{{#Wiki_filter:October 8, 2008  
{{#Wiki_filter:UNITE D S TATE S
 
                                NUC LEAR RE GULATOR Y C OMMI S SI ON
Mr. Ross T. Ridenoure Senior Vice President and  Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station  
                                                  RE G IO N I V
P.O. Box 128 San Clemente, CA 92674-0128  
                                        612 EAST LAMAR BLVD , SU ITE 400
  SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000361/2008005 AND 05000362/2008005) AND REQUEST FOR INFORMATION  
                                        AR L INGTON , TEXAS 7 60 11 - 4125
Dear Mr. Ridenoure:  
                                            October 8, 2008
From October 20-31, 2008, reactor inspectors from the U. S. Nuclear Regulatory Commission's (NRC) Region IV office will perform the baseline inservice inspection at  
Mr. Ross T. Ridenoure
San Onofre Nuclear Generating Station, using NRC Inspection Procedure 71111.08. Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group (Section A  
Senior Vice President and
of the enclosure) identified information to be provided prior to the inspection to ensure that the inspectors are adequately prepared. The second group (Section B of the enclosure) identifies the information the inspectors will need upon arrival at the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.  
   Chief Nuclear Officer
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
SUBJECT:       SAN ONOFRE NUCLEAR GENERATING STATION - NOTIFICATION OF
                INSPECTION (NRC INSPECTION REPORT 05000361/2008005 AND
                05000362/2008005) AND REQUEST FOR INFORMATION
Dear Mr. Ridenoure:
From October 20-31, 2008, reactor inspectors from the U. S. Nuclear Regulatory
Commissions (NRC) Region IV office will perform the baseline inservice inspection at
San Onofre Nuclear Generating Station, using NRC Inspection Procedure 71111.08.
Experience has shown that this inspection is a resource intensive inspection both for the NRC
inspectors and your staff. In order to minimize the impact to your onsite resources and to
ensure a productive inspection, we have enclosed a request for documents needed for this
inspection. These documents have been divided into two groups. The first group (Section A
of the enclosure) identified information to be provided prior to the inspection to ensure that the
inspectors are adequately prepared. The second group (Section B of the enclosure) identifies
the information the inspectors will need upon arrival at the site. It is important that all of these
documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. Dave Axline of your licensing
organization. Our inspection dates are subject to change based on your updated schedule of
outage activities. If there are any questions about this inspection or the material requested,
please contact the lead inspector Shiattin Makor at (817)276-6507 (Shiattin.Makor@nrc.gov ).


We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Dave Axline of your licensing organization.  Our inspection dates are subject to change based on your updated schedule of outage activities.  If there are any questions about this inspection or the material requested, please contact the lead inspector Shiattin Makor at (817)276-6507 (Shiattin.Makor@nrc.gov ).  UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
Southern California Edison Company             -2-
Southern California Edison Company - 2 -  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
enclosure will be available electronically for public inspection in the NRC Public Document
  Sincerely,   /RA/  
Room or from the Publicly Available Records (PARS) component of NRCs document
  Russell L. Bywater, Chief Engineering Branch 1 Division of Reactor Safety  
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
Dockets:   50-361; 50-362 Licenses: NPF-10; NPF-15  
rm/adams.html (the Public Electronic Reading Room).
                                                        Sincerely,
                                                            /RA/
                                                        Russell L. Bywater, Chief
                                                        Engineering Branch 1
                                                        Division of Reactor Safety
Dockets: 50-361; 50-362
Licenses: NPF-10; NPF-15
Enclosures:
Documentation requested
prior to and during the inspection
cc w/enclosure:
Chairman, Board of Supervisors
County of San Diego
1600 Pacific Highway, Room 335
San Diego, CA 92101
Gary L. Nolff
Power Projects/Contracts Manager
Riverside Public Utilities
2911 Adams Street
Riverside, CA 92504
Eileen M. Teichert, Esq.
Supervising Deputy City Attorney
City of Riverside
3900 Main Street
Riverside, CA 92522
Gary Yamamoto, Chief
Division of Drinking Water and
  Environmental Management
Dept. of Public Health
1616 Capitol Avenue, Mail Stop 7400
P.O. Box 997413
Sacramento, CA 95899-7413


Enclosures:  Documentation requested  prior to and during the inspection
Southern California Edison Company    -3-
Mike DeMarco
cc w/enclosure: Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, CA 92101
San Diego Gas & Electric Company
8315 Century Park Court
CP21G
San Diego, CA 92123-1548
Gary Butner
Chief, Radiologic Health Branch
State Department of Health Services
P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-7414
Mayor
City of San Clemente
100 Avenida Presidio
San Clemente, CA 92672
James D. Boyd, Commissioner
California Energy Commission
1516 Ninth Street (MS 34)
Sacramento, CA 95814
Douglas K. Porter, Esq.
Southern California Edison Company
2244 Walnut Grove Avenue
Rosemead, CA 91770
James T. Reilly
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
Daniel P. Breig
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
A. Edward Scherer
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
Albert R. Hochevar
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128


Gary L. Nolff Power Projects/Contracts Manager Riverside Public Utilities 2911 Adams Street
Southern California Edison Company          -4-
Riverside, CA  92504
Electronic distribution by RIV:
Eileen M. Teichert, Esq. Supervising Deputy City Attorney City of Riverside
Regional Administrator (Elmo.Collins@nrc.gov )
3900 Main Street Riverside, CA  92522
DRP Director (Dwight.Chamberlain@nrc.gov)
Gary Yamamoto, Chief Division of Drinking Water and    Environmental Management Dept. of Public Health
DRP Deputy Director (Anton.Vegel@nrc.gov )
1616 Capitol Avenue, Mail Stop 7400 P.O. Box 997413 Sacramento, CA  95899-7413
DRS Director (Roy.Caniano@nrc.gov )
 
DRS Deputy Director (Troy.Pruett@nrc.gov)
Southern California Edison Company  - 3 -  
Senior Resident Inspector (Greg.Warnick@nrc.gov)
Mike DeMarco San Diego Gas & Electric Company 8315 Century Park Court CP21G
Resident Inspector (John.Reynoso@nrc.gov )
San Diego, CA  92123-1548
Branch Chief, DRP/D (Michael.Hay@nrc.gov)
Gary Butner Chief, Radiologic Health Branch State Department of Health Services
Senior Project Engineer, DRP/D (Don.Allen@nrc.gov )
P.O. Box 997414 (MS 7610) Sacramento, CA  95899-7414
SO Site Secretary (Heather.Hutchinson@nrc.gov )
Mayor  City of San Clemente 100 Avenida Presidio San Clemente, CA  92672
Public Affairs Officer (Victor.Dricks@nrc.gov )
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )
RITS Coordinator (Marisa.Herrera@nrc.gov )
SUNSI Review Completed: _RLB__ ADAMS: X Yes                  No      Initials: __RLB_
X Publicly Available        Non-Publicly Available    Sensitive      X Non-Sensitive
R:REACTORS/SO 2008005 rqst ltr-STM                                      ML082820538
EB1                  EB1                                                    EB1: Chief
STMakor              BWHenderson                                            RLBywater
/RA/                  /RA/                                                    /RA/
10/8/08              10/8/08                                                10/8/08
OFFICIAL RECORD COPY T=Telephone                  E=E-mail    F=Fax


James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 34) Sacramento, CA  95814
                        INSERVICE INSPECTION DOCUMENT REQUEST
Inspection Dates:            October 20-31, 2008
Inspection Procedures:      IP 71111.08 Inservice Inspection (ISI) Activities
                            TI 2515/172 Reactor Coolant System Dissimilar Metal Butt Welds
Inspectors:                  S. Makor, Reactor Inspector (Lead Inspector - ISI)
                            B. Henderson, Reactor Inspector
A.    Information Requested for the In-Office Preparation Week
      The following information should be sent to the Region IV office in hard copy or
      electronic format (ims.certrec.com preferred), in care of S. Makor, by October 15, 2008,
      to facilitate the selection of specific items that will be reviewed during the onsite
      inspection week. The inspector will select specific items from the information requested
      below and then request from your staff additional documents needed during the onsite
      inspection week (Section B of this enclosure). We ask that the specific items selected
      from the lists be available and ready for review on the first day of inspection. *Please
      provide requested documentation electronically if possible. If requested documents are
      large and only hard copy formats are available, please inform the inspector(s), and
      provide subject documentation during the first day of the onsite inspection. If you have
      any questions regarding this information request, please call the inspector as soon as
      possible.
A.1    ISI/Welding Programs and Schedule Information
      a)        A detailed schedule (including preliminary dates) of:
                i)      Nondestructive examinations (NDEs) planned for Class 1 & 2 systems
                        and containment, performed as part of your ASME Section XI, Risk
                        Informed (if applicable), and augmented ISI programs during the
                        upcoming outage.
                        Provide a status summary of the NDE inspection activities vs. the
                        required inspection period percentages for this Interval by category per
                        ASME Section XI, IWX-2400 (Do not provide separately if other
                        documentation requested contains this information).
                ii)    Reactor pressure vessel head (RPVH) examinations planned for the
                        upcoming outage.
                iii)    Examinations planned for Alloy 82/182/600 components that are not
                        included in the Section XI scope (If applicable).
                iv)    Examinations planned as part of your Boric Acid Corrosion Control
                        Program (Mode 3 walkdowns, bolted connection walkdowns, etc.).
                                              -1-                                        Enclosure


Douglas K. Porter, Esq. Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA  91770
          v)      Welding activities that are scheduled to be completed during the
                  upcoming outage (ASME Class 1, 2, or 3 structures, systems, or
                  components (SSCs)).
    b)    A copy of ASME Section XI Code Relief Requests and associated NRC Safety
          Evaluations applicable to the examinations identified above.
    c)    A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,
          Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code
          Class 1 & 2 systems since the beginning of the last refueling outage. This should
          include the previous Section XI pressure test(s) conducted during start up and
          any evaluations associated with the results of the pressure tests. Also, include in
          the list the NDE reports with relevant conditions in the RPVH penetration nozzles
          which have been accepted for continued service. The list of NDE reports should
          include a brief description of the SSC where the relevant condition was identified.
    d)    A list with a brief description (e.g., system, material, pipe size, weld number, and
          NDE performed) of the welds in Code Class 1 and 2 systems which have been
          fabricated due to component repair/replacement activities since the beginning of
          the last refueling outage, or are planned to be fabricated this refueling outage.
    e)    If reactor vessel weld examinations required by the ASME Code are scheduled to
          occur during the upcoming outage, provide a detailed description of the welds to
          be examined and the extent of the planned examination. Please also provide
          reference numbers for applicable procedures that will be used to conduct these
          examinations.
    f)    Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of
          Section XI of the ASME Code that have been identified since the beginning of the
          last refueling outage.
    g)    A list of any temporary non-code repairs in service (e.g., pinhole leaks).
    h)    Please provide copies of the most recent self assessments for the ISI, Welding,
          and Alloy 600 Programs.
A.2 Reactor Pressure Vessel Head (RPVH)
    a)    Provide the detailed scope of the planned NDE of the reactor vessel head which
          identifies the types of NDE methods to be used on each specific part of the
          vessel head to fulfill commitments made in response to NRC Bulletin 2002-02
          and NRC Order EA-03-009. Also, include examination scope expansion criteria
          and planned expansion sample sizes if relevant conditions are identified (If
          applicable).
    b)    A list of the standards and/or requirements that will be used to evaluate
          indications identified during NDE of the reactor vessel head (e.g., the specific
                                        -2-                                        Enclosure
 
          industry or procedural standards which will be used to evaluate potential leakage
          and/or flaw indications).
A.3 Boric Acid Corrosion Control Program (BACCP)
    a)    Copy of the procedures that govern the scope, equipment and implementation of
          the inspections required to identify boric acid leakage and the procedures for
          boric acid leakage/corrosion evaluation.
    b)    Please provide a list of leaks (including Code class of the components) that have
          been identified since the last refueling outage and associated corrective action
          documentation. If during the last cycle, the Unit was shutdown, please provide
          documentation of containment walkdown inspections performed as part of the
          BACCP.
    c)    Please provide a copy of the most recent self-assessment performed for the
          BACCP.
A.4 Steam Generator Tube (SGT) Inspections
    a)    A detailed schedule of:
          i)      SGT inspection, data analyses, and repair activities for the upcoming
                  outage (If occurring).
          ii)    SG secondary side inspection activities for the upcoming outage (If
                  occurring).
    b)    Please provide a copy of your SG ISI Inspection Program and Plan. Please
          include a copy of the Operational Assessment from last outage and a copy of the
          following documents as they become available:
          i)      Degradation Assessment
          ii)    Condition Monitoring Assessment
    c)    If you are planning on modifying your Technical Specifications such that they are
          consistent with TSTF-449, please provide copies of your correspondence with
          the NRC regarding deviations from the STS.
    d)    Copy of SG history documentation given to vendors performing eddy current (ET)
          testing of the SGs during the upcoming outage.
    e)    Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy
          Current Technique Specification Sheets (ETSS). Additionally, please provide a
          copy of EPRI Appendix H ETSS Qualification Records.
                                        -3-                                      Enclosure
 
