ML072841216: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:October 11, 2007Docket No. 05000029 License No. DPR-03 Wayne NortonPresident Yankee Atomic Electric Company 49 Yankee Road Rowe, MA 01367
{{#Wiki_filter:October 11, 2007 Docket No. 05000029                                                         License No. DPR-03 Wayne Norton President Yankee Atomic Electric Company 49 Yankee Road Rowe, MA 01367


==SUBJECT:==
==SUBJECT:==
Line 22: Line 22:
==Dear Mr. Norton:==
==Dear Mr. Norton:==


We are writing to congratulate you and your staff on the significant accomplishment of safelyand successfully completing the initial phase of decommissioning at the former Yankee Atomic Electric Company site in Rowe, Massachusetts. This campaign allowed spent fuel to be safely transferred for onsite storage at the Independent Spent Fuel Storage Installation and the former Protected Area for the nuclear power facility to be released for unrestricted use. These actions were accomplished while maintaining high standards for radiological and industrial safety. In particular, we acknowledge your efforts to obtain input from the Commonwealth of Massachusetts and other stakeholders to enhance the project outcome.We appreciated the professional manner of the interactions among our staffs as we sought toensure that NRC regulatory requirements were met. Sincerely,/RA/Samuel J. Collins Regional Administrator/RA/Brian Holian, Director Division of Nuclear Materials Safety/RA/Raymond Lorson, Chief Decommissioning Branch Division of Nuclear Materials Safety October 11, 2007Docket No. 05000029 License No. DPR-03Wayne NortonPresident Yankee Atomic Electric Company 49 Yankee Road Rowe, MA 01367
We are writing to congratulate you and your staff on the significant accomplishment of safely and successfully completing the initial phase of decommissioning at the former Yankee Atomic Electric Company site in Rowe, Massachusetts. This campaign allowed spent fuel to be safely transferred for onsite storage at the Independent Spent Fuel Storage Installation and the former Protected Area for the nuclear power facility to be released for unrestricted use. These actions were accomplished while maintaining high standards for radiological and industrial safety. In particular, we acknowledge your efforts to obtain input from the Commonwealth of Massachusetts and other stakeholders to enhance the project outcome.
We appreciated the professional manner of the interactions among our staffs as we sought to ensure that NRC regulatory requirements were met.
Sincerely,
                                                      /RA/
Samuel J. Collins Regional Administrator
                                                      /RA/
Brian Holian, Director Division of Nuclear Materials Safety
                                                      /RA/
Raymond Lorson, Chief Decommissioning Branch Division of Nuclear Materials Safety
 
October 11, 2007 Docket No. 05000029                                                                             License No. DPR-03 Wayne Norton President Yankee Atomic Electric Company 49 Yankee Road Rowe, MA 01367


==SUBJECT:==
==SUBJECT:==
Line 29: Line 39:
==Dear Mr. Norton:==
==Dear Mr. Norton:==


We are writing to congratulate you and your staff on the significant accomplishment of safelyand successfully completing the initial phase of decommissioning at the former Yankee Atomic Electric Company site in Rowe, Massachusetts. This campaign allowed spent fuel to be safely transferred for onsite storage at the Independent Spent Fuel Storage Installation and the former Protected Area for the nuclear power facility to be released for unrestricted use. These actions were accomplished while maintaining high standards for radiological and industrial safety. In particular, we acknowledge your efforts to obtain input from the Commonwealth of Massachusetts and other stakeholders to enhance the project outcome.We appreciated the professional manner of the interactions among our staffs as we sought toensure that NRC regulatory requirements were met. Sincerely,/RA/Samuel Collins Regional Administrator/RA/Brian Holian, Director Division of Nuclear Materials Safety/RA/Raymond Lorson, Chief Decommissioning Branch Division of Nuclear Materials SafetyDistribution
We are writing to congratulate you and your staff on the significant accomplishment of safely and successfully completing the initial phase of decommissioning at the former Yankee Atomic Electric Company site in Rowe, Massachusetts. This campaign allowed spent fuel to be safely transferred for onsite storage at the Independent Spent Fuel Storage Installation and the former Protected Area for the nuclear power facility to be released for unrestricted use. These actions were accomplished while maintaining high standards for radiological and industrial safety. In particular, we acknowledge your efforts to obtain input from the Commonwealth of Massachusetts and other stakeholders to enhance the project outcome.
:S. Collins, RAM. Dapas, DRA B. Holian, DNMS R. Lorson, DNMS R. Laufer, OEDO T. Bloomer, OEDO K. McConnell, FSME A. Persnko, FSMEJ. Hickman, FSMET. Youngblood, FSME B. Watson, FSME D. Screnci, PAO N. Sheehan, PAO R. Temps, NMSSSUNSI Review Complete:         R. Lorson    (Reviewer's Initials
We appreciated the professional manner of the interactions among our staffs as we sought to ensure that NRC regulatory requirements were met.
)DOCUMENT NAME: G:\D&LB\YankeeRowe\nortonthankyouYR.wpdAfter declaring this document "An Official Agency Record" it WILL be released to the Public.To receive a copy of this document, indicate in the box:
Sincerely,
" C" = Copy without attachment/enclosure   " E" = Copy with attachment/enclosure   " N" = No copyOFFICERI/DNMSRI\DNMSRI/ORARI/ORANAMERLorsonBHolianKFarrarSCollinsDATE10/03/0710/9/0710/10/0710/10/07ADAMS ACCESSION NO. ML072841216OFFICIAL RECORD COPY W. Norton3 W. Norton2 cc:T. Smith, Executive Director of Business Operations J. Bourassa, Director, Site Closure and Project Support J. Fay, General Counsel R. Mitchell, ISFSI Manager J. Connell, ISFSI, RPM & QA R. Capstick, Public & Government Affairs G. van Noordennen, Regulatory Affairs Manager J. Kay, Principal Licensing Engineer A. Carson, Licensing Manager C. Pizzella, Treasurer R. Walker, Department of Public Health, Commonwealth of Massachusetts Citizens Awareness Network Commonwealth of Massachusetts, SLO Designee State of Vermont, SLO Designee}}
                                                                                    /RA/
Samuel Collins Regional Administrator
                                                                                    /RA/
Brian Holian, Director Division of Nuclear Materials Safety
                                                                                    /RA/
Raymond Lorson, Chief Decommissioning Branch Division of Nuclear Materials Safety Distribution:
S. Collins, RA                                                      J. Hickman, FSME M. Dapas, DRA                                                       T. Youngblood, FSME B. Holian, DNMS                                                     B. Watson, FSME R. Lorson, DNMS                                                     D. Screnci, PAO R. Laufer, OEDO                                                     N. Sheehan, PAO T. Bloomer, OEDO                                                     R. Temps, NMSS K. McConnell, FSME A. Persnko, FSME SUNSI Review Complete:           R. Lorson    (Reviewers Initials)
DOCUMENT NAME: G:\D&LB\YankeeRowe\nortonthankyouYR.wpd After declaring this document An Official Agency Record it WILL be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE                RI/DNMS                  RI\DNMS                    RI/ORA                    RI/ORA NAME                  RLorson                  BHolian                    KFarrar                  SCollins DATE                  10/03/07                  10/9/07                    10/10/07                  10/10/07 ADAMS ACCESSION NO. ML072841216 OFFICIAL RECORD COPY
 
W. Norton 3 W. Norton                                      2 cc:
T. Smith, Executive Director of Business Operations J. Bourassa, Director, Site Closure and Project Support J. Fay, General Counsel R. Mitchell, ISFSI Manager J. Connell, ISFSI, RPM & QA R. Capstick, Public & Government Affairs G. van Noordennen, Regulatory Affairs Manager J. Kay, Principal Licensing Engineer A. Carson, Licensing Manager C. Pizzella, Treasurer R. Walker, Department of Public Health, Commonwealth of Massachusetts Citizens Awareness Network Commonwealth of Massachusetts, SLO Designee State of Vermont, SLO Designee}}

Revision as of 01:59, 23 November 2019

Ltr. to Wayne Norton, Yankee Atomic Electric Company, Offering Congratulations on Significant Accomplishment of Safely & Successfully Completing Initial Phase of Decommissioning at Former Yankee Atomic Electric Company Site in Rowe, Ma
ML072841216
Person / Time
Site: Yankee Rowe
Issue date: 10/11/2007
From: Collins S, Brian Holian, Ray Lorson
Division of Nuclear Materials Safety I, Decommissioning Branch I, Region 1 Administrator
To: Norton W
Yankee Atomic Electric Co
References
Download: ML072841216 (3)


Text

October 11, 2007 Docket No. 05000029 License No. DPR-03 Wayne Norton President Yankee Atomic Electric Company 49 Yankee Road Rowe, MA 01367

SUBJECT:

YANKEE ATOMIC ELECTRIC COMPANY

Dear Mr. Norton:

We are writing to congratulate you and your staff on the significant accomplishment of safely and successfully completing the initial phase of decommissioning at the former Yankee Atomic Electric Company site in Rowe, Massachusetts. This campaign allowed spent fuel to be safely transferred for onsite storage at the Independent Spent Fuel Storage Installation and the former Protected Area for the nuclear power facility to be released for unrestricted use. These actions were accomplished while maintaining high standards for radiological and industrial safety. In particular, we acknowledge your efforts to obtain input from the Commonwealth of Massachusetts and other stakeholders to enhance the project outcome.

We appreciated the professional manner of the interactions among our staffs as we sought to ensure that NRC regulatory requirements were met.

Sincerely,

/RA/

Samuel J. Collins Regional Administrator

/RA/

Brian Holian, Director Division of Nuclear Materials Safety

/RA/

Raymond Lorson, Chief Decommissioning Branch Division of Nuclear Materials Safety

October 11, 2007 Docket No. 05000029 License No. DPR-03 Wayne Norton President Yankee Atomic Electric Company 49 Yankee Road Rowe, MA 01367

SUBJECT:

YANKEE ATOMIC ELECTRIC COMPANY

Dear Mr. Norton:

We are writing to congratulate you and your staff on the significant accomplishment of safely and successfully completing the initial phase of decommissioning at the former Yankee Atomic Electric Company site in Rowe, Massachusetts. This campaign allowed spent fuel to be safely transferred for onsite storage at the Independent Spent Fuel Storage Installation and the former Protected Area for the nuclear power facility to be released for unrestricted use. These actions were accomplished while maintaining high standards for radiological and industrial safety. In particular, we acknowledge your efforts to obtain input from the Commonwealth of Massachusetts and other stakeholders to enhance the project outcome.

We appreciated the professional manner of the interactions among our staffs as we sought to ensure that NRC regulatory requirements were met.

Sincerely,

/RA/

Samuel Collins Regional Administrator

/RA/

Brian Holian, Director Division of Nuclear Materials Safety

/RA/

Raymond Lorson, Chief Decommissioning Branch Division of Nuclear Materials Safety Distribution:

S. Collins, RA J. Hickman, FSME M. Dapas, DRA T. Youngblood, FSME B. Holian, DNMS B. Watson, FSME R. Lorson, DNMS D. Screnci, PAO R. Laufer, OEDO N. Sheehan, PAO T. Bloomer, OEDO R. Temps, NMSS K. McConnell, FSME A. Persnko, FSME SUNSI Review Complete: R. Lorson (Reviewers Initials)

DOCUMENT NAME: G:\D&LB\YankeeRowe\nortonthankyouYR.wpd After declaring this document An Official Agency Record it WILL be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DNMS RI\DNMS RI/ORA RI/ORA NAME RLorson BHolian KFarrar SCollins DATE 10/03/07 10/9/07 10/10/07 10/10/07 ADAMS ACCESSION NO. ML072841216 OFFICIAL RECORD COPY

W. Norton 3 W. Norton 2 cc:

T. Smith, Executive Director of Business Operations J. Bourassa, Director, Site Closure and Project Support J. Fay, General Counsel R. Mitchell, ISFSI Manager J. Connell, ISFSI, RPM & QA R. Capstick, Public & Government Affairs G. van Noordennen, Regulatory Affairs Manager J. Kay, Principal Licensing Engineer A. Carson, Licensing Manager C. Pizzella, Treasurer R. Walker, Department of Public Health, Commonwealth of Massachusetts Citizens Awareness Network Commonwealth of Massachusetts, SLO Designee State of Vermont, SLO Designee