{{#Wiki_filter:U ml Participation Drill-Plume Only* March 1,2011* Bridgman, MIiNDIANA MICHIGANA unit of American Electric Power"PA Donald C. Cook Nuclear Plant USNRC Region III Incident Response Program oo ucer ln Safety and Human Performance Guiding Principles
{{#Wiki_filter:U ml Participation Drill                   - Plume Only
,,-,a dhu a errors 1e.2. !d hip and ,-accuotaility prevent 3. an safety and human error duction into our work.4.I Personal Protective Equipment* EOF, ENC/JIC, SCR, OSC are outside the powerblock and PPE is not required." TSC and Damage Control Teams dispatched from the OSC require: Hardhat, ANSI footwear with protective toe, safety glasses with installed side shields and hearing protection.
* March 1,2011
u-u El 0 Orientation Goals*Plant Overview*Organizational Match-ups eFacility Locations*NRC Incident Response Team Entrance*Logistics
* Bridgman, MI "PA
: 4.  
* iNDIANA MICHIGAN P0OWER*
.E d D.C.Cook Nuclear Plant*.**Two- 1100 Mw Four Loop Westinghouse PWR**o 10 Mile EPZ is inside Berrien County o:o EAL Scheme -NUMARC/NESP-007 o:o NUREG-0654 based Emergency Plan Organizational Overlay* NRC IRT and D.C. Cook ERO positions are not perfectly matched* Aligned positions as closely as possible and arranged seating accordingly
A unit ofAmerican Electric Power Donald C. Cook Nuclear Plant             USNRC Region III Incident Response Program
 
oo       ucer       ln Safety and Human Performance Guiding Principles
            ,,-,a dhu a errors 1e.
: 2.                     !d hip and
                      ,-accuotaility prevent
: 3. an safety and human error duction into our work.
4.
 
Personal Protective Equipment
* EOF, ENC/JIC, SCR, OSC are outside the powerblock and PPE is not required.
" TSC and Damage Control Teams dispatched from the OSC require:
Hardhat, ANSI footwear with protective toe, safety glasses with installed side shields and hearing protection.
 
u-u El 0 OrientationGoals
        *Plant Overview
        *Organizational Match-ups eFacility Locations
        *NRC Incident Response Team Entrance
        *Logistics 4.
 
.Ed D.C. Cook Nuclear Plant
  *.**Two- 1100 Mw Four Loop Westinghouse PWR
  **o 10 Mile EPZ is inside Berrien County o:o EAL Scheme -
NUMARC/NESP-007 o:o NUREG-0654 based Emergency Plan
 
Organizational Overlay
* NRC IRT and D.C. Cook ERO positions are not perfectly matched
* Aligned positions as closely as possible and arranged seating accordingly
* Extra seating exists. IRT members are encouraged to move to any seat with a Incident Response Team sign above the workstation.
* Extra seating exists. IRT members are encouraged to move to any seat with a Incident Response Team sign above the workstation.
U Site Team NRC Region III Site Team Director Site: D.C. COOK Deputy Site Team DatelShift:
 
March , 2011 Anne Boland Director I Gary Shear NRC GLM at FEMA RRCC N/A Site Team Evaluator/Controller Desiree Smith Rev. 1 -January 28, 2011 NU Integrated Organizational Chart Ann;Boland NRC Region III Site Team Emergency Director Dept Site Team Dir Shane Lies Gary Shear D.C. COOK EOF Emergency Response Team IAssistant ED March 1, 2011 1 Randy Keppeler TA Specialist/
U Site Team NRC Region III Site Team   Director Site: D.C. COOK                                 Deputy Site Team DatelShift: March , 2011 Anne Boland                 Director I   Gary Shear NRC GLM at FEMA RRCC N/A Site Team Rev. 1 - January 28, 2011 Evaluator/Controller Desiree Smith
Chuck Zoia Engineering Design Manager Madan Goel Communicator:
 