    f)    Identify and quantify any SGT leakage experienced during the previous operating
          cycle. Also provide documentation identifying which SG was leaking and
          corrective actions completed or planned for this condition (If applicable).
    g)    Provide past history of the condition and issues pertaining to the secondary side
          of the steam generators (including items such as loose parts, fouling, top of tube
          sheet condition, crud removal amounts, etc.)
    h)    Please provide copies of your most recent self assessments of the SG
          monitoring, loose parts monitoring, and secondary side water chemistry control
          programs.
    i)    Please also indicate where the primary, secondary, and resolution analyses are
          scheduled to take place.
    j)    Please provide a summary of the scope of the SGT examinations, including
          examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the
          percentage of tubes to be examined. *Do not provide these documents
          separately if already included in other information requested.
A.5 Materials Reliability (MRP-139) Program Activities
    a)    A list of, with verification, that the baseline inspections of all applicable Dissimilar
          Metal Butt Welds (DMBWs) have been completed by December 31, 2007.
    b)    Verification that baseline inspection of hot leg and cold leg temperature DMBWs
          have been included in the inspection program and that the schedules for the
          baseline inspections are consistent with the baseline schedules in MRP-139.
    c)    A list and schedule (examination dates) of all DMBW examinations planned for
          the upcoming refueling outage. If none are scheduled, then data from previous
          examinations should be available for review.
    d)    A list and schedule for any welding to be performed on DMBWs in the upcoming
          outage. If no welding will be performed then records of previous welding on
          DMBWs and postweld NDE documentation.
    e)    A list and schedule of any stress improvement (SI) activities planned for the
          upcoming refueling outage. If none are scheduled then have qualification reports
          for any SIs previously performed.
    f)    Documentation and description of how the baseline and inservice inspection
          specifications in MRP-139 are satisfied at your facility.
                                          -4-                                        Enclosure


James T. Reilly Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128
A.6 Additional information related to all ISI activities
San Clemente, CA  92674-0128
    a)    A list with a brief description of ISI, BACCP, and SGT inspection related issues
Daniel P. Breig Southern California Edison Company San Onofre Nuclear Generating Station
          (e.g., condition reports) entered into your corrective action program since the
P.O. Box 128 San Clemente, CA  92674-0128
          beginning of the last refueling outage (for Unit 2). For example, a list based upon
A. Edward Scherer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128
          data base searches using key words related to piping or SG tube degradation
San Clemente, CA  92674-0128
          such as: ISI, ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust,
Albert R. Hochevar Southern California Edison Company San Onofre Nuclear Generating Station
          corrosion, boric acid, or errors in piping/SGT examinations.
P.O. Box 128 San Clemente, CA  92674-0128 
    b)     Please provide names and phone numbers for the following program leads:
Southern California Edison Company  - 4 -
          ISI contacts (Examination, planning)
  Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov ) DRP Director (Dwight.Chamberlain@nrc.gov) DRP Deputy Director (Anton.Vegel@nrc.gov ) DRS Director (Roy.Caniano@nrc.gov ) DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (Greg.Warnick@nrc.gov) Resident Inspector (John.Reynoso@nrc.gov ) Branch Chief, DRP/D (Michael.Hay@nrc.gov) Senior Project Engineer, DRP/D (Don.Allen@nrc.gov ) SO Site Secretary (Heather.Hutchinson@nrc.gov ) Public Affairs Officer (Victor.Dricks@nrc.gov ) Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov ) RITS Coordinator (Marisa.Herrera@nrc.gov )
          Containment Exams
   
          RPVH Exams
   
          Snubbers and Supports
   
          Repair and Replacement Program Manager
   
          Licensing Contact
  SUNSI Review Completed:  _RLB__ ADAMS:  X Yes  No            Initials: __RLB_
          Site Welding Engineer
  X  Publicly Available        Non-Publicly Available        Sensitive X  Non-Sensitive
          Boric Acid Corrosion Control Program
R:REACTORS/SO 2008005 rqst ltr-STM     ML082820538 
          SG Inspection Activities (site lead and vendor contact)
EB1 EB1  EB1: Chief STMakor BWHenderson  RLBywater /RA/ /RA/  /RA/ 10/8/08 10/8/08  10/8/08 OFFICIAL RECORD COPY  T=Telephone          E=E-mail        F=Fax 
B. Information to be provided onsite to the inspector(s) at the entrance meeting (April 28,
 
    2008):
  - 1 - Enclosure INSERVICE INSPECTION DOCUMENT REQUEST
B.1 ISI / Welding Programs and Schedule Information
  Inspection Dates: October 20-31, 2008
    a)     Updated schedules for ISI/NDE activities, including SGT inspections, planned
          welding activities, and schedule showing contingency repair plans, if available.
Inspection Procedures: IP 71111.08 "Inservice Inspection (ISI) Activities" TI 2515/172 "Reactor Coolant System Dissimilar Metal Butt Welds"
     b)    For ASME Code Class 1 and 2 welds selected by the inspector from the lists
Inspectors: S. Makor, Reactor Inspector (Lead Inspector - ISI) B. Henderson, Reactor Inspector
          provided from section A of this enclosure, please provide copies of the following
A. Information Requested for the In-Office Preparation Week
          documentation for each subject weld:
The following information should be sent to the Region IV office in hard copy or electronic format (ims.certrec.com preferred), in care of S. Makor, by October 15, 2008, to facilitate the selection of specific items that will be reviewed during the onsite inspection week.  The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week (Section B of this enclosure).  We ask that the specific items selected from the lists be available and ready for review on the first day of inspection.  *Please provide requested documentation electronically if possible.  If requested documents are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation during the first day of the onsite inspection.  If you have any questions regarding this information request, please call the inspector as soon as possible.
          i)      Weld data sheet (traveler)
A.1 ISI/Welding Programs and Schedule Information
          ii)     Weld configuration and system location
  a) A detailed schedule (including preliminary dates) of:
          iii)    Applicable Code Edition and Addenda for weldment
i) Nondestructive examinations (NDEs) planned for Class 1 & 2 systems and containment, performed as part of your ASME Section XI, Risk
          iv)      Applicable Code Edition and Addenda for welding procedures
Informed (if applicable), and augmented ISI programs during the upcoming outage.  
          v)      Applicable weld procedures (WPS) used to fabricate the welds
Provide a status summary of the NDE inspection activities vs. the required inspection period percentages for this Interval by category per
          vi)     Copies of procedure qualification records (PQRs) supporting the WPS
ASME Section XI, IWX-2400 (Do not provide separately if other documentation requested contains this information).
                    from B.1.b.v
ii)  Reactor pressure vessel head (RPVH) examinations planned for the upcoming outage.  
          vii)    Copies of mechanical test reports identified in the PQRs above
iii) Examinations planned for Alloy 82/182/600 components that are not included in the Section XI scope (If applicable).  
          viii)    Copies of the nonconformance reports for the selected welds (If
iv) Examinations planned as part of your Boric Acid Corrosion Control Program (Mode 3 walkdowns, bolted connection walkdowns, etc.).
                    applicable)
  - 2 - Enclosure
          ix)      Radiographs of the selected welds and access to equipment to allow
v) Welding activities that are scheduled to be completed during the upcoming outage (ASME Class 1, 2, or 3 structures, systems, or components (SSCs)).  
                    viewing radiographs (If RT was performed)
b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety Evaluations applicable to the examinations identified above.
          x)      Copies of the preservice examination records for the selected welds.
  c) A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate, Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code Class 1 & 2 systems since the beginning of the last refueling outage.  This should include the previous Section XI pressure test(s) conducted during start up and any evaluations associated with the results of the pressure tests. Also, include in the list the NDE reports with relevant conditions in the RPVH penetration nozzles which have been accepted for continued service.  The list of NDE reports should include a brief description of the SSC where the relevant condition was identified.  
          xi)      Copies of welder performance qualifications records applicable to the
d) A list with a brief description (e.g., system, material, pipe size, weld number, and NDE performed) of the welds in Code Class 1 and 2 systems which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage, or are planned to be fabricated this refueling outage.  
                    selected welds, including documentation that welder maintained
e) If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the upcoming outage, provide a detailed description of the welds to be examined and the extent of the planned examination. Please also provide reference numbers for applicable procedures that will be used to conduct these examinations.
                                          -5-                                      Enclosure
f) Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.  
 
g)  A list of any temporary non-code repairs in service (e.g., pinhole leaks).  
                    proficiency in the applicable welding processes specified in the WPS (at
h) Please provide copies of the most recent self assessments for the ISI, Welding, and Alloy 600 Programs.
                    least six months prior to the date of subject work)
          xii)     Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable
A.2 Reactor Pressure Vessel Head (RPVH)
    c)     For the ISI related corrective action issues selected by the inspector(s) from
  a)  Provide the detailed scope of the planned NDE of the reactor vessel head which identifies the types of NDE methods to be used on each specific part of the vessel head to fulfill commitments made in response to NRC Bulletin 2002-02 and NRC Order EA-03-009. Also, include examination scope expansion criteria and planned expansion sample sizes if relevant conditions are identified (If
          section A of this enclosure, provide a copy of the corrective actions and
applicable).
          supporting documentation.
b) A list of the standards and/or requirements that will be used to evaluate indications identified during NDE of the reactor vessel head (e.g., the specific 
    d)    For the NDE reports with relevant conditions on Code Class 1 & 2 systems
  - 3 - Enclosure industry or procedural standards which will be used to evaluate potential leakage and/or flaw indications).  
          selected by the inspector from section A above, provide a copy of the
A.3 Boric Acid Corrosion Control Program (BACCP)
          examination records, examiner qualification records, and associated corrective
  a)  Copy of the procedures that govern the scope, equipment and implementation of the inspections required to identify boric acid leakage and the procedures for boric acid leakage/corrosion evaluation.  
          action documents.
b) Please provide a list of leaks (including Code class of the components) that have been identified since the last refueling outage and associated corrective action documentation. If during the last cycle, the Unit was shutdown, please provide documentation of containment walkdown inspections performed as part of the BACCP.  c) Please provide a copy of the most recent self-assessment performed for the BACCP. A.4 Steam Generator Tube (SGT) Inspections
    e)     A copy of (or ready access to) most current revision of the ISI Program Manual
  a) A detailed schedule of:
          and Plan for the current Interval.
i)  SGT inspection, data analyses, and repair activities for the upcoming outage (If occurring).
    f)     For the NDEs selected by the inspector from section A of this enclosure, provide
ii)  SG secondary side inspection activities for the upcoming outage (If occurring).  
          copy of the NDE procedures used to perform the examinations (including
b) Please provide a copy of your SG ISI Inspection Program and Plan.  Please include a copy of the Operational Assessment from last outage and a copy of the following documents as they become available: 
          calibration and flaw characterization/sizing procedures). For ultrasonic
i) Degradation Assessment ii) Condition Monitoring Assessment 
          examination procedures qualified in accordance with ASME Code, Section XI,
c) If you are planning on modifying your Technical Specifications such that they are consistent with TSTF-449, please provide copies of your correspondence with
          Appendix VIII, provide documentation supporting the procedure qualification
the NRC regarding deviations from the STS.  
          (e.g., the EPRI performance demonstration qualification summary sheets). Also,
d) Copy of SG history documentation given to vendors performing eddy current (ET) testing of the SGs during the upcoming outage.  
          include qualification documentation of the specific equipment to be used (e.g.,
e) Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy Current Technique Specification Sheets (ETSS). Additionally, please provide a copy of EPRI Appendix H ETSS Qualification Records.  
          ultrasonic unit, cables, and transducers including serial numbers) and NDE
 
          personnel qualification records.
  - 4 - Enclosure f) Identify and quantify any SGT leakage experienced during the previous operating cycle. Also provide documentation identifying which SG was leaking and corrective actions completed or planned for this condition (If applicable).  
B.2 Reactor Pressure Vessel Head (RPVH)
g)  Provide past history of the condition and issues pertaining to the secondary side of the steam generators (including items such as loose parts, fouling, top of tube sheet condition, crud removal amounts, etc.)
    a)    Provide the NDE personnel qualification records for the examiners who will
h) Please provide copies of your most recent self assessments of the SG monitoring, loose parts monitoring, and secondary side water chemistry control
          perform examinations of the RPVH.
programs.  
    b)    Provide drawings showing the following: (If a visual examination is planned for
i) Please also indicate where the primary, secondary, and resolution analyses are scheduled to take place.
          the upcoming refueling outage)
j) Please provide a summary of the scope of the SGT examinations, including examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the
          i)      RPVH and CRDM nozzle configurations
percentage of tubes to be examined. *Do not provide these documents separately if already included in other information requested.  A.5 Materials Reliability (MRP-139) Program Activities
          ii)      RPVH insulation configuration
  a) A list of, with verification, that the baseline inspections of all applicable Dissimilar Metal Butt Welds (DMBWs) have been completed by December 31, 2007.
    The drawings listed above should include fabrication drawings for the nozzle attachment
b) Verification that baseline inspection of hot leg and cold leg temperature DMBWs have been included in the inspection program and that the schedules for the
    welds as applicable.
baseline inspections are consistent with the baseline schedules in MRP-139.
    c)    Copy of NDE reports from the last RPVH examination.
c) A list and schedule (examination dates) of all DMBW examinations planned for the upcoming refueling outage.  If none are scheduled, then data from previous examinations should be available for review.
    d)     Copy of evaluation or calculation demonstrating that the scope of the visual
d) A list and schedule for any welding to be performed on DMBWs in the upcoming outage.  If no welding will be performed then records of previous welding on DMBWs and postweld NDE documentation.
          examination of the upper head will meet the 95% minimum coverage required by
e) A list and schedule of any stress improvement (SI) activities planned for the upcoming refueling outage.  If none are scheduled then have qualification reports for any SIs previously performed.
          NRC Order EA-03-009 (If a visual examination is planned for the upcoming
f) Documentation and description of how the baseline and inservice inspection specifications in MRP-139 are satisfied at your facility.
          refueling outage).
 
