  Yard Storm Drain            Yard Storm Drain Drainage Location Description Observers Name:                                                                                NONE                            NONE                          NONE                          NONE Observation Time Title:
Time Discharge Began Signature:                                            Were Pollutants Observed (If yes, complete reverse side)
 
FORM 4-MONTHLY VISUAL OBSERVATIONS OF                                                                                    SIDE A STORM WATER DISCHARGES
  "   Storm water discharge visual observations are required for at least one storm           0   Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
event per month between October 1 and May 31.                                           0   Make additional copies of this form as necessary.
* Visual observations must be conducted during the first hour of discharge
* Visual observations must be conducted during the first hour of discharge
* Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations, water discharge and note the date, time, name, and title of who observed there was no storm water* Discharges of temporarily stored or contained storm water must be observed discharge.
* Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations,                                                                   water discharge and note the date, time, name, and title of who observed there was no storm water
* Discharges of temporarily stored or contained storm water must be observed                   discharge.
at the time of discharge.
                                                                                        #13 013                        #14 014                          #15 015                      #16 020 Observation    Date: February 7 2007                                        Description  Yard Storm Drain              Storm Water Runoff              Yard Storm Drain              Intake Deck Storm DranagLoatonesciptonDrainr Observers Name: Trevor Rebel                                                                      15:35                    No Discharge                          15:30                        14:28 Observation Time Title:  Environmental Specialist                                                                  14:40                    No Discharge                          14:40                        14:25
                          -*          1    _          Time Discharge Began:
Signature:                                            Were Pollutants Observed                    No                            No                              No                            No (If yes, complete reverse side)
                                                                                        #13 013                        #14 014                          #15 015                      #16 020 Observation Date: March      20    2007                                                Yard Storm Drain              Storm Water Runoff              Yard Storm Drain              Intake Deck Storm Drainage Location Description                                                                                                Drainr Observers Name: Trevor Rebel                                                                      13:50                          13:58                          13:55                        13:21 Observation Time Title:  Environmental Specialist                                                                  13:20                          13:20                          13:20                        13:10 Time Discharge Began Signature:          ,___/ w__...              _        Were Pollutants Observed                    Yes                          No                              Yes                          No (Ifyes, complete reverse side)              Yes____No____Yes_[__No___
                                                                                        #13 013                      #14 014                          #15 015                      #16. 020 Observation Date: April      19    2007                                                  Yard Storm Drain              Storm Water Runoff              Yard Storm Drain              Intake Deck Storm Drainage Location Description                                                                                                Drainr Observers Name: Trevor Rebel                                                                  4-20 07:07                      4-20 07:31                          18:57                        18:25 Observation Time Title:  Environmental SDecialjst                                                              4-20 00:00                      4-20 00:00                          18:45                        18:15 Time Discharge Began Signature:                                            Were Pollutants Observed                    NoZ7                          NoZ                            NoZ                          No (if yes, complete reverse side)              N    2IN.                                                      oNN
                                                                                        #13 013                        #14 014                          #15 015                      #16 020 ObservationDrainage                                                Location Description Yard Storm Drain              Storm Water Runoff              Yard Storm Drain              Intake Deck Storm
_rainageocationscriptio                                                                                                        Drainr Observers Name:                                                                                  NONE                            NONE                            NONE                          NONE Observation Time Title:
Time Discharge    Began Signature:                                            Were Pollutants Observed (If yes, complete reverse side)
 
FORM 4-MONTHLY VISUAL OBSERVATIONS OF                                                                                                  SIDE A STORM WATER DISCHARGES
    "      Storm water discharge visual observations are required for at least one storm                        Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
event per month between October 1 and May 31.                                                        Make additional copies of this form as necessary.
    "      Visual observations must be conducted during the first hour of discharge                            Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations.                                                                        water discharge and note the date, time, name, and title of who observed there was no storm water
    "      Discharges of temporarily stored or contained storm water must be observed                          discharge.
at the time of discharge.
at the time of discharge.
#13 013 #14 014 #15 015 #16 020 Observation Date: February 7 2007 Description Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm DranagLoatonesciptonDrainr Observers Name: Trevor Rebel 15:35 No Discharge 15:30 14:28 Observation Time Title: Environmental Specialist 14:40 No Discharge 14:40 14:251 _ Time Discharge Began: Signature:
                                                                                              #17 021                               #18 023 Observation Date: February                 7 2007YadSomDin                                                                             arStmDan Drainage Location DescriptionYadSomDanarStmDai Observers Name: Trevor Rebel                                                                               14:28                                   14:30 Observation Time:
Were Pollutants Observed No No No No (If yes, complete reverse side)#13 013 #14 014 #15 015 #16 020 Observation Date: March 20 2007 Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm Drainage Location Description Drainr Observers Name: Trevor Rebel 13:50 13:58 13:55 13:21 Observation Time Title: Environmental Specialist 13:20 13:20 13:20 13:10 Time Discharge Began Signature:
Title:     Environmental Specialist                                                                         14:25                                   14:25 Time Discharge Began                                                   ____________
,___/ w__... _ Were Pollutants Observed Yes No Yes No (If yes, complete reverse side) Yes____No____Yes_[__No___
Sinaur:       ___________________Were           Pollutants Observed                   No                                     No ;7 Sintue                                     (If yes, complete reverse side) ____________                           ___________                 _____           ______         __________
#13 013 #14 014 #15 015 #16. 020 Observation Date: April 19 2007 Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm Drainage Location Description Drainr Observers Name: Trevor Rebel 4-20 07:07 4-20 07:31 18:57 18:25 Observation Time Title: Environmental SDecialjst 4-20 00:00 4-20 00:00 18:45 18:15 Time Discharge Began Signature:
                                                                                              #17 021                               #18 023 Observation Date: March                 20   2007           DangLotinesrponYard Storm Drain                                         Yard Storm Drain Observers Name: Trevor Rebel                                                                               13:22                                   13:23 Observation Time Title:     Environmental Specialist                                                                         13:10                                   13:10 Time Discharge Began             _______
Were Pollutants Observed NoZ7 NoZ NoZ No (if yes, complete reverse side) N 2IN. oNN#13 013 #14 014 #15 015 #16 020 ObservationDrainage Location Description Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm_rainageocationscriptio Drainr Observers Name: NONE NONE NONE NONE Observation Time Title: Time Discharge Began Signature:
Signaure:____________________Were Pollutants ObservedNoN Signature:               _________________                 (if yes, complete reverse side)               No___________                          No___________
Were Pollutants Observed (If yes, complete reverse side)
FORM 4-MONTHLY VISUAL OBSERVATIONS OF SIDE A STORM WATER DISCHARGES" Storm water discharge visual observations are required for at least one storm event per month between October 1 and May 31." Visual observations must be conducted during the first hour of discharge at all discharge locations." Discharges of temporarily stored or contained storm water must be observed at the time of discharge.
Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.
Make additional copies of this form as necessary.
Until a monthly visual observation is made, record any eligible storm events that do not result in a storm water discharge and note the date, time, name, and title of who observed there was no storm water discharge.
#17 021 #18 023 Observation Date: February 7 2007YadSomDin arStmDan Drainage Location DescriptionYadSomDanarStmDai Observers Name: Trevor Rebel 14:28 14:30 Observation Time: Title: Environmental Specialist 14:25 14:25 Time Discharge Began ____________
Sinaur: ___________________Were Pollutants Observed No No ;7 Sintue (If yes, complete reverse side) ____________
___________
_____ ______ __________
#17 021 #18 023 Observation Date: March 20 2007 DangLotinesrponYard Storm Drain Yard Storm Drain Observers Name: Trevor Rebel 13:22 13:23 Observation Time Title: Environmental Specialist 13:10 13:10 Time Discharge Began _______Signaure:____________________Were Pollutants ObservedNoN Signature:
_________________ (if yes, complete reverse side) No___________
______________
______________
No___________
                                                                                              #17 021                               #18 023 Obsrvtin at: Ari       1     207Drainage                 Location Description Yard Storm Drain                     Yard Storm Drain Observers Name: Trevor Rebel                                                                               18:27                                   18:28 Observation Time Title:     Environmental SDecialist                                                                         18:15                                   18:15
#17 021 #18 023 Obsrvtin at: Ari 1 207Drainage Location Description Yard Storm Drain Yard Storm Drain Observers Name: Trevor Rebel 18:27 18:28 Observation Time Title: Environmental SDecialist 18:15 18:15-R I ~~~Time Discharge Began ______Signature:
                              -R           I             ~~~Time Discharge Began                                                                               ______
L A-'- Were Pollutants Observed No No _(if yes, complete reverse side)__#17 021 #18 023 Obsrvtin at: ay 207Drainage Location Description Yard Storm Drain Yard Storm Drain Observers Name: _ ____NONE NONE Observation Time_____________
Signature:                   L       A-'-                   Were Pollutants Observed                     No                                     No     _
_____ _______Title:_____
(if yes, complete reverse side)__
__Time Discharge Began ____________
                                                                                              #17 021                               #18 023 Obsrvtin at: ay             207Drainage                   Location Description Yard Storm Drain                     Yard Storm Drain Observers Name:           _     ____NONE                                                                                                       NONE Observation Time_____________                                           _____            _______
Signature:
Title:_____             __
___________________Were Pollutants Observed (if yes, complete reverse side) _________
Time Discharge Began                                                                                 ____________
_______________
Signature: ___________________Were Pollutants Observed (if yes, complete reverse side) _________                 _______________
SIDE B FORM 4-MONTHLY VISUAL OBSERVATIONS OF STORM WATER DISCHARGES DATE/TIME OF DRAINAGE AREA DESCRIBE STORM WATER DISCHARGE IDENTIFY AND DESCRIBE SOURCE(S)
 
OF DESCRIBE ANY REVISED OR NEW OBSERVATION DESCRIPTION CHARACTERISTICS POLLUTANTS BMPs AND THEIR DATE OF (From Reverse Side) IMPLEMENTATION Indicate whether storm water discharge is clear, EXAMPLE: Discharge from cloudy, or discolored; causing staining; containing EXAMPLE: Oil sheen caused by oil dripped by material storage Area #2 floating objects or an oil sheen, has odors, etc. trucks in vehicle maintenance area.013 Drainage Sediment observed in storm water. Extremelyheavy rainfall over 20 min Additional silt check dams 03/20/07 period dislodged some sediment and installed in the 013 path.soil.13:50 015 Drainage Sediment observed in storm water. Extremely heavy rainfall over 20 min Additional silt check dams 03/20/07 period dislodged some sediment and installed in the 015 path.soil.13:55 EAM flPM/ /F lAM F- PM/ /: lAM M PM FORM 5-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS EVALUATION DATE: 06 / 04 1 07 INSPECTOR NAME: Trevor Rebel TITLE: Environmental Specialist SIGNATURE:
SIDE B FORM 4-MONTHLY VISUAL OBSERVATIONS OF STORM WATER DISCHARGES DATE/TIME OF         DRAINAGE AREA             DESCRIBE STORM WATER DISCHARGE                 IDENTIFY AND DESCRIBE SOURCE(S) OF           DESCRIBE ANY REVISED OR NEW OBSERVATION             DESCRIPTION                       CHARACTERISTICS                                     POLLUTANTS                       BMPs AND THEIR DATE OF (From Reverse Side)                                                                                                                                   IMPLEMENTATION Indicate whether storm water discharge is clear, EXAMPLE: Discharge from cloudy, or discolored; causing staining; containing EXAMPLE: Oil sheen caused by oil dripped by material storage Area #2 floating objects or an oil sheen, has odors, etc. trucks in vehicle maintenance area.
POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?
013 Drainage             Sediment observed in storm water.             Extremelyheavy rainfall over 20 min         Additional silt check dams 03/20/07                                                                                   period dislodged some sediment and         installed in the 013 path.
NO implementation FULL IMLEMETED Fx1N 0the next two columns of this Turbine Building form ARE ADDITIONAL/REVISED 0 YES BMPs NECESSARY?
soil.
[91 NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES If yes, to either implementation corrective actions and their date(s) of (as identified in your SWPPP) -FULLY IMPLEMENTED?
13:50 015 Drainage             Sediment observed in storm water.             Extremely heavy rainfall over 20 min       Additional silt check dams 03/20/07                                                                                   period dislodged some sediment and         installed in the 015 path.
[91 NO question, complete implementation the next two columns of this Turbine Buttress form ARE ADDITIONAL/REVISED O YES BMPs NECESSARY?
soil.
rx! NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCEIINDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES If yes, to either ipeetto orcieatosadterdt~)o qu esto, ompeither implementation corrective actions and their date(s) of (asE/NUSRA identifie inE your SNWBPPNT EN P)E question, complete ipeetto (as identified in your SWPPP) FULLY IMPLEMENTED?
13:55 EAM flPM
21 NO the next two columns of this U1 and U2 Transformer Yards form ARE ADDITIONAL/REVISED 0 YES BMPs NECESSARY?
    /   /
[K NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additionallrevised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0YES If yes, to either implementation corrective actions and their date(s) of SUCINUTILATVTARA HVANBMsNTBE
FlAM F- PM
]ESquestion, complete implementation (as identified in your SWPPP) FULLY IMPLEMENTED?
    /   /
21 NO the next two columns of this Intake Areas form ARE ADDITIONALIREVISED 0 YES BMPs NECESSARY?
: lAM M PM
N] NO SIDE B FORM 5 (Continued)-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS/ Y(/(AY6~CUMA IIATIAM flArr- flA I AlA i nl7 tM1Q0fTn0 JARMe Tra-nrw Pchgal Till ~ Fn~,irnnmi~nt~iI
~nrn~i~IiQtN ATI IRF: POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0l YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?
I] NO If yes, to either -implementation question, Hazardous Waste Facility complete the next two columns of this form ARE ADDITIONAL/REVISED 0l YES BMPs NECESSARY?
0] NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCEIINDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0l YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?
[91 NO If yes, to either implementation question, Area 10 complete the next two columns of this form ARE ADDITIONAL/REVISED 0l YES BMPs NECESSARY?
IXI NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0l YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?
[M NO If yes, to either implementation question, Sewage Treatment Facility complete the next two columns of this ARE ADDITIONAL/REVISED El YES form BMPs NECESSARY?
[] NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN [E YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?
[] NO If yes, to either implementation question, Sea Water Reverse Osmosis complete the Facili next two lity columns of this ARE ADDITIONAL/REVISED El YES form BMPs NECESSARY?
[] NO FORM 5 (Continued)-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS EVALUATION DATE: 06 / 08 / 07 INSPECTOR NAME: Trevor Rebel TITLE: Environmental Specialist SIGNATURE:
POTENTIAL POLLUTANT
* Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?
0] NO If yes, to either implementation question, Make Up Water Treatment complete the next two Facility columns of this form ARE ADDITIONAL/REVISED 0 YES BMPs NECESSARY?
0] NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?
EM NO If yes, to either implementation question, Waste Water Holding Facility complete the next two columns of this ARE ADDITIONAL/REVISED 0 YES form BMPs NECESSARY?
[K] NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?
0] NO If yes, to either implementation question, Vehicle Maintenance Yard complete the next two columns of this ARE ADDITIONAL/REVISED 0 YES form BMPs NECESSARY?
21 NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additionalfrevised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?
[K NO If yes, to either implementation question, Fleet Vehicle Fueling complete the next two columns of this ARE ADDITIONALIREVISED 0 YES form BMPs NECESSARY?
(9J NO FORM 5 (Continued)-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS EVALUATION DATE: 06 / 04 / 07 INSPECTOR NAME: Trevor Rebel TITLE: Environmental Specialist SIGNATURE:
POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additionallrevised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?
0 NO If yes, to either implementation question, Marine Fueling Facility complete the next two columns of this form ARE ADDITIONAL/REVISED 0 YES BMPs NECESSARY?
IE] NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN [91 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?
0 NO If yes, to either implementation question, Additional BMP have been found necessary Shooting Range complete the to control transport of lead (pb) from the Removal of fine sediment and silt from the next two DCPP Shooting Range. shooting range basin by 9-15-07.columns of this Installation of additional check dams and ARE ADDITIONALIREVISED
[K] YES sediment weirs at shooting range by BMPs NECESSARY?
0 NO 10-1-07.POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN E0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?
CRJ NO If yes, to either implementation question, 500 kV Switch Yard complete the next two columns of this ARE ADDITIONALIREVISED
[I YES form BMPs NECESSARY?
0] NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?
21 NO If yes, to either implementation question, 230 kV Switch Yard complete the next two columns of this ARE ADDITIONAL/REVISED 0 YES form BMPs NECESSARY?
[] NO FORM 5 (Continued)-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS EVALUATION DATE: 06 / 04 / 07 INSPECTOR NAME: Trevor Rebel TITLE: Environmental Specialist SIGNATURE:
POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?
[EX NO If yes, to either implementation question, Remote 12 kV Electrical complete the next two Transformers
-columns of this form ARE ADDITIONAL/REVISED 0 YES BMPs NECESSARY?
[CX NO POTENTIAL POLLUTANT HAVE ANY BMPs NOT BEEN 0 YES Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA FULLY IMPLEMENTED?
IM NO implementation corrective actions and their date(s) of (as identified in your SWPPP) If yes, to either implementation question, complete the next two ARE ADDITIONAL/REVISED
-7 YES columns of this BMPs NECESSARY?
[CX NO form POTENTIAL POLLUTANT HAVE ANY BMPs NOT BEEN 0 YES Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA FULLY IMPLEMENTED?
[CX NO implementation corrective actions and their date(s) of-(as identified in your SWPPP) If yes, to either implementation question, complete the next two ARE ADDITIONAL/REVISED 0] YES columns of this BMPs NECESSARY?
M] NO form POTENTIAL POLLUTANT HAVE ANY BMPs NOT BEEN 0 YES Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA FULLY IMPLEMENTED?
[CX NO implementation corrective actions and their date(s) of (as identified in your SWPPP) If yes, to either implementation question, complete the next two ARE ADDITIONAL/REVISED 0] YES columns of this BMPs NECESSARY?
[C] NO form The following narrative comments provide explanation, where required, for the 2006-2007 Annual Report for Storm Water Discharges Associated with Industrial Activities, Diablo Canyon Power Plant (DCPP), Facility WDID No. 3401018248.
General Comments: 1. Sample and observation times throughout the report are reported in 24-hr clock format.2. This is the first annual storm water report submitted by the Facility to the Regional Water Quality Control Board. Reference PG&E Letter DCL-2006-556 to the Central Coast Region dated November 09, 2006 regarding DCPP implementation of sampling and visual observations in accordance with provisions of the State General Industrial Storm Water Permit (General Permit).Section Specific Comments: Comments are arranged by section and item number.Section E. Number 2. -Did you collect storm water samples from the first storm of the wet season that produced a discharge during scheduled facility operating hours? (Section B.5 of the General Permit).Checked "No": An unexpected storm event on 11-14-06 dropped 0.28 inches of precipitation between 00:30 and 04:00 hours in the morning. This storm generated unexpected rainfall at the plant site outside of facility operation hours in which support staff were available and staged to conduct sampling.
The next qualifying storm event was sampled on 11-26-06.Section E. Number 5. -Was the sample collection or analysis reduced in accordance with Section B.7.d of the General Permit?Checked "Yes": If "YES", attach documentation supporting your determination that two or more drainage areas are substantially identical.
The following text describes each discharge location and sample point. Additionally, substantially identical drainages, not sampled, are described as required by Section E, Number 5: Boat -Marine Refueling Facility Runoff


== Description:==
FORM 5-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS EVALUATION DATE:         06 / 04 1 07    INSPECTOR NAME:    Trevor Rebel          TITLE:      Environmental Specialist        SIGNATURE:
POTENTIAL POLLUTANT                                                                          Describe deficiencies in BMPs or BMP    Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA        HAVE ANY BMPs NOT BEEN    0 YES                                        implementation              corrective actions and their date(s) of (as identified in your SWPPP)      FULLY IMPLEMENTED?            NO                                                                              implementation FULL IMLEMETED Fx1N 0the next two columns of this Turbine Building                                                          form ARE ADDITIONAL/REVISED    0 YES BMPs NECESSARY?          [91 NO POTENTIAL POLLUTANT                                                                          Describe deficiencies in BMPs or BMP    Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA        HAVE ANY BMPs NOT BEEN    0  YES If yes, to either                  implementation              corrective actions and their date(s) of (as identified in your SWPPP)    - FULLY IMPLEMENTED?        [91 NO question, complete                                                            implementation the next two Turbine Buttress                                                          columns of this form ARE ADDITIONAL/REVISED    O YES BMPs NECESSARY?          rx! NO POTENTIAL POLLUTANT                                                                          Describe deficiencies in BMPs or BMP    Describe additional/revised BMPs or (asE/NUSRA identifie inEyour  SNWBPPNT P)E                        EN            qu esto, ompeither                  implementation              corrective actions ipeetto and their date(s) of SOURCEIINDUSTRIAL        ACTIVITY  AREA HAVE ANY BMPs NOT BEEN      0 YES question,    complete If yes, to either                  ipeetto                      orcieatosadterdt~)o (as identified in your SWPPP)      FULLY IMPLEMENTED?        21 NO    the next two columns of this U1 and U2 Transformer Yards                                                form ARE ADDITIONAL/REVISED    0 YES BMPs NECESSARY?          [K NO POTENTIAL POLLUTANT                                                                          Describe deficiencies in BMPs or BMP    Describe additionallrevised BMPs or SOURCE/INDUSTRIALSUCINUTILATVTARA ACTIVITY AREA  HAVE ANY BMPs NOT BEEN HVANBMsNTBE                0YES
                                                                    ]ESquestion,        complete If yes, to either                  implementation                          implementation corrective actions  and their date(s) of (as identified in your SWPPP)      FULLY IMPLEMENTED?        21 NO the next two columns of this Intake Areas                                                              form ARE ADDITIONALIREVISED    0 YES BMPs NECESSARY?          N] NO


Storm water generated near and around the marine refueling facility.Sample Point: Sample valve leading from concrete bermed area to final discharge approximately 10-ft away.003 -Yard Storm Drain
SIDE B FORM 5 (Continued)-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS CUMA IIATIAM flArr-        flA  I AlA i  nl7  tM1Q0fTn0  JARMe  Tra-nrw Pchgal      Till  ~        Fn~,irnnmi~nt~iI ~nrn~i~IiQt      .ql* N ATI IRF:      / Y(/(AY6~
POTENTIAL POLLUTANT                                                                          Describe deficiencies in BMPs or BMP          Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA            HAVE ANY BMPs NOT BEEN        0l YES                                    implementation                    corrective actions and their date(s) of (as identified in your SWPPP)        FULLY IMPLEMENTED?            I]  NO  If yes, to either                                                              -implementation question, Hazardous Waste Facility                                                        complete the next two columns of this form ARE ADDITIONAL/REVISED        0l YES BMPs NECESSARY?              0] NO POTENTIAL POLLUTANT                                                                            Describe deficiencies in BMPs or BMP          Describe additional/revised BMPs or SOURCEIINDUSTRIAL ACTIVITY AREA            HAVE ANY BMPs NOT BEEN      0l YES                                    implementation                    corrective actions and their date(s) of (as identified in your SWPPP)        FULLY IMPLEMENTED?          [91 NO  If yes, to either                                                                implementation question, Area 10                                                                           complete the next two columns of this form ARE ADDITIONAL/REVISED        0l YES BMPs NECESSARY?              IXI NO POTENTIAL POLLUTANT                                                                            Describe deficiencies in BMPs or BMP          Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA            HAVE ANY BMPs NOT BEEN        0l YES                                  implementation                    corrective actions and their date(s) of (as identified in your SWPPP)        FULLY IMPLEMENTED?            [M NO  If yes, to either                                                                implementation question, Sewage Treatment Facility                                                        complete the next two columns of this ARE ADDITIONAL/REVISED        El YES  form BMPs NECESSARY?              [] NO POTENTIAL POLLUTANT                                                                            Describe deficiencies in BMPs or BMP          Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA            HAVE ANY BMPs NOT BEEN        [E YES                                  implementation                    corrective actions and their date(s) of (as identified in your SWPPP)        FULLY IMPLEMENTED?            [] NO  If yes, to either                                                                implementation question, Sea Water Reverse Osmosis                                                        complete the next two Facilility                                                                      columns of this ARE ADDITIONAL/REVISED        El YES  form BMPs NECESSARY?              [] NO


== Description:==
FORM 5 (Continued)-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS EVALUATION DATE:         06 / 08 / 07    INSPECTOR NAME:    Trevor Rebel      TITLE:        Environmental Specialist          SIGNATURE:
POTENTIAL POLLUTANT                                                                      *Describe deficiencies in BMPs or BMP    Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA        HAVE ANY BMPs NOT BEEN        0 YES                                  implementation                corrective actions and their date(s) of (as identified in your SWPPP)    FULLY IMPLEMENTED?            0] NO If yes, to either                                                        implementation question, Make Up Water Treatment                                                    complete the next two Facility                                                                    columns of this form 0 YES ARE ADDITIONAL/REVISED BMPs NECESSARY?              0] NO POTENTIAL POLLUTANT                                                                      Describe deficiencies in BMPs or BMP    Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA        HAVE ANY BMPs NOT BEEN      0 YES                                  implementation                corrective actions and their date(s) of (as identified in your SWPPP)    FULLY IMPLEMENTED?          EM NO  If yes, to either                                                        implementation question, Waste Water Holding Facility                                                complete the next two columns of this 0 YES form ARE ADDITIONAL/REVISED BMPs NECESSARY?              [K] NO POTENTIAL POLLUTANT                                                                      Describe deficiencies in BMPs or BMP    Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA        HAVE ANY BMPs NOT BEEN        0 YES                                  implementation                corrective actions and their date(s) of (as identified in your SWPPP)    FULLY IMPLEMENTED?            0] NO If yes, to either                                                        implementation question, Vehicle Maintenance Yard                                                    complete the next two columns of this ARE ADDITIONAL/REVISED        0 YES form BMPs NECESSARY?              21 NO POTENTIAL POLLUTANT                                                                      Describe deficiencies in BMPs or BMP    Describe additionalfrevised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA        HAVE ANY BMPs NOT BEEN      0 YES                                  implementation                corrective actions and their date(s) of (as identified in your SWPPP)    FULLY IMPLEMENTED?          [K NO  If yes, to either                                                        implementation question, Fleet Vehicle Fueling                                                      complete the next two columns of this 0 YES  form ARE ADDITIONALIREVISED BMPs NECESSARY?            (9J NO


Storm water runoff from areas surrounding the seawater intake structure building.Sample Point: Sampled at 003 culvert inlet as close to point of discharge as practicable.
FORM 5 (Continued)-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS EVALUATION DATE:        06 / 04 / 07    INSPECTOR NAME:    Trevor Rebel        TITLE:        Environmental Specialist            SIGNATURE:
Storm water travels through the 003 culvert before combining with seawater discharge.
POTENTIAL POLLUTANT                                                                        Describe deficiencies in BMPs or BMP            Describe additionallrevised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA        HAVE ANY BMPs NOT BEEN        0 YES                                    implementation                    corrective actions and their date(s) of (as identified in your SWPPP)    FULLY IMPLEMENTED?          0    NO  If yes, to either                                                                implementation question, Marine Fueling Facility                                                    complete the next two columns of this form 0 YES ARE ADDITIONAL/REVISED BMPs NECESSARY?              IE] NO POTENTIAL POLLUTANT                                                                        Describe deficiencies in BMPs or BMP            Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA        HAVE ANY BMPs NOT BEEN      [91 YES                                    implementation                    corrective actions and their date(s) of (as identified in your SWPPP)    FULLY IMPLEMENTED?          0 NO    If yes, to either                                                                implementation question,          Additional BMP have been found necessary Shooting Range                                                              complete the      to control transport of lead (pb) from the    Removal of fine sediment and silt from the next two          DCPP Shooting Range.                          shooting range basin by 9-15-07.
2006-2007 Annual Report Conmnents Section Page I of 5 004 -Yard Storm Drain to Retention Basin
columns of this                                                  Installation of additional check dams and ARE ADDITIONALIREVISED    [K] YES                                                                    sediment weirs at shooting range by BMPs NECESSARY?            0 NO                                                                      10-1-07.
POTENTIAL POLLUTANT                                                                        Describe deficiencies in BMPs or BMP            Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA        HAVE ANY BMPs NOT BEEN        E0 YES                                  implementation                    corrective actions and their date(s) of (as identified in your SWPPP)    FULLY IMPLEMENTED?          CRJNO    If yes, to either                                                                implementation question, 500 kV Switch Yard                                                          complete the next two columns of this
[I YES  form ARE ADDITIONALIREVISED BMPs NECESSARY?            0] NO POTENTIAL POLLUTANT                                                                        Describe deficiencies in BMPs or BMP            Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA        HAVE ANY BMPs NOT BEEN        0 YES                                    implementation                    corrective actions and their date(s) of (as identified in your SWPPP)    FULLY IMPLEMENTED?          21 NO  If yes, to either                                                                implementation question, 230 kV Switch Yard                                                         complete the next two columns of this 0 YES  form ARE ADDITIONAL/REVISED BMPs NECESSARY?              [] NO


== Description:==
FORM 5 (Continued)-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS EVALUATION DATE:       06 / 04 / 07    INSPECTOR NAME:    Trevor Rebel      TITLE:          Environmental Specialist        SIGNATURE:
POTENTIAL POLLUTANT                                                                        Describe deficiencies in BMPs or BMP  Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA        HAVE ANY BMPs NOT BEEN        0 YES                                  implementation              corrective actions and their date(s) of (as identified in your SWPPP)    FULLY IMPLEMENTED?            [EXNO  If yes, to either                                                      implementation question, complete the Remote 12 kV Electrical                                                    next two Transformers                                                            -  columns of this form 0 YES ARE ADDITIONAL/REVISED BMPs NECESSARY?              [CXNO POTENTIAL POLLUTANT            HAVE ANY BMPs NOT BEEN        0 YES                        Describe deficiencies in BMPs or BMP  Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA        FULLY IMPLEMENTED?            IM NO                                  implementation              corrective actions and their date(s) of (as identified in your SWPPP)                                          If yes, to either                                                      implementation question, complete the next two ARE ADDITIONAL/REVISED    -7    YES columns of this BMPs NECESSARY?              [CXNO  form POTENTIAL POLLUTANT            HAVE ANY BMPs NOT BEEN        0 YES                        Describe deficiencies in BMPs or BMP  Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA        FULLY IMPLEMENTED?            [CXNO                                  implementation              corrective actions and their date(s) of
      -(as identified in your SWPPP)                                          If yes, to either                                                      implementation question, complete the next two ARE ADDITIONAL/REVISED        0] YES columns of this BMPs NECESSARY?              M] NO  form POTENTIAL POLLUTANT            HAVE ANY BMPs NOT BEEN        0 YES                        Describe deficiencies in BMPs or BMP  Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA        FULLY IMPLEMENTED?            [CXNO                                  implementation              corrective actions and their date(s) of (as identified in your SWPPP)                                          If yes, to either                                                      implementation question, complete the next two ARE ADDITIONAL/REVISED        0] YES columns of this BMPs NECESSARY?              [C] NO  form


Storm water drains to discharge 004 from the following areas on site: " Southeast side of the Unit 2 Turbine Building," Administration Building," Security Building," Training and Maintenance Shop Buildings," Parking lots 4 and 5," Meteorological tower area," A small area to the west side of the west plant access road," Hazardous Waste Storage Unit," Firewater storage tank," Truck bay, and" Firewater pump building.Sample Point: Sampled at the inlet to the 004 retention basin. When full, the retained water in the de-silting basin overflows a vertical riser then flows through approximately 100-ft of underground conduit to discharge.
The following narrative comments provide explanation, where required, for the 2006-2007 Annual Report for Storm Water Discharges Associated with Industrial Activities, Diablo Canyon Power Plant (DCPP),
005 -Yard Storm Drain
Facility WDID No. 3401018248.
General Comments:
: 1. Sample and observation times throughout the report are reported in 24-hr clock format.
: 2. This is the first annual storm water report submitted by the Facility to the Regional Water Quality Control Board. Reference PG&E Letter DCL-2006-556 to the Central Coast Region dated November 09, 2006 regarding DCPP implementation of sampling and visual observations in accordance with provisions of the State General Industrial Storm Water Permit (General Permit).
Section Specific Comments:
Comments are arranged by section and item number.
Section E. Number 2. - Did you collect storm water samples from the first storm of the wet season that produced a discharge during scheduled facility operating hours? (Section B.5 of the General Permit).
Checked "No":
An unexpected storm event on 11-14-06 dropped 0.28 inches of precipitation between 00:30 and 04:00 hours in the morning. This storm generated unexpected rainfall at the plant site outside of facility operation hours in which support staff were available and staged to conduct sampling. The next qualifying storm event was sampled on 11-26-06.
Section E. Number 5. - Was the sample collection or analysis reduced in accordance with Section B.7.d of the General Permit?
Checked "Yes":
If "YES", attach documentation supporting your determination that two or more drainage areas are substantially identical.
The following text describes each discharge location and sample point. Additionally, substantially identical drainages, not sampled, are described as required by Section E, Number 5:
Boat - Marine Refueling Facility Runoff


== Description:==
==
Description:==
Storm water generated near and around the marine refueling facility.
Sample Point: Sample valve leading from concrete bermed area to final discharge approximately 10-ft away.
003 - Yard Storm Drain