Jim Neurauter Boadwriter Tony McMutuary Radiation Safety Coordinator (TSC)Tony Go Radiation Assessment Coordinator Milt Paquette Dose Assessor Wayne Slawinski Env Assessment Coordinator David Raye Mike Allard NRC GLM at FEMA RRCC N/A Site Team Evaluator/Controller Desiree Smith Rev. 1 -February 19, 2011 EOF/JIC Sequence of Events" AEP EOF Liaison will greet NRC in the lobby & escort to 2nd Floor Conference Room" NRC will await phone call for deployment to briefing area" When notified, NRC will be escorted to East Entrance and process into briefing area" Group briefing provided by Assistant Emergency Director L Current emergency classification o, Reason for classification" Current plant status" Status of radiological release if any Current protective action recommendation, if any Mitigative actions -description and status o Challenges" Questions from the NRC team" AEP EOF Liaison escorts NRC to the JIC for individual briefings with counterparts" Asst Emergency Director escorts NRC to the EOF for individual briefings with counterparts AEP Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107 AEP NGG Building Front of building S 4/7 I I--- r--
NU
U-NGG First Floor North TOVVER Front Lobby Inside JIC/EOF Entrance Briefing Room for the IRT EOF/JIC EOF Layout Emergency Operations U PBX Room I 1 Facility II Pull-Down Moio Screen 2o90 Bndq. Monitor I I Pull-Down 11 Reg Affairs Coord Computer AnalystRckIncluding IMgr's 2919 2911 IRT Scheduling and Planning Mgr.IRT Telecom Emergency Operations Facility Dose Assessment Facility JIC Layout Ul (1) Public Information Technical Briefer (2) Public Information Leader 1 (3) Public Information Leader 2 MEDIA WORK AREA SUPPORT STAFF 5890 FRE S O FFý I Mo RESTROOM Joint Information Center JIC Media Area Media Work Area Looking back towards BOB Lobby Area JIC Auditorium Uj TSC Sequence of events" Deputy Technical Assessment Branch Leader and Radiation Safety Coordinator will meet at the Resident Inspectors Office located in the fourth floor of the East Office Building." When deployed, the NRC IRT will be escorted to the TSC by an AEP staff member." IRT receives briefing from the Assistant Site Emergency Coordinator
                                                  *itA T*m NIr*ctnr Integrated Organizational Chart                     Ann;Boland NRC Region III Site Team                       Emergency Director                 Dept Site Team Dir D.C. COOK EOF Emergency Response Team               Shane Lies IAssistantGary Shear ED Randy Keppeler 1
March 1, 2011 TA Specialist/
Chuck Zoia       Radiation Safety Engineering Design Coordinator Manager               (TSC)
Madan Goel            Tony Go Communicator:    Radiation Assessment Jim Neurauter      Coordinator Boadwriter Milt Paquette Tony McMutuary NRC GLM at FEMA RRCC Dose Assessor Wayne Slawinski                                                                         N/A Env Assessment Coordinator David Raye Mike Allard Site Team Rev. 1 - February 19, 2011 Evaluator/Controller Desiree Smith
 
EOF/JIC Sequence of Events
" AEP EOF Liaison will greet NRC in the lobby & escort to 2nd Floor Conference Room
" NRC will await phone call for deployment to briefing area
" When notified, NRC will be escorted to East Entrance and process into briefing area
" Group briefing provided by Assistant Emergency Director L   Current emergency classification o, Reason for classification
  "   Current plant status
  "   Status of radiological release if any Current protective action recommendation, if any Mitigative actions - description and status o   Challenges
" Questions from the NRC team
" AEP EOF Liaison escorts NRC to the JIC for individual briefings with counterparts
" Asst Emergency Director escorts NRC to the EOF for individual briefings with counterparts
 
AEP Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107
 
AEP NGG Building Front of building 4/7   I S
  ---
r-I
                        -
 
U-NGG First Floor North TOVVER
 
Front Lobby Inside JIC/EOF Entrance Briefing Room for the IRT EOF/JIC EOF Layout Emergency U                                 PBX Room                                       I1 Operations II Pull-Down               Moio             II                Pull-Down     11 Facility      Screen      2o90Bndq. Monitor Reg Affairs Coord       Computer AnalystRck r*                                    Including IMgr's 2919         2911       *'ge, IRT Scheduling and Planning Mgr.
IRT   Telecom
 
Emergency Operations Facility Dose Assessment Facility JIC Layout Ul (1) Public Information Technical Briefer (2) Public Information Leader 1 (3) Public Information Leader 2 SUPPORT MEDIA WORK AREA                   STAFF 5890 FRE         S FF O
                                                  ý IMo RESTROOM
 
Joint Information Center JIC Media Area Media Work Area Looking back towards BOB Lobby Area
 