                                        -6-                                      Enclosure
  - 5 - Enclosure A.6 Additional information related to all ISI activities
 
  a)  A list with a brief description of ISI, BACCP, and SGT inspection related issues (e.g., condition reports) entered into your corrective action program since the beginning of the last refueling outage (for Unit 2).  For example, a list based upon
    e)     Provide a copy of the procedures that will be used to identify the source of any
data base searches using key words related to piping or SG tube degradation such as: ISI, ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion, boric acid, or errors in piping/SGT examinations.
          boric acid deposits identified on the RPVH. If no explicit procedures exist which
b)  Please provide names and phone numbers for the following program leads:
          govern this activity, provide a description of the process to be followed including
ISI contacts (Examination, planning) Containment Exams RPVH Exams Snubbers and Supports Repair and Replacement Program Manager Licensing Contact
          personnel responsibilities and expectations.
Site Welding Engineer Boric Acid Corrosion Control Program SG Inspection Activities (site lead and vendor contact)
    f)     Provide a copy of the updated calculation of effective degradation years (EDY)
B. Information to be provided onsite to the inspector(s) at the entrance meeting (April 28, 2008):  B.1 ISI / Welding Programs and Schedule Information
          for the RPVH susceptibility ranking.
  a) Updated schedules for ISI/NDE activities, including SGT inspections, planned welding activities, and schedule showing contingency repair plans, if available.
    g)    Provide copy of the vendor qualification report(s) that demonstrates the detection
b) For ASME Code Class 1 and 2 welds selected by the inspector from the lists provided from section A of this enclosure, please provide copies of the following documentation for each subject weld:
          capability of the NDE equipment used for the RPVH examinations. Also, identify
i) Weld data sheet (traveler) ii) Weld configuration and system location iii) Applicable Code Edition and Addenda for weldment iv) Applicable Code Edition and Addenda for welding procedures
          any changes in equipment configurations used for the RPVH examinations which
v) Applicable weld procedures (WPS) used to fabricate the welds vi) Copies of procedure qualification records (PQRs) supporting the WPS from B.1.b.v vii) Copies of mechanical test reports identified in the PQRs above viii) Copies of the nonconformance reports for the selected welds (If applicable) ix) Radiographs of the selected welds and access to equipment to allow viewing radiographs (If RT was performed) x) Copies of the preservice examination records for the selected welds. xi) Copies of welder performance qualifications records applicable to the selected welds, including documentation that welder maintained 
          differ from that used in the vendor qualification report(s).
  - 6 - Enclosure proficiency in the applicable welding processes specified in the WPS (at least six months prior to the date of subject work) xii) Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable
B.3 Boric Acid Corrosion Control Program (BACCP)
c) For the ISI related corrective action issues selected by the inspector(s) from section A of this enclosure, provide a copy of the corrective actions and supporting documentation.
    a)     Please provide boric acid walkdown inspection results, an updated list of boric
d) For the NDE reports with relevant conditions on Code Class 1 & 2 systems selected by the inspector from section A above, provide a copy of the
          acid leaks identified so far this outage, associated corrective action
examination records, examiner qualification records, and associated corrective action documents.
          documentation, and overall status of planned boric acid inspections.
e) A copy of (or ready access to) most current revision of the ISI Program Manual and Plan for the current Interval. 
    b)    Please provide any engineering evaluations completed for boric acid leaks
f) For the NDEs selected by the inspector from section A of this enclosure, provide copy of the NDE procedures used to perform the examinations (including calibration and flaw characterization/sizing procedures).  For ultrasonic examination procedures qualified in accordance with ASME Code, Section XI, Appendix VIII, provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets).  Also,
          identified since the end of the last refueling outage. Please include a status of
include qualification documentation of the specific equipment to be used (e.g., ultrasonic unit, cables, and transducers including serial numbers) and NDE personnel qualification records.
          corrective actions to repair and/or clean these boric acid leaks. Please identify
B.2 Reactor Pressure Vessel Head (RPVH)
          specifically which known leaks, if any, have remained in service or will remain in
  a) Provide the NDE personnel qualification records for the examiners who will perform examinations of the RPVH. 
          service as active leaks.
b) Provide drawings showing the following: (If a visual examination is planned for the upcoming refueling outage)
B.4 Steam Generator Tube (SGT) Inspections
i) RPVH and CRDM nozzle configurations  ii) RPVH insulation configuration 
    a)     Copies of the Examination Technique Specification Sheets (ETSS) and
The drawings listed above should include fabrication drawings for the nozzle attachment welds as applicable. 
          associated justification for any revisions.
c) Copy of NDE reports from the last RPVH examination.
    b)    Copy of the guidance to be followed if a loose part or foreign material is identified
d) Copy of evaluation or calculation demonstrating that the scope of the visual examination of the upper head will meet the 95% minimum coverage required by
          in the SGs.
NRC Order EA-03-009 (If a visual examination is planned for the upcoming refueling outage).
    c)     Please provide a copy of the ET procedures used to perform the SGT
 
          inspections (specifically calibration and flaw characterization/sizing procedures,
  - 7 - Enclosure e) Provide a copy of the procedures that will be used to identify the source of any boric acid deposits identified on the RPVH.  If no explicit procedures exist which govern this activity, provide a description of the process to be followed including personnel responsibilities and expectations. 
          etc.). Also include documentation for the specific equipment to be used.
    d)     Please provide copies of your responses to NRC and industry operating
f)  Provide a copy of the updated calculation of effective degradation years (EDY) for the RPVH susceptibility ranking.
          experience communications such as Generic Letters, Information Notices, etc.
g)  Provide copy of the vendor qualification report(s) that demonstrates the detection capability of the NDE equipment used for the RPVH examinations.  Also, identify
          (as applicable to SGT inspections) *Do not provide these documents separately if
any changes in equipment configurations used for the RPVH examinations which differ from that used in the vendor qualification report(s).
          already included in other information requested such as the degradation
B.3 Boric Acid Corrosion Control Program (BACCP)
          assessment.
  a) Please provide boric acid walkdown inspection results, an updated list of boric acid leaks identified so far this outage, associated corrective action
    e)     List of corrective action documents generated by the vendor and/or site with
documentation, and overall status of planned boric acid inspections. 
          respect to SG inspection activities.
b) Please provide any engineering evaluations completed for boric acid leaks identified since the end of the last refueling outage.  Please include a status of corrective actions to repair and/or clean these boric acid leaks.  Please identify
                                        -7-                                        Enclosure
specifically which known leaks, if any, have remained in service or will remain in service as active leaks. 
 
