ML080790026: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:AC Sources --Operating 3.8.1 SURVEILLANCE REQUiR__MENTS SURVEILLANCE FREQUENCY SR 3.8.1.1 Verify correct breaker alignment and 7 days indicated power availability for each offsite circuit.-SR 3.8.1.2 ------------------- | {{#Wiki_filter:AC Sources -- Operating 3.8.1 SURVEILLANCE REQUiR__MENTS SURVEILLANCE FREQUENCY SR 3.8.1.1 Verify correct breaker alignment and 7 days indicated power availability for each offsite circuit.- | ||
NOTES ------------------- | SR 3.8.1.2 ------------------- NOTES ------------------- | ||
: 1. All EDG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.2. A modified EDG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer. | : 1. All EDG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading. | ||
Verify each EDG starts and achieves steady 31 days state voltage 2 3873 V and -4580 V and frequency 2 58.8 Hz and : 61.2 Hz.SR 3.8.1.3 ..... --............ | : 2. A modified EDG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer. | ||
NOTES .................--- | Verify each EDG starts and achieves steady 31 days state voltage 2 3873 V and - 4580 V and frequency 2 58.8 Hz and : 61.2 Hz. | ||
: 1. EDG loadings may include gradual loading as recommended by the manufacturer. | SR 3.8.1.3 ..... - -............ NOTES .................--- | ||
: 2. Momentary transients below the load limit do not invalidate this test.3. This Surveillance shall be conducted on only one EDG at a time.................... | : 1. EDG loadings may include gradual loading as recommended by the manufacturer. | ||
'........................ | : 2. Momentary transients below the load limit do not invalidate this test. | ||
Verify each EDG is synchronized and loaded 31 days and operates for a 60 minutes at a load 2 2500 kW.(continued) | : 3. This Surveillance shall be conducted on only one EDG at a time. | ||
FERMI -UNIT 2 3.8-3.Amendment No. X# 178 AC Sources --Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued) | ................... '........................ | ||
SURVEILLANCE FREQUENCY SR 3.8.1.4 Verify each day tank contains Z:210 gal of 31 days fuel oil.SR 3.8.1.5 Check for and remove accumulated water from 31 days each day tank.SR 3.8.1.6 Verify each fuel oil transfer system 31 days operates to automatically transfer fuel oil from storage tanks to the day tanks.SR 3.8.1.7 ................... | Verify each EDG is synchronized and loaded 31 days and operates for a 60 minutes at a load 2 2500 kW. | ||
NOTE .................... | (continued) | ||
All EDG starts-may be preceded by an engine-prelube period and followed by a warmup period prior to loading.Verify each EDG starts from standby 184 days condition and achieves: a. In : 10 seconds. voltage > 3873 V and frequency | FERMI - UNIT 2 3.8-3 . Amendment No. X# 178 | ||
> 58.8 Hz; and b. Steady state voltage a 3873 V and:9 4580 V and frequency k 58.8 Hz and:5 61.2 Hz.SR 3.8.1.8 Verify each EDG rejects a load greater than 18 months or equal to its associated single largest post-accident load, and following load rejection, the frequency is :9 66.75 Hz.(continued) | |||
AC Sources -- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued) | |||
SURVEILLANCE I FREQUENCY SR 3.8.1.9 Verify each EDG does not trip and voltage 18 months is maintained | SURVEILLANCE FREQUENCY SR 3.8.1.4 Verify each day tank contains Z:210 gal of 31 days fuel oil. | ||
< 5267 V during and following a load rejection of 2 2850 kW.SR 3.8.1.10 ................... | SR 3.8.1.5 Check for and remove accumulated water from 31 days each day tank. | ||
NOTE .................... | SR 3.8.1.6 Verify each fuel oil transfer system 31 days operates to automatically transfer fuel oil from storage tanks to the day tanks. | ||
