ML080230254: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:II iviicnaei
{{#Wiki_filter:UN GIL  ZUU4-U~ ~LUN~~                                                                     raqe II IIII IIMichael ~Coii 11iviicnaei          ~UbIWA'k ON Scou -- FEEDBACK         I.iL 2004-02 Rt:Z>FUNZA:b                                                               raqe From:               Michael Scott To:                 John Butler Date:               01/22/2008 10:25:34 AM
~Coii -~UbIWA'k UN I.iL ZUU4-U~ ~LUN~~ raqe I II 11 Michael Scou -FEEDBACK ON GIL 2004-02 Rt:Z>FUNZA:b raqe I II From: Michael Scott To: John Butler Date: 01/22/2008 10:25:34 AM  


==Subject:==
==Subject:==
FEEDBACK ON GL 2004-02 RESPONSES John: Based on a quick review of one of the GL 2004-02 packages that we have received to date, we provide you the attached feedback that can be shared with your members. There may be a couple of additional items later in the week, but I wanted to put this in your hands ASAP.The presence of an item in the attachment means that the staff believes the package reviewed should have provided more information in the subject area. This feedback is intended to inform the other licensees so the NRC staff will not have the same issues regarding information to be provided in the GL 2004-02 responses yet to be submitted.
FEEDBACK ON GL 2004-02 RESPONSES John:
Some of the items may not be applicable to a given plant, though most are fairly general and would be applicable to all plants. Depending on how the staffs holistic review turns out for each plant, plants not providing this information might see requests for additional information from the staff.Thanks for facilitating this communication.
Based on a quick review of one of the GL 2004-02 packages that we have received to date, we provide you the attached feedback that can be shared with your members. There may be a couple of additional items later in the week, but I wanted to put this in your hands ASAP.
Michael L (Mike) Scott Chief, Safety Issues Resolution Branch Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Phone (301) 415-0565 CC: GSI-191; William Ruland 11 cAtemD\GWI00001.TMP Page 1 [1 I -:tm\WOO1.M ae1I Mail Envelope Properties (47960AEE.430:
The presence of an item in the attachment means that the staff believes the package reviewed should have provided more information in the subject area. This feedback is intended to inform the other licensees so the NRC staff will not have the same issues regarding information to be provided in the GL 2004-02 responses yet to be submitted. Some of the items may not be applicable to a given plant, though most are fairly general and would be applicable to all plants. Depending on how the staffs holistic review turns out for each plant, plants not providing this information might see requests for additional information from the staff.
13 : 9524)
Thanks for facilitating this communication.
Michael L (Mike) Scott Chief, Safety Issues Resolution Branch Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Phone (301) 415-0565 CC:                 GSI-191; William Ruland
 
11cAtemD\GWI00001.TMP                                                                       Page 1 [1 I :tm\WOO1.M
    -                                                                                        ae1I Mail Envelope Properties     (47960AEE.430: 13 : 9524)


==Subject:==
==Subject:==
Creation Date From: Created By: FEEDBACK ON GL 2004-02 RESPONSES 01/22/2008 10:25:34 AM Michael Scott MLS3@nrc.gov Recipients nei.org AM jcb (John Butler)Action Transferred Date & Time 01/22/2008 10:25:55 nrc.gov OWGWPO01 .HQGWDO01 AM AEB 1 CC (Aleem Boatright)
FEEDBACK ON GL 2004-02 RESPONSES Creation Date          01/22/2008 10:25:34 AM From:                  Michael Scott Created By:            MLS3@nrc.gov Recipients                                       Action      Date & Time nei.org                                           Transferred 01/22/2008 10:25:55 AM jcb (John Butler) nrc.gov OWGWPO01 .HQGWDO01                             Delivered  01/22/2008 10:25:37 AM AEB 1 CC (Aleem Boatright)
JPB3 CC (John Burke)REA CC (Ralph Architzel)
JPB3 CC (John Burke)
AM nrc.gov OWGWPOO2.HQGWDOO1 AM AXI CC (Ata Istar)EXG CC (Ervin Geiger)AM JAG2 CC (Joe Golla)nrc.gov OWGWPO03.HQGWDO01 AM TEC CC (Timothy Collins)nrc.gov OWGWPO04.HQGWDO01 AM ALH1 CC (Allen Hiser)AM PAK CC (Paul Klein)nrc.gov TWGWPO01 .HQGWDO01 AM Delivered Opened Delivered Opened 01/22/2008 10:25:37 01/22/2008 10:25:46 01/22/2008 10:25:36 01/22/2008 10:25:42 Delivered 01/22/2008 10:25:36 Delivered Opened 01/22/2008 10:25:35 01/22/2008 10:26:12 Delivered 01/22/2008 10:25:36 1 c:\temp\UW}OOOUi IMP Paqe 211 11 c: Uem p\(3VVJ00UU
REA CC (Ralph Architzel)                     Opened      01/22/2008 10:25:46 AM nrc.gov OWGWPOO2.HQGWDOO1                               Delivered  01/22/2008 10:25:36 AM AXI CC (Ata Istar)
: 1. IM P Paqe 2 11 JXL4 CC (John Lehning)RRL CC (Ralph Landry)nrc.gov TWGWPO02.HQGWDOOI AM RLT1 CC (Roberto L Torres)SJS2 CC (Stephen Smith)nrc.gov TWGWPO03.HQGWDOO1 AM WHR CC (William Ruland)'nrc.gov TWGWPO04.HQGWDO01 AM LEWI CC (Leon Whitney)MGY CC (Matthew Yoder)Post Office OWGWPO01 .HQGWDO01 OWGWPOO2.HQGWDOO1 OWGWPOO3.HQGWDO01 OWGWPO04.HQGWDOO1 TWGWPO01 .HQGWDO01 TWGWPO02.HQGWDOO1 TWGWPO03.HQGWDO01 TWGWPO04.HQGWDOO1 Delivered 01/22/2008 10:25:35 Delivered 01/22/2008 10:25:36 Delivered 01/22/2008 10:25:36 Delivered Route nei.org 01/22/2008 10:25:37 AM nrc.gov 01/22/2008 10:25:36 AM nrc.gov 01/22/2008 10:25:36 AM nrc.gov 01/22/2008 10:25:35 AM nrc.gov 01/22/2008 10:25:36 AM nrc.gov 01/22/2008 10:25:35 AM nrc.gov 01/22/2008 10:25:36 AM nrc.gov 01/22/2008 10:25:36 AM nrc.gov Date & Time 01/22/2008 10:25:34 AM 01/22/2008 10:20:30 AM Files MESSAGE GL 04-02 fdbk.doc Options Auto Delete: Expiration Date: Notify Recipients:
EXG CC (Ervin Geiger)                         Opened      01/22/2008 10:25:42 AM JAG2 CC (Joe Golla) nrc.gov OWGWPO03.HQGWDO01                               Delivered  01/22/2008 10:25:36 AM TEC CC (Timothy Collins) nrc.gov OWGWPO04.HQGWDO01                               Delivered  01/22/2008 10:25:35 AM ALH1 CC (Allen Hiser)                         Opened      01/22/2008 10:26:12 AM PAK CC (Paul Klein) nrc.gov TWGWPO01 .HQGWDO01                             Delivered   01/22/2008 10:25:36 AM
Priority: ReplyRequested:
 
Return Notification:
Paqe 211 1c:
Concealed  
11 c:\temp\UW}OOOUi   IMP Uem p\(3VVJ00UU 1.IM P                                                                   Paqe 2 11 JXL4 CC (John Lehning)
RRL CC (Ralph Landry) nrc.gov TWGWPO02.HQGWDOOI                   Delivered            01/22/2008 10:25:35 AM RLT1 CC (Roberto L Torres)
SJS2 CC (Stephen Smith) nrc.gov TWGWPO03.HQGWDOO1                   Delivered            01/22/2008 10:25:36 AM WHR CC (William Ruland)'
nrc.gov TWGWPO04.HQGWDO01                   Delivered            01/22/2008 10:25:36 AM LEWI CC (Leon Whitney)
MGY CC (Matthew Yoder)
Post Office                           Delivered           Route nei.org OWGWPO01 .HQGWDO01                    01/22/2008 10:25:37 AM       nrc.gov OWGWPOO2.HQGWDOO1                    01/22/2008 10:25:36 AM       nrc.gov OWGWPOO3.HQGWDO01                    01/22/2008 10:25:36 AM       nrc.gov OWGWPO04.HQGWDOO1                    01/22/2008 10:25:35 AM       nrc.gov TWGWPO01 .HQGWDO01                    01/22/2008 10:25:36 AM       nrc.gov TWGWPO02.HQGWDOO1                    01/22/2008 10:25:35 AM       nrc.gov TWGWPO03.HQGWDO01                    01/22/2008 10:25:36 AM       nrc.gov TWGWPO04.HQGWDOO1                    01/22/2008 10:25:36 AM       nrc.gov Files                        Size      Date & Time MESSAGE                      1767      01/22/2008 10:25:34 AM GL 04-02 fdbk.doc            34304    01/22/2008 10:20:30 AM Options Auto Delete:                 No Expiration Date:             None Notify Recipients:           Yes Priority:                   Standard ReplyRequested:             No Return Notification:         None Concealed  


==Subject:==
==Subject:==
Security: Size 1767 34304 No None Yes Standard No None No Standard 11 c:\temp\GW}O0001 .TMP Paae 3 11-1 To Be Delivered:
No Security:                   Standard
Status Tracking: Immediate Delivered  
 
& Opened PREDECISIONAL DRAFT JANUARY 22, 2008 1. Page 1 of the NRC's Content Guide states: "The GL supplemental response should begin with a summary-level description of the approach chosen...
11 c:\temp\GW}O0001 .TMP                         -1Paae 3 11 To Be Delivered: Immediate Status Tracking: Delivered & Opened
The summary should address significant conservatisms and margins that are used to provide high confidence that the issue has been addressed even with uncertainties remaining." Licensees should remember that the staff will need to validate a holistic safety case for each plant, based on information provided by the licensee.
 
This section (not numbered in the Content Guide) is important in making that case. Each licensee submitting a response has presumably concluded it has completed corrective actions (possibly with stated exceptions);
PREDECISIONAL DRAFT JANUARY 22, 2008
this "up front" part of the submittal should provide the overall argument that is the basis for that conclusion.
: 1. Page 1 of the NRC's Content Guide states: "The GL supplemental response should begin with a summary-level description of the approach chosen... The summary should address significant conservatisms and margins that are used to provide high confidence that the issue has been addressed even with uncertainties remaining."
More than just a list of conservatisms, it paints the overall picture of how the plant has confidence they are in compliance.
Licensees should remember that the staff will need to validate a holistic safety case for each plant, based on information provided by the licensee. This section (not numbered in the Content Guide) is important in making that case. Each licensee submitting a response has presumably concluded it has completed corrective actions (possibly with stated exceptions); this "up front" part of the submittal should provide the overall argument that is the basis for that conclusion. More than just a list of conservatisms, it paints the overall picture of how the plant has confidence they are in compliance.
: 2. In addition to referring to the staff's Content Guide, licensees should review the staff's draft (soon to be final) review guidance for expectations of information to be provided in the areas of chemical effects, head loss testing/vortexing, and coatings.(Drafts are at ML072600372, ML072600348, and ML072600335.)
: 2. In addition to referring to the staff's Content Guide, licensees should review the staff's draft (soon to be final) review guidance for expectations of information to be provided in the areas of chemical effects, head loss testing/vortexing, and coatings.
: 3. In responding to Content Guide item 3.p, licensees should remember that licensing bases include design basis information as defined in 10 CFR 50.2 and documented in the final safety analysis report, not just technical specifications, so the summary of changes to licensing bases should address changes made to design basis information as well.4. Licensees will minimize the chance of requests for additional information (RAIs) by specifically addressing all the information requests in the staff's Content Guide (at the bullet level). All assumptions and bases requested by the content guide should be supplied, in sufficient detail for the staff to conclude that the submittal conclusions are reasonable.
(Drafts are at ML072600372, ML072600348, and ML072600335.)
For questions that request an amount, an amount should be provided.
: 3. In responding to Content Guide item 3.p, licensees should remember that licensing bases include design basis information as defined in 10 CFR 50.2 and documented in the final safety analysis report, not just technical specifications, so the summary of changes to licensing bases should address changes made to design basis information as well.
When this amount is requested to be justified, a technical justification for the specific amount should be supplied.5. In the debris characteristics area, licensees should justify debris size distributions for debris sources for which a reduced zone of influence (ZOI) has been determined by testing. The default size distributions in the staffs 2004 safety evaluation (SE) have been derived for the ZOls approved in the SE. Usage of a default size distribution with a reduced ZOI may be non-conservative because higher average jet pressures inside reduced ZOls can result in an increased degree of damage to the debris.6. In response to item 3.e, 2 nd bullet, in the debris transport area, licensees should list the specific refinements and deviations to the approved SE guidance that were incorporated in their transport calculations so that the staff can understand how the calculation was performed.
: 4. Licensees will minimize the chance of requests for additional information (RAIs) by specifically addressing all the information requests in the staff's Content Guide (at the bullet level). All assumptions and bases requested by the content guide should be supplied, in sufficient detail for the staff to conclude that the submittal conclusions are reasonable. For questions that request an amount, an amount should be provided. When this amount is requested to be justified, a technical justification for the specific amount should be supplied.
: 7. In the net positive suction head (NPSH) area, licensees using a time- or temperature-dependent NPSH evaluation should provide the time or temperature trends of NPSH.PREDECISIONAL DRAFT PREDECISIONAL DRAFT 8. Regarding head loss testing, considerations include: " Where the staff has raised concerns regarding test protocols, licensees should in some manner respond to them, summarizing how they have been resolved or justifying how remaining discrepancies would not affect conclusions the licensee has reached in their submittal.
: 5. In the debris characteristics area, licensees should justify debris size distributions for debris sources for which a reduced zone of influence (ZOI) has been determined by testing. The default size distributions in the staffs 2004 safety evaluation (SE) have been derived for the ZOls approved in the SE. Usage of a default size distribution with a reduced ZOI may be non-conservative because higher average jet pressures inside reduced ZOls can result in an increased degree of damage to the debris.
* Licensees should discuss anomalies observed during testing and summarize evaluation of whether the anomalies could have affected the head loss result nonconservatively." If an anomaly could indicate that channeling or bore holes were present and temperature correction was performed, the licensee should provide a summary of the evaluation of the acceptability of the correction.
: 6. In response to item 3.e, 2 nd bullet, in the debris transport area, licensees should list the specific refinements and deviations to the approved SE guidance that were incorporated in their transport calculations so that the staff can understand how the calculation was performed.
* An explanation of the acceptability of any scaling of test data to different velocities or temperatures should be presented." A justification for extrapolation methods or non-extrapolation of test results out to the ECCS mission time should be presented." If the head loss across the strainer including debris and clean strainer components is greater than the strainer minimum submergence, licensees should explain why flashing will not occur in the debris bed or within the strainer.* If a thin bed was not considered the limiting debris bed for head loss, licensees should explain how the thin bed was eliminated as a limiting concern.9. The NRC's SE for WCAP-16406-P did not reach conclusions on aspects of that report regarding in-vessel downstream effects, considering that the subject would be addressed in detail in WCAP-16793-NP.
: 7. In the net positive suction head (NPSH) area, licensees using a time- or temperature- dependent NPSH evaluation should provide the time or temperature trends of NPSH.
Licensees reaching conclusions regarding adequacy of core cooling in the presence of possible debris blockage without reference to WCAP-1 6793 and the staff's draft conditions and limitations on use of WCAP-16793 (to be provided last week in January 2008) should provide additional explanation of the method used.PREDECISIONAL DRAFT}}
PREDECISIONAL DRAFT
 
PREDECISIONAL DRAFT
: 8. Regarding head loss testing, considerations include:
      "   Where the staff has raised concerns regarding test protocols, licensees should in some manner respond to them, summarizing how they have been resolved or justifying how remaining discrepancies would not affect conclusions the licensee has reached in their submittal.
* Licensees should discuss anomalies observed during testing and summarize evaluation of whether the anomalies could have affected the head loss result nonconservatively.
      " If an anomaly could indicate that channeling or bore holes were present and temperature correction was performed, the licensee should provide a summary of the evaluation of the acceptability of the correction.
* An explanation of the acceptability of any scaling of test data to different velocities or temperatures should be presented.
      " A justification for extrapolation methods or non-extrapolation of test results out to the ECCS mission time should be presented.
      " If the head loss across the strainer including debris and clean strainer components is greater than the strainer minimum submergence, licensees should explain why flashing will not occur in the debris bed or within the strainer.
* If a thin bed was not considered the limiting debris bed for head loss, licensees should explain how the thin bed was eliminated as a limiting concern.
: 9. The NRC's SE for WCAP-16406-P did not reach conclusions on aspects of that report regarding in-vessel downstream effects, considering that the subject would be addressed in detail in WCAP-16793-NP. Licensees reaching conclusions regarding adequacy of core cooling in the presence of possible debris blockage without reference to WCAP-1 6793 and the staff's draft conditions and limitations on use of WCAP-16793 (to be provided last week in January 2008) should provide additional explanation of the method used.
PREDECISIONAL DRAFT}}

