ML090630183: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125 March 4, 2009 Michael Perito Vice President, Operations Entergy Operations, Inc.
{{#Wiki_filter:UNITED STATES NU C LE AR RE G ULATO RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU ITE 400 AR LIN GTON , TEXAS 76011-4125 March 4, 2009 Michael Perito Vice President, Operations Entergy Operations, Inc.
River Bend Station  
River Bend Station 5485 US Highway 61N St. Francisville, LA 70775
 
5485 US Highway 61N St. Francisville, LA 70775  


==SUBJECT:==
==SUBJECT:==
ANNUAL ASSESSMENT LETTER - RIVER BEND STATION (NRC INSPECTION REPORT 05000458/2009001)  
ANNUAL ASSESSMENT LETTER - RIVER BEND STATION (NRC INSPECTION REPORT 05000458/2009001)


==Dear Mr. Perito:==
==Dear Mr. Perito:==


On February 12, 2009, the NRC staff completed its performance review of River Bend Station. Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31, 2008. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
On February 12, 2009, the NRC staff completed its performance review of River Bend Station.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security-Related Information" will include the security cornerstone review and resultant inspection plan.  
Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31, 2008. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
 
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security-Related Information" will include the security cornerstone review and resultant inspection plan.
Overall, River Bend Station operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within  
Overall, River Bend Station operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green).
 
While plant performance for the most recent quarter is within the Licensee Response column of the Action Matrix, plant performance entered the Regulatory Response Column of the NRCs Action Matrix during the first quarter of the assessment cycle as a result of a White performance indicator for unplanned scrams per 7000 critical hours. This performance indicator returned to Green in the second quarter of 2008.
the Licensee Response Column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green).
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2010. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
While plant performance for the most recent quarter is within the Licensee Response column of the Action Matrix, plant performance entered the Regulatory Response Column of the NRC's Action Matrix during the first quarter of the assessment cycle as a result of a White performance indicator for unplanned scrams per 7000 critical hours. This performance indicator returned to Green in the second quarter of 2008.
The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid cycle review.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2010. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
Entergy Operations, Inc.                   system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Geoffrey Miller at (817) 860-8144 with any questions you may have regarding this letter or the inspection plan.
enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document Entergy Operations, Inc. system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Geoffrey Miller at (817) 860-8144 with any questions you may have regarding this letter or the inspection plan.  
                                            /RA/ WWalker for Geoffrey B. Miller, Chief Project Branch C Division of Reactor Projects Docket: 50-458 License: NPF-47
 
Sincerely,
 
      /RA/ WWalker for Geoffrey B. Miller, Chief Project Branch C Division of Reactor Projects Docket:   50-458 License: NPF-47  


==Enclosure:==
==Enclosure:==
River Bend Station Inspection/Activity Plan
cc w/enclosure:
Melanie Bueche, President
Pointe Coupee Parish Police Jury P.O. Box 290 New Roads, LA  70760
Riley Berthelot, Jr., President
West Baton Rouge Parish Policy Jury P.O. Box 757 Port Allen, LA  70767
Federal Emergency Management Agency
Region VI ATTN:  William E. Peterson, Regional Director FRC 800 North Loop 288 Denton, TX  76209-3698
JoAnne Moreau, Director
Office of Homeland Security and Emergency Preparedness East Baton Rouge Parish 3773 Harding Blvd.
Baton Rouge, LA  70807
Don Ewing, Director Office of Emergency Preparedness Pointe Coupee Parish P.O. Box 248 New Roads, LA  70760