JIC Auditorium Uj TSC Sequence of events
  " Deputy Technical Assessment Branch Leader and Radiation Safety Coordinator will meet at the Resident Inspectors Office located in the fourth floor of the East Office Building.
  " When deployed, the NRC IRT will be escorted to the TSC by an AEP staff member.
  " IRT receives briefing from the Assistant Site Emergency Coordinator
* Current emergency classification
* Current emergency classification
* Reason for classification" Current plant status" Status of radiological release if any* Current protective action recommendation, if any* Mitigative actions -description and status* Challenges
* Reason for classification
* Questions from the NRC IRT* Assistant Site Emergency Coordinator introduces IRT to TSC ERO U Cook3 Nula ln ieLyu 7/AMMUCM E&MCUM POW=
      "   Current plant status
USNRC Residents Office is on the Fourth Floor in the Northeast corner.Maintenance U TSC TSC Reference Material LC,COMMUNICATIONS ROOM_SPP 211 1088 Phone Jack 1034 Computer Analyst TSC Drawngs Public Affairs Hotline DAP Computer 1092 Administrative 2 Coordinator IN I 50-SFI-216.E CABINET" 1202 1 Security PET PET Director Training Operations 1063 ý STA 1302 Asst. 1451 STI STA RAC HOTLINE HOTLINE (1824) 186 ENS HPN RAC 1032 FTS-2001 FTS-2001 371-6772 371-6779 NRC 1204 1621 1030 Maint. Reactor RSC (2) DTABL Eng'r. Physics (1)PLANT EVALUATION TEAM ROOM 203 Asst.SEC EROS SEC Team Boardwnter 2080 Coordinator Brdge [ odge 8.I FAX Operator/Runner NRC ROOM (1) Deputy Technical Assessment Branch Leader (2) Radiological Safety Coordinator (3) Protective Measures Coordinator Link (4) Reactor Safety Coordinator Link Conference Table PMCL (3R FTS-200t-2 371-6775 RSCL (46r FTS-200T-371-6776 ENS HPN FTS-2001 FTS-2001 37 6772 371-6779 S 1683 1682 P[nmary Copier U Logistics  
      "   Status of radiological release if any
-GPS addre D. C. Cook Nuclear Plant One Cook Place Bridgman, MI 49106 TSC, OSC, SCR AEP Buchanan Office Building 500 Circle Drive Buchanan, MI 49107 EOF, ENC/JIC Contact the CNP Switchboard at (269) 465-5901 should you need assistance in your travels sses N Southwest Michigan-Driving Distance to" Lisle, II 105 miles" New Buffalo, MI 15 miles" South Bend, IN 35 miles" Stevensville, MI 5 miles" St. Joseph, MI 11 miles Plant* Driving Distance to the EOF/JIC Buchanan, MI U U U U U U Cook Nuclear Plant Lisle, II New Buffalo, MI South Bend, IN Stevensville, MI St. Joseph, MI 19 miles 112 miles 27 miles 18 miles 24 miles 22 miles Questions?}}
* Current protective action recommendation, if any
* Mitigative actions - description and status
* Challenges
* Questions from the NRC IRT
* Assistant Site Emergency Coordinator introduces IRT to TSC ERO
 
U Cook3Nula ln ieLyu 7/ AMMUCM E&MCUM POW=
 
USNRC Residents Office is on the Fourth Floor in the Northeast corner
                  .Maintenance
 
U TSC                                                             I                                      1202                  1 203 TSCReference Material                                                                                     Asst.
SEC        EROS LC, i*    COMMUNICATIONS                                                     Security           PET         PET Director         Training   Operations ROOM
_SPP 21150-SFI-216                        1063         ý   STA           1302
                                                      .E CABINET"  Asst. 1451                       STI           STA RAC                               HOTLINE       HOTLINE (1824)         186 ENS           HPN 1088                                            RAC     1032   FTS-2001   FTS-2001                                 SEC Phone Jack                                                        371-6772     371-6779 1034      Computer                                                            NRC Analyst TSC Drawngs                                          1204               1621       1030 Public Affairs                                                                                          Maint. Reactor Hotline RSC (2) DTABL           Eng'r. Physics DAP (1)
Computer                                                    PLANT EVALUATION TEAM ROOM 1092      Administrative                  2                                                        Team         Boardwnter         2080 Coordinator                   IN                                                    Coordinator        Brdge     [       odge
                                                                                                  .I 8
FAX Operator/
Runner NRC ROOM (1) Deputy Technical Assessment Branch Leader (2) Radiological Safety Coordinator PMCL (3R (3) Protective Measures Coordinator Link                                                                             FTS-200t-2 (4) Reactor Safety Coordinator Link                               Conference                                         371-6775 Table RSCL (46r FTS-200T-371-6776 ENS             HPN FTS-2001       FTS-2001 37   6772       371-6779 P[nmary Copier                           S    1683                      1682
 