Storm Water drains to discharge 005 from the following areas on site: " Plant Yard on the Unit 2 side of Radioactive Waste Building" West side of the Turbine Building" Hazardous Materials Warehouse* Construction Offices" Parking lots 2, 3, 6, 7, and 8" Cold Machine Shop" Seawater Reverse Osmosis Facility" Biological Laboratory (not in service)" Fabrication Shop Sample Point: Located in large concrete drainage canal downstream of a de-silting weir. Water flowing past the sample point travels another 600-ft of concrete surface before entering a 4-ft diameter conduit leading to a final discharge location with limited access.006 -Yard Storm Drain
==
Description:==
Storm water runoff from areas surrounding the seawater intake structure building.
Sample Point: Sampled at 003 culvert inlet as close to point of discharge as practicable. Storm water travels through the 003 culvert before combining with seawater discharge.
2006-2007 Annual Report Conmnents Section                                                              Page I of 5


== Description:==
004 - Yard Storm Drain to Retention Basin


Storm water drains to discharge 006 from the following areas on site: " Pacific Ocean side of the ridge Southeast of the power plant." Warehouse B" Shooting Range" Outdoor Abrasive Blast Facility" Fleet Vehicle Fueling Facility" Parking Lot #1 Sample Point 006 at Discharge:
==
Sampled from the culvert outlet as it enters a v-ditch. Storm water travels another 75 feet to discharge.
Description:==
Sample Point 006 Range Immediate Outlet: Sampled from culvert outlet immediately downstream of Diablo Canyon Shooting Range. Past the sampling point, storm water traverses 25-ft of concrete v-ditch, combining with upstream flows, before entering another underground culvert for 600-ft, then combination with other 006 pathway flows listed above. Combined storm water then travels approximately 75-ft to outfall. This pathway undergoes significant dilution as all 006 flows combine prior to discharge from the plant site.007 -Storm Water Runoff
Storm water drains to discharge 004 from the following areas on site:
" Southeast side of the Unit 2 Turbine Building,
" Administration Building,
" Security Building,
" Training and Maintenance Shop Buildings,
" Parking lots 4 and 5,
" Meteorological tower area,
" A small area to the west side of the west plant access road,
" Hazardous Waste Storage Unit,
" Firewater storage tank,
" Truck bay, and
" Firewater pump building.
Sample Point: Sampled at the inlet to the 004 retention basin. When full, the retained water in the de-silting basin overflows a vertical riser then flows through approximately 100-ft of underground conduit to discharge.
005 - Yard Storm Drain


== Description:==
==
Description:==
Storm Water drains to discharge 005 from the following areas on site:
" Plant Yard on the Unit 2 side of Radioactive Waste Building
" West side of the Turbine Building
" Hazardous Materials Warehouse
* Construction Offices
" Parking lots 2, 3, 6, 7, and 8
" Cold Machine Shop
" Seawater Reverse Osmosis Facility
" Biological Laboratory (not in service)
" Fabrication Shop Sample Point: Located in large concrete drainage canal downstream of a de-silting weir. Water flowing past the sample point travels another 600-ft of concrete surface before entering a 4-ft diameter conduit leading to a final discharge location with limited access.
006 - Yard Storm Drain


Storm water from watershed South and East of the facility.
==
There are no industrial activities present in this path. Water discharges to an inaccessible rip-rap field west of the facility.Sampling:
Description:==
This point is not sampled. The point is not downstream of industrial activity and the underground conduitdischarge location is not safely accessible.
Storm water drains to discharge 006 from the following areas on site:
2006-2007 Annual Report Cornments Section Page 2 of-5 008 -Yard Storm Drain
" Pacific Ocean side of the ridge Southeast of the power plant.
" Warehouse B
" Shooting Range
" Outdoor Abrasive Blast Facility
" Fleet Vehicle Fueling Facility
" Parking Lot #1 Sample Point 006 at Discharge: Sampled from the culvert outlet as it enters a v-ditch. Storm water travels another 75 feet to discharge.
Sample Point 006 Range Immediate Outlet: Sampled from culvert outlet immediately downstream of Diablo Canyon Shooting Range. Past the sampling point, storm water traverses 25-ft of concrete v-ditch, combining with upstream flows, before entering another underground culvert for 600-ft, then combination with other 006 pathway flows listed above. Combined storm water then travels approximately 75-ft to outfall. This pathway undergoes significant dilution as all 006 flows combine prior to discharge from the plant site.
007 - Storm Water Runoff


== Description:==
==
Description:==
Storm water from watershed South and East of the facility. There are no industrial activities present in this path. Water discharges to an inaccessible rip-rap field west of the facility.
Sampling: This point is not sampled. The point is not downstream of industrial activity and the underground conduitdischarge location is not safely accessible.
2006-2007 Annual Report Cornments Section                                                              Page 2 of-5


Storm water yard drains from the following areas: " Northwest side of the Turbine Building" Technical Maintenance Building" Watershed on the North Side of Diablo Creek to the Northwest of the power plant.Sample Point: Sample is taken from culvert inlet directly above discharge point. Note, this area has additional security requirements for access that may result in delayed sample times.009 -Yard Storm Drain
008 - Yard Storm Drain


== Description:==
==
Description:==
Storm water yard drains from the following areas:
" Northwest side of the Turbine Building
" Technical Maintenance Building
" Watershed on the North Side of Diablo Creek to the Northwest of the power plant.
Sample Point: Sample is taken from culvert inlet directly above discharge point. Note, this area has additional security requirements for access that may result in delayed sample times.
009 - Yard Storm Drain


==
Description:==
Storm water from the north and northeast side of the Unit I Auxiliary, Containment, Fuel Handling, and Turbine buildings drains to the north side of the yard to discharge.
Storm water from the north and northeast side of the Unit I Auxiliary, Containment, Fuel Handling, and Turbine buildings drains to the north side of the yard to discharge.
Sample Point: Sample is taken from an accessible sump nearest the point of discharge.
Sample Point: Sample is taken from an accessible sump nearest the point of discharge. From the sump, storm water then flows through an underground culvert 300-ft to a discharge location that is not safely accessible during storm events.
From the sump, storm water then flows through an underground culvert 300-ft to a discharge location that is not safely accessible during storm events.010 -Yard Storm Drain
010 - Yard Storm Drain
 
== Description:==


==
Description:==
Runoff from the hillside betweenDCPP and the Raw Water Reservoirs drains into a concrete culvert that is routed to the north along steep inaccessible terrain prior to discharge.
Runoff from the hillside betweenDCPP and the Raw Water Reservoirs drains into a concrete culvert that is routed to the north along steep inaccessible terrain prior to discharge.
Sample Point: This point is not sampled. Storm water collected from discharge 013 is substantially identical to this discharge point.011 -Yard Storm Drain
Sample Point: This point is not sampled. Storm water collected from discharge 013 is substantially identical to this discharge point.
011 - Yard Storm Drain


== Description:==
==
 
Description:==
Runoff from Diablo Creek Road and the North sides of the 230 kV and 500 kV switch yards.Sample Point: Sample is taken at the inlet of an accessible drop in culvert nearest the point of discharge.
Runoff from Diablo Creek Road and the North sides of the 230 kV and 500 kV switch yards.
Storm water then travels another 500-ft across a concrete surface to a steep metal conduit leading to the discharge point. The final discharge point is not safely accessible during a storm event and is in an area subject to restricted security access.012 -Yard Storm Drain
Sample Point: Sample is taken at the inlet of an accessible drop in culvert nearest the point of discharge. Storm water then travels another 500-ft across a concrete surface to a steep metal conduit leading to the discharge point. The final discharge point is not safely accessible during a storm event and is in an area subject to restricted security access.
 
012 - Yard Storm Drain
== Description:==


==
Description:==
Runoff from the area between the 230 KV Switchyard and the 500 KV Switchyard drains to a vertical shaft leading to an underground culvert and discharge.
Runoff from the area between the 230 KV Switchyard and the 500 KV Switchyard drains to a vertical shaft leading to an underground culvert and discharge.
Sample Point: This point is not sampled. Storm water sampled from discharge 011 and 013 are substantially identical to this discharge point.013 -Yard Storm Drain
Sample Point: This point is not sampled. Storm water sampled from discharge 011 and 013 are substantially identical to this discharge point.
 
013 - Yard Storm Drain
== Description:==
-Storm water drains to 013 from the following areas: 0 Raw Water Reservoirs 0 Makeup Water Treatment Facility 0 230 kV Switchyard Sample Point: Sample taken from a sample well in the 013 concrete V-ditch. Water flows an additional 200-ft before entering an inaccessible metal conduit to discharge.
014 -Storm Water Runoff


== Description:==
==
Description:==
-Storm water drains to 013 from the following areas:
0 Raw Water Reservoirs 0 Makeup Water Treatment Facility 0 230 kV Switchyard Sample Point: Sample taken from a sample well in the 013 concrete V-ditch. Water flows an additional 200-ft before entering an inaccessible metal conduit to discharge.
014 - Storm Water Runoff


==
Description:==
Storm water runoff from lay down areas and the hillside south and east of the 500 KV Switchyard is collected in a drainage ditch and routed to discharge.
Storm water runoff from lay down areas and the hillside south and east of the 500 KV Switchyard is collected in a drainage ditch and routed to discharge.
Sample Point: This point is not sampled. Storm water sampled from discharge points 013 and 015 are substantially identical to this discharge point.015 -Yard Storm Drain
Sample Point: This point is not sampled. Storm water sampled from discharge points 013 and 015 are substantially identical to this discharge point.
015 - Yard Storm Drain


== Description:==
==
Description:==
Storm water runoff from the area around the temporary auto facilities and adjacent roadway is collected in a drainage ditch and discharged.
Sample Point: Sample taken from drop in culvert downstream of automotive facility. After the sampling point, water flows 100-ft through an inaccessible culvert to rip-rap and discharge.
2006-2007 Annual Report Comments Section                                                                Page 3 of 5


Storm water runoff from the area around the temporary auto facilities and adjacent roadway is collected in a drainage ditch and discharged.
018 - Yard Storm Drain
Sample Point: Sample taken from drop in culvert downstream of automotive facility.
After the sampling point, water flows 100-ft through an inaccessible culvert to rip-rap and discharge.
2006-2007 Annual Report Comments Section Page 3 of 5 018 -Yard Storm Drain


== Description:==
== Description:==
Storm water runoff from the east side of the Intake Structure building.
Sample Point: This point is not sampled. Storm water sampled from discharge points 003 and 023 are substantially identical to this discharge point.
020 - Intake Deck Storm Drain
==
Description:==
Storm water collected directly in front of seawater traveling screen housings drains that lead to the circulating water pump fore bays through open gratings.
Sample Point: This point is not sampled. Storm water sampled from discharge points 003 and 023 are substantially identical to this discharge point.
021 - Yard Storm Drain


Storm water runoff from the east side of the Intake Structure building.Sample Point: This point is not sampled. Storm water sampled from discharge points 003 and 023 are substantially identical to this discharge point.020 -Intake Deck Storm Drain
==
Description:==
Screen wash over spray drains and storm water from the east side of the traveling screen deck.
Sample Point: This point is not sampled. Storm water sampled from discharge points 003 and 023 are substantially identical to this discharge point.
023 - Yard Storm Drain


== Description:==
==
Description:==
Storm water generated on the North and East sides of Intake Structure Building and Intake roadways is drained through discharge point 023.
Sample Point: Sampled at the drop in box culvert inlet approximately 10-ft prior to discharge.
Section E. Number 6. - Were all samples collected during the first hour of discharge?
Checked "No":
First storm event sample point 009 yard storm drain discharge started at 11-26-06, 20:30 hrs. The sample was collected at 22:30 hrs due to safety and security concerns for personnel performing collection during night time hours.
Section E. Number 9. - Did you collect and analyze samples of temporarily stored or contained storm water discharges from two storm events?
Checked, "Yes", with the following clarifying information:
Sample point 004 for both the first and second storm events was sampled as a pre-release. The 004 discharge path first fills a settling basin before flowing through a riser pipe to discharge.
Section E. Number 11. - Discharge Location and Sample Point Reference narrative comments for Section E. Number 5, above, for a description of discharge and sample point information.
Section F. Number 1.b. - Indicate whether you visually observed all authorized non-storm water discharges and their sources during the quarters when they were discharged. Attach explanation for any "NO" answers.
During the July - September quarter no inspections for authorized storm water discharges were made. In accordance with PG&E Letter DCL-2006-556 dated November 09, 2006 addressed to the California Regional Water Quality Control Board Central Coast Region, monitoring for industrial site storm water discharges in accordance with General Permit provisions were initiated during the October - December quarter.
2006-2007 Annoual Report Comments Section                                                              Page 4 of 5


Storm water collected directly in front of seawater traveling screen housings drains that lead to the circulating water pump fore bays through open gratings.Sample Point: This point is not sampled. Storm water sampled from discharge points 003 and 023 are substantially identical to this discharge point.021 -Yard Storm Drain
Section F. Number 2.a. - Indicate whether you visually observed all drainage areas to detect the presence of unauthorized non-storm water discharges and their sources. Attach explanation for any "NO" answers.
During the July - September quarter no inspections for authorized storm water discharges were made. In accordance with PG&E Letter DCL-2006-556 dated November 09, 2006 addressed to the California Regional Water Quality Control Board Central Coast Region, monitoring for industrial site storm water discharges in accordance with General Permit provisions were initiated during the October - December quarter.
Section G. Number 1. - Monthly Wet Season Visual Observations Attach an explanation for any "NO" answer months.
October 2006 - No qualifying storm events producing discharge to waters of the state during daylight hours. A total of 0.07 inches of precipitation was received at the plant site on 10-13-06, however, the event did not produce sufficient runoff, and was not in daylight hours.
November 2006 - An unexpected storm on 11-14-06 dropped 0.28 inches of precipitation between 00:30 and 04:00 hours in the morning. This storm was unexpected and did not occur during daylight hours.
April 2007 - Several discharge observation points exceeded the 1-hour requirement. This was due to the storm arriving in evening hours. Darkness arrived before sufficient runoff occurred at these locations as listed on Form-4 of the Annual Report. Observations were performed as soon as practical during daylight hours the following morning.
May 2007 - Insufficient precipitation for May 2007. Rainfall/drizzle received on 05-04-07 produced only 0.03 inches of precipitation as measured at the Diablo Canyon Ocean Lab. The amount of precipitation, 0.03 inches, was insufficient to produce runoff.
2006-2007 Annual Repori Conmiments Section                                                              Page 5 of 5


== Description:==
CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-o\v/ed BIusiness Enterprise 141 SUBURBAN ROAD, SUITE C-5
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838 9 FAX (805) 545-0107 Page 1 Trevor Rebel                                              Log Number:          06-C15462 Diablo Canyon Power Plant                                Order:              N7120 P.O. Box 56                                              Project:            Stormwater Avila Beach, CA 93424                                    Received:            11/27/06 Printed:            12/06/06
                                                                                                                    &NVOPC      &#xfd;i REPORT OF ANALYTICAL RESULTS Sampled Sample Description                   Sampled By                      Date @ Time            Matrix 2006-Boat-1 (Boat Refuel)            Trevor Rebel                      11/26/06@20:30              Aqueous AnaLyte                                Result        DLR        Dilution          Units          Method    Date      Date  Batch Factor                                  Analyzed  Prepared Electrical Conductance                480              1              1          umhos/cm      SM 2510  11/27/06              65 I"& Grease                        Not Detected        5              1          mg/L        EPA  1664  12/05/06            272 7.6            0.1            1          pH units    EPA  150.1 11/27/06              65 Suspended Solids                      390              5              1          mg/L        EPA  160.2 11/29/06            174 Iron                                    17              0.1            1          mg/L        EPA  200.7 12/05/06  12/04/06  261 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0  PRINTED ON RECYCLED PAPER


Screen wash over spray drains and storm water from the east side of the traveling screen deck.Sample Point: This point is not sampled. Storm water sampled from discharge points 003 and 023 are substantially identical to this discharge point.023 -Yard Storm Drain
CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-ownecI BLISkiess Enterprise 141 SUBURBAN ROAD, SUITE C-5
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838
* FAX (805) 545-0107 Page 1 Trevor Rebel                                                                                                    Log Number:                    06-C15461 Diablo Canyon Power Plant                                                                                        Order:                          N7119 P.O. Box 56                                                                                                      Project:                        Stormwater Avila Beach, CA, 93424                                                                                          Received:                      11/27/06 Printed:                       12106106 REPORT OF ANALYTICAL RESULTS
                                                                                                                                                                                        ,    ENV. oPa.     )
Sampled SampLe Descriptifn                                                        Sampled By                                                  Date @ Time                        Matrix 2006-ge-1 (NW Intake Btdg)                                                Trevor Rebel                                                11/26/06@20:22                            Aqueous
= --------------------
  = = == = =                == = = = = = = =                  ===
Anatyte                                                                      ResuLt                        DLR              Dilution                    Units                Method    Date    Date  Batch Factor                                                    AnaLyzed Prepared
  - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - -. - . - - - - -  - - - - - - -. - - -.  - - - - - -.  - - - . - - - - - - - - .- - -  .- - - - - -
Electrical Conductance                                                3,400                                  1                        1                umhos/cm            SM 2510  11/27/06            65 t & Grease                                                                  8                            5                        1                mg/L              EPA 1664    12!05/06            272 6.9                          0.1                                        pH units          EPA 150.1  11/27/06            65 Suspended Solids                                                          580                                5                        1                mg/L              EPA 160.2  11/29/06            174 Iron                                                                          23                              0.1                                        mg/L              EPA 200.7  12/05/06 12/04/06  261 DLR = Detection Limit for Reporting.                                    Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0      PRINTED ON RECYCLED PAPER


== Description:==
CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C SAN LUIS OBISPO, CA 93401        * (805) 545-9838
* FAX (805) 545-0107 Page 1 Trevor Rebel                                                Log Number:        06-C15460 Diablo Canyon Power Plant                                  Order:            N7118 P.O. Box 56                                                  Project:          Stormwater Avila Beach, CA 93424                                      Received:          11/27/06 Printed:          12/05/06 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                     Sampled By                        Date @ Time          Matrix 2006-004-1 (Settle Basin)              Trevor Rebel                      11126/06@20:43              Aqueous Analyte                                  Result        DLR        Dilution        Units            Method          Date        Date  Batch Factor                                        Analyzed    Prepared Electrical Conductance                1,000                1              1        umhos/cm        SM 2510      11/27/06                65
    & Grease                        Not Detected          5              1        mg/L          EPA 1664      11/30/06                181 7.3            0.1            1        pH units      EPA 150.1      11/27/06                65 Suspended Solids                        250                5              1        mg/L          EPA 160.2      11/29/06                174 Iron                                      11              0.1            1        mg/L          EPA 200.7      12/05/06    12/04/06  261 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng
()  PRINTED ON RECYCLED PAPER


Storm water generated on the North and East sides of Intake Structure Building and Intake roadways is drained through discharge point 023.Sample Point: Sampled at the drop in box culvert inlet approximately 10-ft prior to discharge.
CREEK ENVIRONMENTAL LABORATORIES, INC.
Section E. Number 6. -Were all samples collected during the first hour of discharge?
A Minority-SOSned BuLSiness 3Enrpise8 141 SUBURBAN ROAD, SUITE C-5
Checked "No": First storm event sample point 009 yard storm drain discharge started at 11-26-06, 20:30 hrs. The sample was collected at 22:30 hrs due to safety and security concerns for personnel performing collection during night time hours.Section E. Number 9. -Did you collect and analyze samples of temporarily stored or contained storm water discharges from two storm events?Checked, "Yes", with the following clarifying information:
Sample point 004 for both the first and second storm events was sampled as a pre-release.
The 004 discharge path first fills a settling basin before flowing through a riser pipe to discharge.
Section E. Number 11. -Discharge Location and Sample Point Reference narrative comments for Section E. Number 5, above, for a description of discharge and sample point information.
Section F. Number 1.b. -Indicate whether you visually observed all authorized non-storm water discharges and their sources during the quarters when they were discharged.
Attach explanation for any "NO" answers.During the July -September quarter no inspections for authorized storm water discharges were made. In accordance with PG&E Letter DCL-2006-556 dated November 09, 2006 addressed to the California Regional Water Quality Control Board Central Coast Region, monitoring for industrial site storm water discharges in accordance with General Permit provisions were initiated during the October -December quarter.2006-2007 Annoual Report Comments Section Page 4 of 5 Section F. Number 2.a. -Indicate whether you visually observed all drainage areas to detect the presence of unauthorized non-storm water discharges and their sources. Attach explanation for any "NO" answers.During the July -September quarter no inspections for authorized storm water discharges were made. In accordance with PG&E Letter DCL-2006-556 dated November 09, 2006 addressed to the California Regional Water Quality Control Board Central Coast Region, monitoring for industrial site storm water discharges in accordance with General Permit provisions were initiated during the October -December quarter.Section G. Number 1. -Monthly Wet Season Visual Observations Attach an explanation for any "NO" answer months.October 2006 -No qualifying storm events producing discharge to waters of the state during daylight hours. A total of 0.07 inches of precipitation was received at the plant site on 10-13-06, however, the event did not produce sufficient runoff, and was not in daylight hours.November 2006 -An unexpected storm on 11-14-06 dropped 0.28 inches of precipitation between 00:30 and 04:00 hours in the morning. This storm was unexpected and did not occur during daylight hours.April 2007 -Several discharge observation points exceeded the 1-hour requirement.
This was due to the storm arriving in evening hours. Darkness arrived before sufficient runoff occurred at these locations as listed on Form-4 of the Annual Report. Observations were performed as soon as practical during daylight hours the following morning.May 2007 -Insufficient precipitation for May 2007. Rainfall/drizzle received on 05-04-07 produced only 0.03 inches of precipitation as measured at the Diablo Canyon Ocean Lab. The amount of precipitation, 0.03 inches, was insufficient to produce runoff.2006-2007 Annual Repori Conmiments Section Page 5 of 5 CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-o\v/ed BIusiness Enterprise 141 SUBURBAN ROAD, SUITE C-5
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838 9 FAX (805) 545-0107 Page 1 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 06-C15462 N7120 Stormwater 11/27/06 12/06/06&NVOP C &#xfd;i REPORT OF ANALYTICAL RESULTS Sample Description 2006-Boat-1 (Boat Refuel)AnaLyte Sampled Sampled By Date @ Time Matrix Trevor Rebel 11/26/06@20:30 Aqueous Result DLR Dilution Units Method Date Factor Analyzed 480 1 1 umhos/cm SM 2510 11/27/06 Not Detected 5 1 mg/L EPA 1664 12/05/06 7.6 0.1 1 pH units EPA 150.1 11/27/06 390 5 1 mg/L EPA 160.2 11/29/06 17 0.1 1 mg/L EPA 200.7 12/05/06 Date Batch Prepared Electrical Conductance I" & Grease Suspended Solids Iron 65 272 65 174 261 12/04/06 DLR = Detection Limit for Reporting.
Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-ownecI BLISkiess Enterprise 141 SUBURBAN ROAD, SUITE C-5
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838
* FAX (805) 545-0107 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA, 93424 Log Number: Order: Project: Received: Printed: 06-C15461 N7119 Stormwater 11/27/06 12106106 Page 1 , E NV. oPa. )REPORT OF ANALYTICAL RESULTS SampLe Descriptifn Sampled By 2006-ge-1 (NW Intake Btdg) Trevor Rebel= = = == = = == = = = = = = = === --------------------
* FAX (805) 545-0107 Page 1 Trevor Rebel                                                   Log Number:          06-C15464 Diablo Canyon Power Plant                                     Order:              N7122 P.O. Box 56                                                 Project:            Stormwater Avila Beach,     CA   93424                                 Received:           11/27/06 Printed:             12/06/06
Sampled Date @ Time 11/26/06@20:22 Matrix Aqueous Anatyte ResuLt DLR Dilution Units Factor----------------- -----------------. -.------------. ---. ------. ---.--------.- --.- -----Electrical Conductance t & Grease 3,400 8 6.9 580 23 1 5 0.1 5 0.1 1 1 1 umhos/cm mg/L pH units mg/L mg/L Method SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 Date AnaLyzed 11/27/06 12!05/06 11/27/06 11/29/06 12/05/06 Date Batch Prepared 65 272 65 174 Suspended Solids Iron 12/04/06 261 DLR = Detection Limit for Reporting.
:*-          C REPORT OF ANALYTICAL               RESULTS                     L '....    .
Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 -SAN LUIS OBISPO, CA 93401 * (805) 545-9838
Sampled Sample Description                      Sampled By                         Date @ Time            Matrix 2006-005-1 (005 Area 10 Ditch)         Trevor Rebel                       11/26/06@21:00              Aqueous Anatyte                                 Result          DLR         Dilution           Units           Method        Date    Date  Batch Factor                                       Analyzed  Prepared Electrical Conductance                 2,100                1                           umhos/cm       SM 2510      11/27/06            65 L & Grease                              10                5                          mg/L         EPA 1664       12/05/06           272
* FAX (805) 545-0107 Page 1 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 06-C15460 N7118 Stormwater 11/27/06 12/05/06 REPORT OF ANALYTICAL RESULTS Sample Description 2006-004-1 (Settle Basin)Analyte Sampled By Trevor Rebel Result Sampled Date @ Time 11126/06@20:43 DLR Dilution Units Factor Matrix Aqueous Method Electrical Conductance
  .1                                         9.1             0.1             1           pH units     EPA 150.1     11127106            65 Suspended Solids                        660                5               1           mg/L         EPA 160.2     11/29/06            174 Iron                                      14                0.1             1           mg/L         EPA 200.7     12/05/06 12/04/06   261
& Grease Suspended Solids Iron 1,000 1 1 umhos/cm SM 2510 Not Detected 5 1 mg/L EPA 1664 7.3 0.1 1 pH units EPA 150.1 250 5 1 mg/L EPA 160.2 11 0.1 1 mg/L EPA 200.7 Date Analyzed 11/27/06 11/30/06 11/27/06 11/29/06 12/05/06 Date Batch Prepared 65 181 65 174 12/04/06 261 DLR = Detection Limit for Reporting.
-------       ......-----------------------------------.----------.--------------
Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng () PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-SOSned BuLSiness 3Enrpise8 141 SUBURBAN ROAD, SUITE C-5
DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng
* FAX (805) 545-0107 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 06-C15464 N7122 Stormwater 11/27/06 12/06/06 Page 1:* -C L '.... .REPORT OF ANALYTICAL RESULTS Sample Description 2006-005-1 (005 Area 10 Ditch)Anatyte Sampled By Trevor Rebel Sampled Date @ Time 11/26/06@21:00 Matrix Aqueous Result DLR Dilution Factor Units Method Date Date Analyzed Prepared Batch Electrical Conductance L & Grease 2,100 10 1 5.1 9.1 0.1 1 Suspended Solids 660 5 1 Iron 14 0.1 1------- ......-----------------------------------.----------.--------------
( PRINTED ON RECYCLED PAPER
DLR = Detection Limit for Reporting.
Results of "Not Detected" are below DLR.umhos/cm mg/L pH units mg/L mg/L SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 11/27/06 12/05/06 11127106 11/29/06 12/05/06 65 272 65 174 12/04/06 261 CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng ( PRINTED ON RECYCLED PAPER
* CREEK ENVIRONMENTAL LABORATORIES,_INC.
* CREEK ENVIRONMENTAL LABORATORIES,_INC.
A Mino-ity-owned Business Enteuprise 141 SUBURBAN ROAD, SUITE C-5
A Mino-ity-owned Business Enteuprise 141 SUBURBAN ROAD, SUITE C-5
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838
* SAN LUIS OBISPO, CA 93401                     * (805) 545-9838
* FAX (805) 545-0107 Page 1 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 06-C15463 N7121 Stormwater 11/27/06 12/06/06~NV.OPS.REPORT OF ANALYTICAL RESULTS Sampled Date @ Time Sample Description 2006-006B-I (006 Storm Grate in Lot #1)Anatyte Sampled By Trevor Rebel----------
* FAX (805) 545-0107 Page 1 Trevor Rebel                                                                                               Log Number:                    06-C15463 Diablo Canyon Power Plant                                                                                   Order:                        N7121 P.O. Box 56                                                                                               Project:                      Stormwater Avila Beach, CA                                 93424                                                       Received:                       11/27/06 Printed:                      12/06/06 REPORT OF ANALYTICAL RESULTS                                                                    ~NV.OPS.
== == == == ==Matrix 11/26/06@21:10 ution Units Aqueous Result DLR DiLu Method Date Date Analyzed Prepared Batch Factor----------------------------------. -.------. ---. -. ---. ------. ---.--------.- --.- -----ectricat Conductance.L & Grease pH Suspended Solids Iron 170 Not Detected 9.3 57 2.1 1 5 0.1 5 0.1 1 1 1 1 umhos/cm mg/L pH units mg/L mg/L SM 2510. 11/27/06 EPA 1664 12/05/06 EPA 150.1 11/27/06 EPA 160.2 11/29/06 EPA 200.7 12/05/06 12/04/06----------------..----------.----------
Sampled Sample Description                                                        Sampled By                                          Date @ Time                       Matrix 2006-006B-I (006 Storm Grate in                                           Trevor Rebel                                          11/26/06@21:10                        Aqueous Lot #1)
65 272 65 174 261 DLR = Detection Limit for Reporting.
                                                                                                  == == ==
Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng% PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minoirity-owneod I3usiness Enterrkie 61M -" 14i SUBURBAN ROAD, SUITE C-5
                                                                                            ----------           == ==
* SAN LUIS OBISPO, CA 93401 e (805) 545-9838
Anatyte                                                                      Result                  DLR            DiLu ution                  Units              Method         Date     Date   Batch Factor                                                      Analyzed   Prepared
* FAX (805) 545-0107 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 06-C15466 N7124 Stormwater 11/27/06 12/06/06 Page 1 S .. ... .... .L LeNV._OP$
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -. - . - - - - - -. - - -. -. - - -. - - - - - -. - - - . - - - - - - - - .-- - .-- - - - -
__REPORT OF ANALYTICAL RESULTS Sample Description 2006-006A-1 (Shoot Range Eff)AnaLyte Sampled Sampled By Date @ Time Matrix Trevor Rebel 11/26/06@21:56 Aqueous Result DLR Dilution Factor Units Method Date Date Batch Analyzed Prepared Electrical Conductance L & Grease 150 1 1 umhos/cm SM 2510 11/27/06 65 Not Detected 5 1 mo/L EPA 1664 12105/06 272 Suspended Solids Iron Lead 8.4 100 2.7 0.14 0.1 5 0.1 0.02 1 1 1 1 pH units mg/L mg/L mg/L EPA 150.1 EPA 160.2 EPA 200.7 EPA 200.7 11/27/06 11/29/06 12/05/06 12/05/06 65 174 12/04/06 261 12/04/06 262 DLR = Detection Limit for Reporting.
ectricat Conductance                                                     170                          1                        1              umhos/cm          SM 2510.        11/27/06              65
Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER C CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-ovnecd Business Eniterprise 141 SUBURBAN ROAD, SUITE C-5 -SAN LUIS OBISPO, CA 93401 -(805) 545-9838
  .L& Grease                                                         Not Detected                       5                        1               mg/L            EPA  1664      12/05/06              272 pH                                                                              9.3                      0.1                     1               pH units        EPA  150.1     11/27/06              65 Suspended Solids                                                              57                        5                        1              mg/L             EPA  160.2      11/29/06             174 Iron                                                                            2.1                     0.1                                      mg/L              EPA 200.7     12/05/06   12/04/06   261
* FAX (805) 545-0107 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 06-C15455 N7113 Stormwater 11/27/06 12/05/06* Pagel1 L~tiNV. OPS.REPORT OF ANALYTICAL RESULTS Sample Description 2006-008-1 (008-Diab Creek)Analyte Sampled By Trevor Rebel Sampled Date @ Time 11/26/06@21:39 Matrix Aqueous Result DLR Dilution Factor Units Method Date Date Analyzed Prepared Batch Electrical Conductance
                                                                                                                                                                ----------------..----------.----------
.& Grease.I Suspended Solids Iron 940 Not Detected 6.8 18 1.2 1 5 0.1 5 0.02 1 1 1 1 1 umhos/cm mg/L pH units mg/L mg/L SM 2510 EPA 1664 11/27/06 11/30/06 65 181 EPA 150.1 11/27/06 65 EPA 160.2 11/29/06 174 EPA 200.7 12/05/06 12/04/06 262----------------.-.--------.--.--------.--.
DLR = Detection Limit for Reporting.                                   Results of "Not Detected" are below DLR.
DLR = Detection Limit for Reporting.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng
Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng PRINTED ON.RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A 4 UiAnority-o\\ U -SL Fsoness Enter prise 141 SUBURBAN ROAD, SUITE C-5 -SAN LUIS OBISPO, CA 93401 * (805) 545-9838
                                                                                                  % PRINTED ON RECYCLED PAPER
* FAX (805) 545-0107 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 06-C15458 N7116 Stormwater 11/27/06 12/05/06 Page 1 FNV. OPS.REPORT OF ANALYTICAL RESULTS Sample Description 2006-009-1 (009-N Protected)
 
AnaLyte Sampled By Trevor Rebel Sampled Date @ Time 11/26/06@22:30 Matrix Aqueous Result DLR Dilution Units Method Factor................-----------------  
CREEK ENVIRONMENTAL LABORATORIES, INC.
----------------.----------.------------.-------  
A Minoirity-owneodI3usiness Enterrkie 61M     -"   14i SUBURBAN ROAD, SUITE C-5
-----------------
* SAN LUIS OBISPO, CA 93401           e (805) 545-9838
Electrical Conductance 450 1 1 umhos/cm SM 2510& Grease Not Detected 5 1 mg/L EPA 1664.1 7.0 0.1 1 pH units EPA 150.1 Suspended Solids 11 5 1 mg/L EPA 160.2 Iron 0.80 0.02 1 mg/L EPA 200.7.....-----------.-------------.---------------------------.------------.--------------------------
* FAX (805) 545-0107 Page 1 Trevor Rebel                                                 Log Number:          06-C15466 Diablo Canyon Power Plant                                   Order:              N7124 P.O. Box 56                                                 Project:            Stormwater Avila Beach, CA 93424                                       Received:           11/27/06 Printed:            12/06/06 S   ..   . ..   .... .L LeNV._OP$               __
DLR = Detection Limit for Reporting.
REPORT OF ANALYTICAL RESULTS Sampled Sample Description                     Sampled By                        Date @Time                Matrix 2006-006A-1 (Shoot Range Eff)         Trevor Rebel                      11/26/06@21:56                 Aqueous AnaLyte                                Result         DLR         Dilution           Units             Method           Date       Date   Batch Factor                                            Analyzed     Prepared Electrical Conductance                 150               1               1           umhos/cm         SM 2510       11/27/06                   65 L & Grease                        Not Detected         5               1           mo/L           EPA 1664         12105/06                 272 1
Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng Date Date Analyzed Prepared 11/27/06 11/30/06 11/27/06 11/29/06 12/05/06 12/04/06 Batch 65 181 65 174 262 0 PRINTED ON RECYCLED PAPER
8.4             0.1                         pH units       EPA 150.1       11/27/06                  65 1
* CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 e SAN LUIS OBISPO, CA 93401 9 (805) 545-9838
Suspended Solids                        100                5                          mg/L            EPA 160.2       11/29/06                 174 1
* FAX (805) 545-0107 Page 1 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 06-C15456 N7114 Stormwater 11/27/06 12/05/06 REPORT OF ANALYTICAL RESULTS Sampted Sample Description Sampled By Date @ Time Matrix 2006-011-1 (Diablo Creek Dr.) Trevor Rebel 11/26/06@21:32 Aqueous AnaLyte Result DLR Dilution Units Method Factor Electrical Conductance 230 1 1 umhos/cm SM 2510& Grease Not Detected 5 1 mg/L EPA 1664., 7.3 0.1 1 pH units EPA 150.1 Suspended Solids 38 5 1 mg/L EPA 160.2 Iron 2.0 0.02 1 mgIL EPA 200.7 Date Analyzed 11/27/06 11/30/06 11/27/06 11/29/06 12/05/06 Date Batch Prepared 65 181 65 174 12/04/06 262 DIR-----.Detection
Iron                                      2.7              0.1                        mg/L            EPA 200.7        12/05/06     12/04/06     261 1
----limit...for.
Lead                                      0.14            0.02                        mg/L            EPA 200.7        12/05/06     12/04/06    262 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
Reporting.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0   PRINTED ON RECYCLED PAPER
Reutso--o Deeced are---....
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
C A Minority-ovnecd Business Eniterprise 141 SUBURBAN ROAD, SUITE C SAN LUIS OBISPO, CA 93401       - (805) 545-9838
* FAX (805) 545-0107
* Pagel1 Trevor Rebel                                               Log Number:        06-C15455 Diablo Canyon Power Plant                                 Order:            N7113 P.O. Box 56                                               Project:          Stormwater Avila Beach, CA 93424                                     Received:         11/27/06 Printed:          12/05/06 L~tiNV. OPS.
REPORT OF ANALYTICAL RESULTS Sampled Sample Description                     Sampled By                        Date @ Time            Matrix 2006-008-1 (008-Diab Creek)           Trevor Rebel                     11/26/06@21:39               Aqueous Analyte                                Result         DLR         Dilution         Units             Method         Date       Date   Batch Factor                                      Analyzed   Prepared Electrical Conductance                 940              1                1        umhos/cm        SM 2510      11/27/06                65 1
    . & Grease                       Not Detected         5                        mg/L            EPA 1664      11/30/06                181 1
  .I                                                                                                                                        65 6.8             0.1                       pH units        EPA 150.1     11/27/06 1
Suspended Solids                        18              5                        mg/L           EPA 160.2    11/29/06               174 1
Iron                                      1.2            0.02                      mg/L            EPA 200.7    12/05/06   12/04/06   262
                                                                                                ----------------.-.--------.--.--------.--.
DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng PRINTED ON.RECYCLED PAPER
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
A4 UiAnority-o\\ c*U-SL Fsoness Enter prise 141 SUBURBAN ROAD, SUITE C SAN LUIS OBISPO, CA 93401 * (805) 545-9838
* FAX (805) 545-0107 Page 1 Trevor Rebel                                                     Log Number:        06-C15458 Diablo Canyon Power Plant                                       Order:              N7116 P.O. Box 56                                                     Project:            Stormwater Avila Beach, CA 93424                                           Received:           11/27/06 Printed:            12/05/06 FNV. OPS.
REPORT OF ANALYTICAL RESULTS Sampled Sample Description                       Sampled By                          Date @ Time            Matrix 2006-009-1 (009-N Protected)             Trevor Rebel                         11/26/06@22:30               Aqueous AnaLyte                                    Result           DLR         Dilution         Units             Method           Date      Date  Batch Factor                                         Analyzed    Prepared
................----------------- ----------------.----------.------------.-------                 ----------------
Electrical Conductance                     450                 1                 1       umhos/cm         SM 2510         11/27/06              65
      & Grease                           Not Detected           5               1         mg/L           EPA 1664         11/30/06              181
.1                                           7.0             0.1             1         pH units       EPA 150.1         11/27/06              65 Suspended Solids                            11                5                1         mg/L           EPA 160.2         11/29/06              174 Iron                                         0.80             0.02             1         mg/L           EPA 200.7         12/05/06  12/04/06  262
.     .   .   ..-----------.-------------.---------------------------.------------.--------------------------
DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0  PRINTED ON RECYCLED PAPER
* CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 e SAN LUIS OBISPO, CA 93401 9 (805) 545-9838
* FAX (805) 545-0107 Page 1 Trevor Rebel                                                       Log Number: 06-C15456 Diablo Canyon Power Plant                                         Order:            N7114 P.O. Box 56                                                       Project:          Stormwater Avila Beach,         CA     93424                                 Received:         11/27/06 Printed:          12/05/06 REPORT OF ANALYTICAL RESULTS Sampted Sample Description                           Sampled By                         Date @ Time         Matrix 2006-011-1 (Diablo Creek Dr.)               Trevor Rebel                       11/26/06@21:32           Aqueous AnaLyte                                       Result         DLR         Dilution         Units           Method   Date    Date  Batch Factor                                 Analyzed Prepared Electrical Conductance                       230                 1             1         umhos/cm       SM 2510 11/27/06            65
      & Grease                             Not Detected         5               1         mg/L         EPA 1664 11/30/06            181
  .,                                             7.3             0.1             1         pH units     EPA 150.1 11/27/06            65 Suspended Solids                               38               5               1         mg/L         EPA 160.2 11/29/06            174 Iron                                           2.0             0.02           1         mgIL         EPA 200.7 12/05/06 12/04/06 262 DIR-----.Detection limit...for.
                      ----     Reporting. Reutso--o       Deeced       are---....
below.....
below.....
DLR = Detection Limit for Reporting.
DLR = Detection Limit for Reporting.       Results of "Not Detected" are below DLR.
Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER C CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owined Business Enterpirise 141 SUBURBAN ROAD, SUITE C-5 e SAN LUIS OBISPO, CA 93401 * (805) 545-9838 -FAX (805) 545-0107 Page 1 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 06-C15465 N7123 Stormwater 11/27/06 12/06/06 REPORT OF ANALYTICAL RESULTS Sample Description 2006-013-1 (013-Below reservoir and adj. 230 kv. yard Analyte sampled Sampled By Date @ Time Trevor Rebel 11/26/06@21:21 Matrix Aqueous=============================
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0   PRINTED ON RECYCLED PAPER
Result DLR Dilution Units Method Date Date Analyzed Prepared Batch Factor ectricaL Conductance it & Grease pH 320 Not Detected 8.5 7 0.1 1 umhos/cm 1 mg/L 1 pH units SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 11/27/06 12/05/06 11/27/06 11/29/06 12/05/06 65 272 65 174 12/04/06 261 Suspended Solids 760 5 1 mg/L Iron 16 0.1 1 mg/L DLR = Detection Limit for Reporting.
 
Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng Q PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5
CREEK ENVIRONMENTAL LABORATORIES, INC.
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838 o FAX (805) 545-0107 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 06-C15457 N7115 Stormwater 11/27/06 12/05/06 Page 1 KN -V. P ENV. OPS.REPORT OF ANALYTICAL RESULTS Sample Description 2006-015-1 (015-Adj Garage)AnaLyte Sampled By Trevor Rebel Result Sampled Date @ Time 11/26/06@21:26 DLR Dilution Units Factor Matrix Aqueous Method Date Date Batch Analyzed Prepared Electrical Conductance
C A Minority-owined Business Enterpirise 141 SUBURBAN ROAD, SUITE C-5 e SAN LUIS OBISPO, CA 93401       *   (805) 545-9838 - FAX (805) 545-0107 Page 1 Trevor Rebel                                               Log Number:        06-C15465 Diablo Canyon Power Plant                                 Order:              N7123 P.O. Box 56                                                 Project:          Stormwater Avila Beach, CA 93424                                     Received:           11/27/06 Printed:            12/06/06 REPORT OF ANALYTICAL RESULTS sampled Sample Description                     Sampled By                        Date @ Time              Matrix 2006-013-1 (013-Below reservoir       Trevor Rebel                     11/26/06@21:21                 Aqueous and adj. 230 kv. yard
& Grease.6.Suspended Solids Iron 180 Not Detected 8.2 190 8.8 1 5 0.1 5 0.02 1 umhos/cm 1 mg/L 1 pH units 1 mg/L 1 mg/L------------.-.---------
                                      =============================
SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 11/27/06 11/30/06 11/27/06 11/29/06 12/05/06 12/04/06----------.-.---------
Analyte                                Result         DLR       Dilution         Units               Method         Date     Date   Batch Factor                                          Analyzed   Prepared ectricaL Conductance                 320                               1         umhos/cm           SM 2510       11/27/06             65 it & Grease                        Not Detected        7              1        mg/L              EPA 1664      12/05/06             272 pH                                        8.5            0.1            1        pH units          EPA 150.1      11/27/06             65 Suspended Solids                       760               5               1         mg/L             EPA 160.2      11/29/06            174 Iron                                     16               0.1             1         mg/L             EPA 200.7      12/05/06  12/04/06  261 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
65 181 65 174 262 DLR = Detection Limit for Reporting.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng Q PRINTED ON RECYCLED PAPER
Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5
 
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838 a FAX (805) 545-0107 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 06-C15459 N7117 Stormwater 11/27/06 12/05/06 Page 1 F N.rp;REPORT OF ANALYTICAL RESULTS Sample Description 2006-023-1 (Intake Rd.)Sampled By Trevor Rebel Sampled Date @ Time 11/26/06@20:25 Matrix Aqueous Analyte Result DLR Dilution Units Factor Electrical Conductance 940 1 1 umhos/cm-& Grease Not Detected 5 1 mg/L 6.7 0.1 1 pH units Suspended Solids 210 5 1 mg/L Iron 10 0.1 1 mg/L DLR = Detection Limit for Reporting.
CREEK ENVIRONMENTAL LABORATORIES, INC.
Results of "Not Detected" are below DLR.Method SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 Date Date Batch Analyzed Prepared----------.-.---------.----
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5
11/27/06 65 11/30/06 181 11/27/06 65 11/29/06 174 12/05/06 12/04/06 261----------.-.---------.-.-
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838 o FAX (805) 545-0107 Page 1 Trevor Rebel                                               Log Number:        06-C15457 Diablo Canyon Power Plant                                 Order:            N7115 P.O. Box 56                                               Project:          Stormwater Avila Beach, CA 93424                                     Received:         11/27/06 Printed:          12/05/06 KN             P
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng ( PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 &deg; SAN LUIS OBISPO, CA 93401 &deg; (805) 545-9838 -FAX (805) 545-0107 Page 8 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 07-C1782 0825 Stormwater 02/08/07 02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time 2006-Boat-2 (Boat Dock) Trevor Rebel 02/07/07@14:34 Analyte Result DLR Dilution Units Factor Matrix Aqueous Method Electrical Conductance 240 1 1 umhos/cm SM 2510-iL & Grease Not Detected 5 1 mg/L EPA 1664 7.8 0.1 1 pH units EPA 150.1 Suspended Solids 230 5 1 mg/L EPA 160.2 Iron 10 0.02 1 mg/L EPA 200.7-------------------------------------------------. -.--------.- .- ----......- -......................DLR Detection Limit for Reporting.
                                                                                                                                  -V.
Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng Date Analyzed 02/08/07 02/20/07 02/08/07.02/14/07 02/13/07 Date Batch Prepared 2045 02/15/07 2402 2045 2329 2234 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 -SAN LUIS OBISPO, CA 93401 * (805) 545-9838 -FAX (805) 545-0107 Page 6 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 07-C1780 0825 Stormwater 02/08/07 02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time 2006-003-2 (NW Intake BLdg) Trevor Rebel 02/07/07@14:27 Analyte Result DLR Dilution Units Factor Electrical Conductance 610 1 1 umhos/cm--it & Grease 8 5 1 mg/L 7.3 0.1 1 pH units Suspended Solids 330 5 1 mg/L Iron 18 0.02 1 mg/L DLR = Detection Limit for Reporting.
ENV. OPS.
Results of "Not Detected" are below DLR.Matrix Aqueous Method SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 Date Analyzed 02/08/07 02/20/07 02/08/07 02/14/07 02/13/07 Date Batch Prepared 2045 02/15/07 2402 2045 2329 2234 CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 &deg; SAN LUIS OBISPO, CA 93401 -(805) 545-9838
REPORT OF ANALYTICAL RESULTS Sampled Sample Description                     Sampled By                      Date @ Time          Matrix 2006-015-1 (015-Adj Garage)           Trevor Rebel                     11/26/06@21:26             Aqueous AnaLyte                                Result        DLR       Dilution         Units           Method       Date               Date   Batch Factor                                  Analyzed             Prepared Electrical Conductance                 180              1              1        umhos/cm      SM 2510  11/27/06                          65
* FAX (805) 545-0107 Page 12 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 07-C1786 0825 Stormwater 02/08/07 02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time 2006-004-2 (Settling Basin) Trevor Rebel 02/07/07@14:38 Matrix Aqueous Analyte Result DLR Dilution Factor Units Electrical Conductance nit & Grease Suspended Solids Iron 480 Not Detected 7.0 44 1.9 1 5 0.1 5 0.02 1 1 1 1 1 umhos/cm mg/L pH units mg/L mg/L Method SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 Date Analyzed 02/08/07 02/20/07 02/08/07 02/14/07 02/13/07 Date Batch Prepared 2045 02/15/07 2402 2045 2329 2234 DLR = Detection Limit for Reporting.
      & Grease                       Not Detected        5              1        mg/L        EPA 1664    11/30/06                        181
Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5
  .6.                                      8.2           0.1             1         pH units    EPA 150.1   11/27/06                          65 Suspended Solids                        190              5              1         mg/L         EPA 160.2  11/29/06                        174 Iron                                      8.8            0.02            1         mg/L         EPA 200.7  12/05/06              12/04/06  262
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838 a FAX (805) 545-0107 Page 11 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 07-C1785 0825 Stormwater 02/08/07 02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time 2006-Path 005-2 (Area 10 Ditch) Trevor Rebel 02/07/07@14:42 Matrix Aqueous Analyte Result DLR Dilution Factor Units Method Electrical Conductance 630 1 1 umhos/cm SM 2510')il & Grease Not Detected 5 1 mg/L EPA 1664 7.8 0.1 1 pH units EPA 150.1 Suspended Solids 86 5 1 mg/L EPA 160.2 Iron 2.7 0.02 1 mg/L EPA 200.7 DLR Detection limit for Reporting.
                                                                  ------------.-.---------                 ----------.-.---------
Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Date Analyzed 02/08/07 02/20/07 02/08/07 02/14/07 02/13/07 Date Prepared Batch 2045 02/15/07 2402 2045 2329 2234 Lab Director, Michael Ng PRINTED ON RECYCLED PAPER Q CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 a SAN LUIS OBISPO, CA 93401 * (805) 545-9838
DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
* FAX (805) 545-0107 Page 9 Trevor Rebel Diablo Canyon Pc P.O. Box 56 Avila Beach, CA Dwer Plant Log Number: Order: Project: Received: Printed: 07-C1783 0825 Stormwater 02/08/07 02/20/07 93424 REPORT OF ANALYTICAL RESULTS Sample Description 2006-006B-2 (Lot #1)Analyte Sampled Sampled By Date @ Time Trevor Rebel 02/07/07@14:49 Matrix Aqueous Result DLR Dilution Factor Units Method Electrical Conductance 120 1 1 umhos/cm'l & Grease Not Detected 5 1 mg/L 1 8.3 0.1 1 pH units Suspended Solids 44 5 1 mg/L Iron 2.0 0.02 1 mg/L DLR = Detection Limit for Reporting.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng PRINTED ON RECYCLED PAPER
Results of "Not Detected" are below DLR.SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 Date Analyzed 02/08/07 02/20/07 02/08/07 02/14/07 02/13/07 Date Batch Prepared 2045 02/15/07 2402 2045 2329 2234 CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5
 
* SAN LUIS OBISPO, CA 93401 -(805) 545-9838
CREEK ENVIRONMENTAL LABORATORIES, INC.
* FAX (805) 545-0107 Page. 2 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Received: Printed: 07-C2138 00969 02/14/07 02/27/07 REPORT OF ANALYTICAL RESULTS Sample Description 006 Lot 1 AnaLyte Sampled By Trevor Rebel Result Sampled Date @ Time 02/07107@14:49 DLR Dilution Units Factor Matrix Aqueous Method Date Date Batch Analyzed Prepared EPA 200.8 02/22/07 02/22/07 2509 EPA 6020 02/22/07 2505----------------.-.--------.--.--------.--.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5
Lead 0.004 0.001 11 mg/L ead, TCLP extract Not Detected O004 0.1 mg/L DLR = Detection Limit for Reporting.
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838 a FAX (805) 545-0107 Page 1 Trevor Rebel                                               Log Number:        06-C15459 Diablo Canyon Power Plant                                 Order:            N7117 P.O. Box 56                                               Project:          Stormwater Avila Beach, CA 93424                                     Received:         11/27/06 Printed:
Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director; Michael Ng 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 &deg; SAN LUIS OBISPO, CA 93401 * (805) 545-9838
REPORT OF ANALYTICAL RESULTS 12/05/06 FN.rp; Sampled Sample Description                     Sampled By                      Date @ Time          Matrix 2006-023-1 (Intake Rd.)               Trevor Rebel                     11/26/06@20:25           Aqueous Analyte                                 Result         DLR       Dilution         Units           Method    Date      Date  Batch Factor                                 Analyzed    Prepared
* FAX (805) 545-0107 Page 10 Trevor Rebel Diablo Canyon Pc P.O. Box 56 Avila Beach, CA ower Plant Log Number: Order: Project: Received: Printed: 07-C1784 0825 Stormwater 02/08/07 02/20/07 93424 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time 2006-006A-2 (Shooting Effluent)
                                                                                                          ----------.-.---------.----
Trevor Rebel 02/07/07@14:56 Matrix Aqueous Analyte-----------
Electrical Conductance                  940              1               1       umhos/cm      SM 2510  11/27/06                65
-----------Result DLR Dilution Factor Units Electrical Conductance 130 1 1 nit & Grease Not Detected 5 1 8.0 0.1 1 Suspended Solids 40 5 1 Iron 1.2 0.02 1 DLR = Detection Limit for Reporting.
    - & Grease                        Not Detected         5              1        mg/L        EPA 1664   11/30/06                181 6.7            0.1            1        pH units    EPA 150.1 11/27/06                65 Suspended Solids                        210              5              1        mg/L        EPA 160.2 11/29/06                174 Iron                                    10              0.1              1        mg/L        EPA 200.7  12/05/06    12/04/06  261
Results of "Not Detected" are below DLR.umhos/cm mg/L pH units mg/L mg/L Method SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 Date Analyzed 02/08/07 02/20/07 02/08/07 02/14/07 02/13/07 2045 02/15/07 2402 2045 2329 2234 Date Prepared Batch CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.-A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 .SAN LUIS OBISPO, CA 93401 -(805) 545-9838
                                                                                                          ----------.-.---------.-.-
* FAX (805) 545-0107 Page 1 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Received: Printed: 07-C2137 00969 02/14/07 02/27/07 REPORT OF ANALYTICAL RESULTS Sample Description 006 Range Analyte Sampled By Trevor Rebel Sampled Date @ Time 02/07/07@14:46 Matrix Aqueous Result DLR Dilution Factor Units Method----------------------------------
DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
---------------
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng
----------
( PRINTED ON RECYCLED PAPER
------------
 
-----------
CREEK ENVIRONMENTAL LABORATORIES, INC.
Date Analyzed 02/22/07 02/22/07 Date Batch Prepared 02/22/07 2509 2505 Lead 0.13 0.001 1 mg/L'ead, TCLP extract 0.13 0.04 0.1 mg/L DLR = Detection Limit for Reporting.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 &deg; SAN LUIS OBISPO, CA 93401 &deg; (805) 545-9838 - FAX (805) 545-0107 Page 8 Trevor Rebel                                                                              Log Number:                07-C1782 Diablo Canyon Power Plant                                                                  Order:                      0825 P.O. Box 56                                                                                Project:                    Stormwater Avila Beach, CA 93424                                                                      Received:                  02/08/07 Printed:                    02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                                Sampled By                                              Date @ Time                      Matrix 2006-Boat-2 (Boat Dock)                          Trevor Rebel                                            02/07/07@14:34                            Aqueous Analyte                                            Result                      DLR              Dilution                  Units                      Method            Date    Date  Batch Factor                                                              Analyzed Prepared Electrical Conductance                              240                              1                        1            umhos/cm                SM 2510            02/08/07          2045
Results of "Not Detected" are below DLR.EPA 200.8 EPA 6020 CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5
-iL & Grease                                  Not Detected                          5                        1            mg/L                  EPA 1664            02/20/07 02/15/07  2402 7.8                         0.1                      1            pH units              EPA 150.1            02/08/07          2045 Suspended Solids                                    230                              5                        1            mg/L                  EPA 160.2          .02/14/07           2329 Iron                                                  10                            0.02                     1            mg/L                  EPA 200.7            02/13/07           2234
-- ---- -- -- --- ---- ---- ---- ---- --- -- - - - - - - - - - - - - - - -. - . - - - - - - - - .- .-- - - - . . . . . .-
                                                                                                                          - . . . . . . . . . . . . . . . . . . . . . .
DLR    Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director,         Michael Ng 0    PRINTED ON RECYCLED PAPER
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C SAN LUIS OBISPO, CA 93401 * (805) 545-9838 - FAX (805) 545-0107 Page 6 Trevor Rebel                                               Log Number:        07-C1780 Diablo Canyon Power Plant                                 Order:              0825 P.O. Box 56                                               Project:          Stormwater Avila Beach, CA 93424                                     Received:           02/08/07 Printed:          02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                   Sampled By                       Date @ Time         Matrix 2006-003-2 (NW Intake BLdg)           Trevor Rebel                     02/07/07@14:27           Aqueous Analyte                               Result         DLR         Dilution         Units           Method    Date      Date  Batch Factor                                 Analyzed    Prepared Electrical Conductance                 610               1               1         umhos/cm     SM 2510  02/08/07              2045
--it & Grease                             8               5               1         mg/L         EPA  1664  02/20/07    02/15/07  2402 7.3            0.1             1         pH units     EPA  150.1 02/08/07              2045 Suspended Solids                       330               5               1         mg/L         EPA  160.2 02/14/07              2329 Iron                                   18               0.02           1         mg/L         EPA 200.7  02/13/07              2234 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0  PRINTED ON RECYCLED PAPER
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 &deg; SAN LUIS OBISPO, CA 93401 - (805) 545-9838
* FAX (805) 545-0107 Page 12 Trevor Rebel                                              Log Number:        07-C1786 Diablo Canyon Power Plant                                  Order:            0825 P.O. Box 56                                                Project:          Stormwater Avila Beach, CA 93424                                      Received:          02/08/07 Printed:          02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                    Sampled By                        Date @ Time          Matrix 2006-004-2 (Settling Basin)            Trevor Rebel                      02/07/07@14:38            Aqueous Analyte                                Result        DLR        Dilution        Units          Method          Date      Date  Batch Factor                                        Analyzed    Prepared Electrical Conductance                  480              1              1        umhos/cm      SM 2510        02/08/07              2045 1
nit & Grease                        Not Detected        5                       mg/L          EPA  1664        02/20/07    02/15/07  2402 1
7.0            0.1                      pH units    EPA  150.1      02/08/07             2045 1
Suspended Solids                        44              5                        mg/L          EPA  160.2       02/14/07             2329 1
Iron                                     1.9             0.02                    mg/L          EPA  200.7      02/13/07              2234 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0  PRINTED ON RECYCLED PAPER
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838 a FAX (805) 545-0107 Page 11 Trevor Rebel                                                Log Number:        07-C1785 Diablo Canyon Power Plant                                    Order:              0825 P.O. Box 56                                                  Project:            Stormwater Avila Beach, CA 93424                                        Received:          02/08/07 Printed:            02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                      Sampled By                        Date @ Time          Matrix 2006-Path 005-2 (Area 10 Ditch)         Trevor Rebel                       02/07/07@14:42            Aqueous Analyte                                  Result          DLR        Dilution        Units          Method      Date      Date  Batch Factor                                  Analyzed    Prepared Electrical Conductance                  630                1              1        umhos/cm      SM 2510    02/08/07             2045
')il & Grease                        Not Detected          5              1        mg/L        EPA 1664    02/20/07   02/15/07  2402 7.8              0.1            1        pH units    EPA 150.1  02/08/07             2045 Suspended Solids                          86                5              1        mg/L         EPA 160.2  02/14/07              2329 Iron                                       2.7             0.02           1         mg/L         EPA 200.7   02/13/07            2234 DLR   Detection limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng PRINTED ON RECYCLED PAPER
 
Q CREEK              ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 a SAN LUIS OBISPO, CA 93401 * (805) 545-9838
* FAX (805) 545-0107 Page 9 Trevor Rebel                                             Log Number:        07-C1783 Diablo Canyon Pc Dwer Plant                              Order:            0825 P.O. Box 56                                               Project:          Stormwater Avila Beach, CA         93424                            Received:         02/08/07 Printed:          02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                   Sampled By                      Date @ Time          Matrix 2006-006B-2 (Lot #1)                 Trevor Rebel                     02/07/07@14:49             Aqueous Analyte                                Result         DLR       Dilution         Units           Method           Date      Date  Batch Factor                                        Analyzed    Prepared Electrical Conductance                 120             1               1         umhos/cm       SM 2510        02/08/07              2045
'l & Grease                         Not Detected       5               1         mg/L         EPA 1664        02/20/07    02/15/07  2402 1                                      8.3           0.1             1         pH units     EPA 150.1        02/08/07              2045 Suspended Solids                       44             5               1         mg/L         EPA 160.2        02/14/07              2329 Iron                                     2.0           0.02           1       mg/L         EPA 200.7        02/13/07              2234 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng PRINTED ON RECYCLED PAPER
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5
* SAN LUIS OBISPO, CA 93401 - (805) 545-9838
* FAX (805) 545-0107 Page. 2 Trevor Rebel                                              Log Number:        07-C2138 Diablo Canyon Power Plant                                  Order:            00969 P.O. Box 56                                                Received:          02/14/07 Avila Beach, CA 93424                                      Printed:          02/27/07 REPORT OF ANALYTICAL            RESULTS Sampled Sample Description                    Sampled By                      Date @ Time          Matrix 006 Lot 1                              Trevor Rebel                      02/07107@14:49            Aqueous AnaLyte                                Result        DLR        Dilution        Units            Method      Date      Date    Batch Factor                                    Analyzed  Prepared Lead                                      0.004          0.001          11      mg/L          EPA 200.8    02/22/07  02/22/07  2509 ead, TCLP extract                  Not Detected        O004            0.1      mg/L          EPA 6020      02/22/07              2505
                                                                                              ----------------.-.--------.--.--------.--.
DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director; Michael Ng 0  PRINTED ON RECYCLED PAPER
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 &deg; SAN LUIS OBISPO, CA 93401 * (805) 545-9838
* FAX (805) 545-0107 Page 10 Trevor Rebel                                              Log Number:              07-C1784 Diablo Canyon Pcower Plant                                Order:                  0825 P.O. Box 56                                                Project:                Stormwater Avila Beach, CA        93424                            Received:                02/08/07 Printed:                02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                    Sampled By                      Date @ Time              Matrix 2006-006A-2 (Shooting Effluent)        Trevor Rebel                      02/07/07@14:56                Aqueous
                                      -----------                 -- - - - - - - - - -
Analyte                                Result        DLR        Dilution              Units          Method          Date        Date  Batch Factor                                            Analyzed    Prepared Electrical Conductance                  130              1                  1          umhos/cm      SM 2510        02/08/07              2045 nit & Grease                        Not Detected        5                  1          mg/L         EPA  1664        02/20/07    02/15/07  2402 8.0            0.1               1          pH units    EPA  150.1      02/08/07              2045 Suspended Solids                        40              5                  1          mg/L         EPA  160.2      02/14/07              2329 Iron                                      1.2            0.02              1          mg/L        EPA  200.7      02/13/07              2234 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
                                                        - A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5   . SAN LUIS OBISPO, CA 93401 - (805) 545-9838
* FAX (805) 545-0107 Page 1 Trevor Rebel                                                   Log Number:        07-C2137 Diablo Canyon Power Plant                                      Order:              00969 P.O. Box 56                                                   Received:          02/14/07 Avila Beach, CA 93424                                          Printed:           02/27/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                       Sampled By                         Date @ Time           Matrix 006 Range                                Trevor Rebel                       02/07/07@14:46            Aqueous Analyte                                   Result          DLR        Dilution          Units          Method          Date        Date  Batch Factor                                        Analyzed    Prepared
----------------------------------    ---------------  ----------    ------------    -----------
Lead                                        0.13            0.001          1         mg/L         EPA 200.8        02/22/07    02/22/07  2509
  'ead, TCLP extract                          0.13            0.04          0.1       mg/L        EPA 6020        02/22/07             2505 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838
* FAX (805) 545-0107 Page 4 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 07-C1778 0825 Stormwater 02/08/07 02/20/07 REPORT OF ANALYTICAL RESULTS Sample Description 2006-008-2 (Diablo Creek)Analyte Sampled Sampled By Date @ Time Matrix Trevor Rebel 02/07/07@14:30 Aqueous Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared Electrical Conductance "2,100 1 1 umhos/cm SM 2510-;L & Grease Not Detected 5 1 mg/L EPA 1664 6.7 0.1 -1 pH units EPA 150.1 Suspended Solids 33 5 1 mg/L EPA 160.2 Iron 1.6 0.02 1 mg/L EPA 200.7 DLR Detection Limit for Reporting.
* FAX (805) 545-0107 Page 4 Trevor Rebel                                               Log Number:        07-C1778 Diablo Canyon Power Plant                                 Order:            0825 P.O. Box 56                                                 Project:          Stormwater Avila Beach, CA 93424                                     Received:         02/08/07 Printed:          02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                     Sampled By                      Date @ Time          Matrix 2006-008-2 (Diablo Creek)               Trevor Rebel                     02/07/07@14:30           Aqueous Analyte                                  Result         DLR       Dilution         Units           Method     Date       Date   Batch Factor                                 Analyzed   Prepared Electrical Conductance               "2,100             1               1         umhos/cm     SM 2510   02/08/07              2045
Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 02/08/07 02/20/07 02/08/07 02/14/07 02/13/07 2045 02/15/07 2402 2045 2329 2234 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 e SAN LUIS OBISPO, CA 93401 * (805) 545-9838
  -;L & Grease                         Not Detected       5               1       mg/L         EPA 1664   02/20/07    02/15/07 2402 6.7           0.1             -1       pH units     EPA 150.1 02/08/07            2045 Suspended Solids                         33             5               1       mg/L         EPA 160.2 02/14/07            2329 Iron                                       1.6           0.02           1       mg/L         EPA 200.7 02/13/07            2234 DLR   Detection Limit for Reporting. Results of "Not Detected" are below DLR.
* FAX (805) 545-0107 Page 1 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 07-C1775 0825 Stormwater 02/08/07 02/20/07 REPORT*OF ANALYTICAL RESULTS Sample Description 2006-009-2 (NW Protected Area)Analyte Sampled By Trevor Rebel Sampled Date @ Time 02/07/07@14:45 Matrix Aqueous Result DLR Dilution Units Method Factor Electrical Conductance"iL & Grease 130 Not Detected 6.6 1 5 0.1 1 1 1 umhos/cm mg/L pH units mglL mg/L SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 Date Date Batch Analyzed Prepared 02/08/07 2045 02/15/07 02/13/07 2268 02/08/07 2045 02/14/07 2329 02/13/07 2234 Suspended Solids 18 5 1 Iron 0.17 0.02 1 DLR = Detection Limit for Reporting.
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER
Results of "Not Detected" are below DLR.I----------
 