Revision as of 20:19, 14 November 2019

E-mail to NEI Dated 1/22/08 - Feedback on GL 2004-02 Responses
ML080230254
Person / Time
Issue date: 01/22/2008
From: Michael Scott
Office of Nuclear Reactor Regulation
To: Butler J
Nuclear Energy Institute
References
GL-04-002
Download: ML080230254 (6)


Text

UN GIL ZUU4-U~ ~LUN~~ raqe II IIII IIMichael ~Coii 11iviicnaei ~UbIWA'k ON Scou -- FEEDBACK I.iL 2004-02 Rt:Z>FUNZA:b raqe From: Michael Scott To: John Butler Date: 01/22/2008 10:25:34 AM

Subject:

FEEDBACK ON GL 2004-02 RESPONSES John:

Based on a quick review of one of the GL 2004-02 packages that we have received to date, we provide you the attached feedback that can be shared with your members. There may be a couple of additional items later in the week, but I wanted to put this in your hands ASAP.

The presence of an item in the attachment means that the staff believes the package reviewed should have provided more information in the subject area. This feedback is intended to inform the other licensees so the NRC staff will not have the same issues regarding information to be provided in the GL 2004-02 responses yet to be submitted. Some of the items may not be applicable to a given plant, though most are fairly general and would be applicable to all plants. Depending on how the staffs holistic review turns out for each plant, plants not providing this information might see requests for additional information from the staff.

Thanks for facilitating this communication.

Michael L (Mike) Scott Chief, Safety Issues Resolution Branch Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Phone (301) 415-0565 CC: GSI-191; William Ruland

11cAtemD\GWI00001.TMP Page 1 [1 I :tm\WOO1.M

- ae1I Mail Envelope Properties (47960AEE.430: 13 : 9524)

Subject:

FEEDBACK ON GL 2004-02 RESPONSES Creation Date 01/22/2008 10:25:34 AM From: Michael Scott Created By: MLS3@nrc.gov Recipients Action Date & Time nei.org Transferred 01/22/2008 10:25:55 AM jcb (John Butler) nrc.gov OWGWPO01 .HQGWDO01 Delivered 01/22/2008 10:25:37 AM AEB 1 CC (Aleem Boatright)

JPB3 CC (John Burke)

REA CC (Ralph Architzel) Opened 01/22/2008 10:25:46 AM nrc.gov OWGWPOO2.HQGWDOO1 Delivered 01/22/2008 10:25:36 AM AXI CC (Ata Istar)

EXG CC (Ervin Geiger) Opened 01/22/2008 10:25:42 AM JAG2 CC (Joe Golla) nrc.gov OWGWPO03.HQGWDO01 Delivered 01/22/2008 10:25:36 AM TEC CC (Timothy Collins) nrc.gov OWGWPO04.HQGWDO01 Delivered 01/22/2008 10:25:35 AM ALH1 CC (Allen Hiser) Opened 01/22/2008 10:26:12 AM PAK CC (Paul Klein) nrc.gov TWGWPO01 .HQGWDO01 Delivered 01/22/2008 10:25:36 AM

Paqe 211 1c:

11 c:\temp\UW}OOOUi IMP Uem p\(3VVJ00UU 1.IM P Paqe 2 11 JXL4 CC (John Lehning)

RRL CC (Ralph Landry) nrc.gov TWGWPO02.HQGWDOOI Delivered 01/22/2008 10:25:35 AM RLT1 CC (Roberto L Torres)

SJS2 CC (Stephen Smith) nrc.gov TWGWPO03.HQGWDOO1 Delivered 01/22/2008 10:25:36 AM WHR CC (William Ruland)'

nrc.gov TWGWPO04.HQGWDO01 Delivered 01/22/2008 10:25:36 AM LEWI CC (Leon Whitney)

MGY CC (Matthew Yoder)

Post Office Delivered Route nei.org OWGWPO01 .HQGWDO01 01/22/2008 10:25:37 AM nrc.gov OWGWPOO2.HQGWDOO1 01/22/2008 10:25:36 AM nrc.gov OWGWPOO3.HQGWDO01 01/22/2008 10:25:36 AM nrc.gov OWGWPO04.HQGWDOO1 01/22/2008 10:25:35 AM nrc.gov TWGWPO01 .HQGWDO01 01/22/2008 10:25:36 AM nrc.gov TWGWPO02.HQGWDOO1 01/22/2008 10:25:35 AM nrc.gov TWGWPO03.HQGWDO01 01/22/2008 10:25:36 AM nrc.gov TWGWPO04.HQGWDOO1 01/22/2008 10:25:36 AM nrc.gov Files Size Date & Time MESSAGE 1767 01/22/2008 10:25:34 AM GL 04-02 fdbk.doc 34304 01/22/2008 10:20:30 AM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard ReplyRequested: No Return Notification: None Concealed

