{{#Wiki_filter:August 14, 2007Mr. Dennis R. MadisonVice President - Hatch Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513
{{#Wiki_filter:August 14, 2007 Mr. Dennis R. Madison Vice President - Hatch Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513


==SUBJECT:==
==SUBJECT:==
EDWIN I. HATCH NUCLEAR PLANT, UNIT NOS. 1 AND 2 - NRC RECEIPT OFLICENSEE RESPONSE TO GENERIC LETTER 2006-03, "POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS" (TAC NOS. MD1586, MD1587)
EDWIN I. HATCH NUCLEAR PLANT, UNIT NOS. 1 AND 2 - NRC RECEIPT OF LICENSEE RESPONSE TO GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NOS. MD1586, MD1587)


==Dear Mr. Madison:==
==Dear Mr. Madison:==


The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your response toGeneric Letter 2006-03, "Potentially Nonconforming Hemyc and MT Fire Barrier Configurations," in letters dated July 24, 2007, November 28 and June 9, 2006, (ML072060088, ML063330230, ML061600376, respectively). Under oath or affirmation, you have stated that your nuclear power plant does not rely on either the Hemyc or MT fire barrier system. You have submitted documentation under oath or affirmation that other 1 or 3-hour fire barriers that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance. Based on your response, the basis for stating that this other fire barrier has been designed and installed in accordance with NRC guidance should be maintained on site and will be subject to inspection during the normal NRC inspection process.If you have any questions regarding this response, please contact me at 301-415-1493.Sincerely,/RA/Robert E. Martin, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-321 and 50-366 cc: See next page  
The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations, in letters dated July 24, 2007, November 28 and June 9, 2006, (ML072060088, ML063330230, ML061600376, respectively). Under oath or affirmation, you have stated that your nuclear power plant does not rely on either the Hemyc or MT fire barrier system. You have submitted documentation under oath or affirmation that other 1 or 3-hour fire barriers that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance. Based on your response, the basis for stating that this other fire barrier has been designed and installed in accordance with NRC guidance should be maintained on site and will be subject to inspection during the normal NRC inspection process.
If you have any questions regarding this response, please contact me at 301-415-1493.
Sincerely,
                                                      /RA/
Robert E. Martin, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366 cc: See next page


ML072180188OFFICENRR/LPL2-1/PMNRR/LPL2-1/LANRR/AFPB/BCNRR/LPL2-1/BCNAMERMartin:ncMO'BrienAKleinEMarinos DATE08/9/0708/9/0708/10/0708/14/07 Edwin I. Hatch Nuclear Plant, Units 1 & 2 cc:
ML072180188 OFFICE        NRR/LPL2-1/PM        NRR/LPL2-1/LA    NRR/AFPB/BC        NRR/LPL2-1/BC NAME          RMartin:nc            MOBrien          AKlein            EMarinos DATE          08/9/07              08/9/07          08/10/07          08/14/07
Laurence BergenOglethorpe Power Corporation 2100 E. Exchange Place P.O. Box 1349 Tucker, GA 30085-1349Mr. R. D. BakerManager - Licensing Southern Nuclear Operating Company, Inc.
 
