{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931
{{#Wiki_filter:UNITED STATES
  October 28, 2009  
                                NUCLEAR REGULATORY COMMISSION
  Mr. Tom E. Tynan  
                                                REGION II
Vice President Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830  
                                  SAM NUNN ATLANTA FEDERAL CENTER
                                  61 FORSYTH STREET, SW, SUITE 23T85
                                      ATLANTA, GEORGIA 30303-8931
                                          October 28, 2009
Mr. Tom E. Tynan
Vice President
Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant
7821 River Road
Waynesboro, GA 30830
SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED
            OPERATOR INITIAL EXAMINATION 05000424/2010301 AND 05000425/2010301
Dear Mr. Tynan:
In a telephone conversation on October 27, 2009, between Mr. George Gunn, Operations
Training Supervisor and Mr. Dan Scukanec, Lead Instructor, of your staff, and Mr. Edwin Lea,
Senior Operations Engineer, of the Nuclear Regulatory Commission (NRC), arrangements were
made for the administration of licensing examinations at Vogtle Electric Generating Plant. The
operating test is scheduled to be administered during the week of February 22, 2010. The
written examination is scheduled to be administered the week of March 1, 2010. The on-site
preparatory week is scheduled for the week of January 25, 2010.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors." The U.S. NRC regional office
will discuss with your staff any changes that might be necessary before the examinations are
administered. Your staff has also agreed to make copies of all examination materials that are
necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by December 9, 2009. Mr. Lea provided the written outline to members of your staff in
September 2009. The operating test, written examination, and the supporting reference
materials identified in Attachment 3 to ES-201 will be due by January 8, 2010. Pursuant to Title
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outline, examination, and test before
they are submitted to the NRC for review and approval. All materials shall be complete and
ready-to-use.


SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000424/2010301 AND 05000425/2010301
SNC                                            2
Dear Mr. Tynan:
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications, medical certifications, and waiver
requests (if any) at least 30 days before the first examination date. If the applications are not
received at least 30 days before the examination date, a postponement may be necessary.
Signed applications certifying that all training has been completed should be submitted at least
14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget. The public reporting burden for this collection of information is
estimated to average 500 hours per response, including the time for reviewing instructions,
gathering and maintaining the data needed, writing the examinations, and completing and
reviewing the collection of information. Send comments on any aspect of this collection of
information, including suggestions for reducing the burden, to the Information and Records
Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer,
Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management
and Budget, Washington, DC 20503.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs document
system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-
rm.adams.html (the Public Electronic Reading Room).


In a telephone conversation on October 27, 2009, between Mr. George Gunn, Operations Training Supervisor and Mr. Dan Scukanec, Lead Instructor, of your staff, and Mr. Edwin Lea, Senior Operations Engineer, of the Nuclear Regulatory Commission (NRC), arrangements were made for the administration of licensing examinations at Vogtle Electric Generating Plant.  The
SNC                                            3
operating test is scheduled to be administered during the week of February 22, 2010.  The written examination is scheduled to be administered the week of March 1, 2010.  The on-site preparatory week is scheduled for the week of January 25, 2010.
Thank you for your cooperation in this matter. Mr. Scukanec has been advised of the policies
As agreed during the telephone conversation, your staff will prepare both the operating test and written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors."  The U.S. NRC regional office
and guidelines referenced in this letter. If you have any questions regarding the NRC's
will discuss with your staff any changes that might be necessary before the examinations are administered.  Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.
examination procedures and guidelines, please contact Mr. Edwin Lea at (404) 562-4567,
To meet the above schedule, it will be necessary for your staff to furnish the operating test
(Internet E-mail: edwin.lea @nrc.gov), or me at (404) 562-4550, (Internet E-mail:
outline by December 9, 2009.  Mr. Lea provided the written outline to members of your staff in September 2009.  The operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-201 will be due by January 8, 2010. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test before
malcolm.widmann@nrc.gov).
they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.   
                                              Sincerely,
SNC 2  We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
                                              /RA/
                                              Malcolm T. Widmann, Chief
                                              Operations Branch
                                              Division of Reactor Safety
Docket Nos.: 50-424, 50-425
License Nos.: NPF-68, NPF-81
cc: (See Page 4)


In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30 days before the first examination date.  If the applications are not received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.


  This letter contains information collections that are subject to the Paperwork Reduction Act of  
_________________________            X SUNSI REVIEW COMPLETE MTW
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions,
OFFICE            RII:DRS        RII:DRS
gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer,
SIGNATURE        EXL /RA/        MTW /RA/
Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.  
NAME              ELea            MWidmann
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).
DATE                10/28/2009      10/28/2009
SNC 3  Thank you for your cooperation in this matter.  Mr. Scukanec has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Edwin Lea at (404) 562-4567, (Internet E-mail:  edwin.lea @nrc.gov), or me at (404) 562-4550, (Internet E-mail:
E-MAIL COPY?        YES        NO  YES        NO YES    NO YES      NO  YES        NO  YES        NO YES    NO
malcolm.widmann@nrc.gov).  
       
Sincerely,        /RA/        Malcolm T. Widmann, Chief      Operations Branch      Division of Reactor Safety
SNC                                      4
Docket Nos.: 50-424, 50-425
cc w/encl:                                Lee Foley
License Nos.: NPF-68,  NPF-81
Angela Thornhill                          Manager of Contracts Generation
cc:  (See Page 4)  
Managing Attorney and Compliance Officer  Oglethorpe Power Corporation
 
Southern Nuclear Operating Company, Inc.   Electronic Mail Distribution
Electronic Mail Distribution
                                          Mr. N. Holcomb
N. J. Stringfellow                        Commissioner
Manager                                    Department of Natural Resources
Licensing                                  Electronic Mail Distribution
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution              Dr. Carol Couch
                                          Director
Jeffrey T. Gasser                          Environmental Protection
Executive Vice President                  Department of Natural Resources
Southern Nuclear Operating Company, Inc.   Electronic Mail Distribution
Electronic Mail Distribution
                                          Cynthia Sanders
L. Mike Stinson                            Program Manager
Vice President                            Radioactive Materials Program
Fleet Operations Support                  Department of Natural Resources
Southern Nuclear Operating Company, Inc.   Electronic Mail Distribution
Electronic Mail Distribution
                                          Jim Sommerville
Michael A. MacFarlane                      (Acting) Chief
Southern Nuclear Operating Company, Inc.   Environmental Protection Division
40 Inverness Center Parkway                Department of Natural Resources
P.O. Box 1295                              Electronic Mail Distribution
Birmingham, AL 35201-1295
                                          Mr. Steven M. Jackson
Paula Marino                              Senior Engineer - Power Supply
Vice President                            Municipal Electric Authority of Georgia
Engineering                                Electronic Mail Distribution
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution              Mr. Reece McAlister
                                          Executive Secretary
Bob Masse                                  Georgia Public Service Commission
Resident Manager                          Electronic Mail Distribution
Vogtle Electric Generating Plant
Oglethorpe Power Corporation              Office of the County Commissioner
Electronic Mail Distribution              Burke County Commission
                                          Electronic Mail Distribution
Moanica Caston
Vice President and General Counsel        Arthur H. Domby, Esq.
Southern Nuclear Operating Company, Inc.   Troutman Sanders
Electronic Mail Distribution              Electronic Mail Distribution
Office of the Attorney General            (cc continued next page)
Electronic Mail Distribution


_________________________  X  SUNSI REVIEW COMPLETE  MTW OFFICE RII:DRS RII:DRS      SIGNATURE EXL /RA/ MTW /RA/      NAME ELea MWidmann      DATE 10/28/2009 10/28/2009      E-MAIL COPY?    YES NO  YES NO  YES NO  YES NO  YES NO  YES NO  YES NO 
SNC                                      5
SNC 4  cc w/encl: Angela Thornhill Managing Attorney and Compliance Officer Southern Nuclear Operating Company, Inc.  
cc continued
Electronic Mail Distribution
Director
N. J. Stringfellow Manager Licensing
Consumers' Utility Counsel Division
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
Govenor's Office of Consumer Affairs
Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
2 M. L. King, Jr. Drive
Plaza Level East; Suite 356
Atlanta, GA 30334-4600
Susan E. Jenkins
Director, Division of Waste Management
Bureau of Land and Waste Management
S.C. Department of Health and
Environmental Control
Electronic Mail Distribution
Richard D. Brigdon
Plant Training and
Emergency Preparedness Manager
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution


L. Mike Stinson Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc.
SNC                                     6
Electronic Mail Distribution
Letter to Tom E. Tynan from Malcolm T. Widmann dated October 28, 2009
Michael A. MacFarlane Southern Nuclear Operating Company, Inc. 40 Inverness Center Parkway
SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED
P.O. Box 1295 Birmingham, AL  35201-1295
              OPERATOR INITIAL EXAMINATION 05000424/2010301 AND 05000425/2010301
Paula Marino Vice President
Distribution w/encl:
Engineering Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
C. Evans, RII
Bob Masse
L. Slack, RII
Resident Manager Vogtle Electric Generating Plant Oglethorpe Power Corporation Electronic Mail Distribution
OE Mail
Moanica Caston Vice President and General Counsel
RIDSNRRDIRS
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
PUBLIC
Office of the Attorney General Electronic Mail Distribution
RidsNrrPMVogtle Resource
 
Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution
 
Mr. N. Holcomb Commissioner Department of Natural Resources Electronic Mail Distribution
 
Dr. Carol Couch Director Environmental Protection Department of Natural Resources Electronic Mail Distribution
Cynthia Sanders Program Manager Radioactive Materials Program Department of Natural Resources Electronic Mail Distribution
 
Jim Sommerville (Acting) Chief Environmental Protection Division Department of Natural Resources
Electronic Mail Distribution
Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia
Electronic Mail Distribution
Mr. Reece McAlister Executive Secretary Georgia Public Service Commission
Electronic Mail Distribution
Office of the County Commissioner Burke County Commission Electronic Mail Distribution
Arthur H. Domby, Esq.
Troutman Sanders Electronic Mail Distribution
(cc continued next page)
 
SNC 5  cc continued
Director Consumers' Utility Counsel Division
Govenor's Office of Consumer Affairs 2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Atlanta, GA  30334-4600
Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution
Richard D. Brigdon Plant Training and Emergency Preparedness Manager Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
 
 
SNC 6  Letter to Tom E. Tynan from Malcolm T. Widmann dated October 28, 2009  
SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000424/2010301 AND 05000425/2010301  
Distribution w/encl
: C. Evans, RII L. Slack, RII OE Mail
RIDSNRRDIRS PUBLIC RidsNrrPMVogtle Resource
}}
}}

Revision as of 01:07, 14 November 2019

Notification of Licensed Operator Initial Examination 05000424/2010301 and 05000425/2010301
ML093010327
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/28/2009
From: Widmann M
Division of Reactor Safety II
To: Tynan T
Southern Nuclear Operating Co
References
50-424/10-301, 50-425/10-301
Download: ML093010327 (7)


See also: IR 05000424/2010301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER

61 FORSYTH STREET, SW, SUITE 23T85

ATLANTA, GEORGIA 30303-8931

October 28, 2009

Mr. Tom E. Tynan

Vice President

Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant

7821 River Road

Waynesboro, GA 30830

SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000424/2010301 AND 05000425/2010301

Dear Mr. Tynan:

In a telephone conversation on October 27, 2009, between Mr. George Gunn, Operations

Training Supervisor and Mr. Dan Scukanec, Lead Instructor, of your staff, and Mr. Edwin Lea,

Senior Operations Engineer, of the Nuclear Regulatory Commission (NRC), arrangements were

made for the administration of licensing examinations at Vogtle Electric Generating Plant. The

operating test is scheduled to be administered during the week of February 22, 2010. The

written examination is scheduled to be administered the week of March 1, 2010. The on-site

preparatory week is scheduled for the week of January 25, 2010.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors." The U.S. NRC regional office

will discuss with your staff any changes that might be necessary before the examinations are

administered. Your staff has also agreed to make copies of all examination materials that are

necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by December 9, 2009. Mr. Lea provided the written outline to members of your staff in

September 2009. The operating test, written examination, and the supporting reference

materials identified in Attachment 3 to ES-201 will be due by January 8, 2010. Pursuant to Title

10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outline, examination, and test before

they are submitted to the NRC for review and approval. All materials shall be complete and

ready-to-use.

SNC 2

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications, medical certifications, and waiver

requests (if any) at least 30 days before the first examination date. If the applications are not

received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least

14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget. The public reporting burden for this collection of information is

estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions,

gathering and maintaining the data needed, writing the examinations, and completing and

reviewing the collection of information. Send comments on any aspect of this collection of

information, including suggestions for reducing the burden, to the Information and Records

Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-

0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer,

Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management

and Budget, Washington, DC 20503.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs document

system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-

rm.adams.html (the Public Electronic Reading Room).

SNC 3

Thank you for your cooperation in this matter. Mr. Scukanec has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Edwin Lea at (404) 562-4567,

(Internet E-mail: edwin.lea @nrc.gov), or me at (404) 562-4550, (Internet E-mail:

malcolm.widmann@nrc.gov).

Sincerely,

/RA/

Malcolm T. Widmann, Chief

Operations Branch

Division of Reactor Safety

Docket Nos.: 50-424, 50-425

License Nos.: NPF-68, NPF-81

cc: (See Page 4)

_________________________ X SUNSI REVIEW COMPLETE MTW

OFFICE RII:DRS RII:DRS

SIGNATURE EXL /RA/ MTW /RA/

NAME ELea MWidmann

DATE 10/28/2009 10/28/2009

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

SNC 4

cc w/encl: Lee Foley

Angela Thornhill Manager of Contracts Generation

Managing Attorney and Compliance Officer Oglethorpe Power Corporation

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

Mr. N. Holcomb

N. J. Stringfellow Commissioner

Manager Department of Natural Resources

Licensing Electronic Mail Distribution

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Dr. Carol Couch

Director

Jeffrey T. Gasser Environmental Protection

Executive Vice President Department of Natural Resources

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

Cynthia Sanders

L. Mike Stinson Program Manager

Vice President Radioactive Materials Program

Fleet Operations Support Department of Natural Resources

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

Jim Sommerville

Michael A. MacFarlane (Acting) Chief

Southern Nuclear Operating Company, Inc. Environmental Protection Division

40 Inverness Center Parkway Department of Natural Resources

P.O. Box 1295 Electronic Mail Distribution

Birmingham, AL 35201-1295

Mr. Steven M. Jackson

Paula Marino Senior Engineer - Power Supply

Vice President Municipal Electric Authority of Georgia

Engineering Electronic Mail Distribution

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Mr. Reece McAlister

Executive Secretary

Bob Masse Georgia Public Service Commission

Resident Manager Electronic Mail Distribution

Vogtle Electric Generating Plant

Oglethorpe Power Corporation Office of the County Commissioner

Electronic Mail Distribution Burke County Commission

Electronic Mail Distribution

Moanica Caston

Vice President and General Counsel Arthur H. Domby, Esq.

Southern Nuclear Operating Company, Inc. Troutman Sanders

Electronic Mail Distribution Electronic Mail Distribution

Office of the Attorney General (cc continued next page)

Electronic Mail Distribution

SNC 5

cc continued

Director

Consumers' Utility Counsel Division

Govenor's Office of Consumer Affairs

2 M. L. King, Jr. Drive

Plaza Level East; Suite 356

Atlanta, GA 30334-4600

Susan E. Jenkins

Director, Division of Waste Management

Bureau of Land and Waste Management

S.C. Department of Health and

Environmental Control

Electronic Mail Distribution

Richard D. Brigdon

Plant Training and

Emergency Preparedness Manager

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

SNC 6

Letter to Tom E. Tynan from Malcolm T. Widmann dated October 28, 2009

SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000424/2010301 AND 05000425/2010301

Distribution w/encl:

C. Evans, RII

L. Slack, RII

OE Mail

RIDSNRRDIRS

PUBLIC

RidsNrrPMVogtle Resource