ML091520300: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE  
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:        RO SYSTEM a TITLE:        TERMINATE FROM EMERGENCY BORATION CANDIDATE: _____________________________________________
EXAMINER:  _____________________________________________


JPM: RO SYSTEM a TITLE: TERMINATE FROM EMERGENCY BORATION 
JPM-RO SYSTEM a JOB PERFORMANCE MEASURE DATA PAGE Task:   Align Charging Pump Suction to SIRWT (Safety Injection Refueling Water Tank)
 
Alternate Path: NO Facility JPM #: PL-OPS-EOP-032J K/A: 004A4.18             Importance:       RO: 4.3       SRO: 4.1 K/A Statement: Ability to manually operate and/or monitor in the control room:
CANDIDATE: _____________________________________________
Emergency borate valve Task Standard: Emergency Boration secured with Charging Pump suction to the SIRWT and all Charging Pumps operating.
 
Preferred Evaluation Location: Simulator         __X__   In Plant   _____
EXAMINER: _____________________________________________
Preferred Evaluation Method:       Perform     __X__   Simulate   _____
 
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 2 of 8 JULY 2008  JOB PERFORMANCE MEASURE DATA PAGE Task: Align Charging Pump Suction to SIRWT (Safety Injection Refueling Water Tank)
Alternate Path: NO  
 
Facility JPM #: PL-OPS-EOP-032J  
 
K/A: 004A4.18   Importance: RO: 4.3   SRO: 4.1  
 
K/A Statement: Ability to manually operate and/or monitor in the control room: Emergency borate valve  
 
Task Standard: Emergency Boration secured with Charging Pump suction to the SIRWT and all Charging Pumps operating.  
 
Preferred Evaluation Location: Simulator __X__ In Plant _____  
 
Preferred Evaluation Method: Perform __X__ Simulate _____  


==References:==
==References:==
EOP-4.0, Loss Of Coolant Recovery     EOP Supplement 40, Charging Pump Suction Alignment  
EOP-4.0, Loss Of Coolant Recovery EOP Supplement 40, Charging Pump Suction Alignment Validation Time:5 minutes           Time Critical:     NO Candidate: ___________________________________________________
 
Time Start: ________         Time Finish:       ________
Validation Time: 5 minutes Time Critical: NO  
Performance Time:         ________ minutes Performance Rating:       SAT______         UNSAT ______
 
Comments:
Candidate: ___________________________________________________  
Examiner: _______________________________                 Date:   ______________
 
Signature PALISADES NUCLEAR PLANT                   Page 2 of 8                         JULY 2008
Time Start: ________ Time Finish: ________  
 
Performance Time: ________ minutes  
 
Performance Rating: SAT______ UNSAT ______  
 
Comments:  
 
Examiner: _______________________________ Date: ______________ Signature JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 3 of 8 JULY 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
EOP Supplement 40, Charging Pump Suction Alignment, Rev. 5
 
Also see Simulator Operator Instructions (last page of this document).
 
READ TO CANDIDATE
 
DIRECTION TO CANDIDATE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.


JPM-RO SYSTEM a EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
EOP Supplement 40, Charging Pump Suction Alignment, Rev. 5 Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE DIRECTION TO CANDIDATE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* A Loss of Coolant Accident has occurred.
* A Loss of Coolant Accident has occurred.
* SIS and CHR have occurred.
* SIS and CHR have occurred.
* PCS boron concentration has been verified greater than the required concentration per EOP Supplement 35, Determination of Emergency Boration Requirements.  
* PCS boron concentration has been verified greater than the required concentration per EOP Supplement 35, Determination of Emergency Boration Requirements.
 
INITIATING CUES:
INITIATING CUES:
* During performance of EOP-4.0, "Loss of Coolant Accident Recovery," Step 22, the Control Room Supervisor directs you to secure Emergency Boration per EOP Supplement 40 aligning Charging Pump suction to the SIRWT with all Charging Pumps left operating.  
* During performance of EOP-4.0, Loss of Coolant Accident Recovery, Step 22, the Control Room Supervisor directs you to secure Emergency Boration per EOP Supplement 40 aligning Charging Pump suction to the SIRWT with all Charging Pumps left operating.
 
