ML072130139: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:September 5, 2006 NOTE TO: Steve Garchow FROM: Vincent Gaddy, Chief Chief Examiner, Operations Branch Operations Branch Division of Reactor Safety  
{{#Wiki_filter:September 5, 2006 NOTE TO: Steve Garchow Chief Examiner, Operations Branch FROM:         Vincent Gaddy, Chief Operations Branch Division of Reactor Safety


==SUBJECT:==
==SUBJECT:==
EXAMINATION ASSIGNMENT You have been assigned as Chief of the Grand Gulf examination.
EXAMINATION ASSIGNMENT You have been assigned as Chief of the Grand Gulf examination. The operating test has been scheduled to be completed by March 9, 2007. Thank you for contacting the Grand Guld facility to finalize the details of the examination. You are reminded that the RPS/IP system must be maintained to ensure that the examiners and numbers of candidates are accurate. In addition, you are reminded that only qualified examiners are permitted to conduct any part of the examination.
The operating test has been scheduled to be completed by March 9, 2007. Thank you for contacting the Grand Guld facility to finalize the details of the examination.
Vincent Gaddy, Chief '
You are reminded that the RPS/IP system must be maintained to ensure that the examiners and numbers of candidates are accurate.
Operations Branch Division of Reactor Safety
In addition, you are reminded that only qualified examiners are permitted to conduct any part of the examination. Vincent Gaddy, Chief ' Operations Branch Division of Reactor Safety Replaces NUREG-1021 Revision 9, ES Forms 201-1 and 501-1 CHIEF: Due Date Steve FACILITY:
 
Grand Gulf Garchow Description 9/6/06 11/5/06 11/5/06 Exam Administration Date Confirmed (C.l .a; C.2.a  
Replaces NUREG-1021 Revision 9, ES Forms 201-1 and 501-1 CHIEF:           Steve Garchow FACILITY:                     Grand Gulf             1  DATE of OPERATING EXAM:        1  3/5/07 Due Date Description                                                     Date Complete I Initials i Notes 9/6/06       Exam Administration Date Confirmed (C.l .a; C.2.a & b) 11/5/06      NRC Staff & Facility Contact Assigned (C.l .d; C.2.e) 11/5/06      Facility Contact Briefed on Security & Other Reqs (C.2.c) 11/5/06       Corporate Notification Letter (ES-201 Att-3) Sent (C.2.d) 12/5/06      Reference Material Due (if NRC authored) (C.1.e; C.3.c) 12/20/06  I Integrated Exam Outlines Due (C.1.e & f; C.3.d) 12/25/06 I Outlines Review NRC Feedback Provided (c.2.h; C.3.e)
& b) NRC Staff & Facility Contact Assigned (C.l .d; C.2.e) Facility Contact Briefed on Security & Other Req's (C.2.c) 11/5/06 12/5/06 Corporate Notification Letter (ES-201 Att-3) Sent (C.2.d) Reference Material Due (if NRC authored) (C.1.e; C.3.c) 1/19/07 2/3/07 Draft Exams w/References Due (C.l .e,f,g,h; C.3.d) *Peer Reviewer Completes Review of Exam on ES-401-9 2/3/07 2/3/07 2/3/07 *NRC BC Approves Feedback to Facility (C.2.h; C.3.f) *Exams Reviewed w/ Fac. (C.l .h;C.2.f & h; C.3.g) Preliminary Applications Due (C.l .I;C.2.g; ES-202) 2/8/07 2/19/07 ~~ ~~ Preliminary Applications Reviewed (C.l .I;C.2.g) Final Applications Due (C.l .I;C.2.i;ES-202) 2/19/07 2/26/07 On-Site Audit (10%) of License App's (ES-202 C.2.e) Final Appl. OK'ed i3 Waiver Letters Sent (ES-204; C.2.e) 2/26/07 2/26/07 2/26/07 NRC Supervisor Approved Final Exams (C.2.i;C.3.h)
                              &
Exam Approval Letter (ES-201 Att-4) and List of Applicants (ES-201-4) Prepared (C.2.i) Proctor Rules Review w/Fac.  
1/19/07     Draft Exams w/References Due (C.l .e,f,g,h; C.3.d) 2/3/07      *Peer Reviewer Completes Review of Exam on ES-401-9 2/3/07       *NRC BC Approves Feedback to Facility (C.2.h; C.3.f) 2/3/07      *Exams Reviewed w/ Fac. (C.l .h;C.2.f & h; C.3.g) 2/3/07      Preliminary Applications Due (C.l .I;C.2.g; ES-202)
& Written Authorized (C.3.k) 2/26/07 3/5/07 Exam Material to Exam Team (C.3.i) Administer Operating Exam On-Site 3/17/07 3/20/07 Facility Graded Exam  
                                                      ~~ ~~
& Comments Received NRC Written Exam Grading Completed 3/20/07 3/30/07 Examiners Document Exam Grades on ES Forms NRC Chief Examiner Gradina Review Completed 3/31/07 4/4/07 NRC BC Review Completed License/Denials Sinned  
2/8/07       Preliminary Applications Reviewed (C.l .I;C.2.g) 2/19/07      Final Applications Due (C.l .I;C.2.i;ES-202) 2/19/07   I On-Site Preparatow Week    to Validate Operatina Exam 2/19/07     On-Site Audit (10%) of License Apps (ES-202 C.2.e) 2/26/07      Final Appl. OKed i3 Waiver Letters Sent (ES-204; C.2.e) 2/26/07     NRC Supervisor Approved Final Exams (C.2.i;C.3.h) 2/26/07      Exam Approval Letter (ES-201 Att-4) and List of Applicants (ES-201-4) Prepared (C.2.i) 2/26/07      Proctor Rules Review w/Fac. & Written Authorized (C.3.k) 2/26/07     Exam Material to Exam Team (C.3.i) 3/5/07      Administer Operating Exam On-Site 3/17/07     Facility Graded Exam & Comments Received 3/20/07      NRC Written Exam Grading Completed 3/20/07     Examiners Document Exam Grades on ES Forms 3/30/07      NRC Chief Examiner Gradina Review Completed 3/31/07     NRC BC Review Completed 4/4/07     License/Denials Sinned & Report Issued 4/4/07     RPS/IP Number of Examinees Updated 4/19/07      Examination Report Issued 4/26/07     Package Closed Out 4/26/07     Chief QA of ADAMS and SlSP review comolete Indicates the due dates are more conservative than the ES-201-1 requires.
& Report Issued 4/4/07 4/19/07 RPS/IP Number of Examinees Updated Examination Report Issued 4/26/07 4/26/07 Package Closed Out Chief QA of ADAMS and SlSP review comolete 1 DATE of OPERATING EXAM:
 
