ML101870528: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:Entergy Nuclear Operations, Inc. | ||
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Tel 269 764 2000 Paula Anderson Licensing Manager July 6,2010 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Palisades Nuclear Plant Readiness for 95001 Supplemental Inspection Palisades Nuclear Plant Docket 50-255 License No. DPR-20 | Palisades Nuclear Plant Readiness for 95001 Supplemental Inspection Palisades Nuclear Plant Docket 50-255 License No. DPR-20 | ||
==References:== | ==References:== | ||
: 1. EA-09-269, January 20, 2010, Final Significance Determination for a White Finding; Notification of Follow-Up Assessment; and Notice of Violation; NRC Inspection Report No. 05000255/2010007 Palisades Nuclear Plant | : 1. EA-09-269, January 20, 2010, Final Significance Determination for a White Finding; Notification of Follow-Up Assessment; and Notice of Violation; NRC Inspection Report No. 05000255/2010007 Palisades Nuclear Plant | ||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
On January 20, 2010, the Nuclear Regulatory Commission (NRC) issued a White finding to Entergy Nuclear Operations, Inc. (END) (Reference | |||
On January 20, 2010, the Nuclear Regulatory Commission (NRC) issued a White finding to Entergy Nuclear Operations, Inc. (END) (Reference 1) and an associated violation for the failure to maintain the Region I spent fuel pool storage racks with a Keff s 0.95 when fully flooded with unborated water. | |||
This letter provides notification that END is prepared for that inspection. | In Reference 1 the NRC also requested that END provide notification of readiness for a 95-001 supplemental inspection. This letter provides notification that END is prepared for that inspection. | ||
Summary of Commitments This letter identifies no new commitments and no revisions to existing commitments. | Summary of Commitments This letter identifies no new commitments and no revisions to existing commitments. | ||
Document Control Desk Page 2 PKAljlk cc: Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC}} | |||
Document Control Desk Page 2 PKAljlk cc: Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC}} | |||
Revision as of 16:29, 13 November 2019
| ML101870528 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/06/2010 |
| From: | Patricia Anderson Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML101870528 (2) | |
Text
Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Tel 269 764 2000 Paula Anderson Licensing Manager July 6,2010 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Palisades Nuclear Plant Readiness for 95001 Supplemental Inspection Palisades Nuclear Plant Docket 50-255 License No. DPR-20
References:
- 1. EA-09-269, January 20, 2010, Final Significance Determination for a White Finding; Notification of Follow-Up Assessment; and Notice of Violation; NRC Inspection Report No. 05000255/2010007 Palisades Nuclear Plant
Dear Sir or Madam:
On January 20, 2010, the Nuclear Regulatory Commission (NRC) issued a White finding to Entergy Nuclear Operations, Inc. (END) (Reference 1) and an associated violation for the failure to maintain the Region I spent fuel pool storage racks with a Keff s 0.95 when fully flooded with unborated water.
In Reference 1 the NRC also requested that END provide notification of readiness for a 95-001 supplemental inspection. This letter provides notification that END is prepared for that inspection.
Summary of Commitments This letter identifies no new commitments and no revisions to existing commitments.
Document Control Desk Page 2 PKAljlk cc: Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC