ML091520338: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE  
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:        RO SYSTEM h TITLE:        SET RIA-1113 WASTE GAS DISCHARGE MONITOR HI ALARM SETPOINT CANDIDATE: _____________________________________________
EXAMINER:  _____________________________________________


JPM: RO SYSTEM h TITLE: SET RIA-1113 WASTE GAS DISCHARGE MONITOR HI ALARM SETPOINT
JPM: RO SYSTEM h JOB PERFORMANCE MEASURE DATA PAGE Task:   Adjust RIA-1113 Waste Gas Discharge Monitor Hi Alarm Setpoint Alternate Path: NO Facility JPM #: PL-OPS-RMS-001J K/A: 073A4.01           Importance:       RO: 3.9           SRO: 3.9 K/A Statement: Ability to manually operate and/or monitor in the control room: effluent release Task Standard: Waste Gas Discharge Monitor,RIA-1113, high alarm setpoint adjusted to 8585 CPM Preferred Evaluation Location: Simulator       __X__   In Plant     _____
 
Preferred Evaluation Method:       Perform     __X__   Simulate     _____
CANDIDATE: _______________
__________________
____________
 
EXAMINER: _____________________________________________
 
JPM: RO SYSTEM h JOB PERFORMANCE MEASURE DATA PAGE Task: Adjust RIA-1113 Waste Gas Di scharge Monitor Hi Alarm Setpoint  
 
Alternate Path: NO  
 
Facility JPM #: PL-OPS-RMS-001J  
 
K/A: 073A4.01   Importance: RO: 3.9   SRO: 3.9  
 
K/A Statement: Ability to manual ly operate and/or monitor in the control room: effluent release Task Standard: Waste Gas Discharge Monitor,RIA-1113, high alarm setpoint adjusted to 8585 CPM  
 
Preferred Evaluation Location: Simulator __X__ In Plant _____  
 
Preferred Evaluation Method: Perform __X__ Simulate _____  


==References:==
==References:==
SOP-38, Gaseous Waste Monitoring System Validation Time:10 minutes        Time Critical:    NO Candidate: _____________________________________________________
Time Start: ________        Time Finish:      ________
Performance Time:        ________ minutes Performance Rating:      SAT______        UNSAT ______
Comments:
Examiner: _______________________________              Date:    ______________
Signature PALISADES NUCLEAR PLANT                  Page 2 of 10                          JULY 2008


SOP-38, Gaseous Waste Monitoring System
JPM: RO SYSTEM h EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
Validation Time: 10 minutes  Time Critical: NO
 
Candidate: _________
________________________
____________________
 
Time Start: ________  Time Finish: ________
 
Performance Time:  ________  minutes
 
Performance Rating: SAT______  UNSAT ______
 
Comments:
 
Examiner: _________
______________________  Date: ______________
Signature PALISADES NUCLEAR PLANT Page 2 of 10 JULY 2008 JPM: RO SYSTEM h EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
SOP-38, Gaseous Waste Monitoring System Release Order, Form HP 6.6-3 (batch card)
SOP-38, Gaseous Waste Monitoring System Release Order, Form HP 6.6-3 (batch card)
Safety glasses (optional)
Safety glasses (optional)
Fire Retardant Class 1 Electr ical Safety Shirt (optional)  
Fire Retardant Class 1 Electrical Safety Shirt (optional)
 
Also see Simulator Operator Instructions (last page of this document).
Also see Simulator Operator Instructions (last page of this document).  
READ TO CANDIDATE DIRECTION TO CANDIDATE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
READ TO CANDIDATE  
 
DIRECTION TO CANDIDATE:  
 
I will explain the initial conditions, and state the task to be per formed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.  
 
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* Waste Gas Discharge Monitor, RIA-1113 Batch Card background reading = 95 CPM.
* Waste Gas Discharge Monitor, RIA-1113 Batch Card background reading = 95 CPM.
* Waste Gas Discharge Monitor, RIA-1113 Batch Card Release Limit = 8500 CPM
* Waste Gas Discharge Monitor, RIA-1113 Batch Card Release Limit = 8500 CPM
* Waste Gas Discharge Monitor, RIA-1113 Batch Card "High Alarm Setpoint" = 8600 CPM.
* Waste Gas Discharge Monitor, RIA-1113 Batch Card High Alarm Setpoint = 8600 CPM.
* Release Order, Form HP 6.6-3 (batch card) is available.
* Release Order, Form HP 6.6-3 (batch card) is available.
* Breaker 34 on Y-01 is closed.
* Breaker 34 on Y-01 is closed.
* RIA-1113 has been verified aligned for service per Attachment 5, Checklist 38, "Gaseous Process Radiation Monitors System Checklist"
* RIA-1113 has been verified aligned for service per Attachment 5, Checklist 38, Gaseous Process Radiation Monitors System Checklist
* A check source has been completed on RIA-1113 with a reading of 620000 CPM.
* A check source has been completed on RIA-1113 with a reading of 620000 CPM.
INITIATING CUES:
INITIATING CUES:
* The CRS directs you to set up Waste Gas Discharge Monitor, RIA-1113 High Alarm Setpoint using SOP-38 Section 7.3.6 to a setpoint of 8600 cpm.  
* The CRS directs you to set up Waste Gas Discharge Monitor, RIA-1113 High Alarm Setpoint using SOP-38 Section 7.3.6 to a setpoint of 8600 cpm.
 
PALISADES NUCLEAR PLANT                     Page 3 of 10                             JULY 2008
PALISADES NUCLEAR PLANT Page 3 of 10 JULY 2008 JPM: RO SYSTEM h Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Locate SOP-38, Section 7.3.6 SOP-38, Section 7.3.6 located
 
S  U Comment:
Evaluator provides candidate with a Work ing Copy of SOP-38 and Form HP 6.6-3
 
Proc. Step TASK ELEMENT 2 STANDARD Grade7.3.6a READ the "As Found" count rate on RIA-1113, Waste Gas Discharge Monitor 9.5 x 10 1 "As Found" count rate read on RIA-1113 (given in initial conditions)
 
S  U Comment: 
 
Proc. Step TASK ELEMENT 3 STANDARD Grade7.3.6b PULL RIA-1113 out from the panel about (6) inches to access the control buttons RIA-1113 pulled out from panel about 6 inches.
 
S  U Comment:
NOTE: Operator may don safety gl asses and a Fire Retardant Class 1 electrical safety shirt, although this is not required.
 
Proc. Step TASK ELEMENT 4 STANDARD Grade7.3.6c VERIFY the Function switch is on "0." (seen on the right side of the switch)
Verifies right side of Function Switch is set to "0". S  U Comment:
PALISADES NUCLEAR PLANT Page 4 of 10 JULY 2008 JPM: RO SYSTEM h Proc. Step TASK ELEMENT 5 STANDARD Grade7.3.6d PRESS Enter button to display the High Alarm setpoint.
Enter button pressed and one digit blinking.
S  U Comment: NOTE: Control buttons and Function switch ar e located on the right, inside RIA-1113. The control buttons are labeled Digit, Value, and Enter.
CRITICAL STEP
 
Proc. Step TASK ELEMENT 6 STANDARD Grade7.3.6e SET the High Alarm Setpoint per Form HP 6.6-3, WGDT Release Authorization, by performing the following as necessary:  IF changing the digit value, THEN PRESS the Value pushbutton until the desired value for that digit is displayed  IF selecting another digit, THEN PRESS the Digit pushbutton "Digit" and "Value" push buttons used to change the trip setpoint to 8.6 x 10 3 (8600) CPM value.
S  U Comment:
CRITICAL STEP
 
Proc. Step TASK ELEMENT 7 STANDARD Grade7.3.6f WHEN entire display indicates the desired Setpoint, THEN PRESS the Enter pushbutton Enter pushbutton pressed
 
S  U Comment:
CRITICAL STEP
 
PALISADES NUCLEAR PLANT Page 5 of 10 JULY 2008 JPM: RO SYSTEM h Proc. Step TASK ELEMENT 8 STANDARD Grade7.3.6g PUSH the monitor back into panel.
Monitor pushed back into panel.
S  U Comment: 
 
Proc. Step TASK ELEMENT 9 STANDARD Grade7.3.6h PRESS High Alarm pushbutton on the front of RIA-1113 to verify High Alarm Setpoint is correct.
High Alarm push button pressed and 8.6 x 10 3 (8600) CPM trip setpoint verified.


S U Comment:
JPM: RO SYSTEM h Proc. Step            TASK ELEMENT 1                                        STANDARD                      Grade Locate SOP-38, Section 7.3.6                  SOP-38, Section 7.3.6 located n/a                                                                                                      S U Comment:
Evaluator provides candidate with a Working Copy of SOP-38 and Form HP 6.6-3 Proc. Step            TASK ELEMENT 2                                        STANDARD                      Grade READ the As Found count rate on RIA-        9.5 x 101 As Found count rate read on RIA-7.3.6a    1113, Waste Gas Discharge Monitor              1113 (given in initial conditions)                S U Comment:
Proc. Step            TASK ELEMENT 3                                        STANDARD                      Grade PULL RIA-1113 out from the panel about RIA-1113 pulled out from panel about 6 inches.
7.3.6b    (6) inches to access the control buttons                                                          S U Comment:
NOTE: Operator may don safety glasses and a Fire Retardant Class 1 electrical safety shirt, although this is not required.
Proc. Step            TASK ELEMENT 4                                        STANDARD                      Grade VERIFY the Function switch is on 0.          Verifies right side of Function Switch is set to 7.3.6c    (seen on the right side of the switch)        0.                                              S U Comment:
PALISADES NUCLEAR PLANT                        Page 4 of 10                                      JULY 2008


Proc. Step TASK ELEMENT 10 STANDARD Grade7.3.6i PRESS Alarm Ack pushbutton to clear any alarms that may have annunciated.
JPM: RO SYSTEM h Proc. Step             TASK ELEMENT 5                                          STANDARD                     Grade PRESS Enter button to display the High Enter button pressed and one digit blinking.
Alarms clear.
7.3.6d    Alarm setpoint.                                                                                    S U Comment:
S U Comment:
NOTE: Control buttons and Function switch are located on the right, inside RIA-1113. The control buttons are labeled Digit, Value, and Enter.
CRITICAL STEP Proc. Step              TASK ELEMENT 6                                          STANDARD                    Grade SET the High Alarm Setpoint per Form HP 6.6-3, WGDT Release Authorization, by performing the following as necessary:          "Digit" and "Value" push buttons used to change 3
the trip setpoint to 8.6 x 10 (8600) CPM value.
IF changing the digit value, THEN 7.3.6e                                                                                                      S U PRESS the Value pushbutton until the desired value for that digit is displayed IF selecting another digit, THEN PRESS the Digit pushbutton Comment:
CRITICAL STEP Proc. Step              TASK ELEMENT 7                                          STANDARD                    Grade WHEN entire display indicates the desired Setpoint, THEN PRESS the Enter                  Enter pushbutton pressed 7.3.6f  pushbutton                                                                                        S U Comment:
CRITICAL STEP PALISADES NUCLEAR PLANT                          Page 5 of 10                                    JULY 2008


Proc. Step TASK ELEMENT 11 STANDARD Grade7.3.6j VERIFY EK-1364, "Gaseous Waste Monitoring Hi Radiation" annunciator is CLEAR. Alarm clear.
JPM: RO SYSTEM h Proc. Step            TASK ELEMENT 8                                      STANDARD                      Grade PUSH the monitor back into panel.              Monitor pushed back into panel.
S U Comment:
7.3.6g                                                                                                  S U Comment:
PALISADES NUCLEAR PLANT Page 6 of 10 JULY 2008 JPM: RO SYSTEM h PALISADES NUCLEAR PLANT Page 7 of 10 JULY 2008 Proc. Step TASK ELEMENT 12 STANDARD Grade7.3.6k NOTIFY RETS/REMP representative of the new High Alarm Setpoint.
Proc. Step            TASK ELEMENT 9                                      STANDARD                      Grade PRESS High Alarm pushbutton on the                                                        3 High Alarm push button pressed and 8.6 x 10 front of RIA-1113 to verify High Alarm 7.3.6h                                                  (8600) CPM trip setpoint verified.              S U Setpoint is correct.
Step not necessary, setpoint raised for batch release. S  U Comment:
Comment:
NOTE: Evaluator: If operator starts to contact RETS/REMP, STATE: they are aware that the High Alarm Setpoint has been raised for the batch release.
Proc. Step             TASK ELEMENT 10                                    STANDARD                     Grade PRESS Alarm Ack pushbutton to clear any Alarms clear.
7.3.6i  alarms that may have annunciated.                                                              S U Comment:
Proc. Step            TASK ELEMENT 11                                    STANDARD                      Grade VERIFY EK-1364, Gaseous Waste Monitoring Hi Radiation annunciator is       Alarm clear.
7.3.6j  CLEAR.                                                                                        S U Comment:
PALISADES NUCLEAR PLANT                         Page 6 of 10                                   JULY 2008


Proc. Step TASK ELEMENT 13 STANDARD Grade n/a Notify the CRS that RIA-1113 High Alarm Setpoint is 8.6 x 10 3 (8600) CPM.
JPM: RO SYSTEM h Proc. Step            TASK ELEMENT 12                                  STANDARD                      Grade NOTIFY RETS/REMP representative of          Step not necessary, setpoint raised for batch 7.3.6k    the new High Alarm Setpoint.                release.                                        S U Comment:
CRS notified of RIA-1113 setpoint raised to 8.6 x 10 3 (8600) CPM.
NOTE: Evaluator: If operator starts to contact RETS/REMP, STATE: they are aware that the High Alarm Setpoint has been raised for the batch release.
S U Comment:
Proc. Step             TASK ELEMENT 13                                 STANDARD                       Grade Notify the CRS that RIA-1113 High Alarm     CRS notified of RIA-1113 setpoint raised to 8.6 3
NOTE: Evaluator Cue: If Operator asks if Batch Card needs to be signed in "Alarm Set By:" space, RESOND: YES, sign the Batch Card END OF TASK  
n/a    Setpoint is 8.6 x 10 (8600) CPM.           x 103 (8600) CPM.                                S U Comment:
 
NOTE: Evaluator Cue: If Operator asks if Batch Card needs to be signed in Alarm Set By: space, RESOND: YES, sign the Batch Card END OF TASK PALISADES NUCLEAR PLANT                      Page 7 of 10                                    JULY 2008
JPM: RO SYSTEM h CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)


JPM: RO SYSTEM h CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* Waste Gas Discharge Monitor, RIA-1113 Batch Card background reading = 95 CPM.
* Waste Gas Discharge Monitor, RIA-1113 Batch Card background reading = 95 CPM.
* Waste Gas Discharge Monitor, RIA-1113 Batch Card Release Limit = 8500 CPM
* Waste Gas Discharge Monitor, RIA-1113 Batch Card Release Limit = 8500 CPM
* Waste Gas Discharge Monitor, RIA-1113 Batch Card "High Alarm Setpoint" = 8600 CPM.
* Waste Gas Discharge Monitor, RIA-1113 Batch Card High Alarm Setpoint = 8600 CPM.
* Release Order, Form HP 6.6-3 (batch card) is available.
* Release Order, Form HP 6.6-3 (batch card) is available.
* Breaker 34 on Y-01 is closed.
* Breaker 34 on Y-01 is closed.
* RIA-1113 has been verified aligned for service per Attachment 5, Checklist 38, "Gaseous Process Radiation Monitors System Checklist"
* RIA-1113 has been verified aligned for service per Attachment 5, Checklist 38, Gaseous Process Radiation Monitors System Checklist
* A check source has been completed on RIA-1113 with a reading of 620000CPM.  
* A check source has been completed on RIA-1113 with a reading of 620000CPM.
 
INITIATING CUES:
INITIATING CUES:
* The CRS directs you to set up Waste Gas Discharge Monitor, RIA-1113 High Alarm Setpoint using SOP-38 Section 7.3.6 to a setpoint of 8600 cpm.  
* The CRS directs you to set up Waste Gas Discharge Monitor, RIA-1113 High Alarm Setpoint using SOP-38 Section 7.3.6 to a setpoint of 8600 cpm.
PALISADES NUCLEAR PLANT              Page 8 of 10                            JULY 2008


PALISADES NUCLEAR PLANT Page 8 of 10 JULY 2008 JPM: RO SYSTEM h SIMULATOR OPERATOR INSTRUCTIONS Initial Setup: Any IC RIA-1113 initial High al arm setpoint 2.5 x 10 3  Fill out WGDT Release Authorization, for HP 6.6-3 (procedure HP-6.6, Attachment
JPM: RO SYSTEM h SIMULATOR OPERATOR INSTRUCTIONS Initial Setup:
Any IC RIA-1113 initial High alarm setpoint 2.5 x 103 Fill out WGDT Release Authorization, for HP 6.6-3 (procedure HP-6.6, Attachment
: 4) as follows:
: 4) as follows:
HP 6.6-3, page 1 of 2:   SEE ATTACHED HP FORM RIA-1113 initial High al arm setpoint 2.5 x 10 3  RESET RIA-1113 to 2.5 x 10 3 at end of JPM PALISADES NUCLEAR PLANT Page 9 of 10 JULY 2008 PALISADES NUCLEAR PLANT Page 10 of 10 JULY 2008 FORM HP 6.6-3 Proc No HP 6.6 Attachment 3 WGDT RELEASE AUTHORIZATION Revision 21 Page 1 of 2 WGDT # __T-101C______  Batch Number __
HP 6.6-3, page 1 of 2:
08________013_____        Isolation Date  07/12/07  Time  1200 
SEE ATTACHED HP FORM RIA-1113 initial High alarm setpoint 2.5 x 103 RESET RIA-1113 to 2.5 x 103 at end of JPM PALISADES NUCLEAR PLANT               Page 9 of 10                         JULY 2008
 
Release Volume 32.5  m 3 Isolation Pressure 93  psig 
 
Gamma Conc 7.24E-5  Ci/cc Release Pressure 93  psig 
 
Expected RIA-1113 RDG 9.5 x 10 1  cpm Qtr A i/C i  0.1  (must be < 0.5)
Year-to-Date A i/C i  0.24  (must be < 1.0)
APPROVAL TO RELEASE RIA-1113 Release Limit        8.5E+3        cpm  RETS Analyst  Jane Retssup Today  /  0815          Shift Manager  Ralph Manager Today  /  0840            Main Exhaust Fan In Service      V-6A      V-6B I/S fan    Purge RIA-1113 Source Check RIA-1113  6.5 X 10 5 cpm 
 
RIA-1113 Release Limit  8.5 x 10 3 cpm 
 
RIA-1113 Background 
+  9.5 x 10 1 cpm RIA-1113 Alarm Setpt =  8.6 x 10 3  cpm Alarm Set By:
 
Alarm Verified By:
Purge RIA-1113 After Release Reset Alarm to 2500 cpm
 
Alarm Reset By:
 
C O N T R O L  R M  O P E R  Alarm Reset Verified By:


If RIA-1113 is not operational, effluent releases may continue provided that prior to release:
FORM HP 6.6-3                              Proc No HP 6.6 Attachment 3 WGDT RELEASE AUTHORIZATION                            Revision 21 Page 1 of 2 WGDT # __T-101C______ Batch Number __08________013_____
: 1. At least two independent samples are analyzed; and
Isolation Date 07/12/07        Time 1200                    Release Volume                                32.5 m3
: 2. At least two technically qualified members of the Facility Staff independently verify the release rate calculations and discharge line valving.
                                                                                                            -5 Isolation Pressure                            93 psig      Gamma Conc                              7.24E Ci/cc 1
Palisades ODCM Appendix A, Table A-1, Item 1.a Action 1.
Release Pressure                              93 psig      Expected RIA-1113 RDG                    9.5 x 10 cpm Qtr A i /C i 0.1    (must be < 0.5)
Remarks:}}
Year-to-Date A i /C i  0.24    (must be < 1.0)
APPROVAL TO RELEASE
                                        +3 RIA-1113 Release Limit          8.5E        cpm RETS Analyst Jane Retssup                    Today / 0815 Shift Manager    Ralph Manager              Today / 0840 C    Main Exhaust Fan                                      If RIA-1113 is not operational, effluent releases O    In Service    V-6A        V-6B I/S fan              may continue provided that prior to release:
N T    Purge RIA-1113                                        1. At least two independent samples are 5
R    Source Check RIA-1113              6.5 X 10 cpm              analyzed; and O    RIA-1113 Release Limit 3
8.5 x 10 cpm L                                                1          2. At least two technically qualified RIA-1113 Background +              9.5 x 10 cpm members of the Facility Staff R    RIA-1113 Alarm Setpt =
3 8.6 x 10 cpm M                                                                  independently verify the release rate Alarm Set By:                                                calculations and discharge line valving.
O    Alarm Verified By:
P                                                            Palisades ODCM Appendix A, Table A-1, Purge RIA-1113 After Release E                                                            Item 1.a Action 1.
R    Reset Alarm to 2500                            cpm Alarm Reset By:
Alarm Reset Verified By:
Remarks:
PALISADES NUCLEAR PLANT                          Page 10 of 10                                JULY 2008}}

Revision as of 05:13, 14 November 2019

NRC Region III, Initial License Exam, Job Performance Measure, JPM: RO System H, Title: Set RIA-1113 Waste Gas Discharge Monitor Hi Alarm Setpoint
ML091520338
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/07/2008
From:
NRC/RGN-III
To:
Entergy Nuclear Palisades
Shared Package
ML082200311 List:
References
Download: ML091520338 (10)


Text

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO SYSTEM h TITLE: SET RIA-1113 WASTE GAS DISCHARGE MONITOR HI ALARM SETPOINT CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM: RO SYSTEM h JOB PERFORMANCE MEASURE DATA PAGE Task: Adjust RIA-1113 Waste Gas Discharge Monitor Hi Alarm Setpoint Alternate Path: NO Facility JPM #: PL-OPS-RMS-001J K/A: 073A4.01 Importance: RO: 3.9 SRO: 3.9 K/A Statement: Ability to manually operate and/or monitor in the control room: effluent release Task Standard: Waste Gas Discharge Monitor,RIA-1113, high alarm setpoint adjusted to 8585 CPM Preferred Evaluation Location: Simulator __X__ In Plant _____

Preferred Evaluation Method: Perform __X__ Simulate _____

References:

SOP-38, Gaseous Waste Monitoring System Validation Time:10 minutes Time Critical: NO Candidate: _____________________________________________________

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 10 JULY 2008

JPM: RO SYSTEM h EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

SOP-38, Gaseous Waste Monitoring System Release Order, Form HP 6.6-3 (batch card)

Safety glasses (optional)

Fire Retardant Class 1 Electrical Safety Shirt (optional)

Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Waste Gas Discharge Monitor, RIA-1113 Batch Card background reading = 95 CPM.
  • Waste Gas Discharge Monitor, RIA-1113 Batch Card Release Limit = 8500 CPM
  • Waste Gas Discharge Monitor, RIA-1113 Batch Card High Alarm Setpoint = 8600 CPM.
  • Release Order, Form HP 6.6-3 (batch card) is available.
  • Breaker 34 on Y-01 is closed.
  • RIA-1113 has been verified aligned for service per Attachment 5, Checklist 38, Gaseous Process Radiation Monitors System Checklist
  • A check source has been completed on RIA-1113 with a reading of 620000 CPM.

INITIATING CUES:

  • The CRS directs you to set up Waste Gas Discharge Monitor, RIA-1113 High Alarm Setpoint using SOP-38 Section 7.3.6 to a setpoint of 8600 cpm.

PALISADES NUCLEAR PLANT Page 3 of 10 JULY 2008

JPM: RO SYSTEM h Proc. Step TASK ELEMENT 1 STANDARD Grade Locate SOP-38, Section 7.3.6 SOP-38, Section 7.3.6 located n/a S U Comment:

Evaluator provides candidate with a Working Copy of SOP-38 and Form HP 6.6-3 Proc. Step TASK ELEMENT 2 STANDARD Grade READ the As Found count rate on RIA- 9.5 x 101 As Found count rate read on RIA-7.3.6a 1113, Waste Gas Discharge Monitor 1113 (given in initial conditions) S U Comment:

Proc. Step TASK ELEMENT 3 STANDARD Grade PULL RIA-1113 out from the panel about RIA-1113 pulled out from panel about 6 inches.

7.3.6b (6) inches to access the control buttons S U Comment:

NOTE: Operator may don safety glasses and a Fire Retardant Class 1 electrical safety shirt, although this is not required.

Proc. Step TASK ELEMENT 4 STANDARD Grade VERIFY the Function switch is on 0. Verifies right side of Function Switch is set to 7.3.6c (seen on the right side of the switch) 0. S U Comment:

PALISADES NUCLEAR PLANT Page 4 of 10 JULY 2008

JPM: RO SYSTEM h Proc. Step TASK ELEMENT 5 STANDARD Grade PRESS Enter button to display the High Enter button pressed and one digit blinking.

7.3.6d Alarm setpoint. S U Comment:

NOTE: Control buttons and Function switch are located on the right, inside RIA-1113. The control buttons are labeled Digit, Value, and Enter.

CRITICAL STEP Proc. Step TASK ELEMENT 6 STANDARD Grade SET the High Alarm Setpoint per Form HP 6.6-3, WGDT Release Authorization, by performing the following as necessary: "Digit" and "Value" push buttons used to change 3

the trip setpoint to 8.6 x 10 (8600) CPM value.

IF changing the digit value, THEN 7.3.6e S U PRESS the Value pushbutton until the desired value for that digit is displayed IF selecting another digit, THEN PRESS the Digit pushbutton Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 7 STANDARD Grade WHEN entire display indicates the desired Setpoint, THEN PRESS the Enter Enter pushbutton pressed 7.3.6f pushbutton S U Comment:

CRITICAL STEP PALISADES NUCLEAR PLANT Page 5 of 10 JULY 2008

JPM: RO SYSTEM h Proc. Step TASK ELEMENT 8 STANDARD Grade PUSH the monitor back into panel. Monitor pushed back into panel.

7.3.6g S U Comment:

Proc. Step TASK ELEMENT 9 STANDARD Grade PRESS High Alarm pushbutton on the 3 High Alarm push button pressed and 8.6 x 10 front of RIA-1113 to verify High Alarm 7.3.6h (8600) CPM trip setpoint verified. S U Setpoint is correct.

Comment:

Proc. Step TASK ELEMENT 10 STANDARD Grade PRESS Alarm Ack pushbutton to clear any Alarms clear.

7.3.6i alarms that may have annunciated. S U Comment:

Proc. Step TASK ELEMENT 11 STANDARD Grade VERIFY EK-1364, Gaseous Waste Monitoring Hi Radiation annunciator is Alarm clear.

7.3.6j CLEAR. S U Comment:

PALISADES NUCLEAR PLANT Page 6 of 10 JULY 2008

JPM: RO SYSTEM h Proc. Step TASK ELEMENT 12 STANDARD Grade NOTIFY RETS/REMP representative of Step not necessary, setpoint raised for batch 7.3.6k the new High Alarm Setpoint. release. S U Comment:

NOTE: Evaluator: If operator starts to contact RETS/REMP, STATE: they are aware that the High Alarm Setpoint has been raised for the batch release.

Proc. Step TASK ELEMENT 13 STANDARD Grade Notify the CRS that RIA-1113 High Alarm CRS notified of RIA-1113 setpoint raised to 8.6 3

n/a Setpoint is 8.6 x 10 (8600) CPM. x 103 (8600) CPM. S U Comment:

NOTE: Evaluator Cue: If Operator asks if Batch Card needs to be signed in Alarm Set By: space, RESOND: YES, sign the Batch Card END OF TASK PALISADES NUCLEAR PLANT Page 7 of 10 JULY 2008

JPM: RO SYSTEM h CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Waste Gas Discharge Monitor, RIA-1113 Batch Card background reading = 95 CPM.
  • Waste Gas Discharge Monitor, RIA-1113 Batch Card Release Limit = 8500 CPM
  • Waste Gas Discharge Monitor, RIA-1113 Batch Card High Alarm Setpoint = 8600 CPM.
  • Release Order, Form HP 6.6-3 (batch card) is available.
  • Breaker 34 on Y-01 is closed.
  • RIA-1113 has been verified aligned for service per Attachment 5, Checklist 38, Gaseous Process Radiation Monitors System Checklist
  • A check source has been completed on RIA-1113 with a reading of 620000CPM.

INITIATING CUES:

  • The CRS directs you to set up Waste Gas Discharge Monitor, RIA-1113 High Alarm Setpoint using SOP-38 Section 7.3.6 to a setpoint of 8600 cpm.

PALISADES NUCLEAR PLANT Page 8 of 10 JULY 2008

JPM: RO SYSTEM h SIMULATOR OPERATOR INSTRUCTIONS Initial Setup:

Any IC RIA-1113 initial High alarm setpoint 2.5 x 103 Fill out WGDT Release Authorization, for HP 6.6-3 (procedure HP-6.6, Attachment

4) as follows:

HP 6.6-3, page 1 of 2:

SEE ATTACHED HP FORM RIA-1113 initial High alarm setpoint 2.5 x 103 RESET RIA-1113 to 2.5 x 103 at end of JPM PALISADES NUCLEAR PLANT Page 9 of 10 JULY 2008

FORM HP 6.6-3 Proc No HP 6.6 Attachment 3 WGDT RELEASE AUTHORIZATION Revision 21 Page 1 of 2 WGDT # __T-101C______ Batch Number __08________013_____

Isolation Date 07/12/07 Time 1200 Release Volume 32.5 m3

-5 Isolation Pressure 93 psig Gamma Conc 7.24E Ci/cc 1

Release Pressure 93 psig Expected RIA-1113 RDG 9.5 x 10 cpm Qtr A i /C i 0.1 (must be < 0.5)

Year-to-Date A i /C i 0.24 (must be < 1.0)

APPROVAL TO RELEASE

+3 RIA-1113 Release Limit 8.5E cpm RETS Analyst Jane Retssup Today / 0815 Shift Manager Ralph Manager Today / 0840 C Main Exhaust Fan If RIA-1113 is not operational, effluent releases O In Service V-6A V-6B I/S fan may continue provided that prior to release:

N T Purge RIA-1113 1. At least two independent samples are 5

R Source Check RIA-1113 6.5 X 10 cpm analyzed; and O RIA-1113 Release Limit 3

8.5 x 10 cpm L 1 2. At least two technically qualified RIA-1113 Background + 9.5 x 10 cpm members of the Facility Staff R RIA-1113 Alarm Setpt =

3 8.6 x 10 cpm M independently verify the release rate Alarm Set By: calculations and discharge line valving.

O Alarm Verified By:

P Palisades ODCM Appendix A, Table A-1, Purge RIA-1113 After Release E Item 1.a Action 1.

R Reset Alarm to 2500 cpm Alarm Reset By:

Alarm Reset Verified By:

Remarks:

PALISADES NUCLEAR PLANT Page 10 of 10 JULY 2008