ML080640638: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:AmerenUE Cal/away Plant PO Box 620 Fulton, MO 65251 February 7, 2008 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 ULNRC05474 WAmeren 11E Ladies and Gentlemen:
{{#Wiki_filter:AmerenUE                                                                             PO Box 620 Cal/away Plant                                                                       Fulton, MO 65251 February 7, 2008 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 ULNRC05474 Ladies and Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.FACILITY OPERATING LICENSE NPF-30 Semi-Annual Fitness for Duty Program Performance Data Report for AmerenUE Callaway Plant Enclosed is the Semi-Annual Fitness For Duty Program Performance Data Report for AmerenUE's Callaway Nuclear, Plant in accordance with I OCFR26.7. (d). This report applies to the period beginning July 1, 2007 and ending December 31, 2007.The enclosure includes the following:
WAmeren                                          DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 11E                                          UNION ELECTRIC CO.
Attachment A Fitness For Duty Program Performance Data* Personnel Subject to 1OCFR26" Breakdown of Confirmed Positive Tests for Specific Substances Attachment B -Fitness For Duty Management Action with regard to:* Initiatives Taken / Lessons Learned* Reportable Fitness For Duty Events under 10CFR26.73 If you have questions in regard to the Performance Data Report, please contact me at (573) 676-8129.Sincerely, Luke H. Graessle Manager, Regulatory Affairs LHG: DSH: KRF: AEE/rmm Enclosure X402-(a subsidiary of Ameren Corporation ULNRC05474 February 7, 2008 Page 2 cc: Mr. Elmo E. Collins, Jr.Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack N. Donohew Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O-8B1 Washington, DC 20555-2738 Mr. Mohan C. Thadani (2 copies)Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O-8G14 Washington, DC 20555-2738 ULNRC05474 February 7, 2008 Page 3 Index and send hardcopy to QA File A160.0761 Hardcopy: Certrec Corporation 4200 South Hulen, Suite 422 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed).
FACILITY OPERATING LICENSE NPF-30 Semi-Annual Fitness for Duty Program Performance Data Report for AmerenUE Callaway Plant Enclosed is the Semi-Annual Fitness For Duty Program Performance Data Report for AmerenUE's Callaway Nuclear, Plant in accordance with IOCFR26.7. (d). This report applies to the period beginning July 1, 2007 and ending December 31, 2007.
The enclosure includes the following:
Attachment A             Fitness For Duty Program Performance Data
* Personnel Subject to 10CFR26
                                          " Breakdown of Confirmed Positive Tests for Specific Substances Attachment B - Fitness For Duty Management Action with regard to:
* Initiatives Taken / Lessons Learned
* Reportable Fitness For Duty Events under 10CFR26.73 If you have questions in regard to the Performance Data Report, please contact me at (573) 676-8129.
Sincerely, Luke H. Graessle Manager, Regulatory Affairs LHG: DSH: KRF: AEE/rmm Enclosure                                                                                           X402-(
a subsidiaryof Ameren Corporation
 
ULNRC05474 February 7, 2008 Page 2 cc:   Mr. Elmo E. Collins, Jr.
Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack N. Donohew Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O-8B1 Washington, DC 20555-2738 Mr. Mohan C. Thadani (2 copies)
Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O-8G14 Washington, DC 20555-2738
 
