{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 March 3, 2008 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B) | ||
ATTN: | ATTN: Supervisor, Licensing & | ||
Regulatory Programs 15760 West Power Line Street Crystal River, FL 34428-6708 | |||
==SUBJECT:== | ==SUBJECT:== | ||
ANNUAL ASSESSMENT LETTER - CRYSTAL RIVER NUCLEAR PLANT (NRC INSPECTION REPORT 05000302/2008001) | ANNUAL ASSESSMENT LETTER - CRYSTAL RIVER NUCLEAR PLANT (NRC INSPECTION REPORT 05000302/2008001) | ||
==Dear Mr. Young:== | ==Dear Mr. Young:== | ||
On February 7, 2008, the NRC staff completed its performance review of the Crystal River Nuclear Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility. | On February 7, 2008, the NRC staff completed its performance review of the Crystal River Nuclear Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility. | ||
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information," will include the security cornerstone review and resultant inspection plan. | This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information," will include the security cornerstone review and resultant inspection plan. | ||
Overall, Crystal River operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to | Overall, Crystal River operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections which include TI 2515/171, Verification of Site Specific (B.5.b) Phase 2 and 3 Mitigation Strategies and TI 2515/172, Reactor Coolant System Dissimilar Metal. | ||
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through September 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review. | The enclosed inspection plan details the inspections, less those related to physical protection scheduled through September 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review. | ||
FPC 2 In accordance with 10 CFR 2.390 of the NRC | FPC 2 In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4629 with any questions you may have regarding this letter or the inspection plan. | If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4629 with any questions you may have regarding this letter or the inspection plan. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Marvin D. Sykes, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket No.: 50-302 License No.: DPR-72 | |||
Division of Reactor Projects Docket No.: | |||
==Enclosure:== | ==Enclosure:== | ||
Crystal River Inspection/Activity Plan (03/01/08 - 09/30/09) cc w/encl: (See page 3) | Crystal River Inspection/Activity Plan (03/01/08 - 09/30/09) cc w/encl: (See page 3) | ||
Distribution: | |||
Distribution: | Normal distribution list | ||
Normal distribution list | |||
Citrus County 110 N. Apopka Avenue Inverness, FL | FPC 3 cc w/encl.: | ||
Jon A. Franke Jim Mallay Director Site Operations Framatome ANP, Inc. | |||
Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution Electronic Mail Distribution Michael J. Annacone Plant General Manager Crystal River Nuclear Plant (NA2C) | |||
Electronic Mail Distribution Phyllis Dixon Manager Nuclear Assessment Crystal River Nuclear Plant (NA2C) | |||
Electronic Mail Distribution Stephen J. Cahill Crystal River Nuclear Plant (NA2C) | |||
Electronic Mail Distribution R. Alexander Glenn Associate General Counsel (MAC - BT15A) | |||
Florida Power Corporation Electronic Mail Distribution Steven R. Carr Associate General Counsel Legal Department Progress Energy Service Company, LLC Electronic Mail Distribution William A. Passetti Bureau of Radiation Control Department of Health Electronic Mail Distribution Craig Fugate Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250 | |||
Page 1 of 2 Crystal River 03/03/2008 12:09:21 Inspection / Activity Plan Report 22 03/03/2008 - 06/30/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PI&R - PREP TRIP-PROBLEM ID AND RESOL 1 3 IP 71152B Identification and Resolution of Problems 03/05/2008 03/06/2008 Baseline Inspections PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 3 IP 71152B Identification and Resolution of Problems 04/07/2008 04/11/2008 Baseline Inspections 3 IP 71152B Identification and Resolution of Problems 04/21/2008 04/25/2008 Baseline Inspections PSB1-EP - EP EXERCISE 3 3 IP 7111401 Exercise Evaluation 05/19/2008 05/23/2008 EP Baseline Inspection 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 05/19/2008 05/23/2008 EP Baseline Inspection 3 IP 71151-EP01 Drill/Exercise Performance 05/19/2008 05/23/2008 Baseline Inspections 3 IP 71151-EP02 ERO Drill Participation 05/19/2008 05/23/2008 Baseline Inspections 3 IP 71151-EP03 Alert & Notification System 05/19/2008 05/23/2008 Baseline Inspections EB3-HS - HEAT SINK 1 3 IP 7111107B Heat Sink Performance 07/21/2008 07/25/2008 Baseline Inspections TI-171 - B.5.B PHASE 2&3 3 3 IP 2515/171 Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 10/20/2008 10/24/2008 Generic Safety Inspectio PSB1-RP - RADIATION PROTECTION PREINSPECTION VISIT 1 3 IP 7112101 Access Control to Radiologically Significant Areas 10/27/2008 10/29/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION PUBLIC BASELINE 4 3 IP 7112101 Access Control to Radiologically Significant Areas 12/01/2008 12/05/2008 Baseline Inspections 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 12/01/2008 12/05/2008 Baseline Inspections 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 12/01/2008 12/05/2008 Baseline Inspections 3 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 12/01/2008 12/05/2008 Baseline Inspections 3 IP 71151-OR01 Occupational Exposure Control Effectiveness 12/01/2008 12/05/2008 Baseline Inspections 3 IP 71151-PR01 RETS/ODCM Radiological Effluent 12/01/2008 12/05/2008 Baseline Inspections EB3TI172 - TI-172 1 3 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 12/08/2008 12/12/2008 Generic Safety Inspectio EB1-MODS - MODIFICATIONS-10CFR50.59 4 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 02/23/2009 02/27/2009 Baseline Inspections 3 IP 7111117B Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 02/23/2009 02/27/2009 Baseline Inspections 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 03/09/2009 03/13/2009 Baseline Inspections 3 IP 7111117B Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 03/09/2009 03/13/2009 Baseline Inspections PSB1EP - EP INSPECTION 1 3 IP 7111402 Alert and Notification System Testing 05/04/2009 05/08/2009 EP Baseline Inspection 3 IP 7111403 Emergency Response Organization Augmentation Testing 05/04/2009 05/08/2009 EP Baseline Inspection 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 05/04/2009 05/08/2009 EP Baseline Inspection This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures. | |||
Page 2 of 2 Crystal River 03/03/2008 12:09:21 Inspection / Activity Plan Report 22 03/03/2008 - 06/30/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1EP - EP INSPECTION 1 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 05/04/2009 05/08/2009 EP Baseline Inspection 3 IP 71151-EP01 Drill/Exercise Performance 05/04/2009 05/08/2009 Baseline Inspections 3 IP 71151-EP02 ERO Drill Participation 05/04/2009 05/08/2009 Baseline Inspections 3 IP 71151-EP03 Alert & Notification System 05/04/2009 05/08/2009 Baseline Inspections This report does not include INPO and OUTAGE activities. | |||
-06/30/2009 | |||
This report shows only on-site and announced inspection procedures.}} | This report shows only on-site and announced inspection procedures.}} | ||
Revision as of 19:02, 14 November 2019
| ML080630243 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/03/2008 |
| From: | Marvin Sykes NRC/RGN-II/DRP/RPB3 |
| To: | Young D Florida Power & Light Co |
| References | |
| IR-08-001 | |
| Download: ML080630243 (5) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 March 3, 2008 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)
ATTN: Supervisor, Licensing &
Regulatory Programs 15760 West Power Line Street Crystal River, FL 34428-6708
SUBJECT:
ANNUAL ASSESSMENT LETTER - CRYSTAL RIVER NUCLEAR PLANT (NRC INSPECTION REPORT 05000302/2008001)
Dear Mr. Young:
On February 7, 2008, the NRC staff completed its performance review of the Crystal River Nuclear Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information," will include the security cornerstone review and resultant inspection plan.
Overall, Crystal River operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections which include TI 2515/171, Verification of Site Specific (B.5.b) Phase 2 and 3 Mitigation Strategies and TI 2515/172, Reactor Coolant System Dissimilar Metal.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through September 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.
FPC 2 In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4629 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Marvin D. Sykes, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket No.: 50-302 License No.: DPR-72
Enclosure:
Crystal River Inspection/Activity Plan (03/01/08 - 09/30/09) cc w/encl: (See page 3)
Distribution:
Normal distribution list
FPC 3 cc w/encl.:
Jon A. Franke Jim Mallay Director Site Operations Framatome ANP, Inc.
Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution Electronic Mail Distribution Michael J. Annacone Plant General Manager Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution Phyllis Dixon Manager Nuclear Assessment Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution Stephen J. Cahill Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution R. Alexander Glenn Associate General Counsel (MAC - BT15A)
Florida Power Corporation Electronic Mail Distribution Steven R. Carr Associate General Counsel Legal Department Progress Energy Service Company, LLC Electronic Mail Distribution William A. Passetti Bureau of Radiation Control Department of Health Electronic Mail Distribution Craig Fugate Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250
Page 1 of 2 Crystal River 03/03/2008 12:09:21 Inspection / Activity Plan Report 22 03/03/2008 - 06/30/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PI&R - PREP TRIP-PROBLEM ID AND RESOL 1 3 IP 71152B Identification and Resolution of Problems 03/05/2008 03/06/2008 Baseline Inspections PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 3 IP 71152B Identification and Resolution of Problems 04/07/2008 04/11/2008 Baseline Inspections 3 IP 71152B Identification and Resolution of Problems 04/21/2008 04/25/2008 Baseline Inspections PSB1-EP - EP EXERCISE 3 3 IP 7111401 Exercise Evaluation 05/19/2008 05/23/2008 EP Baseline Inspection 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 05/19/2008 05/23/2008 EP Baseline Inspection 3 IP 71151-EP01 Drill/Exercise Performance 05/19/2008 05/23/2008 Baseline Inspections 3 IP 71151-EP02 ERO Drill Participation 05/19/2008 05/23/2008 Baseline Inspections 3 IP 71151-EP03 Alert & Notification System 05/19/2008 05/23/2008 Baseline Inspections EB3-HS - HEAT SINK 1 3 IP 7111107B Heat Sink Performance 07/21/2008 07/25/2008 Baseline Inspections TI-171 - B.5.B PHASE 2&3 3 3 IP 2515/171 Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 10/20/2008 10/24/2008 Generic Safety Inspectio PSB1-RP - RADIATION PROTECTION PREINSPECTION VISIT 1 3 IP 7112101 Access Control to Radiologically Significant Areas 10/27/2008 10/29/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION PUBLIC BASELINE 4 3 IP 7112101 Access Control to Radiologically Significant Areas 12/01/2008 12/05/2008 Baseline Inspections 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 12/01/2008 12/05/2008 Baseline Inspections 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 12/01/2008 12/05/2008 Baseline Inspections 3 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 12/01/2008 12/05/2008 Baseline Inspections 3 IP 71151-OR01 Occupational Exposure Control Effectiveness 12/01/2008 12/05/2008 Baseline Inspections 3 IP 71151-PR01 RETS/ODCM Radiological Effluent 12/01/2008 12/05/2008 Baseline Inspections EB3TI172 - TI-172 1 3 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 12/08/2008 12/12/2008 Generic Safety Inspectio EB1-MODS - MODIFICATIONS-10CFR50.59 4 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 02/23/2009 02/27/2009 Baseline Inspections 3 IP 7111117B Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 02/23/2009 02/27/2009 Baseline Inspections 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 03/09/2009 03/13/2009 Baseline Inspections 3 IP 7111117B Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 03/09/2009 03/13/2009 Baseline Inspections PSB1EP - EP INSPECTION 1 3 IP 7111402 Alert and Notification System Testing 05/04/2009 05/08/2009 EP Baseline Inspection 3 IP 7111403 Emergency Response Organization Augmentation Testing 05/04/2009 05/08/2009 EP Baseline Inspection 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 05/04/2009 05/08/2009 EP Baseline Inspection This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.
Page 2 of 2 Crystal River 03/03/2008 12:09:21 Inspection / Activity Plan Report 22 03/03/2008 - 06/30/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1EP - EP INSPECTION 1 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 05/04/2009 05/08/2009 EP Baseline Inspection 3 IP 71151-EP01 Drill/Exercise Performance 05/04/2009 05/08/2009 Baseline Inspections 3 IP 71151-EP02 ERO Drill Participation 05/04/2009 05/08/2009 Baseline Inspections 3 IP 71151-EP03 Alert & Notification System 05/04/2009 05/08/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.