All EDG starts may be preceded by an engine prelube period.Verify on simulated loss of offsite power 18 months ,signal: a. De-energization of emergency buses:....b,.. Load shedding. | SR 3.8.1.7 ................... NOTE .................... | ||
from emergency buses:.and c. EDG auto-starts and: 1. energizes permanently connected loads in : 10 seconds.2. energizes auto-connected shutdown loads through load sequencer,- | All EDG starts-may be preceded by an engine-prelube period and followed by a warmup period prior to loading. | ||
: 3. maintains steady state voltage> 3873 V and | Verify each EDG starts from standby 184 days condition and achieves: | ||
FERMI -UNIT 2 3.8-5 Amendment No. M4, 1#178 AC Sources --Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued) | : a. In : 10 seconds. voltage > 3873 V and I frequency > 58.8 Hz; and | ||
,11DI/rTL AIIAuCE FREQUENCY" | : b. Steady state voltage a 3873 V and | ||
NOTE&- ............... | :9 4580 V and frequency k 58.8 Hz and | ||
All EDG starts may be preceded by an engine prelube period..... ....................... | :5 61.2 Hz. | ||
°. o............... | SR 3.8.1.8 Verify each EDG rejects a load greater than 18 months or equal to its associated single largest post-accident load, and following load rejection, the frequency is :9 66.75 Hz. | ||
Verify on an actual or simulated Emergency 18 months Core Cooling System (ECCS) initiation signal each EDG auto-starts and: a. In 5 10 seconds after auto-start and during tests, achieves voltage L 3873 V and frequency>ý 58.8 Hz: b. Achieves steady state voltage k 3873 V and : 4580 V. and frequency 2 58.8 Hz and | (continued) | ||
: b. Generator differential current;c. Low lube oil pressure;d. Crankcase overpressure; and e. Failure to start.(continued) | FERMI -UNIT 2 3.8-4 Amendment No. X# 178 | ||
S4RVILLANCE FREQUENCY SR 3.8.1.13 .................. | AC Sources -- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued) | ||
NOTE --------------------- | SURVEILLANCE I FREQUENCY SR 3.8.1.9 Verify each EDG does not trip and voltage 18 months is maintained < 5267 V during and following a load rejection of 2 2850 kW. | ||
Momentary transients outside the load range do not invalidate this test.Verify each EDG operates for -24 hours: 18 months a. For all but the final k 2 hours loaded k 2500 kW and : 2600 kW: and b. For the final > 2 hours of the test loaded 2 2800 kW and ! 2900 kW.SR 3.8.1.14 -------.--------- | SR 3.8.1.10 ................... NOTE .................... | ||
NOTES ------------------- | All EDG starts may be preceded by an engine prelube period. | ||
Verify on simulated loss of offsite power 18 months | |||
,signal: | |||
: a. De-energization of emergency buses: | |||
....b,.. Load shedding. from emergency buses:. | |||
and | |||
: c. EDG auto-starts and: | |||
: 1. energizes permanently connected loads in : 10 seconds. | |||
: 2. energizes auto-connected shutdown loads through load sequencer,- | |||
: 3. maintains steady state voltage | |||
> 3873 V and | |||
* 4580 V, | |||
: 4. maintains steady state frequency | |||
: 58.8 Hz and | |||
* 61.2 Hz, and | |||
: 5. supplies permanently connected and auto-connected shutdown loads for | |||
> 5 minutes. | |||
(continued) | |||
FERMI -UNIT 2 3.8-5 Amendment No. M4, 1#178 | |||
AC Sources -- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued) | |||
,11DI/rTL | |||
.. ~l*l IL.,.IJ*tLlt AIIAuCE FREQUENCY" SR 3.8.1.11 .................... NOTE&- ............... | |||
All EDG starts may be preceded by an engine prelube period. | |||
.... ....................... °. o............... | |||
Verify on an actual or simulated Emergency 18 months Core Cooling System (ECCS) initiation signal each EDG auto-starts and: | |||
: a. In 5 10 seconds after auto-start and during tests, achieves voltage L 3873 V and frequency>ý 58.8 Hz: I I | |||
: b. Achieves steady state voltage k 3873 V and : 4580 V. and frequency 2 58.8 Hz and | |||
* 61.2 Hz; and | |||
: c. Operates for 2 5 minutes. | |||
SR 3.8.1.12 Verify each EDG's automatic trips are 18 months bypassed on an actual or simulated emergency start signal except: | |||
: a. Engine overspeed: | |||
: b. Generator differential current; | |||
: c. Low lube oil pressure; | |||
: d. Crankcase overpressure; and | |||
: e. Failure to start. | |||
(continued) | |||
FERMI - UNIT 2 3.8-6 Amendment No. %#K*' 178 | |||
AC Sources -- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued) | |||
S4RVILLANCE FREQUENCY SR 3.8.1.13 .................. NOTE --------------------- | |||
Momentary transients outside the load range do not invalidate this test. | |||
Verify each EDG operates for - 24 hours: 18 months | |||
: a. For all but the final k 2 hours loaded k 2500 kW and : 2600 kW: and | |||
: b. For the final > 2 hours of the test loaded 2 2800 kW and ! 2900 kW. | |||
SR 3.8.1.14 -------.--------- NOTES ------------------- | |||
: 1. This Surveillance shall be performed within 5 minutes of shutting down the EDG after the EDG has operated k 2 hours loaded > 2500 kW or until operating temperatures have stabilized. | : 1. This Surveillance shall be performed within 5 minutes of shutting down the EDG after the EDG has operated k 2 hours loaded > 2500 kW or until operating temperatures have stabilized. | ||
Momentary transients below the load limit do not invalidate this test.2. All EDG starts may be preceded by an engine prelube period...................................... | Momentary transients below the load limit do not invalidate this test. | ||
Verify each EDG starts and achieves: | : 2. All EDG starts may be preceded by an engine prelube period. | ||
18 months a. In :T 10 seconds, voltage k 3873 V and frequency | ..................................... | ||
> 58.8 Hz; and b. Steady state voltage 2 3873 V and: 4580 V and frequency | Verify each EDG starts and achieves: 18 months | ||
> 58.8 Hz and 61.2 Hz.(continued) | : a. In :T 10 seconds, voltage k 3873 V and I frequency > 58.8 Hz; and | ||
: b. Steady state voltage 2 3873 V and | |||
SJRVEILLA.NCE FREQUENCY SR 3.8.1.17 ------------------- | : 4580 V and frequency > 58.8 Hz and | ||
NOTE .................... | * 61.2 Hz. | ||
All EDG starts may be preceded by an engine prelube period.................................... | (continued) | ||
.... ....Verify, on simulated loss of offsite power 18 months signal in conjunction with an actual or simulated ECCS initiation signal: a. De-energization of emergency buses;b. Load shedding from emergency buses;and c. EDG auto-starts and: 1. -energizes permanently connected loads in _< 10 seconds.2. energizes auto-connected emergency loads through load sequencer, 3. achieves steady state voltage k 3873 V and _- 4580 V.4. achieves steady state frequency k 58.8 Hz and < 61.2 Hz. and 5. supplies permanently connected and auto-connected emergency loads for k 5 minutes.SR 3.8.1.18 ................... | FERMI -UNIT 2 3.8-7 Amendment No. 4 178 | ||
NOTE ------------------- | |||
All EDG starts may be preceded by an engine prelube period.°..... ................ | AC Sources -- Operating 3.8.1 A | ||
... ..... ......... | SURVEILLANCE REQUIREMENTS (continued) | ||
.....Verify, when started simultaneously each 10 years EDG achieves, in : 10 seconds. frequency k 58.8 Hz.FERMI -UNIT 2 3.8-9 Amendment No. W 178}} | SJRVEILLA.NCE FREQUENCY SR 3.8.1.17 ------------------- NOTE .................... | ||
All EDG starts may be preceded by an engine prelube period. | |||
................................... .... .... | |||
Verify, on simulated loss of offsite power 18 months signal in conjunction with an actual or simulated ECCS initiation signal: | |||