1 3/5/07 Date Complete I Initials Notes i 12/20/06 I Integrated Exam Outlines Due (C.1.e
ES-201                                         Examination Outline Qualitv Checklist                                                         Form ES-201-2
& f; C.3.d) 12/25/06 I Outlines Review & NRC Feedback Provided (c.2.h; C.3.e) 2/19/07 I On-Site Preparatow Week to Validate Operatina Exam Indicates the due dates are more conservative than the ES-201-1 requires.
/I Facility: GRAND GULF NUCLEAR STATION                                                                                               Date of Examination: 21 May 2007 Item   1                                                           Task Description
ES-201 Examination Outline Qualitv Checklist Form ES-201-2 /I Facility: GRAND GULF NUCLEAR STATION Date of Examination:
                                                                                                                                                    -il-F-In it iaIs
21 May 2007 Item 1 Task Description In i t i a I s -il-F- 1. I a. Verify that the outline(s) fit@)
: 1. I   a. Verify that the outline(s) fit@)the appropriate model, in accordance with ES-401.
the appropriate model, in accordance with ES-401. b. Assess whether the outline was systematically and randomly prepared in accordance with Section D.1 of ES-401 and whether all K/A categories are appropriately sampled. R 1 c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics. d. Assess whether the justifications for deselected or rejected K/A statements are appropriate.
: b. Assess whether the outline was systematically and randomly prepared in accordance with Section D.1 of ES-401 and R            whether all K/A categories are appropriately sampled.
T T A // R that each applicant can he tested using at least one new or significantly modified scenario, that no scenarios are Form ES-301-4 and described in Appendix D. II 3. I a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:
1
(1) the outline(s) contain(s) the required number of control room and in-plant tasks distributed among the safety functions (2) task repetition from the last two NRC examinations is within the limits specified on the form (3) no tasks are duplicated from the applicants' audit test(s) (4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form. W / T as specified on the form b. Verify that the administrative outline meets the criteria specified on Form ES-301-1: (I) the tasks are distributed among the topics as specified on the form (2) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations E. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days. 4. G E N E R A I' I a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the appropriate exam sections.
: c. Assess whether the outline over-emphasizes any systems, evolutions, o r generic topics.
T T        d. Assess whether the justifications for deselected o r rejected K/A statements are appropriate.
    /  A R
3.
W T
        /
that each applicant can he tested using at least one new o r significantly modified scenario, that no scenarios are Form ES-301-4 and described in Appendix D.
I a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:
(1)the outline(s) contain(s) the required number of control room and in-plant tasks distributed among the safety functions as specified on the form (2) task repetition from the last two NRC examinations is within the limits specified on the form (3) no tasks are duplicated from the applicants audit test(s)
(4) the number of new o r modified tasks meets o r exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form.
I      I
: b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:
(I) the tasks are distributed among the topics as specified on the form (2) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations E. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.
: 4. I a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the appropriate exam sections.
: b. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate.
: b. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate.
: c. Ensure that K/A importance ratings (except for plant-specific priorities) are at least 2.5. d. Check for duplication and overlap among exam sections.
G
: e. Check the entire exam for balance of coverage.
: c. Ensure that K/A importance ratings (except for plant-specific priorities) are a t least 2.5.
: f. Assess whether the exam fits the appropriate job level (RO or SRO). ~ Printed Name/Signature
E N        d. Check for duplication and overlap among exam sections.
: a. Author b. Facility Reviewer(*)
E      e. Check the entire exam for balance of coverage.
: c. NRC Chief Examiner (#) d. NRC Supervisor II Date Note:# Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.
R
ES-401, Rev. 9 Written Examination Quality Checklist Form ES-401-6 Facility:
: f. Assess whether the exam fits the appropriate job level (RO or SRO).
Grand Gulf Nuclear Station Date of Exam: 21 May 2007 ExamLevel:
A I
RO SRO 1. Questions and answers are technically accurate and applicable to the facility.
                                                                ~     Printed Name/Signature                                                             Date
: a. Author
: b. Facility Reviewer(*)
: c. NRC Chief Examiner (#)
: d. NRC Supervisor I
Note:# Independent NRC reviewer initial items in Column c; chief examiner concurrence required.
 
