IR 05000219/2008006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:December 22, 2008 Mr. Charles President and Chief Nuclear Officer (CNO)
{{#Wiki_filter:ber 22, 2008
Exelon Nuclear Chief Nuclear Officer (CNO) AmerGen Energy Company, LLC 4300 Winfield Rd. Warrenville, IL 60555 SUBJECT: OYSTER CREEK NUCLEAR GENERATING STATION - NRC TEAM INSPECTION REPORT 05000219/2008006
 
==SUBJECT:==
OYSTER CREEK NUCLEAR GENERATING STATION - NRC TEAM INSPECTION REPORT 05000219/2008006


==Dear Mr. Pardee:==
==Dear Mr. Pardee:==
On December 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection of your Oyster Creek Nuclear Generating Station (OCNGS). The enclosed report documents the team's results, which were discussed on December 11, 2008, with Mr. Dostal and other members of your staff.
On December 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection of your Oyster Creek Nuclear Generating Station (OCNGS). The enclosed report documents the teams results, which were discussed on December 11, 2008, with Mr. Dostal and other members of your staff.


The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commission's rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel. No findings of significance were identified.
The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commissions rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel. No findings of significance were identified.


In accordance with 10 CFR 2.390 of the NRC "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of the NRC Agency-wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, When separated from the Enclosure, this document is DECONTROLLED. because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390 of the NRC Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of the NRC Agency-wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, When separated from the Enclosure, this document is DECONTROLLED. because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.


Sincerely,
Sincerely,
/RA/ John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No.: 50-219 License No.: DPR-16 Enclosure: Inspection Report 05000219/2008006 w/Attachment: Supplemental Information (w/OUO-SRI)
/RA/
John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No.: 50-219 License No.: DPR-16 Enclosure: Inspection Report 05000219/2008006 w/Attachment: Supplemental Information (w/OUO-SRI)
}}
}}

Revision as of 10:16, 14 November 2019

IR 05000219-08-006; Exelon Nuclear; 12/08/2008-12/11/2008; Oyster Creek Nuclear Generating Station; Temporary Instruction 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 & 3 Mitigating Strategies, Revision 1. (Letter
ML083570173
Person / Time
Site: Oyster Creek
Issue date: 12/22/2008
From: Rogge J
Engineering Region 1 Branch 3
To: Pardee C
Exelon Nuclear
References
IR-08-006
Download: ML083570173 (5)


Text

ber 22, 2008

SUBJECT:

OYSTER CREEK NUCLEAR GENERATING STATION - NRC TEAM INSPECTION REPORT 05000219/2008006

Dear Mr. Pardee:

On December 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection of your Oyster Creek Nuclear Generating Station (OCNGS). The enclosed report documents the teams results, which were discussed on December 11, 2008, with Mr. Dostal and other members of your staff.

The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commissions rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel. No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of the NRC Agency-wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, When separated from the Enclosure, this document is DECONTROLLED. because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Sincerely,

/RA/

John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No.: 50-219 License No.: DPR-16 Enclosure: Inspection Report 05000219/2008006 w/Attachment: Supplemental Information (w/OUO-SRI)