{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 20, 2011  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 20, 2011 Mr. Tom E. Tynan Vice President Southern Nuclear Operating Company, Inc.
 
Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830
Mr. Tom E. Tynan Vice President Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830  


==SUBJECT:==
==SUBJECT:==
REQUALIFICATION PROGRAM INSPECTION - VOGTLE NUCLEAR PLANT
REQUALIFICATION PROGRAM INSPECTION - VOGTLE NUCLEAR PLANT


==Dear Mr. Tynan:==
==Dear Mr. Tynan:==


In a telephone conversation on Sept 16, 2011, Mr. Mark Bates, Senior Operations Engineer, and Mr. John Acree, Operations Requalification Supervisor, made arrangements for the NRC to inspect the licensed operator requalification program at the Vogtle Nuclear Plant. The inspection is planned for the week of October 24, 2011, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that you have committed to maintain your plant-referenced simulator in accordance with ANSI/ANS-3.5-1985, "American National Standard for Nuclear Power Plant Simulators for Use in Operator Training and Examination."
In a telephone conversation on Sept 16, 2011, Mr. Mark Bates, Senior Operations Engineer, and Mr. John Acree, Operations Requalification Supervisor, made arrangements for the NRC to inspect the licensed operator requalification program at the Vogtle Nuclear Plant. The inspection is planned for the week of October 24, 2011, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that you have committed to maintain your plant-referenced simulator in accordance with ANSI/ANS-3.5-1985, American National Standard for Nuclear Power Plant Simulators for Use in Operator Training and Examination.
 
In accordance with 10 CFR 55.59, the NRC has requested that you either submit by October 17, 2011, or make ready upon arrival, the material as specified in the Enclosure, in order to support the NRC's inspection program needs. Mr. Acree has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
In accordance with 10 CFR 55.59, the NRC has requested that you either submit by October 17, 2011, or make ready upon arrival, the material as specified in the Enclosure, in order to support the NRC's inspection program needs. Mr. Acree has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.  
 
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on February 28, 2013.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on February 28, 2013.
The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.  
The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
 
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.
SNC 2  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.  (The Public Electronic Reading Room).


Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Bates at (404) 997-4612 (Internet E-mail: Mark.Bates@nrc.gov), or me at (404) 997-4550, (Internet E-mail: Malcolm.Widmann@nrc.gov).
SNC                                          2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).
Sincerely,       /RA: G. Laska for/
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Bates at (404) 997-4612 (Internet E-mail: Mark.Bates@nrc.gov),
Malcolm T. Widmann, Chief Operations Branch 1 Division of Reactor Safety Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81  
or me at (404) 997-4550, (Internet E-mail: Malcolm.Widmann@nrc.gov).
Sincerely,
                                              /RA: G. Laska for/
Malcolm T. Widmann, Chief Operations Branch 1 Division of Reactor Safety Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81


==Enclosure:==
==Enclosure:==
Materials Request List cc w/encl.: (See page 3)  
Materials Request List cc w/encl.: (See page 3)


_ML112650670_______________ x G SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRP     SIGNATURE RA RA RA     NAME MBATES MWIDMANN JHICKEY     DATE 9/20/2011 9/20/2011 9/20/2011     E-MAIL COPY?    YES NO       YES NO       YES NO       YES NO       YES NO       YES NO       YES NO SNC 3  cc w/encl: S. Kuczynski Chairman, President and CEO Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
_ML112650670_______________             xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE           RII:DRS       RII:DRS       RII:DRP SIGNATURE         RA             RA           RA NAME             MBATES         MWIDMANN     JHICKEY DATE                 9/20/2011     9/20/2011     9/20/2011 E-MAIL COPY?       YES     NO   YES     NO   YES     NO     YES   NO     YES     NO     YES   NO     YES   NO