: a. De-energization of emergency buses; | |||
: b. Load shedding from emergency buses; and | |||
: c. EDG auto-starts and: | |||
: 1. - energizes permanently connected loads in _<10 seconds. | |||
: 2. energizes auto-connected emergency loads through load sequencer, | |||
: 3. achieves steady state voltage k 3873 V and _-4580 V. | |||
: 4. achieves steady state frequency k 58.8 Hz and < 61.2 Hz. and | |||
: 5. supplies permanently connected and auto-connected emergency loads for k 5 minutes. | |||
SR 3.8.1.18 ................... NOTE ------------------- | |||
All EDG starts may be preceded by an engine prelube period. | |||
°..... ................ ... ..... ......... ..... | |||
Verify, when started simultaneously each 10 years EDG achieves, in : 10 seconds. frequency k 58.8 Hz. | |||
FERMI -UNIT 2 3.8-9 Amendment No. W 178}} | |||
Revision as of 18:34, 14 November 2019
| ML080790026 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 03/17/2008 |
| From: | NRC/NRR/ADRO/DORL/LPLIII-1 |
| To: | |
| Milano P, NRR/DORL/LPLA, 415-1457 | |
| Shared Package | |
| ML080290283 | List: |
| References | |
| TAC MD4930 | |
| Download: ML080790026 (6) | |
Text
AC Sources -- Operating 3.8.1 SURVEILLANCE REQUiR__MENTS SURVEILLANCE FREQUENCY SR 3.8.1.1 Verify correct breaker alignment and 7 days indicated power availability for each offsite circuit.-
SR 3.8.1.2 ------------------- NOTES -------------------
- 1. All EDG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.
- 2. A modified EDG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer.
Verify each EDG starts and achieves steady 31 days state voltage 2 3873 V and - 4580 V and frequency 2 58.8 Hz and : 61.2 Hz.
SR 3.8.1.3 ..... - -............ NOTES .................---
- 1. EDG loadings may include gradual loading as recommended by the manufacturer.
- 2. Momentary transients below the load limit do not invalidate this test.
- 3. This Surveillance shall be conducted on only one EDG at a time.
................... '........................
Verify each EDG is synchronized and loaded 31 days and operates for a 60 minutes at a load 2 2500 kW.
(continued)
FERMI - UNIT 2 3.8-3 . Amendment No. X# 178
AC Sources -- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.8.1.4 Verify each day tank contains Z:210 gal of 31 days fuel oil.
SR 3.8.1.5 Check for and remove accumulated water from 31 days each day tank.
SR 3.8.1.6 Verify each fuel oil transfer system 31 days operates to automatically transfer fuel oil from storage tanks to the day tanks.
SR 3.8.1.7 ................... NOTE ....................
All EDG starts-may be preceded by an engine-prelube period and followed by a warmup period prior to loading.
Verify each EDG starts from standby 184 days condition and achieves:
- a. In : 10 seconds. voltage > 3873 V and I frequency > 58.8 Hz; and
- b. Steady state voltage a 3873 V and
- 9 4580 V and frequency k 58.8 Hz and
- 5 61.2 Hz.
SR 3.8.1.8 Verify each EDG rejects a load greater than 18 months or equal to its associated single largest post-accident load, and following load rejection, the frequency is :9 66.75 Hz.
(continued)
FERMI -UNIT 2 3.8-4 Amendment No. X# 178
AC Sources -- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE I FREQUENCY SR 3.8.1.9 Verify each EDG does not trip and voltage 18 months is maintained < 5267 V during and following a load rejection of 2 2850 kW.
SR 3.8.1.10 ................... NOTE ....................
All EDG starts may be preceded by an engine prelube period.
Verify on simulated loss of offsite power 18 months
,signal:
- a. De-energization of emergency buses:
....b,.. Load shedding. from emergency buses:.
and
- c. EDG auto-starts and:
- 1. energizes permanently connected loads in : 10 seconds.
- 2. energizes auto-connected shutdown loads through load sequencer,-
- 3. maintains steady state voltage
> 3873 V and
- 4580 V,
- 4. maintains steady state frequency
- 58.8 Hz and
- 61.2 Hz, and
- 5. supplies permanently connected and auto-connected shutdown loads for
> 5 minutes.
(continued)
FERMI -UNIT 2 3.8-5 Amendment No. M4, 1#178
AC Sources -- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
,11DI/rTL
.. ~l*l IL.,.IJ*tLlt AIIAuCE FREQUENCY" SR 3.8.1.11 .................... NOTE&- ...............
All EDG starts may be preceded by an engine prelube period.
.... ....................... °. o...............
Verify on an actual or simulated Emergency 18 months Core Cooling System (ECCS) initiation signal each EDG auto-starts and:
- a. In 5 10 seconds after auto-start and during tests, achieves voltage L 3873 V and frequency>ý 58.8 Hz: I I
- b. Achieves steady state voltage k 3873 V and : 4580 V. and frequency 2 58.8 Hz and
- 61.2 Hz; and
- c. Operates for 2 5 minutes.
SR 3.8.1.12 Verify each EDG's automatic trips are 18 months bypassed on an actual or simulated emergency start signal except:
- a. Engine overspeed:
- b. Generator differential current;
- c. Low lube oil pressure;
- d. Crankcase overpressure; and
- e. Failure to start.
(continued)
FERMI - UNIT 2 3.8-6 Amendment No. %#K*' 178
AC Sources -- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
S4RVILLANCE FREQUENCY SR 3.8.1.13 .................. NOTE ---------------------
Momentary transients outside the load range do not invalidate this test.
Verify each EDG operates for - 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s: 18 months
- a. For all but the final k 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded k 2500 kW and : 2600 kW: and
- b. For the final > 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of the test loaded 2 2800 kW and ! 2900 kW.
SR 3.8.1.14 -------.--------- NOTES -------------------
- 1. This Surveillance shall be performed within 5 minutes of shutting down the EDG after the EDG has operated k 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded > 2500 kW or until operating temperatures have stabilized.
Momentary transients below the load limit do not invalidate this test.
- 2. All EDG starts may be preceded by an engine prelube period.
.....................................
Verify each EDG starts and achieves: 18 months
- a. In :T 10 seconds, voltage k 3873 V and I frequency > 58.8 Hz; and
- b. Steady state voltage 2 3873 V and
- 4580 V and frequency > 58.8 Hz and
- 61.2 Hz.
(continued)
FERMI -UNIT 2 3.8-7 Amendment No. 4 178
AC Sources -- Operating 3.8.1 A
SURVEILLANCE REQUIREMENTS (continued)
SJRVEILLA.NCE FREQUENCY SR 3.8.1.17 ------------------- NOTE ....................
All EDG starts may be preceded by an engine prelube period.
................................... .... ....
Verify, on simulated loss of offsite power 18 months signal in conjunction with an actual or simulated ECCS initiation signal:
- a. De-energization of emergency buses;
- b. Load shedding from emergency buses; and
- c. EDG auto-starts and:
- 1. - energizes permanently connected loads in _<10 seconds.
- 2. energizes auto-connected emergency loads through load sequencer,
- 3. achieves steady state voltage k 3873 V and _-4580 V.
- 4. achieves steady state frequency k 58.8 Hz and < 61.2 Hz. and
- 5. supplies permanently connected and auto-connected emergency loads for k 5 minutes.
SR 3.8.1.18 ................... NOTE -------------------
All EDG starts may be preceded by an engine prelube period.
°..... ................ ... ..... ......... .....
Verify, when started simultaneously each 10 years EDG achieves, in : 10 seconds. frequency k 58.8 Hz.
FERMI -UNIT 2 3.8-9 Amendment No. W 178