ULNRC05474 February 7, 2008 Page 3 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 4200 South Hulen, Suite 422 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed).
Electronic distribution for the following can be made via Other Situations ULNRC Distribution:
Electronic distribution for the following can be made via Other Situations ULNRC Distribution:
C. D. Naslund A. C. Heflin L. H. Graessle G. A. Hughes S. A. Maglio S. L. Gallagher L. M. Belsky (NSRB)T. B. Elwood Ms. Diane M. Hooper Supervisor, Licensing WCNOC P.O. Box 411 Burlington, KS 66839 Mr. Scott Bauer Regulatory Affairs Palo Verde NGS P.O. Box 52034, Mail Station 7636 Phoenix, AZ 85072-2034 Mr. Scott Head Supervisor, Licensing South Texas Project NOC Mail Code N5014 P.O. Box 289 Wadsworth, TX 77483 Mr. Dennis Buschbaum TXU Power Comanche Peak SES P.O. Box 1002 Glen Rose, TX 76043 Mr. Stan Ketelsen Manager, Regulatory Services Pacific Gas & Electric Mail Stop 104/5/536 P.O. Box 56 Avila Beach, CA 93424 Mr. John O'Neill Pillsbury Winthrop Shaw Pittman LLP 2300 N. Street N.W.Washington, DC 20037 Missouri Public Service Commission Governor Office Building 200 Madison Street PO Box 360 Jefferson City, MO 65102-0360 ULNRC05474 February 7, 2008 Fitness For Duty Program Performance Data Personnel Subject to 1OCFR26 (NUMARC Rev. Date 1/92)AmerenUE Company July 1 -Dec 31, 2007 6 Months Callaway Plant Location Aaron Enloe (573) 676-4300 Contact Name Phone (Include Area Code)D Appendix A to 10CFR26 Cuttoffs:
C. D. Naslund A. C. Heflin L. H. Graessle G. A. Hughes S. A. Maglio S. L. Gallagher L. M. Belsky (NSRB)
Screen/Confirmation (ng/ml)Marijuana Cocaine Opiates 20/ 15 300/ 150 300/ 150 Amphetamines Phencyclidine Alcohol 1000/ 250 25/ 25 (.04% BAC)Long-Term Short-Term Testing Results Licensee Employees Contractor-Personnel Contractor-Personnel Average Number with Unescorted Access 841 223 219 Categories  
T. B. Elwood Ms. Diane M. Hooper                                 Mr. Dennis Buschbaum Supervisor, Licensing                               TXU Power WCNOC                                               Comanche Peak SES P.O. Box 411                                       P.O. Box 1002 Burlington, KS 66839                                Glen Rose, TX 76043 Mr. Scott Bauer                                    Mr. Stan Ketelsen Regulatory Affairs                                  Manager, Regulatory Services Palo Verde NGS                                      Pacific Gas & Electric P.O. Box 52034,                                    Mail Stop 104/5/536 Mail Station 7636                                  P.O. Box 56 Phoenix, AZ 85072-2034                              Avila Beach, CA 93424 Mr. Scott Head                                      Mr. John O'Neill Supervisor, Licensing                              Pillsbury Winthrop Shaw Pittman LLP South Texas Project NOC                            2300 N. Street N.W.
# # # # # #Tested Positive Tested Positive Tested Positive Pre-Access 51 0 0 0 83 0 Post Accident 2 0 0 0 1 0 Observed Behavior 0 0 0 0 0 0 Random 218 0 66 0 63 0 Follow-up 9 0 2 0 1 1 Other 6 0 1 0 3 0 Total 286 0 69 0 151 1 Attachment A Page 1 of 2 ULNRC05474 February 7, 2008 Breakdown of Confirmed Positive Tests for Specific Substances
Mail Code N5014                                    Washington, DC 20037 P.O. Box 289 Wadsworth, TX 77483                                Missouri Public Service Commission Governor Office Building 200 Madison Street PO Box 360 Jefferson City, MO 65102-0360
* -~. I --'I -. -V U. I...... l a L1an,111 ,1 ,~u-j*Apifp ~aIIIesC P Ihen\cycIdill c.I*j~~oii~V,' c f,, , t In'c,,ils  
 
