ML082770628: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY  
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY- RELATED INFORMATION
- SECURITY- RELATED INFORMATION
                                                  UNITED STATES
  OFFICIAL USE ONLY
                                  NUC LE AR RE G UL AT O RY C O M M I S S I O N
- SECURITY- RELATED INFORMATION
                                                    R E GI ON I V
  October 3, 2008  
                                        612 EAST LAMAR BLVD , SU I TE 400
                                        AR LI N GTON , TEXAS 76011-4125
Mr. Ross T. Ridenoure Senior Vice President and Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station  
                                          October 3, 2008
P.O. Box 128 San Clemente, CA 92674-0128  
Mr. Ross T. Ridenoure
  SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 - SITE-SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES TEMPORARY INSTRUCTION INSPECTION (NRC INSPECTION REPORT 05000361/2008007 AND 05000362/2008007)  
Senior Vice President and Chief Nuclear Officer
Dear Mr. Ridenoure:  
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
SUBJECT:       SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 -
              SITE-SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING
              STRATEGIES TEMPORARY INSTRUCTION INSPECTION (NRC INSPECTION
              REPORT 05000361/2008007 AND 05000362/2008007)
Dear Mr. Ridenoure:
On August 22, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a site-specific
implementation of B.5.b, Phase 2 and 3, temporary instruction team inspection of your San
Onofre Nuclear Generating Station, Units 2 and 3. The enclosed report documents the teams
results, which were discussed on August 22, 2008, with Mr. A. Hochevar and other members of
your staff.
The inspection examined activities conducted under your license as they relate to the
implementation of B.5.b, Phase 2 and 3, mitigating strategies, your compliance with the
Commissions rules and regulations, and with the condition of your operating license. Within
these areas, the inspection involved examination of selected procedures and records,
observation of activities, and interviews with station personnel.
Based on the results of this inspection, no findings of significance were identified.
      OFFICIAL USE ONLY - SECURITY- RELATED INFORMATION


On August 22, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a site-specific implementation of B.5.b, Phase 2 and 3, temporary instruction team inspection of your San Onofre Nuclear Generating Station, Units 2 and 3.  The enclosed report documents the team's results, which were discussed on August 22, 2008, with Mr. A. Hochevar and other members of
      OFFICIAL USE ONLY - SECURITY- RELATED INFORMATION
your staff.
Southern California Edison Company             -2-
The inspection examined activities conducted under your license as they relate to the implementation of B.5.b, Phase 2 and 3, mitigating strategies, your compliance with the Commission's rules and regulations, and with the condition of your operating license.  Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel. Based on the results of this inspection, no findings of significance were identified. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
OFFICIAL USE ONLY  
available electronically for public inspection in the NRC Public Document Room or from the
- SECURITY- RELATED INFORMATION
Publicly Available Records component of NRCs document system (ADAMS). ADAMS is
  Southern California Edison Company - 2 -  
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
OFFICIAL USE ONLY
Electronic Reading Room). However, because of the sensitive information contained in the
- SECURITY- RELATED INFORMATIO
enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the  
available for public inspection.
enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.  
                                                Sincerely,
Sincerely,
                                                /RA/
/RA/   Ryan E. Lantz, Chief Operations Branch  
                                                Ryan E. Lantz, Chief
Division of Reactor Safety  
                                                Operations Branch
Dockets:   50-361; 50-362 Licenses: NPF-10; NPF-15  
                                                Division of Reactor Safety
Nonpublic Enclosure:   Inspection Report 05000361/2008007; 05000362/2008007  
Dockets: 50-361; 50-362
   w/Attachment: Supplemental Information  
Licenses: NPF-10; NPF-15
cc w/o enclosure: Vice President and Site Manager Southern California Edison Company  
Nonpublic Enclosure:
San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128  
Inspection Report 05000361/2008007; 05000362/2008007
Mr. A. Edward Scherer  
   w/Attachment: Supplemental Information
Director, Nuclear Regulatory Affairs Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128  
cc w/o enclosure:
 
Vice President and Site Manager
Mr. James T. Reilly Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
Mr. A. Edward Scherer
Director, Nuclear Regulatory Affairs
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
Mr. James T. Reilly
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
      OFFICIAL USE ONLY - SECURITY- RELATED INFORMATION
}}
}}

Latest revision as of 12:21, 14 November 2019

Site Specific Implementation of B.5.b Phase 2 and 3 Mitigating Strategies Temporary Instruction Inspection (IR 05000361-08-007 and 05000362-08-007)
ML082770628
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 10/03/2008
From: Ryan Lantz
NRC/RGN-IV/DNMS/OB
To: Ridenoure R
Southern California Edison Co
Lynn berger
References
IR-08-007
Download: ML082770628 (2)


See also: IR 05000361/2008007

Text

OFFICIAL USE ONLY - SECURITY- RELATED INFORMATION

UNITED STATES

NUC LE AR RE G UL AT O RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

October 3, 2008

Mr. Ross T. Ridenoure

Senior Vice President and Chief Nuclear Officer

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 -

SITE-SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING

STRATEGIES TEMPORARY INSTRUCTION INSPECTION (NRC INSPECTION

REPORT 05000361/2008007 AND 05000362/2008007)

Dear Mr. Ridenoure:

On August 22, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a site-specific

implementation of B.5.b, Phase 2 and 3, temporary instruction team inspection of your San

Onofre Nuclear Generating Station, Units 2 and 3. The enclosed report documents the teams

results, which were discussed on August 22, 2008, with Mr. A. Hochevar and other members of

your staff.

The inspection examined activities conducted under your license as they relate to the

implementation of B.5.b, Phase 2 and 3, mitigating strategies, your compliance with the

Commissions rules and regulations, and with the condition of your operating license. Within

these areas, the inspection involved examination of selected procedures and records,

observation of activities, and interviews with station personnel.

Based on the results of this inspection, no findings of significance were identified.

OFFICIAL USE ONLY - SECURITY- RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY- RELATED INFORMATION

Southern California Edison Company -2-

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records component of NRCs document system (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room). However, because of the sensitive information contained in the

enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be

available for public inspection.

Sincerely,

/RA/

Ryan E. Lantz, Chief

Operations Branch

Division of Reactor Safety

Dockets: 50-361; 50-362

Licenses: NPF-10; NPF-15

Nonpublic Enclosure:

Inspection Report 05000361/2008007; 05000362/2008007

w/Attachment: Supplemental Information

cc w/o enclosure:

Vice President and Site Manager

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

Mr. A. Edward Scherer

Director, Nuclear Regulatory Affairs

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

Mr. James T. Reilly

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

OFFICIAL USE ONLY - SECURITY- RELATED INFORMATION