ES-401, Rev. 9                             Written Examination Quality Checklist                                 Form ES-401-6 Facility: Grand Gulf Nuclear Station                         Date of Exam: 21 May 2007                             ExamLevel: RO SRO
: 1. Questions and answers are technically accurate and applicable to the facility.
2a. NRC K/As are referenced for all questions.
2a. NRC K/As are referenced for all questions.
: b. Facility learning objectives are referenced as available.
: b. Facility learning objectives are referenced as available.
: 3. SRO questions are appropriate in accordance with Section D.2.d of ES-401 4. The sampling process was random and systematic (If more than 4 RO or 2 SRO questions were repeated from the last 2 NRC licensing exams, consult the NRR OL program office). 5. Question duplication from the license screening/audit exam was controlled as indicated below (check the item - the audit exam was systematically and randomly developed, or - the audit exam was completed before the license exam was started, or - the examinations were developed independently, or X the licensee certifies that there is no duplication, or - other (explain) that applies) and appears appropriate:
: 3. SRO questions are appropriate in accordance with Section D.2.d of ES-401
: 6. Bank use meets limits (no more than 75 percent from the bank, at least 10 percent new, and the rest new or modified);
: 4. The sampling process was random and systematic (If more than 4 RO or 2 SRO questions were repeated from the last 2 NRC licensing exams, consult the NRR OL program office).
enter the actual RO / SRO-only question 11 distribution(s) at right. I I Memory Overall 37 % 7. Between 50 and 60 percent of the questions on the RO exam are written at the comprehension/ analysis level; the SRO exam may exceed 60 percent if the randomly selected WAS support the higher cognitive levels; enter the actual RO / SRO question distribution(s) at right. New 72(96%)/23(92
: 5. Question duplication from the license screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate:
%) C/A Overall 63 % II 31(41.3%)/6(24%)
  -the audit exam was systematically and randomly developed, or
  -the audit exam was completed before the license exam was started, or
  -the examinations were developed independently, or X the licensee certifies that there is no duplication, o r
  -other (explain)
: 6. Bank use meets limits (no more than 75 percent                                                           New from the bank, at least 10 percent new, and the rest new o r modified); enter the actual RO / SRO-only question                                           72(96%)/23(92%)
1    distribution(s) at right.
I I
: 7. Between 50 and 60 percent of the questions on the RO exam are                     Memory                C/A written at the comprehension/ analysis level; the SRO exam may Overall 37 %        Overall 63 %
exceed 60 percent if the randomly selected WAS support the higher cognitive levels; enter the actual RO / SRO question distribution(s) at right.
I                                                                                  31(41.3%)/6(24%)
: 8. References/handouts provided do not give away answers or aid in the elimination of distractors.
: 8. References/handouts provided do not give away answers or aid in the elimination of distractors.
: 9. Question content conforms with specific IUA statements in the previously approved examination outline and is appropriate for the tier to which they are assigned; deviations are justified.
: 9. Question content conforms with specific IUA statements in the previously approved examination outline and is appropriate for the tier to which they are assigned; deviations are justified.
: 11. The exam contains the required number of one-point, multiple choice items; the total is correct and agrees with the Printed Name / Signature Date a. Author b. Facility Reviewer
: 11. The exam contains the required number of one-point, multiple choice items; the total is correct and agrees with the Printed Name / Signature                                   Date
(*) c. NRC Chief Examiner (#) d. NRC Regional Supervisor Note:* The facility reviewer's initials/signature are not applicable for NRC-developed examinations.  
: a. Author
# Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.
: b. Facility Reviewer (*)
Rev 1 2/26/2007 ESSOI Operating Test Quality Checklist Form ES-301-3 Facility:
: c. NRC Chief Examiner (#)
GRAND GULF NUCLEAR STATION Date of Examination:
: d. NRC Regional Supervisor Note:* The facility reviewers initials/signature are not applicable for NRC-developed examinations.
05/21/20C
  # Independent NRC reviewer initial items in Column c; chief examiner concurrence required.
Rev 1 2 / 2 6 / 2 0 0 7
 