P.O. Box 1295 Birmingham, AL 35201-1295Resident InspectorPlant Hatch 11030 Hatch Parkway N.
Edwin I. Hatch Nuclear Plant, Units 1 & 2 cc:
Baxley, GA 31531Harold Reheis, DirectorDepartment of Natural Resources 205 Butler Street, SE., Suite 1252 Atlanta, GA 30334Steven M. JacksonSenior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW Atlanta, GA 30328-4684Mr. Reece McAlisterExecutive Secretary Georgia Public Service Commission 244 Washington St., SW Atlanta, GA 30334Arthur H. Domby, Esq.Troutman Sanders Nations Bank Plaza 600 Peachtree St, NE, Suite 5200 Atlanta, GA 30308-2216ChairmanAppling County Commissioners County Courthouse Baxley, GA 31513Mr. Jeffrey T. GasserExecutive Vice President Southern Nuclear Operating Company, Inc.
Laurence Bergen                          Mr. Jeffrey T. Gasser Oglethorpe Power Corporation             Executive Vice President 2100 E. Exchange Place                   Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL  35201-1295General ManagerEdwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc.
P.O. Box 1349                             P.O. Box 1295 Tucker, GA 30085-1349                    Birmingham, AL 35201-1295 Mr. R. D. Baker                          General Manager Manager - Licensing                       Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.
U.S. Highway 1 North P.O. Box 2010 Baxley, GA 31515Mr. K. RosanskiResident Manager Oglethorpe Power Corporation Edwin I. Hatch Nuclear Plant P.O. Box 2010 Baxley, GA 31515}}
P.O. Box 1295                             U.S. Highway 1 North Birmingham, AL 35201-1295                P.O. Box 2010 Baxley, GA 31515 Resident Inspector Plant Hatch                               Mr. K. Rosanski 11030 Hatch Parkway N.                   Resident Manager Baxley, GA 31531                          Oglethorpe Power Corporation Edwin I. Hatch Nuclear Plant Harold Reheis, Director                  P.O. Box 2010 Department of Natural Resources           Baxley, GA 31515 205 Butler Street, SE., Suite 1252 Atlanta, GA 30334 Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW Atlanta, GA 30328-4684 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission 244 Washington St., SW Atlanta, GA 30334 Arthur H. Domby, Esq.
Troutman Sanders Nations Bank Plaza 600 Peachtree St, NE, Suite 5200 Atlanta, GA 30308-2216 Chairman Appling County Commissioners County Courthouse Baxley, GA 31513}}

Revision as of 03:52, 23 November 2019

NRC Receipt of Licensee Response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations (TAC Nos. MD1586, MD1587)
ML072180188
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/14/2007
From: Martin R
NRC/NRR/ADRO/DORL/LPLII-1
To: Madison D
Southern Nuclear Operating Co
Martin R, NRR/DORL, 415-1493
References
TAC MD1586, TAC MD1587
Download: ML072180188 (3)


Text

August 14, 2007 Mr. Dennis R. Madison Vice President - Hatch Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT, UNIT NOS. 1 AND 2 - NRC RECEIPT OF LICENSEE RESPONSE TO GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NOS. MD1586, MD1587)

Dear Mr. Madison:

The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations, in letters dated July 24, 2007, November 28 and June 9, 2006, (ML072060088, ML063330230, ML061600376, respectively). Under oath or affirmation, you have stated that your nuclear power plant does not rely on either the Hemyc or MT fire barrier system. You have submitted documentation under oath or affirmation that other 1 or 3-hour fire barriers that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance. Based on your response, the basis for stating that this other fire barrier has been designed and installed in accordance with NRC guidance should be maintained on site and will be subject to inspection during the normal NRC inspection process.

If you have any questions regarding this response, please contact me at 301-415-1493.

Sincerely,

/RA/

Robert E. Martin, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366 cc: See next page

ML072180188 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/AFPB/BC NRR/LPL2-1/BC NAME RMartin:nc MOBrien AKlein EMarinos DATE 08/9/07 08/9/07 08/10/07 08/14/07

Edwin I. Hatch Nuclear Plant, Units 1 & 2 cc:

Laurence Bergen Mr. Jeffrey T. Gasser Oglethorpe Power Corporation Executive Vice President 2100 E. Exchange Place Southern Nuclear Operating Company, Inc.

P.O. Box 1349 P.O. Box 1295 Tucker, GA 30085-1349 Birmingham, AL 35201-1295 Mr. R. D. Baker General Manager Manager - Licensing Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.

P.O. Box 1295 U.S. Highway 1 North Birmingham, AL 35201-1295 P.O. Box 2010 Baxley, GA 31515 Resident Inspector Plant Hatch Mr. K. Rosanski 11030 Hatch Parkway N. Resident Manager Baxley, GA 31531 Oglethorpe Power Corporation Edwin I. Hatch Nuclear Plant Harold Reheis, Director P.O. Box 2010 Department of Natural Resources Baxley, GA 31515 205 Butler Street, SE., Suite 1252 Atlanta, GA 30334 Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW Atlanta, GA 30328-4684 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission 244 Washington St., SW Atlanta, GA 30334 Arthur H. Domby, Esq.

Troutman Sanders Nations Bank Plaza 600 Peachtree St, NE, Suite 5200 Atlanta, GA 30308-2216 Chairman Appling County Commissioners County Courthouse Baxley, GA 31513