Subject:

No Security: Standard

11 c:\temp\GW}O0001 .TMP -1Paae 3 11 To Be Delivered: Immediate Status Tracking: Delivered & Opened

PREDECISIONAL DRAFT JANUARY 22, 2008

1. Page 1 of the NRC's Content Guide states: "The GL supplemental response should begin with a summary-level description of the approach chosen... The summary should address significant conservatisms and margins that are used to provide high confidence that the issue has been addressed even with uncertainties remaining."

Licensees should remember that the staff will need to validate a holistic safety case for each plant, based on information provided by the licensee. This section (not numbered in the Content Guide) is important in making that case. Each licensee submitting a response has presumably concluded it has completed corrective actions (possibly with stated exceptions); this "up front" part of the submittal should provide the overall argument that is the basis for that conclusion. More than just a list of conservatisms, it paints the overall picture of how the plant has confidence they are in compliance.

2. In addition to referring to the staff's Content Guide, licensees should review the staff's draft (soon to be final) review guidance for expectations of information to be provided in the areas of chemical effects, head loss testing/vortexing, and coatings.

(Drafts are at ML072600372, ML072600348, and ML072600335.)

3. In responding to Content Guide item 3.p, licensees should remember that licensing bases include design basis information as defined in 10 CFR 50.2 and documented in the final safety analysis report, not just technical specifications, so the summary of changes to licensing bases should address changes made to design basis information as well.
4. Licensees will minimize the chance of requests for additional information (RAIs) by specifically addressing all the information requests in the staff's Content Guide (at the bullet level). All assumptions and bases requested by the content guide should be supplied, in sufficient detail for the staff to conclude that the submittal conclusions are reasonable. For questions that request an amount, an amount should be provided. When this amount is requested to be justified, a technical justification for the specific amount should be supplied.
5. In the debris characteristics area, licensees should justify debris size distributions for debris sources for which a reduced zone of influence (ZOI) has been determined by testing. The default size distributions in the staffs 2004 safety evaluation (SE) have been derived for the ZOls approved in the SE. Usage of a default size distribution with a reduced ZOI may be non-conservative because higher average jet pressures inside reduced ZOls can result in an increased degree of damage to the debris.
6. In response to item 3.e, 2 nd bullet, in the debris transport area, licensees should list the specific refinements and deviations to the approved SE guidance that were incorporated in their transport calculations so that the staff can understand how the calculation was performed.
7. In the net positive suction head (NPSH) area, licensees using a time- or temperature- dependent NPSH evaluation should provide the time or temperature trends of NPSH.

PREDECISIONAL DRAFT

PREDECISIONAL DRAFT

8. Regarding head loss testing, considerations include:

" Where the staff has raised concerns regarding test protocols, licensees should in some manner respond to them, summarizing how they have been resolved or justifying how remaining discrepancies would not affect conclusions the licensee has reached in their submittal.

  • Licensees should discuss anomalies observed during testing and summarize evaluation of whether the anomalies could have affected the head loss result nonconservatively.

" If an anomaly could indicate that channeling or bore holes were present and temperature correction was performed, the licensee should provide a summary of the evaluation of the acceptability of the correction.

  • An explanation of the acceptability of any scaling of test data to different velocities or temperatures should be presented.

" A justification for extrapolation methods or non-extrapolation of test results out to the ECCS mission time should be presented.

" If the head loss across the strainer including debris and clean strainer components is greater than the strainer minimum submergence, licensees should explain why flashing will not occur in the debris bed or within the strainer.

  • If a thin bed was not considered the limiting debris bed for head loss, licensees should explain how the thin bed was eliminated as a limiting concern.
9. The NRC's SE for WCAP-16406-P did not reach conclusions on aspects of that report regarding in-vessel downstream effects, considering that the subject would be addressed in detail in WCAP-16793-NP. Licensees reaching conclusions regarding adequacy of core cooling in the presence of possible debris blockage without reference to WCAP-1 6793 and the staff's draft conditions and limitations on use of WCAP-16793 (to be provided last week in January 2008) should provide additional explanation of the method used.

PREDECISIONAL DRAFT