ESSOI                                       Operating Test Quality Checklist                                   Form ES-301-3 Facility:           GRAND GULF NUCLEAR STATION                               Date of Examination: 05/21/20C   - 05/25/2007 Initials
: 1. GENERAL CRITERIA
: 1. GENERAL CRITERIA
: a. The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., 10 CFR 55.45, operational importance, safety function distribution).
: a.         The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., 10 CFR 55.45, operational importance, safety function distribution).
: b. There is no day-to-day repetition between this and other operating tests to be administered during this examination.
: b.         There is no day-to-day repetition between this and other operating tests to be administered during this examination.
C. The operating test shall not duplicate items from the applicants' audit test(s) (see Section D.1 .a). d. Overlap with the written examination and between different parts of the operating test is within acceptable limits.
C.         The operating test shall not duplicate items from the applicants' audit test(s) (see Section D.1.a).
: e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level.
: d.         Overlap with the written examination and between different parts of the operating test is within acceptable limits.
: 2. WALK-THROUGH (CATEGORY A & B) CRITERIA a. Each JPM includes the following, as applicable: initial conditions initiating cues 0 references and tools, including associated procedures 0 reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee operationally important specific performance criteria that include: - detailed expected actions with exact criteria and nomenclature - system response and other examiner cues - statements describing important observations to be made by the applicant - criteria for successful completion of the task - identification of critical steps and their associated performance standards - restrictions on the sequence of steps, if applicable
: e.         It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level.
: b. Ensure that any changes from the previously approved systems and administrative walk trough outlines (Forms 301-1 and
: 2. WALK-THROUGH (CATEGORY A & B) CRITERIA
: 2) have not caused the test to deviate from any of the acceptance criteria (e.g. item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2..
: a.         Each JPM includes the following, as applicable:
initial conditions initiating cues 0 references and tools, including associated procedures 0 reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee operationally important specific performance criteria that include:
                - detailed expected actions with exact criteria and nomenclature
                  - system response and other examiner cues
                  - statements describing important observations to be made by the applicant
                  - criteria for successful completion of the task
                  - identification of critical steps and their associated performance standards
                  - restrictions on the sequence of steps, if applicable
: b.         Ensure that any changes from the previously approved systems and administrative walk trough outlines (Forms 301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g. item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2..
: 3. SIMULATOR (CATEGORY C) CRITERIA
: 3. SIMULATOR (CATEGORY C) CRITERIA
: a. The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a copy is attached. - 05/25/2007 Initials Date rinted Name  
: a.         The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a copy is attached.
/ Signature
rinted Name / Signature                                               Date
: b. Facility Reviewer(*)
: b. Facility Reviewer(*)
: c. NRC Chief Examiner
: c. NRC Chief Examiner (#)
(#) NOTE:
NOTE:
* The facility signature is not applicable for NRC-developed tests.  
* The facility signature is not applicable for NRC-developedtests.
# Independent NRC reviewer initial items in Column "c," chief examiner concurrence required.
            # Independent NRC reviewer initial items in Column "c," chief examiner concurrence required.
ES-301 Simulator Scenario Quality Checklist Form ES-301-4 break) is incorporated into the scenario without a
 
: 13. The level of difficulty IS appropriate to support licensing decisions for each crew position.
ES-301                               Simulator Scenario Quality Checklist                                           Form ES-301-4 break) is incorporated into the scenario without a
Revision 1 02/21/2007 NUREG 1021, REVISION 9 ES-301 Transient and Event Checklist Form ES-301-5 CREW POSITION A IF I N 0 T I CREW CREW CREW A M POSITION L U POSITION POSITION C A N T I/ SRO-I SRO-U RO 0 SRO-I 0 SRO-U H RO SRO-I H SRO-U 0 II RO SRO-I E4 SRO-U 0 E V E N T T Y P E RX NOR I/C MAJ TS RX NOR I/C MAJ TS RX NOR I/C MAJ TS RX NOR I/C MAJ TS Scenarios 1 I 2 I 3 I 4 IT1 M Instructions:
: 13.     The level of difficulty IS appropriate to support licensing decisions for each crew position.
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants.
Revision 1 02/21/2007                                                                                 NUREG 1021, REVISION 9
ROs must serve in both the "at-the-controls (ATC)" and "balance-of-plant (BOP)" positions; Instant SROs must do one scenario, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position.
 
I 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1 -for-1 basis.
ES-301                                   Transient and Event Checklist                               Form ES-301-5 A           E                                                      Scenarios V
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
I F                E N
: 3. Revision 1 02/22/2007 ES-301 Competencies Checklist Form ES-301-6 Facility:
1          I          2          I        3        I        4        I T 1 0
Grand Gulf Nuclear Date of Examination:
MI N
21 May 2007 Operating Test No.: Station Competencies Interpret/Diagnose Events and Conditions Comply With and Use Procedures Operate Control Boards (2) (1 1 Communicate and Interact Demonstrate Supervisory Ability (3) Comply With and Use Tech Specs (3) Notes: RO 0 SRO-I [XI SRO-U atc 3; 4; 5; 6; 7 1; 2; 3; 4; 5; 6; 7 1; 2; 3; 4; 5; 6; 7 1; 2; 3; 4; 5; 6; 7 NIA - ~ - - ~ NIA ~ - iNARIO rn APPLICANTS RO 0 RO 17 RO 0 SRO-I 0 SRO-I [XI SRO-I [XI SRO-U [XI SRO-U 0 SRO-U 0 SCENARIO 1 I 2 131411 1 -11 SCENARIO (1 1 (2) Optional for an SRO-U.
T                                                                                            T         I C                        CREW                   CREW                 CREW               CREW          A       M A          T          POSITION               POSITION              POSITION            POSITION        L       U N         Y T         P E
(3) Only Applicable to SROs. Instructions: Includes Technical Specification compliance for an RO. Check the applicants' license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.
I/               RX NOR SRO-I       I/C SRO-U MAJ TS RX RO NOR 0
Note: SROU will be surrogate ATC in scenario
SRO-I       I/C 0
: 2. A Surrogate operator will perform role of BOP. Revision 1 02/22/2007 I . .. *I ES403 Written Examination Grading  
SRO-U MAJ H
' Form ES-403-1 U Quality Checklist  
TS RX RO NOR SRO-I       I/C H
' .J Facility:
SRO-U       MAJ 0           TS I            I RX RO NOR SRO-I       I/C E4 SRO-U 0           MAJ TS Instructions:
6Wb G4LF Date of Exam: 5/21 /Zoo7 Exam Item Description
: 1.     Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must do one scenario, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position.
: 1. 2. 3. 4. 5. Clean answer sheets copied before grading Answer key changes and question deletions justified and documented Applicants*
I
scores checked for addition errors (reviewers spot check > 25% of examinations)
: 2.     Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
Grading for all borderline cases (80 k2% overall and 70 or 80, as applicable, 54% on the SRO-only) reviewed in detail All other failing examinations checked to ensure that grades are justified
: 3.      Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 6. Performance on missed questions checked for training deficiencies and wording problems; evaluate validity of questions missed by half or more of the applicants Printed NamelSignature .eve]: ROO SRO~ initials a. Grader lu,k G4s b. Facility Reviewerr)
Revision 1 02/22/2007
: c. NRC Chief Examiner r) d. NRC Supervisor r) ~~ Date r) The facility reviewer's signature is not applicable for examinations graded by the NRC; two independent NRC reviews are required.
 
ES-403, Page 5 of 5 S 0 m S m x .- U .- E Y 2 n c- ~ S 0 m S m X fn 0 .- U .- E Y n U hi a, 0 m a IC? I li br. 00 00 N- -cu cum 00 ?!?? .,
ES-301                               Competencies Checklist                           Form ES-301-6 Facility:   Grand Gulf Nuclear         Date of Examination:   21 May 2007           Operating Test No.:
m Q) U 0 0 Q) ln m 2= R Iu U 0 0 0) u) m c n S 0 P) 8 CT .- 
Station APPLICANTS RO        0          RO      0          RO      17          RO       0 SRO-I [XI           SRO-I 0              SRO-I [XI            SRO-I [XI SRO-U                SRO-U [XI            SRO-U 0              SRO-U 0 Competencies                  iNARIO rn            SCENARIO 1 I 2 131411 1 1 -1                SCENARIO atc Interpret/Diagnose      3; 4; Events and              5;6 ;
- m C 0 .- c. E Q 0 v) .. a, U 0 0 a, ln m c n d C 0 0) a, U .-}}
Conditions                7
                      -
Comply With and          1; 2; Use Procedures          3; 4; 5;6; (11                      7
                      ~
Operate Control          1; 2; Boards (2)              3; 4; 5;6;
                      -  7 Communicate and          1; 2; Interact                3; 4; 5;6;
                      -  7 Demonstrate              NIA Supervisory Ability (3)                    ~
Comply With and          NIA Use Tech Specs (3)                    -
                      ~
Notes:
(11      Includes Technical Specification compliance for an RO.
(2)       Optional for an SRO-U.
(3)       Only Applicable to SROs.
Instructions:
Check the applicants license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.
Note: SROU will be surrogate ATC in scenario 2. A Surrogate operator will perform role of BOP.
Revision 102/22/2007
 
I . ..
* I ES403                             Written Examination Grading       '             Form ES-403-1 U                                           Quality Checklist Facility: 6 W b G4LF                   Date of Exam: 5/21 /Zoo7 Exam .eve]: ROO            S R O ~
initials Item Description
: 1.     Clean answer sheets copied before grading
: 2.      Answer key changes and question deletions justified and documented
: 3.      Applicants*scores checked for addition errors (reviewers spot check > 25% of examinations)
: 4.      Grading for all borderline cases (80 k2% overall and 70 or 80, as applicable, 54% on the SRO-only) reviewed in detail
: 5.      All other failing examinations checked to ensure that grades are justified
: 6.       Performance on missed questions checked for training deficiencies and wording problems; evaluate validity of questions missed by half or more of the applicants
' .J                                          Printed NamelSignature
                                                                                              ~~
Date
: a. Grader                         lu,k G 4 s
: b. Facility Reviewerr)
: c. NRC Chief Examiner       r)
: d. NRC Supervisor     r) r)     The facility reviewer's signature is not applicable for examinations graded by the NRC; two independent NRC reviews are required.
ES-403,Page 5 of 5
 
a, 0
m a
S S
.-
0 .-0 U
m m .-S
.-
S E
E m m  X x Y Y  U fn 2  0 n  n c- hi
 
IC?I li
 
b  r  .
0    0 0    0
? ! ? -?
.,
N
- c u c
0 u  m 0
 
m Q)
U 0
0 Q) ln m
2=
R
 
Iu U
0 0
0) u)
m c
n S
.-0 P) 8 CT
 
-m C
.-
0 c.
E Q
0 v)
  ..
a, U
0 0
a, ln m
c n
d C
.-00) a, U}}

Revision as of 04:02, 23 November 2019

GG-05-2007 - Public Forms
ML072130139
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 09/05/2006
From: Vincent Gaddy
Operations Branch IV
To: Garchow S
Operations Branch IV
References
50-416/07-301
Download: ML072130139 (15)


Text

September 5, 2006 NOTE TO: Steve Garchow Chief Examiner, Operations Branch FROM: Vincent Gaddy, Chief Operations Branch Division of Reactor Safety

SUBJECT:

EXAMINATION ASSIGNMENT You have been assigned as Chief of the Grand Gulf examination. The operating test has been scheduled to be completed by March 9, 2007. Thank you for contacting the Grand Guld facility to finalize the details of the examination. You are reminded that the RPS/IP system must be maintained to ensure that the examiners and numbers of candidates are accurate. In addition, you are reminded that only qualified examiners are permitted to conduct any part of the examination.

Vincent Gaddy, Chief '

Operations Branch Division of Reactor Safety

Replaces NUREG-1021 Revision 9, ES Forms 201-1 and 501-1 CHIEF: Steve Garchow FACILITY: Grand Gulf 1 DATE of OPERATING EXAM: 1 3/5/07 Due Date Description Date Complete I Initials i Notes 9/6/06 Exam Administration Date Confirmed (C.l .a; C.2.a & b) 11/5/06 NRC Staff & Facility Contact Assigned (C.l .d; C.2.e) 11/5/06 Facility Contact Briefed on Security & Other Reqs (C.2.c) 11/5/06 Corporate Notification Letter (ES-201 Att-3) Sent (C.2.d) 12/5/06 Reference Material Due (if NRC authored) (C.1.e; C.3.c) 12/20/06 I Integrated Exam Outlines Due (C.1.e & f; C.3.d) 12/25/06 I Outlines Review NRC Feedback Provided (c.2.h; C.3.e)

&

1/19/07 Draft Exams w/References Due (C.l .e,f,g,h; C.3.d) 2/3/07 *Peer Reviewer Completes Review of Exam on ES-401-9 2/3/07 *NRC BC Approves Feedback to Facility (C.2.h; C.3.f) 2/3/07 *Exams Reviewed w/ Fac. (C.l .h;C.2.f & h; C.3.g) 2/3/07 Preliminary Applications Due (C.l .I;C.2.g; ES-202)

~~ ~~

2/8/07 Preliminary Applications Reviewed (C.l .I;C.2.g) 2/19/07 Final Applications Due (C.l .I;C.2.i;ES-202) 2/19/07 I On-Site Preparatow Week to Validate Operatina Exam 2/19/07 On-Site Audit (10%) of License Apps (ES-202 C.2.e) 2/26/07 Final Appl. OKed i3 Waiver Letters Sent (ES-204; C.2.e) 2/26/07 NRC Supervisor Approved Final Exams (C.2.i;C.3.h) 2/26/07 Exam Approval Letter (ES-201 Att-4) and List of Applicants (ES-201-4) Prepared (C.2.i) 2/26/07 Proctor Rules Review w/Fac. & Written Authorized (C.3.k) 2/26/07 Exam Material to Exam Team (C.3.i) 3/5/07 Administer Operating Exam On-Site 3/17/07 Facility Graded Exam & Comments Received 3/20/07 NRC Written Exam Grading Completed 3/20/07 Examiners Document Exam Grades on ES Forms 3/30/07 NRC Chief Examiner Gradina Review Completed 3/31/07 NRC BC Review Completed 4/4/07 License/Denials Sinned & Report Issued 4/4/07 RPS/IP Number of Examinees Updated 4/19/07 Examination Report Issued 4/26/07 Package Closed Out 4/26/07 Chief QA of ADAMS and SlSP review comolete Indicates the due dates are more conservative than the ES-201-1 requires.

ES-201 Examination Outline Qualitv Checklist Form ES-201-2

/I Facility: GRAND GULF NUCLEAR STATION Date of Examination: 21 May 2007 Item 1 Task Description

-il-F-In it iaIs

1. I a. Verify that the outline(s) fit@)the appropriate model, in accordance with ES-401.
b. Assess whether the outline was systematically and randomly prepared in accordance with Section D.1 of ES-401 and R whether all K/A categories are appropriately sampled.

1

c. Assess whether the outline over-emphasizes any systems, evolutions, o r generic topics.

T T d. Assess whether the justifications for deselected o r rejected K/A statements are appropriate.

/ A R

3.

W T

/

that each applicant can he tested using at least one new o r significantly modified scenario, that no scenarios are Form ES-301-4 and described in Appendix D.

I a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:

(1)the outline(s) contain(s) the required number of control room and in-plant tasks distributed among the safety functions as specified on the form (2) task repetition from the last two NRC examinations is within the limits specified on the form (3) no tasks are duplicated from the applicants audit test(s)

(4) the number of new o r modified tasks meets o r exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form.

I I

b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:

(I) the tasks are distributed among the topics as specified on the form (2) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations E. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.

4. I a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the appropriate exam sections.
b. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate.

G

c. Ensure that K/A importance ratings (except for plant-specific priorities) are a t least 2.5.

E N d. Check for duplication and overlap among exam sections.

E e. Check the entire exam for balance of coverage.

R

f. Assess whether the exam fits the appropriate job level (RO or SRO).

A I

~ Printed Name/Signature Date

a. Author
b. Facility Reviewer(*)
c. NRC Chief Examiner (#)
d. NRC Supervisor I

Note:# Independent NRC reviewer initial items in Column c; chief examiner concurrence required.

ES-401, Rev. 9 Written Examination Quality Checklist Form ES-401-6 Facility: Grand Gulf Nuclear Station Date of Exam: 21 May 2007 ExamLevel: RO SRO

1. Questions and answers are technically accurate and applicable to the facility.

2a. NRC K/As are referenced for all questions.

b. Facility learning objectives are referenced as available.
3. SRO questions are appropriate in accordance with Section D.2.d of ES-401
4. The sampling process was random and systematic (If more than 4 RO or 2 SRO questions were repeated from the last 2 NRC licensing exams, consult the NRR OL program office).
5. Question duplication from the license screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate:

-the audit exam was systematically and randomly developed, or

-the audit exam was completed before the license exam was started, or

-the examinations were developed independently, or X the licensee certifies that there is no duplication, o r

-other (explain)

6. Bank use meets limits (no more than 75 percent New from the bank, at least 10 percent new, and the rest new o r modified); enter the actual RO / SRO-only question 72(96%)/23(92%)

1 distribution(s) at right.

I I

7. Between 50 and 60 percent of the questions on the RO exam are Memory C/A written at the comprehension/ analysis level; the SRO exam may Overall 37 % Overall 63 %

exceed 60 percent if the randomly selected WAS support the higher cognitive levels; enter the actual RO / SRO question distribution(s) at right.

I 31(41.3%)/6(24%)

8. References/handouts provided do not give away answers or aid in the elimination of distractors.
9. Question content conforms with specific IUA statements in the previously approved examination outline and is appropriate for the tier to which they are assigned; deviations are justified.
11. The exam contains the required number of one-point, multiple choice items; the total is correct and agrees with the Printed Name / Signature Date
a. Author
b. Facility Reviewer (*)
c. NRC Chief Examiner (#)
d. NRC Regional Supervisor Note:* The facility reviewers initials/signature are not applicable for NRC-developed examinations.
  1. Independent NRC reviewer initial items in Column c; chief examiner concurrence required.

Rev 1 2 / 2 6 / 2 0 0 7

ESSOI Operating Test Quality Checklist Form ES-301-3 Facility: GRAND GULF NUCLEAR STATION Date of Examination: 05/21/20C - 05/25/2007 Initials

1. GENERAL CRITERIA
a. The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., 10 CFR 55.45, operational importance, safety function distribution).
b. There is no day-to-day repetition between this and other operating tests to be administered during this examination.

C. The operating test shall not duplicate items from the applicants' audit test(s) (see Section D.1.a).

d. Overlap with the written examination and between different parts of the operating test is within acceptable limits.
e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level.
2. WALK-THROUGH (CATEGORY A & B) CRITERIA
a. Each JPM includes the following, as applicable:

initial conditions initiating cues 0 references and tools, including associated procedures 0 reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee operationally important specific performance criteria that include:

- detailed expected actions with exact criteria and nomenclature

- system response and other examiner cues

- statements describing important observations to be made by the applicant

- criteria for successful completion of the task

- identification of critical steps and their associated performance standards

- restrictions on the sequence of steps, if applicable

b. Ensure that any changes from the previously approved systems and administrative walk trough outlines (Forms 301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g. item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2..
3. SIMULATOR (CATEGORY C) CRITERIA
a. The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a copy is attached.

rinted Name / Signature Date

b. Facility Reviewer(*)
c. NRC Chief Examiner (#)

NOTE:

  • The facility signature is not applicable for NRC-developedtests.
  1. Independent NRC reviewer initial items in Column "c," chief examiner concurrence required.

ES-301 Simulator Scenario Quality Checklist Form ES-301-4 break) is incorporated into the scenario without a

13. The level of difficulty IS appropriate to support licensing decisions for each crew position.

Revision 1 02/21/2007 NUREG 1021, REVISION 9

ES-301 Transient and Event Checklist Form ES-301-5 A E Scenarios V

I F E N

1 I 2 I 3 I 4 I T 1 0

MI N

T T I C CREW CREW CREW CREW A M A T POSITION POSITION POSITION POSITION L U N Y T P E

I/ RX NOR SRO-I I/C SRO-U MAJ TS RX RO NOR 0

SRO-I I/C 0

SRO-U MAJ H

TS RX RO NOR SRO-I I/C H

SRO-U MAJ 0 TS I I RX RO NOR SRO-I I/C E4 SRO-U 0 MAJ TS Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must do one scenario, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position.

I

2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

Revision 1 02/22/2007

ES-301 Competencies Checklist Form ES-301-6 Facility: Grand Gulf Nuclear Date of Examination: 21 May 2007 Operating Test No.:

Station APPLICANTS RO 0 RO 0 RO 17 RO 0 SRO-I [XI SRO-I 0 SRO-I [XI SRO-I [XI SRO-U SRO-U [XI SRO-U 0 SRO-U 0 Competencies iNARIO rn SCENARIO 1 I 2 131411 1 1 -1 SCENARIO atc Interpret/Diagnose 3; 4; Events and 5;6 ;

Conditions 7

-

Comply With and 1; 2; Use Procedures 3; 4; 5;6; (11 7

~

Operate Control 1; 2; Boards (2) 3; 4; 5;6;

- 7 Communicate and 1; 2; Interact 3; 4; 5;6;

- 7 Demonstrate NIA Supervisory Ability (3) ~

Comply With and NIA Use Tech Specs (3) -

~

Notes:

(11 Includes Technical Specification compliance for an RO.

(2) Optional for an SRO-U.

(3) Only Applicable to SROs.

Instructions:

Check the applicants license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.

Note: SROU will be surrogate ATC in scenario 2. A Surrogate operator will perform role of BOP.

Revision 102/22/2007

I . ..

  • I ES403 Written Examination Grading ' Form ES-403-1 U Quality Checklist Facility: 6 W b G4LF Date of Exam: 5/21 /Zoo7 Exam .eve]: ROO S R O ~

initials Item Description

1. Clean answer sheets copied before grading
2. Answer key changes and question deletions justified and documented
3. Applicants*scores checked for addition errors (reviewers spot check > 25% of examinations)
4. Grading for all borderline cases (80 k2% overall and 70 or 80, as applicable, 54% on the SRO-only) reviewed in detail
5. All other failing examinations checked to ensure that grades are justified
6. Performance on missed questions checked for training deficiencies and wording problems; evaluate validity of questions missed by half or more of the applicants

' .J Printed NamelSignature

~~

Date

a. Grader lu,k G 4 s
b. Facility Reviewerr)
c. NRC Chief Examiner r)
d. NRC Supervisor r) r) The facility reviewer's signature is not applicable for examinations graded by the NRC; two independent NRC reviews are required.

ES-403,Page 5 of 5

a, 0

m a

S S

.-

0 .-0 U

U m m .-S

.-

S E

E m m X x Y Y U fn 2 0 n n c- hi

IC?I li

b r .

0 0 0 0

? ! ? -?

.,

N

- c u c

0 u m 0

m Q)

U 0

0 Q) ln m

2=

R

Iu U

0 0

0) u)

m c

n S

.-0 P) 8 CT

-m C

.-

0 c.

E Q

0 v)

..

a, U

0 0

a, ln m

c n

d C

.-00) a, U