" Licenisee 0 0 0 0 0 0 0 0 0 0ýEmployees____
ULNRC05474 February 7, 2008 Fitness For Duty Program Performance Data Personnel Subject to 10CFR26 (NUMARC Rev. Date 1/92)
____Lon(Y-Termi 0 0 0 0 0 0 0 0 0 0 Contractors
AmerenUE                                                     July 1 -Dec 31, 2007 Company                                                          6 Months Callaway Plant Location Aaron Enloe                                                     (573) 676-4300 Contact Name                                                 Phone (Include Area Code)
: Short-ftorS 0 1 0 0 0 0 0 0 0 0-Co~ntractors-ý 10 0 0 0 0 0 TOTAL*Left Side Right Side Record of test results that would have been Positive at the NRC cutoff level.Record of MRO confirmed positives based on Union Electric's more stringent cutoff level.Attachment A Page 2 of 2 ULNRC05474 February 7, 2008 Initiatives Taken: None.Reportable Fitness For Duty Events Under 10CFR26.73:
Cuttoffs: Screen/Confirmation (ng/ml)                                 D Appendix A to 10CFR26 Marijuana         20/ 15           Amphetamines        1000/ 250 Cocaine          300/ 150           Phencyclidine         25/   25 Opiates          300/ 150          Alcohol          (.04% BAC)
None.Mannaement Actions: One short term contractor tested positive for Marijuana during a Follow-up collection.
Long-Term                 Short-Term Testing Results               Licensee Employees         Contractor-Personnel       Contractor-Personnel Average Number with Unescorted Access                     841                         223                       219 Categories                       #           #             #           #             #           #
Their access to the plant was denied.Test Results: Ameren UE Callaway Nuclear Plant performs random testing of the workforce at an annual rate Of at least 50% ih accordance with 10CFR26.24.a'.'2.
Tested       Positive     Tested       Positive       Tested       Positive Pre-Access                       51           0             0           0             83           0 Post Accident                 2           0             0           0             1           0 Observed Behavior             0           0             0           0             0           0 Random                         218           0             66           0             63           0 Follow-up                         9           0             2           0             1             1 Other                             6           0             1           0             3             0 Total                           286           0             69           0             151           1 Attachment A Page 1 of 2
For the six months beginning July 1, 2007 and ending December 31, 2007 random screens were performed at a rate of 27.0% of the population.
 
ULNRC05474 February 7, 2008 Breakdown of Confirmed Positive Tests for Specific Substances
                            * -~.                           I       - -     'I -.         -       V                   U.                     I.
I*j~
                                                                                                                                              -y*,~io
                    ..... a l I**
L1an,111
                                      ,1 ,               ~u-j                         *Apifp   ~aIIIesC   PIhen\cycIdill c.         ~oii~V I,* ,
                                                                                                                                                      ' c f,, l'*, t In'c,,ils
                                                                                                                                                                            "
Licenisee         0             0               0               0       0           0             0         0                     0                           0
ýEmployees____                                                                                   ____
Lon(Y-Termi         0             0               0               0       0           0             0         0                     0                           0 Contractors :
Short-ftorS         0             1             0               0       0           0             0         0                     0                           0
-Co~ntractors-ý 10                                 0                     0                   0                     0                           0 TOTAL
          *Left Side                   Record of test results that would have been Positive at the NRC cutoff level.
Right Side                  Record of MRO confirmed positives based on Union Electric's more stringent cutoff level.
Attachment A Page 2 of 2
 
ULNRC05474 February 7, 2008 Initiatives Taken:
None.
Reportable Fitness For Duty Events Under 10CFR26.73:
None.
Mannaement Actions:
One short term contractor tested positive for Marijuana during a Follow-up collection.
Their access to the plant was denied.
Test Results:
Ameren UE Callaway Nuclear Plant performs random testing of the workforce at an annual rate Of at least 50% ih accordance with 10CFR26.24.a'.'2. For the six months beginning July 1, 2007 and ending December 31, 2007 random screens were performed at a rate of 27.0% of the population.
Attachment B Page 1 of I}}
Attachment B Page 1 of I}}

Revision as of 18:59, 14 November 2019

Semi-Annual Fitness for Duty Program Performance Data Report Period Beginning July 1, 2007 and Ending December 31, 2007
ML080640638
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/07/2008
From: Graessle L
AmerenUE, Union Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC05474
Download: ML080640638 (6)


Text

AmerenUE PO Box 620 Cal/away Plant Fulton, MO 65251 February 7, 2008 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 ULNRC05474 Ladies and Gentlemen:

WAmeren DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 11E UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 Semi-Annual Fitness for Duty Program Performance Data Report for AmerenUE Callaway Plant Enclosed is the Semi-Annual Fitness For Duty Program Performance Data Report for AmerenUE's Callaway Nuclear, Plant in accordance with IOCFR26.7. (d). This report applies to the period beginning July 1, 2007 and ending December 31, 2007.

The enclosure includes the following:

Attachment A Fitness For Duty Program Performance Data

" Breakdown of Confirmed Positive Tests for Specific Substances Attachment B - Fitness For Duty Management Action with regard to:

  • Initiatives Taken / Lessons Learned
  • Reportable Fitness For Duty Events under 10CFR26.73 If you have questions in regard to the Performance Data Report, please contact me at (573) 676-8129.

Sincerely, Luke H. Graessle Manager, Regulatory Affairs LHG: DSH: KRF: AEE/rmm Enclosure X402-(

a subsidiaryof Ameren Corporation

ULNRC05474 February 7, 2008 Page 2 cc: Mr. Elmo E. Collins, Jr.

Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack N. Donohew Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O-8B1 Washington, DC 20555-2738 Mr. Mohan C. Thadani (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O-8G14 Washington, DC 20555-2738

ULNRC05474 February 7, 2008 Page 3 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4200 South Hulen, Suite 422 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed).

Electronic distribution for the following can be made via Other Situations ULNRC Distribution:

C. D. Naslund A. C. Heflin L. H. Graessle G. A. Hughes S. A. Maglio S. L. Gallagher L. M. Belsky (NSRB)

T. B. Elwood Ms. Diane M. Hooper Mr. Dennis Buschbaum Supervisor, Licensing TXU Power WCNOC Comanche Peak SES P.O. Box 411 P.O. Box 1002 Burlington, KS 66839 Glen Rose, TX 76043 Mr. Scott Bauer Mr. Stan Ketelsen Regulatory Affairs Manager, Regulatory Services Palo Verde NGS Pacific Gas & Electric P.O. Box 52034, Mail Stop 104/5/536 Mail Station 7636 P.O. Box 56 Phoenix, AZ 85072-2034 Avila Beach, CA 93424 Mr. Scott Head Mr. John O'Neill Supervisor, Licensing Pillsbury Winthrop Shaw Pittman LLP South Texas Project NOC 2300 N. Street N.W.

Mail Code N5014 Washington, DC 20037 P.O. Box 289 Wadsworth, TX 77483 Missouri Public Service Commission Governor Office Building 200 Madison Street PO Box 360 Jefferson City, MO 65102-0360

ULNRC05474 February 7, 2008 Fitness For Duty Program Performance Data Personnel Subject to 10CFR26 (NUMARC Rev. Date 1/92)

AmerenUE July 1 -Dec 31, 2007 Company 6 Months Callaway Plant Location Aaron Enloe (573) 676-4300 Contact Name Phone (Include Area Code)

Cuttoffs: Screen/Confirmation (ng/ml) D Appendix A to 10CFR26 Marijuana 20/ 15 Amphetamines 1000/ 250 Cocaine 300/ 150 Phencyclidine 25/ 25 Opiates 300/ 150 Alcohol (.04% BAC)

Long-Term Short-Term Testing Results Licensee Employees Contractor-Personnel Contractor-Personnel Average Number with Unescorted Access 841 223 219 Categories # # # # # #

Tested Positive Tested Positive Tested Positive Pre-Access 51 0 0 0 83 0 Post Accident 2 0 0 0 1 0 Observed Behavior 0 0 0 0 0 0 Random 218 0 66 0 63 0 Follow-up 9 0 2 0 1 1 Other 6 0 1 0 3 0 Total 286 0 69 0 151 1 Attachment A Page 1 of 2

ULNRC05474 February 7, 2008 Breakdown of Confirmed Positive Tests for Specific Substances

  • -~. I - - 'I -. - V U. I.

I*j~

-y*,~io

..... a l I**

L1an,111

,1 , ~u-j *Apifp ~aIIIesC PIhen\cycIdill c. ~oii~V I,* ,

' c f,, l'*, t In'c,,ils

"

Licenisee 0 0 0 0 0 0 0 0 0 0

ýEmployees____ ____

Lon(Y-Termi 0 0 0 0 0 0 0 0 0 0 Contractors :

Short-ftorS 0 1 0 0 0 0 0 0 0 0

-Co~ntractors-ý 10 0 0 0 0 0 TOTAL

  • Left Side Record of test results that would have been Positive at the NRC cutoff level.

Right Side Record of MRO confirmed positives based on Union Electric's more stringent cutoff level.

Attachment A Page 2 of 2

ULNRC05474 February 7, 2008 Initiatives Taken:

None.

Reportable Fitness For Duty Events Under 10CFR26.73:

None.

Mannaement Actions:

One short term contractor tested positive for Marijuana during a Follow-up collection.

Their access to the plant was denied.

Test Results:

Ameren UE Callaway Nuclear Plant performs random testing of the workforce at an annual rate Of at least 50% ih accordance with 10CFR26.24.a'.'2. For the six months beginning July 1, 2007 and ending December 31, 2007 random screens were performed at a rate of 27.0% of the population.

Attachment B Page 1 of I