U Logistics - GPS addre sses D. C. Cook Nuclear Plant One Cook Place Bridgman, MI 49106 TSC, OSC, SCR AEP Buchanan Office Building 500 Circle Drive Buchanan, MI 49107 EOF, ENC/JIC Contact the CNP Switchboard at (269) 465-5901 should you need assistance in your travels
 
N Southwest Michigan
  - Driving Distance to Plant
  " Lisle, II         105 miles
  " New Buffalo, MI     15 miles
  " South Bend, IN       35 miles
  " Stevensville, MI     5 miles
  " St. Joseph, MI       11 miles
* Driving Distance to the EOF/JIC Buchanan, MI U Cook Nuclear Plant   19 miles U Lisle, II         112 miles U New Buffalo, MI     27 miles U South Bend, IN     18 miles U Stevensville, MI   24 miles U St. Joseph, MI     22 miles
 
Questions?}}

Revision as of 01:47, 13 November 2019

02/22/11 Summary of Meeting Between NRC and D. C. Cook Emergency Preparedness and Regulatory Affairs to Discuss the Upcoming March 2011 Emergency Preparedness Exercise
ML110820737
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/21/2011
From: Billy Dickson
Division of Reactor Safety III
To: Weber L
Indiana Michigan Power Co
References
Download: ML110820737 (36)


Text

U ml Participation Drill - Plume Only

  • March 1,2011
  • Bridgman, MI "PA

A unit ofAmerican Electric Power Donald C. Cook Nuclear Plant USNRC Region III Incident Response Program

oo ucer ln Safety and Human Performance Guiding Principles

,,-,a dhu a errors 1e.

2. !d hip and

,-accuotaility prevent

3. an safety and human error duction into our work.

4.

Personal Protective Equipment

  • EOF, ENC/JIC, SCR, OSC are outside the powerblock and PPE is not required.

" TSC and Damage Control Teams dispatched from the OSC require:

Hardhat, ANSI footwear with protective toe, safety glasses with installed side shields and hearing protection.

u-u El 0 OrientationGoals

  • Plant Overview
  • Organizational Match-ups eFacility Locations
  • NRC Incident Response Team Entrance
  • Logistics 4.

.Ed D.C. Cook Nuclear Plant

    • o 10 Mile EPZ is inside Berrien County o:o EAL Scheme -

NUMARC/NESP-007 o:o NUREG-0654 based Emergency Plan

Organizational Overlay

  • NRC IRT and D.C. Cook ERO positions are not perfectly matched
  • Aligned positions as closely as possible and arranged seating accordingly
  • Extra seating exists. IRT members are encouraged to move to any seat with a Incident Response Team sign above the workstation.

U Site Team NRC Region III Site Team Director Site: D.C. COOK Deputy Site Team DatelShift: March , 2011 Anne Boland Director I Gary Shear NRC GLM at FEMA RRCC N/A Site Team Rev. 1 - January 28, 2011 Evaluator/Controller Desiree Smith

NU

  • itA T*m NIr*ctnr Integrated Organizational Chart Ann;Boland NRC Region III Site Team Emergency Director Dept Site Team Dir D.C. COOK EOF Emergency Response Team Shane Lies IAssistantGary Shear ED Randy Keppeler 1

March 1, 2011 TA Specialist/

Chuck Zoia Radiation Safety Engineering Design Coordinator Manager (TSC)

Madan Goel Tony Go Communicator: Radiation Assessment Jim Neurauter Coordinator Boadwriter Milt Paquette Tony McMutuary NRC GLM at FEMA RRCC Dose Assessor Wayne Slawinski N/A Env Assessment Coordinator David Raye Mike Allard Site Team Rev. 1 - February 19, 2011 Evaluator/Controller Desiree Smith

EOF/JIC Sequence of Events

" AEP EOF Liaison will greet NRC in the lobby & escort to 2nd Floor Conference Room

" NRC will await phone call for deployment to briefing area

" When notified, NRC will be escorted to East Entrance and process into briefing area

" Group briefing provided by Assistant Emergency Director L Current emergency classification o, Reason for classification

" Current plant status

" Status of radiological release if any Current protective action recommendation, if any Mitigative actions - description and status o Challenges

" Questions from the NRC team

" AEP EOF Liaison escorts NRC to the JIC for individual briefings with counterparts

" Asst Emergency Director escorts NRC to the EOF for individual briefings with counterparts

AEP Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107

AEP NGG Building Front of building 4/7 I S

---

r-I

-

U-NGG First Floor North TOVVER

Front Lobby Inside JIC/EOF Entrance Briefing Room for the IRT EOF/JIC EOF Layout Emergency U PBX Room I1 Operations II Pull-Down Moio II Pull-Down 11 Facility Screen 2o90Bndq. Monitor Reg Affairs Coord Computer AnalystRck r* Including IMgr's 2919 2911 *'ge, IRT Scheduling and Planning Mgr.

IRT Telecom

Emergency Operations Facility Dose Assessment Facility JIC Layout Ul (1) Public Information Technical Briefer (2) Public Information Leader 1 (3) Public Information Leader 2 SUPPORT MEDIA WORK AREA STAFF 5890 FRE S FF O

ý IMo RESTROOM

Joint Information Center JIC Media Area Media Work Area Looking back towards BOB Lobby Area

JIC Auditorium Uj TSC Sequence of events

" Deputy Technical Assessment Branch Leader and Radiation Safety Coordinator will meet at the Resident Inspectors Office located in the fourth floor of the East Office Building.

" When deployed, the NRC IRT will be escorted to the TSC by an AEP staff member.

" IRT receives briefing from the Assistant Site Emergency Coordinator

  • Current emergency classification
  • Reason for classification

" Current plant status

" Status of radiological release if any

  • Current protective action recommendation, if any
  • Mitigative actions - description and status
  • Challenges
  • Questions from the NRC IRT
  • Assistant Site Emergency Coordinator introduces IRT to TSC ERO

U Cook3Nula ln ieLyu 7/ AMMUCM E&MCUM POW=

USNRC Residents Office is on the Fourth Floor in the Northeast corner

.Maintenance

U TSC I 1202 1 203 TSCReference Material Asst.

SEC EROS LC, i* COMMUNICATIONS Security PET PET Director Training Operations ROOM

_SPP 21150-SFI-216 1063 ý STA 1302

.E CABINET" Asst. 1451 STI STA RAC HOTLINE HOTLINE (1824) 186 ENS HPN 1088 RAC 1032 FTS-2001 FTS-2001 SEC Phone Jack 371-6772 371-6779 1034 Computer NRC Analyst TSC Drawngs 1204 1621 1030 Public Affairs Maint. Reactor Hotline RSC (2) DTABL Eng'r. Physics DAP (1)

Computer PLANT EVALUATION TEAM ROOM 1092 Administrative 2 Team Boardwnter 2080 Coordinator IN Coordinator Brdge [ odge

.I 8

FAX Operator/

Runner NRC ROOM (1) Deputy Technical Assessment Branch Leader (2) Radiological Safety Coordinator PMCL (3R (3) Protective Measures Coordinator Link FTS-200t-2 (4) Reactor Safety Coordinator Link Conference 371-6775 Table RSCL (46r FTS-200T-371-6776 ENS HPN FTS-2001 FTS-2001 37 6772 371-6779 P[nmary Copier S 1683 1682

U Logistics - GPS addre sses D. C. Cook Nuclear Plant One Cook Place Bridgman, MI 49106 TSC, OSC, SCR AEP Buchanan Office Building 500 Circle Drive Buchanan, MI 49107 EOF, ENC/JIC Contact the CNP Switchboard at (269) 465-5901 should you need assistance in your travels

N Southwest Michigan

- Driving Distance to Plant

" Lisle, II 105 miles

" New Buffalo, MI 15 miles

" South Bend, IN 35 miles

" Stevensville, MI 5 miles

" St. Joseph, MI 11 miles

  • Driving Distance to the EOF/JIC Buchanan, MI U Cook Nuclear Plant 19 miles U Lisle, II 112 miles U New Buffalo, MI 27 miles U South Bend, IN 18 miles U Stevensville, MI 24 miles U St. Joseph, MI 22 miles

Questions?