PALISADES NUCLEAR PLANT                     Page 3 of 8                             JULY 2008
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 4 of 8 JULY 2008 Proc. Step TASK ELEMENT 1 STANDARD Graden/a Locate EOP Supplement 40, Charging Pump Suction Alignment EOP Supplement 40 located.
S  U Comment:  Evaluator hands operator a Working Copy.
 
Proc. Step TASK ELEMENT 2 STANDARD Grade2.01 Open Charging Pumps Suction From SIRWT Valve, MO-2160 MO-2160 handswitch taken to the open position (valve opens).
S  U Comment:  Note: MO-2160 will take a little time to stroke open.
CRITICAL STEP
 
Proc. Step TASK ELEMENT 3 STANDARD Grade2.02 Stop the Boric Acid Pumps. P-56A  P-56B  P-56A AND P-56B handswitches to the trip position (Pumps off).
S  U Comment:
CRITICAL STEP
 
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 5 of 8 JULY 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade2.03 Close the following valves:  Boric Acid Pump Feed Valve, MO-2140  Gravity Feed Valves  MO-2169  MO-2170  MO-2140, MO-2169, and MO-2170 handswitches taken to the closed position (valves close)
S  U Comment:  Note: MO-2140, MO-2169, and MO-2170 will take a little time to stroke closed.
CRITICAL STEP
 
Proc. Step TASK ELEMENT 5 STANDARD Grade2.04 Ensure closed Charging Pumps Suction VCT Outlet Valve, MO-2087.
MO-2087 verified closed.
S  U Comment: 
 
Proc. Step TASK ELEMENT 6 STANDARD Grade2.05 Operate each Charging Pump for at least five minutes.
Determines that all Charging pumps will be left in-service (given in initial conditions).
S  U Comment: 
 
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 6 of 8 JULY 2008 Proc. Step TASK ELEMENT 7 STANDARD Grade2.06 WHEN each pump has been operated at least five minutes, -.
Determines that all Charging pumps will be left in-service (given in initial conditions).
S  U Comment:  Evaluator Cue: Inform Operator that another Operator will perform this step.
 
Proc. Step TASK ELEMENT 8 STANDARD Graden/a EOP Supplement 40 is Signed, Dated/Timed EOP Supplement 40 Signed, Dated/Timed S  U Comment: 


Proc. Step TASK ELEMENT 9 STANDARD Grade n/a Notify CRS of the completion of EOP Supplement 40 CRS notified that EOP Supplement 40 complete S U Comment:
JPM-RO SYSTEM a Proc. Step             TASK ELEMENT 1                                STANDARD                     Grade Locate EOP Supplement 40, Charging EOP Supplement 40 located.
n/a    Pump Suction Alignment                                                                  S U Comment:
Evaluator hands operator a Working Copy.
Proc. Step            TASK ELEMENT 2                                STANDARD                    Grade Open Charging Pumps Suction From          MO-2160 handswitch taken to the open position 2.01    SIRWT Valve, MO-2160                      (valve opens).                                S U Comment:
Note: MO-2160 will take a little time to stroke open.
CRITICAL STEP Proc. Step            TASK ELEMENT 3                                STANDARD                    Grade Stop the Boric Acid Pumps.
P-56A AND P-56B handswitches to the trip P-56A 2.02                                              position (Pumps off).                          S U P-56B Comment:
CRITICAL STEP PALISADES NUCLEAR PLANT                    Page 4 of 8                                  JULY 2008


END OF TASK  
JPM-RO SYSTEM a Proc. Step              TASK ELEMENT 4                                      STANDARD                        Grade Close the following valves:
Boric Acid Pump Feed Valve, MO-2140 MO-2140, MO-2169, and MO-2170 Gravity Feed Valves                    handswitches taken to the closed position 2.03                                                  (valves close)                                      S U MO-2169 MO-2170 Comment:
Note: MO-2140, MO-2169, and MO-2170 will take a little time to stroke closed.
CRITICAL STEP Proc. Step              TASK ELEMENT 5                                      STANDARD                        Grade Ensure closed Charging Pumps Suction MO-2087 verified closed.
2.04    VCT Outlet Valve, MO-2087.                                                                        S U Comment:
Proc. Step              TASK ELEMENT 6                                      STANDARD                        Grade Operate each Charging Pump for at least      Determines that all Charging pumps will be left in-2.05    five minutes.                                service (given in initial conditions).              S U Comment:
PALISADES NUCLEAR PLANT                      Page 5 of 8                                      JULY 2008


JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 7 of 8 JULY 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
JPM-RO SYSTEM a Proc. Step              TASK ELEMENT 7                                      STANDARD                        Grade WHEN each pump has been operated at          Determines that all Charging pumps will be left in-2.06    least five minutes, .                      service (given in initial conditions).              S U Comment:
Evaluator Cue: Inform Operator that another Operator will perform this step.
Proc. Step              TASK ELEMENT 8                                      STANDARD                        Grade EOP Supplement 40 is Signed, EOP Supplement 40 Signed, Dated/Timed n/a    Dated/Timed                                                                                      S U Comment:
Proc. Step              TASK ELEMENT 9                                      STANDARD                        Grade Notify CRS of the completion of EOP CRS notified that EOP Supplement 40 complete n/a    Supplement 40                                                                                    S U Comment:
END OF TASK PALISADES NUCLEAR PLANT                       Page 6 of 8                                       JULY 2008


JPM-RO SYSTEM a CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* A Loss of Coolant Accident has occurred.
* A Loss of Coolant Accident has occurred.
* SIS and CHR have occurred.
* SIS and CHR have occurred.
* PCS boron concentration has been verified greater than the required concentration per EOP Supplement 35, Determination of Emergency Boration Requirements.  
* PCS boron concentration has been verified greater than the required concentration per EOP Supplement 35, Determination of Emergency Boration Requirements.
 
INITIATING CUES:
INITIATING CUES:
* During performance of EOP-4.0, "Loss of Coolant Accident Recovery," Step 22, the Control Room Supervisor directs you to secure Emergency Boration per EOP Supplement 40 aligning Charging Pump suction to the SIRWT with all Charging Pumps left operating.  
* During performance of EOP-4.0, Loss of Coolant Accident Recovery, Step 22, the Control Room Supervisor directs you to secure Emergency Boration per EOP Supplement 40 aligning Charging Pump suction to the SIRWT with all Charging Pumps left operating.
 
PALISADES NUCLEAR PLANT               Page 7 of 8                           JULY 2008
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 8 of 8 JULY 2008 SIMULATOR OPERATOR INSTRUCTIONS


USE IC-79}}
JPM-RO SYSTEM a SIMULATOR OPERATOR INSTRUCTIONS USE IC-79 PALISADES NUCLEAR PLANT          Page 8 of 8                JULY 2008}}

Revision as of 05:13, 14 November 2019

NRC Region III, Initial License Exam, Job Performance Measure, JPM: RO System a, Title: Terminate from Emergency Boration
ML091520300
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/07/2008
From:
NRC/RGN-III
To:
Entergy Nuclear Palisades
Shared Package
ML082200311 List:
References
Download: ML091520300 (8)


Text

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO SYSTEM a TITLE: TERMINATE FROM EMERGENCY BORATION CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM-RO SYSTEM a JOB PERFORMANCE MEASURE DATA PAGE Task: Align Charging Pump Suction to SIRWT (Safety Injection Refueling Water Tank)

Alternate Path: NO Facility JPM #: PL-OPS-EOP-032J K/A: 004A4.18 Importance: RO: 4.3 SRO: 4.1 K/A Statement: Ability to manually operate and/or monitor in the control room:

Emergency borate valve Task Standard: Emergency Boration secured with Charging Pump suction to the SIRWT and all Charging Pumps operating.

Preferred Evaluation Location: Simulator __X__ In Plant _____

Preferred Evaluation Method: Perform __X__ Simulate _____

References:

EOP-4.0, Loss Of Coolant Recovery EOP Supplement 40, Charging Pump Suction Alignment Validation Time:5 minutes Time Critical: NO Candidate: ___________________________________________________

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 8 JULY 2008

JPM-RO SYSTEM a EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

EOP Supplement 40, Charging Pump Suction Alignment, Rev. 5 Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • A Loss of Coolant Accident has occurred.
  • SIS and CHR have occurred.
  • PCS boron concentration has been verified greater than the required concentration per EOP Supplement 35, Determination of Emergency Boration Requirements.

