ML111160176: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ES-301 Administrative Topics Outline Form ES-301-1 Revision 0 SRO Facility: WATERFORD 3 Date of Examination: March 21, 2011 Examination Level:
{{#Wiki_filter:ES-301                               Administrative Topics Outline                       Form ES-301-1 Facility:     WATERFORD 3                             Date of Examination:         March 21, 2011 Examination Level:       SRO                         Operating Test Number:       1 Administrative Topic         Type                      Describe activity to be performed (see Note)             Code*
SRO Operating Test Number:
A5                               2.1.23, Ability to perform specific system and integrated R, N          plant procedures during all modes of plant operation.
1 Administrative Topic (see Note)
Conduct of Operations Review and approve a completed Shutdown Margin with K/A Importance:
Type Code* Describe activity to be performed A5 Conduct of Operations K/A Importance:
an immoveable CEA in accordance with OP-903-090, 4.4                                Shutdown Margin, section 7.3, Shutdown Margin Verification - Un-trippable CEA.
4.4 R, N 2.1.23, Ability to perform specific system and integrated plant procedures during all modes of plant operation. Review and approve a completed Shutdown Margin with an immoveable CEA in accordance with OP-903-090, Shutdown Margin, section 7.3, Shutdown Margin Verification - Un-trippable CEA.
A6                               2.1.18, Ability to make accurate, clear, and concise logs, R, M          records, status boards, and reports.
A6 Conduct of Operations K/A Importance:
Conduct of Operations Review and approve OP-903-001, Technical K/A Importance:
3.8 R, M 2.1.18, Ability to make accurate, clear, and concise logs, records, status boards, and reports. Review and approve OP-903-001, Technical Specification Surveillance Logs, Attachment 11.18, Adjustment of CPC and Excore Nuclear Instrumentation  
Specification Surveillance Logs, Attachment 11.18, 3.8                                Adjustment of CPC and Excore Nuclear Instrumentation Data.
A7                                2.2.37, Ability to determine operability and/or availability R, N          of safety related equipment.
Equipment Control Review and approve a completed Equipment Out of K/A Importance:
Service document in accordance with OP-100-010, 4.6                                Equipment Out of Service.
A8                                2.3.4, Knowledge of radiation exposure limits under R, N          normal and emergency conditions.
Radiation Control Calculate dose and assign non-licensed operators to K/A Importance:
perform work in radiological restricted areas. Given 3.7                                dose rate with and without shielding installed, time to install shielding, and job completion time using 1 operator or using 2 operators, determine proper job assignment.
A9                                2.4.38, Ability to take actions called for in the facility S, M          emergency plan, including supporting or acting as Emergency Plan emergency coordinator if required.
K/A Importance:
Determine appropriate classification and actions based 4.4                                on a toxic gas release in accordance with EP-004-010, Toxic Chemical Contingency Procedure.
NOTE:        All items (5 total are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
* Type Codes & Criteria:          (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs;  4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
Revision 0 SRO


Data. A7 Equipment Control K/A Importance:
ES-301                            Control Room/In-Plant Systems Outline                      Form ES-301-2 Facility:        WATERFORD 3                                    Date of Examination:    March 21, 2011 Exam Level                    Reactor Operator                  Operating Test No.:            NRC Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
4.6 R, N 2.2.37, Ability to determine operability and/or availability of safety related equipment. Review and approve a completed Equipment Out of Service document in accordance with OP-100-010, Equipment Out of Service.
System / JPM Title                                      Type      Safety Code*    Function S1    001 Control Rod Drive, Perform CEA testing for Regulating Group 6 in            A, D, S        1 accordance with OP-903-005, Control Element Assembly Operability Check.
A8 Radiation Control K/A Importance:
Fault: CEA 21 will insert after initially moved, requiring a reactor trip.
3.7 R, N 2.3.4, Knowledge of radiation exposure limits under normal and emergency conditions. Calculate dose and assign non-licensed operators to perform work in radiological restricted areas. Given dose rate with and without shielding installed, time to install shielding, and job completion time using 1 operator or using 2 operators, determine proper job assignment.
A4.01 Controls for CCWS                      RO - 3.1, SRO - 2.9 S2    004 Chemical and Volume Control System; Makeup to the Volume                    A, M, S        2 Control Tank using Boric Acid and Primary Makeup Water batches in accordance with OP-002-005, Chemical and Volume Control.
A9 Emergency Plan K/A Importance:
Fault: The Boric Acid counter will fail to secure the Boric Acid addition, requiring the applicant to manually secure Boric Acid flow. The applicant will then need to add the Primary Makeup Water for the initial calculation, plus the additional based on the extra boric acid added.
4.4 S, M 2.4.38, Ability to take actions called for in the facility emergency plan, including supporting or acting as emergency coordinator if required. Determine appropriate classification and actions based on a toxic gas release in accordance with EP-004-010, Toxic Chemical Contingency Procedure. NOTE: All items (5 total are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
A4.07 Boration/dilution            RO - 3.9, SRO - 3.7 S3    005 Shutdown Cooling System; Secure Shutdown Cooling Train B and               D, L, S      4-P place it in standby in accordance with OP-009-005, Shutdown Cooling.
* Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs;  4 for SROs & RO retakes) (N)ew or (M)odified from bank ( 1) (P)revious 2 exams ( 1; randomly selected)
A4.01 Controls and indication for RHR pumps RO - 3.6, SRO - 3.4 S4    039 Main and Reheat Steam System; BOP operator immediate operator              A, M, S      4-S actions on evacuation of the Control Room in accordance with OP-901-502, Control Room Evacuation Fault: Atmospheric Dump Valve B will spuriously open, requiring the applicant to take contingency actions to control Steam Generator pressure.
A4.01 Main steam supply. Valves              RO - 2.9, SRO - 2.8 S5    028 Hydrogen Recombiner and Purge Control System                              D, L, P, S      5 Start Hydrogen Recombiner A in accordance with OP-008-006.
A4.01 HRPS controls                RO - 4.0, SRO - 4.0 S6    064 Emergency Diesel Generator (ED/G) System; Parallel Emergency              A, D, S        6 Diesel Generator A for EDG testing in accordance with OP-009-002, Emergency Diesel Generator.
Fault: After EDG A load is raised, EDG A load will rise without manipulation requiring a trip of EDG A.
A4.06 Manual start, loading, and stopping of the ED/G RO - 3.9, SRO - 3.9 S7. 029 Containment Purge System; Perform surveillance OP-903-052,                    N, S         8 Controlled Ventilation Area System Operability Check, and secure RAB Normal Ventilation and start CVAS Train A.
K1.03 Engineering safeguards RO - 3.6, SRO - 3.8 S8. 012 Reactor Protection System; Place Reactor Power Cutback in service            D, S        7 and remove reactor trip on turbine trip in accordance with OP-004-015, Reactor Power Cutback.
A4.03 Channel blocks and bypasses            RO - 3.6, SRO - 3.6 1                                   NRC 2011 Revision 1


ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 1 NRC 2011 Revision 1 Facility: WATERFORD 3  Date of Examination: March 21, 2011 Exam Level Reactor Operator  Operating Test No.:
ES-301                           Control Room/In-Plant Systems Outline                       Form ES-301-2 In-Plant Systems@ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)
NRC Control Room Systems
P1    061 Emergency Feedwater System; Reset overspeed device on                          D, E, L,   4-S Emergency Feedwater Pump AB in accordance with OP-902-005,                         P, R Station Blackout Recovery.
@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) System / JPM Title Type Code* Safety Function S1 001 Control Rod Drive, Perform CEA testing for Regulating Group 6 in accordance with OP-903-005, Control Element Assembly Operability Check. Fault:  CEA 21 will insert after initially moved, requiring a reactor trip. A4.01 Controls for CCWS  RO - 3.1, SRO - 2.9 A, D, S 1 S2 004 Chemical and Volume Control System; Makeup to the Volume Control Tank using Boric Acid and Primary Makeup Water batches in accordance with OP-002-005, Chemical and Volume Control. Fault: The Boric Acid counter will fail to secure the Boric Acid addition, requiring the applicant to manually secure Boric Acid flow. The applicant will then need to add the Primary Makeup Water for the initial calculation, plus the additional based on the extra boric acid added. A4.07 Boration/dilution  RO - 3.9, SRO - 3.7 A, M, S 2 S3 005 Shutdown Cooling System; Secure Shutdown Cooling Train B and place it in standby in accordance with OP-009-005, Shutdown Cooling. A4.01 Controls and indication for RHR pumps RO - 3.6, SRO - 3.4 D, L, S 4 - P S4 039 Main and Reheat Steam System; BOP operator immediate operator actions on evacuation of the Control Room in accordance with OP-901-502, Control Room Evacuation Fault: Atmospheric Dump Valve B will spuriously open, requiring the applicant to take contingency actions to control Steam Generator pressure. A4.01 Main steam supply. Valves RO - 2.9, SRO - 2.8 A, M, S 4 - S S5 028 Hydrogen Recombiner and Purge Control System Start Hydrogen Recombiner A in accordance with OP-008-006. A4.01 HRPS controls  RO - 4.0, SRO - 4.0 D, L, P, S 5 S6 064 Emergency Diesel Generator (ED/G) System; Parallel Emergency Diesel Generator A for EDG testing in accordance with OP-009-002, Emergency Diesel Generator. Fault: After EDG A load is raised, EDG A load will rise without manipulation requiring a trip of EDG A. A4.06 Manual start, loading, and stopping of the ED/G RO - 3.9, SRO - 3.9 A, D, S 6 S7. 029 Containment Purge System; Perform surveillance OP-903-052, Controlled Ventilation Area System Operability Check, and secure RAB Normal Ventilation and start CVAS Train A. K1.03 Engineering safeguards RO - 3.6, SRO - 3.8 N, S 8 S8. 012 Reactor Protection System; Place Reactor Power Cutback in service and remove reactor trip on turbine trip in accordance with OP-004-015, Reactor Power Cutback. A4.03 Channel blocks and bypasses RO - 3.6, SRO - 3.6 D, S 7 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 2 NRC 2011 Revision 1 In-Plant Systems
A2.04 Pump failure or improper operation          RO - 3.4, SRO - 3.8 P2    064 Emergency Diesel Generator (ED/G) System; Trip Emergency                      A, D, R      6 Diesel Generator B locally.
@ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)
Fault: The first method the applicant performs to trip the EDG B will fail, requiring contingency actions to secure EDG B.
P1 061 Emergency Feedwater System; Reset overspeed device on Emergency Feedwater Pump AB in accordance with OP-902-005, Station Blackout Recovery. A2.04 Pump failure or improper operation RO - 3.4, SRO - 3.8 D, E, L, P, R 4 - S P2 064 Emergency Diesel Generator (ED/G) System; Trip Emergency Diesel Generator B locally. Fault: The first method the applicant performs to trip the EDG B will fail, requiring contingency actions to secure EDG B. K4.02 Trips for ED/G while operating (normal or emergency)  
K4.02 Trips for ED/G while operating (normal or emergency)
RO - 3.9, SRO - 4.2 P3    068 Control Room Evacuation                                                        E, L, N      2 Close Train B Safety Injection Tank outlet valves during a Control Room Evacuation in accordance with OP-901-502, Evacuation of Control Room and Subsequent Plant Shutdown.
AA1.28 PZR level control and pressure control RO - 3.8, SRO - 4.0
@        All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes                                  Criteria for RO / SRO-I / SRO-U (A)lternate path                                      4-6 / 4-6 / 2-3                 5 (C)ontrol room                                                                      0 (D)irect from bank                                    9/8/4                        7 (E)mergency or abnormal in-plant                                1/1/1                        2 (EN)gineered safety feature                    - / - / 1 (control room system)            -
(L)ow-Power / Shutdown                                    1/1/1                        4 (N)ew or (M)odified from bank including 1(A)                        2/2/1                        4 (P)revious 2 exams                          3 3 /  2 (randomly selected)        2 (R)CA                                          1/1/1                        2 (S)imulator                                                                      8 2                                        NRC 2011 Revision 1


RO - 3.9, SRO - 4.2 A, D, R 6 P3 068 Control Room Evacuation Close Train B Safety Injection Tank outlet valves during a Control Room Evacuation in accordance with OP-901-502, Evacuation of Control Room and Subsequent Plant Shutdown. AA1.28 PZR level control and pressure control RO - 3.8, SRO - 4.0 E, L, N 2 @ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
ES-301                            Control Room/In-Plant Systems Outline                      Form ES-301-2 Facility:        WATERFORD 3                                     Date of Examination:    March 21, 2011 Exam Level                    SRO - Instant                    Operating Test No.:            NRC Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 5 (C)ontrol room  0 (D)irect from bank  9 /  8 /  4 7 (E)mergency or abnormal in-plant  1 /  1 /  1 2 (EN)gineered safety feature - -   /  1 (control room system) - (L)ow-Power / Shutdown  1 /  1 /  1 4 (N)ew or (M)odified from bank including 1(A)  2 /  2 /  1 4 (P)revious 2 exams  3 3 /  2 (randomly selected) 2 (R)CA  1 /  1 /  1 2 (S)imulator  8
System / JPM Title                                      Type      Safety Code*    Function S1    001 Control Rod Drive, Perform CEA testing for Regulating Group 6 in            A, D, S        1 accordance with OP-903-005, Control Element Assembly Operability Check.
Fault: CEA 21 will insert after initially moved, requiring a reactor trip.
A4.01 Controls for CCWS                      RO - 3.1, SRO - 2.9 S2    004 Chemical and Volume Control System; Makeup to the Volume                    A, M, S        2 Control Tank using Boric Acid and Primary Makeup Water batches in accordance with OP-002-005, Chemical and Volume Control.
Fault: The Boric Acid counter will fail to secure the Boric Acid addition, requiring the applicant to manually secure Boric Acid flow. The applicant will then need to add the Primary Makeup Water for the initial calculation, plus the additional based on the extra boric acid added.
A4.07 Boration/dilution            RO - 3.9, SRO - 3.7 S3    005 Shutdown Cooling System; Secure Shutdown Cooling Train B and                D, L, S      4-P place it in standby in accordance with OP-009-005, Shutdown Cooling.
A4.01 Controls and indication for RHR pumps RO - 3.6, SRO - 3.4 S4    039 Main and Reheat Steam System; BOP operator immediate operator              A, M, S      4-S actions on evacuation of the Control Room in accordance with OP-901-502, Control Room Evacuation Fault: Atmospheric Dump Valve B will spuriously open, requiring the applicant to take contingency actions to control Steam Generator pressure.
A4.01 Main steam supply. Valves              RO - 2.9, SRO - 2.8 S5 S6    064 Emergency Diesel Generator (ED/G) System; Parallel Emergency              A, D, S        6 Diesel Generator A for EDG testing in accordance with OP-009-002, Emergency Diesel Generator.
Fault: After EDG A load is raised, EDG A load will rise without manipulation requiring a trip of EDG A.
A4.06 Manual start, loading, and stopping of the ED/G RO - 3.9, SRO - 3.9 S7. 029 Containment Purge System; Perform surveillance OP-903-052,                    N, S        8 Controlled Ventilation Area System Operability Check, and secure RAB Normal Ventilation and start CVAS Train A.
K1.03 Engineering safeguards RO - 3.6, SRO - 3.8 S8. 012 Reactor Protection System; Place Reactor Power Cutback in service            D, S        7 and remove reactor trip on turbine trip in accordance with OP-004-015, Reactor Power Cutback.
A4.03 Channel blocks and bypasses            RO - 3.6, SRO - 3.6 3                                   NRC 2011 Revision 1


ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 3 NRC 2011 Revision 1 Facility: WATERFORD 3  Date of Examination: March 21, 2011 Exam Level SRO - Instant  Operating Test No.:
ES-301                           Control Room/In-Plant Systems Outline                       Form ES-301-2 In-Plant Systems@ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)
NRC Control Room Systems
P1    061 Emergency Feedwater System; Reset overspeed device on                          D, E, L,   4-S Emergency Feedwater Pump AB in accordance with OP-902-005,                         P, R Station Blackout Recovery.
@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) System / JPM Title Type Code* Safety Function S1 001 Control Rod Drive, Perform CEA testing for Regulating Group 6 in accordance with OP-903-005, Control Element Assembly Operability Check. Fault:  CEA 21 will insert after initially moved, requiring a reactor trip. A4.01 Controls for CCWS  RO - 3.1, SRO - 2.9 A, D, S 1 S2 004 Chemical and Volume Control System; Makeup to the Volume Control Tank using Boric Acid and Primary Makeup Water batches in accordance with OP-002-005, Chemical and Volume Control. Fault: The Boric Acid counter will fail to secure the Boric Acid addition, requiring the applicant to manually secure Boric Acid flow. The applicant will then need to add the Primary Makeup Water for the initial calculation, plus the additional based on the extra boric acid added. A4.07 Boration/dilution  RO - 3.9, SRO - 3.7 A, M, S 2 S3 005 Shutdown Cooling System; Secure Shutdown Cooling Train B and place it in standby in accordance with OP-009-005, Shutdown Cooling. A4.01 Controls and indication for RHR pumps RO - 3.6, SRO - 3.4 D, L, S 4 - P S4 039 Main and Reheat Steam System; BOP operator immediate operator actions on evacuation of the Control Room in accordance with OP-901-502, Control Room Evacuation Fault: Atmospheric Dump Valve B will spuriously open, requiring the applicant to take contingency actions to control Steam Generator pressure. A4.01 Main steam supply. Valves RO - 2.9, SRO - 2.8 A, M, S 4 - S S5    S6 064 Emergency Diesel Generator (ED/G) System; Parallel Emergency Diesel Generator A for EDG testing in accordance with OP-009-002, Emergency Diesel Generator. Fault: After EDG A load is raised, EDG A load will rise without manipulation requiring a trip of EDG A. A4.06 Manual start, loading, and stopping of the ED/G
A2.04 Pump failure or improper operation          RO - 3.4, SRO - 3.8 P2    064 Emergency Diesel Generator (ED/G) System; Trip Emergency                      A, D, R      6 Diesel Generator B locally.
Fault: The first method the applicant performs to trip the EDG B will fail, requiring contingency actions to secure EDG B.
K4.02 Trips for ED/G while operating (normal or emergency)
RO - 3.9, SRO - 4.2 P3    068 Control Room Evacuation                                                        E, L, N      2 Close Train B Safety Injection Tank outlet valves during a Control Room Evacuation in accordance with OP-901-502, Evacuation of Control Room and Subsequent Plant Shutdown.
AA1.28 PZR level control and pressure control RO - 3.8, SRO - 4.0
@        All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes                                  Criteria for RO / SRO-I / SRO-U (A)lternate path                                      4-6 / 4-6 / 2-3                5 (C)ontrol room                                                                      0 (D)irect from bank                                    9/8/4                       6 (E)mergency or abnormal in-plant                                1/1/1                        2 (EN)gineered safety feature                    - / - / 1 (control room system)           -
(L)ow-Power / Shutdown                                    1/1/1                        3 (N)ew or (M)odified from bank including 1(A)                        2/2/1                        4 (P)revious 2 exams                          3 /  3 /  2 (randomly selected)        1 (R)CA                                          1/1/1                        2 (S)imulator                                                                      7 4                                        NRC 2011 Revision 1


RO - 3.9, SRO - 3.9 A, D, S 6 S7. 029 Containment Purge System; Perform surveillance OP-903-052, Controlled Ventilation Area System Operability Check, and secure RAB Normal Ventilation and start CVAS Train A. K1.03 Engineering safeguards RO - 3.6, SRO - 3.8 N, S 8 S8. 012 Reactor Protection System; Place Reactor Power Cutback in service and remove reactor trip on turbine trip in accordance with OP-004-015, Reactor Power Cutback. A4.03 Channel blocks and bypasses RO - 3.6, SRO - 3.6 D, S 7 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 4 NRC 2011 Revision 1 In-Plant Systems
ES-301                           Control Room/In-Plant Systems Outline                       Form ES-301-2 Facility:      WATERFORD 3                                      Date of Examination:    March 21, 2011 Exam Level                    SRO - Upgrade                    Operating Test No.:            NRC Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
@ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)
System / JPM Title                                      Type        Safety Code*      Function S1    001 Control Rod Drive, Perform CEA testing for Regulating Group 6 in           A, D, S        1 accordance with OP-903-005, Control Element Assembly Operability Check.
P1 061 Emergency Feedwater System; Reset overspeed device on Emergency Feedwater Pump AB in accordance with OP-902-005, Station Blackout Recovery. A2.04 Pump failure or improper operation RO - 3.4, SRO - 3.8 D, E, L, P, R 4 - S P2 064 Emergency Diesel Generator (ED/G) System; Trip Emergency Diesel Generator B locally. Fault: The first method the applicant performs to trip the EDG B will fail, requiring contingency actions to secure EDG B. K4.02 Trips for ED/G while operating (normal or emergency)
Fault: CEA 21 will insert after initially moved, requiring a reactor trip.
A4.01 Controls for CCWS                      RO - 3.1, SRO - 2.9 S2 S3 S4    039 Main and Reheat Steam System; BOP operator immediate operator              A, M, S      4-S actions on evacuation of the Control Room in accordance with OP-901-502, Control Room Evacuation Fault: Atmospheric Dump Valve B will spuriously open, requiring the applicant to take contingency actions to control Steam Generator pressure.
A4.01 Main steam supply. Valves              RO - 2.9, SRO - 2.8 S5 S6 S7. 029 Containment Purge System; Perform surveillance OP-903-052,                N, EN, S        8 Controlled Ventilation Area System Operability Check, and secure RAB Normal Ventilation and start CVAS Train A.
K1.03 Engineering safeguards RO - 3.6, SRO - 3.8 S8.
5                                  NRC 2011 Revision 1


RO - 3.9, SRO - 4.2 A, D, R 6 P3 068 Control Room Evacuation Close Train B Safety Injection Tank outlet valves during a Control Room Evacuation in accordance with OP-901-502, Evacuation of Control Room and Subsequent Plant Shutdown. AA1.28 PZR level control and pressure control RO - 3.8, SRO - 4.0 E, L, N 2 @ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
ES-301                            Control Room/In-Plant Systems Outline                        Form ES-301-2 In-Plant Systems@ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)
* Type Codes Criteria for RO /
P1 P2    064 Emergency Diesel Generator (ED/G) System; Trip Emergency                      A, D, R      6 Diesel Generator B locally.
SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 5 (C)ontrol room 0 (D)irect from bank 9 / 8 / 4 6 (E)mergency or abnormal in-plant 1 / 1 / 1 2 (EN)gineered safety feature - / -   /   1 (control room system) - (L)ow-Power / Shutdown 1 / 1 / 1 3 (N)ew or (M)odified from bank including 1(A) 2 / 2 / 1 4 (P)revious 2 exams 3 /  3 /  2 (randomly selected) 1 (R)CA 1 / 1 / 1 2 (S)imulator 7
Fault: The first method the applicant performs to trip the EDG B will fail, requiring contingency actions to secure EDG B.
K4.02 Trips for ED/G while operating (normal or emergency)
RO - 3.9, SRO - 4.2 P3   068 Control Room Evacuation                                                       E, L, N      2 Close Train B Safety Injection Tank outlet valves during a Control Room Evacuation in accordance with OP-901-502, Evacuation of Control Room and Subsequent Plant Shutdown.
AA1.28 PZR level control and pressure control RO - 3.8, SRO - 4.0
@       All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes                                   Criteria for RO / SRO-I / SRO-U (A)lternate path                                     4-6 / 4-6 / 2-3                 3 (C)ontrol room                                                                       0 (D)irect from bank                                     9/8/4                       2 (E)mergency or abnormal in-plant                               1/1/1                       1 (EN)gineered safety feature                     - / - / 1 (control room system)           1 (L)ow-Power / Shutdown                                     1/1/1                       1 (N)ew or (M)odified from bank including 1(A)                         2/2/1                       3 (P)revious 2 exams                           3 /  3 /  2 (randomly selected)         0 (R)CA                                           1/1/1                       1 (S)imulator                                                                       3 6                                        NRC 2011 Revision 1


ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 5 NRC 2011 Revision 1 Facility: WATERFORD 3 Date of Examination: March 21, 2011 Exam Level SRO - Upgrade  Operating Test No.:
ES-301                       Simulator Scenario Quality Checklist                    Form ES-301-5 Facility: Waterford 3             Date of Exam:   March 21, 2011         Operating Test No. NRC A        E                                        Scenarios P        V 1              2               3               4            T   M P        E O   I L        N          CREW            CREW              CREW            CREW T   N I       T        POSITION        POSITION          POSITION          POSITION I
NRC Control Room Systems
C              S      A  B    S      A   B   S      A      B   S    A     B     A M
@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) System / JPM Title Type Code* Safety Function S1 001 Control Rod Drive, Perform CEA testing for Regulating Group 6 in accordance with OP-903-005, Control Element Assembly Operability Check. Fault:  CEA 21 will insert after initially moved, requiring a reactor trip. A4.01 Controls for CCWS  RO - 3.1, SRO - 2.9 A, D, S 1 S2    S3   S4 039 Main and Reheat Steam System; BOP operator immediate operator actions on evacuation of the Control Room in accordance with OP-901-502, Control Room Evacuation Fault: Atmospheric Dump Valve B will spuriously open, requiring the applicant to take contingency actions to control Steam Generator pressure. A4.01 Main steam supply. Valves RO - 2.9, SRO - 2.8 A, M, S 4 - S S5   S6   S7. 029 Containment Purge System; Perform surveillance OP-903-052, Controlled Ventilation Area System Operability Check, and secure RAB Normal Ventilation and start CVAS Train A. K1.03 Engineering safeguards RO - 3.6, SRO - 3.8 N, EN, S 8 S8.
A       T     R      O    R      T   O    R      T     O   R    T     O    L   U N       Y     O       C P    O       C    P   O     C     P   O   C     P         M(*)
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 6 NRC 2011 Revision 1 In-Plant Systems
T       P E                                                                                R   I U RX                                                                             0 1   1 0 NOR                   1                                                       1 1   1 1 SRO-U I/C                   2,3,5,           1,3,4,                               11  4  4  2 7,8              5,7,8 1&2 MAJ                   6                 6                                     2 2   2 1 TS                     3,4               1,2,3                                 5 0   2 2 RX                             1                                               1 1   1 0 NOR 3                                                                           1 1   1 1 SRO-I I/C   1,2,5,                 2,8                     1,4,7,                   8 4   4 2 6,7                                            8 1
@ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)
MAJ   4                       6                       6                       3 2   2 1 TS     1,2,3                                                                   3 0   2 2 RX             3                                                               1 1   1 0 NOR                   1                                                       1 1   1 1 SRO-I I/C           1,5     2,3,5,           1,3,4,                               13  4  4  2 7,8              5,7,8 2
P1   P2 064 Emergency Diesel Generator (ED/G) System; Trip Emergency Diesel Generator B locally. Fault: The first method the applicant performs to trip the EDG B will fail, requiring contingency actions to secure EDG B. K4.02 Trips for ED/G while operating (normal or emergency)
MAJ           4       6                 6                                     3 2   2 1 TS                     3,4               1,2,3                                 5 0   2 2 RX                             1                                               1 1   1 0 NOR 3                                                                           1 1   1 1 SRO-I I/C   1,2,5,                 2,8                                             7 4   4 2 6,7 3&4 MAJ    4                       6                                               2  2  2  1 TS     1,2,3                                                                   3 2  2 NRC Revision 0
RO - 3.9, SRO - 4.2 A, D, R 6 P3 068 Control Room Evacuation Close Train B Safety Injection Tank outlet valves during a Control Room Evacuation in accordance with OP-901-502, Evacuation of Control Room and Subsequent Plant Shutdown. AA1.28 PZR level control and pressure control RO - 3.8, SRO - 4.0 E, L, N 2 @ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 3 (C)ontrol room  0 (D)irect from bank  9 /  8 /  4 2 (E)mergency or abnormal in-plant  1 /  1 /  1 1 (EN)gineered safety feature -  /  -  /  1 (control room system) 1 (L)ow-Power / Shutdown  1 /  1 /  1 1 (N)ew or (M)odified from bank including 1(A)  2 /  2 /  1 3 (P)revious 2 exams  3 /  3 /  2 (randomly selected) 0 (R)CA  1 /  1 /  1 1 (S)imulator  3 NRC Revision 0 ES-301 Simulator Scenario Quality Checklist Form ES-301-5 Facility: Waterford 3 Date of Exam:
March 21, 2011 Operating Test No.NRC A P P L I C A N T E V E N T  T Y P E Scenarios 1 2 3 4 T O T A L     M      I      N       I      M      U     M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O A T C B O P S R O A T C B O P S R O A T C B O P S R O A T C B O P R I U SRO-U 1 & 2  RX             0 1 1 0 NOR   1         1 1 1 1 I/C   2,3,5, 7,8  1,3,4,5,7,8     11 4 4 2 MAJ   6   6     2 2 2 1 TS   3,4   1,2,3 5 0 2 2 SRO-I 1  RX     1       1 1 1 0 NOR 3           1 1 1 1 I/C 1,2,5, 6,7    2,8   1,4,7, 8   8 4 4 2 MAJ 4   6   6   3 2 2 1 TS 1,2,3           3 0 2 2 SRO-I 2  RX 3           1 1 1 0 NOR   1         1 1 1 1 I/C 1,5 2,3,5, 7,8  1,3,4,5,7,8     13 4 4 2 MAJ 4 6   6     3 2 2 1 TS   3,4   1,2,3 5 0 2 2 SRO-I 3 & 4  RX     1       1 1 1 0 NOR 3           1 1 1 1 I/C 1,2,5, 6,7    2,8 7 4 4 2 MAJ 4    6       2 2 2 1 TS 1,2,3            3 0 2 2  NRC Revision 0 RO 1 & 3 RX            0 1 1 0 NOR  3  1      2 1 1 1 I/C  2,6,7  3,5,7  3,5,8 9 4 4 2 MAJ   4  6  6    3 2 2 1 TS            0 0 2 2 RO 2 & 4  RX  3          1 1 1 0 NOR            0 1 1 1 I/C  1,5 1,4,7, 8   6 4 4 2 MAJ  4       6   2 2 2 1 TS            0 0 2 2 RO 5 RX            0 1 1 0 NOR  3  1      2 1 1 1 I/C   2,6,7  3,5,7 3,5,8 9 4 4 2 MAJ  4  6  6    3 2 2 1 TS             0 0 2 2 Spare  RX          4 NOR          4 I/C          1,2,3,6,7,8 3,7,8 1,2,6, 8    MAJ          5 5 5 TS          1,3 Instructions: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)" and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D.  (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.


Appendix D Scenario Outline Form ES-D-1 Scenario 1 Rev 1 Facility: WATERFORD 3 Scenario No.: 1 Op Test No.:
RX                                                                                      0  1    1 0 NOR                  3                    1                                            2  1    1 1 RO        I/C                  2,6,7                3,5,7      3,5,8                            9  4    4 2 1&3        MAJ                  4                    6          6                                3  2    2 1 TS                                                                                      0  0    2 2 RX            3                                                                          1  1    1 0 NOR                                                                                      0  1    1 1 RO I/C          1,5                                            1,4,7,                    6  4    4 2 8
NRC Examiners:   Operators:             Initial Conditions:
2&4 MAJ          4                                              6                          2  2    2 1 TS                                                                                      0  0    2 2 RX                                                                                      0  1    1 0 NOR                  3                    1                                            2  1    1 1 RO I/C                  2,6,7                3,5,7      3,5,8                            9  4    4 2 5        MAJ                  4                    6          6                                3  2    2 1 TS                                                                                      0  0    2 2 RX                                                                          4 NOR                                                                  4 I/C                                                                  1,2,3, 3,7,8 1,2,6, Spare                                                                            6,7,8        8 MAJ                                                                  5      5    5 TS                                                                  1,3 Instructions:
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
: 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
NRC Revision 0
 
Appendix D                                 Scenario Outline                     Form ES-D-1 Facility:       WATERFORD 3                 Scenario No.: 1       Op Test No.:   NRC Examiners:                                           Operators:
Initial Conditions:
* Reactor power is 100%
* Reactor power is 100%
* Protected Train is A
* Protected Train is A
* AB Bus is aligned to Train A Turnover: Maintain 100% power Event No. Malf. No. Event Type* Event Description 1 RC15A2 I - ATC I - SRO TS - SRO Pressurizer level instrument RC-ILI-0110 X fails low. OP-901-110, Pressurizer Level Control Malfunction.
* AB Bus is aligned to Train A Turnover:             Maintain 100% power Event         Malf. No.       Event Type*                     Event No.                                                        Description RC15A2           I - ATC           Pressurizer level instrument RC-ILI-0110 X 1                          I - SRO          fails low. OP-901-110, Pressurizer Level TS - SRO          Control Malfunction.
2 FW26A I - BOP I - SRO TS - SRO Steam Generator #1 Feedwater flow instrument FW-IFR-1111 fails low. OP-901-201, Steam Generator Level Control Malfunction.
FW26A           I - BOP           Steam Generator #1 Feedwater flow I - SRO          instrument FW-IFR-1111 fails low. OP-901-2 TS - SRO          201, Steam Generator Level Control Malfunction.
3 RD02A52 R - ATC N - BOP N - SRO TS - SRO CEA 52 Drops into the core, OP-901-102, CEA or CEDMCS Malfunction, and OP-901-212, Rapid Plant Power Reduction.
RD02A52         R - ATC           CEA 52 Drops into the core, OP-901-102, N - BOP          CEA or CEDMCS Malfunction, and OP-901-3 N - SRO          212, Rapid Plant Power Reduction.
4 RC23A CS04A M - All Loss of Coolant Accident, OP-902-002, Loss of Coolant Accident Recovery.
TS - SRO RC23A           M - All           Loss of Coolant Accident, OP-902-002, Loss 4          CS04A                            of Coolant Accident Recovery.
CS-125 A fails closed 5 CV02A C - ATC C - SRO Charging Pump A fails to auto-start.
CS-125 A fails closed CV02A           C - ATC           Charging Pump A fails to auto-start.
6 SI02D C - BOP C - SRO Low Pressure Safety Injection Pump A fails to auto start on SIAS requiring manual start 7 CS01B C - BOP C - SRO Containment Spray Pump B trip, OP-902-008, Safety Function Recovery Procedure Alignment of LPSI Pu mp B to replace CS Pump B. * (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor
5                          C - SRO SI02D         C - BOP           Low Pressure Safety Injection Pump A fails 6                                            to auto start on SIAS requiring manual start C - SRO CS01B           C - BOP           Containment Spray Pump B trip, OP-902-C - SRO          008, Safety Function Recovery Procedure 7
 
Alignment of LPSI Pump B to replace CS Pump B.
Scenario Event Description NRC Scenario 1 Scenario 1 Rev 1 The crew assumes the shift at 100% power with instructions to maintain 100% power.
    *   (N)ormal,   (R)eactivity, (I)nstrument,   (C)omponent,   (M)ajor Scenario 1 Rev 1
 
After taking the shift, Pressu rizer level instrument RC-ILI-011 0X fails low. Due to the failure, Letdown flow goes to minimum flow and both backup Charging Pumps start. The SRO should enter OP-901-110, Pressurize r Level Control Malfunction. The crew should utilize sub section E1, Pressurizer Lev el Control Channel Malfunction. The ATC should take manual control of Pressurizer level and select the non-faulted channel.
Using Tech Specs and OP-903-013, Monthl y Channel Checks, the SRO should enter Tech Spec 3.3.3.5, a 7 day action require ment, and determine Tech Spec 3.3.3.6 entry is not required since QSPDS is operable and meeting the Pressurizer level channel check. SPDS indication of Pressurizer le vel on the Plant Monitoring Computer is affected by this failure.
 
After the non-faulted channel is selected and Tech Specs are addressed, Steam Generator #1 Feedwater flow instrument FW-IFR-1111 fa ils low. The Feedwater Control System will respond by raising Feedwa ter flow to Steam Generator #1. The SRO should enter OP-901-201, St eam Generator Level Contro l Malfunction. The BOP will be required to take manual control and ma tch Feedwater and Main Steam flow. The Ultrasonic Flow Meter will fail as a result of the instrument failure and require entry into TRM 3.3.5. The Feedwater controls for Steam Generator #1 will remain in manual as a result of this failure.
 
After the crew has addressed the Feedwater instrument failure, CEA 52 drops into the core. Off normal procedure OP-901-102, CEA or CEDMCS Malfunction, should be entered. The dropped CEA will require a rapid plant power reduction. The SRO should enter OP-901-212, Rapid Plant Power Reduction. Direct Boration should commence within 15 minutes of the dropped CEA. For t he power reduction, the ATC will perform direct Boration to the RCS as well as ASI control with CEAs and Pressurizer Boron Equalization. The BOP will manipulate the controls to reduce Main Turbine load and manipulate Feedwater to Steam Generator #1 in manual. The SRO should enter Tech Specs 3.2.3, 3.1.
3.1, and 3.1.3.5.
 
Once the crew has commenced the power reduc tion and lowered power to ~ 90%, or at the lead examiner's discretion, a loss of coolant accident will occur. Charging Pump A will fail to start on the lowering Pressurizer level. The crew should diagnose the
 
Pressurizer level dropping with all available Charging Pumps operating, trip the Reactor, and initiate Safety Injection Actuation (S IAS) and Containment Isolation Actuation (CIAS). When Containment Spra y is actuated, either manually or automatically, CS-125 A will fail to automatically open and will not open using the control switch. This does not create a need for action at this time, but Containment Spray flow will only be provided from Train B with CS
-125 A failed closed. Low Pr essure Safety Injection Pump A will fail to automatically start on SIAS, requiring the BOP operator to manually start LPSI Pump A.
 
Scenario Event Description NRC Scenario 1 Scenario 1 Rev 1 After the crew completes OP-902-000, Standard Post Trip Actions and diagnoses into OP-902-002, Loss of Coolant Accident Recovery, Containment Spray Pump B will trip, resulting in no Containment Spray flow. The crew should recognize that they are not meeting the Safety Function Status Checklist of OP-902-002 and transition to OP-902-008, Safety function Recovery Procedure.
 
Prioritization in OP-902-008 should result in Containment Isolation being priority 1 and Containment Temperature and Pressure Control being priority 2. The crew should address Containment Isolation by overriding CS-125 B closed. The crew should address Containment Temperat ure and Pressure Control by aligning Low Pressure Safety Injection Pump B to replace the fa iled Containment Spray Pump B. It is acceptable to pursue these tasks in parallel, since establishing flow with LPSI B to the Containment Spray header will also satisf y Containment Isolation concerns. 


The scenario can be terminated after Low Pressu re Safety Injection Pump B is aligned for Containment Spray, or a fter the CRS gives the order to perform that alignment, at the lead examiners discretion.  
Scenario Event Description NRC Scenario 1 The crew assumes the shift at 100% power with instructions to maintain 100% power.
After taking the shift, Pressurizer level instrument RC-ILI-0110X fails low. Due to the failure, Letdown flow goes to minimum flow and both backup Charging Pumps start.
The SRO should enter OP-901-110, Pressurizer Level Control Malfunction. The crew should utilize sub section E1, Pressurizer Level Control Channel Malfunction. The ATC should take manual control of Pressurizer level and select the non-faulted channel.
Using Tech Specs and OP-903-013, Monthly Channel Checks, the SRO should enter Tech Spec 3.3.3.5, a 7 day action requirement, and determine Tech Spec 3.3.3.6 entry is not required since QSPDS is operable and meeting the Pressurizer level channel check. SPDS indication of Pressurizer level on the Plant Monitoring Computer is affected by this failure.
After the non-faulted channel is selected and Tech Specs are addressed, Steam Generator #1 Feedwater flow instrument FW-IFR-1111 fails low. The Feedwater Control System will respond by raising Feedwater flow to Steam Generator #1. The SRO should enter OP-901-201, Steam Generator Level Control Malfunction. The BOP will be required to take manual control and match Feedwater and Main Steam flow. The Ultrasonic Flow Meter will fail as a result of the instrument failure and require entry into TRM 3.3.5. The Feedwater controls for Steam Generator #1 will remain in manual as a result of this failure.
After the crew has addressed the Feedwater instrument failure, CEA 52 drops into the core. Off normal procedure OP-901-102, CEA or CEDMCS Malfunction, should be entered. The dropped CEA will require a rapid plant power reduction. The SRO should enter OP-901-212, Rapid Plant Power Reduction. Direct Boration should commence within 15 minutes of the dropped CEA. For the power reduction, the ATC will perform direct Boration to the RCS as well as ASI control with CEAs and Pressurizer Boron Equalization. The BOP will manipulate the controls to reduce Main Turbine load and manipulate Feedwater to Steam Generator #1 in manual. The SRO should enter Tech Specs 3.2.3, 3.1.3.1, and 3.1.3.5.
Once the crew has commenced the power reduction and lowered power to ~ 90%, or at the lead examiners discretion, a loss of coolant accident will occur. Charging Pump A will fail to start on the lowering Pressurizer level. The crew should diagnose the Pressurizer level dropping with all available Charging Pumps operating, trip the Reactor, and initiate Safety Injection Actuation (SIAS) and Containment Isolation Actuation (CIAS). When Containment Spray is actuated, either manually or automatically, CS-125 A will fail to automatically open and will not open using the control switch. This does not create a need for action at this time, but Containment Spray flow will only be provided from Train B with CS-125 A failed closed. Low Pressure Safety Injection Pump A will fail to automatically start on SIAS, requiring the BOP operator to manually start LPSI Pump A.
Scenario 1 Rev 1


NRC Scenario 1 Scenario 1 Rev 1 Critical Tasks
Scenario Event Description NRC Scenario 1 After the crew completes OP-902-000, Standard Post Trip Actions and diagnoses into OP-902-002, Loss of Coolant Accident Recovery, Containment Spray Pump B will trip, resulting in no Containment Spray flow. The crew should recognize that they are not meeting the Safety Function Status Checklist of OP-902-002 and transition to OP-902-008, Safety function Recovery Procedure.
: 1. Trip any RCP not satisfying RCP operating limits.
Prioritization in OP-902-008 should result in Containment Isolation being priority 1 and Containment Temperature and Pressure Control being priority 2. The crew should address Containment Isolation by overriding CS-125 B closed. The crew should address Containment Temperature and Pressure Control by aligning Low Pressure Safety Injection Pump B to replace the failed Containment Spray Pump B. It is acceptable to pursue these tasks in parallel, since establishing flow with LPSI B to the Containment Spray header will also satisfy Containment Isolation concerns.
The scenario can be terminated after Low Pressure Safety Injection Pump B is aligned for Containment Spray, or after the CRS gives the order to perform that alignment, at the lead examiners discretion.
Scenario 1 Rev 1


NRC Scenario 1 Critical Tasks
: 1. Trip any RCP not satisfying RCP operating limits.
This task is satisfied by securing all RCPs within 3 minutes of loss of CCW flow. This task becomes applicable after Containment Spray is initiated. The time requirement of 3 minutes is based on the RCP operating limit of 3 minutes without CCW cooling.
This task is satisfied by securing all RCPs within 3 minutes of loss of CCW flow. This task becomes applicable after Containment Spray is initiated. The time requirement of 3 minutes is based on the RCP operating limit of 3 minutes without CCW cooling.
: 2. Establish Containment temperature and pressure control.  
: 2. Establish Containment temperature and pressure control.
 