Jeffrey T. Gasser Chief Nuclear Officer Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
SNC                                      3 cc w/encl:                                B. D. McKinney, Jr.
S. Kuczynski                              Regulatory Response Manager Chairman, President and CEO                Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution T. D. Honeycutt Jeffrey T. Gasser                         Regulatory Response Supervisor Chief Nuclear Officer                     Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution L. P. Hill N. J. Stringfellow                        Licensing Supervisor Licensing Manager                          Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution R. L. Gladney Paula Marino                              Licensing Engineer Vice President                            Southern Nuclear Operating Company, Inc.
Engineering                                Electronic Mail Distribution Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution              L. L. Crumpton Administrative Assistant, Sr.
L. Mike Stinson                            Southern Nuclear Operating Company, Inc.
Vice President                            Electronic Mail Distribution Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc. Hickox, T. Mark Electronic Mail Distribution              Vogtle Electric Generating Plant Electronic Mail Distribution Dennis R. Madison Vice President                            S. C. Swanson Edwin I. Hatch Nuclear Plant              Site Support Manager Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant Electronic Mail Distribution              Electronic Mail Distribution J. L. Pemberton                            Senior Resident Inspector SVP & General Counsel-Ops & SNC            U.S. Nuclear Regulatory Commission Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant Electronic Mail Distribution              U.S. NRC 7821 River Road T. E. Tynan                                Waynesboro, GA 30830 Site Vice President Vogtle Electric Generating Plant          Bob Masse Southern Nuclear Operating Company, Inc. Resident Manager Electronic Mail Distribution              Vogtle Electric Generating Plant Oglethorpe Power Corporation M. J. Ajluni                              Electronic Mail Distribution Nuclear Licensing Director Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution (cc w/encl contd - See page 4)


N. J. Stringfellow Licensing Manager Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Paula Marino Vice President Engineering Southern Nuclear Operating Company, Inc. Electronic Mail Distribution L. Mike Stinson Vice President Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
SNC                                    4 (cc w/encl contd)                        James A. Capp Arthur H. Domby, Esq.                    Program Coordination Branch Chief Troutman Sanders                          Environmental Protection Division Electronic Mail Distribution              Georgia Department of Natural Resources Electronic Mail Distribution Sandra Threatt, Manager Nuclear Response and Emergency            James C. Hardeman Environmental Surveillance                Environmental Radiation Program Manager Bureau of Land and Waste Management      Environmental Protection Division Department of Health and Environmental    Georgia Department of Natural Resources Control                                  Electronic Mail Distribution Electronic Mail Distribution Al Frazier Division of Radiological Health          Emergency Response and Radiation TN Dept. of Environment & Conservation    Program Manager 401 Church Street                        Environmental Protection Division Nashville, TN 37243-1532                  Georgia Department of Natural Resources Electronic Mail Distribution Richard Haynes Director, Division of Waste Management    Mr. Steven M. Jackson Bureau of Land and Waste Management      Senior Engineer - Power Supply S.C. Department of Health and            Municipal Electric Authority of Georgia Environmental Control                    Electronic Mail Distribution 2600 Bull Street Columbia, SC 29201                        Reece McAlister Executive Secretary Lee Foley                                Georgia Public Service Commission Manager of Contracts Generation          Electronic Mail Distribution Oglethorpe Power Corporation Electronic Mail Distribution             Office of the Attorney General 40 Capitol Square, SW Mark Williams                            Atlanta, GA 30334 Commissioner Georgia Department of Natural Resources  Office of the County Commissioner Electronic Mail Distribution              Burke County Commission Electronic Mail Distribution F. Allen Barnes Director                                  Director Environmental Protection Division        Consumers' Utility Counsel Division Georgia Department of Natural Resources  Governor's Office of Consumer Affairs Electronic Mail Distribution             2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Cynthia A. Sanders                        Atlanta, GA 30334-4600 Radioactive Materials Program Manager Environmental Protection Division        Amy Whaley Georgia Department of Natural Resources  Engineer Electronic Mail Distribution              Nuclear Generation Development and Construction Electronic Mail Distribution (cc w/encl contd - See page 5)


Dennis R. Madison Vice President Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
SNC                                    5 (cc w/encl contd)
Southern Nuclear Operating Company Inc.
ATTN: Mr. Richard D. Brigdon Plant Training and Emergency Preparedness Manager Vogtle Electric Generating Plant 7821 River Road Bin 63030 Waynesboro, GA 30830-2965


J. L. Pemberton SVP & General Counsel-Ops & SNC Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
SNC                                       6 Letter to Tom E. Tynan, from Malcolm T. Widmann dated September 20, 2011.
 
T. E. Tynan Site Vice President Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
 
M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
 
B. D. McKinney, Jr. Regulatory Response Manager Southern Nuclear Operating Company, Inc. Electronic Mail Distribution T. D. Honeycutt Regulatory Response Supervisor Southern Nuclear Operating Company, Inc. Electronic Mail Distribution L. P. Hill Licensing Supervisor Southern Nuclear Operating Company, Inc. Electronic Mail Distribution R. L. Gladney Licensing Engineer Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution L. L. Crumpton Administrative Assistant, Sr. Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Hickox, T. Mark Vogtle Electric Generating Plant Electronic Mail Distribution
 
S. C. Swanson Site Support Manager Vogtle Electric Generating Plant Electronic Mail Distribution
 
Senior Resident Inspector U.S. Nuclear Regulatory Commission Vogtle Electric Generating Plant U.S. NRC 7821 River Road Waynesboro, GA  30830 Bob Masse Resident Manager Vogtle Electric Generating Plant Oglethorpe Power Corporation Electronic Mail Distribution (cc w/encl cont'd - See page 4)
 
SNC 4  (cc w/encl cont'd) Arthur H. Domby, Esq. Troutman Sanders Electronic Mail Distribution Sandra Threatt, Manager Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management Department of Health and Environmental  Control Electronic Mail Distribution Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street Nashville, TN  37243-1532
 
Richard Haynes Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control 2600 Bull Street Columbia, SC  29201 Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution Mark Williams Commissioner Georgia Department of Natural Resources Electronic Mail Distribution F. Allen Barnes Director Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution
 
James A. Capp Program Coordination Branch Chief Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution
 
James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution
 
Al Frazier Emergency Response and Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution
 
Mr. Steven M. Jackson Senior Engineer - Power  Supply Municipal Electric Authority of Georgia Electronic Mail Distribution
 
Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution
 
Office of the Attorney General 40 Capitol Square, SW Atlanta, GA  30334
 
Office of the County Commissioner Burke County Commission Electronic Mail Distribution Director Consumers' Utility Counsel Division Governor's Office of Consumer Affairs 2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Atlanta, GA  30334-4600 Amy Whaley Engineer Nuclear Generation Development and Construction Electronic Mail Distribution (cc w/encl cont'd - See page 5)
SNC 5  (cc w/encl cont'd) Southern Nuclear Operating Company Inc. ATTN:  Mr. Richard D. Brigdon  Plant Training and  Emergency Preparedness Manager Vogtle Electric Generating Plant 7821 River Road Bin 63030 Waynesboro, GA  30830-2965
 
SNC 6   Letter to Tom E. Tynan, from Malcolm T. Widmann dated September 20, 2011.  


==SUBJECT:==
==SUBJECT:==
REQUALIFICATION PROGRAM INSPECTION - VOGTLE NUCLEAR PLANT Distribution w/encl:
REQUALIFICATION PROGRAM INSPECTION - VOGTLE NUCLEAR PLANT Distribution w/encl:
RIDSNRRDIRS PUBLIC R. Martin, NRR (PM - Vogtle) RidsNrrPMVogtle Resource
RIDSNRRDIRS PUBLIC R. Martin, NRR (PM - Vogtle)
RidsNrrPMVogtle Resource


Enclosure Materials Request List The items listed below are being requested per telephone conversation on September 16, 2011 to support the upcoming IP-71111.11B inspection in October 2011 at Vogtle. Items in paragraph "A" are to be sent prior to the inspection. They must be received in our office by October 17, 2011. Please have the items listed in paragraph "B" ready for our review upon arrival on October 24, 2011.
Materials Request List The items listed below are being requested per telephone conversation on September 16, 2011 to support the upcoming IP-71111.11B inspection in October 2011 at Vogtle. Items in paragraph "A" are to be sent prior to the inspection. They must be received in our office by October 17, 2011. Please have the items listed in paragraph "B" ready for our review upon arrival on October 24, 2011.
A. In-office inspection material:
A.     In-office inspection material:
: 1. Complete list of all licensed individuals (active and inactive; RO and SRO), including license restrictions
: 1. Complete list of all licensed individuals (active and inactive; RO and SRO), including license restrictions
: 2. Copy of an organizational chart for the operations and training departments including the simulator group
: 2. Copy of an organizational chart for the operations and training departments including the simulator group
: 3. Copy of the weekly schedules for the weeks that the 2011 annual operating exams will be administered, including a list of personnel scheduled for testing the week of 10/24/11 4. A copy of the written exams (all weeks) that were administered for the last biennial requalification exam, including all biennial re-take exams
: 3. Copy of the weekly schedules for the weeks that the 2011 annual operating exams will be administered, including a list of personnel scheduled for testing the week of 10/24/11
: 4. A copy of the written exams (all weeks) that were administered for the last biennial requalification exam, including all biennial re-take exams
: 5. Copies of the simulator scenarios and JPMs (simulator and in-plant) that have already been administered and that will be administered the week of 10/24/11 (exam security related item)
: 5. Copies of the simulator scenarios and JPMs (simulator and in-plant) that have already been administered and that will be administered the week of 10/24/11 (exam security related item)
: 6. Self assessment reports, condition reports, and LERs resulting from human performance errors since the last requalification inspection
: 6. Self assessment reports, condition reports, and LERs resulting from human performance errors since the last requalification inspection
: 7. A copy of the governing site procedure(s) for the conduct of license operator requalification training (classroom and simulator) and exam development/administration
: 7. A copy of the governing site procedure(s) for the conduct of license operator requalification training (classroom and simulator) and exam development/administration
: 8. A copy of the governing site procedure(s) for the simulator fidelity which includes all the testing requirements used to fulfill ANSI/ANS B3.5-1985 requirements B. On-site inspection material:
: 8. A copy of the governing site procedure(s) for the simulator fidelity which includes all the testing requirements used to fulfill ANSI/ANSB3.5-1985 requirements B.     On-site inspection material:
: 1. Requalification training attendance records for the current two year requalification training cycle
: 1. Requalification training attendance records for the current two year requalification training cycle
: 2. Exam results since last requalification inspection (weekly operating & written exams), copies of exams that had pass/failure rates significantly outside the average
: 2. Exam results since last requalification inspection (weekly operating & written exams),
copies of exams that had pass/failure rates significantly outside the average
: 3. Simulator scenarios and JPMs (in-plant and simulator) that have been or will be administered for this requalification exam (exam security related item)
: 3. Simulator scenarios and JPMs (in-plant and simulator) that have been or will be administered for this requalification exam (exam security related item)
: 4. All training feedback forms since the last requalification inspection 2 Enclosure 5. All remedial training packages since the last requalification inspection
: 4. All training feedback forms since the last requalification inspection Enclosure
 
2
: 5. All remedial training packages since the last requalification inspection
: 6. A list of all personnel that reactivated their licenses since the last requalification inspection
: 6. A list of all personnel that reactivated their licenses since the last requalification inspection
: 7. Security badge and HP printouts for all personnel that reactivated their licenses since the last requalification inspection (Records shall support verification of time on shift under instruction and complete plant tours for both the reactivating operator and the supervising active license for the time on shift as well as the plant tour.)
: 7. Security badge and HP printouts for all personnel that reactivated their licenses since the last requalification inspection (Records shall support verification of time on shift under instruction and complete plant tours for both the reactivating operator and the supervising active license for the time on shift as well as the plant tour.)
Line 107: Line 89:
: 10. Copies of the reference list for all administrative procedures which direct the training process, including development of training and test materials, remedial training, modifications, plant and industry experience
: 10. Copies of the reference list for all administrative procedures which direct the training process, including development of training and test materials, remedial training, modifications, plant and industry experience
: 11. Simulator:
: 11. Simulator:
List of all open simulator discrepancies (DR
List of all open simulator discrepancies (DR=s)
=s) Copy of the Simulator Management and Configuration Procedures List of all closed simulator DR
Copy of the Simulator Management and Configuration Procedures List of all closed simulator DR=s for last 12 months List of Simulator Performance tests Simulator Testing Documentation
=s for last 12 months List of Simulator Performance tests  
 
Simulator Testing Documentation
: 12. Security procedures for the simulator
: 12. Security procedures for the simulator
: 13. Program evaluation for the previous 2 years training cycle}}
: 13. Program evaluation for the previous 2 years training cycle Enclosure}}

Revision as of 14:16, 12 November 2019

Requalification Program Inspection - Vogtle Nuclear Plant
ML112650670
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/20/2011
From: Widmann M
Division of Reactor Safety II
To: Tynan T
Southern Nuclear Operating Co
References
Download: ML112650670 (9)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 20, 2011 Mr. Tom E. Tynan Vice President Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - VOGTLE NUCLEAR PLANT

Dear Mr. Tynan:

In a telephone conversation on Sept 16, 2011, Mr. Mark Bates, Senior Operations Engineer, and Mr. John Acree, Operations Requalification Supervisor, made arrangements for the NRC to inspect the licensed operator requalification program at the Vogtle Nuclear Plant. The inspection is planned for the week of October 24, 2011, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that you have committed to maintain your plant-referenced simulator in accordance with ANSI/ANS-3.5-1985, American National Standard for Nuclear Power Plant Simulators for Use in Operator Training and Examination.

In accordance with 10 CFR 55.59, the NRC has requested that you either submit by October 17, 2011, or make ready upon arrival, the material as specified in the Enclosure, in order to support the NRC's inspection program needs. Mr. Acree has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on February 28, 2013.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.

SNC 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Bates at (404) 997-4612 (Internet E-mail: Mark.Bates@nrc.gov),

or me at (404) 997-4550, (Internet E-mail: Malcolm.Widmann@nrc.gov).

Sincerely,

/RA: G. Laska for/

Malcolm T. Widmann, Chief Operations Branch 1 Division of Reactor Safety Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81

Enclosure:

Materials Request List cc w/encl.: (See page 3)

_ML112650670_______________ xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRP SIGNATURE RA RA RA NAME MBATES MWIDMANN JHICKEY DATE 9/20/2011 9/20/2011 9/20/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

SNC 3 cc w/encl: B. D. McKinney, Jr.

S. Kuczynski Regulatory Response Manager Chairman, President and CEO Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution T. D. Honeycutt Jeffrey T. Gasser Regulatory Response Supervisor Chief Nuclear Officer Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution L. P. Hill N. J. Stringfellow Licensing Supervisor Licensing Manager Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution R. L. Gladney Paula Marino Licensing Engineer Vice President Southern Nuclear Operating Company, Inc.

Engineering Electronic Mail Distribution Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution L. L. Crumpton Administrative Assistant, Sr.

L. Mike Stinson Southern Nuclear Operating Company, Inc.

Vice President Electronic Mail Distribution Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc. Hickox, T. Mark Electronic Mail Distribution Vogtle Electric Generating Plant Electronic Mail Distribution Dennis R. Madison Vice President S. C. Swanson Edwin I. Hatch Nuclear Plant Site Support Manager Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant Electronic Mail Distribution Electronic Mail Distribution J. L. Pemberton Senior Resident Inspector SVP & General Counsel-Ops & SNC U.S. Nuclear Regulatory Commission Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant Electronic Mail Distribution U.S. NRC 7821 River Road T. E. Tynan Waynesboro, GA 30830 Site Vice President Vogtle Electric Generating Plant Bob Masse Southern Nuclear Operating Company, Inc. Resident Manager Electronic Mail Distribution Vogtle Electric Generating Plant Oglethorpe Power Corporation M. J. Ajluni Electronic Mail Distribution Nuclear Licensing Director Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution (cc w/encl contd - See page 4)

SNC 4 (cc w/encl contd) James A. Capp Arthur H. Domby, Esq. Program Coordination Branch Chief Troutman Sanders Environmental Protection Division Electronic Mail Distribution Georgia Department of Natural Resources Electronic Mail Distribution Sandra Threatt, Manager Nuclear Response and Emergency James C. Hardeman Environmental Surveillance Environmental Radiation Program Manager Bureau of Land and Waste Management Environmental Protection Division Department of Health and Environmental Georgia Department of Natural Resources Control Electronic Mail Distribution Electronic Mail Distribution Al Frazier Division of Radiological Health Emergency Response and Radiation TN Dept. of Environment & Conservation Program Manager 401 Church Street Environmental Protection Division Nashville, TN 37243-1532 Georgia Department of Natural Resources Electronic Mail Distribution Richard Haynes Director, Division of Waste Management Mr. Steven M. Jackson Bureau of Land and Waste Management Senior Engineer - Power Supply S.C. Department of Health and Municipal Electric Authority of Georgia Environmental Control Electronic Mail Distribution 2600 Bull Street Columbia, SC 29201 Reece McAlister Executive Secretary Lee Foley Georgia Public Service Commission Manager of Contracts Generation Electronic Mail Distribution Oglethorpe Power Corporation Electronic Mail Distribution Office of the Attorney General 40 Capitol Square, SW Mark Williams Atlanta, GA 30334 Commissioner Georgia Department of Natural Resources Office of the County Commissioner Electronic Mail Distribution Burke County Commission Electronic Mail Distribution F. Allen Barnes Director Director Environmental Protection Division Consumers' Utility Counsel Division Georgia Department of Natural Resources Governor's Office of Consumer Affairs Electronic Mail Distribution 2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Cynthia A. Sanders Atlanta, GA 30334-4600 Radioactive Materials Program Manager Environmental Protection Division Amy Whaley Georgia Department of Natural Resources Engineer Electronic Mail Distribution Nuclear Generation Development and Construction Electronic Mail Distribution (cc w/encl contd - See page 5)

SNC 5 (cc w/encl contd)

Southern Nuclear Operating Company Inc.

ATTN: Mr. Richard D. Brigdon Plant Training and Emergency Preparedness Manager Vogtle Electric Generating Plant 7821 River Road Bin 63030 Waynesboro, GA 30830-2965

SNC 6 Letter to Tom E. Tynan, from Malcolm T. Widmann dated September 20, 2011.

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - VOGTLE NUCLEAR PLANT Distribution w/encl:

RIDSNRRDIRS PUBLIC R. Martin, NRR (PM - Vogtle)

RidsNrrPMVogtle Resource

Materials Request List The items listed below are being requested per telephone conversation on September 16, 2011 to support the upcoming IP-71111.11B inspection in October 2011 at Vogtle. Items in paragraph "A" are to be sent prior to the inspection. They must be received in our office by October 17, 2011. Please have the items listed in paragraph "B" ready for our review upon arrival on October 24, 2011.

A. In-office inspection material:

1. Complete list of all licensed individuals (active and inactive; RO and SRO), including license restrictions
2. Copy of an organizational chart for the operations and training departments including the simulator group
3. Copy of the weekly schedules for the weeks that the 2011 annual operating exams will be administered, including a list of personnel scheduled for testing the week of 10/24/11
4. A copy of the written exams (all weeks) that were administered for the last biennial requalification exam, including all biennial re-take exams
5. Copies of the simulator scenarios and JPMs (simulator and in-plant) that have already been administered and that will be administered the week of 10/24/11 (exam security related item)
6. Self assessment reports, condition reports, and LERs resulting from human performance errors since the last requalification inspection
7. A copy of the governing site procedure(s) for the conduct of license operator requalification training (classroom and simulator) and exam development/administration
8. A copy of the governing site procedure(s) for the simulator fidelity which includes all the testing requirements used to fulfill ANSI/ANSB3.5-1985 requirements B. On-site inspection material:
1. Requalification training attendance records for the current two year requalification training cycle
2. Exam results since last requalification inspection (weekly operating & written exams),

copies of exams that had pass/failure rates significantly outside the average

3. Simulator scenarios and JPMs (in-plant and simulator) that have been or will be administered for this requalification exam (exam security related item)
4. All training feedback forms since the last requalification inspection Enclosure

2

5. All remedial training packages since the last requalification inspection
6. A list of all personnel that reactivated their licenses since the last requalification inspection
7. Security badge and HP printouts for all personnel that reactivated their licenses since the last requalification inspection (Records shall support verification of time on shift under instruction and complete plant tours for both the reactivating operator and the supervising active license for the time on shift as well as the plant tour.)
8. Records for maintenance of active licenses - time on shift 56/60 hrs/qtr since the last requalification inspection
9. All medical exam records
10. Copies of the reference list for all administrative procedures which direct the training process, including development of training and test materials, remedial training, modifications, plant and industry experience
11. Simulator:

List of all open simulator discrepancies (DR=s)

Copy of the Simulator Management and Configuration Procedures List of all closed simulator DR=s for last 12 months List of Simulator Performance tests Simulator Testing Documentation

12. Security procedures for the simulator
13. Program evaluation for the previous 2 years training cycle Enclosure