Jesse Means, Jr., Director Office of Homeland Security and   Emergency Preparedness West Feliciana Parish P.O. Box 796 St. Francisville, LA 70775 Louis Kent, President East Feliciana Parish Policy Jury P.O. Box 427  
River Bend Station Inspection/Activity Plan cc w/enclosure:
Melanie Bueche, President                          JoAnne Moreau, Director Pointe Coupee Parish Police Jury                    Office of Homeland Security and P.O. Box 290                                        Emergency Preparedness New Roads, LA 70760                                East Baton Rouge Parish 3773 Harding Blvd.
Riley Berthelot, Jr., President                    Baton Rouge, LA 70807 West Baton Rouge Parish Policy Jury P.O. Box 757                                        Don Ewing, Director Port Allen, LA 70767                                Office of Emergency Preparedness Pointe Coupee Parish Federal Emergency Management Agency                P.O. Box 248 Region VI                                          New Roads, LA 70760 ATTN: William E. Peterson, Regional Director                                            Jesse Means, Jr., Director FRC 800 North Loop 288                              Office of Homeland Security and Denton, TX 76209-3698                                Emergency Preparedness West Feliciana Parish P.O. Box 796 St. Francisville, LA 70775 Louis Kent, President East Feliciana Parish Policy Jury P.O. Box 427 Clinton, LA 70722


Clinton, LA 70722  
Entergy Operations, Inc.            Kip Holden, Mayor-President              Senior Vice President and COO Office of the Mayor-President            Entergy Operations, Inc.
East Baton Rouge Parish                  P. O. Box 31995 222 St. Louis Street, 3rd Floor          Jackson, MS 39286-1995 Baton Rouge, LA 70802 Vice President, Oversight Mike Futrell                            Entergy Operations, Inc.
Chief Administrative Officer            P. O. Box 31995 Office of the Mayor-President            Jackson, MS 39286-1995 East Baton Rouge Parish P.O. Box 1471                            Senior Manager, Nuclear Safety &
Baton Rouge, LA 70821                    Licensing Entergy Nuclear Operations Sharlot Edwards, Director                P. O. Box 31995 Office of Emergency Preparedness        Jackson, MS 39286-1995 West Baton Rouge Parish 2413 Ernest Wilson Dr.                  Manager, Licensing Port Allen, LA 70767                    Entergy Operations, Inc.
River Bend Station Mark Cooper, Director                    5485 US Highway 61N Governors Office of Homeland            St. Francisville, LA 70775 Security and Emergency Preparedness 7667 Independence Blvd.                  Attorney General Baton Rouge, LA 70806                    State of Louisiana P. O. Box 94005 Glen Kent, Director                      Baton Rouge, LA 70804-9005 Office of Homeland Security and Emergency Preparedness                Ms. H. Anne Plettinger East Feliciana Parish                    3456 Villa Rose Drive P.O. Box 427                            Baton Rouge, LA 70806 Clinton, LA 70722 President of West Feliciana The Honorable William DAquilla          Police Jury Mayor, Town of St. Francisville          P. O. Box 1921 P.O. Box 400                            St. Francisville, LA 70775 St. Francisville, LA 70775 Mr. Brian Almon Jeffrey P. Meyers                        Public Utility Commission Division Administrator                  William B. Travis Building Emergency and Radiological Services      P. O. Box 13326 Division                                Austin, TX 78701-3326 LA Dept. of Environmental Quality P.O. Box 4312                            Mr. Jim Calloway Baton Rouge, LA 70821-4312              Public Utility Commission of Texas Senior Vice President                    1701 N. Congress Avenue Entergy Nuclear Operations              Austin, TX 78711-3326 P.O. Box 31995 Jackson, MS 39286-1995


Entergy Operations, Inc. Kip Holden, Mayor-President Office of the Mayor-President
Entergy Operations, Inc.             Louisiana Department of Environmental    Associate General Counsel Quality                                  Entergy Nuclear Operations Radiological Emergency Planning and      P. O. Box 31995 Response Division                        Jackson, MS 39286-1995 P. O. Box 4312 Baton Rouge, LA 70821-4312                Chief, Technological Services Branch FEMA Region VI 800 N. Loop 288 Denton, TX 76201-3698


East Baton Rouge Parish 222 St. Louis Street, 3 rd Floor Baton Rouge, LA  70802
Entergy Operations, Inc.                     Electronic distribution by RIV:
 
Mike Futrell Chief Administrative Officer Office of the Mayor-President East Baton Rouge Parish P.O. Box 1471
 
Baton Rouge, LA  70821
 
Sharlot Edwards, Director Office of Emergency Preparedness West Baton Rouge Parish
 
2413 Ernest Wilson Dr.
 
Port Allen, LA  70767
 
Mark Cooper, Director Governor's Office of Homeland Security and Emergency Preparedness 7667 Independence Blvd.
 
Baton Rouge, LA  70806
 
Glen Kent, Director Office of Homeland Security and Emergency Preparedness East Feliciana Parish P.O. Box 427 Clinton, LA  70722
 
The Honorable William D'Aquilla
 
Mayor, Town of St. Francisville P.O. Box 400 St. Francisville, LA  70775 Jeffrey P. Meyers Division Administrator Emergency and Radiological Services
 
Division LA Dept. of Environmental Quality P.O. Box 4312
 
Baton Rouge, LA  70821-4312
 
Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS  39286-1995
 
Senior Vice President and COO Entergy Operations, Inc.
P. O. Box 31995 Jackson, MS  39286-1995
 
Vice President, Oversight Entergy Operations, Inc.
P. O. Box 31995 Jackson, MS  39286-1995 Senior Manager, Nuclear Safety &
 
Licensing Entergy Nuclear Operations P. O. Box 31995 Jackson, MS  39286-1995
 
Manager, Licensing Entergy Operations, Inc.
River Bend Station 5485 US Highway 61N St. Francisville, LA  70775
 
Attorney General
 
State of Louisiana P. O. Box 94005 Baton Rouge, LA  70804-9005
 
Ms. H. Anne Plettinger
 
3456 Villa Rose Drive
 
Baton Rouge, LA  70806 President of West Feliciana 
 
Police Jury P. O. Box 1921 St. Francisville, LA  70775
 
Mr. Brian Almon Public Utility Commission William B. Travis Building P. O. Box 13326 Austin, TX  78701-3326 Mr. Jim Calloway Public Utility Commission of Texas
 
1701 N. Congress Avenue Austin, TX  78711-3326
 
Entergy Operations, Inc. Louisiana Department of Environmental Quality Radiological Emergency Planning and  Response Division P. O. Box 4312
 
Baton Rouge,  LA 70821-4312
 
Associate General Counsel Entergy Nuclear Operations P. O. Box 31995 Jackson, MS  39286-1995
 
Chief, Technological Services
 
Branch FEMA Region VI
 
800 N. Loop 288 Denton, TX  76201-3698 Entergy Operations, Inc. Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov) DRP Director (Dwight.Chamberlain@nrc.gov) DRP Deputy Director (Anton.Vegel@nrc.goV)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.goV)
DRP Director (Roy.Caniano@nrc.gov)
DRP Director (Roy.Caniano@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (Grant.Larkin@nrc.gov)  
Senior Resident Inspector (Grant.Larkin@nrc.gov)
 
Branch Chief, DRP/C (Geoffrey.Miller@nrc.gov)
Branch Chief, DRP/C (Geoffrey.Miller@nrc.gov) Senior Project Engineer, DRP/C (Wayne.Walker@nrc.gov) Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)
Senior Project Engineer, DRP/C (Wayne.Walker@nrc.gov)
Regional State Liaison Officer (Bill.Maier@nrc.gov) RA Secretary (Lucy.Owen@nrc.gov) DRA Secretary (Judy.Kilcrease@nrc.gov)
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Regional State Liaison Officer (Bill.Maier@nrc.gov)
RA Secretary (Lucy.Owen@nrc.gov)
DRA Secretary (Judy.Kilcrease@nrc.gov)
Branch Chief, DRS/EB1 (Thomas.Farnholtz@nrc.gov)
Branch Chief, DRS/EB1 (Thomas.Farnholtz@nrc.gov)
Branch Chief, DRS/EB2 (Neil.OKeefe@nrc.gov)  
Branch Chief, DRS/EB2 (Neil.OKeefe@nrc.gov)
 