INITIATING CUES:

  • During performance of EOP-4.0, Loss of Coolant Accident Recovery, Step 22, the Control Room Supervisor directs you to secure Emergency Boration per EOP Supplement 40 aligning Charging Pump suction to the SIRWT with all Charging Pumps left operating.

PALISADES NUCLEAR PLANT Page 3 of 8 JULY 2008

JPM-RO SYSTEM a Proc. Step TASK ELEMENT 1 STANDARD Grade Locate EOP Supplement 40, Charging EOP Supplement 40 located.

n/a Pump Suction Alignment S U Comment:

Evaluator hands operator a Working Copy.

Proc. Step TASK ELEMENT 2 STANDARD Grade Open Charging Pumps Suction From MO-2160 handswitch taken to the open position 2.01 SIRWT Valve, MO-2160 (valve opens). S U Comment:

Note: MO-2160 will take a little time to stroke open.

CRITICAL STEP Proc. Step TASK ELEMENT 3 STANDARD Grade Stop the Boric Acid Pumps.

P-56A AND P-56B handswitches to the trip P-56A 2.02 position (Pumps off). S U P-56B Comment:

CRITICAL STEP PALISADES NUCLEAR PLANT Page 4 of 8 JULY 2008

JPM-RO SYSTEM a Proc. Step TASK ELEMENT 4 STANDARD Grade Close the following valves:

Boric Acid Pump Feed Valve, MO-2140 MO-2140, MO-2169, and MO-2170 Gravity Feed Valves handswitches taken to the closed position 2.03 (valves close) S U MO-2169 MO-2170 Comment:

Note: MO-2140, MO-2169, and MO-2170 will take a little time to stroke closed.

CRITICAL STEP Proc. Step TASK ELEMENT 5 STANDARD Grade Ensure closed Charging Pumps Suction MO-2087 verified closed.

2.04 VCT Outlet Valve, MO-2087. S U Comment:

Proc. Step TASK ELEMENT 6 STANDARD Grade Operate each Charging Pump for at least Determines that all Charging pumps will be left in-2.05 five minutes. service (given in initial conditions). S U Comment:

PALISADES NUCLEAR PLANT Page 5 of 8 JULY 2008

JPM-RO SYSTEM a Proc. Step TASK ELEMENT 7 STANDARD Grade WHEN each pump has been operated at Determines that all Charging pumps will be left in-2.06 least five minutes, . service (given in initial conditions). S U Comment:

Evaluator Cue: Inform Operator that another Operator will perform this step.

Proc. Step TASK ELEMENT 8 STANDARD Grade EOP Supplement 40 is Signed, EOP Supplement 40 Signed, Dated/Timed n/a Dated/Timed S U Comment:

Proc. Step TASK ELEMENT 9 STANDARD Grade Notify CRS of the completion of EOP CRS notified that EOP Supplement 40 complete n/a Supplement 40 S U Comment:

END OF TASK PALISADES NUCLEAR PLANT Page 6 of 8 JULY 2008

JPM-RO SYSTEM a CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • A Loss of Coolant Accident has occurred.
  • SIS and CHR have occurred.
  • PCS boron concentration has been verified greater than the required concentration per EOP Supplement 35, Determination of Emergency Boration Requirements.

INITIATING CUES:

  • During performance of EOP-4.0, Loss of Coolant Accident Recovery, Step 22, the Control Room Supervisor directs you to secure Emergency Boration per EOP Supplement 40 aligning Charging Pump suction to the SIRWT with all Charging Pumps left operating.

PALISADES NUCLEAR PLANT Page 7 of 8 JULY 2008

JPM-RO SYSTEM a SIMULATOR OPERATOR INSTRUCTIONS USE IC-79 PALISADES NUCLEAR PLANT Page 8 of 8 JULY 2008