B.4 Steam Generator Tube (SGT) Inspections
B.5    Codes and Standards
  a) Copies of the Examination Technique Specification Sheets (ETSS) and associated justification for any revisions.
        a)    Ready access to (i.e., copies provided to the inspector(s) for use during the
b) Copy of the guidance to be followed if a loose part or foreign material is identified in the SGs.
              inspection at the onsite inspection location, or room number and location where
c) Please provide a copy of the ET procedures used to perform the SGT inspections (specifically calibration and flaw characterization/sizing procedures, etc.).  Also include documentation for the specific equipment to be used.
              available):
              i)     Applicable Editions of the ASME Code (Sections V, IX and XI) for the
d) Please provide copies of your responses to NRC and industry operating experience communications such as Generic Letters, Information Notices, etc. (as applicable to SGT inspections) *Do not provide these documents separately if already included in other information requested such as the degradation assessment.
                      inservice inspection program and the repair/replacement program.
e) List of corrective action documents generated by the vendor and/or site with respect to SG inspection activities.
              ii)     EPRI and industry standards referenced in the procedures used to
 
                      perform the SGT eddy current examination.
  - 8 - Enclosure B.5 Codes and Standards
Inspector Contact Information:
  a) Ready access to (i.e., copies provided to the inspector(s) for use during the inspection at the onsite inspection location, or room number and location where available):
S.T. Makor                    B.W. Henderson
i)  Applicable Editions of the ASME Code (Sections V, IX and XI) for the inservice inspection program and the repair/replacement program. 
Reactor Inspector              Reactor Inspector
ii)  EPRI and industry standards referenced in the procedures used to perform the SGT eddy current examination.
817-276-6507                  817-276-6569
  Inspector Contact Information:
Shiattin.Makor@nrc.gov        Breck.Henderson@nrc.gov
S.T. Makor  B.W. Henderson    Reactor Inspector  Reactor Inspector 
Mailing Address:
817-276-6507  817-276-6569    Shiattin.Makor@nrc.gov
US NRC Region IV
Breck.Henderson@nrc.gov      Mailing Address:
Attn: S. T. Makor
US NRC Region IV Attn: S. T. Makor 612 Lamar Blvd., Suite 400 Arlington, TX 76011
612 Lamar Blvd., Suite 400
Arlington, TX 76011
                                            -8-                                      Enclosure
}}
}}

Revision as of 12:15, 14 November 2019

IR 05000361-08-005, IR 05000362-08-005, on 10/20/2008 - 10/31/2008, San Onofre Nuclear Generating Station - Notification of Inspection and Request for Information
ML082820538
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 10/08/2008
From: Russ Bywater
Region 4 Engineering Branch 1
To: Ridenoure R
Southern California Edison Co
References
IR-08-005
Download: ML082820538 (12)


See also: IR 05000361/2008005

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

RE G IO N I V

612 EAST LAMAR BLVD , SU ITE 400

AR L INGTON , TEXAS 7 60 11 - 4125

October 8, 2008

Mr. Ross T. Ridenoure

Senior Vice President and

Chief Nuclear Officer

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION - NOTIFICATION OF

INSPECTION (NRC INSPECTION REPORT 05000361/2008005 AND

05000362/2008005) AND REQUEST FOR INFORMATION

Dear Mr. Ridenoure:

From October 20-31, 2008, reactor inspectors from the U. S. Nuclear Regulatory

Commissions (NRC) Region IV office will perform the baseline inservice inspection at

San Onofre Nuclear Generating Station, using NRC Inspection Procedure 71111.08.

Experience has shown that this inspection is a resource intensive inspection both for the NRC

inspectors and your staff. In order to minimize the impact to your onsite resources and to

ensure a productive inspection, we have enclosed a request for documents needed for this

inspection. These documents have been divided into two groups. The first group (Section A

of the enclosure) identified information to be provided prior to the inspection to ensure that the

inspectors are adequately prepared. The second group (Section B of the enclosure) identifies

the information the inspectors will need upon arrival at the site. It is important that all of these

documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Dave Axline of your licensing

organization. Our inspection dates are subject to change based on your updated schedule of

outage activities. If there are any questions about this inspection or the material requested,

please contact the lead inspector Shiattin Makor at (817)276-6507 (Shiattin.Makor@nrc.gov ).

Southern California Edison Company -2-

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Russell L. Bywater, Chief

Engineering Branch 1

Division of Reactor Safety

Dockets: 50-361; 50-362

Licenses: NPF-10; NPF-15

Enclosures:

Documentation requested

prior to and during the inspection

cc w/enclosure:

Chairman, Board of Supervisors

County of San Diego

1600 Pacific Highway, Room 335

San Diego, CA 92101

Gary L. Nolff

Power Projects/Contracts Manager

Riverside Public Utilities

2911 Adams Street

Riverside, CA 92504

Eileen M. Teichert, Esq.

Supervising Deputy City Attorney

City of Riverside

3900 Main Street

Riverside, CA 92522

Gary Yamamoto, Chief

Division of Drinking Water and

Environmental Management

Dept. of Public Health

1616 Capitol Avenue, Mail Stop 7400

P.O. Box 997413

Sacramento, CA 95899-7413

Southern California Edison Company -3-

Mike DeMarco

San Diego Gas & Electric Company

8315 Century Park Court

CP21G

San Diego, CA 92123-1548

Gary Butner

Chief, Radiologic Health Branch

State Department of Health Services

P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414

Mayor

City of San Clemente

100 Avenida Presidio

San Clemente, CA 92672

James D. Boyd, Commissioner

California Energy Commission

1516 Ninth Street (MS 34)

Sacramento, CA 95814

Douglas K. Porter, Esq.

Southern California Edison Company

2244 Walnut Grove Avenue

Rosemead, CA 91770

James T. Reilly

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

Daniel P. Breig

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

A. Edward Scherer

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

Albert R. Hochevar

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

Southern California Edison Company -4-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov )

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov )

DRS Director (Roy.Caniano@nrc.gov )

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Greg.Warnick@nrc.gov)

Resident Inspector (John.Reynoso@nrc.gov )

Branch Chief, DRP/D (Michael.Hay@nrc.gov)

Senior Project Engineer, DRP/D (Don.Allen@nrc.gov )

SO Site Secretary (Heather.Hutchinson@nrc.gov )

Public Affairs Officer (Victor.Dricks@nrc.gov )

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )

RITS Coordinator (Marisa.Herrera@nrc.gov )

SUNSI Review Completed: _RLB__ ADAMS: X Yes No Initials: __RLB_

X Publicly Available Non-Publicly Available Sensitive X Non-Sensitive

R:REACTORS/SO 2008005 rqst ltr-STM ML082820538

EB1 EB1 EB1: Chief

STMakor BWHenderson RLBywater

/RA/ /RA/ /RA/

10/8/08 10/8/08 10/8/08

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

INSERVICE INSPECTION DOCUMENT REQUEST

Inspection Dates: October 20-31, 2008

Inspection Procedures: IP 71111.08 Inservice Inspection (ISI) Activities

TI 2515/172 Reactor Coolant System Dissimilar Metal Butt Welds

Inspectors: S. Makor, Reactor Inspector (Lead Inspector - ISI)

B. Henderson, Reactor Inspector

A. Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or

electronic format (ims.certrec.com preferred), in care of S. Makor, by October 15, 2008,

to facilitate the selection of specific items that will be reviewed during the onsite

inspection week. The inspector will select specific items from the information requested

below and then request from your staff additional documents needed during the onsite

inspection week (Section B of this enclosure). We ask that the specific items selected

from the lists be available and ready for review on the first day of inspection. *Please

provide requested documentation electronically if possible. If requested documents are

large and only hard copy formats are available, please inform the inspector(s), and

provide subject documentation during the first day of the onsite inspection. If you have

any questions regarding this information request, please call the inspector as soon as

possible.

A.1 ISI/Welding Programs and Schedule Information

a) A detailed schedule (including preliminary dates) of:

i) Nondestructive examinations (NDEs) planned for Class 1 & 2 systems

and containment, performed as part of your ASME Section XI, Risk

Informed (if applicable), and augmented ISI programs during the

upcoming outage.

Provide a status summary of the NDE inspection activities vs. the

required inspection period percentages for this Interval by category per

ASME Section XI, IWX-2400 (Do not provide separately if other

documentation requested contains this information).

ii) Reactor pressure vessel head (RPVH) examinations planned for the

upcoming outage.

iii) Examinations planned for Alloy 82/182/600 components that are not

included in the Section XI scope (If applicable).

iv) Examinations planned as part of your Boric Acid Corrosion Control

Program (Mode 3 walkdowns, bolted connection walkdowns, etc.).

-1- Enclosure

v) Welding activities that are scheduled to be completed during the

upcoming outage (ASME Class 1, 2, or 3 structures, systems, or

components (SSCs)).

b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety

Evaluations applicable to the examinations identified above.

c) A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,

Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code

Class 1 & 2 systems since the beginning of the last refueling outage. This should

include the previousSection XI pressure test(s) conducted during start up and

any evaluations associated with the results of the pressure tests. Also, include in

the list the NDE reports with relevant conditions in the RPVH penetration nozzles

which have been accepted for continued service. The list of NDE reports should

include a brief description of the SSC where the relevant condition was identified.

d) A list with a brief description (e.g., system, material, pipe size, weld number, and

NDE performed) of the welds in Code Class 1 and 2 systems which have been

fabricated due to component repair/replacement activities since the beginning of

the last refueling outage, or are planned to be fabricated this refueling outage.

e) If reactor vessel weld examinations required by the ASME Code are scheduled to

occur during the upcoming outage, provide a detailed description of the welds to

be examined and the extent of the planned examination. Please also provide

reference numbers for applicable procedures that will be used to conduct these

examinations.

f) Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of

Section XI of the ASME Code that have been identified since the beginning of the

last refueling outage.

g) A list of any temporary non-code repairs in service (e.g., pinhole leaks).

h) Please provide copies of the most recent self assessments for the ISI, Welding,

and Alloy 600 Programs.

A.2 Reactor Pressure Vessel Head (RPVH)

a) Provide the detailed scope of the planned NDE of the reactor vessel head which

identifies the types of NDE methods to be used on each specific part of the

vessel head to fulfill commitments made in response to NRC Bulletin 2002-02

and NRC Order EA-03-009. Also, include examination scope expansion criteria

and planned expansion sample sizes if relevant conditions are identified (If

applicable).

b) A list of the standards and/or requirements that will be used to evaluate

indications identified during NDE of the reactor vessel head (e.g., the specific

-2- Enclosure

industry or procedural standards which will be used to evaluate potential leakage

and/or flaw indications).

A.3 Boric Acid Corrosion Control Program (BACCP)

a) Copy of the procedures that govern the scope, equipment and implementation of

the inspections required to identify boric acid leakage and the procedures for

boric acid leakage/corrosion evaluation.

b) Please provide a list of leaks (including Code class of the components) that have

been identified since the last refueling outage and associated corrective action

documentation. If during the last cycle, the Unit was shutdown, please provide

documentation of containment walkdown inspections performed as part of the

BACCP.

c) Please provide a copy of the most recent self-assessment performed for the

BACCP.

A.4 Steam Generator Tube (SGT) Inspections

a) A detailed schedule of:

i) SGT inspection, data analyses, and repair activities for the upcoming

outage (If occurring).

ii) SG secondary side inspection activities for the upcoming outage (If

occurring).

b) Please provide a copy of your SG ISI Inspection Program and Plan. Please

include a copy of the Operational Assessment from last outage and a copy of the

following documents as they become available:

i) Degradation Assessment

ii) Condition Monitoring Assessment

c) If you are planning on modifying your Technical Specifications such that they are

consistent with TSTF-449, please provide copies of your correspondence with

the NRC regarding deviations from the STS.

d) Copy of SG history documentation given to vendors performing eddy current (ET)

testing of the SGs during the upcoming outage.

e) Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy

Current Technique Specification Sheets (ETSS). Additionally, please provide a

copy of EPRI Appendix H ETSS Qualification Records.

-3- Enclosure

f) Identify and quantify any SGT leakage experienced during the previous operating

cycle. Also provide documentation identifying which SG was leaking and

corrective actions completed or planned for this condition (If applicable).

g) Provide past history of the condition and issues pertaining to the secondary side

of the steam generators (including items such as loose parts, fouling, top of tube

sheet condition, crud removal amounts, etc.)

h) Please provide copies of your most recent self assessments of the SG

monitoring, loose parts monitoring, and secondary side water chemistry control

programs.

i) Please also indicate where the primary, secondary, and resolution analyses are

scheduled to take place.

j) Please provide a summary of the scope of the SGT examinations, including

examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the

percentage of tubes to be examined. *Do not provide these documents

separately if already included in other information requested.

A.5 Materials Reliability (MRP-139) Program Activities

a) A list of, with verification, that the baseline inspections of all applicable Dissimilar

Metal Butt Welds (DMBWs) have been completed by December 31, 2007.

b) Verification that baseline inspection of hot leg and cold leg temperature DMBWs

have been included in the inspection program and that the schedules for the

baseline inspections are consistent with the baseline schedules in MRP-139.

c) A list and schedule (examination dates) of all DMBW examinations planned for

the upcoming refueling outage. If none are scheduled, then data from previous

examinations should be available for review.

d) A list and schedule for any welding to be performed on DMBWs in the upcoming

outage. If no welding will be performed then records of previous welding on

DMBWs and postweld NDE documentation.

e) A list and schedule of any stress improvement (SI) activities planned for the

upcoming refueling outage. If none are scheduled then have qualification reports

for any SIs previously performed.

f) Documentation and description of how the baseline and inservice inspection

specifications in MRP-139 are satisfied at your facility.