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5
CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 e SAN LUIS OBISPO, CA 93401 * (805) 545-9838
* FAX (805) 545-0107 Page 1 Trevor Rebel                                               Log Number:        07-C1775 Diablo Canyon Power Plant                                 Order:              0825 P.O. Box 56                                                 Project:          Stormwater Avila Beach, CA 93424                                     Received:           02/08/07 Printed:            02/20/07 REPORT*OF ANALYTICAL RESULTS Sampled Sample Description                     Sampled By                        Date @ Time          Matrix 2006-009-2 (NW Protected Area)         Trevor Rebel                     02/07/07@14:45             Aqueous Analyte                                Result         DLR         Dilution         Units           Method             Date    Date  Batch Factor                                         Analyzed  Prepared Electrical Conductance                 130               1             1         umhos/cm       SM 2510         02/08/07             2045 1
"iL & Grease                        Not Detected        5                        mg/L        EPA 1664          02/15/07   02/13/07 2268 1
6.6            0.1                      pH units    EPA 150.1        02/08/07             2045 Suspended Solids                        18              5              1        mglL        EPA 160.2        02/14/07             2329 Iron                                     0.17           0.02           1         mg/L        EPA 200.7        02/13/07            2234
                                                                                                                  ----------
DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
I CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838
* FAX (805) 545-0107 Page 5 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 07-C1779 0825 Stormwater 02/08/07 02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time 2006-011-2 (Diabto Creek Rd. Trevor Rebel 02/07/07@15:12 Culvert Inlet)AnaLyte Result DLR Dilution Units Factor Matrix Aqueous Method I Date Date Analyzed Prepared Batch electrical Conductance I & Grease pH Suspended Solids Iron 190 Not Detected 7.5 30 1.3 1 5 0.1 5 0.02 1 1 1 1 1 umhos/cm mg/L pH units mg/L mg/L SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 02/08/07 02/20/07 02/08/07 02/14/07 02/13/07 2045 02/15/07 2402 2045 2329 2234 DLR = Detection Limit for Reporting.
* FAX (805) 545-0107 Page 5 Trevor Rebel                                               Log Number:        07-C1779 Diablo Canyon Power Plant                                 Order:            0825 P.O. Box 56                                               Project:          Stormwater Avila Beach, CA 93424                                     Received:         02/08/07 Printed:          02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                     Sampled By                       Date @ Time           Matrix 2006-011-2 (Diabto Creek Rd.           Trevor Rebel                     02/07/07@15:12             Aqueous Culvert Inlet)
Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5
AnaLyte                                 Result         DLR       Dilution         Units           Method I Date       Date   Batch Factor                                  Analyzed   Prepared electrical Conductance                 190             1               1         umhos/cm       SM 2510  02/08/07              2045 1
I & Grease                        Not Detected        5                        mg/L         EPA 1664 02/20/07   02/15/07 2402 1
pH                                        7.5            0.1                      pH units      EPA 150.1 02/08/07             2045 1
Suspended Solids                        30              5                        mg/L          EPA 160.2 02/14/07             2329 1
Iron                                      1.3            0.02                     mg/L          EPA 200.7 02/13/07             2234 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
CREEK ENVIRONMENTAL LABORATORIES Lab Director,   Michael Ng 0 PRINTED ON RECYCLED PAPER
 
CREEK ENVIRONMENTAL LABORATORIES, INC.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838
* FAX (805) 545-0107 Page 2 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 07-C1776 0825 Stormwater 02/08/07 02/20/07 Sample Description 2006-013-2 (V-Ditch Below Reservoir)
* FAX (805) 545-0107 Page 2 Trevor Rebel                                               Log Number:        07-C1776 Diablo Canyon Power Plant                                 Order:              0825 P.O. Box 56                                                 Project:          Stormwater Avila Beach, CA 93424                                     Received:           02/08/07 Printed:          02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                     Sampled By                        Date @ Time          Matrix 2006-013-2                             Trevor Rebel                      02/07/07@15:03             Aqueous (V-Ditch Below Reservoir)
Anatyte REPORT OF ANALYTICAL RESULTS Sampled Sampled By Date @ Time Trevor Rebel 02/07/07@15:03 Result DLR Dilution Units Factor Matrix Aqueous-.....=================
                                                                                                          =================                   -
Method*Lectrical Conductance 260 1 1 umhos/cm I & Grease Not Detected 5 1 mg/I pH 7.8 0.1 1 pH units Suspended Solids 200 5 1 mg/L Iron 4.8 0.02 1 mg/L DLR = Detection Limit for Reporting.
Anatyte                                Result        DLR        Dilution          Units            Method           Date        Date  Batch Factor                                        Analyzed    Prepared
Results of "Not Detected" are below DLR.SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 Date Analyzed 02/08/07 02/20/07 02/08/07 02/14/07 02/13/07 Date Batch Prepared 2045 02/15/07 2402 2045 2329 2234 CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 -SAN LUIS OBISPO, CA 93401 * (805) 545-9838
  *Lectrical Conductance                 260               1               1         umhos/cm       SM 2510        02/08/07              2045 I & Grease                       Not Detected         5               1         mg/I         EPA 1664        02/20/07    02/15/07  2402 pH                                       7.8             0.1             1         pH units     EPA 150.1        02/08/07              2045 Suspended Solids                       200               5               1         mg/L         EPA 160.2        02/14/07              2329 Iron                                      4.8            0.02           1         mg/L         EPA 200.7        02/13/07              2234 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
* FAX (805) 545-0107 Page 3 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 07-C1777 0825 Stormwater 02/08/07 02/20/07 REPORT OF ANALYTICAL RESULTS Sample Description 2006-015-2 (Downstream NPG Garage)Analyte Sampled By Trevor Rebel Sampled Date @ Time 02/07/07@15:07 ution Units tor Matrix Aqueous Result DLR Dilu Fac Method Date Date Batch Analyzed Prepared-tectrical Conductance At & Grease pH Suspended Solids Iron 140 Not Detected 8.0 86 2.6 I 5 0.1 5 0.02 I umhos/cm mg/L pH units mg/L mg/L SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 02/08/07 02/20/07 02/08/07 02/14/07 02/13/07 2045 02/15/07 2402 2045 2329 2234 DLR = Detection Limit for Reporting.
CREEK ENVIRONMENTAL LABORATORIES Lab Director,  Michael Ng 0  PRINTED ON RECYCLED PAPER
Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng t PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC..A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5
 
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838 -FAX (805) 545-0107 Page 7 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 07-C1781 0825 Stormwater 02/08/07 02/20/07 REPORT OF ANALYTICAL RESULTS Samp I ed Sample Description Sampled By Date @ Time 2006-023-2 (Intake Road) Trevor Rebel 02/07/07614:30 Anatyte Result DLR Dilution Units Factor Matrix Aqueous Electrical Conductance
CREEK ENVIRONMENTAL LABORATORIES, INC.
'it & Grease 370 Not Detected 6.9 180 3.1 1 5 0.1 5 0.02 1 1 1'1 umhos/cm mg/L pH units mg/L mg/L Method SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 Date Analyzed 02/08/07 02/20/07 02/08/07 02/14/07 02/13/07 Date Prepared 2045 02/15/07 2402 2045 2329 2234 Batch Suspended Solids Iron DLR = Detection Limit for Reporting.
A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C SAN LUIS OBISPO, CA 93401 * (805) 545-9838
Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng q PRINTED ON RECYCLED PAPER Creek- Environmental Laboratorloms, Inc.141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 nlamn-oit-usoway Order # /* Please Print in Pen Client Name Contact Phone Due Date: Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other Nor~ITEJ Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print, / Comments:
* FAX (805) 545-0107 Page 3 Trevor Rebel                                              Log Number:        07-C1777 Diablo Canyon Power Plant                                  Order:              0825 P.O. Box 56                                                Project:          Stormwater Avila Beach, CA 93424                                      Received:          02/08/07 Printed:            02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description                    Sampled By                        Date @ Time          Matrix 2006-015-2                            Trevor Rebel                      02/07/07@15:07            Aqueous (Downstream NPG Garage)
Storm Water Set 1 Matrix Key: DW = Drinking Water"1 Qol r-I AQ = Aqueous SL = Soil/Solid Date/Time Samaled#of Matrix Bottles Preservative, Sample Descriotion Analysis 2006-Boat-I  
Analyte                                Result        DLR        Diluution        Units          Method    Date      Date  Batch Fac tor                                Analyzed    Prepared
,,oi- Oil and Grease, ph, EC, TSS, Fe AQ. 3 (Boat Refuel)RELINQUISHED BY DATE/TIME RECEIVED BY UreeV Lnvironmental Laboratorins, Inc.141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805).545-9838 fax (805) 545-0107* Please Print in Pen Order# # /P?Client Name Contact Phone JJDue Date: ....Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other 7ormaITA#7 Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments:
-tectrical Conductance                  140              I                        umhos/cm      SM 2510  02/08/07             2045 At & Grease                        Not Detected        5                        mg/L        EPA 1664  02/20/07   02/15/07 2402 pH                                        8.0            0.1            I        pH units    EPA 150.1 02/08/07              2045 Suspended Solids                         86               5                         mg/L        EPA 160.2 02/14/07              2329 Iron                                      2.6            0.02                      mg/L         EPA 200.7 02/13/07             2234 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
Storm Water Set 1 Matrix Key: DW = Drinking Water AQ = Aqueous SL = Soil/Solid Date/Time.  
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng t PRINTED ON RECYCLED PAPER
#of Sample Description A, Sampled Analysis Matrix Bottles Preservative I Type Bottles Creek Lab Sample #2006-0 1 i -~~' Oil and Grease, ph, EC, TSS, Fe AQ 3 ...e .rB (NW In ae Bldg) ___.N .......RELI'NQUISHED BY DATEITIME RECEIVED BY (Sg)(Print) (Organization) (Sign) (Pit (Organization)
 
"7iFe.,PA-40,Xj.Q.-
CREEK ENVIRONMENTAL LABORATORIES, INC.
ENVE OPS L~-I"ISO I Creek Environmental Laboratories.
                                                    . A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5
Inc.I Ureel' Environmental Laworatori-s, Inc.141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 unain-oi-uu s-oqy Order# h, 0 leIade rilL in Puen Client Name Cotc IPhone Due Date: Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other Normal TAT Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments:
* SAN LUIS OBISPO, CA 93401 * (805) 545-9838 - FAX (805) 545-0107 Page 7 Trevor Rebel                                               Log Number:        07-C1781 Diablo Canyon Power Plant                                 Order:              0825 P.O. Box 56                                               Project:            Stormwater Avila Beach, CA 93424                                     Received:           02/08/07 Printed:            02/20/07 REPORT OF ANALYTICAL RESULTS Samp I ed Sample Description                     Sampled By                       Date @ Time         Matrix 2006-023-2 (Intake Road)               Trevor Rebel                     02/07/07614:30           Aqueous Anatyte                                 Result         DLR         Dilution         Units           Method    Date      Date  Batch Factor                                 Analyzed    Prepared Electrical Conductance                 370              1              1        umhos/cm      SM 2510 02/08/07              2045
Storm Water Set I Matrix Key: DW = Drinking Water AQ = Aqueous SL = Soil/Solid Date/Time  
'it & Grease                         Not Detected         5              1        mg/L        EPA 1664  02/20/07    02/15/07  2402 1'
# of Sample Description Sampled Analysis Matrix Bottles Preservative/
6.9             0.1                       pH units    EPA 150.1 02/08/07              2045 Suspended Solids                        180              5              1        mg/L         EPA 160.2 02/14/07             2329 Iron                                      3.1            0.02                     mg/L        EPA 200.7 02/13/07             2234 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.
Type Bottles Creek Lab Sample #If.n ,-, Oil and Grease, ph, EC, TSS, Fe AQ 3 .-Pu Q- A 2006-004-1 SArn2!S44 100m-(Settle Basin) __V RELINQUISHED BY DATE/TIME RECEIVED BY (Sign) (Print) (Organization) (Sign) (Print) (Organization)
CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng q PRINTED ON RECYCLED PAPER
.... .AN V E 0 P ."__-__.I0t-2-74-Itl.A IkK4-Y&A,/,- 0516 r v Creek Environmental T nhnrntnrie.v.
 
Tne.
Creek-Environmental Laboratorloms, Inc.                                                                                   nlamn-oit-usoway 141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Order # /
Creek- Environmental Laboratories, Inc.141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Uhain-ot-uustoay Order # ALL 2 2.* PI~,g~ Print in P~n Client Name Contact Phone Due Date: Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other No malTAi Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments:
* Please Print in Pen Client Name                                                 Contact                                 Phone Diablo Canyon Power Plant                                                                                                               Due Date:
Storm Water Set 1 Matrix Key: DW = Drinking Water I.AQ = Aqueous SL =Soil/Solid Date/Time U of Sample Description Sampled Analysis Matrix Bottles Preservative/
Trevor Rebel                             805.545.3607                     24Hr 48Hr Other Nor~ITEJ Address                                   City                     State       Zip                 Fax                               Cell PO Box 56, Avila Beach CA 93424                                                                       805.545.3459                     Beeper 805.441.5435 Project Name/Number                                                                                   PO#                               Copies To:
Type Bottles Creek Lab Sample #2006-005-1 Oil and Grease, ph, EC, TSS, Fe AQ 3 P Q R 3 250 444 ,, i , (005 Area 10 Ditch)_ ___i RELINQUISHED BY DATE/TIME RECEIVED BY (Sign)~~~~~4 (Print)4 (Ogaiztin (Sg)(rit Ogaiain J E.44 $$.* 4444S4 L." 7& .1 Creek Environmental Creek- Environmental Laboratorip-s, Inc.141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Chain-ot-Uustody Order #
Stormwater Bill to: (if different from above)                         Address                               City                                 State         Zip Sampler Name (Print,             /                     Comments: Storm Water Set 1                                                     Matrix Key: DW = Drinking Water "1Qol r-I                                                                                                                         AQ = Aqueous SL = Soil/Solid Date/Time                                                     #of Sample Descriotion                                 Samaled                Analysis                       Matrix Bottles 2006-Boat-I Preservative,
* Pl~i~c~ Pr~rt in P0,, Client Name Contact hone Due Date: Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other Normal TAT Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435.
                                                    , oi-       Oil and Grease, ph, EC, TSS, Fe           AQ. 3 (Boat Refuel)
Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments:
RELINQUISHED BY                                                 DATE/TIME             RECEIVED BY
Storm Water Set I Matrix Key: DW = Drinking Water I AQ = Aqueous SL = Soil/Solid Date/Time  
 
# of Sample Description Sampled Analysis Matrix Bottles Preservative IType Bottles Creek Lab Sample #2006-006B-1, (&4o7-' Oil and Grease, ph, EC, TSS, Fe AQ 3 "/n Q 206-0 0 B 1 "G112O 100 ml,.. .(006 Storm Grate in Lot #1) ' -RELINQUISHED BY DATE/TIME RECEIVED BY (Sign) (Print) (Organization) (Sign) (Print) (Organization)
UreeV Lnvironmental Laboratorins, Inc.                                                                                       Chain-ot-Cu*-tody 141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805).545-9838 fax (805) 545-0107 Order##           /P?
P-)d7- 1/4  
* Please Print inPen Client Name                                                   Contact Diablo Canyon Power Plant                                    Trevor Rebel                              Phone 805.545.3607 JJDue   Date:
%.r1.0 ;, i .vironmental Laborat ies, Inc.Chain-of-Custody Order #_ ______141 Subu. .i Road, Suite C-5,,San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107.Please Print in Pen Client Name Contact Phone 1'DueDate:
24Hr 48Hr        Other
N a 1 Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other al Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments:
                                                                                                                                                                              ....
Storm Water Set I MaAQ = Aqueous SL = Soil/Solid Date/Time#of lottles 121 Sample Description 2006-006A-1 (Shoot Range Eff)I I RELINQUISHED BY Cree'- Environmental Laboratorves, Inc.141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (80)) 545-0107 OrderU _- UY Order # _,J)711-0 Client Name rContact f Phone 1.Due Date: Diablo Canyon Power Plant Trevor Rebel J[805.545.3607 24Hr 48Hr Other Normal TAT Address City State Zip Fax Cell*PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip samPler Name (Print) Comments:
7ormaITA#7 Address                                     City                   State       Zip                     Fax                               Cell PO Box 56, Avila Beach CA 93424 805.545.3459                       Beeper 805.441.5435 Project Name/Number                                                                                     PO#                               Copies To:
Storm Water Set I Matrix Key: OW = Drinking Water AQ = Aqueous SL = Soil/Solid Date/Time  
Stormwater Bill to: (if different from above)                         Address                                 City                                   State             Zip Sampler Name (Print)                                   Comments: Storm Water Set 1                                                         Matrix Key: DW = Drinking Water AQ = Aqueous SL = Soil/Solid Date/Time.                                                       #of Sample Description           A,                     Sampled               Analysis                           Matrix Bottles Preservative I Type Bottles 2006-0 1             i -~~'   Oil and Grease, ph, EC, TSS, Fe               AQ     3                             e ... rB *1 Creek Lab Sample #
# of Sample Description Sampled Analysis Matrix Bottles Preservative I Type Bottles Creek Lab Sample #Oil and Grease, ph, EC, TSS, Fe AQ 3 -P/j .. Q-4, A 2006-008-1 AG1-jSO 100 .-(008- Diab Creek)(/LSign) .,... rintg (Organization). (sign) (Print) (Organization)
                                                                                                                                                                        .
' " ENVE OPS/f//I//Q I 5~su,.Creek Environmental 1 .ahnpofniAAC T"'.I  
(NW In                     ae Bldg)                             ___
,re'-K Invironmental Laboratc ies, Inc.141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Chain-of-C
                                                                                                                                              .N                         .......
~stody Order #_______S* PI~~ Print in PAn Client Name Contact Phone Due Date: Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other Normal TAT Address city State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments:
L~
Storm Water Set I Matrix Key: DW = Drinking Water I AQ = Aqueous SL = Soil/Solid DatelTime  
RELI'NQUISHED BY                                               DATEITIME               RECEIVED BY (Sg)(Print)                                   (Organization)                   (Sign)                           (Pit                           (Organization)
#of Sample Description Sampled Analysis Matrix Bottles Preservative
                                "7iFe.,PA- 40,Xj.Q.-   ENVE OPS
/ Type Bottles Creek Lab Sample #fv'l-o.-O Oil and Grease, ph, EC, TSS, Fe AQ 3 P/unp Q- A&#xfd;2006-009-1.
                                                                          -I       "ISO I                                 Creek Environmental Laboratories. Inc.         I
AGIH2SO41000ml-(009 N Protected) 09- ote t RELINQUISHED BY DATE/TIME RECEIVED BY (Sign) (Print) (Organization (Sign) " (Print) (Organization)
 
"-- [
Ureel' Environmental Laworatori-s, Inc.                                                                                       unain-oi-uu s-oqy 141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107                                                         Order#       h, 0
j._ ENVEOPS 1 ., ...I QIQ'" I obF2/I & 6~&-HA~4 Creek Environmental T Qh.VQ+hAw1Atn If", Iu k, reeK Lnvironmentai Laborator"s, Inc.141 Suburban Koad, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Chain-of-Cu
leIaderilL in Puen Client Name Diablo Canyon Power Plant Cotc Trevor Rebel IPhone 805.545.3607 Due Date:
..tody Order # -//7///." Please Print in Pen --'%, Client Name Contact Phone Due Date: Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments:
24Hr 48Hr Other           Normal TAT Address                                       City                 State       Zip                       Fax                               Cell PO Box 56, Avila Beach CA 93424                                                                           805.545.3459                     Beeper 805.441.5435 Project Name/Number                                                                                       PO#                               Copies To:
Storm Water Set I Matrix Key: DW = Drinking Water AQ = Aqueous SL = Soil/Solid Date/Time Sampled# Of Matrix Bottles Sample Description Analysis 2006-011-1 t,.z.,4 Oil and Grease, ph, EC, TSS, Fe AQ 3 (DiabloCreek Dr)KtLINQUISHED Y DATE/TIME RE EIVE Y Creek- Environmental Laboratorins, Inc.141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 unaln-oi-tuswouy Order# Y'/'710Z.Please Print in Pen Client Name Contact Phone Due Date: Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other Normal TAT Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments:
Stormwater Bill to: (if different from above)                       Address                                     City                                 State             Zip Sampler Name (Print)                                 Comments: Storm Water Set I                                                           Matrix Key: DW = Drinking Water AQ = Aqueous SL = Soil/Solid Date/Time                                                         #of Sample Description                                 Sampled               Analysis                             Matrix Bottles Preservative/ Type Bottles       Creek Lab Sample #
Storm Water Set I Matrix Key: DW = Drinking Water AQ = Aqueous SL = Soil/Solid Date/Time Sam oled# of Matrix Bottles Samole Descriotion Analvsis 2 0 -1 Oil and Grease, ph, EC, TSS, Fe AQ 3 2006-013-1 (013 -Below reservoir and adj 230 kv yard)RELINQUISHED BY DATEITIME RECEIVED BY  
                                                            ,-,
.;relK t-nvironmental Laboratcvies, Inc.141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Chain-of-C .stody Order #S Please Print in Pen Client Name Contact Phone Due Date: Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other Nornral'TAT)II Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.44,1.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments:
If.nOil and Grease, ph, EC, TSS,       Fe         AQ     3       .- Pu Q- A 2006-004-1                                         SArn2!S44                                                                                   100m-(Settle Basin)                                       __
Storm Water Set I Matrix Key: DW = Drinking Water-AQ = Aqueous SL = Soil/Solid DatelTime  
V RELINQUISHED BY                                               DATE/TIME                 RECEIVED BY (Sign)                               (Print)             (Organization)                       (Sign)                         (Print)                         (Organization)
# of Sample Description Sampled Analysis Matrix Bottles Preservative I Type Bottles Creek Lab Sample #it-22v-01-, Oil and Grease, ph, EC, TSS, Fe AQ 3 Plu*-0.20106-015-1 AG12Sk 1000___ ______(015 -AdjGarage)
                                . ...                   VE0P                                .AN "__-__.           .
RELINQUISHED BY DATE/TIME RECEIVED BY (Sign) (Prin~t) (Organization) (Sign) (Print) (Organization) j 0 1 rZ_ ENVE OPS -I I I i -1*OL I ~<.63~S~9 Creek Environmental Creek. Environmental Laboratories, Inc.141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Chai-rod-cus# ly Order # tf ' *7J/7 0 D1 0 ; f; D Client Name Contact Phone Due ate: Diablo Canyon Power Plant Trevor Rebel .805.545.3607 24Hr 48Hr Other Normal TAT Address City State Zip Fax Cell P0 Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments:
I0t-2-74
Storm Water Set 1 Matrix Key: DW = Drinking Water I AQ = Aqueous SL = Soil/Solid Date/Time  
                                                                                  -Itl.A     IkK4-Y&                   A,/,- 0516 rv                  Creek Environmental T nhnrntnrie.v. Tne.
# of Sample Description a led Analysis Matrix Bottles Preservative I Type Bottles Creek Lab Sample #2-v,-o Oil and Grease, ph, EC, TSS, Fe AQ 3 P n AG/12SO4 1000 ~ml-B'2006-023-1 RI0 5 i-](intake Rd), RELINQUISHED BY DATErrlME RECEIVED BY (sign) (Print) (Organization) (Sign) .(Print) (Organization)
 
NVE OP3/4i i I I1-?<.I XYI&#xfd;'Creek Environmental Laboratories.
Creek- Environmental Laboratories, Inc.                                                                                           Uhain-ot-uustoay 141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Order # ALL             22.
Inc.
* PI~,g~ Print in P~n Client Name                                                   Contact                                       Phone                             Due Date:
SreeFK rnvironmenial LaDoraior*'s, inc.141 Suburbau Road, C-5, Sm Luis Obispo, CA 93401 phont (905) 545-9838 fax (805) 545-0107 Unaln-ol-COd
Diablo Canyon Power Plant                                     Trevor Rebel                                   805.545.3607                     24Hr 48Hr Other No malTAi Address                                         City                 State           Zip                     Fax PO Box 56, Avila Beach CA 93424                                                                                                               Cell 805.545.3459                     Beeper 805.441.5435 Project Name/Number                                                                                         PO#                               Copies To:
#to Order 4* Please Print in Pen Client Name I Contact " Phone I Due Date: Diablo Canyon Power PlantI Trevor Rebel 805.545.3607 1 24Hr 48Hr Other Normal TAT jc Address City State Zip Fax Cell PO Box 66, Av~la Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number j PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments:
Stormwater Bill to: (if different from above)                       Address                                       City                                 State             Zip Sampler Name (Print)                                   Comments: Storm Water Set 1                                                             Matrix Key: DW = Drinking Water I.AQ = Aqueous         SL =Soil/Solid Date/Time                                                             U of Sample Description                                   Sampled                   Analysis                         Matrix Bottles Preservative/ Type Bottles         Creek Lab Sample #
Storm Water Set 2 Matrix Key: DW = Drinking Water ,[ AQ = Aqueous SL = SoillSolid DatelTime or Sample Description Sampled Analyis Matrrx Bobes. Pmserv.ITypB SotUs Cm*1.ub Smnmple 9 2006-003-2 (NW Intake Bldg) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 Plump .-A mll; .2006-023-2 (Intake Road) 2-7.07 Oil and Grease, ph, EC, TSS, Fe AQ 3 P/unp --.~~~~~~.A0Ga2idO411ool"-00 : -2006-Boat-2 (Boat Dock) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 Plo.ip ..A'AG./H2,6O4''10'0-04"Mi
2006-005-1Oil and Grease, ph, EC, TSS, Fe                   AQ     3       P         Q R           444 3 250       i  ,, ,
-_- .f--T 2`50 mI-C -137.2.: 2006-006B-2 (Lot#l) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 PlUnp Q1-A.-.AGIH2 O4 OO-I-2006-OO6A-2 (Shooting Effluent) Oil and Grease, ph, EC, TSS, Fe AQ 3 P/l ..A AGNI2&#xfd;1010Q mIB _7Q, 2006-Path 005-2 (Area 10 Ditch) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 30Plunp .-.A AG/H29O 100 49:8~2006-004-2 (Settling Basin) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 QP.up-. A .AGH2SO4 1000 mi-B : RELINQUISHED BY DATEOrME RECEIVED BY (sign (?Tnt (Organization)(Sign (Print) (Organization) j / Trevor Rebel ENVE OPS V-6"_7____________
(005 Area 10 Ditch)_                                                           ___i (Sign)~~~~~4 (Print)4             (Ogaiztin                           (Sg)(rit Ogaiain J E.44
()~Creek Environmental L_ 0 Laboratories, Inc.PORLABl*EONLY:-
                                                                                                                                                $$.* 4444S4 RELINQUISHED BY                                                    DATE/TIME              RECEIVED BY L." 7&                         .1                                 Creek Environmental
od:- *Lab/ Curer: "S ". .eCo lions: Inz "I& Y -Cust dy aleYI-- .--
 
LrepK :nvlronmental Laboratorz's, Inc.141 Suburbaa Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Chaln-ot-Cu tody Order #SPease Print in Pen Client Name Contact Phone Due Date: Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other Normal TAT Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (If different from above) Address City State Zip Sampler Name (Print) Comments:
Creek- Environmental Laboratorip-s, Inc.                                                                                   Chain-ot-Uustody 141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107                                                         Order # iv//2*
Storm Water Set 2 Matrix Key: DW = Drinking Water AQ = Aqueous SL = SofI/Solid DatelTime  
* Pl~i~c~ Pr~rt in P0,,
*OF Sample Description Sampled Analysis Matrix Prewwvof Type BaWas Cea, Lab Sa-smple#2006-009-2 (NW Protected Area) 2.7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 .P1Ulip .,Q-:A;-AG/HsO4 1060 ml*l..!_ _ _ _ _ _ __--_ _-_ _._ /H .> 5 0 rm ,-C : ..-_. _ _- _ _- _ _. _2006-013-2 (V-Ditch Below Reservoir) 2-7-0'7 Oil and Grease, ph, EC, TSS, Fe' AQ 3 Plunp.Q.-:
Client Name                                                   Contact                                     hone                             Due Date:
A .'..!2006-015-2 (Downstream NPG Garage) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 J AGMW2"O 16004h mi-B A 2006-008-2 (Diablo Creek) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 .Piu rp ,--.;2006-011-2 (Diablo Creek Rd Culvert Inlet) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 Ap 1620--)E : .25 " r.B RELINQUISHED BY DATEITIME RECEIVED BY Pr(s0a) zationS (Sign) "Print) (Organization)
Diablo Canyon Power Plant                                     Trevor Rebel                               805.545.3607                     24Hr 48Hr Other Normal TAT Address                                   City                     State       Zip                     Fax                               Cell PO Box 56, Avila Beach CA 93424                                                                         805.545.3459                     Beeper 805.441.5435.
Trevor Rebei ENVE OPS 250 Creek Environmental
Project Name/Number                                                                                     PO#                               Copies To:
Stormwater Bill to: (if different from above)                         Address                                 City                                 State           Zip Sampler Name (Print)                                 Comments: Storm Water Set I                                                           Matrix Key: DW = Drinking Water I AQ = Aqueous SL = Soil/Solid Date/Time                                                         # of Sample Description                                 Sampled                 Analysis                           Matrix 2006-006B-1,                                                                                                        Bottles Preservative IType Bottles       Creek Lab Sample #
206-0 0 B 1                                         (&4o7-'       Oil and Grease, ph, EC, TSS, Fe             AQ     3                 Q      "/n 100 ml,..     "G112O            .
(006 Storm Grate in Lot #1)                                                                                                                                                             '   -
RELINQUISHED BY                                               DATE/TIME               RECEIVED BY (Sign)                             (Print)                 (Organization)                   (Sign)                         (Print)                       (Organization)
P-)d7-                             1/4
 
  %.r1.0 ;,                   i.vironmental Laborat ies, Inc.                                                                     Chain-of-Custody 141 Subu.       .i Road, Suite C-5,,San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Order #_  ______
. Please Print in Pen Client Name Diablo Canyon Power Plant Contact Trevor Rebel Phone 805.545.3607 1'DueDate:
24Hr 48Hr Other N    a al 1
Address                                         City                   State         Zip                 Fax                         Cell PO Box 56, Avila Beach CA 93424                                                                             805.545.3459                 Beeper 805.441.5435 Project Name/Number                                                                                         PO#                           Copies To:
Stormwater Bill to: (if different from above)                             Address                               City                             State       Zip Sampler Name (Print)                                       Comments: Storm Water Set I                                                   MaAQ= Aqueous SL = Soil/Solid Date/Time                                                     #of Sample Description lottles   121 2006-006A-1 (Shoot Range Eff)                                                                                                               II RELINQUISHED BY
 
Cree'- Environmental Laboratorves, Inc.                                                                                                                 OrderU
_-                    UY 141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (80)) 545-0107                                                         Order # _,J)711-0 Client Name   rContact 1.Due Diablo Canyon Power Plant f Phone                                  Date:
Trevor Rebel                                 J[805.545.3607                     24Hr 48Hr Other Normal TAT Address                                   City                   State         Zip                       Fax
*PO Box 56, Avila Beach CA 93424                                                                                                             Cell 805.545.3459                     Beeper 805.441.5435 Project Name/Number                                                                                       PO#
Stormwater                                                                                                                                  Copies To:
Bill to: (if different from above)                       Address                                     City                                 State               Zip samPler Name (Print)                                 Comments: Storm Water Set I                                                           Matrix AQ      Key: OW = Drinking Water
                                                                                                                                                  = Aqueous       SL = Soil/Solid Date/Time                                                         # of Sample Description                                 Sampled               Analysis                             Matrix Bottles Preservative I Type Bottles         Creek Lab Sample #
Oil and Grease, ph, EC, TSS, Fe                 AQ     3       -P/j     Q-4,
                                                                                                                                            .. A 2006-008-1                                                                                                                       AG1-jSO 100                                       .-
(008- Diab Creek)
(/LSign) .                     ,... rintg                 (Organization).                     (sign)                           (Print)                         (Organization)
                                '   *            "   ENVE OPS
                                                                                    ,*;          /f//I//Q               I       5~su,.
Creek Environmental 1 .ahnpofniAAC T"'.           I
 