This task is satisfied by aligning LPSI Pump B to replace CS Pump B prior to exiting the Containment Temperature and Pressure Control safety function in OP-902-008. This task becomes applicable following the failure of Containment Spray Pump B. The Functional Recovery procedure utilized following this failure will direct this activity to satisfy the Containment Pressure and Temperature Control safety function.
This task is satisfied by aligning LPSI Pump B to replace CS Pump B prior to exiting the Containment Temperature and Pressure Control safety function in OP-902-008. This task becomes applicable following the failure of Containment Spray Pump B. The Functional Recovery procedure utilized following this failure will direct this activity to satisfy the Containment Pressure and Temperature Control safety function.  
Scenario Quantitative Attributes
: 1. Total malfunctions (5-8)                                                  7
: 2. Malfunctions after EOP entry (1-2)                                        2
: 3. Abnormal events (2-4)                                                    3
: 4. Major transients (1-2)                                                    1
: 5. EOPs entered/requiring substantive actions (1-2)                          2
: 6. EOP contingencies requiring substantive actions (0-2)                    1
: 7. Critical tasks (2-3)                                                      2 Scenario 1 Rev 1


Scenario Quantitative Attributes 1. Total malfunctions (5-8) 7 2. Malfunctions after EOP entry (1-2) 2 3. Abnormal events (2-4) 3 4. Major transients (1-2) 1 5. EOPs entered/requiring substantive actions (1-2) 2 6. EOP contingencies requiring substantive actions (0-2) 1 7. Critical tasks (2-3) 2 NRC Scenario 1 Scenario 1 Rev 1 Scenario Notes:
NRC Scenario 1 Scenario Notes:
A. Reset Simulator to IC-191. B. Verify the following Scenario Malfunctions: 1. rc15a for Pressurizer level
A. Reset Simulator to IC-191.
: 2. fw26a for Steam Genera tor #1 Feedwater flow 3. rd02a52 for CEA 52
B. Verify the following Scenario Malfunctions:
: 1. rc15a for Pressurizer level
: 2. fw26a for Steam Generator #1 Feedwater flow
: 3. rd02a52 for CEA 52
: 4. rc23a for LOCA
: 4. rc23a for LOCA
: 5. cv02a for Charging Pump A
: 5. cv02a for Charging Pump A
: 6. si02d for Low Pressure Safety Injection Pump A
: 6. si02d for Low Pressure Safety Injection Pump A
: 7. cs01b for Containment Spray Pump B
: 7. cs01b for Containment Spray Pump B
: 8. cs04a for CS-125 A C. Verify the following Override: 1. di-08a04s22-1 for CS-125 A D. Ensure Protected Train A sign is placed in SM office window.
: 8. cs04a for CS-125 A C. Verify the following Override:
: 1. di-08a04s22-1 for CS-125 A D. Ensure Protected Train A sign is placed in SM office window.
E. Verify EOOS is 10.0 Green F. Complete the simulator setup checklist.
E. Verify EOOS is 10.0 Green F. Complete the simulator setup checklist.
G. Start DCS, Record Data, select file PlantParameters.txt.  
G. Start DCS, Record Data, select file PlantParameters.txt.
Scenario 1 Rev 1


NRC Scenario 1 Scenario 1 Rev 1 Simulator Booth Instructions
NRC Scenario 1 Simulator Booth Instructions Event 1       Pressurizer Level Instrument RC-ILI-0110X Fails Low
 
Event 1 Pressurizer Level Instrument RC-ILI-0110X Fails Low
: 1. On Lead Examiner's cue, initiate Event Trigger 1.
: 1. On Lead Examiner's cue, initiate Event Trigger 1.
: 2. If Work Week Manager or I&C is called, inform the ca ller that a work package will be assembled and a team will be sent to the Control Room. 3. If sent to LCP-43, report RC-ILI-0110 X1 is failed low.  
: 2. If Work Week Manager or I&C is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.
 
: 3. If sent to LCP-43, report RC-ILI-0110 X1 is failed low.
Event 2 Steam Generator #1 Feedwater Flow Instrument FW-IFR-1111 Fails Low
Event 2       Steam Generator #1 Feedwater Flow Instrument FW-IFR-1111 Fails Low
: 1. On Lead Examiner's cue, initiate Event Trigger 2.
: 1. On Lead Examiner's cue, initiate Event Trigger 2.
: 2. If Work Week Manager or I&C is called, inform the ca ller that a work package will be assembled and a team will be sent to the Control Room.  
: 2. If Work Week Manager or I&C is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.
 
Event 3       CEA 52 Drops, Rapid Plant Power Reduction
Event 3 CEA 52 Drops, Rapid Plant Power Reduction
: 1. On Lead Examiner's cue, initiate Event Trigger 3.
: 1. On Lead Examiner's cue, initiate Event Trigger 3.
: 2. If called to remove Condensate Polis hers from service, acknowledge communication and report that you will perform actions requested. 3. If Work Week Manager or I&C is calle d, inform the caller that a and a team will be sent to the CEDMCS Alley to investigate.  
: 2. If called to remove Condensate Polishers from service, acknowledge communication and report that you will perform actions requested.
 
: 3. If Work Week Manager or I&C is called, inform the caller that a and a team will be sent to the CEDMCS Alley to investigate.
Event 4 LOCA Inside Containment
Event 4       LOCA Inside Containment
: 1. On Lead Examiner's cue, initiate Event Trigger 4.
: 1. On Lead Examiner's cue, initiate Event Trigger 4.
: 2. If called as RCA watch report CS-125 A appears to be mechanically bound, the stem looks bent. 3. If called as RAB watch to check the Emergency Diesel Generators, initiate Trigger 10, EDG A & B Trouble ala rms clear, report they are running satisfactorily. 4. If the Duty Plant Manager is called, inform the caller that he will make the necessary calls.
: 2. If called as RCA watch report CS-125 A appears to be mechanically bound, the stem looks bent.
Event 5 Low Pressure Safety Injection Pump A fails to start
: 3. If called as RAB watch to check the Emergency Diesel Generators, initiate Trigger 10, EDG A & B Trouble alarms clear, report they are running satisfactorily.
: 1. If called to check the LPSI Pump A breaker, report all indications are normal. 2. If called to check the LPSI Pump A locally, report all indications are normal.
: 4. If the Duty Plant Manager is called, inform the caller that he will make the necessary calls.
NRC Scenario 1 Scenario 1 Rev 1 Event 6 Containment Spray Pump B Trips
Event 5       Low Pressure Safety Injection Pump A fails to start
: 1. After the crew has entered OP-902-002 and on the Lead Examiner's cue, initiate Event Trigger 7. 2. If called to check the Containment Spra y Pump B breaker, report over-current flags are picked up on all 3 phases. 3. If called to check the Containment Spray Pump B, report that there are visible charring on the motor with an acrid smell, but no indications of a fire or smoke. 4. If called for TSC concurrence, report SM/EC has granted concurrence. 5. If called as RAB watch to come to the Control Room for over-ride key for CS-125 B, acknowledge communication. Report to the Control Room on lead examiner's cue. 6. If crew does obtain key and over-rides CS-125 B closed, use remote CSR13B for the local key operation.
: 1. If called to check the LPSI Pump A breaker, report all indications are normal.
: 2. If called to check the LPSI Pump A locally, report all indications are normal.
Scenario 1 Rev 1


At the end of the scenario, before resetting, complete data collection by stopping recording and saving the file as 2011 SRO Scenario1.cdf.
NRC Scenario 1 Event 6        Containment Spray Pump B Trips
Save the file into the folder for the appropriate crew.  
: 1. After the crew has entered OP-902-002 and on the Lead Examiner's cue, initiate Event Trigger 7.
: 2. If called to check the Containment Spray Pump B breaker, report over-current flags are picked up on all 3 phases.
: 3. If called to check the Containment Spray Pump B, report that there are visible charring on the motor with an acrid smell, but no indications of a fire or smoke.
: 4. If called for TSC concurrence, report SM/EC has granted concurrence.
: 5. If called as RAB watch to come to the Control Room for over-ride key for CS-125 B, acknowledge communication. Report to the Control Room on lead examiners cue.
: 6. If crew does obtain key and over-rides CS-125 B closed, use remote CSR13B for the local key operation.
At the end of the scenario, before resetting, complete data collection by stopping recording and saving the file as 2011 SRO Scenario1.cdf. Save the file into the folder for the appropriate crew.
Scenario 1 Rev 1


NRC Scenario 1 Scenario 1 Rev 1 Scenario Timeline: Event Malfunction Severity Ramp HH:MM:SS Delay Trigger 1 RC15A2 0 N/A N/A 1 Pressurizer level instrument RC-ILI-0110 X fails low 2 FW26A 0 N/A N/A 2 Steam Generator #1 Feedwater flow instrument FW-IFR-1111 fails low 3 RD02A52 N/A N/A N/A 3 CEA 52 Drops into the core 4 RC23A 3.0 % 8:00 N/A 4 Loss of Coolant Accident 5 CV02A N/A N/A N/A 5 Charging Pump A fails to auto-start 6 SI02D N/A N/A N/A N/A Low Pressure Safety Injection Pump A fails to auto start 7 CS04A DI-08a04s22-1 N/A N/A N/A N/A CS-125 A Fails to open, will not open manually. 7 CS01B N/A N/A N/A 7 Containment Spray Pump B trip  
NRC Scenario 1 Scenario Timeline:
Ramp Event   Malfunction             Severity                   Delay Trigger HH:MM:SS 1       RC15A2                   0           N/A           N/A     1 Pressurizer level instrument RC-ILI-0110 X fails low 2       FW26A                   0           N/A           N/A     2 Steam Generator #1 Feedwater flow instrument FW-IFR-1111 fails low 3       RD02A52                 N/A         N/A           N/A     3 CEA 52 Drops into the core 4       RC23A                 3.0 %       8:00           N/A     4 Loss of Coolant Accident 5         CV02A                 N/A         N/A           N/A     5 Charging Pump A fails to auto-start 6         SI02D                 N/A         N/A           N/A   N/A Low Pressure Safety Injection Pump A fails to auto start 7       CS04A                 N/A         N/A           N/A   N/A DI-08a04s22-1 CS-125 A Fails to open, will not open manually.
7       CS01B                 N/A         N/A           N/A     7 Containment Spray Pump B trip Scenario 1 Rev 1


NRC Scenario 1 Scenario 1 Rev 1  
NRC Scenario 1


==REFERENCES:==
==REFERENCES:==


Event Procedures 1 OP-901-110, Pressurizer Level Control Malfunction OP-903-013, Monthl y Channel Checks Tech Spec 3.3.3.5 2 OP-901-201, Steam Generator Level Control Malfunction Tech Requirement Manual 3.3.5 3 OP-901-102, CEA or CEDMCS Malfunction OP-901-212, Rapid Plant Power Reduction  
Event Procedures 1   OP-901-110, Pressurizer Level Control Malfunction OP-903-013, Monthly Channel Checks Tech Spec 3.3.3.5 2   OP-901-201, Steam Generator Level Control Malfunction Tech Requirement Manual 3.3.5 3   OP-901-102, CEA or CEDMCS Malfunction OP-901-212, Rapid Plant Power Reduction OP-004-004, Control Element Drive Tech Spec 3.2.3, 3.1.3.1, 3.1.3.5 4  OP-902-000, Standard Post Trip Actions OP-902-009, Standard Appendices, Appendix 1, Diagnostic Flow Chart OP-902-002, Loss of Coolant Accident Recovery 5  OP-902-000, Standard Post Trip Actions OI-038-000, Emergency Operating Procedures Operations Expectations /
Guidance 6  OP-902-000, Standard Post Trip Actions OI-038-000, Emergency Operating Procedures Operations Expectations /
Guidance 7  OP-902-008, Safety Function Recovery Procedure OP-902-009, Standard Appendices, Appendix 28, Aligning LPSI to Replace CS Scenario 1 Rev 1


OP-004-004, Control Element Drive Tech Spec 3.2.3, 3.1.3.1, 3.1.3.5 4 OP-902-000, Standard Post Trip Actions OP-902-009, Standard Appendices, Appendix 1, Diagnostic Flow Chart OP-902-002, Loss of Coolant Accident Recovery 5 OP-902-000, Standard Post Trip Actions OI-038-000, Emergency Operat ing Procedures Operations Expectations /
Appendix D                                 Scenario Outline                       Form ES-D-1 Facility:       WATERFORD 3                 Scenario No.: 2       Op Test No.:   NRC Examiners:                                             Operators:
Guidance 6 OP-902-000, Standard Post Trip Actions OI-038-000, Emergency Operat ing Procedures Operations Expectations /
Initial Conditions:
Guidance 7 OP-902-008, Safety Function Recovery Procedure OP-902-009, Standard Appendic es, Appendix 28, Aligning LPSI to Replace CS Appendix D Scenario Outline Form ES-D-1 Scenario 2 Rev 1 Facility: WATERFORD 3 Scenario No.: 2 Op Test No.:
NRC Examiners:   Operators:             Initial Conditions:
* Reactor power is 77%
* Reactor power is 77%
* Protected Train is B
* Protected Train is B
* AB Bus is aligned to Train B
* AB Bus is aligned to Train B
* Emergency Diesel Gener ator A is tagged out Turnover:
* Emergency Diesel Generator A is tagged out Turnover:
* Charging Pumps A & B are operating
* Charging Pumps A & B are operating
* Boron Equalization is in progress
* Boron Equalization is in progress
* Re-commence power ascension Event No. Malf. No. Event Type* Event Description 1 N/A R - ATC N - BOP N - SRO Re-commence power ascension to 100% power 2 RX14A I - ATC I - SRO Pressurizer pressure instrument RC-IPR-0100 X fails low, OP-901-120, Pressurizer  
* Re-commence power ascension Event         Malf. No.       Event Type*                     Event No.                                                        Description N/A           R - ATC           Re-commence power ascension to 100%
 
1                          N - BOP          power N - SRO RX14A           I - ATC           Pressurizer pressure instrument RC-IPR-2                          I - SRO          0100 X fails low, OP-901-120, Pressurizer Pressure Control Malfunction RC16B           I - BOP           RCP 1A speed instrument failure, Channel B, 3                          I - SRO          Core Protection Calculator B trip TS - SRO N/A           TS - SRO         Dry Cooling Tower Fan 8B failure 4
Pressure Control Malfunction 3 RC16B I - BOP I - SRO TS - SRO RCP 1A speed instrument failure, Channel B, Core Protection Calculator B trip 4 N/A TS - SRO Dry Cooling Tower Fan 8B failure 5 DI-07a8s06-1 DI-07a8s12-1 I - BOP I - SRO Inadvertent Containment Spray Actuation OP-901-504, Inadvertent ESFAS Actuation 6 MS11B M - All Main Steam line break inside Containment, S/G #2, OP-902-004, Excess Steam Demand  
DI-07a8s06-1       I - BOP          Inadvertent Containment Spray Actuation 5        DI-07a8s12-1       I - SRO           OP-901-504, Inadvertent ESFAS Actuation MS11B           M - All           Main Steam line break inside Containment, 6                                            S/G #2, OP-902-004, Excess Steam Demand Recovery N/A           C - BOP           Initiate Containment Spray flow 7                          C - SRO RP09E           C - ATC           Relay K301 failure, BAM-113 A and CVC-8                          C - SRO          183 fail to position on Safety Injection
 
    *   (N)ormal,   (R)eactivity, (I)nstrument,   (C)omponent,    (M)ajor Scenario 2 Rev 1
Recovery 7 N/A C - BOP C - SRO Initiate Containment Spray flow 8 RP09E C - ATC C - SRO Relay K301 failure, BAM-113 A and CVC-183 fail to position on Safety Injection  
* (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,    (M)ajor
 
Scenario Event Description NRC Scenario 2 Scenario 2 Rev 1 The crew assumes the shift at ~77% power with instructions to raise power to 100%.
 
After assuming the shift, the crew will commence raising power to 100%. The ATC operator will dilute to the Volume Control Tank and withdraw Group 6 CEAs. The BOP operator will adjust Main Turbine load to raise power.
 
When an adequate power ascension has occurred, Pressurizer pressure instrument RC-IPR-0100 X will fail low. Since Boron Equalization is in progress, the Main Spray valves will close. The SRO will enter OP-901-120, Pressurizer Pressure Control Malfunction, and select the non-faulted pressure channel.


After Channel Y has been selected for Pressu rizer pressure contro l, Reactor Coolant Pump 1A speed sensor for Core Protection Calculator B will fail.
Scenario Event Description NRC Scenario 2 The crew assumes the shift at ~77% power with instructions to raise power to 100%.
CPC B will trip as a result of the failure. The SRO should enter Tech Spec 3.3.1 and have the BOP operator bypass bistable s 3 and 4 on Channel B.
After assuming the shift, the crew will commence raising power to 100%. The ATC operator will dilute to the Volume Control Tank and withdraw Group 6 CEAs. The BOP operator will adjust Main Turbine load to raise power.
After the bypass operation is complete, the Outside Watch will call and report an oil failure on Dry Cooling Tower Fan 8B. The SR O should enter Tech Spec 3.7.4 action d. His review of ambient tem perature and Tech Spec 3.7.4 should conclude that Train B Ultimate Heat Sink remains operable and that Tech Spec 3.8.1.1 is being complied with.  
When an adequate power ascension has occurred, Pressurizer pressure instrument RC-IPR-0100 X will fail low. Since Boron Equalization is in progress, the Main Spray valves will close. The SRO will enter OP-901-120, Pressurizer Pressure Control Malfunction, and select the non-faulted pressure channel.
After Channel Y has been selected for Pressurizer pressure control, Reactor Coolant Pump 1A speed sensor for Core Protection Calculator B will fail. CPC B will trip as a result of the failure. The SRO should enter Tech Spec 3.3.1 and have the BOP operator bypass bistables 3 and 4 on Channel B.
After the bypass operation is complete, the Outside Watch will call and report an oil failure on Dry Cooling Tower Fan 8B. The SRO should enter Tech Spec 3.7.4 action d.
His review of ambient temperature and Tech Spec 3.7.4 should conclude that Train B Ultimate Heat Sink remains operable and that Tech Spec 3.8.1.1 is being complied with.
After the Tech Spec review is complete, an inadvertent Containment Spray Actuation will occur. Component Cooling Water flow to the Reactor Coolant Pumps will be secured. The SRO should enter OP-901-504, Inadvertent ESFAS Actuation. The Containment Spray Pumps should be secured. If the Component Cooling Water Isolations to the Reactor Coolant Pumps are not restored within 3 minutes, the reactor should be tripped and the Reactor Coolant Pumps secured.
A Main Steam line break will develop on Steam Generator #2 after the preceding event.
If the crew restored CCW to the Reactor Coolant Pumps, the crew should perform a manual reactor trip due to the excess steam demand. If the crew tripped the reactor and secured Reactor Coolant Pumps on the previous event, then the Main Steam line break will ramp in after the reactor trip. Because the Containment Spray Pumps control switches maintain off, the BOP should re-start Containment Spray Pumps A and B after Containment pressure rises above 17.7 psia.
Relay K301 will not actuate and BAM-113 A will fail to open and CVC-183 will fail to close on the Safety Injection Actuation. The ATC operator should position these valves to ensure Emergency Boration. After Steam Generator #2 blows down, the crew will take action to maintain RCS temperature and pressure. The scenario can be terminated after these actions are complete.
Scenario 2 Rev 1


After the Tech Spec review is complete, an inadvertent Containment Spray Actuation will occur. Component Cooling Water flow to the Reactor Coolant Pumps will be secured. The SRO should enter OP-901-504, Inadvertent ESFAS Actuation. The Containment Spray Pumps should be secur ed. If the Com ponent Cooling Water Isolations to the Reactor Coolant Pumps ar e not restored within 3 minutes, the reactor should be tripped and the Reactor Coolant Pumps secured.  
NRC Scenario 2 Critical Tasks
: 1. Trip any RCP not satisfying RCP operating limits.
This task is satisfied by securing all RCPs within 3 minutes of loss of CCW flow. The required task becomes applicable after Containment Spray has been actuated. The time requirement of 3 minutes is based on the RCP operating limit of 3 minutes without CCW cooling. If the crew does not restore CCW flow to the RCPs after the inadvertent CSAS, then the 3 minute criteria starts at the time of that CSAS. If the crew restores CCW flow to the RCPs following the inadvertent CSAS, then the 3 minute criteria starts after the Main Steam line break.
: 2. Establish Containment temperature and pressure control This task is satisfied by manually starting at least 1 Containment Spray Pump following the Main Steam line break. This should be completed before completing the review of OP-902-000, Standard Post Trip Actions.
: 3. Establish RCS temperature control This task is satisfied by taking action to stabilize RCS temperature within the limits of the RCS P/T curve using ADV #1 and establishing EFW flow to Steam Generator #1.
Action to address this task should commence within 10 minutes after the applicable parameters begin to rise.
: 4. Establish RCS pressure control This task is satisfied by taking action to stabilize RCS pressure within the limits of the RCS P/T curve and additionally maintain RCS pressure within 1500-1600 psid of the faulted steam generator. Action to address this task should commence within 10 minutes after the applicable parameters begin to rise.
Scenario Quantitative Attributes
: 1. Total malfunctions (5-8)                                      7
: 2. Malfunctions after EOP entry (1-2)                            2
: 3. Abnormal events (2-4)                                          2
: 4. Major transients (1-2)                                        1
: 5. EOPs entered/requiring substantive actions (1-2)              1
: 6. EOP contingencies requiring substantive actions (0-2)          0
: 7. Critical tasks (2-3)                                          4 Scenario 2 Rev 1


A Main Steam line break will develop on Stea m Generator #2 after the preceding event.
NRC Scenario 2 Scenario Notes:
If the crew restored CCW to the Reactor Coolant Pumps, the crew should perform a manual reactor trip due to the excess steam demand. If the crew tripped the reactor and secured Reactor Coolant Pumps on the pr evious event, then the Main Steam line break will ramp in after the reactor trip.
A. Reset Simulator to IC-192.
Because the Containment Spray Pumps control switches maintain off, the BOP should re-s tart Containment Spray Pumps A and B after Containment pressure rises above 17.7 psia.
B. Verify the following Scenario Malfunctions:
 
: 1. eg10a for EDG A tagout
Relay K301 will not actuate and BAM-113 A will fail to open and CVC-183 will fail to close on the Safety Injection Actuation. The ATC operator should position these valves to ensure Emergency Boration. After Steam Generator #2 blows down, the crew will take action to maintain RCS temperat ure and pressure. The scenario can be terminated after these actions are complete.
: 2. rx14-A for Pressurizer pressure instrument RC-IPT-0100 X
 
: 3. rc16b for RCP 1A speed
NRC Scenario 2 Scenario 2 Rev 1 Critical Tasks
: 1. Trip any RCP not satisfying RCP operating limits.
 
This task is satisfied by securing all RCPs within 3 minutes of loss of CCW flow. The required task becomes applicable after Co ntainment Spray has been actuated. The time requirement of 3 minutes is based on the RCP operating limit of 3 minutes without CCW cooling. If the crew does not restore CCW flow to the RCPs after the inadvertent CSAS, then the 3 minute criteria starts at the time of that CSAS. If the crew restores CCW flow to the RCPs following the inadvertent CSAS, then the 3 minu te criteria starts after the Main Steam line break.
: 2. Establish Containment tem perature and pressure control
 
This task is satisfied by manually starting at least 1 Containment Spray Pump following the Main Steam line break. This should be co mpleted before comple ting the review of OP-902-000, Standard Post Trip Actions.
: 3. Establish RCS temperature control
 
This task is satisfied by taking action to st abilize RCS temperature within the limits of the RCS P/T curve using ADV #1 and establishing EFW flow to Steam Generator #1.
Action to address this task should commenc e within 10 minutes after the applicable parameters begin to rise.
: 4. Establish RCS pressure control
 
This task is satisfied by taking action to stabilize RCS pressure within the limits of the RCS P/T curve and additionally maintain RCS pressure within 1500-1600 psid of the faulted steam generator. Action to addr ess this task should commence within 10 minutes after the applicable parameters begin to rise.
Scenario Quantitative Attributes 1. Total malfunctions (5-8) 7 2. Malfunctions after EOP entry (1-2) 2 3. Abnormal events (2-4) 2 4. Major transients (1-2) 1 5. EOPs entered/requiring substantive actions (1-2) 1 6. EOP contingencies requiring substantive actions (0-2) 0 7. Critical tasks (2-3) 4 NRC Scenario 2 Scenario 2 Rev 1 Scenario Notes:
A. Reset Simulator to IC-192. B. Verify the following Scenario Malfunctions: 1. eg10a for EDG A tagout
: 2. rx14-A for Pressurizer pressure instrument RC-IPT-0100 X 3. rc16b for RCP 1A speed
: 4. ms11b for Main Steam line break S/G #2
: 4. ms11b for Main Steam line break S/G #2
: 5. rp09e for Relay K301 C. Verify the following Overrides: 1. di-07a08s06-1 and di-07a08s12-1 for CSAS D. Ensure Protected Train B sign is placed in SM office window.
: 5. rp09e for Relay K301 C. Verify the following Overrides:
E. Verify the following C ontrol Board Conditions: 1. Danger tag placed on EDG A control switch
: 1. di-07a08s06-1 and di-07a08s12-1 for CSAS D. Ensure Protected Train B sign is placed in SM office window.
E. Verify the following Control Board Conditions:
: 1. Danger tag placed on EDG A control switch
: 2. Danger tag placed on EDG A Output Breaker F. Verify EOOS is 8.5 Yellow G. Complete the simulator setup checklist.
: 2. Danger tag placed on EDG A Output Breaker F. Verify EOOS is 8.5 Yellow G. Complete the simulator setup checklist.
H. Start DCS, Record Data, select file PlantParameters.txt.  
H. Start DCS, Record Data, select file PlantParameters.txt.
 
Scenario 2 Rev 1
NRC Scenario 2 Scenario 2 Rev 1 Simulator Booth Instructions
 
Event 1 Perform Power Ascension
: 1. No communications should occur for this evolution.


Event 2 Pressurizer Pressure Instrument Fails Low
NRC Scenario 2 Simulator Booth Instructions Event 1        Perform Power Ascension
: 1. No communications should occur for this evolution.
Event 2         Pressurizer Pressure Instrument Fails Low
: 1. On Lead Examiner's cue, initiate Event Trigger 2.
: 1. On Lead Examiner's cue, initiate Event Trigger 2.
: 2. If Work Week Manager or I&C is called, inform the ca ller that a work package will be assembled and a team will be sent to the Control Room.  
: 2. If Work Week Manager or I&C is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.
 
Event 3         RCP 1A Speed Instrument Failure
Event 3 RCP 1A Speed Instrument Failure
: 1. On Lead Examiner's cue, initiate Event Trigger 3.
: 1. On Lead Examiner's cue, initiate Event Trigger 3.
: 2. If Work Week Manager or I&C is called, inform the ca ller that a work package will be assembled and a team will be sent to the Control Room.  
: 2. If Work Week Manager or I&C is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.
Event 4        Dry Cooling Tower Fan 8B Fan Failure
: 1. On Lead Examiner's cue, call the CRS as the Outside Watch and report that Dry Cooling Tower Fan 8B has no oil in the reduction gear sightglass. There is oil on the ground under the fan. This discovery is made during rounds.
: 2. If Work Week Manager or PMM is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.
Event 5        Inadvertent CSAS
: 1. On Lead Examiner's cue, initiate Event Trigger 5.
: 2. No communications should occur for this evolution.
Event 6        Main Steam Line Break S/G #2
: 1. On the Lead Examiner's cue, or after the reactor is manually tripped in the previous event, initiate Event Trigger 6.
: 2. When called as the Outside Watch to check Main Steam Safeties not lifting, report that no safety valves are lifting.
At the end of the scenario, before resetting, complete data collection by stopping recording and saving the file as 2011 SRO Scenario 2.cdf. Save the file into the folder for the appropriate crew.
Scenario 2 Rev 1


Event 4 Dry Cooling Tower Fan 8B Fan Failure
NRC Scenario 2 Scenario Timeline:
: 1. On Lead Examiner's cue, call the CRS as the Outside Watch and report that Dry Cooling Tower Fan 8B has no oil in the r eduction gear sightglass. There is oil on the ground under the fan. This discovery is made during rounds. 2. If Work Week Manager or PMM is called, inform the ca ller that a work package will be assembled and a team will be sent to the Control Room.
Ramp Event   Malfunction          Severity              Delay Trigger HH:MM:SS 1          N/A                N/A        N/A      N/A    N/A Power ascension 2          RX14A              0%          N/A      N/A    2 Pressurizer pressure RC-IPR-0100 X fails low 3        RC16B                N/A        N/A      N/A    3 RCP 1A Speed failure, Channel B 4           N/A                N/A        N/A      N/A    N/A Dry Cooling Tower Fan 8B failure 5      Di-07a8a06-1            N/A        N/A      N/A    5 DI-07a8s12-1 Inadvertent Containment Spray 6        MS11B              10%          3:00    N/A    6 Main Steam line break, S/G #2 7          N/A                N/A        N/A      N/A    N/A Initiate Containment Spray flow 8        RP09E                N/A        N/A      N/A    N/A Relay K301 failure Scenario 2 Rev 1


Event 5 Inadvertent CSAS
NRC Scenario 2
: 1. On Lead Examiner's cue, initiate Event Trigger 5. 2. No communications should occur for this evolution.


Event 6 Main Steam Line Break S/G #2
==REFERENCES:==
: 1. On the Lead Examiner's cue, or after the reactor is manually tripped in the previous event, initiate Event Trigger 6. 2. When called as the Outside Watch to check Main Steam Safeties not lifting, report that no safety valves are lifting.


At the end of the scenario, before resetting, complete data collection by stopping recording and saving the file as 2011 SRO Scenario 2.cdf. Save the file into the folder for the appropriate crew.  
Event Procedures 1  OP-010-003, Plant Startup OP-002-005, Chemical and Volume Control 2   OP-901-120, Pressurizer Pressure Control Malfunction 3  OP-009-007, Plant Protection System Tech Spec 3.3.1 4  Tech Spec 3.7.4 and 3.8.1.1 OP-100-014, Technical Specification and Technical Requirements Compliance 5  OP-901-504, Inadvertent ESFAS Actuation 6  OP-902-000, Standard Post Trip Actions OP-902-009, Standard Appendices, Appendix 1, Diagnostic Flow Chart OP-902-004, Excess Steam Demand Recovery 7  OP-902-000, Standard Post Trip Actions OI-038-000, Emergency Operating Procedures Operations Expectations /
Guidance 8  OP-902-000, Standard Post Trip Actions OI-038-000, Emergency Operating Procedures Operations Expectations /
Guidance Scenario 2 Rev 1


NRC Scenario 2 Scenario 2 Rev 1 Scenario Timeline: Event Malfunction  Severity Ramp HH:MM:SS Delay Trigger 1 N/A  N/A N/A N/A N/A  Power ascension 2 RX14A  0% N/A N/A 2  Pressurizer pressure RC-IPR-0100 X fails low 3 RC16B  N/A N/A N/A 3  RCP 1A Speed failure, Channel B 4 N/A  N/A N/A N/A N/A  Dry Cooling Tower Fan 8B failure 5 Di-07a8a06-1 DI-07a8s12-1 N/A N/A N/A 5  Inadvertent Containment Spray 6 MS11B  10% 3:00 N/A 6  Main Steam line break, S/G #2 7 N/A  N/A N/A N/A N/A  Initiate Containment Spray flow 8 RP09E  N/A N/A N/A N/A  Relay K301 failure
Appendix D                                 Scenario Outline                     Form ES-D-1 Facility:       WATERFORD 3                 Scenario No.: 3       Op Test No.: NRC Examiners:                                           Operators:
 
Initial Conditions:
NRC Scenario 2 Scenario 2 Rev 1
 
==REFERENCES:==
 
Event Procedures 1 OP-010-003, Plant Startup OP-002-005, Chemical and Volume Control 2 OP-901-120, Pressurizer Pressure Control Malfunction 3 OP-009-007, Plant Protection System Tech Spec 3.3.1 4 Tech Spec 3.7.4 and 3.8.1.1 OP-100-014, Technical Specificat ion and Technical Requirements Compliance 5 OP-901-504, Inadvert ent ESFAS Actuation 6 OP-902-000, Standard Post Trip Actions OP-902-009, Standard Appendices, Appendix 1, Diagnostic Flow Chart OP-902-004, Excess Steam Demand Recovery 7 OP-902-000, Standard Post Trip Actions OI-038-000, Emergency Operat ing Procedures Operations Expectations /
Guidance 8 OP-902-000, Standard Post Trip Actions OI-038-000, Emergency Operat ing Procedures Operations Expectations /
Guidance Appendix D Scenario Outline Form ES-D-1 Scenario 3 Rev 1 Facility: WATERFORD 3 Scenario No.: 3 Op Test No.:
NRC Examiners:   Operators:             Initial Conditions:
* Reactor power is 5.7 e -2 %
* Reactor power is 5.7 e -2 %
* Protected Train is B
* Protected Train is B
* AB Bus is aligned to Train B Turnover:
* AB Bus is aligned to Train B Turnover:
* Maintain power during Main Feedwater Pump preparations Event No. Malf. No. Event Type* Event Description 1 Di-08a07s11-1 C - BOP C - SRO TS - SRO Relay K402 fails, MS-401 B opens Emergency Feedwater Pump AB starts 2 FW51A TS - SRO Condensate Storage Pool level instrument EFW-ILI-9013 A fails low 3 CV01B C - ATC C - SRO TS - SRO Charging Pump B trips OP-901-112, Charging or Letdown Malfunction 4 RC09A C - BOP C - SRO Reactor Coolant Pump 1A middle seal failure OP-901-130, Reactor Coolant Pump  
* Maintain power during Main Feedwater Pump preparations Event         Malf. No.       Event Type*                     Event No.                                                        Description Di-08a07s11-1       C - BOP           Relay K402 fails, MS-401 B opens 1                          C - SRO          Emergency Feedwater Pump AB starts TS - SRO FW51A           TS - SRO         Condensate Storage Pool level instrument 2                                            EFW-ILI-9013 A fails low CV01B           C - ATC           Charging Pump B trips 3                          C - SRO          OP-901-112, Charging or Letdown TS - SRO          Malfunction RC09A           C - BOP           Reactor Coolant Pump 1A middle seal failure 4                          C - SRO          OP-901-130, Reactor Coolant Pump Malfunction RC04A           I - ATC           RCP 1A shaft shear, automatic reactor trip 5          RP02 A-D        I - SRO          failure RP01A SG01B           M - All           Steam Generator #2 Tube Rupture 6                                            OP-902-007, Steam Generator Tube Rupture Recovery SI02A         C - BOP           High Pressure Safety Injection Pump A fails 7                          C - SRO          to auto-start RP08C           C - ATC           Relay K202 fails, CVC-401, CVC-109, IA-909, 8                          C - BOP          and FP-601 A fail to close C - SRO
 
    *   (N)ormal,   (R)eactivity, (I)nstrument,   (C)omponent,    (M)ajor Scenario 3 Rev 1
Malfunction 5 RC04A RP02 A-D RP01A I - ATC I - SRO RCP 1A shaft shear, automatic reactor trip failure 6 SG01B M - All Steam Generator #2 Tube Rupture OP-902-007, Steam Generator Tube Rupture Recovery 7 SI02A C - BOP C - SRO High Pressure Safety Injection Pump A fails to auto-start 8 RP08C C - ATC C - BOP C - SRO Relay K202 fails, CVC-401, CVC-109, IA-909, and FP-601 A fail to close
* (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,    (M)ajor
 
Scenario Event Description NRC Scenario 3 Scenario 3 Rev 1 The crew assumes the shift at 5.7 e-2 % power with instructions to maintain power while Main Feedwater Pumps are prepared for star ting. A lube oil problem common to both Main Feedwater Pumps has delayed their start by approximately 30 minutes.
 
After assuming the shift, relay K402 fa ils, opening MS-401 B and starting Emergency Feedwater Pump AB, the steam driv en Emergency Feedwater pump. RCS TCOLD will drop and power will rise. The crew should detect the failure and override close MS-401 B. After MS-401 B is closed, Tech Specs 3.7.1.2 action a and 3.6.
3 become applicable due to MS-401 B being inoperable.
 
After MS-401 B is closed and Tech Specs are addressed, Condensate Storage Pool
 
level indicator EFW-ILI-9013 A will fail low. The SRO should use OP-903-013, Monthly channel Checks, and enter Tech Spec 3.3.3.5 and 3.3.3.6.
 
After Tech Specs are addressed, Charging Pu mp B will trip. The crew should start either Charging Pump A or AB and enter OP-901-112, Charging or Letdown Malfunction. Tech Spec 3.1.2.4 and TRM 3.1.2.4 are applicable due to the failure. If the crew aligns Charging Pump AB to replace Charging Pump B, Tech Spec 3.1.2.4 can be exited, but they should remain in TRM 3.1.2.4.
 
After Tech Specs are addressed, Reactor Coolant Pump 1A middle seal will fail, requiring entry into OP-901-130, Reactor Coolant Pump Malfunction. The crew should monitor for indications of multiple seal failure and reduce CCW temperature to control RCP 1A seal bleedoff temperature.
 
After actions have been taken to lower CCW temperature, RCP 1A will have a shaft shear. The reactor will fail to automatically trip. The ATC should detect this condition
 
and trip the reactor. One of the two normal reactor trip pushbuttons will fail and only 2 reactor trip breakers will open.
The ATC will be required to trip the reactor using the Diverse Reactor Trip pushbuttons.
 
A Steam Generator Tube Rupture will ramp in on the reactor tr ip for S/G #2. The crew should detect this situation during their Standard Post Trip Actions. This failure will require entry into OP-902-007, Steam Gener ator Tube Rupture Recovery. On the Safety Injection Actuation, High Pressure Safe ty Injection Pump A will fail to auto start, requiring a manual start. Additionally, re lay K202 will fail, pr eventing CVC-401, CVC-109, IA-909, and FP-601 A from closing on the Containment Isolation signal. The ATC and BOP operators should close these valves.


Scenario Event Description NRC Scenario 3 The crew assumes the shift at 5.7 e-2 % power with instructions to maintain power while Main Feedwater Pumps are prepared for starting. A lube oil problem common to both Main Feedwater Pumps has delayed their start by approximately 30 minutes.
After assuming the shift, relay K402 fails, opening MS-401 B and starting Emergency Feedwater Pump AB, the steam driven Emergency Feedwater pump. RCS TCOLD will drop and power will rise. The crew should detect the failure and override close MS-401 B. After MS-401 B is closed, Tech Specs 3.7.1.2 action a and 3.6.3 become applicable due to MS-401 B being inoperable.
After MS-401 B is closed and Tech Specs are addressed, Condensate Storage Pool level indicator EFW-ILI-9013 A will fail low. The SRO should use OP-903-013, Monthly channel Checks, and enter Tech Spec 3.3.3.5 and 3.3.3.6.
After Tech Specs are addressed, Charging Pump B will trip. The crew should start either Charging Pump A or AB and enter OP-901-112, Charging or Letdown Malfunction. Tech Spec 3.1.2.4 and TRM 3.1.2.4 are applicable due to the failure. If the crew aligns Charging Pump AB to replace Charging Pump B, Tech Spec 3.1.2.4 can be exited, but they should remain in TRM 3.1.2.4.
After Tech Specs are addressed, Reactor Coolant Pump 1A middle seal will fail, requiring entry into OP-901-130, Reactor Coolant Pump Malfunction. The crew should monitor for indications of multiple seal failure and reduce CCW temperature to control RCP 1A seal bleedoff temperature.
After actions have been taken to lower CCW temperature, RCP 1A will have a shaft shear. The reactor will fail to automatically trip. The ATC should detect this condition and trip the reactor. One of the two normal reactor trip pushbuttons will fail and only 2 reactor trip breakers will open. The ATC will be required to trip the reactor using the Diverse Reactor Trip pushbuttons.
A Steam Generator Tube Rupture will ramp in on the reactor trip for S/G #2. The crew should detect this situation during their Standard Post Trip Actions. This failure will require entry into OP-902-007, Steam Generator Tube Rupture Recovery. On the Safety Injection Actuation, High Pressure Safety Injection Pump A will fail to auto start, requiring a manual start. Additionally, relay K202 will fail, preventing CVC-401, CVC-109, IA-909, and FP-601 A from closing on the Containment Isolation signal. The ATC and BOP operators should close these valves.
The Steam Generator Tube Rupture will require a rapid RCS cooldown to less than 520 degrees THOT. After the RCS is < 520 degrees, Steam Generator #2 will be isolated.
The Steam Generator Tube Rupture will require a rapid RCS cooldown to less than 520 degrees THOT. After the RCS is < 520 degrees, Steam Generator #2 will be isolated.
The scenario can be terminated after Steam Generator #2 is isolated.  
The scenario can be terminated after Steam Generator #2 is isolated.
 
Scenario 3 Rev 1
NRC Scenario 3 Scenario 3 Rev 1 Critical Tasks
: 1. Manually trip the Reactor.


NRC Scenario 3 Critical Tasks
: 1. Manually trip the Reactor.
This task is satisfied by manually tripping the reactor within 1 minute of the failure of the automatic trip. The required task becomes applicable after the annunciators are received associated with the RCP 1A sheared shaft.
This task is satisfied by manually tripping the reactor within 1 minute of the failure of the automatic trip. The required task becomes applicable after the annunciators are received associated with the RCP 1A sheared shaft.
: 2. Prevent Opening the Main Steam Safety Valves.  
: 2. Prevent Opening the Main Steam Safety Valves.
 
This task is satisfied by the crew taking action to maintain Steam Generator #2 pressure below the safety valve setpoint by taking action to reduce RCS pressure to < 945 psia.
This task is satisfied by the crew taking action to maintain Steam Generator #2 pressure below the safety valve setpoint by taking action to reduce RCS pressure to < 945 psia.
: 3. Isolate Steam Generator #2.  
: 3. Isolate Steam Generator #2.
 
This task is satisfied by isolating Steam Generator #2 in accordance with step 17 after RCS THOT is reduced below 520 &deg;F.
This task is satisfied by isolating Steam Generator #2 in accordance with step 17 after RCS  
Scenario Quantitative Attributes
: 1. Total malfunctions (5-8)                                                8
: 2. Malfunctions after EOP entry (1-2)                                    2
: 3. Abnormal events (2-4)                                                  2
: 4. Major transients (1-2)                                                  1
: 5. EOPs entered/requiring substantive actions (1-2)                      1
: 6. EOP contingencies requiring substantive actions (0-2)                  0
: 7. Critical tasks (2-3)                                                  3 Scenario 3 Rev 1


T HOT is reduced below 520 &deg;F.
NRC Scenario 3 Scenario Notes:
 
A. Reset Simulator to IC-193.
Scenario Quantitative Attributes 1. Total malfunctions (5-8) 8 2. Malfunctions after EOP entry (1-2) 2 3. Abnormal events (2-4) 2 4. Major transients (1-2) 1 5. EOPs entered/requiring substantive actions (1-2) 1 6. EOP contingencies requiring substantive actions (0-2) 0 7. Critical tasks (2-3) 3 NRC Scenario 3 Scenario 3 Rev 1 Scenario Notes:
: 1. Use keys 165 - 168 for S/G high level bypass setup.
A. Reset Simulator to IC-193. 1. Use keys 165 - 168 for S/G high level bypass setup. B. Verify the following Scenario Malfunctions: 1. fw51a for CSP level instrument
B. Verify the following Scenario Malfunctions:
: 1. fw51a for CSP level instrument
: 2. cv01b for Charging Pump B
: 2. cv01b for Charging Pump B
: 3. rc09a for RCP 1A seal failure
: 3. rc09a for RCP 1A seal failure
Line 294: Line 354:
: 9. rp08c for K202 C. Ensure Protected Train B sign is placed in SM office window.
: 9. rp08c for K202 C. Ensure Protected Train B sign is placed in SM office window.
D. Verify EOOS is 10.0 Green E. Complete the simulator setup checklist.
D. Verify EOOS is 10.0 Green E. Complete the simulator setup checklist.
F. Start DCS, Record Data, select file PlantParameters.txt.  
F. Start DCS, Record Data, select file PlantParameters.txt.
Scenario 3 Rev 1


NRC Scenario 3 Scenario 3 Rev 1 Simulator Booth Instructions
NRC Scenario 3 Simulator Booth Instructions Event 1       Relay K402 Failure, EFW Pump AB Starts
 
: 1. On the Lead Examiner's cue, initiate Event Trigger 1.
Event 1 Relay K402 Failure, EFW Pump AB Starts
: 2. If directed to check EFW Pump AB, report it is running satisfactorily.
: 1. On the Lead Examiner's cue, initiate Event Trigger 1. 2. If directed to check EFW Pump AB, report it is running satisfactorily. 3. If Work Week Manager or I&C is called, inform the ca ller that a work package will be assembled and a team will be sent to the Control Room.  
: 3. If Work Week Manager or I&C is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.
 
Event 2       Condensate Storage Pool Level instrument EFW-ILI-9013 A Fails Low
Event 2 Condensate Storage Pool Level instrument EFW-ILI-9013 A Fails Low
: 1. On Lead Examiner's cue, initiate Event Trigger 2.
: 1. On Lead Examiner's cue, initiate Event Trigger 2.
: 2. If called to check the indication at the Remote Shutdown Panel, report that Condensate Storage Pool Level instru ment EFW-ILI-9013 A is reading 0%. 3. If Work Week Manager or I&C is called, inform the ca ller that a work package will be assembled and a team will be sent to the Control Room.  
: 2. If called to check the indication at the Remote Shutdown Panel, report that Condensate Storage Pool Level instrument EFW-ILI-9013 A is reading 0%.
 
: 3. If Work Week Manager or I&C is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.
Event 3 Charging Pump B Trip
Event 3       Charging Pump B Trip
: 1. On Lead Examiner's cue, initiate Event Trigger 3.
: 1. On Lead Examiner's cue, initiate Event Trigger 3.
: 2. If called to check the Charging Pump that was started, report that it is running satisfactorily. 3. If called to check the Charging Pump B, report that the overcurrent relays are picked up on all 3 phases and that the motor has a strong, odor. 4. If Work Week Manager or PMM is called, inform the ca ller that a work package will be assembled and a team will be sent to the Control Room.
: 2. If called to check the Charging Pump that was started, report that it is running satisfactorily.
Event 4 RCP 1A Middle Seal Failure
: 3. If called to check the Charging Pump B, report that the overcurrent relays are picked up on all 3 phases and that the motor has a strong, odor.
: 1. On the Lead Examiner's cue, initiate Event Trigger 4. 2. If called as the RCP Engineer, report that you will monitor the status of RCP 1A. 3. If Work Week Manager is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.  
: 4. If Work Week Manager or PMM is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.
Event 4       RCP 1A Middle Seal Failure
: 1. On the Lead Examiner's cue, initiate Event Trigger 4.
: 2. If called as the RCP Engineer, report that you will monitor the status of RCP 1A.
: 3. If Work Week Manager is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.
Event 5      RCP 1A Shaft Shear
: 1. On Lead Examiner's cue, initiate Event Trigger 5.
Event 6      Steam Generator #2 Tube Rupture
: 1. Verify SGTR begins ramping in after the reactor trip. If not, initiate Event Trigger 6.
: 2. Acknowledge calls to Chemistry and/or Health Physics to carry out requested actions.
Scenario 3 Rev 1


Event 5 RCP 1A Shaft Shear
NRC Scenario 3 Event 7      High Pressure Safety Injection Pump A
: 1. On Lead Examiner's cue, initiate Event Trigger 5.  
: 1. No communications should occur for this malfunction.
Event 8      Relay K202 Failure
: 2. No communications should occur for this malfunction.
At the end of the scenario, before resetting, complete data collection by stopping recording and saving the file as 2011 SRO Scenario3.cdf. Save the file into the folder for the appropriate crew.
Scenario 3 Rev 1


Event 6 Steam Generator #2 Tube Rupture
NRC Scenario 3 Scenario Timeline:
: 1. Verify SGTR begins ramping in after the reactor trip. If not, initiate Event Trigger
Ramp Event   Malfunction            Severity                    Delay  Trigger HH:MM:SS 1    DI-08a07s11-1            N/A          N/A          N/A      1 Relay K402 failure 2        FW51A                  0%          N/A          N/A      2 CSP Level indication fails low 3        CV01B                  N/A          N/A          N/A      3 Charging Pump B trip 4        RC09A                100%          N/A          N/A      4 RCP 1A middle seal failure 5        RC04A                N/A          N/A          N/A      5 RP02 A-D RP01A RCP 1A sheared shaft, auto trip failure 6        SG01B                10%          3:00        N/A      6 Steam Generator #2 Tube Rupture 7        SI02A                N/A          N/A          N/A    N/A High Pressure Safety Injection Pump A fails to auto start 8        RP08C                  N/A          N/A          N/A    N/A Relay K202 fails to actuate Scenario 3 Rev 1
: 6. 2. Acknowledge calls to Chemistry and/or Health Physics to carry out requested actions.
NRC Scenario 3 Scenario 3 Rev 1 Event 7 High Pressure Safety Injection Pump A
: 1. No communications should occur for this malfunction.


Event 8 Relay K202 Failure
NRC Scenario 3
: 2. No communications should occur for this malfunction.


At the end of the scenario, before resetting, complete data collection by stopping recording and saving the file as 2011 SRO Scenario3.cdf. Save the file into the folder for the appropriate crew.
==REFERENCES:==
 
NRC Scenario 3 Scenario 3 Rev 1 Scenario Timeline: Event Malfunction  Severity Ramp HH:MM:SS Delay Trigger 1 DI-08a07s11-1 N/A N/A N/A 1  Relay K402 failure 2 FW51A  0% N/A N/A 2  CSP Level indication fails low 3 CV01B  N/A N/A N/A 3  Charging Pump B trip 4 RC09A  100% N/A N/A 4  RCP 1A middle seal failure 5 RC04A RP02 A-D RP01A  N/A N/A N/A 5  RCP 1A sheared shaft, auto trip failure 6 SG01B  10% 3:00 N/A 6  Steam Generator #2 Tube Rupture 7 SI02A  N/A N/A N/A N/A  High Pressure Safety Injection Pump A fails to auto start 8 RP08C  N/A N/A N/A N/A  Relay K202 fails to actuate
 
NRC Scenario 3 Scenario 3 Rev 1


==REFERENCES:==
Event Procedures 1  Tech Spec 3.7.1.2.
2  OP-903-013, Monthly Channel Checks Tech Spec 3.3.3.5 and 3.3.3.6 3  OP-002-005, Chemical and Volume Control Tech Spec 3.2.1.4 4  OP-901-130, Reactor Coolant Pump Malfunction 5  OP-902-000, Standard Post Trip Actions OI-038-000, Emergency Operating Procedures Operations Expectations /
Guidance 6  OP-902-009, Standard Appendices, Appendix 1, Diagnostic Flow Chart OP-902-007, Steam Generator Tube Rupture Recovery 7  OI-038-000, Emergency Operating Procedures Operations Expectations /
Guidance 8  OI-038-000, Emergency Operating Procedures Operations Expectations /
Guidance Scenario 3 Rev 1


Event Procedures 1 Tech Spec 3.7.1.2. 2 OP-903-013, Monthl y Channel Checks Tech Spec 3.3.
Appendix D                                 Scenario Outline                       Form ES-D-1 Facility:       WATERFORD 3                 Scenario No.: 4       Op Test No.:     NRC Examiners:                                           Operators:
3.5 and 3.3.3.6 3 OP-002-005, Chemical and Volume Control Tech Spec 3.2.1.4 4 OP-901-130, Reactor C oolant Pump Malfunction 5 OP-902-000, Standard Post Trip Actions OI-038-000, Emergency Operat ing Procedures Operations Expectations /
Initial Conditions:
Guidance 6 OP-902-009, Standard Appendices, Appendix 1, Diagnostic Flow Chart OP-902-007, Steam Generator Tube Rupture Recovery 7 OI-038-000, Emergency Oper ating Procedures Operations Expectations /
Guidance 8 OI-038-000, Emergency Operating Proc edures Operations Expectations /
Guidance Appendix D Scenario Outline Form ES-D-1 Scenario 4 Rev 1 Facility: WATERFORD 3 Scenario No.: 4 Op Test No.:
NRC Examiners:   Operators:             Initial Conditions:
* Reactor power is 100%
* Reactor power is 100%
* Protected Train is B
* Protected Train is B
* AB Bus is aligned to Train A Turnover:
* AB Bus is aligned to Train A Turnover:
* Maintain 100% power Event No. Malf. No. Event Type* Event Description 1 SG10D C - BOP C - SRO TS - SRO Steam Generator #1 leve l instrument SG-ILI-1113 D fails high.
* Maintain 100% power Event         Malf. No.       Event Type*                     Event No.                                                        Description SG10D           C - BOP         Steam Generator #1 level instrument SG-ILI-1                          C - SRO          1113 D fails high.
2 TP01A TP08B C - BOP C - SRO Turbine Cooling Water Pump A trips, Turbine Cooling Water Pump B fails to auto start OP-901-512, Loss of Turbine Cooling Water 3 FW03A C - ATC C - SRO TS - SRO Main Feedwater Pump A trips, Reactor Power Cutback OP-901-101, Reactor Power Cutback 4 RD07D R - ATC Regulating Group 4 CEAs fail to insert in automatic following Reactor Power Cutback  
TS - SRO TP01A           C - BOP         Turbine Cooling Water Pump A trips, Turbine 2          TP08B          C - SRO          Cooling Water Pump B fails to auto start OP-901-512, Loss of Turbine Cooling Water FW03A           C - ATC         Main Feedwater Pump A trips, Reactor 3                          C - SRO          Power Cutback TS - SRO        OP-901-101, Reactor Power Cutback RD07D           R - ATC         Regulating Group 4 CEAs fail to insert in 4                                            automatic following Reactor Power Cutback FW03B           M - All         Main Feedwater Pump B trips, manual 5          FW07A          N - SRO          reactor trip, Emergency Feedwater Pump A fails to run RP03           C - BOP         Main Turbine fails to trip following the reactor 6                          C - SRO          trip RD11A           C - ATC         3 CEAs fail to insert following the reactor trip, 7          28, 37, 79      C - SRO          Emergency Boration FW05           C - BOP         Emergency Feedwater Pump AB trip on 8                          C - ATC          overspeed C - SRO
 
    *   (N)ormal,   (R)eactivity, (I)nstrument,   (C)omponent,    (M)ajor Scenario 4 Rev 1
5 FW03B FW07A  M - All N - SRO Main Feedwater Pump B trips, manual reactor trip, Emergency Feedwater Pump A fails to run 6 RP03 C - BOP C - SRO Main Turbine fails to trip following the reactor trip 7 RD11A 28, 37, 79 C - ATC C - SRO 3 CEAs fail to insert following the reactor trip, Emergency Boration 8 FW05 C - BOP C - ATC C - SRO Emergency Feedwater Pump AB trip on overspeed  
* (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,    (M)ajor
 
Scenario Event Description NRC Scenario 4 Scenario 4 Rev 1 The crew assumes the shift at 100% power with instructions to maintain 100% power.


Scenario Event Description NRC Scenario 4 The crew assumes the shift at 100% power with instructions to maintain 100% power.
After assuming the shift, Steam Generator #1 level instrument SG-ILI-1113 D fails high.
After assuming the shift, Steam Generator #1 level instrument SG-ILI-1113 D fails high.
The SRO should review Tech Specs and enter Tech Spec 3.3.1 and 3.3.2 and TRM  
The SRO should review Tech Specs and enter Tech Spec 3.3.1 and 3.3.2 and TRM 3.3.1. The SRO should direct the BOP operator to bypass the bistables for low Steam Generator #1 level, high level and Steam Generator #1 differential pressure for channel D. This instrument does apply to Tech Spec 3.3.3.6 for Accident Monitoring, but the minimum channel requirements are met using other channels.
 
After the proper bistables are bypassed, Turbine Cooling Water Pump A trips. Turbine Cooling Water Pump B fails to start. The SRO should enter OP-901-512, Loss of Turbine Cooling Water, and start Turbine Cooling Water Pump B. The Plant Monitoring Computer will display an overload condition for TCW Pump A.
3.3.1. The SRO should direct the BOP operator to bypass the bistables for low Steam Generator #1 level, hi gh level and Steam Generator #1 di fferential pressure for channel D. This instrument does apply to Tech Spec 3.3.3.6 for Accident Monitoring, but the minimum channel requirements are met using other channels.  
After Turbine Cooling Water Pump B is running, Main Feedwater Pump A will trip. A Reactor Power Cutback will occur. The ATC should perform the immediate operator actions. The SRO should enter OP-901-101, Reactor Power Cutback. Following the Cutback, Regulating Group 4 CEAs will fail to insert in automatic. The SRO should enter Tech Spec 3.2.4 for DNBR and 3.2.7 for ASI. The crew should take action to address the DNBR power operating limit within 15 minutes by performing ASI control with Group P CEAs.
 
After the crew has addressed Tech Specs and commenced ASI control with Group P CEAs, Main Feedwater Pump B will trip. The crew should perform a manual reactor trip based on this failure. On the Emergency Feedwater Actuation, Emergency Feedwater Pump A will fail to start and will not start manually. The Main Turbine will fail to trip on the reactor trip. The BOP should manually trip the Main Turbine. 3 CEAs will fail to insert on the reactor trip. The ATC operator should perform Emergency Boration due to this condition. The SRO should enter OP-902-006, Loss of Main Feedwater Recovery.
After the proper bistables are bypassed, Turb ine Cooling Water Pump A trips. Turbine Cooling Water Pump B fails to start.
The ATC operator should secure 2 Reactor Coolant Pumps.
The SRO should enter OP-901-512, Loss of Turbine Cooling Water, and star t Turbine Cooling Water Pump B. The Plant Monitoring Computer will display an overload condition for TCW Pump A.  
After 2 Reactor Coolant Pumps are secured, Emergency Feedwater Pump AB will trip due to operator error locally. The crew should remain in OP-902-006 and secure the remaining Reactor Coolant Pumps. On investigation, the local watchstander will report Emergency Feedwater Pump AB is ready to be reset. The BOP operator should perform the necessary actions for resetting Emergency Feedwater Pump AB.
 
The scenario can be terminated after Emergency Feedwater Pump AB is reset.
After Turbine Cooling Water Pump B is r unning, Main Feedwater Pump A will trip. A Reactor Power Cutback will occur. The ATC should perform the immediate operator actions. The SRO should enter OP-901-101, Reactor Power Cutback. Following the Cutback, Regulating Group 4 CEAs will fail to insert in automatic. The SRO should enter Tech Spec 3.2.4 for DNBR and 3.2.7 fo r ASI. The crew should take action to address the DNBR power operati ng limit within 15 minutes by performing ASI control with Group P CEAs.  
Scenario 4 Rev 1
 
After the crew has addressed Tech Spe cs and commenced ASI control with Group P CEAs, Main Feedwater Pump B will trip. Th e crew should perform a manual reactor trip based on this failure. On the Emergency F eedwater Actuation, Emergency Feedwater Pump A will fail to start and wil l not start manually. The Main Turbine will fail to trip on the reactor trip. The BOP should manually trip the Main Turbine. 3 CEAs will fail to insert on the reactor trip. The ATC operator should perform Emergency Boration due to this condition. The SRO should enter OP-9 02-006, Loss of Main Feedwater Recovery.
The ATC operator should secure 2 Reactor Coolant Pumps.  
 
After 2 Reactor Coolant Pumps are secur ed, Emergency Feedwater Pump AB will trip due to operator error locally. The crew s hould remain in OP-902-006 and secure the remaining Reactor Coolant Pump
: s. On investigation, the local watchstander will report Emergency Feedwater Pump AB is ready to be reset. The BOP operator should perform the necessary actions for re setting Emergency Feedwater Pump AB.  
 
The scenario can be terminated after Emergency Feedwater Pump AB is reset.  
 
NRC Scenario 4 Scenario 4 Rev 1 Critical Tasks
: 1. Establish reactivity control.


NRC Scenario 4 Critical Tasks
: 1. Establish reactivity control.
This task is satisfied by establishing Emergency Boration prior to completing Standard Post Trip Actions Reactivity Control verification. The required task becomes applicable after the Reactor is tripped and 3 CEAs remain stuck out.
This task is satisfied by establishing Emergency Boration prior to completing Standard Post Trip Actions Reactivity Control verification. The required task becomes applicable after the Reactor is tripped and 3 CEAs remain stuck out.
: 2. Establish a primary to secondary heat sink  
: 2. Establish a primary to secondary heat sink This task is satisfied by securing all RCPs after Emergency Feedwater Pump AB trips. With Emergency Feedwater Pump A off, Emergency Feedwater Pump B does not have the capacity to provide necessary Emergency Feedwater flow.
Scenario Quantitative Attributes
: 1. Total malfunctions (5-8)                                          8
: 2. Malfunctions after EOP entry (1-2)                                3
: 3. Abnormal events (2-4)                                              2
: 4. Major transients (1-2)                                            1
: 5. EOPs entered/requiring substantive actions (1-2)                  1
: 6. EOP contingencies requiring substantive actions (0-2)              0
: 7. Critical tasks (2-3)                                              2 Scenario 4 Rev 1


This task is satisfied by securing all RCPs after Emergency Feedwater Pump AB trips. With Emergency Feedwater Pump A off, Emergency Feedwater Pump B does not have the capacity to provide necessary Emergency Feedwater flow.
NRC Scenario 4 Scenario Notes:
 
A. Reset Simulator to IC-194.
Scenario Quantitative Attributes 1. Total malfunctions (5-8) 8 2. Malfunctions after EOP entry (1-2) 3 3. Abnormal events (2-4) 2 4. Major transients (1-2) 1 5. EOPs entered/requiring substantive actions (1-2) 1 6. EOP contingencies requiring substantive actions (0-2) 0 7. Critical tasks (2-3) 2 NRC Scenario 4 Scenario 4 Rev 1 Scenario Notes:
B. Verify the following Scenario Malfunctions:
A. Reset Simulator to IC-194. B. Verify the following Scenario Malfunctions: 1. sg10d for S/G #1 level instrument
: 1. sg10d for S/G #1 level instrument
: 2. tp01a for TCW Pump A
: 2. tp01a for TCW Pump A
: 3. tp08b for TCW Pump B
: 3. tp08b for TCW Pump B
Line 384: Line 446:
: 8. rp03 for the Main Turbine failure
: 8. rp03 for the Main Turbine failure
: 9. rd11a28, 37, and 79 for CEAs 28, 37, and 79
: 9. rd11a28, 37, and 79 for CEAs 28, 37, and 79
: 10. fw05 for EFW Pump AB C. Verify the following Override: 1. di-08a04s09-1 for EFW Pump A D. Ensure Protected Train B sign is placed in SM office window.
: 10. fw05 for EFW Pump AB C. Verify the following Override:
: 1. di-08a04s09-1 for EFW Pump A D. Ensure Protected Train B sign is placed in SM office window.
E. Verify EOOS is 10.0 Green F. Complete the simulator setup checklist.
E. Verify EOOS is 10.0 Green F. Complete the simulator setup checklist.
G. Start DCS, Record Data, select file PlantParameters.txt.  
G. Start DCS, Record Data, select file PlantParameters.txt.
Scenario 4 Rev 1


NRC Scenario 4 Scenario 4 Rev 1 Simulator Booth Instructions
NRC Scenario 4 Simulator Booth Instructions Event 1         Steam Generator #1 level instrument failure
 
: 1. On the Lead Examiner's cue, initiate Event Trigger 1.
Event 1 Steam Generator #1 level instrument failure
: 2. If directed to check the remote shutdown panel, report that Channel D S/G #1 level reads 67%.
: 1. On the Lead Examiner's cue, initiate Event Trigger 1. 2. If directed to check the remote shut down panel, report that Channel D S/G #1 level reads 67%. 3. If Work Week Manager or I&C is called, inform the ca ller that a work package will be assembled and a team will be sent to the Control Room.  
: 3. If Work Week Manager or I&C is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.
 
Event 2         Turbine Cooling Water Pump A trip
Event 2 Turbine Cooling Water Pump A trip
: 1. On the Lead Examiner's cue, initiate Event Trigger 2.
: 1. On the Lead Examiner's cue, initiate Event Trigger 2. 2. If directed to check Turbine Cooling Water Pumps locally, report TCW Pump A has overcurrent flags tripped and t hat TCW Pump B looks normal. 3. If Work Week Manager is called, info rm the caller that a work package will be assembled and a team will be sent to the Control Room.  
: 2. If directed to check Turbine Cooling Water Pumps locally, report TCW Pump A has overcurrent flags tripped and that TCW Pump B looks normal.
 
: 3. If Work Week Manager is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.
Event 3 Main Feedwater Pump A trip, Reactor Power Cutback
Event 3         Main Feedwater Pump A trip, Reactor Power Cutback
: 1. On the Lead Examiner's cue, initiate Event Trigger 3. 2. If directed to check Main Feedwater Pump A locally, report there are no abnormal indications locally.  
: 1. On the Lead Examiner's cue, initiate Event Trigger 3.
 
: 2. If directed to check Main Feedwater Pump A locally, report there are no abnormal indications locally.
Event 5 MFW Pump B trip, Reactor trip, Emergency Feedwater Pump A trip
Event 5         MFW Pump B trip, Reactor trip, Emergency Feedwater Pump A trip
: 1. On the Lead Examiner's cue, initiate Event Trigger 5. 2. If directed to check Main Feedwater Pump B locally, report indications of broken linkages on the governor assembly. 3. If directed to check EFW Pump A locall y, report indications of a broken breaker for EFW Pump A at Switchgear 3A.  
: 1. On the Lead Examiner's cue, initiate Event Trigger 5.
 
: 2. If directed to check Main Feedwater Pump B locally, report indications of broken linkages on the governor assembly.
Event 8 Emergency Feedwater Pump AB trip
: 3. If directed to check EFW Pump A locally, report indications of a broken breaker for EFW Pump A at Switchgear 3A.
: 1. On the Lead Examiner's cue, initiate Event Trigger 8. 2. After the remaining Reac tor Coolant Pumps are tripped, call as the RCA watch and report that the Emergency Feedwater Pump AB tripped on overspeed due to his activities while checking the pump.
Event 8         Emergency Feedwater Pump AB trip
Recommend performing actions to reset EFW Pump AB.  
: 1. On the Lead Examiner's cue, initiate Event Trigger 8.
: 2. After the remaining Reactor Coolant Pumps are tripped, call as the RCA watch and report that the Emergency Feedwater Pump AB tripped on overspeed due to his activities while checking the pump. Recommend performing actions to reset EFW Pump AB.
At the end of the scenario, before resetting, complete data collection by stopping recording and saving the file as 2011 SRO Scenario 4.cdf. Save the file into the folder for the appropriate crew.
Scenario 4 Rev 1


At the end of the scenario, before resetting, complete data collection by stopping recording and saving the file as 2011 SRO Scenario 4.cdf. Save the file into the folder for the appropriate crew.
NRC Scenario 4 Scenario Timeline:
NRC Scenario 4 Scenario 4 Rev 1 Scenario Timeline: Event Malfunction Severity Ramp HH:MM:SS Delay Trigger 1 SG10D 100% N/A N/A 1 S/G #1 level instrument channel D fails high 2 TP01A TP08B  N/A N/A N/A 2 TCW Pump A trips, TCW Pump B fails to auto-start 3 FW03A N/A N/A N/A 3 MFW Pump A trips 4 RD07D N/A N/A N/A N/A Regulating Group 4 fails to auto insert 5 FW03B FW07A DI-08a04s09-1 N/A N/A N/A 5 MFW Pump B trips, EFW Pump A fails to run 6 RP03 N/A N/A N/A N/A Main Turbine fails to trip on reactor trip 7 RD11A 28, 37, 79 N/A N/A N/A N/A CEAs 28, 37, 79 fail to insert 8 FW05 N/A N/A N/A 8 EFW Pump AB trips  
Ramp Event   Malfunction             Severity               Delay Trigger HH:MM:SS 1       SG10D                 100%           N/A   N/A     1 S/G #1 level instrument channel D fails high 2         TP01A                 N/A           N/A   N/A     2 TP08B TCW Pump A trips, TCW Pump B fails to auto-start 3       FW03A                   N/A           N/A   N/A     3 MFW Pump A trips 4       RD07D                   N/A           N/A   N/A   N/A Regulating Group 4 fails to auto insert 5         FW03B                 N/A           N/A   N/A     5 FW07A DI-08a04s09-1 MFW Pump B trips, EFW Pump A fails to run 6         RP03                   N/A           N/A   N/A   N/A Main Turbine fails to trip on reactor trip 7       RD11A                   N/A           N/A   N/A   N/A 28, 37, 79 CEAs 28, 37, 79 fail to insert 8         FW05                   N/A           N/A   N/A     8 EFW Pump AB trips Scenario 4 Rev 1


NRC Scenario 4 Scenario 4 Rev 1
NRC Scenario 4


==REFERENCES:==
==REFERENCES:==


Event Procedures 1 OP-009-007, Plant Protection System OP-903-013, Monthl y Channel Checks Tech Spec 3.3.1 and 3.3.2 2 OP-901-512, Loss of Tu rbine Cooling Water 3 & 4 OP-901-101, Reactor Power Cutback Tech Spec 3.2.1 5 OP-902-000, Standard Post Trip Actions OP-902-009, Standard Appendices, Appendix 1, Diagnostic Flow Chart OP-902-006, Loss of Main Feedwater Recovery 6 OP-902-000, Standard Post Trip Actions OI-038-000, Emergency Operat ing Procedures Operations Expectations /
Event Procedures 1   OP-009-007, Plant Protection System OP-903-013, Monthly Channel Checks Tech Spec 3.3.1 and 3.3.2 2   OP-901-512, Loss of Turbine Cooling Water 3&4   OP-901-101, Reactor Power Cutback Tech Spec 3.2.1 5   OP-902-000, Standard Post Trip Actions OP-902-009, Standard Appendices, Appendix 1, Diagnostic Flow Chart OP-902-006, Loss of Main Feedwater Recovery 6   OP-902-000, Standard Post Trip Actions OI-038-000, Emergency Operating Procedures Operations Expectations /
Guidance 7 OP-902-000, Standard Post Trip Actions OI-038-000, Emergency Operat ing Procedures Operations Expectations /
Guidance 7   OP-902-000, Standard Post Trip Actions OI-038-000, Emergency Operating Procedures Operations Expectations /
Guidance 8 OP-902-006, Loss of Main Feedwater Recovery  
Guidance 8   OP-902-006, Loss of Main Feedwater Recovery Scenario 4 Rev 1


ES-301 Administrative Topics Outline Form ES-301-1 Revision 0 RO Facility: WATERFORD 3 Date of Examination: March 21, 2011 Examination Level:
ES-301                               Administrative Topics Outline                     Form ES-301-1 Facility:     WATERFORD 3                           Date of Examination:         March 21, 2011 Examination Level:       RO                         Operating Test Number:       1 Administrative Topic         Type                    Describe activity to be performed (see Note)             Code*
RO Operating Test Number:
2.1.23, Ability to perform specific system and A1                  S, D          integrated plant procedures during all modes of plant operation.
1 Administrative Topic (see Note)
Conduct of Operations Perform a Shutdown Margin with an immoveable CEA in accordance with OP-903-090, Shutdown Margin, K/A Importance:                          section 7.3, Shutdown Margin Verification -
Type Code* Describe activity to be performed A1 Conduct of Operations K/A Importance:
4.3                                Untrippable CEA.
4.3 S, D 2.1.23, Ability to perform specific system and integrated plant procedures during all modes of plant operation. Perform a Shutdown Margin with an immoveable CEA in accordance with OP-903-090, Shutdown Margin, section 7.3, Shutdown Margin Verification - Untrippable CEA.
A2                 R, M         2.1.18, Ability to make accurate, clear, and concise Conduct of Operations                        logs, records, status boards, and reports.
A2 Conduct of Operations K/A Importance:
Perform OP-903-001, Technical Specification K/A Importance:                          Surveillance Logs, Attachment 11.18, Adjustment of 3.6                                CPC and Excore Nuclear Instrumentation Data.
3.6 R, M 2.1.18, Ability to make accurate, clear, and concise logs, records, status boards, and reports. Perform OP-903-001, Technical Specification Surveillance Logs, Attachment 11.18, Adjustment of CPC and Excore Nuclear Instrumentation Data.
A3                 R, N         2.2.12, Knowledge of surveillance procedures Equipment Control Complete surveillance OP-903-013, Monthly Channel Checks, Attachment 10.3 for Accident Monitoring K/A Importance:                           Instrumentation Channel Checks.
A3 Equipment Control K/A Importance:
3.7 A4                  R, N         2.3.4, Knowledge of radiation exposure limits under Radiation Control                          normal and emergency conditions.
3.7 R, N 2.2.12, Knowledge of surveillance procedures Complete surveillance OP-903-013, Monthly Channel Checks, Attachment 10.3 for Accident Monitoring Instrumentation Channel Checks.
Calculate stay time to perform a tagout verification.
A4 Radiation Control K/A Importance:
K/A Importance:                          Room dose rate & operators yearly dose provided.
3.2 R, N 2.3.4, Knowledge of radiation exposure limits under normal and emergency conditions. Calculate stay time to perform a tagout verification.
3.2 Emergency Plan                           Not selected NOTE:       All items (5 total are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
Room dose rate & operator's yearly dose provided.
* Type Codes & Criteria:         (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs;  4 for SROs & RO retakes)
Emergency Plan Not selected NOTE: All items (5 total are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
(N)ew or (M)odified from bank ( 1)
* Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs;  4 for SROs & RO retakes) (N)ew or (M)odified from bank ( 1) (P)revious 2 exams ( 1; randomly selected)}}
(P)revious 2 exams ( 1; randomly selected)
Revision 0 RO}}

Revision as of 00:34, 13 November 2019

WT-2011-03 Draft Outlines
ML111160176
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/21/2011
From:
NRC Region 4
To:
Entergy Operations
References
50-382/11-301
Download: ML111160176 (67)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility: WATERFORD 3 Date of Examination: March 21, 2011 Examination Level: SRO Operating Test Number: 1 Administrative Topic Type Describe activity to be performed (see Note) Code*

A5 2.1.23, Ability to perform specific system and integrated R, N plant procedures during all modes of plant operation.

Conduct of Operations Review and approve a completed Shutdown Margin with K/A Importance:

an immoveable CEA in accordance with OP-903-090, 4.4 Shutdown Margin, section 7.3, Shutdown Margin Verification - Un-trippable CEA.

A6 2.1.18, Ability to make accurate, clear, and concise logs, R, M records, status boards, and reports.

Conduct of Operations Review and approve OP-903-001, Technical K/A Importance:

Specification Surveillance Logs, Attachment 11.18, 3.8 Adjustment of CPC and Excore Nuclear Instrumentation Data.

A7 2.2.37, Ability to determine operability and/or availability R, N of safety related equipment.

Equipment Control Review and approve a completed Equipment Out of K/A Importance:

Service document in accordance with OP-100-010, 4.6 Equipment Out of Service.

A8 2.3.4, Knowledge of radiation exposure limits under R, N normal and emergency conditions.

Radiation Control Calculate dose and assign non-licensed operators to K/A Importance:

perform work in radiological restricted areas. Given 3.7 dose rate with and without shielding installed, time to install shielding, and job completion time using 1 operator or using 2 operators, determine proper job assignment.

A9 2.4.38, Ability to take actions called for in the facility S, M emergency plan, including supporting or acting as Emergency Plan emergency coordinator if required.

K/A Importance:

Determine appropriate classification and actions based 4.4 on a toxic gas release in accordance with EP-004-010, Toxic Chemical Contingency Procedure.

NOTE: All items (5 total are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

Revision 0 SRO

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: WATERFORD 3 Date of Examination: March 21, 2011 Exam Level Reactor Operator Operating Test No.: NRC Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Safety Code* Function S1 001 Control Rod Drive, Perform CEA testing for Regulating Group 6 in A, D, S 1 accordance with OP-903-005, Control Element Assembly Operability Check.

Fault: CEA 21 will insert after initially moved, requiring a reactor trip.

A4.01 Controls for CCWS RO - 3.1, SRO - 2.9 S2 004 Chemical and Volume Control System; Makeup to the Volume A, M, S 2 Control Tank using Boric Acid and Primary Makeup Water batches in accordance with OP-002-005, Chemical and Volume Control.

Fault: The Boric Acid counter will fail to secure the Boric Acid addition, requiring the applicant to manually secure Boric Acid flow. The applicant will then need to add the Primary Makeup Water for the initial calculation, plus the additional based on the extra boric acid added.

A4.07 Boration/dilution RO - 3.9, SRO - 3.7 S3 005 Shutdown Cooling System; Secure Shutdown Cooling Train B and D, L, S 4-P place it in standby in accordance with OP-009-005, Shutdown Cooling.

A4.01 Controls and indication for RHR pumps RO - 3.6, SRO - 3.4 S4 039 Main and Reheat Steam System; BOP operator immediate operator A, M, S 4-S actions on evacuation of the Control Room in accordance with OP-901-502, Control Room Evacuation Fault: Atmospheric Dump Valve B will spuriously open, requiring the applicant to take contingency actions to control Steam Generator pressure.

A4.01 Main steam supply. Valves RO - 2.9, SRO - 2.8 S5 028 Hydrogen Recombiner and Purge Control System D, L, P, S 5 Start Hydrogen Recombiner A in accordance with OP-008-006.

A4.01 HRPS controls RO - 4.0, SRO - 4.0 S6 064 Emergency Diesel Generator (ED/G) System; Parallel Emergency A, D, S 6 Diesel Generator A for EDG testing in accordance with OP-009-002, Emergency Diesel Generator.

Fault: After EDG A load is raised, EDG A load will rise without manipulation requiring a trip of EDG A.

A4.06 Manual start, loading, and stopping of the ED/G RO - 3.9, SRO - 3.9 S7. 029 Containment Purge System; Perform surveillance OP-903-052, N, S 8 Controlled Ventilation Area System Operability Check, and secure RAB Normal Ventilation and start CVAS Train A.

K1.03 Engineering safeguards RO - 3.6, SRO - 3.8 S8. 012 Reactor Protection System; Place Reactor Power Cutback in service D, S 7 and remove reactor trip on turbine trip in accordance with OP-004-015, Reactor Power Cutback.

A4.03 Channel blocks and bypasses RO - 3.6, SRO - 3.6 1 NRC 2011 Revision 1

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 In-Plant Systems@ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)

P1 061 Emergency Feedwater System; Reset overspeed device on D, E, L, 4-S Emergency Feedwater Pump AB in accordance with OP-902-005, P, R Station Blackout Recovery.

A2.04 Pump failure or improper operation RO - 3.4, SRO - 3.8 P2 064 Emergency Diesel Generator (ED/G) System; Trip Emergency A, D, R 6 Diesel Generator B locally.

Fault: The first method the applicant performs to trip the EDG B will fail, requiring contingency actions to secure EDG B.

K4.02 Trips for ED/G while operating (normal or emergency)

RO - 3.9, SRO - 4.2 P3 068 Control Room Evacuation E, L, N 2 Close Train B Safety Injection Tank outlet valves during a Control Room Evacuation in accordance with OP-901-502, Evacuation of Control Room and Subsequent Plant Shutdown.

AA1.28 PZR level control and pressure control RO - 3.8, SRO - 4.0

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 5 (C)ontrol room 0 (D)irect from bank 9/8/4 7 (E)mergency or abnormal in-plant 1/1/1 2 (EN)gineered safety feature - / - / 1 (control room system) -

(L)ow-Power / Shutdown 1/1/1 4 (N)ew or (M)odified from bank including 1(A) 2/2/1 4 (P)revious 2 exams 3 / 3 / 2 (randomly selected) 2 (R)CA 1/1/1 2 (S)imulator 8 2 NRC 2011 Revision 1

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: WATERFORD 3 Date of Examination: March 21, 2011 Exam Level SRO - Instant Operating Test No.: NRC Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Safety Code* Function S1 001 Control Rod Drive, Perform CEA testing for Regulating Group 6 in A, D, S 1 accordance with OP-903-005, Control Element Assembly Operability Check.

Fault: CEA 21 will insert after initially moved, requiring a reactor trip.

A4.01 Controls for CCWS RO - 3.1, SRO - 2.9 S2 004 Chemical and Volume Control System; Makeup to the Volume A, M, S 2 Control Tank using Boric Acid and Primary Makeup Water batches in accordance with OP-002-005, Chemical and Volume Control.

Fault: The Boric Acid counter will fail to secure the Boric Acid addition, requiring the applicant to manually secure Boric Acid flow. The applicant will then need to add the Primary Makeup Water for the initial calculation, plus the additional based on the extra boric acid added.

A4.07 Boration/dilution RO - 3.9, SRO - 3.7 S3 005 Shutdown Cooling System; Secure Shutdown Cooling Train B and D, L, S 4-P place it in standby in accordance with OP-009-005, Shutdown Cooling.

A4.01 Controls and indication for RHR pumps RO - 3.6, SRO - 3.4 S4 039 Main and Reheat Steam System; BOP operator immediate operator A, M, S 4-S actions on evacuation of the Control Room in accordance with OP-901-502, Control Room Evacuation Fault: Atmospheric Dump Valve B will spuriously open, requiring the applicant to take contingency actions to control Steam Generator pressure.

A4.01 Main steam supply. Valves RO - 2.9, SRO - 2.8 S5 S6 064 Emergency Diesel Generator (ED/G) System; Parallel Emergency A, D, S 6 Diesel Generator A for EDG testing in accordance with OP-009-002, Emergency Diesel Generator.

Fault: After EDG A load is raised, EDG A load will rise without manipulation requiring a trip of EDG A.

A4.06 Manual start, loading, and stopping of the ED/G RO - 3.9, SRO - 3.9 S7. 029 Containment Purge System; Perform surveillance OP-903-052, N, S 8 Controlled Ventilation Area System Operability Check, and secure RAB Normal Ventilation and start CVAS Train A.

K1.03 Engineering safeguards RO - 3.6, SRO - 3.8 S8. 012 Reactor Protection System; Place Reactor Power Cutback in service D, S 7 and remove reactor trip on turbine trip in accordance with OP-004-015, Reactor Power Cutback.

A4.03 Channel blocks and bypasses RO - 3.6, SRO - 3.6 3 NRC 2011 Revision 1

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 In-Plant Systems@ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)

P1 061 Emergency Feedwater System; Reset overspeed device on D, E, L, 4-S Emergency Feedwater Pump AB in accordance with OP-902-005, P, R Station Blackout Recovery.

A2.04 Pump failure or improper operation RO - 3.4, SRO - 3.8 P2 064 Emergency Diesel Generator (ED/G) System; Trip Emergency A, D, R 6 Diesel Generator B locally.

Fault: The first method the applicant performs to trip the EDG B will fail, requiring contingency actions to secure EDG B.

K4.02 Trips for ED/G while operating (normal or emergency)

RO - 3.9, SRO - 4.2 P3 068 Control Room Evacuation E, L, N 2 Close Train B Safety Injection Tank outlet valves during a Control Room Evacuation in accordance with OP-901-502, Evacuation of Control Room and Subsequent Plant Shutdown.

AA1.28 PZR level control and pressure control RO - 3.8, SRO - 4.0

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 5 (C)ontrol room 0 (D)irect from bank 9/8/4 6 (E)mergency or abnormal in-plant 1/1/1 2 (EN)gineered safety feature - / - / 1 (control room system) -

(L)ow-Power / Shutdown 1/1/1 3 (N)ew or (M)odified from bank including 1(A) 2/2/1 4 (P)revious 2 exams 3 / 3 / 2 (randomly selected) 1 (R)CA 1/1/1 2 (S)imulator 7 4 NRC 2011 Revision 1

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: WATERFORD 3 Date of Examination: March 21, 2011 Exam Level SRO - Upgrade Operating Test No.: NRC Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Safety Code* Function S1 001 Control Rod Drive, Perform CEA testing for Regulating Group 6 in A, D, S 1 accordance with OP-903-005, Control Element Assembly Operability Check.

Fault: CEA 21 will insert after initially moved, requiring a reactor trip.

A4.01 Controls for CCWS RO - 3.1, SRO - 2.9 S2 S3 S4 039 Main and Reheat Steam System; BOP operator immediate operator A, M, S 4-S actions on evacuation of the Control Room in accordance with OP-901-502, Control Room Evacuation Fault: Atmospheric Dump Valve B will spuriously open, requiring the applicant to take contingency actions to control Steam Generator pressure.

A4.01 Main steam supply. Valves RO - 2.9, SRO - 2.8 S5 S6 S7. 029 Containment Purge System; Perform surveillance OP-903-052, N, EN, S 8 Controlled Ventilation Area System Operability Check, and secure RAB Normal Ventilation and start CVAS Train A.

K1.03 Engineering safeguards RO - 3.6, SRO - 3.8 S8.

5 NRC 2011 Revision 1

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 In-Plant Systems@ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)

P1 P2 064 Emergency Diesel Generator (ED/G) System; Trip Emergency A, D, R 6 Diesel Generator B locally.

Fault: The first method the applicant performs to trip the EDG B will fail, requiring contingency actions to secure EDG B.

K4.02 Trips for ED/G while operating (normal or emergency)

RO - 3.9, SRO - 4.2 P3 068 Control Room Evacuation E, L, N 2 Close Train B Safety Injection Tank outlet valves during a Control Room Evacuation in accordance with OP-901-502, Evacuation of Control Room and Subsequent Plant Shutdown.

AA1.28 PZR level control and pressure control RO - 3.8, SRO - 4.0

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 3 (C)ontrol room 0 (D)irect from bank 9/8/4 2 (E)mergency or abnormal in-plant 1/1/1 1 (EN)gineered safety feature - / - / 1 (control room system) 1 (L)ow-Power / Shutdown 1/1/1 1 (N)ew or (M)odified from bank including 1(A) 2/2/1 3 (P)revious 2 exams 3 / 3 / 2 (randomly selected) 0 (R)CA 1/1/1 1 (S)imulator 3 6 NRC 2011 Revision 1

ES-301 Simulator Scenario Quality Checklist Form ES-301-5 Facility: Waterford 3 Date of Exam: March 21, 2011 Operating Test No. NRC A E Scenarios P V 1 2 3 4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I

C S A B S A B S A B S A B A M

A T R T O R T O R T O R T O L U N Y O C P O C P O C P O C P M(*)

T P E R I U RX 0 1 1 0 NOR 1 1 1 1 1 SRO-U I/C 2,3,5, 1,3,4, 11 4 4 2 7,8 5,7,8 1&2 MAJ 6 6 2 2 2 1 TS 3,4 1,2,3 5 0 2 2 RX 1 1 1 1 0 NOR 3 1 1 1 1 SRO-I I/C 1,2,5, 2,8 1,4,7, 8 4 4 2 6,7 8 1

MAJ 4 6 6 3 2 2 1 TS 1,2,3 3 0 2 2 RX 3 1 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 1,5 2,3,5, 1,3,4, 13 4 4 2 7,8 5,7,8 2

MAJ 4 6 6 3 2 2 1 TS 3,4 1,2,3 5 0 2 2 RX 1 1 1 1 0 NOR 3 1 1 1 1 SRO-I I/C 1,2,5, 2,8 7 4 4 2 6,7 3&4 MAJ 4 6 2 2 2 1 TS 1,2,3 3 0 2 2 NRC Revision 0

RX 0 1 1 0 NOR 3 1 2 1 1 1 RO I/C 2,6,7 3,5,7 3,5,8 9 4 4 2 1&3 MAJ 4 6 6 3 2 2 1 TS 0 0 2 2 RX 3 1 1 1 0 NOR 0 1 1 1 RO I/C 1,5 1,4,7, 6 4 4 2 8

2&4 MAJ 4 6 2 2 2 1 TS 0 0 2 2 RX 0 1 1 0 NOR 3 1 2 1 1 1 RO I/C 2,6,7 3,5,7 3,5,8 9 4 4 2 5 MAJ 4 6 6 3 2 2 1 TS 0 0 2 2 RX 4 NOR 4 I/C 1,2,3, 3,7,8 1,2,6, Spare 6,7,8 8 MAJ 5 5 5 TS 1,3 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

NRC Revision 0

Appendix D Scenario Outline Form ES-D-1 Facility: WATERFORD 3 Scenario No.: 1 Op Test No.: NRC Examiners: Operators:

Initial Conditions:

  • Reactor power is 100%
  • Protected Train is A
  • AB Bus is aligned to Train A Turnover: Maintain 100% power Event Malf. No. Event Type* Event No. Description RC15A2 I - ATC Pressurizer level instrument RC-ILI-0110 X 1 I - SRO fails low. OP-901-110, Pressurizer Level TS - SRO Control Malfunction.

FW26A I - BOP Steam Generator #1 Feedwater flow I - SRO instrument FW-IFR-1111 fails low. OP-901-2 TS - SRO 201, Steam Generator Level Control Malfunction.

RD02A52 R - ATC CEA 52 Drops into the core, OP-901-102, N - BOP CEA or CEDMCS Malfunction, and OP-901-3 N - SRO 212, Rapid Plant Power Reduction.

TS - SRO RC23A M - All Loss of Coolant Accident, OP-902-002, Loss 4 CS04A of Coolant Accident Recovery.

CS-125 A fails closed CV02A C - ATC Charging Pump A fails to auto-start.

5 C - SRO SI02D C - BOP Low Pressure Safety Injection Pump A fails 6 to auto start on SIAS requiring manual start C - SRO CS01B C - BOP Containment Spray Pump B trip, OP-902-C - SRO 008, Safety Function Recovery Procedure 7

Alignment of LPSI Pump B to replace CS Pump B.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Scenario 1 Rev 1

Scenario Event Description NRC Scenario 1 The crew assumes the shift at 100% power with instructions to maintain 100% power.

After taking the shift, Pressurizer level instrument RC-ILI-0110X fails low. Due to the failure, Letdown flow goes to minimum flow and both backup Charging Pumps start.

The SRO should enter OP-901-110, Pressurizer Level Control Malfunction. The crew should utilize sub section E1, Pressurizer Level Control Channel Malfunction. The ATC should take manual control of Pressurizer level and select the non-faulted channel.

Using Tech Specs and OP-903-013, Monthly Channel Checks, the SRO should enter Tech Spec 3.3.3.5, a 7 day action requirement, and determine Tech Spec 3.3.3.6 entry is not required since QSPDS is operable and meeting the Pressurizer level channel check. SPDS indication of Pressurizer level on the Plant Monitoring Computer is affected by this failure.

After the non-faulted channel is selected and Tech Specs are addressed, Steam Generator #1 Feedwater flow instrument FW-IFR-1111 fails low. The Feedwater Control System will respond by raising Feedwater flow to Steam Generator #1. The SRO should enter OP-901-201, Steam Generator Level Control Malfunction. The BOP will be required to take manual control and match Feedwater and Main Steam flow. The Ultrasonic Flow Meter will fail as a result of the instrument failure and require entry into TRM 3.3.5. The Feedwater controls for Steam Generator #1 will remain in manual as a result of this failure.

After the crew has addressed the Feedwater instrument failure, CEA 52 drops into the core. Off normal procedure OP-901-102, CEA or CEDMCS Malfunction, should be entered. The dropped CEA will require a rapid plant power reduction. The SRO should enter OP-901-212, Rapid Plant Power Reduction. Direct Boration should commence within 15 minutes of the dropped CEA. For the power reduction, the ATC will perform direct Boration to the RCS as well as ASI control with CEAs and Pressurizer Boron Equalization. The BOP will manipulate the controls to reduce Main Turbine load and manipulate Feedwater to Steam Generator #1 in manual. The SRO should enter Tech Specs 3.2.3, 3.1.3.1, and 3.1.3.5.

Once the crew has commenced the power reduction and lowered power to ~ 90%, or at the lead examiners discretion, a loss of coolant accident will occur. Charging Pump A will fail to start on the lowering Pressurizer level. The crew should diagnose the Pressurizer level dropping with all available Charging Pumps operating, trip the Reactor, and initiate Safety Injection Actuation (SIAS) and Containment Isolation Actuation (CIAS). When Containment Spray is actuated, either manually or automatically, CS-125 A will fail to automatically open and will not open using the control switch. This does not create a need for action at this time, but Containment Spray flow will only be provided from Train B with CS-125 A failed closed. Low Pressure Safety Injection Pump A will fail to automatically start on SIAS, requiring the BOP operator to manually start LPSI Pump A.

Scenario 1 Rev 1

Scenario Event Description NRC Scenario 1 After the crew completes OP-902-000, Standard Post Trip Actions and diagnoses into OP-902-002, Loss of Coolant Accident Recovery, Containment Spray Pump B will trip, resulting in no Containment Spray flow. The crew should recognize that they are not meeting the Safety Function Status Checklist of OP-902-002 and transition to OP-902-008, Safety function Recovery Procedure.

Prioritization in OP-902-008 should result in Containment Isolation being priority 1 and Containment Temperature and Pressure Control being priority 2. The crew should address Containment Isolation by overriding CS-125 B closed. The crew should address Containment Temperature and Pressure Control by aligning Low Pressure Safety Injection Pump B to replace the failed Containment Spray Pump B. It is acceptable to pursue these tasks in parallel, since establishing flow with LPSI B to the Containment Spray header will also satisfy Containment Isolation concerns.

The scenario can be terminated after Low Pressure Safety Injection Pump B is aligned for Containment Spray, or after the CRS gives the order to perform that alignment, at the lead examiners discretion.

Scenario 1 Rev 1

NRC Scenario 1 Critical Tasks

1. Trip any RCP not satisfying RCP operating limits.

This task is satisfied by securing all RCPs within 3 minutes of loss of CCW flow. This task becomes applicable after Containment Spray is initiated. The time requirement of 3 minutes is based on the RCP operating limit of 3 minutes without CCW cooling.

2. Establish Containment temperature and pressure control.

This task is satisfied by aligning LPSI Pump B to replace CS Pump B prior to exiting the Containment Temperature and Pressure Control safety function in OP-902-008. This task becomes applicable following the failure of Containment Spray Pump B. The Functional Recovery procedure utilized following this failure will direct this activity to satisfy the Containment Pressure and Temperature Control safety function.

Scenario Quantitative Attributes

1. Total malfunctions (5-8) 7
2. Malfunctions after EOP entry (1-2) 2
3. Abnormal events (2-4) 3
4. Major transients (1-2) 1
5. EOPs entered/requiring substantive actions (1-2) 2
6. EOP contingencies requiring substantive actions (0-2) 1
7. Critical tasks (2-3) 2 Scenario 1 Rev 1

NRC Scenario 1 Scenario Notes:

A. Reset Simulator to IC-191.

B. Verify the following Scenario Malfunctions:

1. rc15a for Pressurizer level
2. fw26a for Steam Generator #1 Feedwater flow
3. rd02a52 for CEA 52
4. rc23a for LOCA
5. cv02a for Charging Pump A
6. si02d for Low Pressure Safety Injection Pump A
7. cs01b for Containment Spray Pump B
8. cs04a for CS-125 A C. Verify the following Override:
1. di-08a04s22-1 for CS-125 A D. Ensure Protected Train A sign is placed in SM office window.

E. Verify EOOS is 10.0 Green F. Complete the simulator setup checklist.

G. Start DCS, Record Data, select file PlantParameters.txt.

Scenario 1 Rev 1

NRC Scenario 1 Simulator Booth Instructions Event 1 Pressurizer Level Instrument RC-ILI-0110X Fails Low

1. On Lead Examiner's cue, initiate Event Trigger 1.
2. If Work Week Manager or I&C is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.
3. If sent to LCP-43, report RC-ILI-0110 X1 is failed low.

Event 2 Steam Generator #1 Feedwater Flow Instrument FW-IFR-1111 Fails Low

1. On Lead Examiner's cue, initiate Event Trigger 2.
2. If Work Week Manager or I&C is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.

Event 3 CEA 52 Drops, Rapid Plant Power Reduction

1. On Lead Examiner's cue, initiate Event Trigger 3.
2. If called to remove Condensate Polishers from service, acknowledge communication and report that you will perform actions requested.
3. If Work Week Manager or I&C is called, inform the caller that a and a team will be sent to the CEDMCS Alley to investigate.

Event 4 LOCA Inside Containment

1. On Lead Examiner's cue, initiate Event Trigger 4.
2. If called as RCA watch report CS-125 A appears to be mechanically bound, the stem looks bent.
3. If called as RAB watch to check the Emergency Diesel Generators, initiate Trigger 10, EDG A & B Trouble alarms clear, report they are running satisfactorily.
4. If the Duty Plant Manager is called, inform the caller that he will make the necessary calls.

Event 5 Low Pressure Safety Injection Pump A fails to start

1. If called to check the LPSI Pump A breaker, report all indications are normal.
2. If called to check the LPSI Pump A locally, report all indications are normal.

Scenario 1 Rev 1

NRC Scenario 1 Event 6 Containment Spray Pump B Trips

1. After the crew has entered OP-902-002 and on the Lead Examiner's cue, initiate Event Trigger 7.
2. If called to check the Containment Spray Pump B breaker, report over-current flags are picked up on all 3 phases.
3. If called to check the Containment Spray Pump B, report that there are visible charring on the motor with an acrid smell, but no indications of a fire or smoke.
4. If called for TSC concurrence, report SM/EC has granted concurrence.
5. If called as RAB watch to come to the Control Room for over-ride key for CS-125 B, acknowledge communication. Report to the Control Room on lead examiners cue.
6. If crew does obtain key and over-rides CS-125 B closed, use remote CSR13B for the local key operation.

At the end of the scenario, before resetting, complete data collection by stopping recording and saving the file as 2011 SRO Scenario1.cdf. Save the file into the folder for the appropriate crew.

Scenario 1 Rev 1

NRC Scenario 1 Scenario Timeline:

Ramp Event Malfunction Severity Delay Trigger HH:MM:SS 1 RC15A2 0 N/A N/A 1 Pressurizer level instrument RC-ILI-0110 X fails low 2 FW26A 0 N/A N/A 2 Steam Generator #1 Feedwater flow instrument FW-IFR-1111 fails low 3 RD02A52 N/A N/A N/A 3 CEA 52 Drops into the core 4 RC23A 3.0 % 8:00 N/A 4 Loss of Coolant Accident 5 CV02A N/A N/A N/A 5 Charging Pump A fails to auto-start 6 SI02D N/A N/A N/A N/A Low Pressure Safety Injection Pump A fails to auto start 7 CS04A N/A N/A N/A N/A DI-08a04s22-1 CS-125 A Fails to open, will not open manually.

7 CS01B N/A N/A N/A 7 Containment Spray Pump B trip Scenario 1 Rev 1

NRC Scenario 1

REFERENCES:

Event Procedures 1 OP-901-110, Pressurizer Level Control Malfunction OP-903-013, Monthly Channel Checks Tech Spec 3.3.3.5 2 OP-901-201, Steam Generator Level Control Malfunction Tech Requirement Manual 3.3.5 3 OP-901-102, CEA or CEDMCS Malfunction OP-901-212, Rapid Plant Power Reduction OP-004-004, Control Element Drive Tech Spec 3.2.3, 3.1.3.1, 3.1.3.5 4 OP-902-000, Standard Post Trip Actions OP-902-009, Standard Appendices, Appendix 1, Diagnostic Flow Chart OP-902-002, Loss of Coolant Accident Recovery 5 OP-902-000, Standard Post Trip Actions OI-038-000, Emergency Operating Procedures Operations Expectations /

Guidance 6 OP-902-000, Standard Post Trip Actions OI-038-000, Emergency Operating Procedures Operations Expectations /

Guidance 7 OP-902-008, Safety Function Recovery Procedure OP-902-009, Standard Appendices, Appendix 28, Aligning LPSI to Replace CS Scenario 1 Rev 1

Appendix D Scenario Outline Form ES-D-1 Facility: WATERFORD 3 Scenario No.: 2 Op Test No.: NRC Examiners: Operators:

Initial Conditions:

  • Reactor power is 77%
  • Protected Train is B
  • AB Bus is aligned to Train B
  • Charging Pumps A & B are operating
  • Boron Equalization is in progress
  • Re-commence power ascension Event Malf. No. Event Type* Event No. Description N/A R - ATC Re-commence power ascension to 100%

1 N - BOP power N - SRO RX14A I - ATC Pressurizer pressure instrument RC-IPR-2 I - SRO 0100 X fails low, OP-901-120, Pressurizer Pressure Control Malfunction RC16B I - BOP RCP 1A speed instrument failure, Channel B, 3 I - SRO Core Protection Calculator B trip TS - SRO N/A TS - SRO Dry Cooling Tower Fan 8B failure 4

DI-07a8s06-1 I - BOP Inadvertent Containment Spray Actuation 5 DI-07a8s12-1 I - SRO OP-901-504, Inadvertent ESFAS Actuation MS11B M - All Main Steam line break inside Containment, 6 S/G #2, OP-902-004, Excess Steam Demand Recovery N/A C - BOP Initiate Containment Spray flow 7 C - SRO RP09E C - ATC Relay K301 failure, BAM-113 A and CVC-8 C - SRO 183 fail to position on Safety Injection

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Scenario 2 Rev 1

Scenario Event Description NRC Scenario 2 The crew assumes the shift at ~77% power with instructions to raise power to 100%.

After assuming the shift, the crew will commence raising power to 100%. The ATC operator will dilute to the Volume Control Tank and withdraw Group 6 CEAs. The BOP operator will adjust Main Turbine load to raise power.

When an adequate power ascension has occurred, Pressurizer pressure instrument RC-IPR-0100 X will fail low. Since Boron Equalization is in progress, the Main Spray valves will close. The SRO will enter OP-901-120, Pressurizer Pressure Control Malfunction, and select the non-faulted pressure channel.

After Channel Y has been selected for Pressurizer pressure control, Reactor Coolant Pump 1A speed sensor for Core Protection Calculator B will fail. CPC B will trip as a result of the failure. The SRO should enter Tech Spec 3.3.1 and have the BOP operator bypass bistables 3 and 4 on Channel B.

After the bypass operation is complete, the Outside Watch will call and report an oil failure on Dry Cooling Tower Fan 8B. The SRO should enter Tech Spec 3.7.4 action d.

His review of ambient temperature and Tech Spec 3.7.4 should conclude that Train B Ultimate Heat Sink remains operable and that Tech Spec 3.8.1.1 is being complied with.

After the Tech Spec review is complete, an inadvertent Containment Spray Actuation will occur. Component Cooling Water flow to the Reactor Coolant Pumps will be secured. The SRO should enter OP-901-504, Inadvertent ESFAS Actuation. The Containment Spray Pumps should be secured. If the Component Cooling Water Isolations to the Reactor Coolant Pumps are not restored within 3 minutes, the reactor should be tripped and the Reactor Coolant Pumps secured.

A Main Steam line break will develop on Steam Generator #2 after the preceding event.

If the crew restored CCW to the Reactor Coolant Pumps, the crew should perform a manual reactor trip due to the excess steam demand. If the crew tripped the reactor and secured Reactor Coolant Pumps on the previous event, then the Main Steam line break will ramp in after the reactor trip. Because the Containment Spray Pumps control switches maintain off, the BOP should re-start Containment Spray Pumps A and B after Containment pressure rises above 17.7 psia.

Relay K301 will not actuate and BAM-113 A will fail to open and CVC-183 will fail to close on the Safety Injection Actuation. The ATC operator should position these valves to ensure Emergency Boration. After Steam Generator #2 blows down, the crew will take action to maintain RCS temperature and pressure. The scenario can be terminated after these actions are complete.

Scenario 2 Rev 1

NRC Scenario 2 Critical Tasks

1. Trip any RCP not satisfying RCP operating limits.

This task is satisfied by securing all RCPs within 3 minutes of loss of CCW flow. The required task becomes applicable after Containment Spray has been actuated. The time requirement of 3 minutes is based on the RCP operating limit of 3 minutes without CCW cooling. If the crew does not restore CCW flow to the RCPs after the inadvertent CSAS, then the 3 minute criteria starts at the time of that CSAS. If the crew restores CCW flow to the RCPs following the inadvertent CSAS, then the 3 minute criteria starts after the Main Steam line break.

2. Establish Containment temperature and pressure control This task is satisfied by manually starting at least 1 Containment Spray Pump following the Main Steam line break. This should be completed before completing the review of OP-902-000, Standard Post Trip Actions.
3. Establish RCS temperature control This task is satisfied by taking action to stabilize RCS temperature within the limits of the RCS P/T curve using ADV #1 and establishing EFW flow to Steam Generator #1.

Action to address this task should commence within 10 minutes after the applicable parameters begin to rise.

4. Establish RCS pressure control This task is satisfied by taking action to stabilize RCS pressure within the limits of the RCS P/T curve and additionally maintain RCS pressure within 1500-1600 psid of the faulted steam generator. Action to address this task should commence within 10 minutes after the applicable parameters begin to rise.

Scenario Quantitative Attributes

1. Total malfunctions (5-8) 7
2. Malfunctions after EOP entry (1-2) 2
3. Abnormal events (2-4) 2
4. Major transients (1-2) 1
5. EOPs entered/requiring substantive actions (1-2) 1
6. EOP contingencies requiring substantive actions (0-2) 0
7. Critical tasks (2-3) 4 Scenario 2 Rev 1

NRC Scenario 2 Scenario Notes:

A. Reset Simulator to IC-192.

B. Verify the following Scenario Malfunctions:

1. eg10a for EDG A tagout
2. rx14-A for Pressurizer pressure instrument RC-IPT-0100 X
3. rc16b for RCP 1A speed
4. ms11b for Main Steam line break S/G #2
5. rp09e for Relay K301 C. Verify the following Overrides:
1. di-07a08s06-1 and di-07a08s12-1 for CSAS D. Ensure Protected Train B sign is placed in SM office window.

E. Verify the following Control Board Conditions:

1. Danger tag placed on EDG A control switch
2. Danger tag placed on EDG A Output Breaker F. Verify EOOS is 8.5 Yellow G. Complete the simulator setup checklist.

H. Start DCS, Record Data, select file PlantParameters.txt.

Scenario 2 Rev 1

NRC Scenario 2 Simulator Booth Instructions Event 1 Perform Power Ascension

1. No communications should occur for this evolution.

Event 2 Pressurizer Pressure Instrument Fails Low

1. On Lead Examiner's cue, initiate Event Trigger 2.
2. If Work Week Manager or I&C is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.

Event 3 RCP 1A Speed Instrument Failure

1. On Lead Examiner's cue, initiate Event Trigger 3.
2. If Work Week Manager or I&C is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.

Event 4 Dry Cooling Tower Fan 8B Fan Failure

1. On Lead Examiner's cue, call the CRS as the Outside Watch and report that Dry Cooling Tower Fan 8B has no oil in the reduction gear sightglass. There is oil on the ground under the fan. This discovery is made during rounds.
2. If Work Week Manager or PMM is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.

Event 5 Inadvertent CSAS

1. On Lead Examiner's cue, initiate Event Trigger 5.
2. No communications should occur for this evolution.

Event 6 Main Steam Line Break S/G #2

1. On the Lead Examiner's cue, or after the reactor is manually tripped in the previous event, initiate Event Trigger 6.
2. When called as the Outside Watch to check Main Steam Safeties not lifting, report that no safety valves are lifting.

At the end of the scenario, before resetting, complete data collection by stopping recording and saving the file as 2011 SRO Scenario 2.cdf. Save the file into the folder for the appropriate crew.

Scenario 2 Rev 1

NRC Scenario 2 Scenario Timeline:

Ramp Event Malfunction Severity Delay Trigger HH:MM:SS 1 N/A N/A N/A N/A N/A Power ascension 2 RX14A 0% N/A N/A 2 Pressurizer pressure RC-IPR-0100 X fails low 3 RC16B N/A N/A N/A 3 RCP 1A Speed failure, Channel B 4 N/A N/A N/A N/A N/A Dry Cooling Tower Fan 8B failure 5 Di-07a8a06-1 N/A N/A N/A 5 DI-07a8s12-1 Inadvertent Containment Spray 6 MS11B 10% 3:00 N/A 6 Main Steam line break, S/G #2 7 N/A N/A N/A N/A N/A Initiate Containment Spray flow 8 RP09E N/A N/A N/A N/A Relay K301 failure Scenario 2 Rev 1

NRC Scenario 2

REFERENCES:

Event Procedures 1 OP-010-003, Plant Startup OP-002-005, Chemical and Volume Control 2 OP-901-120, Pressurizer Pressure Control Malfunction 3 OP-009-007, Plant Protection System Tech Spec 3.3.1 4 Tech Spec 3.7.4 and 3.8.1.1 OP-100-014, Technical Specification and Technical Requirements Compliance 5 OP-901-504, Inadvertent ESFAS Actuation 6 OP-902-000, Standard Post Trip Actions OP-902-009, Standard Appendices, Appendix 1, Diagnostic Flow Chart OP-902-004, Excess Steam Demand Recovery 7 OP-902-000, Standard Post Trip Actions OI-038-000, Emergency Operating Procedures Operations Expectations /

Guidance 8 OP-902-000, Standard Post Trip Actions OI-038-000, Emergency Operating Procedures Operations Expectations /

Guidance Scenario 2 Rev 1

Appendix D Scenario Outline Form ES-D-1 Facility: WATERFORD 3 Scenario No.: 3 Op Test No.: NRC Examiners: Operators:

Initial Conditions:

  • Reactor power is 5.7 e -2 %
  • Protected Train is B
  • AB Bus is aligned to Train B Turnover:
  • Maintain power during Main Feedwater Pump preparations Event Malf. No. Event Type* Event No. Description Di-08a07s11-1 C - BOP Relay K402 fails, MS-401 B opens 1 C - SRO Emergency Feedwater Pump AB starts TS - SRO FW51A TS - SRO Condensate Storage Pool level instrument 2 EFW-ILI-9013 A fails low CV01B C - ATC Charging Pump B trips 3 C - SRO OP-901-112, Charging or Letdown TS - SRO Malfunction RC09A C - BOP Reactor Coolant Pump 1A middle seal failure 4 C - SRO OP-901-130, Reactor Coolant Pump Malfunction RC04A I - ATC RCP 1A shaft shear, automatic reactor trip 5 RP02 A-D I - SRO failure RP01A SG01B M - All Steam Generator #2 Tube Rupture 6 OP-902-007, Steam Generator Tube Rupture Recovery SI02A C - BOP High Pressure Safety Injection Pump A fails 7 C - SRO to auto-start RP08C C - ATC Relay K202 fails, CVC-401, CVC-109, IA-909, 8 C - BOP and FP-601 A fail to close C - SRO
  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Scenario 3 Rev 1

Scenario Event Description NRC Scenario 3 The crew assumes the shift at 5.7 e-2 % power with instructions to maintain power while Main Feedwater Pumps are prepared for starting. A lube oil problem common to both Main Feedwater Pumps has delayed their start by approximately 30 minutes.

After assuming the shift, relay K402 fails, opening MS-401 B and starting Emergency Feedwater Pump AB, the steam driven Emergency Feedwater pump. RCS TCOLD will drop and power will rise. The crew should detect the failure and override close MS-401 B. After MS-401 B is closed, Tech Specs 3.7.1.2 action a and 3.6.3 become applicable due to MS-401 B being inoperable.

After MS-401 B is closed and Tech Specs are addressed, Condensate Storage Pool level indicator EFW-ILI-9013 A will fail low. The SRO should use OP-903-013, Monthly channel Checks, and enter Tech Spec 3.3.3.5 and 3.3.3.6.

After Tech Specs are addressed, Charging Pump B will trip. The crew should start either Charging Pump A or AB and enter OP-901-112, Charging or Letdown Malfunction. Tech Spec 3.1.2.4 and TRM 3.1.2.4 are applicable due to the failure. If the crew aligns Charging Pump AB to replace Charging Pump B, Tech Spec 3.1.2.4 can be exited, but they should remain in TRM 3.1.2.4.

After Tech Specs are addressed, Reactor Coolant Pump 1A middle seal will fail, requiring entry into OP-901-130, Reactor Coolant Pump Malfunction. The crew should monitor for indications of multiple seal failure and reduce CCW temperature to control RCP 1A seal bleedoff temperature.

After actions have been taken to lower CCW temperature, RCP 1A will have a shaft shear. The reactor will fail to automatically trip. The ATC should detect this condition and trip the reactor. One of the two normal reactor trip pushbuttons will fail and only 2 reactor trip breakers will open. The ATC will be required to trip the reactor using the Diverse Reactor Trip pushbuttons.

A Steam Generator Tube Rupture will ramp in on the reactor trip for S/G #2. The crew should detect this situation during their Standard Post Trip Actions. This failure will require entry into OP-902-007, Steam Generator Tube Rupture Recovery. On the Safety Injection Actuation, High Pressure Safety Injection Pump A will fail to auto start, requiring a manual start. Additionally, relay K202 will fail, preventing CVC-401, CVC-109, IA-909, and FP-601 A from closing on the Containment Isolation signal. The ATC and BOP operators should close these valves.

The Steam Generator Tube Rupture will require a rapid RCS cooldown to less than 520 degrees THOT. After the RCS is < 520 degrees, Steam Generator #2 will be isolated.

The scenario can be terminated after Steam Generator #2 is isolated.

Scenario 3 Rev 1

NRC Scenario 3 Critical Tasks

1. Manually trip the Reactor.

This task is satisfied by manually tripping the reactor within 1 minute of the failure of the automatic trip. The required task becomes applicable after the annunciators are received associated with the RCP 1A sheared shaft.

2. Prevent Opening the Main Steam Safety Valves.

This task is satisfied by the crew taking action to maintain Steam Generator #2 pressure below the safety valve setpoint by taking action to reduce RCS pressure to < 945 psia.

3. Isolate Steam Generator #2.

This task is satisfied by isolating Steam Generator #2 in accordance with step 17 after RCS THOT is reduced below 520 °F.

Scenario Quantitative Attributes

1. Total malfunctions (5-8) 8
2. Malfunctions after EOP entry (1-2) 2
3. Abnormal events (2-4) 2
4. Major transients (1-2) 1
5. EOPs entered/requiring substantive actions (1-2) 1
6. EOP contingencies requiring substantive actions (0-2) 0
7. Critical tasks (2-3) 3 Scenario 3 Rev 1

NRC Scenario 3 Scenario Notes:

A. Reset Simulator to IC-193.

1. Use keys 165 - 168 for S/G high level bypass setup.

B. Verify the following Scenario Malfunctions:

1. fw51a for CSP level instrument
2. cv01b for Charging Pump B
3. rc09a for RCP 1A seal failure
4. rc04a for RCP 1A shaft shear
5. rp02 a-d for RPS auto trip failure
6. rp01a for CP-2 pushbutton failure
7. sg01b for S/G #2 tube rupture
8. si02a for High Pressure Safety Injection Pump
9. rp08c for K202 C. Ensure Protected Train B sign is placed in SM office window.

D. Verify EOOS is 10.0 Green E. Complete the simulator setup checklist.

F. Start DCS, Record Data, select file PlantParameters.txt.

Scenario 3 Rev 1

NRC Scenario 3 Simulator Booth Instructions Event 1 Relay K402 Failure, EFW Pump AB Starts

1. On the Lead Examiner's cue, initiate Event Trigger 1.
2. If directed to check EFW Pump AB, report it is running satisfactorily.
3. If Work Week Manager or I&C is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.

Event 2 Condensate Storage Pool Level instrument EFW-ILI-9013 A Fails Low

1. On Lead Examiner's cue, initiate Event Trigger 2.
2. If called to check the indication at the Remote Shutdown Panel, report that Condensate Storage Pool Level instrument EFW-ILI-9013 A is reading 0%.
3. If Work Week Manager or I&C is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.

Event 3 Charging Pump B Trip

1. On Lead Examiner's cue, initiate Event Trigger 3.
2. If called to check the Charging Pump that was started, report that it is running satisfactorily.
3. If called to check the Charging Pump B, report that the overcurrent relays are picked up on all 3 phases and that the motor has a strong, odor.
4. If Work Week Manager or PMM is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.

Event 4 RCP 1A Middle Seal Failure

1. On the Lead Examiner's cue, initiate Event Trigger 4.
2. If called as the RCP Engineer, report that you will monitor the status of RCP 1A.
3. If Work Week Manager is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.

Event 5 RCP 1A Shaft Shear

1. On Lead Examiner's cue, initiate Event Trigger 5.

Event 6 Steam Generator #2 Tube Rupture

1. Verify SGTR begins ramping in after the reactor trip. If not, initiate Event Trigger 6.
2. Acknowledge calls to Chemistry and/or Health Physics to carry out requested actions.

Scenario 3 Rev 1

NRC Scenario 3 Event 7 High Pressure Safety Injection Pump A

1. No communications should occur for this malfunction.

Event 8 Relay K202 Failure

2. No communications should occur for this malfunction.

At the end of the scenario, before resetting, complete data collection by stopping recording and saving the file as 2011 SRO Scenario3.cdf. Save the file into the folder for the appropriate crew.

Scenario 3 Rev 1

NRC Scenario 3 Scenario Timeline:

Ramp Event Malfunction Severity Delay Trigger HH:MM:SS 1 DI-08a07s11-1 N/A N/A N/A 1 Relay K402 failure 2 FW51A 0% N/A N/A 2 CSP Level indication fails low 3 CV01B N/A N/A N/A 3 Charging Pump B trip 4 RC09A 100% N/A N/A 4 RCP 1A middle seal failure 5 RC04A N/A N/A N/A 5 RP02 A-D RP01A RCP 1A sheared shaft, auto trip failure 6 SG01B 10% 3:00 N/A 6 Steam Generator #2 Tube Rupture 7 SI02A N/A N/A N/A N/A High Pressure Safety Injection Pump A fails to auto start 8 RP08C N/A N/A N/A N/A Relay K202 fails to actuate Scenario 3 Rev 1

NRC Scenario 3

REFERENCES:

Event Procedures 1 Tech Spec 3.7.1.2.

2 OP-903-013, Monthly Channel Checks Tech Spec 3.3.3.5 and 3.3.3.6 3 OP-002-005, Chemical and Volume Control Tech Spec 3.2.1.4 4 OP-901-130, Reactor Coolant Pump Malfunction 5 OP-902-000, Standard Post Trip Actions OI-038-000, Emergency Operating Procedures Operations Expectations /

Guidance 6 OP-902-009, Standard Appendices, Appendix 1, Diagnostic Flow Chart OP-902-007, Steam Generator Tube Rupture Recovery 7 OI-038-000, Emergency Operating Procedures Operations Expectations /

Guidance 8 OI-038-000, Emergency Operating Procedures Operations Expectations /

Guidance Scenario 3 Rev 1

Appendix D Scenario Outline Form ES-D-1 Facility: WATERFORD 3 Scenario No.: 4 Op Test No.: NRC Examiners: Operators:

Initial Conditions:

  • Reactor power is 100%
  • Protected Train is B
  • AB Bus is aligned to Train A Turnover:
  • Maintain 100% power Event Malf. No. Event Type* Event No. Description SG10D C - BOP Steam Generator #1 level instrument SG-ILI-1 C - SRO 1113 D fails high.

TS - SRO TP01A C - BOP Turbine Cooling Water Pump A trips, Turbine 2 TP08B C - SRO Cooling Water Pump B fails to auto start OP-901-512, Loss of Turbine Cooling Water FW03A C - ATC Main Feedwater Pump A trips, Reactor 3 C - SRO Power Cutback TS - SRO OP-901-101, Reactor Power Cutback RD07D R - ATC Regulating Group 4 CEAs fail to insert in 4 automatic following Reactor Power Cutback FW03B M - All Main Feedwater Pump B trips, manual 5 FW07A N - SRO reactor trip, Emergency Feedwater Pump A fails to run RP03 C - BOP Main Turbine fails to trip following the reactor 6 C - SRO trip RD11A C - ATC 3 CEAs fail to insert following the reactor trip, 7 28, 37, 79 C - SRO Emergency Boration FW05 C - BOP Emergency Feedwater Pump AB trip on 8 C - ATC overspeed C - SRO

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Scenario 4 Rev 1

Scenario Event Description NRC Scenario 4 The crew assumes the shift at 100% power with instructions to maintain 100% power.

After assuming the shift, Steam Generator #1 level instrument SG-ILI-1113 D fails high.

The SRO should review Tech Specs and enter Tech Spec 3.3.1 and 3.3.2 and TRM 3.3.1. The SRO should direct the BOP operator to bypass the bistables for low Steam Generator #1 level, high level and Steam Generator #1 differential pressure for channel D. This instrument does apply to Tech Spec 3.3.3.6 for Accident Monitoring, but the minimum channel requirements are met using other channels.

After the proper bistables are bypassed, Turbine Cooling Water Pump A trips. Turbine Cooling Water Pump B fails to start. The SRO should enter OP-901-512, Loss of Turbine Cooling Water, and start Turbine Cooling Water Pump B. The Plant Monitoring Computer will display an overload condition for TCW Pump A.

After Turbine Cooling Water Pump B is running, Main Feedwater Pump A will trip. A Reactor Power Cutback will occur. The ATC should perform the immediate operator actions. The SRO should enter OP-901-101, Reactor Power Cutback. Following the Cutback, Regulating Group 4 CEAs will fail to insert in automatic. The SRO should enter Tech Spec 3.2.4 for DNBR and 3.2.7 for ASI. The crew should take action to address the DNBR power operating limit within 15 minutes by performing ASI control with Group P CEAs.

After the crew has addressed Tech Specs and commenced ASI control with Group P CEAs, Main Feedwater Pump B will trip. The crew should perform a manual reactor trip based on this failure. On the Emergency Feedwater Actuation, Emergency Feedwater Pump A will fail to start and will not start manually. The Main Turbine will fail to trip on the reactor trip. The BOP should manually trip the Main Turbine. 3 CEAs will fail to insert on the reactor trip. The ATC operator should perform Emergency Boration due to this condition. The SRO should enter OP-902-006, Loss of Main Feedwater Recovery.

The ATC operator should secure 2 Reactor Coolant Pumps.

After 2 Reactor Coolant Pumps are secured, Emergency Feedwater Pump AB will trip due to operator error locally. The crew should remain in OP-902-006 and secure the remaining Reactor Coolant Pumps. On investigation, the local watchstander will report Emergency Feedwater Pump AB is ready to be reset. The BOP operator should perform the necessary actions for resetting Emergency Feedwater Pump AB.

The scenario can be terminated after Emergency Feedwater Pump AB is reset.

Scenario 4 Rev 1

NRC Scenario 4 Critical Tasks

1. Establish reactivity control.

This task is satisfied by establishing Emergency Boration prior to completing Standard Post Trip Actions Reactivity Control verification. The required task becomes applicable after the Reactor is tripped and 3 CEAs remain stuck out.

2. Establish a primary to secondary heat sink This task is satisfied by securing all RCPs after Emergency Feedwater Pump AB trips. With Emergency Feedwater Pump A off, Emergency Feedwater Pump B does not have the capacity to provide necessary Emergency Feedwater flow.

Scenario Quantitative Attributes

1. Total malfunctions (5-8) 8
2. Malfunctions after EOP entry (1-2) 3
3. Abnormal events (2-4) 2
4. Major transients (1-2) 1
5. EOPs entered/requiring substantive actions (1-2) 1
6. EOP contingencies requiring substantive actions (0-2) 0
7. Critical tasks (2-3) 2 Scenario 4 Rev 1

NRC Scenario 4 Scenario Notes:

A. Reset Simulator to IC-194.

B. Verify the following Scenario Malfunctions:

1. sg10d for S/G #1 level instrument
2. tp01a for TCW Pump A
3. tp08b for TCW Pump B
4. fw03a for Main Feedwater Pump A
5. rd07d for Regulating Group 4 CEAs
6. fw03b for Main Feedwater Pump B
7. fw07a for EFW Pump A
8. rp03 for the Main Turbine failure
9. rd11a28, 37, and 79 for CEAs 28, 37, and 79
10. fw05 for EFW Pump AB C. Verify the following Override:
1. di-08a04s09-1 for EFW Pump A D. Ensure Protected Train B sign is placed in SM office window.

E. Verify EOOS is 10.0 Green F. Complete the simulator setup checklist.

G. Start DCS, Record Data, select file PlantParameters.txt.

Scenario 4 Rev 1

NRC Scenario 4 Simulator Booth Instructions Event 1 Steam Generator #1 level instrument failure

1. On the Lead Examiner's cue, initiate Event Trigger 1.
2. If directed to check the remote shutdown panel, report that Channel D S/G #1 level reads 67%.
3. If Work Week Manager or I&C is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.

Event 2 Turbine Cooling Water Pump A trip

1. On the Lead Examiner's cue, initiate Event Trigger 2.
2. If directed to check Turbine Cooling Water Pumps locally, report TCW Pump A has overcurrent flags tripped and that TCW Pump B looks normal.
3. If Work Week Manager is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.

Event 3 Main Feedwater Pump A trip, Reactor Power Cutback

1. On the Lead Examiner's cue, initiate Event Trigger 3.
2. If directed to check Main Feedwater Pump A locally, report there are no abnormal indications locally.

Event 5 MFW Pump B trip, Reactor trip, Emergency Feedwater Pump A trip

1. On the Lead Examiner's cue, initiate Event Trigger 5.
2. If directed to check Main Feedwater Pump B locally, report indications of broken linkages on the governor assembly.
3. If directed to check EFW Pump A locally, report indications of a broken breaker for EFW Pump A at Switchgear 3A.

Event 8 Emergency Feedwater Pump AB trip

1. On the Lead Examiner's cue, initiate Event Trigger 8.
2. After the remaining Reactor Coolant Pumps are tripped, call as the RCA watch and report that the Emergency Feedwater Pump AB tripped on overspeed due to his activities while checking the pump. Recommend performing actions to reset EFW Pump AB.

At the end of the scenario, before resetting, complete data collection by stopping recording and saving the file as 2011 SRO Scenario 4.cdf. Save the file into the folder for the appropriate crew.

Scenario 4 Rev 1

NRC Scenario 4 Scenario Timeline:

Ramp Event Malfunction Severity Delay Trigger HH:MM:SS 1 SG10D 100% N/A N/A 1 S/G #1 level instrument channel D fails high 2 TP01A N/A N/A N/A 2 TP08B TCW Pump A trips, TCW Pump B fails to auto-start 3 FW03A N/A N/A N/A 3 MFW Pump A trips 4 RD07D N/A N/A N/A N/A Regulating Group 4 fails to auto insert 5 FW03B N/A N/A N/A 5 FW07A DI-08a04s09-1 MFW Pump B trips, EFW Pump A fails to run 6 RP03 N/A N/A N/A N/A Main Turbine fails to trip on reactor trip 7 RD11A N/A N/A N/A N/A 28, 37, 79 CEAs 28, 37, 79 fail to insert 8 FW05 N/A N/A N/A 8 EFW Pump AB trips Scenario 4 Rev 1

NRC Scenario 4

REFERENCES:

Event Procedures 1 OP-009-007, Plant Protection System OP-903-013, Monthly Channel Checks Tech Spec 3.3.1 and 3.3.2 2 OP-901-512, Loss of Turbine Cooling Water 3&4 OP-901-101, Reactor Power Cutback Tech Spec 3.2.1 5 OP-902-000, Standard Post Trip Actions OP-902-009, Standard Appendices, Appendix 1, Diagnostic Flow Chart OP-902-006, Loss of Main Feedwater Recovery 6 OP-902-000, Standard Post Trip Actions OI-038-000, Emergency Operating Procedures Operations Expectations /

Guidance 7 OP-902-000, Standard Post Trip Actions OI-038-000, Emergency Operating Procedures Operations Expectations /

Guidance 8 OP-902-006, Loss of Main Feedwater Recovery Scenario 4 Rev 1

ES-301 Administrative Topics Outline Form ES-301-1 Facility: WATERFORD 3 Date of Examination: March 21, 2011 Examination Level: RO Operating Test Number: 1 Administrative Topic Type Describe activity to be performed (see Note) Code*

2.1.23, Ability to perform specific system and A1 S, D integrated plant procedures during all modes of plant operation.

Conduct of Operations Perform a Shutdown Margin with an immoveable CEA in accordance with OP-903-090, Shutdown Margin, K/A Importance: section 7.3, Shutdown Margin Verification -

4.3 Untrippable CEA.

A2 R, M 2.1.18, Ability to make accurate, clear, and concise Conduct of Operations logs, records, status boards, and reports.

Perform OP-903-001, Technical Specification K/A Importance: Surveillance Logs, Attachment 11.18, Adjustment of 3.6 CPC and Excore Nuclear Instrumentation Data.

A3 R, N 2.2.12, Knowledge of surveillance procedures Equipment Control Complete surveillance OP-903-013, Monthly Channel Checks, Attachment 10.3 for Accident Monitoring K/A Importance: Instrumentation Channel Checks.

3.7 A4 R, N 2.3.4, Knowledge of radiation exposure limits under Radiation Control normal and emergency conditions.

Calculate stay time to perform a tagout verification.

K/A Importance: Room dose rate & operators yearly dose provided.

3.2 Emergency Plan Not selected NOTE: All items (5 total are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

Revision 0 RO