Branch Chief, DRS/PSB1 (Michael.Shannon@nrc.gov)
Branch Chief, DRS/PSB1 (Michael.Shannon@nrc.gov)
Branch Chief, DRS/PSB2 (Greg.Werner@nrc.gov) Branch Chief, DRS/OB (Bernard.Stapleton@nrc.gov)
Branch Chief, DRS/PSB2 (Greg.Werner@nrc.gov)
Branch Chief, DRS/OB (Bernard.Stapleton@nrc.gov)
OEDO RIV Coordinator, Primary (Shawn.Williams@nrc.gov)
OEDO RIV Coordinator, Primary (Shawn.Williams@nrc.gov)
OEDO RIV Coordinator, Backup (Eugene.Guthrie@nrc.gov)
OEDO RIV Coordinator, Backup (Eugene.Guthrie@nrc.gov)
OEDO, TRPS (Tamara.Bloomer@nrc.gov)
OEDO, TRPS (Tamara.Bloomer@nrc.gov)
Deputy Director, DIRS, NRR (Frederick.Brown@nrc.gov) Director, DORL, NRR (Joseph Giitter@nrc.gov) Deputy Director, DORL, NRR (Timothy.McGinty@nrc.gov)
Deputy Director, DIRS, NRR (Frederick.Brown@nrc.gov)
Director, DORL, NRR (Joseph Giitter@nrc.gov)
Deputy Director, DORL, NRR (Timothy.McGinty@nrc.gov)
Chief, PLB IV, DORL, NRR (Thomas.Hiltz@nrc.gov)
Chief, PLB IV, DORL, NRR (Thomas.Hiltz@nrc.gov)
NRR Project Manager (Fred.Lyon@nrc.gov)  
NRR Project Manager (Fred.Lyon@nrc.gov)
 
Branch Chief, DRS Operations Branch (Bernard.Stapleton@nrc.gov)
Branch Chief, DRS Operations Branch (Bernard.Stapleton@nrc.gov)
RidsNrrDirslpab Resource@nrc.gov ROPreports.Resource@nrc.gov  
RidsNrrDirslpab Resource@nrc.gov ROPreports.Resource@nrc.gov mortensengk@INPO.org File located: R:\_REACTOR\EOC\EOC Assessment Letter\2008\RBS.doc SUNSI Rev Compl. 7 Yes No ADAMS                    7 Yes No      Reviewer Initials  WCW Publicly Avail          7 Yes No Sensitive          Yes 7 No    Sens. Type Initials WCW RIV/SPE/DRP/C          SRI:RBS          C:DRP/C        D:DRS            D:DRP WCWalker                GLarkin          GBMiller        RJCaniano        DDChamberlain
 
/RA/                    /RA/T-Walker      /RA/            /RA/            /RA/
mortensengk@INPO.org  
2/19/2009              2/19/2009          2/19/2009      2/23/2009        2/23/2009 OFFICIAL RECORD COPY                                  T=Telephone      E=E-mail      F=Fax


File located:  R:\_REACTOR\EOC\EOC Assessment Letter\2008\RBS.doc SUNSI Rev Compl. Yes  No ADAMS  Yes  No Reviewer Initials WCW Publicly Avail  Yes  No Sensitive  Yes  No Sens. Type Initials WCWRIV/SPE/DRP/C SRI:RBS C:DRP/C D:DRS D:DRP WCWalker GLarkin GBMiller RJCaniano DDChamberlain
Page 1 of 1                                                                               River Bend 02/23/2009     12:42:44                                                         Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit         Planned Dates                                                                                                               No. of Staff Number        Start     End     Inspection Activity                                                           Title                       on Site EB1-17T       - 50.59 AND MODS                                                                                   3 1         04/27/2009  05/08/2009  IP 7111117T            Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications PSB2-52B     - BIENNIAL PI&R INSPECTION                                                                         4 1         06/15/2009   06/19/2009   IP 71152B              Identification and Resolution of Problems 1          07/06/2009   07/10/2009   IP 71152B              Identification and Resolution of Problems RP-ORS4       - OCCUPATIONAL RADIATION SAFETY - ACCESS                                                           1 1         09/21/2009  09/25/2009  IP 7112101              Access Control to Radiologically Significant Areas 1          09/21/2009   09/25/2009   IP 7112102              ALARA Planning and Controls 1          09/21/2009   09/25/2009   IP 71151                Performance Indicator Verification EB1-08       - INSERVICE INSPECTION                                                                             1 1         09/28/2009   10/02/2009   IP 7111108G            Inservice Inspection Activities - BWR RP-TRANS - TRANSPORTATION                                                                                         1 1         10/13/2009   10/16/2009   IP 7112202              Radioactive Material Processing and Transportation RP-ORS5       - OCCUPATIONAL RADIATION SAFETY - ALARA                                                             1 1         12/14/2009  12/18/2009  IP 7112101              Access Control to Radiologically Significant Areas 1          12/14/2009   12/18/2009   IP 7112102              ALARA Planning and Controls 1          12/14/2009   12/18/2009   IP 71151                Performance Indicator Verification EXAM         - INITIAL EXAM                                                                                     4 1         03/15/2010   03/19/2010     X02443              INITIAL EXAM-RB (04/2010) 1          04/19/2010   04/23/2010     X02443              INITIAL EXAM-RB (04/2010)
/RA/ /RA/T-Walker
EB2-05T       - TRIENNIAL FIRE PROTECTION                                                                         4 1         04/05/2010   04/09/2010   IP 7111105T            Fire Protection [Triennial]
/RA/ /RA/ /RA/ 2/19/2009 2/19/2009 2/19/2009 2/23/2009 2/23/2009 OFFICIAL RECORD COPY  T=Telephone          E=E-mail        F=Fax Inspection / Activity Plan Page 1 of 1 02/23/2009 12:42:44 Report 22 03/01/2009
1          04/19/2010   04/23/2010   IP 7111105T            Fire Protection [Triennial]
-06/30/2010 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site River Bend EB1-17T-50.59 AND MODS 3 1     IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 04/27/2009 05/08/2009 PSB2-52B-BIENNIAL PI&R INSPECTION 4 1     IP Identification and Resolution of Problems 71152B 06/15/2009 06/19/2009 1    IP Identification and Resolution of Problems 71152B 07/06/2009 07/10/2009 RP-ORS4-OCCUPATIONAL RADIATION SAFETY - ACCESS 1 1     IP A ccess Control to Radiologically Significant Areas 7112101 09/21/2009 09/25/2009 1    IP A LARA Planning and Controls 7112102 09/21/2009 09/25/2009 1    IP Performance Indicator Verification 71151 09/21/2009 09/25/2009 EB1-08-INSERVICE INSPECTION 1 1     IP Inservice Inspection Activities - BWR 7111108G 09/28/2009 10/02/2009 RP-TRANS-TRANSPORTATION 1 1     IP Radioactive Material Processing and Transportation 7112202 10/13/2009 10/16/2009 RP-ORS5-OCCUPATIONAL RADIATION SAFETY - ALARA 1 1     IP A ccess Control to Radiologically Significant Areas 7112101 12/14/2009 12/18/2009 1    IP A LARA Planning and Controls 7112102 12/14/2009 12/18/2009 1    IP Performance Indicator Verification 71151 12/14/2009 12/18/2009 EXAM-INITIAL EXAM 4 1     INITIAL EXAM-RB (04/2010)
EP-1         - BIENNIAL EP EXERCISE INSPECTION                                                                   3 1         06/07/2010  06/11/2010  IP 7111401              Exercise Evaluation 1          06/07/2010   06/11/2010   IP 7111404              Emergency Action Level and Emergency Plan Changes 1          06/07/2010   06/11/2010   IP 71151-EP01          Drill/Exercise Performance 1          06/07/2010   06/11/2010   IP 71151-EP02          ERO Drill Participation 1          06/07/2010   06/11/2010   IP 71151-EP03          Alert & Notification System This report does not include INPO and OUTAGE activities.
X02443 03/15/2010 03/19/2010 1    INITIAL EXAM-RB (04/2010)
X02443 04/19/2010 04/23/2010 EB2-05T-TRIENNIAL FIRE PROTECTION 4 1     IP Fire Protection [Triennial]
7111105T 04/05/2010 04/09/2010 1    IP Fire Protection [Triennial]
7111105T 04/19/2010 04/23/2010 EP-1-BIENNIAL EP EXERCISE INSPECTION 3 1     IP Exercise Evaluation 7111401 06/07/2010 06/11/2010 1    IP Emergency Action Level and Emergency Plan Changes 7111404 06/07/2010 06/11/2010 1    IP Drill/Exercise Performance 71151-EP01 06/07/2010 06/11/2010 1    IP ERO Drill Participation 71151-EP02 06/07/2010 06/11/2010 1    IP A lert & Notification System 71151-EP03 06/07/2010 06/11/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Revision as of 08:33, 14 November 2019

Annual Assessment Letter and Inspection Plan 2008
ML090630183
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/04/2009
From: Geoffrey Miller
NRC/RGN-IV/DRP/RPB-C
To: Mike Perito
Entergy Operations
References
IR-09-001
Download: ML090630183 (6)


Text

UNITED STATES NU C LE AR RE G ULATO RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU ITE 400 AR LIN GTON , TEXAS 76011-4125 March 4, 2009 Michael Perito Vice President, Operations Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775

SUBJECT:

ANNUAL ASSESSMENT LETTER - RIVER BEND STATION (NRC INSPECTION REPORT 05000458/2009001)

Dear Mr. Perito:

On February 12, 2009, the NRC staff completed its performance review of River Bend Station.

Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31, 2008. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security-Related Information" will include the security cornerstone review and resultant inspection plan.

Overall, River Bend Station operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green).

While plant performance for the most recent quarter is within the Licensee Response column of the Action Matrix, plant performance entered the Regulatory Response Column of the NRCs Action Matrix during the first quarter of the assessment cycle as a result of a White performance indicator for unplanned scrams per 7000 critical hours. This performance indicator returned to Green in the second quarter of 2008.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2010. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document

Entergy Operations, Inc. system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Geoffrey Miller at (817) 860-8144 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/ WWalker for Geoffrey B. Miller, Chief Project Branch C Division of Reactor Projects Docket: 50-458 License: NPF-47

Enclosure:

River Bend Station Inspection/Activity Plan cc w/enclosure:

Melanie Bueche, President JoAnne Moreau, Director Pointe Coupee Parish Police Jury Office of Homeland Security and P.O. Box 290 Emergency Preparedness New Roads, LA 70760 East Baton Rouge Parish 3773 Harding Blvd.

Riley Berthelot, Jr., President Baton Rouge, LA 70807 West Baton Rouge Parish Policy Jury P.O. Box 757 Don Ewing, Director Port Allen, LA 70767 Office of Emergency Preparedness Pointe Coupee Parish Federal Emergency Management Agency P.O. Box 248 Region VI New Roads, LA 70760 ATTN: William E. Peterson, Regional Director Jesse Means, Jr., Director FRC 800 North Loop 288 Office of Homeland Security and Denton, TX 76209-3698 Emergency Preparedness West Feliciana Parish P.O. Box 796 St. Francisville, LA 70775 Louis Kent, President East Feliciana Parish Policy Jury P.O. Box 427 Clinton, LA 70722

Entergy Operations, Inc. Kip Holden, Mayor-President Senior Vice President and COO Office of the Mayor-President Entergy Operations, Inc.

East Baton Rouge Parish P. O. Box 31995 222 St. Louis Street, 3rd Floor Jackson, MS 39286-1995 Baton Rouge, LA 70802 Vice President, Oversight Mike Futrell Entergy Operations, Inc.

Chief Administrative Officer P. O. Box 31995 Office of the Mayor-President Jackson, MS 39286-1995 East Baton Rouge Parish P.O. Box 1471 Senior Manager, Nuclear Safety &

Baton Rouge, LA 70821 Licensing Entergy Nuclear Operations Sharlot Edwards, Director P. O. Box 31995 Office of Emergency Preparedness Jackson, MS 39286-1995 West Baton Rouge Parish 2413 Ernest Wilson Dr. Manager, Licensing Port Allen, LA 70767 Entergy Operations, Inc.

River Bend Station Mark Cooper, Director 5485 US Highway 61N Governors Office of Homeland St. Francisville, LA 70775 Security and Emergency Preparedness 7667 Independence Blvd. Attorney General Baton Rouge, LA 70806 State of Louisiana P. O. Box 94005 Glen Kent, Director Baton Rouge, LA 70804-9005 Office of Homeland Security and Emergency Preparedness Ms. H. Anne Plettinger East Feliciana Parish 3456 Villa Rose Drive P.O. Box 427 Baton Rouge, LA 70806 Clinton, LA 70722 President of West Feliciana The Honorable William DAquilla Police Jury Mayor, Town of St. Francisville P. O. Box 1921 P.O. Box 400 St. Francisville, LA 70775 St. Francisville, LA 70775 Mr. Brian Almon Jeffrey P. Meyers Public Utility Commission Division Administrator William B. Travis Building Emergency and Radiological Services P. O. Box 13326 Division Austin, TX 78701-3326 LA Dept. of Environmental Quality P.O. Box 4312 Mr. Jim Calloway Baton Rouge, LA 70821-4312 Public Utility Commission of Texas Senior Vice President 1701 N. Congress Avenue Entergy Nuclear Operations Austin, TX 78711-3326 P.O. Box 31995 Jackson, MS 39286-1995

Entergy Operations, Inc. Louisiana Department of Environmental Associate General Counsel Quality Entergy Nuclear Operations Radiological Emergency Planning and P. O. Box 31995 Response Division Jackson, MS 39286-1995 P. O. Box 4312 Baton Rouge, LA 70821-4312 Chief, Technological Services Branch FEMA Region VI 800 N. Loop 288 Denton, TX 76201-3698

Entergy Operations, Inc. Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.goV)

DRP Director (Roy.Caniano@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Grant.Larkin@nrc.gov)

Branch Chief, DRP/C (Geoffrey.Miller@nrc.gov)

Senior Project Engineer, DRP/C (Wayne.Walker@nrc.gov)

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Regional State Liaison Officer (Bill.Maier@nrc.gov)

RA Secretary (Lucy.Owen@nrc.gov)

DRA Secretary (Judy.Kilcrease@nrc.gov)

Branch Chief, DRS/EB1 (Thomas.Farnholtz@nrc.gov)

Branch Chief, DRS/EB2 (Neil.OKeefe@nrc.gov)

Branch Chief, DRS/PSB1 (Michael.Shannon@nrc.gov)

Branch Chief, DRS/PSB2 (Greg.Werner@nrc.gov)

Branch Chief, DRS/OB (Bernard.Stapleton@nrc.gov)

OEDO RIV Coordinator, Primary (Shawn.Williams@nrc.gov)

OEDO RIV Coordinator, Backup (Eugene.Guthrie@nrc.gov)

OEDO, TRPS (Tamara.Bloomer@nrc.gov)

Deputy Director, DIRS, NRR (Frederick.Brown@nrc.gov)

Director, DORL, NRR (Joseph Giitter@nrc.gov)

Deputy Director, DORL, NRR (Timothy.McGinty@nrc.gov)

Chief, PLB IV, DORL, NRR (Thomas.Hiltz@nrc.gov)

NRR Project Manager (Fred.Lyon@nrc.gov)

Branch Chief, DRS Operations Branch (Bernard.Stapleton@nrc.gov)

RidsNrrDirslpab Resource@nrc.gov ROPreports.Resource@nrc.gov mortensengk@INPO.org File located: R:\_REACTOR\EOC\EOC Assessment Letter\2008\RBS.doc SUNSI Rev Compl. 7 Yes No ADAMS 7 Yes No Reviewer Initials WCW Publicly Avail 7 Yes No Sensitive Yes 7 No Sens. Type Initials WCW RIV/SPE/DRP/C SRI:RBS C:DRP/C D:DRS D:DRP WCWalker GLarkin GBMiller RJCaniano DDChamberlain

/RA/ /RA/T-Walker /RA/ /RA/ /RA/

2/19/2009 2/19/2009 2/19/2009 2/23/2009 2/23/2009 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Page 1 of 1 River Bend 02/23/2009 12:42:44 Inspection / Activity Plan Report 22 03/01/2009 - 06/30/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EB1-17T - 50.59 AND MODS 3 1 04/27/2009 05/08/2009 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications PSB2-52B - BIENNIAL PI&R INSPECTION 4 1 06/15/2009 06/19/2009 IP 71152B Identification and Resolution of Problems 1 07/06/2009 07/10/2009 IP 71152B Identification and Resolution of Problems RP-ORS4 - OCCUPATIONAL RADIATION SAFETY - ACCESS 1 1 09/21/2009 09/25/2009 IP 7112101 Access Control to Radiologically Significant Areas 1 09/21/2009 09/25/2009 IP 7112102 ALARA Planning and Controls 1 09/21/2009 09/25/2009 IP 71151 Performance Indicator Verification EB1-08 - INSERVICE INSPECTION 1 1 09/28/2009 10/02/2009 IP 7111108G Inservice Inspection Activities - BWR RP-TRANS - TRANSPORTATION 1 1 10/13/2009 10/16/2009 IP 7112202 Radioactive Material Processing and Transportation RP-ORS5 - OCCUPATIONAL RADIATION SAFETY - ALARA 1 1 12/14/2009 12/18/2009 IP 7112101 Access Control to Radiologically Significant Areas 1 12/14/2009 12/18/2009 IP 7112102 ALARA Planning and Controls 1 12/14/2009 12/18/2009 IP 71151 Performance Indicator Verification EXAM - INITIAL EXAM 4 1 03/15/2010 03/19/2010 X02443 INITIAL EXAM-RB (04/2010) 1 04/19/2010 04/23/2010 X02443 INITIAL EXAM-RB (04/2010)

EB2-05T - TRIENNIAL FIRE PROTECTION 4 1 04/05/2010 04/09/2010 IP 7111105T Fire Protection [Triennial]

1 04/19/2010 04/23/2010 IP 7111105T Fire Protection [Triennial]

EP-1 - BIENNIAL EP EXERCISE INSPECTION 3 1 06/07/2010 06/11/2010 IP 7111401 Exercise Evaluation 1 06/07/2010 06/11/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 06/07/2010 06/11/2010 IP 71151-EP01 Drill/Exercise Performance 1 06/07/2010 06/11/2010 IP 71151-EP02 ERO Drill Participation 1 06/07/2010 06/11/2010 IP 71151-EP03 Alert & Notification System This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.