-4- Enclosure

A.6 Additional information related to all ISI activities

a) A list with a brief description of ISI, BACCP, and SGT inspection related issues

(e.g., condition reports) entered into your corrective action program since the

beginning of the last refueling outage (for Unit 2). For example, a list based upon

data base searches using key words related to piping or SG tube degradation

such as: ISI, ASME Code,Section XI, NDE, cracks, wear, thinning, leakage, rust,

corrosion, boric acid, or errors in piping/SGT examinations.

b) Please provide names and phone numbers for the following program leads:

ISI contacts (Examination, planning)

Containment Exams

RPVH Exams

Snubbers and Supports

Repair and Replacement Program Manager

Licensing Contact

Site Welding Engineer

Boric Acid Corrosion Control Program

SG Inspection Activities (site lead and vendor contact)

B. Information to be provided onsite to the inspector(s) at the entrance meeting (April 28,

2008):

B.1 ISI / Welding Programs and Schedule Information

a) Updated schedules for ISI/NDE activities, including SGT inspections, planned

welding activities, and schedule showing contingency repair plans, if available.

b) For ASME Code Class 1 and 2 welds selected by the inspector from the lists

provided from section A of this enclosure, please provide copies of the following

documentation for each subject weld:

i) Weld data sheet (traveler)

ii) Weld configuration and system location

iii) Applicable Code Edition and Addenda for weldment

iv) Applicable Code Edition and Addenda for welding procedures

v) Applicable weld procedures (WPS) used to fabricate the welds

vi) Copies of procedure qualification records (PQRs) supporting the WPS

from B.1.b.v

vii) Copies of mechanical test reports identified in the PQRs above

viii) Copies of the nonconformance reports for the selected welds (If

applicable)

ix) Radiographs of the selected welds and access to equipment to allow

viewing radiographs (If RT was performed)

x) Copies of the preservice examination records for the selected welds.

xi) Copies of welder performance qualifications records applicable to the

selected welds, including documentation that welder maintained

-5- Enclosure

proficiency in the applicable welding processes specified in the WPS (at

least six months prior to the date of subject work)

xii) Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable

c) For the ISI related corrective action issues selected by the inspector(s) from

section A of this enclosure, provide a copy of the corrective actions and

supporting documentation.

d) For the NDE reports with relevant conditions on Code Class 1 & 2 systems

selected by the inspector from section A above, provide a copy of the

examination records, examiner qualification records, and associated corrective

action documents.

e) A copy of (or ready access to) most current revision of the ISI Program Manual

and Plan for the current Interval.

f) For the NDEs selected by the inspector from section A of this enclosure, provide

copy of the NDE procedures used to perform the examinations (including

calibration and flaw characterization/sizing procedures). For ultrasonic

examination procedures qualified in accordance with ASME Code,Section XI,

Appendix VIII, provide documentation supporting the procedure qualification

(e.g., the EPRI performance demonstration qualification summary sheets). Also,

include qualification documentation of the specific equipment to be used (e.g.,

ultrasonic unit, cables, and transducers including serial numbers) and NDE

personnel qualification records.

B.2 Reactor Pressure Vessel Head (RPVH)

a) Provide the NDE personnel qualification records for the examiners who will

perform examinations of the RPVH.

b) Provide drawings showing the following: (If a visual examination is planned for

the upcoming refueling outage)

i) RPVH and CRDM nozzle configurations

ii) RPVH insulation configuration

The drawings listed above should include fabrication drawings for the nozzle attachment

welds as applicable.

c) Copy of NDE reports from the last RPVH examination.

d) Copy of evaluation or calculation demonstrating that the scope of the visual

examination of the upper head will meet the 95% minimum coverage required by

NRC Order EA-03-009 (If a visual examination is planned for the upcoming

refueling outage).

-6- Enclosure

e) Provide a copy of the procedures that will be used to identify the source of any

boric acid deposits identified on the RPVH. If no explicit procedures exist which

govern this activity, provide a description of the process to be followed including

personnel responsibilities and expectations.

f) Provide a copy of the updated calculation of effective degradation years (EDY)

for the RPVH susceptibility ranking.

g) Provide copy of the vendor qualification report(s) that demonstrates the detection

capability of the NDE equipment used for the RPVH examinations. Also, identify

any changes in equipment configurations used for the RPVH examinations which

differ from that used in the vendor qualification report(s).

B.3 Boric Acid Corrosion Control Program (BACCP)

a) Please provide boric acid walkdown inspection results, an updated list of boric

acid leaks identified so far this outage, associated corrective action

documentation, and overall status of planned boric acid inspections.

b) Please provide any engineering evaluations completed for boric acid leaks

identified since the end of the last refueling outage. Please include a status of

corrective actions to repair and/or clean these boric acid leaks. Please identify

specifically which known leaks, if any, have remained in service or will remain in

service as active leaks.

B.4 Steam Generator Tube (SGT) Inspections

a) Copies of the Examination Technique Specification Sheets (ETSS) and

associated justification for any revisions.

b) Copy of the guidance to be followed if a loose part or foreign material is identified

in the SGs.

c) Please provide a copy of the ET procedures used to perform the SGT

inspections (specifically calibration and flaw characterization/sizing procedures,

etc.). Also include documentation for the specific equipment to be used.

d) Please provide copies of your responses to NRC and industry operating

experience communications such as Generic Letters, Information Notices, etc.

(as applicable to SGT inspections) *Do not provide these documents separately if

already included in other information requested such as the degradation

assessment.

e) List of corrective action documents generated by the vendor and/or site with

respect to SG inspection activities.

-7- Enclosure

B.5 Codes and Standards

a) Ready access to (i.e., copies provided to the inspector(s) for use during the

inspection at the onsite inspection location, or room number and location where

available):

i) Applicable Editions of the ASME Code (Sections V, IX and XI) for the

inservice inspection program and the repair/replacement program.

ii) EPRI and industry standards referenced in the procedures used to

perform the SGT eddy current examination.

Inspector Contact Information:

S.T. Makor B.W. Henderson

Reactor Inspector Reactor Inspector

817-276-6507 817-276-6569

Shiattin.Makor@nrc.gov Breck.Henderson@nrc.gov

Mailing Address:

US NRC Region IV

Attn: S. T. Makor

612 Lamar Blvd., Suite 400

Arlington, TX 76011

-8- Enclosure