    ,re'-K Invironmental Laboratc ies, Inc.                                                                                 Chain-of-C ~stody 141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Order #_______
S
* PI~~ Print in PAn Client Name                                                   Contact                                   Phone                             Due Date:
Diablo Canyon Power Plant                                     Trevor Rebel                             805.545.3607                       24Hr 48Hr Other Normal TAT Address                                       city                   State       Zip                     Fax                               Cell PO Box 56, Avila Beach CA 93424                                                                         805.545.3459                       Beeper 805.441.5435 Project Name/Number                                                                                     PO#                               Copies To:
Stormwater Bill to: (if different from above)                         Address                                 City                                   State             Zip Sampler Name (Print)                                 Comments: Storm Water Set I                                                           Matrix Key: DW = Drinking Water I AQ = Aqueous SL = Soil/Solid DatelTime                                                         #of 2006-009-1.
Sample Description                                 Sampled fv'l-o.-O Analysis Oil and Grease, ph, EC, TSS, Fe Matrix AQ Bottles 3
Preservative / Type Bottles AGIH2SO41000ml-P/unp     Q- A&#xfd; Creek Lab Sample #
(009 N Protected) 09-t                                                          ote RELINQUISHED BY                                                 DATE/TIME               RECEIVED BY (Sign)                               (Print)                 (Organization                   (Sign)       "
1                                                  (Print)                         (Organization)
"--                             [ ,.f*_.*.*            ENVEOPS j._                         .,   ...
I QIQ'" I       obF2/ I&                       6~&-HA~ 4 Creek Environmental T Qh.VQ+hAw1AtnIf",         Iu
 
k,reeK Lnvironmentai Laborator"s, Inc.                                                                                   Chain-of-Cu ..tody 141 Suburban Koad, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107                                       Order # -//7///
.   " Please Print in Pen
                                                                                                                                                        -- '%,
Client Name                                                 Contact                                   Phone                   Due Date:
Diablo Canyon Power Plant                                   Trevor Rebel                             805.545.3607           24Hr 48Hr Other Address                                   City                   State         Zip                 Fax                     Cell PO Box 56, Avila Beach CA 93424                                                                       805.545.3459           Beeper 805.441.5435 Project Name/Number                                                                                   PO#                     Copies To:
Stormwater Bill to: (if different from above)                       Address                               City                         State         Zip Sampler Name (Print)                                   Comments: Storm Water Set I                                             Matrix Key: DW = Drinking Water AQ = Aqueous SL = Soil/Solid Date/Time                                                     # Of Sample Description                                 Sampled                Analysis                       Matrix Bottles 2006-011-1                                           t,.z.,4 Oil and Grease, ph, EC, TSS, Fe               AQ     3 (DiabloCreek Dr)
KtLINQUISHED           Y                                       DATE/TIME             RE EIVE         Y
 
Creek- Environmental Laboratorins, Inc.                                                                                   unaln-oi-tuswouy 141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107                                       Order# Y'/'710Z
.     Please Print in Pen Client Name                                                 Contact                                   Phone                   Due Date:
Diablo Canyon Power Plant                                   Trevor Rebel                             805.545.3607             24Hr 48Hr Other Normal TAT Address                                   City                     State       Zip                 Fax                     Cell PO Box 56, Avila Beach CA 93424                                                                       805.545.3459             Beeper 805.441.5435 Project Name/Number                                                                                   PO#                     Copies To:
Stormwater Bill to: (if different from above)                       Address                               City                         State         Zip Sampler Name (Print)                                 Comments: Storm Water Set I                                             Matrix Key: DW = Drinking Water AQ = Aqueous SL = Soil/Solid Date/Time                                                     # of Samole Descriotion                                 Sam oled              Analvsis                         Matrix Bottles 2 0- 1-,o*'Oil and Grease, ph, EC, TSS, Fe           AQ     3 2006-013-1 (013 -Below reservoir and adj 230 kv yard)
RELINQUISHED BY                                               DATEITIME           RECEIVED BY
 
  .;relK t-nvironmental Laboratcvies, Inc.                                                                                       Chain-of-C .stody 141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107                                                             Order #
S Please Print in Pen Client Name                                                     Contact                                   Phone                               Due Date:
Diablo Canyon Power Plant                                       Trevor Rebel                               805.545.3607                       24Hr 48Hr Other Nornral'TAT)II Address                                           City               State       Zip                     Fax                                 Cell PO Box 56, Avila Beach CA 93424                                                                             805.545.3459                       Beeper 805.44,1.5435 Project Name/Number                                                                                         PO#                                 Copies To:
Stormwater Bill to: (if different from above)                           Address                                 City                                   State             Zip Sampler Name (Print)                                       Comments: Storm Water Set I                                                         Matrix Key: DW = Drinking Water
                                                                                                                                              -AQ = Aqueous SL = Soil/Solid DatelTime                                                         # of Sample Description                                     Sampled               Analysis                           Matrix Bottles Preservative I Type Bottles       Creek Lab Sample #
it-22v-01-,Oil and Grease, ph, EC, TSS, Fe               AQ     3       Plu*-0.
20106-015-1                                                                             ______                                    AG12Sk           1000___
(015 -AdjGarage)
RELINQUISHED BY                                                 DATE/TIME               RECEIVED BY (Sign)                                 (Prin~t)               (Organization)                   (Sign)                           (Print)                         (Organization) j 01          rZ_       ENVE OPS                                         -
i -1*OL I                  I I
I~<.63~S~ 9                         Creek Environmental
 
Creek. Environmental Laboratories, Inc.                                                                                       Chai-rod-                      cus# ly 141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107                                                           Order # tf '7J/7 0     D1     0 ; f; D Client Name                                                 Contact                                       Phone Diablo Canyon Power Plant                                                                                                                    Due ate:
Trevor Rebel                                 .805.545.3607                     24Hr 48Hr Other Normal TAT Address                                   City                   State         Zip                       Fax P0 Box 56, Avila Beach CA 93424                                                                                                             Cell 805.545.3459                     Beeper 805.441.5435 Project Name/Number                                                                                       PO#
Stormwater                                                                                                                                  Copies To:
Bill to: (if different from above)                       Address                                     City                                 State             Zip Sampler Name (Print)                                   Comments: Storm Water Set 1                                                           Matrix Key: DW = Drinking Water I AQ = Aqueous SL = Soil/Solid Sample Description                                  Date/Time                                                           # of a led               Analysis                             Matrix Bottles Preservative I Type Bottles 2-v,-o     Oil and Grease, ph, EC, TSS, Fe Creek Lab Sample #
2006-023-1                                                                                                      AQ       3     P n AG/12SO4 1000 ~ml-B' RI0 5 i-
](intake Rd),
NVE                  OP3/4 RELINQUISHED BY                                                 DATErrlME                 RECEIVED BY (sign)                             (Print)               (Organization)                       (Sign)                   .       (Print)                         (Organization) i                     i                      II1-?<.
I XYI&#xfd;'
Creek Environmental Laboratories. Inc.
 
SreeFK               rnvironmenial LaDoraior*'s, inc.                                                                                   Unaln-ol-COd          Order 4
                                                                                                                                                                          #to 141 Suburbau Road, S*it C-5, Sm Luis Obispo, CA 93401 phont (905) 545-9838 fax (805) 545-0107
* Please Print in Pen Client Name                                                           I Contact "                                   Phone                         I Due Date:
Diablo Canyon Power PlantI                                               Trevor Rebel                               805.545.3607                 1 24Hr     48Hr Other       Normal TAT jc Address                                           City                             State         Zip                 Fax                             Cell PO Box 66, Av~la Beach CA 93424 Project Name/Number Stormwater j 805.545.3459 PO#
Beeper 805.441.5435 Copies To:
Bill to: (ifdifferent from above)                                   Address                                   City                                 State           Zip Sampler Name (Print)                                           Comments: Storm Water Set 2                                                           Matrix Key: DW = Drinking Water
                                                            ,[                                                                                       AQ = Aqueous SL = SoillSolid DatelTime                                                               or Sample Description                                         Sampled                         Analyis                     Matrrx   Bobes. Pmserv.ITypB     SotUs         Cm*1.ub Smnmple 9 2006-003-2 (NW Intake Bldg)                                   2-7-07           Oil and Grease, ph, EC, TSS, Fe             AQ       3       Plump .- A iA'GIiS*4,4000 mll; .
2006-023-2 (Intake Road)                                     2-7.07           Oil and Grease, ph, EC, TSS, Fe             AQ 3             P/unp -             -.
                                                                                                        ~~~~~~.A0Ga2idO411ool"-00                                       *          :     -
2006-Boat-2 (Boat Dock)                                       2-7-07           Oil and Grease, ph, EC, TSS, Fe           AQ       3       Plo.ip     A' .       .
AG./H2,6O4''10'0-04"Mi
                                                                -_- .f--T                                                                             2`50 mI-C           -137.2.:
2006-006B-2 (Lot#l)                                           2-7-07           Oil and Grease, ph, EC, TSS, Fe           AQ       3       PlUnp Q1-A.-.
AGIH2     O4 OO-I-2006-OO6A-2 (Shooting Effluent)                               *.',07            Oil and Grease, ph, EC, TSS, Fe           AQ       3       P/l         A        .   .
_7Q, AGNI2&#xfd;1010Q         mIB 2006-Path 005-2 (Area 10 Ditch)                               2-7-07           Oil and Grease, ph, EC, TSS, Fe           AQ       30Plunp             .-.
A AG/H29O           10049:8~
2006-004-2 (Settling Basin)                                   2-7-07           Oil and Grease, ph, EC, TSS, Fe           AQ       3                   A .
QP.up-.
AGH2SO4 1000 mi-B :
RELINQUISHED BY                                                                 DATEOrME           RECEIVED BY (sign                                 (?Tnt                           (Organization)(Sign                                                 (Print)                     (Organization) j/           Trevor Rebel                     ENVE OPS                     V-6"_7
____________
L_ 0
()~Creek                       Environmental Laboratories, Inc.
PORLABl*EONLY:- Shippin*g.      od:-       *Lab/ Curer: "S         ".                   . eCo lions: Inz     "I&Y   -Cust dy   aleYI--                       .--
 
LrepK :nvlronmental Laboratorz's, Inc.                                                                                     Chaln-ot-Cu tody 141 Suburbaa Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107                                                         Order #
SPease Print in Pen Client Name                                                   Contact                                     Phone                             Due Date:
Diablo Canyon Power Plant                                     Trevor Rebel                               805.545.3607                     24Hr 48Hr Other           Normal TAT Address                                         City                 State         Zip                   Fax                               Cell PO Box 56, Avila Beach CA 93424                                                                             805.545.3459                     Beeper 805.441.5435 Project Name/Number                                                                                         PO#                               Copies To:
Stormwater Bill to: (Ifdifferent from above)                             Address                                 City                                 State             Zip Sampler Name (Print)                                     Comments: Storm Water Set 2                                                           Matrix Key: DW = Drinking Water AQ = Aqueous SL = SofI/Solid DatelTime                                                         *OF Sample Description                                     Sampled                 Analysis                         Matrix Bo=*      Prewwvof Type BaWas             Cea, Lab Sa-smple#
2006-009-2 (NW Protected Area)                       2.7-07     Oil and Grease, ph, EC, TSS, Fe               AQ     3         .P1Ulip .,Q-:A;-
                                                          .!_               _ _ _ _ _ __--_       _-_   _._                         /H AG/HsO4      0
                                                                                                                                              .>5 1060 rm,-C ml*l.
:. .-   _. _ _- _ _-_ _. _
2006-013-2 (V-Ditch Below Reservoir)                   2-7-0'7     Oil and Grease, ph, EC, TSS, Fe'             AQ     3         Plunp.Q.-: A       .'..!
2006-015-2 (Downstream NPG Garage)                     2-7-07     Oil and Grease, ph, EC, TSS, Fe               AQ     3       J PluipiQ-.A*:I AGMW2"O 16004h         mi-B A 2006-008-2 (Diablo Creek)                               2-7-07     Oil and Grease, ph, EC, TSS, Fe               AQ     3         .Piu rp ,--.;
2006-011-2 (Diablo Creek Rd Culvert Inlet)             2-7-07     Oil and Grease, ph, EC, TSS, Fe               AQ     3           1620-Ap
                                                                                                                                            -)E
: .25"         r.B RELINQUISHED BY                                                     DATEITIME             RECEIVED BY Pr(s0a)                     nL*-rNV zationS                   (Sign)                         "Print)                           (Organization)
Trevor Rebei             ENVE OPS             250 Creek Environmental
_______________
_______________
rLaboratorik Inc..."FoLAa S on :e1odf t.Lab! Couri .sa Ccnhlo1ndacti o1W, N C" Sealed:- Cold' W- N}}
rLaboratorik Inc.
.."FoLAa &ao'o*v. S       on   :e1odf t.Lab! Couri             .           sa   Ccnhlo1ndacti     Cold' o1W,W-N C"     Sealed:-}}

Revision as of 04:53, 23 November 2019

2006-2007 Annual Report for Storm Water Discharges Associated with Industrial Activities, Diablo Canyon Power Plant (Dcpp), Facility Wdid No. 340I018248
ML071840189
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/21/2007
From: Becker J
Pacific Gas & Electric Co
To:
Office of Nuclear Reactor Regulation, State of CA, Regional Water Quality Control Bd
References
340I018248, DCL-2007-526
Download: ML071840189 (84)


Text

Pacific Gas and ElectricCompany' Diablo Canyon Power Plant P 0. Box 56 Avila Beach, CA 93424 PG&E Letter DCL-2007-526 Certified/Return Receipt

  1. 7007-0220-0004-6735-9783 June 21, 2007 California Regional Water Quality Control Board Central Coast Region 895 Aerovista, Suite #101 San Luis Obispo, CA 93401-7906 Attn: Storm Water Division 2006-2007 Annual Report for Storm Water Discharges Associated with Industrial Activities, Diablo Canyon Power Plant (DCPP), Facility WDID No. 3401018248 Enclosed is the DCPP Annual Report for Storm Water Discharges Associated with Industrial Activities for the Reporting Period July 1, 2006 through June 30, 2007.

The report has been completed in accordance with DCPP's commitment to implement provisions of the State General Industrial Storm Water Permit (General Permit) as outlined in PG&E letter DCL-2006-556 dated November 09, 2006 to the Regional Water Quality Control Board Central Coast Region.

If you have any questions or concerns regarding the enclosed report, please contact Trevor Rebel of my staff at (805) 545-3607.

Sincerely, J~ames R. cker Vice President- Diablo Canyon Operationsand Station Director Enclosure 2007526/tdr/kmo J---75

PG&E Letter DCL-2007-526 CCRWQCB Storm Water Division June 21, 2007 Page 2 cc: w/enclosure: Resident Inspector, Terry Jackson U.S. Nuclear Regulatory Commission Diablo Canyon Power Plant 104/5 Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Dr., Suite 400 Arlington, TX 76011-4005 Director, Division of Reactor Projects U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Dr., Suite 400 Arlington, TX 76011-4005 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 cc: w/o enclosure: Peter von Langen Environmental Scientist CCRWQCB 895 Aerovista, #101 San Luis Obispo, CA 93401-7906 California Department of Fish and Game 20 Lower Ragsdale, Suite 100 Monterey, California 93490

State of California STATE WATER RESOURCES CONTROL BOARD 2006-2007 ANNUAL REPORT FOR STORM WATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITIES Reporting Period July 1, 2006 through June 30, 2007 An annual report is required to be submitted to your local Regional Water Quality Control Board (Regional Board) by July 1 of each year. This document must be certified and signed, under penalty of perjury, by the appropriate official of your company. Many of the Annual Report questions require an explanation. Please provide explanations on a separate sheet as an attachment. Retain a copy of the completed Annual Report for your records.

Please circle or highlight any information contained in Items A, B, and C below that is new or revised so we can update our records. Please remember that a Notice of Termination and new Notice of Intent are required whenever a facility operation is relocated or changes ownership.

If you have any questions, please contact your Regional Board Industrial Storm Water Permit Contact.

The names, telephone numbers and e-mail addresses of the Regional Board contacts, as well as the Regional Board office addresses can be found at http://www.waterboards.ca.gov/stormwtr/contact.html.

To find your Regional Board information, match the first digit of your WDID number with the corresponding number that appears in parenthesis on the first line of each Regional Board office.

GENERAL INFORMATION:

A. FacilityInformation: Facility WDID No: 3401018248 Facility Business Name: Diablo Canyon Power Plant (DCPP) Contact Person: Trevor D. Rebel Physical Address: 9 Miles North West of Avila Beach e-mail: tdr5(apqe.com City: Avila Beach State: CA Zip: 93424 Phone: 805.545.3607 Standard Industrial Classification (SIC) Code(s) 4911 B. Facility OperatorInformation:

Operator Name: Pacific Gas and Electric Company Contact Person: Trevor D. Rebel Mailing Address: P.O. Box 56 e-mail: tdr5(,p~qe.com City: Avila Beach State: CA Zip: 93424 Phone: 805.545.3607 C. FacilityBilling Information:

Operator Name: Pacific Gas and Electric Company - DCPP Contact Person: Bryan K. Cunningham Mailing Address: P.O. Box 56 e-mail: bkc3cWDae.com City: Avila Beach State: CA Zip: 93424 Phone: 805.545.4439

2006-2007 ANNUAL REPORT SPECIFIC INFORMA TION MONITORING AND REPORTING PROGRAM D. SAMPLING AND ANALYSIS EXEMPTIONS AND REDUCTIONS

1. For the reporting period, was your facility exempt from collecting and analyzing samples from two storm events in accordance with sections B.12 or 15 of the General Permit?

E- YES Go to Item D.2 NO Go to Section E

2. Indicate the reason your facility is exempt from collecting and analyzing samples from two storm events. Attach a copy of the first page of the appropriate certification if you check boxes ii, iii, iv, or v.
i. -] Participating in an Approved Group Monitoring Plan Group Name:

ii Submitted No Exposure Certification (NEC) Date Submitted:

Re-evaluation Date: / /

Does facility continue to satisfy NEC conditions? YES NO iii. LI Submitted Sampling Reduction Certification (SRC) Date Submitted: /

Re-evaluation Date: / I Does facility continue to satisfy SRC conditions? R YES -1 NO iv. I Received Regional Board Certification Certification Date:

v. [] Received Local Agency Certification Certification Date:
3. If you checked boxes i or iii above, were you scheduled to sample one storm event during the reporting year?

[I YES Go to Section E [I NO Go to Section F

4. If you checked boxes ii, iv, or v, go to Section F.

E. SAMPLING AND ANALYSIS RESULTS

1. How many storm events did you sample? 2 If less than 2, attach explanation (if you checked item D.2.i or iii.

above, only attach explanation ifyou answer "0").

2. Did you collect storm water samples from the first storm of the wet season that produced a discharge during scheduled facility operating hours? (Section B.5 of the General Permit)

LI YES NO attach explanation (Please note that if you do not sample the first storm event, you are still required to sample 2 storm events)

3. How many storm water discharge locations are at your facility? 18

2006-2007.

ANNUAL REPORT

4. For each storm event sampled, did you collect and analyze a sample from each of the facility's' storm water discharge locations? - YES, go to Item E.6 Z NO
5. Was sample collection or analysis reduced in accordance with Section B.7.d of the General Permit? n YESS FII NO, attach explanation If "YES", attach documentation supporting your determination that two or more drainage areas are substantially identical.

Date facility's drainage areas were last evaluated 6/2/07

6. Were all samples collected during the first hour of discharge? LI YES NO, attach explanation
7. Was all storm water sampling preceded by three (3) working days without a storm water discharge? [j YES NO, attach explanation
8. Were there any discharges of storm water that had been temporarily stored or contained? (such as from a pond) YES [ NO,gotoltemE.10
9. Did you collect and analyze samples of temporarily stored or contained storm water discharges from two storm events?

(or one storm event if you checked item D.2.i or iii. above) Z YES 0 NO, attach explanation

10. Section B.5. of the General Permit requires you to analyze storm water samples for pH, Total Suspended Solids (TSS), Specific Conductance (SC), Total Organic Carbon (TOC) or Oil and Grease (O&G), other pollutants likely to be present in storm water discharges in significant quantities, and analytical parameters listed in Table D of the General Permit.
a. Does Table D contain any additional parameters related to your facility's SIC code(s)? l\ YES [:] NO, Goto Item E.11
b. Did you analyze all storm water samples for the applicable parameters listed in Table D? 0 YES li NO
c. If you did not analyze all storm water samples for the applicable Table D parameters, check one of the following reasons:

In prior sampling years, the parameter(s) have not been detected in significant quantities from two consecutive sampling events. Attach explanation The parameter(s) is not likely to be present in storm water discharges and authorized non-storm water discharges in significant quantities based upon the facility operator's evaluation. Attach explanation Other. Attach explanation

11. For each storm event sampled, attach a copy of the laboratory analytical reports and report the sampling and analysis results using Form 1 or its equivalent. The following must be provided for each sample collected:

0 Date and time of sample collection

  • Testing results S Name and title of sampler " Test methods used S Parameters tested
  • Test detection limits S Name of analytical testing laboratory
  • Date of testing 0 Discharge location identification
  • Copies of the laboratory analytical results

2006-2007 ANNUAL REPORT F. QUARTERLY VISUAL OBSERVATIONS

1. Authorized Non-Storm Water Discharges Section B.3.b of the General Permit requires quarterly visual observations of all authorized non-storm water discharges and their sources.
a. Do authorized non-storm water discharges occur at your facility?

v* YES NO GotoltemF.2

b. Indicate whether you visually observed all authorized non-storm water discharges and their sources during the quarters when they were discharged. Attach an explanation for any "NO" answers. Indicate "N/A" for quarters without any authorized non-storm water discharges.

July-September [-] YES NO [: N/A October-December E YES [] NO [] N/A January-March 12 YES L] NO -]N/A April-June EYES OI NO LI N/A

c. Use Form 2 to report quarterly visual observations of authorized non-storm water discharges or provide the following information:
i. name of each authorized non-storm water discharge ii. date and time of observation iii. source and location of each authorized non-storm water discharge iv. characteristics of the discharge at its source and impacted drainage area/discharge location
v. name, title, and signature of observer vi. any new or revised BMPs necessary to reduce or prevent pollutants in authorized non-storm water discharges. Provide new or revised BMP implementation date.
2. Unauthorized Non-Storm Water Discharges Section B.3.a of the General Permit requires quarterly visual observations of all drainage areas to detect the presence of unauthorized non-storm water discharges and their sources.
a. Indicate whether you visually observed all drainage areas to detect the presence of unauthorized non- storm water discharges and their sources. Attach an explanation for any "NO" answers.

July-September E] YES " NO October-December [n YES -- NO January-March [u YES E] NO April-June EYES [L NO

b. Based upon the quarterly visual observations, were any unauthorized non-storm water discharges detected?

,s] YES f- NO Go to Item F.2.d

c. Have each of the unauthorized non-storm water discharges been eliminated or permitted?

YES LI NO Attach explanation

d. Use Form 3 to report quarterly unauthorized non-storm water discharge visual observations or provide the following information:
i. name of each unauthorized non-storm water discharge ii. date and time of observation iii. source and location of each unauthorized non-storm water discharge iv. characteristics of the discharge at its source and impacted drainage area/discharge location
v. name, title, and signature of observer vi. any corrective actions necessary to eliminate the source of each unauthorized non-storm water discharge and to clean impacted drainage areas. Provide date unauthorized non-storm water discharge(s) was eliminated or scheduled to be eliminated.

2006-2007 ANNUAL REPORT G. MONTHLY WET SEASON VISUAL OBSERVATIONS Section B.4.a of the General Permit requires you to conduct monthly visual observations of storm water discharges at all storm water discharge locations during the wet season. These observations shall occur during the first hour of discharge or, in the case of temporarily stored or contained storm water, at the time of discharge.

1. Indicate below whether monthly visual observations of storm water discharges occurred at all discharge locations.

Attach an explanation for any "NO" answers. Include in this explanation whether any eligible storm events occurred during scheduled facility operating hours that did not result in a storm water discharge, and provide the date, time, name and title of the person who observed that there was no storm water discharge.

YES NO YES NO 1: 0 October February D

I-I E]

November D

March D

December April D

January May D

2. Report monthly wet season visual observations using Form 4 or provide the following information:
a. date, time, and location of observation
b. name and title of observer C. characteristics of the discharge (i.e., odor, color, etc.) and source of any pollutants observed
d. any new or revised BMPs necessary to reduce or prevent pollutants in storm water discharges.

Provide new or revised BMP implementation date.

ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION (ACSCE)

H. ACSCE CHECKLIST Section A.9 of the General Permit requires the facility operator to conduct one ACSCE in each reporting period (July 1-June 30). Evaluations must be conducted within 8-16 months of each other. The SWPPP and monitoring program shall be revised and implemented, as necessary, within 90 days of the evaluation. The checklist below includes the minimum steps necessary to complete a ACSCE. Indicate whether you have performed each step below. Attach an explanation for any "NO" answers.

1. Have you inspected all potential pollutant sources and industrial activities areas? YES M NO The following areas should be inspected:
  • areas where spills and leaks have occurred
  • buildin g repair, remodeling, and construction during the last year 0 materik Il storage areas
  • outdoor wash and rinse areas 0 vehicle /equipment storage areas
  • process/manufacturing areas 9 truck p.arking and access areas
  • loading, unloading, and transfer areas 0 rooftop equipment areas
  • waste storage/disposal areas
  • vehicle fueling/maintenance areas

" dust/particulate generating areas

  • non-st( rm water discharge generating areas
  • erosion areas
2. Have you reviewed your SWPPP to assure that its BMPs address existing potential pollutant sources and industrial activities areas? YES Zl NO 3.. Have you inspected the entire facility to verify that the SWPPP's site map is up-to-date? The following site map items should be verified: YES [ NO

" facility boundaries " storm water collection and conveyance system

" outline of all storm water drainage areas

  • structural control measures such as catch basins, berms,
  • areas impacted by run-on containment areas, oil/water separators, etc.
  • storm water discharges locations

2006-2007 ANNUAL REPORT

4. Have you reviewed all General Permit compliance records generated since the last annual evaluation? E YES F] NO The following records should be reviewed:

" quarterly authorized non-storm water

  • quarterly unauthorized non-storm water discharge discharge visual observations visual observations
  • monthly storm water discharge visual
  • Sampling and Analysis records observation
  • preventative maintenance inspection and
  • records of spills/leaks and associated maintenance records clean-up/response activities
5. Have you reviewed the major elements of the SWPPP to assure compliance with the General Permit? 0 YES El, NO The following SWPPP items should be reviewed:

0 pollution prevention team

  • assessment of potential pollutant sources 0 list of significant materials " identification and description of the BMPs to be 0 description of potential pollutant sources implemented for each potential pollutant source
6. Have you reviewed your SWPPP to assure that a) the BMPs are adequate in reducing or preventing pollutants in storm water discharges and authorized non-storm water discharges, and b) the BMPs are being implemented? 0 YES [] NO The following BMP categories should be reviewed:

0 good housekeeping practices preventative maintenance 0 spill response material handling and storage practices 0 employee training waste handling/storage 0 erosion control structural BMPs 0 quality assurance

7. Has all material handling equipment and equipment needed to implement the SWPPP been inspected? M YES FI- NO
1. ACSCE EVALUATION REPORT The facility operator is required to provide an evaluation report that includes:

0 identification of personnel performing the evaluation

  • schedule for implementing SWPPP revisions 0 the date(s) of the evaluation " any incidents of non-compliance and the 0 necessary SWPPP revisions corrective actions taken Use Form 5 to report the results of your evaluation or develop an equivalent form.

J. ACSCE CERTIFICATION The facility operator is required to certify compliance with the Industrial Activities Storm Water General Permit. To certify compliance, both the SWPPP and Monitoring Program must be up to date and be fully implemented.

Based upon your ACSCE, do you certify compliance with the Industrial Activities Storm Water General Permit? [n YES F NO If you answered "NO" attach an explanation to the ACSCE Evaluation Report why you are not in compliance with the Industrial Activities Storm Water General Permit.

2006-2007 ANNUAL REPORT ATTACHMENT

SUMMARY

Answer the questions below to help you determine what should be attached to this annual report. Answer NA (Not Applicable) to questions 2-4 if you are not required to provide those attachments.

1. Have you attached Forms 1,2,3,4, and 5 or their equivalent? [* YES (Mandatory)
2. If you conducted sampling and analysis, have you attached the laboratoryanalytical reports? YES ]NO - NA
3. If you checked box II, Ill, IV, or V in item D.2 of this Annual Report, have you attached the first page of the appropriate certifications? L'- YES - NO ZNA
4. Have you attached an explanation for each "NO" answer in items E.1, E.2, E.5-E.7, E.9, E.10.c, F.1.b, F.2.a, F.2.c, G.1, H.1-H.7, or J? YES DNO -NA ANNUAL REPORT CERTIFICATION I am duly authorized to sign reports required by the INDUSTRIAL ACTIVITIES STORM WATER GENERAL PERMIT (see Standard Provision C.9) and I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those person directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

Printed Name: James R. Becker Signat&uýe...

Date: G Title: Vice President - Diablo Canyon Operations and Station Director

2006-2007 ANNUAL REPORT DESCRIPTION OF BASIC ANZALYTICAL PARAMETERS The Industrial Activities Storm Water General Permit (General Permit) requires you to analyze storm water samples for at least four parameters. These are pH, Total Suspended Solids (TSS), Specific Conductance (SC),and Total Organic Carbon (TOC). Oil and Grease (O&G) may be substituted for TOC. In addition, you must monitor for any other pollutants whichyou believe to be present in your storm water discharge as a result of industrial activity and analytical parameters listed in Table D of the General Permit. There are no numeric limitations for the parameters you test for.

The four parameters which the General Permit requires to be tested are considered indicatorparameters. In other words, regardless of what type of facility you operate, these parameters are nonspecific and general enough to usually provide some indication whether pollutants are present in your storm water discharge. The following briefly explains what each of these parameters mean:

pH is a numeric measure of the hydrogen-ion concentration. The neutral, or acceptable, range is within 6.5 to 8.5. At values less than 6.5, the water is considered acidic; above 8.5 it is considered alkaline or basic. An example of an acidic substance is vinegar, and a alkaline or basic substance is liquid antacid. Pure rainfall tends to have a pH of a little less than 7. There may be sources of materials or industrial activities which could increase or decrease the pH of your storm water discharge. If the pH levels of your storm water discharge are high or low, you should conduct a thorough evaluation of all potential pollutant sources at your site.

Total Suspended Solids (TSS) is a measure of the undissolved solids that are present in your storm water discharge.

Sources of TSS include sediment from, erosion of exposed land, and dirt from impervious (i.e. paved) areas. Sediment by itself can be very toxic to aquatic life because it covers feeding and breeding grounds, and can smother organisms living on the bottom of a water body. Toxic chemicals and other pollutants also adhere to sediment particles. This provides a medium by which toxic or other pollutants end up in our water ways and ultimately in human and aquatic life. TSS levels vary in runoff from undisturbed land. It has been shown that TSS levels increase significantly due to land development.

Specific Conductance (SC) is a numerical expression of the ability of the water to carry an electric current. SC can be used to assess the degree of mineralization, salinity, or estimate the total dissolved solids concentration of a water sample.

Because of air pollution, most rain water has a SC a little above zero. A high SC could affect the usability of waters for drinking, irrigation, and other commercial or industrial use.

Total Organic Carbon (TOC) is a measure of the total organic matter present in water. (All organic matter contains carbon)

This test is sensitive and able to detect small concentrations of organic matter. Organic matter is naturally occurring in animals, plants, and man. Organic matter may also be man made (so called synthetic organics). Synthetic organics include pesticides, fuels, solvents, and paints. Natural organic matter utilizes the oxygen in a receiving water to biodegrade. Too much organic matter could place a significant oxygen demand on the water, and possibly impact its quality. Synthetic organics either do not biodegrade or biodegrade very slowly. Synthetic organics are a source of toxic chemicals that can have adverse affects at very low concentrations. Some of these chemicals bioaccumulate in aquatic life. If your levels of TOC are high, you should evaluate all sources of natural or synthetic organics you may use at your site.

Oil and Grease (O&G) is a measure of the amount of oil and grease present in your storm water discharge. At very low concentrations, O&G can cause a sheen (that floating "rainbow") on the surface of water (1 qt. of oil can pollute 250,000 gallons of water). O&G can adversely affect aquatic life and create unsightly floating material and film on water, thus making it undrinkable. Sources of O&G include maintenance shops, vehicles, machines and roadways.

If you have any questions regarding whether or not your constituent concentrations are too high, please contact your local Regional Board office. The United States Environmental Protection Agency (USEPA) has published stormwater discharge benchmarks for a number of parameters. These benchmarks may be helpful when evaluating whether additional BMPs are appropriate. These benchmarks can be accessed at our website at http://www.waterboards.ca.gov. It is contained in the Sampling and Analysis Reduction Certification.

See Storm Water Contacts at http://www.waterboards.ca.gov/stormwtr/contact.html

SIDE A FORM 1-SAMPLING & ANALYSIS RESULTS FIRST STORM EVENT

" Ifanalytical results are less than the detection limit (or non detectable), show the value as less than 0 When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example: <.05) meters, etc.), indicate PA" in the appropriate test method used box.

" Ifyou did not analyze for a required parameter, do not report "0". Instead, leave the appropriate box blank = Make additional copies of this form as necessary.

NAME OF PERSON COLLECTING SAMPLE(S): Trevor Rebel TITLE: Environmental Specialist SIGNATURE: C . _/(,iL-ANALYTICAL RESULTS DESCRIBE For First Storm Event DISCHARGE DATE/TIME TIME LOCATION OF SAMPLE DISCHARGE Example: NW Out Fall COLLECTION STARTED BASIC PARAMETERS OTHER PARAMETERS PH TSS SC O&G Fe Marine Refuel 11-26-06 Facility Runoff 20:30 20:20 7.6 390 480 ND 17 003 11-26-06 Yard Storm Drain 20:22 20:20 6.9 580 3400 8.0 23 004 11-26-06 Yard Storm Drain 20:43 21:15 (1) -7.3 250 1000 ND 11 to Retention Basin 005 11-26-06 Yard Storm Drain 21:00 20:45 9.1 660 2100 10 14 TEST REPORTING UNITS: pH Units mgIl umho/cm mgIl mgI _

0.1 5 1 5 0.1 TEST METHOD DETECTION LIMIT:

EPA EPA SM EPA EPA TEST METHOD USED: 150.1 160.2 2510 1664 200.7 ANALYZED BY (SELF/LAB):---------- LAB LAB LAB LAB LAB ITS - I otal Suspended Solos SC - Specitic Conductance (O&{3 - (Oil & Grease I UU - T otal Organic C~arbon (1) Point sampled pre-released as explained in comments under Section E, Number 2.

SIDE A FORM 1-SAMPLING & ANALYSIS RESULTS FIRST STORM EVENT

" Ifanalytical results are less than the detection limit (or non detectable), show the value as less than

  • When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example: <.05) meters, etc.), indicate "PA" in the appropriate test method used box.
  • If you did not analyze for a required parameter, do not report "0V. Instead, leave the appropriate box blank
  • Make additional copies of this form as necessary.

NAME OF PERSON COLLECTING SAMPLE(S): Trevor Rebel TITLE: Environmental Specialist SIGNATURE: _

ANALYTICAL RESULTS DESCRIBE For First Storm Event DISCHARGE DATE/TIME TIME LOCATION OF SAMPLE DISCHARGE Example: NW Out Fall COLLECTION STARTED BASIC PARAMETERS OTHER PARAMETERS PH TSS SC O&G Fe Pb 006 11-26-06 Yard Storm Drain 21:10 20:30 9.3 57 170 ND 2.1 n/a (At Discharge) 006 11-26-06 Range Immediate 21:56 21:00 8.4 100 150 ND 2.7 .14 Outlet 008 11-26-06 Yard Storm Drain 21:39 20:45 6.8 18 940 ND 1.2 n/a 009 11-26-06 Yard Storm Drain 22:30 20:30 (1) 7.0 11 450 ND 0.8 n/a TEST REPORTING UNITS: pH Units mg/I umho/cm mg/I mg/I mg/I 0.1 5 1 5 0.1 .001 TEST METHOD DETECTION LIMIT:

EPA EPA SM EPA EPA EPA TEST METHOD USED: 150.1 160.2 2510 1664 200.7 200.8 ANALYZED BY (SELF/LAB):____ LAB LAB LAB LAB LAB LAB I So - I uLIl Suspernudu Suolids - Specific Conductance uO& - Oil & Grease I - Total Organic Carbon (1) Sample obtained greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after discharge started as explained in comments under Section E, Number 6.

SIDE A FORM 1-SAMPLING & ANALYSIS RESULTS FIRST STORM EVENT

  • If analytical results are less than the detection limit (or non detectable), show the value as less than
  • When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example: <.05) meters, etc.), indicate "PA" in the appropriate test method used box.

" If you did not analyze for a required parameter, do not report "0". Instead, leave the appropriate box blank 0 Make additional copies of this form as necessary.

NAME OF PERSON COLLECTING SAMPLE(S): Trevor Rebel TITLE: Environmental Specialist SIGNATURE: Z:7i 1L..

ANALYTICAL RESULTS DESCRIBE For First Storm Event DISCHARGE DATE/TIME TIME LOCATION OF SAMPLE DISCHARGE Example: NW Out Fall COLLECTION STARTED BASIC PARAMETERS OTHER PARAMETERS PH TSS Sc O&G Fe 011 11-26-06 Yard Storm Drain 21:32 20:45 7.3 38 230 ND 2.0 013 11-26-06 Yard Storm Drain 21:21 20:45 8.5 760 320 ND 16 015 11-26-06 Yard Storm Drain 21:26 20:45 8.2 190 180 ND 8.8 023 11-26-06 Yard Storm Drain 20:25 20:20 6.7 210 940 ND 10 TEST REPORTING UNITS: pH Units mgI1 umho/cm mgIl mgIl 0.1 5 1 5 0.1 TEST METHOD DETECTION LIMIT:

EPA EPA SM EPA EPA TEST METHOD USED: 150.1 160.2 2510 1664 200.7 LAB LAB LAB LAB LAB

- - ---

- -

ANALYZED BY (SELF/LAB):

TSS - Total Susoended Solids

... ......... F ....... ..

SC - Soecific Conductance O&G - Oil & Grease TOC - Total Organic v Carbon

SIDE B FORM 1-SAMPLING & ANALYSIS RESULTS SECOND STORM EVENT

" Ifanalytical results are less than the detection limit (or non detectable), show the value as less than

  • When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example: <.05) meters, etc.), indicate "PA" in the appropriate test method used box.

" If you did not analyze for a required parameter, do not report V0".Instead, leave the appropriate box blank

  • Make additional copies of this form as necessary.

NAME OF PERSON COLLECTING SAMPLE(S): Trevor Rebel TITLE: Environmental Specialist SIGNATURE:

  • ° ANALYTICAL RESULTS DESCRIBE For Second Storm Event DISCHARGE DATE/TIME TIME LOCATION OF SAMPLE DISCHARGE Example: NW Out Fall COLLECTION STARTED BASIC PARAMETERS OTHER PARAMETERS PH TSS Sc O&G Fe Marine Refuel 2-7-07 Facility Runoff 14:34 14:25 7.8 230 240 ND 10 003 2-7-07 Yard Storm Drain 14:27 14:25 7.3 330 610 8 18 004 2-7-07 Yard Storm Drain 14:38 14:40 (1) 7.0 44 480 ND 1.9 to Retention Basin 005 2-7-07 Yard Storm Drain 14:42 14:30 7.8 86 630 ND 2.7 TEST REPORTING UNITS: pH Units mgIl umho/cm mglI mgII 0.1 5 1 5 0.1 TEST METHOD DETECTION LIMIT:

EPA EPA SM EPA EPA TEST METHOD USED: 150.1 160.2 2510 1664 200.7 ANALYZED BY (SELF/LAB): LAB LAB LAB LAB LAB

--

ITS - I otal Suspenaea Solids SC - Specitic Conductance rO&G - Oil & Grease TOC - Total Organic Carbon (1) Point sampled pre-released as explained in comments under Section E, Number 2.

SIDE B FORM 1-SAMPLING & ANALYSIS RESULTS SECOND STORM EVENT

" Ifanalytical results are less than the detection limit (or non detectable), show the value as less than the numerical value of the detection limit (example: <.05) = When analysis is done using portable analysis (such as portable pH meters, SC meters, etc.), indicate "PA" in the appropriate test method used box.

" If you did not analyze for a required parameter, do not report "0". Instead, leave the appropriate box blank 0 . Make additional copies of this form as necessary.

NAME OF PERSON COLLECTING SAMPLE(S): Trevor Rebel TITLE: Environmental Specialist SIGNATURE: _ _ -_______

ANALYTICAL RESULTS DESCRIBE For Second Storm Event DISCHARGE DATE/TIME TIME LOCATION OF SAMPLE DISCHARGE Example: NW Out Fall COLLECTION STARTED BASIC PARAMETERS OTHER PARAMETERS PH TSS SC O&G Fe Pb 006 2-7-07 Yard Storm Drain - 14:49 14:25 8.3 44 120 ND 2.0 .004 (At Discharge) 006 2-7-07 Range Immediate 14:56 14:40 8.0 40 130 ND 1.2 .13 Outlet 008 2-7-07 Yard Storm Drain 14:30 14:25 (1) 6.7 33 2100 ND 1.6 n/a 009 2-7-07 Yard Storm Drain 14:45 14:25 (1) 6.6 18 130 ND 0.17 n/a TEST REPORTING UNITS: pH Units mg/I umho/cm mglI mgIl mgIl 0.1 5 1 5 0.1 .001 TEST METHOD DETECTION LIMIT: 0115010 EPA EPA SM EPA EPA EPA TEST METHOD USED: 150.1 160.2 2510 1664 200.7 200.8 LAB LAB LAB LAB LAB LAB ANALYZED BY SELF/LAB:

()- Sample

('i) a uSapl taken toried trained C upta byuenby s T Chemistry - SDpecificunder Technician Dean Novotny the s&G Caonductance - Oil & Grease supervision of Trevor Rebel. TOC - Total Organic Carbon

SIDE B FORM 1-SAMPLING & ANALYSIS RESULTS

-SECOND STORM EVENT

" Ifanalytical results are less than the detection limit (or non detectable), show the value as less than

  • When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example: <.05) meters, etc.), indicate "PA" in the appropriate test method used box.

" If you did not analyze for a required parameter, do not report "0". Instead, leave the appropriate box blank

  • Make additional copies of this form as necessary.

NAME OF PERSON COLLECTING SAMPLE(S): Trevor Rebel TITLE: Environmental Specialist SIGNATURE: ( T 4 ANALYTICAL RESULTS DESCRIBE For Second Storm Event DISCHARGE DATE/TIME TIME LOCATION OF SAMPLE DISCHARGE Example: NW Out Fall COLLECTION STARTED BASIC PARAMETERS OTHER PARAMETERS PH TSS SC O&G Fe 011 2-7-07 Yard Storm Drain 15:12 14:40 7.5 30 190 ND 1.3 013 2-7-07 Yard Storm Drain 15:03 14:40 7.8 200 260 ND 4.8 015 2-7-07 Yard Storm Drain 15:07 14:40 8.0 86 140 ND 2.6 7

023 2-7-07 Yard Storm Drain 14:30 14:25 6.9 180 370 ND 3.1 TEST REPORTING UNITS: pH Units mgIl umho/cm mg/I mgIl 0.1 5 1 5 0.1 TEST METHOD DETECTION LIMIT:

EPA EPA SM EPA EPA TEST METHOD USED: 150.1 160.2 2510 1664 200.7 LAB LAB LAB LAB LAB ANALYZED BY (SELF/LAB):

I13*3 - ITotal S3uspended SoliIds SC - Specific Conductance U&(G - Oil & G~rease I UC - I otal Organic C~aroon

FORM 2-QUARTERLY VISUAL OBSERVATIONS OF AUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)

  • Quarterly dry weather visual observations are required of each authorized NSWD. " Authorized NSWDs must meet the conditions provided in Section D (pages 5-6),

" Observe each authorized NSWD source, impacted drainage area, and of the General Permit.

discharge location. " Make additional copies of this form as necessary.

QUARTER:

JULY-SEPT.

Observers Name:

Title:

D7 YES WERE ANY AUTHORIZED NSWDS If YES, complete DISCHARGED DURING THIS QUARTER? reverse side of See Comment F.1.b w7 NO this form.

Signature:

QUARTER:

Observers Name: Trevor Rebel OCT.-DEC. [* YES OCT.DEC.YESIf YES, complete Title: Environmental Specialist WERE ANY AUTHORIZED NSWDs reverse side of DATE: DISCHARGED DURING THIS QUARTER? reethis form.

12/21/06 Signature: _______________-________NO ti om QUARTER:

Observers Name: Trevor Rebel JAN.-MARCH [* YES JAN.MARC YESIf YES, complete Title: Environmental Specialist WERE ANY AUTHORIZED NSWDs If s, om DATE:

03/29/07 DISCHARGED DURING THIS QUARTER? reverhis form.

03/29/07 Signature: ____________________L NO ti om QUARTER:

Observers Name: Trevor Rebel APRIL-JUNE YES Title: Environmental Specialist WERE ANY AUTHORIZED NSWDs EIf YES, complete DATE: DISCHARGED DURING THIS QUARTER? form.

reNOrthis NO this form

  • 06/04/07 Signature:

SIDE B FORM 2-QUARTERLY VISUAL OBSERVATIONS OF AUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)

DATE /TIME OF SOURCE AND NAME OF DESCRIBE AUTHORIZED NSWD DESCRIBE ANY REVISED OR NEW OBSERVATION LOCATION OF AUTHORIZED CHARACTERISTICS BMPs AND PROVIDE THEIR AUTHORIZED NSWD Indicate whether authorized NSWD is clear, cloudy, or IMPLEMENTATION DATE NSWD discolored, causing staining, contains floating objects or an oil sheen, has odors, etc.

EXAMPLE: EXAMPLE: At the NSWD At the NSWD Drainage Air conditioner Units Air conditioner Source Area and Discharge on Building C condensate Location Admin Building Landscape water Clean and Clear Clean and Clear None 12/21/06 Landscape water to 004 07:30 Training Building Landscape water Clean and clear Clean and Clear None 12/21/06 Landscape water to 004 07:30 Air Compressor. Air Compressor Clean and clear Clean and Clear None 12/21/06 Condensates Condensates To 004 10:00 SWRO facility pump Saltwater pump Clean and clear Clean and Clear None 12/21/06 leak off drains to leak off 005 10:30 Potable water Fresh water Clean and Clear Clean and Clear None 12/21/06 system to 006 at approximately lgpm 13:00

SIDE B FORM 2-QUARTERLY VISUAL OBSERVATIONS OF AUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)

DATE /TIME OF SOURCE AND NAME OF DESCRIBE AUTHORIZED NSWD DESCRIBE ANY REVISED OR NEW OBSERVATION LOCATION OF AUTHORIZED CHARACTERISTICS BMPs AND PROVIDE THEIR AUTHORIZED NSWD Indicate whether authorized NSWD is clear, cloudy, IMPLEMENTATION DATE NSWD or discolored, causing staining, contains floating objects or an oil sheen, has odors, etc.

EXAMPLE: EXAMPLE: At the NSWD At the NSWD Drainage Air conditioner Units Air conditioner Source Area and Discharge on Building C condensate Location Admin Building Landscape water Clean and clear Clean and Clear None 03/29/07 Landscape water to 004 07:30 Training Building Landscape water Clean and clear Clean and Clear None 03/29/07 Landscape water to 004 07:35 Air Compressor Air Compressor Clean and clear Clean and Clear None 03/29/07 Condensates Condensates To 004 10:00 SWRO facility pump Saltwater pump Clean and clear Clean and Clear None 03/29/07 leak off drains to leak off 005 07:25 Potable water Potable Clean and Clear Clean and Clear None 03/29/07 system to 006 at water/natural spring approximately 1gpm 11:00

SIDE B FORM 2-QUARTERLY VISUAL OBSERVATIONS OF AUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)

DATE /TIME OF SOURCE AND NAME OF DESCRIBE AUTHORIZED NSWD DESCRIBE ANY REVISED OR NEW OBSERVATION LOCATION OF AUTHORIZED CHARACTERISTICS BMPs AND PROVIDE THEIR AUTHORIZED NSWD Indicate whether authorized NSWD is clear, cloudy, or IMPLEMENTATION DATE NSWD discolored, causing staining, contains floating objects or an oil sheen, has odors, etc.

EXAMPLE: EXAMPLE: At the NSWD At the NSWD Drainage Air conditioner Units Air conditioner Source Area and Discharge on Building C condensate Location Admin Building Landscape water Clean and clear Clean and Clear None 06/04/07 Landscape water to 004 07:00 Training Building Landscape water Clean and clear Clean and Clear None 06/04/07 Landscape water to 004 07:05 Air Compressor Air Compressor Clean and clear Clean and Clear None 06/04/07 Condensates Condensates To 004 11:00 SWRO facility pump Saltwater pump Clean and clear Clean and Clear None 06/04/07 leak off drains to leak off 005 06:45 Potable water Potable Clean and Clear Clean and Clear None 06/04/07 system to 006 at water/naturarspring approximately lgpm 14:00

SIDE A FORM 3-QUARTERLY VISUAL OBSERVATIONS OF UNAUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)

" Unauthorized NSWDs are discharges (such as wash or rinse waters) that do not meet the conditions provided in Section D (pages 5-6) of the General Permit.

  • Quarterly visual observations are required to observe current and detect prior unauthorized NSWDs.
  • Quarterly visual observations are required during dry weather and at all facility drainage areas.
  • Each unauthorized NSWD source, impacted drainage area, and discharge location must be identified and observed.
  • Unauthorized NSWDs that can not be eliminated within 90 days of observation must be reported to the Regional Board in accordance with Section A.10.e of the General Permit.

" Make additional copies of this form as necessary.

QUARTER: JULY-SEPT. If YES to Observers Name: WERE UNAUTHORIZED either Not Appicable NSWDs OBSERVED? DYES EINO question, Title: complete See comment F.2.a WERE THERE INDICATIONS OF reverse PRIOR UNAUTHORIZED NSWDs? ElYES E]NO side.

Signature:

QUARTER: OCT.-DEC. If YES to Observers Name: Trevor Rebel WERE UNAUTHORIZED either DATE/TIME OF NSWDs OBSERVED? YES NO question, OBSERVATIONS Title: Environmental Specialist complete WERE THERE INDICATIONS OF reverse 12/21/06 16:00 Signature: __ _ _ _ _ PRIOR UNAUTHORIZED NSWDs? Z YES NO side.

QUARTER: JAN.-MARCH If YES to Observers Name: Trevor Rebel WERE UNAUTHORIZED either DATE/TIME OF NSWDs OBSERVED? ElYES Z NO question, OBSERVATIONS Title: Environmental Specialist complete WERE THERE INDICATIONS OF reverse 03/29/07 17:00 PRIOR UNAUTHORIZED NSWDs? ElYES Z NO side.

QUARTER: APRIL-JUNE If YES to Observers Name: Trevor Rebel WERE UNAUTHORIZED either DATE/TIME OF NSWDs OBSERVED? EYES Z NO question, OBSERVATIONS Title: Environmental Specialist complete WERE THERE INDICATIONS OF reverse 06i/04/07 16:00 gnature: PRIOR UNAUTHORIZED NSWDs? E YES Z NO side.

SIDE B FORM 3 QUARTERLY VISUAL OBSERVATIONS OF UNAUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)

OBSERVATION NAME OF SOURCE AND DESCRIBE UNAUTHORIZED NSWD CHARACTERISTICS DESCRIBE CORRECTIVE DATE UNAUTHORIZED LOCATION Indicate whether unauthorized NSWD is clear, cloudy, ACTIONS TO ELIMINATE (FROM NSWD OF discolored, causing stains; contains floating objects or an oil UNAUTHORIZED NSWD AND REVERSE SIDE) UNAUTHORIZED sheen, has odors, etc. TO CLEAN IMPACTED NSWD DRAINAGE AREAS.

PROVIDE UNAUTHORIZED EXAMPLE: EXAMPLE: AT THE UNAUTHORIZED NSWD ELIMINATION DATE.

Vehicle Wash NW Corner of AT THE UNAUTHORIZED NSWD AREA AND Water Parking Lot NSWD SOURCE DISCHARGE LOCATION Rinsing vehicles for West of Warehouse Clean and Clear. No sheen, Clean and Clear. No sheen, Hoses removed.

12/21/06 the removal of salt. B in discharge path no odor. no odor. Area was, and remains clean.

006. No residue or evidence of 13:00 contamination.

No rinsing signage posted.

Fully eliminated as of 2-28-07

/ /

AM

[-PM I I

-AM

-PM

/  !

IAM 1-1PM

FORM 4-MONTHLY VISUAL OBSERVATIONS OF SIDE A STORM WATER DISCHARGES

  • Storm water discharge visual observations are required for at least one storm S Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.

event per month between October 1 and May 31. S Make additional copies of this form as necessary.

" Visual observations must be conducted during the first hour of discharge Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations. water discharge and note the date, time, name, and title of who observed there was no storm water

  • Discharges of temporarily stored or contained storm water must be observed discharge.

at the time of discharge.

  1. 1 Boat #2 003 #3 004 #4 005 Observation Date: October _ 2006 Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain Drainage Location Description Retention Basin Observers Name: NONE NONE NONE NONE Observation Time Title:

Time Discharge Began Signature: Were Pollutants Observed (Ifyes, complete reverse side)

  1. 1 Boat #2 003 #3 004 #4 005 Drainage Location Description Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain DranagLoatonesciptonRetention Basin Observers Name_ NONE NONE NONE NONE Observation Time Title: ______

Time Discharge Began Signature: Were Pollutants Observed (If yes, complete reverse side)

  1. 1 Boat #2 003 #3 004 #-4 005
  1. ot# 0 304# 0 Observation Date: December 8 2006 Drainage Location Description Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain DranagLoatonesciptonRetention Basin Observers Name: Trevor Rebel 115:18 15:10 15:20 15:25 Observation Time Title: Environmental Specialist 15:10 15:10 Pre Release 15:20

--A2t / _ Time Discharge Began Signature: (,'V-X/ - Were Pollutants Observed No No___

(Ifyes, complete reverse side) No_ _ _No No oM_

  1. 1 Boat #2 003 #3 004 .#4 005 DrainageoLocationnDescription7Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain Drainage Location DescriptionBasin Observers Name: Trevor Rebel 11:30 11:20 12:15 (1) 12:30 Observation Time Title: Environmental Specialist 11:20 11:20 Pre Release 11:40 Time Discharge Began Signature: ,-? VL Were Pollutants Observed No No Yes No (If yes, complete reverse side) --------

(1) Jim Kelly, Senior Biologist, performed 004 visual inspection in January.

FORM 4-MONTHLY VISUAL OBSERVATIONS OF SIDE A S TORM WATER DISCHARGES

  • Storm water discharge visual observations are required for at least one storm Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.

event per month between October 1 and May 31. 0 Make additional copies of this form as necessary.

  • Visual observations must be conducted during the first hour of discharge Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations. water discharge and note the date, time, name, and title of who observed there was no storm water
  • Discharges of temporarily stored or contained storm water must be observed discharge.

at the time of discharge.

  1. 5 006 #6 Range #7 007 #8 008 Observation Date: October 2006 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)

Observers Name: NONE NONE NONE NONE Observation Time Title:

Time Discharge Began Signature: Were Pollutants Observed (Ifyes, complete reverse side)

  1. 5 006 #6 Range #7 007 #8 008 Observation Date: November 2006 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)

Observers Name: NONE NONE NONE NONE Observation Time Title:

Time Discharge Began Signature: Were Pollutants Observed (Ifyes, complete reverse side)

  1. 5 006 #6 Range #7 007 #8 008 Observation Date: December 8 2006 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)

Observers Name: Trevor Rebel 15:30 No Discharge No Discharge 15:56 Observation Time Title: Environmental Specialist 15:20 No Discharge No Discharge 15:30 Time Discharge Began Signature: _ Were Pollutants Observed No N/A N/A No ZS]

(Ifyes, complete reverse side)

  1. 5 006 #6 Range #7 007 #8 008 Observation Date: January 4 2007 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)

Observers Name: Trevor Rebel 11:58 12:00 No Discharge 12:20 (1)

Observation Time Title: Environmental Specialist 11:30 11:45 No Discharge 11:30 Time Discharge Began Signature: Were Pollutants Observed No No N/A No S(If yes, complete reverse tide)

(1) Dean Novotny, Chemistry Technician, performed 008 visual inspection in January

FORM 4-MONTHLY VISUAL OBSERVATIONS OF SIDE A STORM WATER DISCHARGES

. Storm water discharge visual observations are required for at least one storm Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.

event per month between October 1 and May 31. Make additional copies of this form as necessary.

" Visual observations must be conducted during the first hour of discharge Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations. water discharge and note the date, time, name, and title of who observed there was no storm water

  • Discharges of temporarily stored or contained storm water must be observed discharge.

at the time of discharge.

  1. 9 009 #10 010 #11 011 #12 012 Observation Date: October 2006 Description Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Observers Name:. NONE NONE NONE NONE Observation Time Title:

Time Discharge Began Signature: Were Pollutants Observed (If yes, complete reverse side)

  1. 9 009 #10 010 #11 011 #12 012 Observation Date: November 2006 Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: NONE NONE NONE NONE Observation Time Title:

Time Discharge Began Signature: Were Pollutants Observed (Ifyes, complete reverse side)

  1. 9 009 #10 010 #11 011 #12 012 Observation Date: December 8 2006 Description Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Observers Name: Trevor Rebel 15:45 (1) 15:3.6 16:00 No Discharge Observation Time Title: Environmental Specialist 15:20 15:20 15:30 No Discharge rn7A Time Discharge Began Signature: Were Pollutants Observed No No Yes F7 No (If yes, complete reverse side) _ _
  1. 9 009 #10 010 #11 011 #12 012 Observation Date: January 4 2007 Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: Trevor Rebel 12:10 (2) 12:02 12:20 12:25 Observation Time Title: EnvirOnmental Specialist 11:20 11:30 11:30 12:25 Time Discharge Began Signat ure:__________ Were Pollutants Observed No No Yes No (If yes, complete reverse side) No No Yes No (1) Trained Chemistry Engineer Clint Gans performed 009 inspection in December.

(2) Dean Novotny, Trained Chemistry Technician, performed 009 visual inspection in January.

FORM 4-MONTHLY VISUAL OBSERVATIONS OF SIDE A STORM WATER DISCHARGES

" Storm water discharge visual observations are required for at least one storm Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.

event per month between October 1 and May 31. S Make additional copies of this form as necessary.

" Visual observations must be conducted during the first hour of discharge S Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations. water discharge and note the date, time, name, and title of who observed there was no storm water

  • Discharges of temporarily stored or contained storm water must be observed discharge.

at the time of discharge.

  1. 13 013 #14 014 #15 015 #16 020 Observation Date: October 2006 Description Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm DrainageocationDscriptio Drainr Observers Name: NONE NONE NONE NONE Observation Time Title:

Time Discharge Began Signature: Were Pollutants Observed (Ifyes, complete reverse side)

  1. 13 013 #14 014 #15 015 #16 020 Observation Date: November 2006 Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm Drainage Location Description Drainr Observers Name: NONE NONE NONE NONE Observation Time Title:

Time Discharge Began Signature: Were Pollutants Observed (If yes, complete reverse side)

  1. 13 013 #14 014 #15 015 #16 020 Observation Date: December 8 2006 Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm Drainage Location Description Drainr Observers Name: Trevor Rebel 15:41 No Discharge 15:45 15:11 Observation Time Title: Environmental Specialist 15:30 No Discharge 15:20 15:10 Time Discharge Began Signature: ____Were Pollutants Observed No No No No SIf yes, complete reverse side) No_ NoNo_____No
  1. 13 013. #14 014 #15 015 #16 020 Observation Date: January 4 2007 Description Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm Drainr Observers Name:, Trevor Rebel 12:06 No Discharge 12:08 11:22 Observation Time Title: Environmental Specialist 11:30 No Discharge 11:30 11:20 j6/~Time Discharge Began Signature: Were Pollutants Observed No No No No No No No No (If yes, complete reverse side)

FORM 4-MONTHLY VISUAL OBSERVATIONS OF SIDE A STORM WATER DISCHARGES

" Storm water discharge visual observations are required for at least one storm Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.

event per month between October 1 and May 31. Make additional copies of this form as necessary.

  • Visual observations must be conducted during the first hour of discharge Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations. water discharge and note the date, time, name, and title of who observed there was no storm water

" Discharges of temporarily stored or contained storm water must be observed discharge.

at the time of discharge.

  1. 17 021 #18 023 ObservationDrainage Location Description Yard Storm Drain Yard Storm Drain Observers Name: NONE NONE Observation Time Title:

Time Discharge Began Signature: Were Pollutants Observed (Ifyes, complete reverse side)

  1. 17 021 #18 023 Observation Date: November 2006 Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: NONE NONE Observation Time Title:

Time Discharge Began Signature: Were Pollutants Observed (if yes, complete reverse side)

  1. 17 021 #18 023 Observation Date: December 8 2006 Yard Storm Drain Yard Storm Drain Drainage Location Description YadSomDinarStmDan Observers Name: Trevor Rebel No Discharge 15:14 Observation Time Title: Environmental Specialist No Discharge 15:10 Time Discharge Began Signature:. , Were Pollutants Observed N/A NoZ (Ifyes, complete reverse side)
  1. 17 021 #18 023 Observation Date: January 4 2007 Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: Trevor Rebel No Discharge 11:23 Observation Time Title: Environmental Specialist No Discharge 11:20 Time Discharge Began.

Signature: Were Pollutants Observed N/A No (If yes, complete reverse side) I

SIDE B FORM 4-MONTHLY VISUAL OBSERVATIONS OF STORM WATER DISCHARGES DATEITIME OF DRAINAGE AREA DESCRIBE STORM WATER DISCHARGE IDENTIFY AND DESCRIBE SOURCE(S) OF DESCRIBE ANY REVISED OR NEW OBSERVATION DESCRIPTION CHARACTERISTICS POLLUTANTS BMPs AND THEIR DATE OF (From Reverse Side) IMPLEMENTATION Indicate whether storm water discharge is clear, EXAMPLE: Discharge from cloudy, or discolored; causing staining; containing EXAMPLE: Oil sheen caused by oil dripped by material storage Area #2 floating objects or an oil sheen, has odors, etc. trucks in vehicle maintenance area.

011 Discharge Foam on top of the water. Foam from recent paving operations in None.

12/08/06 the 500kV yard.

16:00 004 Retention Basin Some foam on top of the water leading to Foam from recent paving operations in None.

01/04/07 the 004 settlement basin. No foam parking lots within the 004 path.

discharging to ocean.

12:15 011 Discharge Foam on top of the water. Foam from recent paving operations in None.

01/04/07 Less foam than was observed at same the 500kV yard.

location on 12-8-06.

12:20 EAM flPM

/1/

AM flPM

FORM 4-MONTHLY VISUAL OBSERVATIONS OF SIDE A STORM WATER DISCHARGES

" Storm water discharge visual observations are required for at least one storm S Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.

event per month between October 1 and May 31. Make additional copies of this form as necessary.

" Visual observations must be conducted during the first hour of discharge S Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations. water discharge and note the date, time, name, and title of who observed there was no storm water

" Discharges of temporarily stored or contained storm water must be observed discharge.

at the time of discharge.

  1. 1 Boat #2 003 #3 004 #4 005 ObsDrainage Locatio Description00Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain Drainage______

LocationDescription Retention Basin Observers Name: Trevor Rebel 14:34 14.:27 14:38 14:42 Observation Time Title: Environmental Specialist 14:25 14:25 14:40 14:30 Time Discharge Began _ _ _ _ _

Signature: -' 4- Were Pollutants Observed No No No No

_____________________________________ (If yes, complete reverse side) _____________ ____________ _____________ ___________

  1. 1 Boat '#2 003 #3 004 #4 005 Observation Date: March 20 2007 Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain Drainage Location DescriptionRentoBai Observers Name: Trevor Rebel 13:25 13:15 13:37 13:34 Observation Time Title: Environmental Snecialist 13:10 13:10 13:20 13:20

~~~AI

~~~Time Discharge Began__ _ _ _ __ _ _ _ _ _ _

Sig atre:__ ___ __ Were Pollutants Observed NoNoNoN (If yes, complete reverse side)

  1. 1 Boat #2 003 #3 004 #4 005 ObDrainage Locatio Description0 Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain DrainageLocationDescriptio Retention Basin Observers Name: Trevor Rebel 18:29 18:25 18:33 18:38 Observation Time Title: Environmental Specialist 18:15 18:15 18:30 18:15 Time Discharge Began ____________

Signa tue: __ __ __ Were Pollutants Observed No No No No (If yes, complete reverse side) ____________ ___________

  1. 1 Boat #2 003 #3 004 '#4 005 Drainvatge Locatio Descriptio Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain DrainageocationDscriptio Retention Basin Observers Name: _ ____NONE NONE NONE NONE Observation Time ____________

Title: _______

Time Discharge Began ___________

Signature: __________________ Were Pollutants Observed

______________________________________ (If yes, complete reverse side) ____________ ____________ ____________ ___________

FORM 4-MONTHLY VISUAL OBSERVATIONS OF SIDE A STORM WATER DISCHARGES

" Storm water discharge visual observations are required for at least one storm " Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.

event per month between October 1 and May 31. " Make additional copies of this form as necessary.

" Visual observations must be conducted during the first hour of discharge " Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations. water discharge and note the date, time, name, and title of who observed there was no storm water

  • Discharges of temporarily stored or contained storm water must be observed discharge.

at the time of discharge.

  1. 5 006 #6 Range #7 007 #8 008 Observation Date: February 7 2007 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)

Observers Name: Trevor Rebel 14:49 14:56 No Discharge 14:30 Observation Time Title: Environmental Specialist 14:25 14:40 No Discharge 14:25


*Time Discharge Began Signature: _______ __- Were Pollutants Observed No No No 19 No (Ifyes, complete reverse side)

  1. 5 006 #6 Range #7 007 #8 008 Observation Date: March 20 2007 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)

Observers Name: Trevor Rebel 13:45 13:40 No Discharge 14:05 Observation Time Title: Environmental Specialist 13:20 13:20 No Discharge 13:20 Time Discharge Began Signa ture:__ Were Pollutants Observed No NO NO No Signature: (If yes, complete reverse side N o

  1. 5 006 #6 Range #7 007 #8 008 Observation Date: April 19 2007 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)

Observers Name: Trevor Rebel 18:47 4-20 06:58 No Discharge 4-20 07:18 Observation Time Title: Environmental Specialist 18:30 4-20 00:00 No Discharge 4-20 00:00

- AA1, fTime Discharge Began Signature: .fVL.,'.." Were Pollutants Observed No No NoZ NoZ (if yes, complete reverse side)

  1. 5 006 #6 Range #7 007 #8 008 Observation Date: May 2007 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)

Observers Name: NONE NONE NONE NONE Observation Time Title:

Time Discharge Began Signature: Were Pollutants Observed (If yes, complete reverse side)

FORM 4-MONTHLY VISUAL OBSERVATIONS OF SIDE A S TORM WATER DISCHARGES

  • Storm water discharge visual observations are required for at least one storm Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.

event per month between October 1 and May 31. Make additional copies of this form as necessary.

" Visual observations must be conducted during the first hour of discharge 0 Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations. water discharge and note the date, time, name, and title of who observed there was no storm water

" Discharges of temporarily stored or contained storm water must be observed discharge.

at the time of discharge.

  1. 9 009 #10 010 #11 011 #12 012 Observation Date: February 7 2007 Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: Trevor Rebel 14:45 14:55 15:12 15:20 Observation Time Title: Environmental Specialist 14:25 14:25 14:40 14:40 Time Discharge Began Signature: ___________..__. _ (If yes,Pollutants Were complete Observed reverse side) Noo[ Noo[ Noo[ Noo[
  1. 9 009 #10 010 #11 011 #12 012 Observation Date: March 20 2007 Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: Trevor Rebel 13:10 13:48 14!10 14:15 Observation Time Title: Environmental Specialist 13:10 13:20 13:20 14:15 Time Discharge Began Signature: rWere Pollutants Observed No No No No (Ifyes, complete reverse side) No No No_ _____
  1. 9 009 #10 010 #11 011 #12 012 Observation Date: April 19 2007 Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: Trevor Rebel 18:19 4-20 07:04 4-20 07:12 4-20 07:26 Observation Time Title: Environmental Soecialist 18:15 4-20 00:00 4-20 00:00 4-20 00:00 Time Discharge Began Signature: Were Pollutants Observed No No No No

_ _ _

(Ifyes, complete reverse side) No NoNoNo _ _ _

  1. 9 009 #10 010 #11 011 #12 012 Observation Date: May 2007 Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: NONE NONE NONE NONE Observation Time Title:

Time Discharge Began Signature: Were Pollutants Observed (If yes, complete reverse side)

FORM 4-MONTHLY VISUAL OBSERVATIONS OF SIDE A STORM WATER DISCHARGES

" Storm water discharge visual observations are required for at least one storm 0 Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.

event per month between October 1 and May 31. 0 Make additional copies of this form as necessary.

  • Visual observations must be conducted during the first hour of discharge
  • Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations, water discharge and note the date, time, name, and title of who observed there was no storm water
  • Discharges of temporarily stored or contained storm water must be observed discharge.

at the time of discharge.

  1. 13 013 #14 014 #15 015 #16 020 Observation Date: February 7 2007 Description Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm DranagLoatonesciptonDrainr Observers Name: Trevor Rebel 15:35 No Discharge 15:30 14:28 Observation Time Title: Environmental Specialist 14:40 No Discharge 14:40 14:25

-* 1 _ Time Discharge Began:

Signature: Were Pollutants Observed No No No No (If yes, complete reverse side)

  1. 13 013 #14 014 #15 015 #16 020 Observation Date: March 20 2007 Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm Drainage Location Description Drainr Observers Name: Trevor Rebel 13:50 13:58 13:55 13:21 Observation Time Title: Environmental Specialist 13:20 13:20 13:20 13:10 Time Discharge Began Signature: ,___/ w__... _ Were Pollutants Observed Yes No Yes No (Ifyes, complete reverse side) Yes____No____Yes_[__No___
  1. 13 013 #14 014 #15 015 #16. 020 Observation Date: April 19 2007 Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm Drainage Location Description Drainr Observers Name: Trevor Rebel 4-20 07:07 4-20 07:31 18:57 18:25 Observation Time Title: Environmental SDecialjst 4-20 00:00 4-20 00:00 18:45 18:15 Time Discharge Began Signature: Were Pollutants Observed NoZ7 NoZ NoZ No (if yes, complete reverse side) N 2IN. oNN
  1. 13 013 #14 014 #15 015 #16 020 ObservationDrainage Location Description Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm

_rainageocationscriptio Drainr Observers Name: NONE NONE NONE NONE Observation Time Title:

Time Discharge Began Signature: Were Pollutants Observed (If yes, complete reverse side)

FORM 4-MONTHLY VISUAL OBSERVATIONS OF SIDE A STORM WATER DISCHARGES

" Storm water discharge visual observations are required for at least one storm Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.

event per month between October 1 and May 31. Make additional copies of this form as necessary.

" Visual observations must be conducted during the first hour of discharge Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations. water discharge and note the date, time, name, and title of who observed there was no storm water

" Discharges of temporarily stored or contained storm water must be observed discharge.

at the time of discharge.

  1. 17 021 #18 023 Observation Date: February 7 2007YadSomDin arStmDan Drainage Location DescriptionYadSomDanarStmDai Observers Name: Trevor Rebel 14:28 14:30 Observation Time:

Title: Environmental Specialist 14:25 14:25 Time Discharge Began ____________

Sinaur: ___________________Were Pollutants Observed No No ;7 Sintue (If yes, complete reverse side) ____________ ___________ _____ ______ __________

  1. 17 021 #18 023 Observation Date: March 20 2007 DangLotinesrponYard Storm Drain Yard Storm Drain Observers Name: Trevor Rebel 13:22 13:23 Observation Time Title: Environmental Specialist 13:10 13:10 Time Discharge Began _______

Signaure:____________________Were Pollutants ObservedNoN Signature: _________________ (if yes, complete reverse side) No___________ No___________

______________

  1. 17 021 #18 023 Obsrvtin at: Ari 1 207Drainage Location Description Yard Storm Drain Yard Storm Drain Observers Name: Trevor Rebel 18:27 18:28 Observation Time Title: Environmental SDecialist 18:15 18:15

-R I ~~~Time Discharge Began ______

Signature: L A-'- Were Pollutants Observed No No _

(if yes, complete reverse side)__

  1. 17 021 #18 023 Obsrvtin at: ay 207Drainage Location Description Yard Storm Drain Yard Storm Drain Observers Name: _ ____NONE NONE Observation Time_____________ _____ _______

Title:_____ __

Time Discharge Began ____________

Signature: ___________________Were Pollutants Observed (if yes, complete reverse side) _________ _______________

SIDE B FORM 4-MONTHLY VISUAL OBSERVATIONS OF STORM WATER DISCHARGES DATE/TIME OF DRAINAGE AREA DESCRIBE STORM WATER DISCHARGE IDENTIFY AND DESCRIBE SOURCE(S) OF DESCRIBE ANY REVISED OR NEW OBSERVATION DESCRIPTION CHARACTERISTICS POLLUTANTS BMPs AND THEIR DATE OF (From Reverse Side) IMPLEMENTATION Indicate whether storm water discharge is clear, EXAMPLE: Discharge from cloudy, or discolored; causing staining; containing EXAMPLE: Oil sheen caused by oil dripped by material storage Area #2 floating objects or an oil sheen, has odors, etc. trucks in vehicle maintenance area.

013 Drainage Sediment observed in storm water. Extremelyheavy rainfall over 20 min Additional silt check dams 03/20/07 period dislodged some sediment and installed in the 013 path.

soil.

13:50 015 Drainage Sediment observed in storm water. Extremely heavy rainfall over 20 min Additional silt check dams 03/20/07 period dislodged some sediment and installed in the 015 path.

soil.

13:55 EAM flPM

/ /

FlAM F- PM

/ /

lAM M PM

FORM 5-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS EVALUATION DATE: 06 / 04 1 07 INSPECTOR NAME: Trevor Rebel TITLE: Environmental Specialist SIGNATURE:

POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED? NO implementation FULL IMLEMETED Fx1N 0the next two columns of this Turbine Building form ARE ADDITIONAL/REVISED 0 YES BMPs NECESSARY? [91 NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES If yes, to either implementation corrective actions and their date(s) of (as identified in your SWPPP) - FULLY IMPLEMENTED? [91 NO question, complete implementation the next two Turbine Buttress columns of this form ARE ADDITIONAL/REVISED O YES BMPs NECESSARY? rx! NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or (asE/NUSRA identifie inEyour SNWBPPNT P)E EN qu esto, ompeither implementation corrective actions ipeetto and their date(s) of SOURCEIINDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES question, complete If yes, to either ipeetto orcieatosadterdt~)o (as identified in your SWPPP) FULLY IMPLEMENTED? 21 NO the next two columns of this U1 and U2 Transformer Yards form ARE ADDITIONAL/REVISED 0 YES BMPs NECESSARY? [K NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additionallrevised BMPs or SOURCE/INDUSTRIALSUCINUTILATVTARA ACTIVITY AREA HAVE ANY BMPs NOT BEEN HVANBMsNTBE 0YES

]ESquestion, complete If yes, to either implementation implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED? 21 NO the next two columns of this Intake Areas form ARE ADDITIONALIREVISED 0 YES BMPs NECESSARY? N] NO

SIDE B FORM 5 (Continued)-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS CUMA IIATIAM flArr- flA I AlA i nl7 tM1Q0fTn0 JARMe Tra-nrw Pchgal Till ~ Fn~,irnnmi~nt~iI ~nrn~i~IiQt .ql* N ATI IRF: / Y(/(AY6~

POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0l YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED? I] NO If yes, to either -implementation question, Hazardous Waste Facility complete the next two columns of this form ARE ADDITIONAL/REVISED 0l YES BMPs NECESSARY? 0] NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCEIINDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0l YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED? [91 NO If yes, to either implementation question, Area 10 complete the next two columns of this form ARE ADDITIONAL/REVISED 0l YES BMPs NECESSARY? IXI NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0l YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED? [M NO If yes, to either implementation question, Sewage Treatment Facility complete the next two columns of this ARE ADDITIONAL/REVISED El YES form BMPs NECESSARY? [] NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN [E YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED? [] NO If yes, to either implementation question, Sea Water Reverse Osmosis complete the next two Facilility columns of this ARE ADDITIONAL/REVISED El YES form BMPs NECESSARY? [] NO

FORM 5 (Continued)-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS EVALUATION DATE: 06 / 08 / 07 INSPECTOR NAME: Trevor Rebel TITLE: Environmental Specialist SIGNATURE:

POTENTIAL POLLUTANT *Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED? 0] NO If yes, to either implementation question, Make Up Water Treatment complete the next two Facility columns of this form 0 YES ARE ADDITIONAL/REVISED BMPs NECESSARY? 0] NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED? EM NO If yes, to either implementation question, Waste Water Holding Facility complete the next two columns of this 0 YES form ARE ADDITIONAL/REVISED BMPs NECESSARY? [K] NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED? 0] NO If yes, to either implementation question, Vehicle Maintenance Yard complete the next two columns of this ARE ADDITIONAL/REVISED 0 YES form BMPs NECESSARY? 21 NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additionalfrevised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED? [K NO If yes, to either implementation question, Fleet Vehicle Fueling complete the next two columns of this 0 YES form ARE ADDITIONALIREVISED BMPs NECESSARY? (9J NO

FORM 5 (Continued)-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS EVALUATION DATE: 06 / 04 / 07 INSPECTOR NAME: Trevor Rebel TITLE: Environmental Specialist SIGNATURE:

POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additionallrevised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED? 0 NO If yes, to either implementation question, Marine Fueling Facility complete the next two columns of this form 0 YES ARE ADDITIONAL/REVISED BMPs NECESSARY? IE] NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN [91 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED? 0 NO If yes, to either implementation question, Additional BMP have been found necessary Shooting Range complete the to control transport of lead (pb) from the Removal of fine sediment and silt from the next two DCPP Shooting Range. shooting range basin by 9-15-07.

columns of this Installation of additional check dams and ARE ADDITIONALIREVISED [K] YES sediment weirs at shooting range by BMPs NECESSARY? 0 NO 10-1-07.

POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN E0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED? CRJNO If yes, to either implementation question, 500 kV Switch Yard complete the next two columns of this

[I YES form ARE ADDITIONALIREVISED BMPs NECESSARY? 0] NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED? 21 NO If yes, to either implementation question, 230 kV Switch Yard complete the next two columns of this 0 YES form ARE ADDITIONAL/REVISED BMPs NECESSARY? [] NO

FORM 5 (Continued)-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS EVALUATION DATE: 06 / 04 / 07 INSPECTOR NAME: Trevor Rebel TITLE: Environmental Specialist SIGNATURE:

POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED? [EXNO If yes, to either implementation question, complete the Remote 12 kV Electrical next two Transformers - columns of this form 0 YES ARE ADDITIONAL/REVISED BMPs NECESSARY? [CXNO POTENTIAL POLLUTANT HAVE ANY BMPs NOT BEEN 0 YES Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA FULLY IMPLEMENTED? IM NO implementation corrective actions and their date(s) of (as identified in your SWPPP) If yes, to either implementation question, complete the next two ARE ADDITIONAL/REVISED -7 YES columns of this BMPs NECESSARY? [CXNO form POTENTIAL POLLUTANT HAVE ANY BMPs NOT BEEN 0 YES Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA FULLY IMPLEMENTED? [CXNO implementation corrective actions and their date(s) of

-(as identified in your SWPPP) If yes, to either implementation question, complete the next two ARE ADDITIONAL/REVISED 0] YES columns of this BMPs NECESSARY? M] NO form POTENTIAL POLLUTANT HAVE ANY BMPs NOT BEEN 0 YES Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA FULLY IMPLEMENTED? [CXNO implementation corrective actions and their date(s) of (as identified in your SWPPP) If yes, to either implementation question, complete the next two ARE ADDITIONAL/REVISED 0] YES columns of this BMPs NECESSARY? [C] NO form

The following narrative comments provide explanation, where required, for the 2006-2007 Annual Report for Storm Water Discharges Associated with Industrial Activities, Diablo Canyon Power Plant (DCPP),

Facility WDID No. 3401018248.

General Comments:

1. Sample and observation times throughout the report are reported in 24-hr clock format.
2. This is the first annual storm water report submitted by the Facility to the Regional Water Quality Control Board. Reference PG&E Letter DCL-2006-556 to the Central Coast Region dated November 09, 2006 regarding DCPP implementation of sampling and visual observations in accordance with provisions of the State General Industrial Storm Water Permit (General Permit).

Section Specific Comments:

Comments are arranged by section and item number.

Section E. Number 2. - Did you collect storm water samples from the first storm of the wet season that produced a discharge during scheduled facility operating hours? (Section B.5 of the General Permit).

Checked "No":

An unexpected storm event on 11-14-06 dropped 0.28 inches of precipitation between 00:30 and 04:00 hours in the morning. This storm generated unexpected rainfall at the plant site outside of facility operation hours in which support staff were available and staged to conduct sampling. The next qualifying storm event was sampled on 11-26-06.

Section E. Number 5. - Was the sample collection or analysis reduced in accordance with Section B.7.d of the General Permit?

Checked "Yes":

If "YES", attach documentation supporting your determination that two or more drainage areas are substantially identical.

The following text describes each discharge location and sample point. Additionally, substantially identical drainages, not sampled, are described as required by Section E, Number 5:

Boat - Marine Refueling Facility Runoff

==

Description:==

Storm water generated near and around the marine refueling facility.

Sample Point: Sample valve leading from concrete bermed area to final discharge approximately 10-ft away.

003 - Yard Storm Drain

==

Description:==

Storm water runoff from areas surrounding the seawater intake structure building.

Sample Point: Sampled at 003 culvert inlet as close to point of discharge as practicable. Storm water travels through the 003 culvert before combining with seawater discharge.

2006-2007 Annual Report Conmnents Section Page I of 5

004 - Yard Storm Drain to Retention Basin

==

Description:==

Storm water drains to discharge 004 from the following areas on site:

" Southeast side of the Unit 2 Turbine Building,

" Administration Building,

" Security Building,

" Training and Maintenance Shop Buildings,

" Parking lots 4 and 5,

" Meteorological tower area,

" A small area to the west side of the west plant access road,

" Hazardous Waste Storage Unit,

" Firewater storage tank,

" Truck bay, and

" Firewater pump building.

Sample Point: Sampled at the inlet to the 004 retention basin. When full, the retained water in the de-silting basin overflows a vertical riser then flows through approximately 100-ft of underground conduit to discharge.

005 - Yard Storm Drain

==

Description:==

Storm Water drains to discharge 005 from the following areas on site:

" Plant Yard on the Unit 2 side of Radioactive Waste Building

" West side of the Turbine Building

" Hazardous Materials Warehouse

  • Construction Offices

" Parking lots 2, 3, 6, 7, and 8

" Cold Machine Shop

" Seawater Reverse Osmosis Facility

" Biological Laboratory (not in service)

" Fabrication Shop Sample Point: Located in large concrete drainage canal downstream of a de-silting weir. Water flowing past the sample point travels another 600-ft of concrete surface before entering a 4-ft diameter conduit leading to a final discharge location with limited access.

006 - Yard Storm Drain

==

Description:==

Storm water drains to discharge 006 from the following areas on site:

" Pacific Ocean side of the ridge Southeast of the power plant.

" Warehouse B

" Shooting Range

" Outdoor Abrasive Blast Facility

" Fleet Vehicle Fueling Facility

" Parking Lot #1 Sample Point 006 at Discharge: Sampled from the culvert outlet as it enters a v-ditch. Storm water travels another 75 feet to discharge.

Sample Point 006 Range Immediate Outlet: Sampled from culvert outlet immediately downstream of Diablo Canyon Shooting Range. Past the sampling point, storm water traverses 25-ft of concrete v-ditch, combining with upstream flows, before entering another underground culvert for 600-ft, then combination with other 006 pathway flows listed above. Combined storm water then travels approximately 75-ft to outfall. This pathway undergoes significant dilution as all 006 flows combine prior to discharge from the plant site.

007 - Storm Water Runoff

==

Description:==

Storm water from watershed South and East of the facility. There are no industrial activities present in this path. Water discharges to an inaccessible rip-rap field west of the facility.

Sampling: This point is not sampled. The point is not downstream of industrial activity and the underground conduitdischarge location is not safely accessible.

2006-2007 Annual Report Cornments Section Page 2 of-5

008 - Yard Storm Drain

==

Description:==

Storm water yard drains from the following areas:

" Northwest side of the Turbine Building

" Technical Maintenance Building

" Watershed on the North Side of Diablo Creek to the Northwest of the power plant.

Sample Point: Sample is taken from culvert inlet directly above discharge point. Note, this area has additional security requirements for access that may result in delayed sample times.

009 - Yard Storm Drain

==

Description:==

Storm water from the north and northeast side of the Unit I Auxiliary, Containment, Fuel Handling, and Turbine buildings drains to the north side of the yard to discharge.

Sample Point: Sample is taken from an accessible sump nearest the point of discharge. From the sump, storm water then flows through an underground culvert 300-ft to a discharge location that is not safely accessible during storm events.

010 - Yard Storm Drain

==

Description:==

Runoff from the hillside betweenDCPP and the Raw Water Reservoirs drains into a concrete culvert that is routed to the north along steep inaccessible terrain prior to discharge.

Sample Point: This point is not sampled. Storm water collected from discharge 013 is substantially identical to this discharge point.

011 - Yard Storm Drain

==

Description:==

Runoff from Diablo Creek Road and the North sides of the 230 kV and 500 kV switch yards.

Sample Point: Sample is taken at the inlet of an accessible drop in culvert nearest the point of discharge. Storm water then travels another 500-ft across a concrete surface to a steep metal conduit leading to the discharge point. The final discharge point is not safely accessible during a storm event and is in an area subject to restricted security access.

012 - Yard Storm Drain

==

Description:==

Runoff from the area between the 230 KV Switchyard and the 500 KV Switchyard drains to a vertical shaft leading to an underground culvert and discharge.

Sample Point: This point is not sampled. Storm water sampled from discharge 011 and 013 are substantially identical to this discharge point.

013 - Yard Storm Drain

==

Description:==

-Storm water drains to 013 from the following areas:

0 Raw Water Reservoirs 0 Makeup Water Treatment Facility 0 230 kV Switchyard Sample Point: Sample taken from a sample well in the 013 concrete V-ditch. Water flows an additional 200-ft before entering an inaccessible metal conduit to discharge.

014 - Storm Water Runoff

==

Description:==

Storm water runoff from lay down areas and the hillside south and east of the 500 KV Switchyard is collected in a drainage ditch and routed to discharge.

Sample Point: This point is not sampled. Storm water sampled from discharge points 013 and 015 are substantially identical to this discharge point.

015 - Yard Storm Drain

==

Description:==

Storm water runoff from the area around the temporary auto facilities and adjacent roadway is collected in a drainage ditch and discharged.

Sample Point: Sample taken from drop in culvert downstream of automotive facility. After the sampling point, water flows 100-ft through an inaccessible culvert to rip-rap and discharge.

2006-2007 Annual Report Comments Section Page 3 of 5

018 - Yard Storm Drain

Description:

Storm water runoff from the east side of the Intake Structure building.

Sample Point: This point is not sampled. Storm water sampled from discharge points 003 and 023 are substantially identical to this discharge point.

020 - Intake Deck Storm Drain

==

Description:==

Storm water collected directly in front of seawater traveling screen housings drains that lead to the circulating water pump fore bays through open gratings.

Sample Point: This point is not sampled. Storm water sampled from discharge points 003 and 023 are substantially identical to this discharge point.

021 - Yard Storm Drain

==

Description:==

Screen wash over spray drains and storm water from the east side of the traveling screen deck.

Sample Point: This point is not sampled. Storm water sampled from discharge points 003 and 023 are substantially identical to this discharge point.

023 - Yard Storm Drain

==

Description:==

Storm water generated on the North and East sides of Intake Structure Building and Intake roadways is drained through discharge point 023.

Sample Point: Sampled at the drop in box culvert inlet approximately 10-ft prior to discharge.

Section E. Number 6. - Were all samples collected during the first hour of discharge?

Checked "No":

First storm event sample point 009 yard storm drain discharge started at 11-26-06, 20:30 hrs. The sample was collected at 22:30 hrs due to safety and security concerns for personnel performing collection during night time hours.

Section E. Number 9. - Did you collect and analyze samples of temporarily stored or contained storm water discharges from two storm events?

Checked, "Yes", with the following clarifying information:

Sample point 004 for both the first and second storm events was sampled as a pre-release. The 004 discharge path first fills a settling basin before flowing through a riser pipe to discharge.

Section E. Number 11. - Discharge Location and Sample Point Reference narrative comments for Section E. Number 5, above, for a description of discharge and sample point information.

Section F. Number 1.b. - Indicate whether you visually observed all authorized non-storm water discharges and their sources during the quarters when they were discharged. Attach explanation for any "NO" answers.

During the July - September quarter no inspections for authorized storm water discharges were made. In accordance with PG&E Letter DCL-2006-556 dated November 09, 2006 addressed to the California Regional Water Quality Control Board Central Coast Region, monitoring for industrial site storm water discharges in accordance with General Permit provisions were initiated during the October - December quarter.

2006-2007 Annoual Report Comments Section Page 4 of 5

Section F. Number 2.a. - Indicate whether you visually observed all drainage areas to detect the presence of unauthorized non-storm water discharges and their sources. Attach explanation for any "NO" answers.

During the July - September quarter no inspections for authorized storm water discharges were made. In accordance with PG&E Letter DCL-2006-556 dated November 09, 2006 addressed to the California Regional Water Quality Control Board Central Coast Region, monitoring for industrial site storm water discharges in accordance with General Permit provisions were initiated during the October - December quarter.

Section G. Number 1. - Monthly Wet Season Visual Observations Attach an explanation for any "NO" answer months.

October 2006 - No qualifying storm events producing discharge to waters of the state during daylight hours. A total of 0.07 inches of precipitation was received at the plant site on 10-13-06, however, the event did not produce sufficient runoff, and was not in daylight hours.

November 2006 - An unexpected storm on 11-14-06 dropped 0.28 inches of precipitation between 00:30 and 04:00 hours in the morning. This storm was unexpected and did not occur during daylight hours.

April 2007 - Several discharge observation points exceeded the 1-hour requirement. This was due to the storm arriving in evening hours. Darkness arrived before sufficient runoff occurred at these locations as listed on Form-4 of the Annual Report. Observations were performed as soon as practical during daylight hours the following morning.

May 2007 - Insufficient precipitation for May 2007. Rainfall/drizzle received on 05-04-07 produced only 0.03 inches of precipitation as measured at the Diablo Canyon Ocean Lab. The amount of precipitation, 0.03 inches, was insufficient to produce runoff.

2006-2007 Annual Repori Conmiments Section Page 5 of 5

CREEK ENVIRONMENTAL LABORATORIES, INC.

A Minority-o\v/ed BIusiness Enterprise 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 * (805) 545-9838 9 FAX (805) 545-0107 Page 1 Trevor Rebel Log Number: 06-C15462 Diablo Canyon Power Plant Order: N7120 P.O. Box 56 Project: Stormwater Avila Beach, CA 93424 Received: 11/27/06 Printed: 12/06/06

&NVOPC ýi REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time Matrix 2006-Boat-1 (Boat Refuel) Trevor Rebel 11/26/06@20:30 Aqueous AnaLyte Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared Electrical Conductance 480 1 1 umhos/cm SM 2510 11/27/06 65 I"& Grease Not Detected 5 1 mg/L EPA 1664 12/05/06 272 7.6 0.1 1 pH units EPA 150.1 11/27/06 65 Suspended Solids 390 5 1 mg/L EPA 160.2 11/29/06 174 Iron 17 0.1 1 mg/L EPA 200.7 12/05/06 12/04/06 261 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER

CREEK ENVIRONMENTAL LABORATORIES, INC.

A Minority-ownecI BLISkiess Enterprise 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 * (805) 545-9838
  • FAX (805) 545-0107 Page 1 Trevor Rebel Log Number: 06-C15461 Diablo Canyon Power Plant Order: N7119 P.O. Box 56 Project: Stormwater Avila Beach, CA, 93424 Received: 11/27/06 Printed: 12106106 REPORT OF ANALYTICAL RESULTS

, ENV. oPa. )

Sampled SampLe Descriptifn Sampled By Date @ Time Matrix 2006-ge-1 (NW Intake Btdg) Trevor Rebel 11/26/06@20:22 Aqueous

= --------------------

= == = = == = = = = = = = ==

Anatyte ResuLt DLR Dilution Units Method Date Date Batch Factor AnaLyzed Prepared

- - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - -. - . - - - - - - - - - - - -. - - -. - - - - - -. - - - . - - - - - - - - .- - - .- - - - - -

Electrical Conductance 3,400 1 1 umhos/cm SM 2510 11/27/06 65 t & Grease 8 5 1 mg/L EPA 1664 12!05/06 272 6.9 0.1 pH units EPA 150.1 11/27/06 65 Suspended Solids 580 5 1 mg/L EPA 160.2 11/29/06 174 Iron 23 0.1 mg/L EPA 200.7 12/05/06 12/04/06 261 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER

CREEK ENVIRONMENTAL LABORATORIES, INC.

A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C SAN LUIS OBISPO, CA 93401 * (805) 545-9838

  • FAX (805) 545-0107 Page 1 Trevor Rebel Log Number: 06-C15460 Diablo Canyon Power Plant Order: N7118 P.O. Box 56 Project: Stormwater Avila Beach, CA 93424 Received: 11/27/06 Printed: 12/05/06 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time Matrix 2006-004-1 (Settle Basin) Trevor Rebel 11126/06@20:43 Aqueous Analyte Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared Electrical Conductance 1,000 1 1 umhos/cm SM 2510 11/27/06 65

& Grease Not Detected 5 1 mg/L EPA 1664 11/30/06 181 7.3 0.1 1 pH units EPA 150.1 11/27/06 65 Suspended Solids 250 5 1 mg/L EPA 160.2 11/29/06 174 Iron 11 0.1 1 mg/L EPA 200.7 12/05/06 12/04/06 261 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng

() PRINTED ON RECYCLED PAPER

CREEK ENVIRONMENTAL LABORATORIES, INC.

A Minority-SOSned BuLSiness 3Enrpise8 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 * (805) 545-9838
  • FAX (805) 545-0107 Page 1 Trevor Rebel Log Number: 06-C15464 Diablo Canyon Power Plant Order: N7122 P.O. Box 56 Project: Stormwater Avila Beach, CA 93424 Received: 11/27/06 Printed: 12/06/06
  • - C REPORT OF ANALYTICAL RESULTS L '.... .

Sampled Sample Description Sampled By Date @ Time Matrix 2006-005-1 (005 Area 10 Ditch) Trevor Rebel 11/26/06@21:00 Aqueous Anatyte Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared Electrical Conductance 2,100 1 umhos/cm SM 2510 11/27/06 65 L & Grease 10 5 mg/L EPA 1664 12/05/06 272

.1 9.1 0.1 1 pH units EPA 150.1 11127106 65 Suspended Solids 660 5 1 mg/L EPA 160.2 11/29/06 174 Iron 14 0.1 1 mg/L EPA 200.7 12/05/06 12/04/06 261


......-----------------------------------.----------.--------------

DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng

( PRINTED ON RECYCLED PAPER

  • CREEK ENVIRONMENTAL LABORATORIES,_INC.

A Mino-ity-owned Business Enteuprise 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 * (805) 545-9838
  • FAX (805) 545-0107 Page 1 Trevor Rebel Log Number: 06-C15463 Diablo Canyon Power Plant Order: N7121 P.O. Box 56 Project: Stormwater Avila Beach, CA 93424 Received: 11/27/06 Printed: 12/06/06 REPORT OF ANALYTICAL RESULTS ~NV.OPS.

Sampled Sample Description Sampled By Date @ Time Matrix 2006-006B-I (006 Storm Grate in Trevor Rebel 11/26/06@21:10 Aqueous Lot #1)

==


== ==

Anatyte Result DLR DiLu ution Units Method Date Date Batch Factor Analyzed Prepared

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -. - . - - - - - -. - - -. -. - - -. - - - - - -. - - - . - - - - - - - - .-- - .-- - - - -

ectricat Conductance 170 1 1 umhos/cm SM 2510. 11/27/06 65

.L& Grease Not Detected 5 1 mg/L EPA 1664 12/05/06 272 pH 9.3 0.1 1 pH units EPA 150.1 11/27/06 65 Suspended Solids 57 5 1 mg/L EPA 160.2 11/29/06 174 Iron 2.1 0.1 mg/L EPA 200.7 12/05/06 12/04/06 261


..----------.----------

DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng

% PRINTED ON RECYCLED PAPER

CREEK ENVIRONMENTAL LABORATORIES, INC.

A Minoirity-owneodI3usiness Enterrkie 61M -" 14i SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 e (805) 545-9838
  • FAX (805) 545-0107 Page 1 Trevor Rebel Log Number: 06-C15466 Diablo Canyon Power Plant Order: N7124 P.O. Box 56 Project: Stormwater Avila Beach, CA 93424 Received: 11/27/06 Printed: 12/06/06 S .. . .. .... .L LeNV._OP$ __

REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @Time Matrix 2006-006A-1 (Shoot Range Eff) Trevor Rebel 11/26/06@21:56 Aqueous AnaLyte Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared Electrical Conductance 150 1 1 umhos/cm SM 2510 11/27/06 65 L & Grease Not Detected 5 1 mo/L EPA 1664 12105/06 272 1

8.4 0.1 pH units EPA 150.1 11/27/06 65 1

Suspended Solids 100 5 mg/L EPA 160.2 11/29/06 174 1

Iron 2.7 0.1 mg/L EPA 200.7 12/05/06 12/04/06 261 1

Lead 0.14 0.02 mg/L EPA 200.7 12/05/06 12/04/06 262 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER

CREEK ENVIRONMENTAL LABORATORIES, INC.

C A Minority-ovnecd Business Eniterprise 141 SUBURBAN ROAD, SUITE C SAN LUIS OBISPO, CA 93401 - (805) 545-9838

  • FAX (805) 545-0107
  • Pagel1 Trevor Rebel Log Number: 06-C15455 Diablo Canyon Power Plant Order: N7113 P.O. Box 56 Project: Stormwater Avila Beach, CA 93424 Received: 11/27/06 Printed: 12/05/06 L~tiNV. OPS.

REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time Matrix 2006-008-1 (008-Diab Creek) Trevor Rebel 11/26/06@21:39 Aqueous Analyte Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared Electrical Conductance 940 1 1 umhos/cm SM 2510 11/27/06 65 1

. & Grease Not Detected 5 mg/L EPA 1664 11/30/06 181 1

.I 65 6.8 0.1 pH units EPA 150.1 11/27/06 1

Suspended Solids 18 5 mg/L EPA 160.2 11/29/06 174 1

Iron 1.2 0.02 mg/L EPA 200.7 12/05/06 12/04/06 262


.-.--------.--.--------.--.

DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng PRINTED ON.RECYCLED PAPER

CREEK ENVIRONMENTAL LABORATORIES, INC.

A4 UiAnority-o\\ c*U-SL Fsoness Enter prise 141 SUBURBAN ROAD, SUITE C SAN LUIS OBISPO, CA 93401 * (805) 545-9838

  • FAX (805) 545-0107 Page 1 Trevor Rebel Log Number: 06-C15458 Diablo Canyon Power Plant Order: N7116 P.O. Box 56 Project: Stormwater Avila Beach, CA 93424 Received: 11/27/06 Printed: 12/05/06 FNV. OPS.

REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time Matrix 2006-009-1 (009-N Protected) Trevor Rebel 11/26/06@22:30 Aqueous AnaLyte Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared

................----------------- ----------------.----------.------------.------- ----------------

Electrical Conductance 450 1 1 umhos/cm SM 2510 11/27/06 65

& Grease Not Detected 5 1 mg/L EPA 1664 11/30/06 181

.1 7.0 0.1 1 pH units EPA 150.1 11/27/06 65 Suspended Solids 11 5 1 mg/L EPA 160.2 11/29/06 174 Iron 0.80 0.02 1 mg/L EPA 200.7 12/05/06 12/04/06 262

. . . ..-----------.-------------.---------------------------.------------.--------------------------

DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER

  • CREEK ENVIRONMENTAL LABORATORIES, INC.

A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 e SAN LUIS OBISPO, CA 93401 9 (805) 545-9838

  • FAX (805) 545-0107 Page 1 Trevor Rebel Log Number: 06-C15456 Diablo Canyon Power Plant Order: N7114 P.O. Box 56 Project: Stormwater Avila Beach, CA 93424 Received: 11/27/06 Printed: 12/05/06 REPORT OF ANALYTICAL RESULTS Sampted Sample Description Sampled By Date @ Time Matrix 2006-011-1 (Diablo Creek Dr.) Trevor Rebel 11/26/06@21:32 Aqueous AnaLyte Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared Electrical Conductance 230 1 1 umhos/cm SM 2510 11/27/06 65

& Grease Not Detected 5 1 mg/L EPA 1664 11/30/06 181

., 7.3 0.1 1 pH units EPA 150.1 11/27/06 65 Suspended Solids 38 5 1 mg/L EPA 160.2 11/29/06 174 Iron 2.0 0.02 1 mgIL EPA 200.7 12/05/06 12/04/06 262 DIR-----.Detection limit...for.


Reporting. Reutso--o Deeced are---....

below.....

DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER

CREEK ENVIRONMENTAL LABORATORIES, INC.

C A Minority-owined Business Enterpirise 141 SUBURBAN ROAD, SUITE C-5 e SAN LUIS OBISPO, CA 93401 * (805) 545-9838 - FAX (805) 545-0107 Page 1 Trevor Rebel Log Number: 06-C15465 Diablo Canyon Power Plant Order: N7123 P.O. Box 56 Project: Stormwater Avila Beach, CA 93424 Received: 11/27/06 Printed: 12/06/06 REPORT OF ANALYTICAL RESULTS sampled Sample Description Sampled By Date @ Time Matrix 2006-013-1 (013-Below reservoir Trevor Rebel 11/26/06@21:21 Aqueous and adj. 230 kv. yard

=================

Analyte Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared ectricaL Conductance 320 1 umhos/cm SM 2510 11/27/06 65 it & Grease Not Detected 7 1 mg/L EPA 1664 12/05/06 272 pH 8.5 0.1 1 pH units EPA 150.1 11/27/06 65 Suspended Solids 760 5 1 mg/L EPA 160.2 11/29/06 174 Iron 16 0.1 1 mg/L EPA 200.7 12/05/06 12/04/06 261 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng Q PRINTED ON RECYCLED PAPER

CREEK ENVIRONMENTAL LABORATORIES, INC.

A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 * (805) 545-9838 o FAX (805) 545-0107 Page 1 Trevor Rebel Log Number: 06-C15457 Diablo Canyon Power Plant Order: N7115 P.O. Box 56 Project: Stormwater Avila Beach, CA 93424 Received: 11/27/06 Printed: 12/05/06 KN P

-V.

ENV. OPS.

REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time Matrix 2006-015-1 (015-Adj Garage) Trevor Rebel 11/26/06@21:26 Aqueous AnaLyte Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared Electrical Conductance 180 1 1 umhos/cm SM 2510 11/27/06 65

& Grease Not Detected 5 1 mg/L EPA 1664 11/30/06 181

.6. 8.2 0.1 1 pH units EPA 150.1 11/27/06 65 Suspended Solids 190 5 1 mg/L EPA 160.2 11/29/06 174 Iron 8.8 0.02 1 mg/L EPA 200.7 12/05/06 12/04/06 262


.-.--------- ----------.-.---------

DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng PRINTED ON RECYCLED PAPER

CREEK ENVIRONMENTAL LABORATORIES, INC.

A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 * (805) 545-9838 a FAX (805) 545-0107 Page 1 Trevor Rebel Log Number: 06-C15459 Diablo Canyon Power Plant Order: N7117 P.O. Box 56 Project: Stormwater Avila Beach, CA 93424 Received: 11/27/06 Printed:

REPORT OF ANALYTICAL RESULTS 12/05/06 FN.rp; Sampled Sample Description Sampled By Date @ Time Matrix 2006-023-1 (Intake Rd.) Trevor Rebel 11/26/06@20:25 Aqueous Analyte Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared


.-.---------.----

Electrical Conductance 940 1 1 umhos/cm SM 2510 11/27/06 65

- & Grease Not Detected 5 1 mg/L EPA 1664 11/30/06 181 6.7 0.1 1 pH units EPA 150.1 11/27/06 65 Suspended Solids 210 5 1 mg/L EPA 160.2 11/29/06 174 Iron 10 0.1 1 mg/L EPA 200.7 12/05/06 12/04/06 261


.-.---------.-.-

DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng

( PRINTED ON RECYCLED PAPER

CREEK ENVIRONMENTAL LABORATORIES, INC.

A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 ° SAN LUIS OBISPO, CA 93401 ° (805) 545-9838 - FAX (805) 545-0107 Page 8 Trevor Rebel Log Number: 07-C1782 Diablo Canyon Power Plant Order: 0825 P.O. Box 56 Project: Stormwater Avila Beach, CA 93424 Received: 02/08/07 Printed: 02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time Matrix 2006-Boat-2 (Boat Dock) Trevor Rebel 02/07/07@14:34 Aqueous Analyte Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared Electrical Conductance 240 1 1 umhos/cm SM 2510 02/08/07 2045

-iL & Grease Not Detected 5 1 mg/L EPA 1664 02/20/07 02/15/07 2402 7.8 0.1 1 pH units EPA 150.1 02/08/07 2045 Suspended Solids 230 5 1 mg/L EPA 160.2 .02/14/07 2329 Iron 10 0.02 1 mg/L EPA 200.7 02/13/07 2234

-- ---- -- -- --- ---- ---- ---- ---- --- -- - - - - - - - - - - - - - - -. - . - - - - - - - - .- .-- - - - . . . . . .-

- . . . . . . . . . . . . . . . . . . . . . .

DLR Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER

CREEK ENVIRONMENTAL LABORATORIES, INC.

A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C SAN LUIS OBISPO, CA 93401 * (805) 545-9838 - FAX (805) 545-0107 Page 6 Trevor Rebel Log Number: 07-C1780 Diablo Canyon Power Plant Order: 0825 P.O. Box 56 Project: Stormwater Avila Beach, CA 93424 Received: 02/08/07 Printed: 02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time Matrix 2006-003-2 (NW Intake BLdg) Trevor Rebel 02/07/07@14:27 Aqueous Analyte Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared Electrical Conductance 610 1 1 umhos/cm SM 2510 02/08/07 2045

--it & Grease 8 5 1 mg/L EPA 1664 02/20/07 02/15/07 2402 7.3 0.1 1 pH units EPA 150.1 02/08/07 2045 Suspended Solids 330 5 1 mg/L EPA 160.2 02/14/07 2329 Iron 18 0.02 1 mg/L EPA 200.7 02/13/07 2234 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER

CREEK ENVIRONMENTAL LABORATORIES, INC.

A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 ° SAN LUIS OBISPO, CA 93401 - (805) 545-9838

  • FAX (805) 545-0107 Page 12 Trevor Rebel Log Number: 07-C1786 Diablo Canyon Power Plant Order: 0825 P.O. Box 56 Project: Stormwater Avila Beach, CA 93424 Received: 02/08/07 Printed: 02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time Matrix 2006-004-2 (Settling Basin) Trevor Rebel 02/07/07@14:38 Aqueous Analyte Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared Electrical Conductance 480 1 1 umhos/cm SM 2510 02/08/07 2045 1

nit & Grease Not Detected 5 mg/L EPA 1664 02/20/07 02/15/07 2402 1

7.0 0.1 pH units EPA 150.1 02/08/07 2045 1

Suspended Solids 44 5 mg/L EPA 160.2 02/14/07 2329 1

Iron 1.9 0.02 mg/L EPA 200.7 02/13/07 2234 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER

CREEK ENVIRONMENTAL LABORATORIES, INC.

A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 * (805) 545-9838 a FAX (805) 545-0107 Page 11 Trevor Rebel Log Number: 07-C1785 Diablo Canyon Power Plant Order: 0825 P.O. Box 56 Project: Stormwater Avila Beach, CA 93424 Received: 02/08/07 Printed: 02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time Matrix 2006-Path 005-2 (Area 10 Ditch) Trevor Rebel 02/07/07@14:42 Aqueous Analyte Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared Electrical Conductance 630 1 1 umhos/cm SM 2510 02/08/07 2045

')il & Grease Not Detected 5 1 mg/L EPA 1664 02/20/07 02/15/07 2402 7.8 0.1 1 pH units EPA 150.1 02/08/07 2045 Suspended Solids 86 5 1 mg/L EPA 160.2 02/14/07 2329 Iron 2.7 0.02 1 mg/L EPA 200.7 02/13/07 2234 DLR Detection limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng PRINTED ON RECYCLED PAPER

Q CREEK ENVIRONMENTAL LABORATORIES, INC.

A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 a SAN LUIS OBISPO, CA 93401 * (805) 545-9838

  • FAX (805) 545-0107 Page 9 Trevor Rebel Log Number: 07-C1783 Diablo Canyon Pc Dwer Plant Order: 0825 P.O. Box 56 Project: Stormwater Avila Beach, CA 93424 Received: 02/08/07 Printed: 02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time Matrix 2006-006B-2 (Lot #1) Trevor Rebel 02/07/07@14:49 Aqueous Analyte Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared Electrical Conductance 120 1 1 umhos/cm SM 2510 02/08/07 2045

'l & Grease Not Detected 5 1 mg/L EPA 1664 02/20/07 02/15/07 2402 1 8.3 0.1 1 pH units EPA 150.1 02/08/07 2045 Suspended Solids 44 5 1 mg/L EPA 160.2 02/14/07 2329 Iron 2.0 0.02 1 mg/L EPA 200.7 02/13/07 2234 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng PRINTED ON RECYCLED PAPER

CREEK ENVIRONMENTAL LABORATORIES, INC.

A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 - (805) 545-9838
  • FAX (805) 545-0107 Page. 2 Trevor Rebel Log Number: 07-C2138 Diablo Canyon Power Plant Order: 00969 P.O. Box 56 Received: 02/14/07 Avila Beach, CA 93424 Printed: 02/27/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time Matrix 006 Lot 1 Trevor Rebel 02/07107@14:49 Aqueous AnaLyte Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared Lead 0.004 0.001 11 mg/L EPA 200.8 02/22/07 02/22/07 2509 ead, TCLP extract Not Detected O004 0.1 mg/L EPA 6020 02/22/07 2505

.-.--------.--.--------.--.

DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director; Michael Ng 0 PRINTED ON RECYCLED PAPER

CREEK ENVIRONMENTAL LABORATORIES, INC.

A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 ° SAN LUIS OBISPO, CA 93401 * (805) 545-9838

  • FAX (805) 545-0107 Page 10 Trevor Rebel Log Number: 07-C1784 Diablo Canyon Pcower Plant Order: 0825 P.O. Box 56 Project: Stormwater Avila Beach, CA 93424 Received: 02/08/07 Printed: 02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time Matrix 2006-006A-2 (Shooting Effluent) Trevor Rebel 02/07/07@14:56 Aqueous

-- - - - - - - - - -

Analyte Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared Electrical Conductance 130 1 1 umhos/cm SM 2510 02/08/07 2045 nit & Grease Not Detected 5 1 mg/L EPA 1664 02/20/07 02/15/07 2402 8.0 0.1 1 pH units EPA 150.1 02/08/07 2045 Suspended Solids 40 5 1 mg/L EPA 160.2 02/14/07 2329 Iron 1.2 0.02 1 mg/L EPA 200.7 02/13/07 2234 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER

CREEK ENVIRONMENTAL LABORATORIES, INC.

- A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 . SAN LUIS OBISPO, CA 93401 - (805) 545-9838

  • FAX (805) 545-0107 Page 1 Trevor Rebel Log Number: 07-C2137 Diablo Canyon Power Plant Order: 00969 P.O. Box 56 Received: 02/14/07 Avila Beach, CA 93424 Printed: 02/27/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time Matrix 006 Range Trevor Rebel 02/07/07@14:46 Aqueous Analyte Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared

--------------- ---------- ------------ -----------

Lead 0.13 0.001 1 mg/L EPA 200.8 02/22/07 02/22/07 2509

'ead, TCLP extract 0.13 0.04 0.1 mg/L EPA 6020 02/22/07 2505 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER

CREEK ENVIRONMENTAL LABORATORIES, INC.

A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 * (805) 545-9838
  • FAX (805) 545-0107 Page 4 Trevor Rebel Log Number: 07-C1778 Diablo Canyon Power Plant Order: 0825 P.O. Box 56 Project: Stormwater Avila Beach, CA 93424 Received: 02/08/07 Printed: 02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time Matrix 2006-008-2 (Diablo Creek) Trevor Rebel 02/07/07@14:30 Aqueous Analyte Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared Electrical Conductance "2,100 1 1 umhos/cm SM 2510 02/08/07 2045

-;L & Grease Not Detected 5 1 mg/L EPA 1664 02/20/07 02/15/07 2402 6.7 0.1 -1 pH units EPA 150.1 02/08/07 2045 Suspended Solids 33 5 1 mg/L EPA 160.2 02/14/07 2329 Iron 1.6 0.02 1 mg/L EPA 200.7 02/13/07 2234 DLR Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER

CREEK ENVIRONMENTAL LABORATORIES, INC.

A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 e SAN LUIS OBISPO, CA 93401 * (805) 545-9838

  • FAX (805) 545-0107 Page 1 Trevor Rebel Log Number: 07-C1775 Diablo Canyon Power Plant Order: 0825 P.O. Box 56 Project: Stormwater Avila Beach, CA 93424 Received: 02/08/07 Printed: 02/20/07 REPORT*OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time Matrix 2006-009-2 (NW Protected Area) Trevor Rebel 02/07/07@14:45 Aqueous Analyte Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared Electrical Conductance 130 1 1 umhos/cm SM 2510 02/08/07 2045 1

"iL & Grease Not Detected 5 mg/L EPA 1664 02/15/07 02/13/07 2268 1

6.6 0.1 pH units EPA 150.1 02/08/07 2045 Suspended Solids 18 5 1 mglL EPA 160.2 02/14/07 2329 Iron 0.17 0.02 1 mg/L EPA 200.7 02/13/07 2234


DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.

I CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER

CREEK ENVIRONMENTAL LABORATORIES, INC.

A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 * (805) 545-9838
  • FAX (805) 545-0107 Page 5 Trevor Rebel Log Number: 07-C1779 Diablo Canyon Power Plant Order: 0825 P.O. Box 56 Project: Stormwater Avila Beach, CA 93424 Received: 02/08/07 Printed: 02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time Matrix 2006-011-2 (Diabto Creek Rd. Trevor Rebel 02/07/07@15:12 Aqueous Culvert Inlet)

AnaLyte Result DLR Dilution Units Method I Date Date Batch Factor Analyzed Prepared electrical Conductance 190 1 1 umhos/cm SM 2510 02/08/07 2045 1

I & Grease Not Detected 5 mg/L EPA 1664 02/20/07 02/15/07 2402 1

pH 7.5 0.1 pH units EPA 150.1 02/08/07 2045 1

Suspended Solids 30 5 mg/L EPA 160.2 02/14/07 2329 1

Iron 1.3 0.02 mg/L EPA 200.7 02/13/07 2234 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER

CREEK ENVIRONMENTAL LABORATORIES, INC.

A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 * (805) 545-9838
  • FAX (805) 545-0107 Page 2 Trevor Rebel Log Number: 07-C1776 Diablo Canyon Power Plant Order: 0825 P.O. Box 56 Project: Stormwater Avila Beach, CA 93424 Received: 02/08/07 Printed: 02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time Matrix 2006-013-2 Trevor Rebel 02/07/07@15:03 Aqueous (V-Ditch Below Reservoir)

================= -

Anatyte Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared

  • Lectrical Conductance 260 1 1 umhos/cm SM 2510 02/08/07 2045 I & Grease Not Detected 5 1 mg/I EPA 1664 02/20/07 02/15/07 2402 pH 7.8 0.1 1 pH units EPA 150.1 02/08/07 2045 Suspended Solids 200 5 1 mg/L EPA 160.2 02/14/07 2329 Iron 4.8 0.02 1 mg/L EPA 200.7 02/13/07 2234 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER

CREEK ENVIRONMENTAL LABORATORIES, INC.

A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C SAN LUIS OBISPO, CA 93401 * (805) 545-9838

  • FAX (805) 545-0107 Page 3 Trevor Rebel Log Number: 07-C1777 Diablo Canyon Power Plant Order: 0825 P.O. Box 56 Project: Stormwater Avila Beach, CA 93424 Received: 02/08/07 Printed: 02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time Matrix 2006-015-2 Trevor Rebel 02/07/07@15:07 Aqueous (Downstream NPG Garage)

Analyte Result DLR Diluution Units Method Date Date Batch Fac tor Analyzed Prepared

-tectrical Conductance 140 I umhos/cm SM 2510 02/08/07 2045 At & Grease Not Detected 5 mg/L EPA 1664 02/20/07 02/15/07 2402 pH 8.0 0.1 I pH units EPA 150.1 02/08/07 2045 Suspended Solids 86 5 mg/L EPA 160.2 02/14/07 2329 Iron 2.6 0.02 mg/L EPA 200.7 02/13/07 2234 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng t PRINTED ON RECYCLED PAPER

CREEK ENVIRONMENTAL LABORATORIES, INC.

. A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 * (805) 545-9838 - FAX (805) 545-0107 Page 7 Trevor Rebel Log Number: 07-C1781 Diablo Canyon Power Plant Order: 0825 P.O. Box 56 Project: Stormwater Avila Beach, CA 93424 Received: 02/08/07 Printed: 02/20/07 REPORT OF ANALYTICAL RESULTS Samp I ed Sample Description Sampled By Date @ Time Matrix 2006-023-2 (Intake Road) Trevor Rebel 02/07/07614:30 Aqueous Anatyte Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared Electrical Conductance 370 1 1 umhos/cm SM 2510 02/08/07 2045

'it & Grease Not Detected 5 1 mg/L EPA 1664 02/20/07 02/15/07 2402 1'

6.9 0.1 pH units EPA 150.1 02/08/07 2045 Suspended Solids 180 5 1 mg/L EPA 160.2 02/14/07 2329 Iron 3.1 0.02 mg/L EPA 200.7 02/13/07 2234 DLR = Detection Limit for Reporting. Results of "Not Detected" are below DLR.

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng q PRINTED ON RECYCLED PAPER

Creek-Environmental Laboratorloms, Inc. nlamn-oit-usoway 141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Order # /

  • Please Print in Pen Client Name Contact Phone Diablo Canyon Power Plant Due Date:

Trevor Rebel 805.545.3607 24Hr 48Hr Other Nor~ITEJ Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To:

Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print, / Comments: Storm Water Set 1 Matrix Key: DW = Drinking Water "1Qol r-I AQ = Aqueous SL = Soil/Solid Date/Time #of Sample Descriotion Samaled Analysis Matrix Bottles 2006-Boat-I Preservative,

, oi- Oil and Grease, ph, EC, TSS, Fe AQ. 3 (Boat Refuel)

RELINQUISHED BY DATE/TIME RECEIVED BY

UreeV Lnvironmental Laboratorins, Inc. Chain-ot-Cu*-tody 141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805).545-9838 fax (805) 545-0107 Order## /P?

  • Please Print inPen Client Name Contact Diablo Canyon Power Plant Trevor Rebel Phone 805.545.3607 JJDue Date:

24Hr 48Hr Other

....

7ormaITA#7 Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To:

Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments: Storm Water Set 1 Matrix Key: DW = Drinking Water AQ = Aqueous SL = Soil/Solid Date/Time. #of Sample Description A, Sampled Analysis Matrix Bottles Preservative I Type Bottles 2006-0 1 i -~~' Oil and Grease, ph, EC, TSS, Fe AQ 3 e ... rB *1 Creek Lab Sample #

.

(NW In ae Bldg) ___

.N .......

L~

RELI'NQUISHED BY DATEITIME RECEIVED BY (Sg)(Print) (Organization) (Sign) (Pit (Organization)

"7iFe.,PA- 40,Xj.Q.- ENVE OPS

-I "ISO I Creek Environmental Laboratories. Inc. I

Ureel' Environmental Laworatori-s, Inc. unain-oi-uu s-oqy 141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Order# h, 0

leIade* rilL in Puen Client Name Diablo Canyon Power Plant Cotc Trevor Rebel IPhone 805.545.3607 Due Date:

24Hr 48Hr Other Normal TAT Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To:

Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments: Storm Water Set I Matrix Key: DW = Drinking Water AQ = Aqueous SL = Soil/Solid Date/Time #of Sample Description Sampled Analysis Matrix Bottles Preservative/ Type Bottles Creek Lab Sample #

,-,

If.nOil and Grease, ph, EC, TSS, Fe AQ 3 .- Pu Q- A 2006-004-1 SArn2!S44 100m-(Settle Basin) __

V RELINQUISHED BY DATE/TIME RECEIVED BY (Sign) (Print) (Organization) (Sign) (Print) (Organization)

. ... VE0P .AN "__-__. .

I0t-2-74

-Itl.A IkK4-Y& A,/,- 0516 rv Creek Environmental T nhnrntnrie.v. Tne.

Creek- Environmental Laboratories, Inc. Uhain-ot-uustoay 141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Order # ALL 22.

  • PI~,g~ Print in P~n Client Name Contact Phone Due Date:

Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other No malTAi Address City State Zip Fax PO Box 56, Avila Beach CA 93424 Cell 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To:

Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments: Storm Water Set 1 Matrix Key: DW = Drinking Water I.AQ = Aqueous SL =Soil/Solid Date/Time U of Sample Description Sampled Analysis Matrix Bottles Preservative/ Type Bottles Creek Lab Sample #

2006-005-1Oil and Grease, ph, EC, TSS, Fe AQ 3 P Q R 444 3 250 i ,, ,

(005 Area 10 Ditch)_ ___i (Sign)~~~~~4 (Print)4 (Ogaiztin (Sg)(rit Ogaiain J E.44

$$.* 4444S4 RELINQUISHED BY DATE/TIME RECEIVED BY L." 7& .1 Creek Environmental

Creek- Environmental Laboratorip-s, Inc. Chain-ot-Uustody 141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Order # iv//2*

  • Pl~i~c~ Pr~rt in P0,,

Client Name Contact hone Due Date:

Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other Normal TAT Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435.

Project Name/Number PO# Copies To:

Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments: Storm Water Set I Matrix Key: DW = Drinking Water I AQ = Aqueous SL = Soil/Solid Date/Time # of Sample Description Sampled Analysis Matrix 2006-006B-1, Bottles Preservative IType Bottles Creek Lab Sample #

206-0 0 B 1 (&4o7-' Oil and Grease, ph, EC, TSS, Fe AQ 3 Q "/n 100 ml,.. "G112O .

(006 Storm Grate in Lot #1) ' -

RELINQUISHED BY DATE/TIME RECEIVED BY (Sign) (Print) (Organization) (Sign) (Print) (Organization)

P-)d7- 1/4

%.r1.0 ;, i.vironmental Laborat ies, Inc. Chain-of-Custody 141 Subu. .i Road, Suite C-5,,San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Order #_ ______

. Please Print in Pen Client Name Diablo Canyon Power Plant Contact Trevor Rebel Phone 805.545.3607 1'DueDate:

24Hr 48Hr Other N a al 1

Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To:

Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments: Storm Water Set I MaAQ= Aqueous SL = Soil/Solid Date/Time #of Sample Description lottles 121 2006-006A-1 (Shoot Range Eff) II RELINQUISHED BY

Cree'- Environmental Laboratorves, Inc. OrderU

_- UY 141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (80)) 545-0107 Order # _,J)711-0 Client Name rContact 1.Due Diablo Canyon Power Plant f Phone Date:

Trevor Rebel J[805.545.3607 24Hr 48Hr Other Normal TAT Address City State Zip Fax

  • PO Box 56, Avila Beach CA 93424 Cell 805.545.3459 Beeper 805.441.5435 Project Name/Number PO#

Stormwater Copies To:

Bill to: (if different from above) Address City State Zip samPler Name (Print) Comments: Storm Water Set I Matrix AQ Key: OW = Drinking Water

= Aqueous SL = Soil/Solid Date/Time # of Sample Description Sampled Analysis Matrix Bottles Preservative I Type Bottles Creek Lab Sample #

Oil and Grease, ph, EC, TSS, Fe AQ 3 -P/j Q-4,

.. A 2006-008-1 AG1-jSO 100 .-

(008- Diab Creek)

(/LSign) . ,... rintg (Organization). (sign) (Print) (Organization)

' * " ENVE OPS

,*; /f//I//Q I 5~su,.

Creek Environmental 1 .ahnpofniAAC T"'. I

,re'-K Invironmental Laboratc ies, Inc. Chain-of-C ~stody 141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Order #_______

S

  • PI~~ Print in PAn Client Name Contact Phone Due Date:

Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other Normal TAT Address city State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To:

Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments: Storm Water Set I Matrix Key: DW = Drinking Water I AQ = Aqueous SL = Soil/Solid DatelTime #of 2006-009-1.

Sample Description Sampled fv'l-o.-O Analysis Oil and Grease, ph, EC, TSS, Fe Matrix AQ Bottles 3

Preservative / Type Bottles AGIH2SO41000ml-P/unp Q- Aý Creek Lab Sample #

(009 N Protected) 09-t ote RELINQUISHED BY DATE/TIME RECEIVED BY (Sign) (Print) (Organization (Sign) "

1 (Print) (Organization)

"-- [ ,.f*_.*.* ENVEOPS j._ ., ...

I QIQ'" I obF2/ I& 6~&-HA~ 4 Creek Environmental T Qh.VQ+hAw1AtnIf", Iu

k,reeK Lnvironmentai Laborator"s, Inc. Chain-of-Cu ..tody 141 Suburban Koad, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Order # -//7///

. " Please Print in Pen

-- '%,

Client Name Contact Phone Due Date:

Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To:

Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments: Storm Water Set I Matrix Key: DW = Drinking Water AQ = Aqueous SL = Soil/Solid Date/Time # Of Sample Description Sampled Analysis Matrix Bottles 2006-011-1 t,.z.,4 Oil and Grease, ph, EC, TSS, Fe AQ 3 (DiabloCreek Dr)

KtLINQUISHED Y DATE/TIME RE EIVE Y

Creek- Environmental Laboratorins, Inc. unaln-oi-tuswouy 141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Order# Y'/'710Z

. Please Print in Pen Client Name Contact Phone Due Date:

Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other Normal TAT Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To:

Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments: Storm Water Set I Matrix Key: DW = Drinking Water AQ = Aqueous SL = Soil/Solid Date/Time # of Samole Descriotion Sam oled Analvsis Matrix Bottles 2 0- 1-,o*'Oil and Grease, ph, EC, TSS, Fe AQ 3 2006-013-1 (013 -Below reservoir and adj 230 kv yard)

RELINQUISHED BY DATEITIME RECEIVED BY

.;relK t-nvironmental Laboratcvies, Inc. Chain-of-C .stody 141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Order #

S Please Print in Pen Client Name Contact Phone Due Date:

Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other Nornral'TAT)II Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.44,1.5435 Project Name/Number PO# Copies To:

Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments: Storm Water Set I Matrix Key: DW = Drinking Water

-AQ = Aqueous SL = Soil/Solid DatelTime # of Sample Description Sampled Analysis Matrix Bottles Preservative I Type Bottles Creek Lab Sample #

it-22v-01-,Oil and Grease, ph, EC, TSS, Fe AQ 3 Plu*-0.

20106-015-1 ______ AG12Sk 1000___

(015 -AdjGarage)

RELINQUISHED BY DATE/TIME RECEIVED BY (Sign) (Prin~t) (Organization) (Sign) (Print) (Organization) j 01 rZ_ ENVE OPS -

i -1*OL I I I

I~<.63~S~ 9 Creek Environmental

Creek. Environmental Laboratories, Inc. Chai-rod- cus# ly 141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Order # tf '7J/7 0 D1 0  ; f; D Client Name Contact Phone Diablo Canyon Power Plant Due ate:

Trevor Rebel .805.545.3607 24Hr 48Hr Other Normal TAT Address City State Zip Fax P0 Box 56, Avila Beach CA 93424 Cell 805.545.3459 Beeper 805.441.5435 Project Name/Number PO#

Stormwater Copies To:

Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments: Storm Water Set 1 Matrix Key: DW = Drinking Water I AQ = Aqueous SL = Soil/Solid Sample Description Date/Time # of a led Analysis Matrix Bottles Preservative I Type Bottles 2-v,-o Oil and Grease, ph, EC, TSS, Fe Creek Lab Sample #

2006-023-1 AQ 3 P n AG/12SO4 1000 ~ml-B' RI0 5 i-

](intake Rd),

NVE OP3/4 RELINQUISHED BY DATErrlME RECEIVED BY (sign) (Print) (Organization) (Sign) . (Print) (Organization) i i II1-?<.

I XYIý'

Creek Environmental Laboratories. Inc.

SreeFK rnvironmenial LaDoraior*'s, inc. Unaln-ol-COd Order 4

  1. to 141 Suburbau Road, S*it C-5, Sm Luis Obispo, CA 93401 phont (905) 545-9838 fax (805) 545-0107
  • Please Print in Pen Client Name I Contact " Phone I Due Date:

Diablo Canyon Power PlantI Trevor Rebel 805.545.3607 1 24Hr 48Hr Other Normal TAT jc Address City State Zip Fax Cell PO Box 66, Av~la Beach CA 93424 Project Name/Number Stormwater j 805.545.3459 PO#

Beeper 805.441.5435 Copies To:

Bill to: (ifdifferent from above) Address City State Zip Sampler Name (Print) Comments: Storm Water Set 2 Matrix Key: DW = Drinking Water

,[ AQ = Aqueous SL = SoillSolid DatelTime or Sample Description Sampled Analyis Matrrx Bobes. Pmserv.ITypB SotUs Cm*1.ub Smnmple 9 2006-003-2 (NW Intake Bldg) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 Plump .- A iA'GIiS*4,4000 mll; .

2006-023-2 (Intake Road) 2-7.07 Oil and Grease, ph, EC, TSS, Fe AQ 3 P/unp - -.

~~~~~~.A0Ga2idO411ool"-00 *  : -

2006-Boat-2 (Boat Dock) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 Plo.ip A' . .

AG./H2,6O410'0-04"Mi

-_- .f--T 2`50 mI-C -137.2.:

2006-006B-2 (Lot#l) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 PlUnp Q1-A.-.

AGIH2 O4 OO-I-2006-OO6A-2 (Shooting Effluent) *.',07 Oil and Grease, ph, EC, TSS, Fe AQ 3 P/l A . .

_7Q, AGNI2ý1010Q mIB 2006-Path 005-2 (Area 10 Ditch) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 30Plunp .-.

A AG/H29O 10049:8~

2006-004-2 (Settling Basin) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 A .

QP.up-.

AGH2SO4 1000 mi-B :

RELINQUISHED BY DATEOrME RECEIVED BY (sign (?Tnt (Organization)(Sign (Print) (Organization) j/ Trevor Rebel ENVE OPS V-6"_7

____________

L_ 0

()~Creek Environmental Laboratories, Inc.

PORLABl*EONLY:- Shippin*g. od:- *Lab/ Curer: "S ". . eCo lions: Inz "I&Y -Cust dy aleYI-- .--

LrepK :nvlronmental Laboratorz's, Inc. Chaln-ot-Cu tody 141 Suburbaa Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Order #

SPease Print in Pen Client Name Contact Phone Due Date:

Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other Normal TAT Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To:

Stormwater Bill to: (Ifdifferent from above) Address City State Zip Sampler Name (Print) Comments: Storm Water Set 2 Matrix Key: DW = Drinking Water AQ = Aqueous SL = SofI/Solid DatelTime *OF Sample Description Sampled Analysis Matrix Bo=* Prewwvof Type BaWas Cea, Lab Sa-smple#

2006-009-2 (NW Protected Area) 2.7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 .P1Ulip .,Q-:A;-

.!_ _ _ _ _ _ __--_ _-_ _._ /H AG/HsO4 0

.>5 1060 rm,-C ml*l.

. .- _. _ _- _ _-_ _. _

2006-013-2 (V-Ditch Below Reservoir) 2-7-0'7 Oil and Grease, ph, EC, TSS, Fe' AQ 3 Plunp.Q.-: A .'..!

2006-015-2 (Downstream NPG Garage) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 J PluipiQ-.A*:I AGMW2"O 16004h mi-B A 2006-008-2 (Diablo Creek) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 .Piu rp ,--.;

2006-011-2 (Diablo Creek Rd Culvert Inlet) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 1620-Ap

-)E

.25" r.B RELINQUISHED BY DATEITIME RECEIVED BY Pr(s0a) nL*-rNV zationS (Sign) "Print) (Organization)

Trevor Rebei ENVE OPS 250 Creek Environmental

_______________

rLaboratorik Inc.

.."FoLAa &ao'o*v. S on :e1odf t.Lab! Couri . sa Ccnhlo1ndacti Cold' o1W,W-N C" Sealed:-