ML100610244: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 March 3, 2010 Mr. Joseph N. Jensen Senior Vice President and  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 March 3, 2010 Mr. Joseph N. Jensen Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106
 
Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place  
 
Bridgman, MI 49106  


==SUBJECT:==
==SUBJECT:==
ANNUAL ASSESSMENT LETTER - D. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2, (05000315/2010001; 05000316/2010001)  
ANNUAL ASSESSMENT LETTER - D. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2, (05000315/2010001; 05000316/2010001)


==Dear Mr. Jensen:==
==Dear Mr. Jensen:==


On February 11, 2010, the NRC staff completed its performance review of D.C. Cook Nuclear Power Plant, Units 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.  
On February 11, 2010, the NRC staff completed its performance review of D.C. Cook Nuclear Power Plant, Units 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
 
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the Security Cornerstone review and resultant inspection plan.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the Security Cornerstone review and resultant inspection plan.
Overall, D.C. Cook Nuclear Power Plant, Units 1 and 2, operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter at D.C. Cook, Unit 1 and Unit 2, was within the Licensee Response  
Overall, D.C. Cook Nuclear Power Plant, Units 1 and 2, operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter at D.C. Cook, Unit 1 and Unit 2, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at the facility. We also plan on conducting several special and infrequently performed Inspection Procedures (IPs) which include: IP 60856.1, "Review of 10 CFR 72.212(b) Evaluations at Operating Plants"; and IP 60853, "Independent Spent Fuel Storage Installation Onsite Fabrication."
 
column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at the facility. We also plan on conducting several special and infrequently performed Inspection Procedures (IPs) which include: IP 60856.1, "Review of 10 CFR 72.212(b) Evaluations at Operating Plants"; and IP 60853, "Independent Spent Fuel Storage Installation Onsite Fabrication."
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle review.
The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle review.
J. Jensen     
In accordance with 10 CFR 2.390 of the NRC
=s A Rules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's  Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


J. Jensen                                      In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
Sincerely,
 
                                              /RA/
/RA/ Jamnes L. Cameron, Chief  
Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74
 
Branch 6 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74  


==Enclosure:==
==Enclosure:==
D.C. Cook Inspection/Activity Plan cc w/encl: Distribution via ListServ
D.C. Cook Inspection/Activity Plan cc w/encl:     Distribution via ListServ


Inspection / Activity Plan Page 1 of 2 02/24/2010 Report 22 03/01/2010
D.C. Cook Inspection / Activity Plan 03/01/2010 - 06/30/2011 Planned Dates                                                                                                                               No. of Staff Start     End     Inspection Activity                                                         Title                                         on Site ISFSI         - ISFSI INSPECTION                                                                                                 2 04/01/2010  12/31/2010  IP 60856              Review of 10 CFR 72.212(b) Evaluations 06/01/2010   09/30/2010   IP 60853              On-Site Fabrication Of Components And Construction On An ISFSI BI ENG       - INSERVICE INSPECTION & TI-172 REVISION 1                                                                         1 03/08/2010  03/26/2010  IP 2515/172          Reactor Coolant System Dissimiliar Metal Butt Welds 03/08/2010   03/26/2010   IP 2515/172          Reactor Coolant System Dissimiliar Metal Butt Welds 03/08/2010   03/26/2010   IP 7111108P          Inservice Inspection Activities - PWR BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                          1 03/15/2010   03/19/2010   IP 71124.01          Radiological Hazard Assessment and Exposure Controls 03/15/2010   03/19/2010   IP 71124.02          Occupational ALARA Planning and Controls BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                                                         1 05/17/2010  05/21/2010  IP 2515/173          Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 05/17/2010   05/21/2010   IP 71124.06          Radioactive Gaseous and Liquid Effluent Treatment 05/17/2010   05/21/2010   IP 71151-BI01        Reactor Coolant System Activity TI            - TEMPORARY INSTRUCTION 2515/180                                                                                    1 06/15/2010   06/15/2010   IP 2515/180           Inspection of Procedures and Processes for Managing Fatigue OL EXAM       - D. C. COOK INIT EXAM 06/2010                                                                                     3 06/21/2010   07/02/2010     W90217            OL - INITIAL EXAM - JUNE 2010 - COOK BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                                                         1 08/09/2010  08/13/2010  IP 71124.08          Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 08/09/2010   08/13/2010   IP 71151-PR01        RETS/ODCM Radiological Effluent BI ENG       - COMPONENT DESIGN BASES INSPECTION                                                                                 5 08/16/2010   09/17/2010   IP 7111121            Component Design Bases Inspection BI EP         - EP ROUTINE INSPECTION / PI VERIFICATION                                                                           2 09/13/2010  09/17/2010  IP 7111402            Radiological Environmental Monitoring Program 09/13/2010   09/17/2010   IP 7111403            Emergency Response Organization Augmentation Testing 09/13/2010   09/17/2010   IP 7111405            Correction of Emergency Preparedness Weaknesses and Deficiencies 09/13/2010   09/17/2010   IP 71151-EP01        Drill/Exercise Performance 09/13/2010   09/17/2010   IP 71151-EP02        ERO Drill Participation 09/13/2010   09/17/2010   IP 71151-EP03        Alert & Notification System BI ENG        - ENGINEERING INSERVICE INSPECTION                                                                                  1 10/04/2010   10/22/2010  IP 2515/172          Reactor Coolant System Dissimiliar Metal Butt Welds 10/04/2010   10/22/2010  IP 7111108P          Inservice Inspection Activities - PWR
-06/30/2011 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site D.C. Cook ISFSI-ISFSI INSPECTION 2 1    IP Review of 10 CFR 72.212(b) Evaluations 60856 04/01/2010 12/31/2010 1    IP On-Site Fabrication Of Components And Construction On An ISFSI 60853 06/01/2010 09/30/2010 BI ENG-INSERVICE INSPECTION & TI-172 REVISION 1 1 1    IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 03/08/2010 03/26/2010 1    IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 03/08/2010 03/26/2010 1    IP Inservice Inspection Activities - PWR 7111108P 03/08/2010 03/26/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1    IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/15/2010 03/19/2010 1    IP Occupational ALARA Planning and Controls 71124.02 03/15/2010 03/19/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1    IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 05/17/2010 05/21/2010 1    IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 05/17/2010 05/21/2010 1    IP Reactor Coolant System Activity 71151-BI01 05/17/2010 05/21/2010 TI-TEMPORARY INSTRUCTION 2515/180 1 1    IP Inspection of Procedures and Processes for Managing Fatigue 2515/180 06/15/2010 06/15/2010 OL EXAM-D. C. COOK INIT EXAM 06/2010 3 1    OL - INITIAL EXAM - JUNE 2010 - COOK W90217 06/21/2010 07/02/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1    IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 08/09/2010 08/13/2010 1    IP RETS/ODCM Radiological Effluent 71151-PR01 08/09/2010 08/13/2010 BI ENG-COMPONENT DESIGN BASES INSPECTION 5 1    IP Component Design Bases Inspection 7111121 08/16/2010 09/17/2010 BI EP-EP ROUTINE INSPECTION / PI VERIFICATION 2 1    IP Radiological Environmental Monitoring Program 7111402 09/13/2010 09/17/2010 1    IP Emergency Response Organization Augmentation Testing 7111403 09/13/2010 09/17/2010 1    IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 09/13/2010 09/17/2010 1    IP Drill/Exercise Performance 71151-EP01 09/13/2010 09/17/2010 1    IP ERO Drill Participation 71151-EP02 09/13/2010 09/17/2010 1    IP A lert & Notification System 71151-EP03 09/13/2010 09/17/2010 BI ENG-ENGINEERING INSERVICE INSPECTION 1  2   IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 10/04/2010 10/22/2010 2   IP Inservice Inspection Activities - PWR 7111108P 10/04/2010 10/22/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Inspection / Activity Plan Page 2 of 2 02/24/2010 Report 22 03/01/2010
-06/30/2011 Unit Number Planned Dates Start          End Inspection Activity Title No. of Staff on Site D.C. Cook BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1    IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/11/2010 10/15/2010 1    IP Occupational ALARA Planning and Controls 71124.02 10/11/2010 10/15/2010 1    IP Occupational Exposure Control Effectiveness 71151-OR01 10/11/2010 10/15/2010 BI EP-EP EXERCISE INSPECTION / PI VERIFICATION 3 1    IP Exercise Evaluation 7111401 02/28/2011 03/04/2011 1    IP Drill/Exercise Performance 71151-EP01 02/28/2011 03/04/2011 1    IP ERO Drill Participation 71151-EP02 02/28/2011 03/04/2011 1    IP A lert & Notification System 71151-EP03 02/28/2011 03/04/2011 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1    IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 02/28/2011 03/04/2011 1    IP Occupational Dose Assessment 71124.04 02/28/2011 03/04/2011 1    IP Performance Indicator Verification 71151 02/28/2011 03/04/2011 BI ENG-TRIENNIAL ENGINEERING PERM MODS/50.59 3 1    IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 03/21/2011 04/08/2011 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1    IP Public Radiation Safety 71124.07 04/25/2011 04/29/2011 1    IP RETS/ODCM Radiological Effluent 71151-PR01 04/25/2011 04/29/2011 BI PI&R-BIENNIAL PI&R INSPECTION 3 1    IP Identification and Resolution of Problems 71152B 05/02/2011 05/20/2011 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1    IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 06/20/2011 06/24/2011 1    IP Radiological Hazard Assessment and Exposure Controls 71124.01 06/20/2011 06/24/2011 1    IP Occupational ALARA Planning and Controls 71124.02 06/20/2011 06/24/2011 1    IP Occupational Exposure Control Effectiveness 71151-OR01 06/20/2011 06/24/2011 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
J. Jensen     


In accordance with 10 CFR 2.390 of the NRC
Inspection / Activity Plan 03/01/2010 - 06/30/2011 Planned Dates                                                                                                                              No. of Staff Start      End      Inspection Activity                                                          Title                                        on Site BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                        1
=s A Rules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's  Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
/11/2010  10/15/2010  IP 71124.01        Radiological Hazard Assessment and Exposure Controls
/11/2010  10/15/2010  IP 71124.02        Occupational ALARA Planning and Controls
/11/2010  10/15/2010  IP 71151-OR01      Occupational Exposure Control Effectiveness BI EP        - EP EXERCISE INSPECTION / PI VERIFICATION                                                                        3
/28/2011  03/04/2011  IP 7111401          Exercise Evaluation
/28/2011  03/04/2011  IP 71151-EP01      Drill/Exercise Performance
/28/2011  03/04/2011  IP 71151-EP02      ERO Drill Participation
/28/2011  03/04/2011  IP 71151-EP03      Alert & Notification System BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                        1
/28/2011  03/04/2011  IP 71124.03        In-Plant Airborne Radioactivity Control and Mitigation
/28/2011  03/04/2011  IP 71124.04        Occupational Dose Assessment
/28/2011  03/04/2011  IP 71151            Performance Indicator Verification BI ENG        - TRIENNIAL ENGINEERING PERM MODS/50.59                                                                            3
/21/2011  04/08/2011  IP 7111117T        Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                        1
/25/2011  04/29/2011  IP 71124.07        Public Radiation Safety
/25/2011  04/29/2011  IP 71151-PR01      RETS/ODCM Radiological Effluent BI PI&R      - BIENNIAL PI&R INSPECTION                                                                                        3
/02/2011  05/20/2011  IP 71152B          Identification and Resolution of Problems BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                        1
/20/2011  06/24/2011  IP 2515/179        Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS
/20/2011  06/24/2011  IP 71124.01        Radiological Hazard Assessment and Exposure Controls
/20/2011  06/24/2011  IP 71124.02        Occupational ALARA Planning and Controls
/20/2011  06/24/2011  IP 71151-OR01      Occupational Exposure Control Effectiveness


J. Jensen                                                                    In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
Sincerely,
 
                                                                          /RA/
/RA/ Jamnes L. Cameron, Chief  
Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74
 
Branch 6 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74  


==Enclosure:==
==Enclosure:==
D.C. Cook Inspection/Activity Plan cc w/encl: Distribution via ListServ
D.C. Cook Inspection/Activity Plan cc w/encl:               Distribution via ListServ DOCUMENT NAME: G:\1-Secy\1-Work in Progress\2009 EOC Letters\DC Cook EOC 2009 Letter.doc G Publicly Available                        G Non-Publicly Available                  G Sensitive              G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE              RIII                                RIII NAME                PVoss:dtp                          JCameron DATE                02/22/10                            03/03/10 OFFICIAL RECORD COPY


DOCUMENT NAME:  G:\1-Secy\1-Work in Progress\2009 EOC Letters\DC Cook EOC 2009 Letter.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl  "N" = No copy OFFICE  RIII    RIII          NAME  PVoss:dtp JCameron    DATE  02/22/10  03/03/10    OFFICIAL RECORD COPY Letter to J. Jensen from J. Cameron dated March 3, 2010.  
Letter to J. Jensen from J. Cameron dated March 3, 2010.


==SUBJECT:==
==SUBJECT:==
ANNUAL ASSESSMENT LETTER - D. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2, (05000315/2010001; 05000316/2010001)
ANNUAL ASSESSMENT LETTER - D. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2, (05000315/2010001; 05000316/2010001)
DISTRIBUTION:
DISTRIBUTION:
RidsNrrDorlLpl3-2 Resource  
RidsNrrDorlLpl3-2 Resource Susan Bagley RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource}}
 
Susan Bagley RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano  
 
Linda Linn  
 
DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource}}

Revision as of 21:25, 13 November 2019

EOC Annual Assessment Letter, Inspection/Activity Plan
ML100610244
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/03/2010
From: Jamnes Cameron
NRC/RGN-III/DRP/B6
To: Jensen J
Indiana Michigan Power Co
References
FOIA/PA-2010-0209
Download: ML100610244 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 March 3, 2010 Mr. Joseph N. Jensen Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106

SUBJECT:

ANNUAL ASSESSMENT LETTER - D. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2, (05000315/2010001; 05000316/2010001)

Dear Mr. Jensen:

On February 11, 2010, the NRC staff completed its performance review of D.C. Cook Nuclear Power Plant, Units 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the Security Cornerstone review and resultant inspection plan.

Overall, D.C. Cook Nuclear Power Plant, Units 1 and 2, operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter at D.C. Cook, Unit 1 and Unit 2, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at the facility. We also plan on conducting several special and infrequently performed Inspection Procedures (IPs) which include: IP 60856.1, "Review of 10 CFR 72.212(b) Evaluations at Operating Plants"; and IP 60853, "Independent Spent Fuel Storage Installation Onsite Fabrication."

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle review.

J. Jensen In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74

Enclosure:

D.C. Cook Inspection/Activity Plan cc w/encl: Distribution via ListServ

D.C. Cook Inspection / Activity Plan 03/01/2010 - 06/30/2011 Planned Dates No. of Staff Start End Inspection Activity Title on Site ISFSI - ISFSI INSPECTION 2 04/01/2010 12/31/2010 IP 60856 Review of 10 CFR 72.212(b) Evaluations 06/01/2010 09/30/2010 IP 60853 On-Site Fabrication Of Components And Construction On An ISFSI BI ENG - INSERVICE INSPECTION & TI-172 REVISION 1 1 03/08/2010 03/26/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 03/08/2010 03/26/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 03/08/2010 03/26/2010 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 03/15/2010 03/19/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 03/15/2010 03/19/2010 IP 71124.02 Occupational ALARA Planning and Controls BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 05/17/2010 05/21/2010 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 05/17/2010 05/21/2010 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 05/17/2010 05/21/2010 IP 71151-BI01 Reactor Coolant System Activity TI - TEMPORARY INSTRUCTION 2515/180 1 06/15/2010 06/15/2010 IP 2515/180 Inspection of Procedures and Processes for Managing Fatigue OL EXAM - D. C. COOK INIT EXAM 06/2010 3 06/21/2010 07/02/2010 W90217 OL - INITIAL EXAM - JUNE 2010 - COOK BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 08/09/2010 08/13/2010 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 08/09/2010 08/13/2010 IP 71151-PR01 RETS/ODCM Radiological Effluent BI ENG - COMPONENT DESIGN BASES INSPECTION 5 08/16/2010 09/17/2010 IP 7111121 Component Design Bases Inspection BI EP - EP ROUTINE INSPECTION / PI VERIFICATION 2 09/13/2010 09/17/2010 IP 7111402 Radiological Environmental Monitoring Program 09/13/2010 09/17/2010 IP 7111403 Emergency Response Organization Augmentation Testing 09/13/2010 09/17/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 09/13/2010 09/17/2010 IP 71151-EP01 Drill/Exercise Performance 09/13/2010 09/17/2010 IP 71151-EP02 ERO Drill Participation 09/13/2010 09/17/2010 IP 71151-EP03 Alert & Notification System BI ENG - ENGINEERING INSERVICE INSPECTION 1 10/04/2010 10/22/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 10/04/2010 10/22/2010 IP 7111108P Inservice Inspection Activities - PWR

Inspection / Activity Plan 03/01/2010 - 06/30/2011 Planned Dates No. of Staff Start End Inspection Activity Title on Site BI RP - RADIATION PROTECTION BASELINE INSPECTION 1

/11/2010 10/15/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

/11/2010 10/15/2010 IP 71124.02 Occupational ALARA Planning and Controls

/11/2010 10/15/2010 IP 71151-OR01 Occupational Exposure Control Effectiveness BI EP - EP EXERCISE INSPECTION / PI VERIFICATION 3

/28/2011 03/04/2011 IP 7111401 Exercise Evaluation

/28/2011 03/04/2011 IP 71151-EP01 Drill/Exercise Performance

/28/2011 03/04/2011 IP 71151-EP02 ERO Drill Participation

/28/2011 03/04/2011 IP 71151-EP03 Alert & Notification System BI RP - RADIATION PROTECTION BASELINE INSPECTION 1

/28/2011 03/04/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation

/28/2011 03/04/2011 IP 71124.04 Occupational Dose Assessment

/28/2011 03/04/2011 IP 71151 Performance Indicator Verification BI ENG - TRIENNIAL ENGINEERING PERM MODS/50.59 3

/21/2011 04/08/2011 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications BI RP - RADIATION PROTECTION BASELINE INSPECTION 1

/25/2011 04/29/2011 IP 71124.07 Public Radiation Safety

/25/2011 04/29/2011 IP 71151-PR01 RETS/ODCM Radiological Effluent BI PI&R - BIENNIAL PI&R INSPECTION 3

/02/2011 05/20/2011 IP 71152B Identification and Resolution of Problems BI RP - RADIATION PROTECTION BASELINE INSPECTION 1

/20/2011 06/24/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS

/20/2011 06/24/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

/20/2011 06/24/2011 IP 71124.02 Occupational ALARA Planning and Controls

/20/2011 06/24/2011 IP 71151-OR01 Occupational Exposure Control Effectiveness

J. Jensen In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74

Enclosure:

D.C. Cook Inspection/Activity Plan cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\1-Secy\1-Work in Progress\2009 EOC Letters\DC Cook EOC 2009 Letter.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME PVoss:dtp JCameron DATE 02/22/10 03/03/10 OFFICIAL RECORD COPY

Letter to J. Jensen from J. Cameron dated March 3, 2010.

SUBJECT:

ANNUAL ASSESSMENT LETTER - D. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2, (05000315/2010001; 05000316/2010001)

DISTRIBUTION:

RidsNrrDorlLpl3-2 Resource Susan Bagley RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource