{{#Wiki_filter:OFFICIAL USE ONLY  
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
- SECURITY RELATED INFORMATION
                                                  UNITED STATES
  UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257
                                      NUCLEAR REGULATORY COMMISSION
  Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this  
                                                      REGION II
                                    245 PEACHTREE CENTER AVENUE NE, SUITE 1200
                                            ATLANTA, GEORGIA 30303-1257
                                                February 27, 2013
      Mr. T. Preston Gillespie, Jr.
      Site Vice President
      Duke Energy Corporation
      Oconee Nuclear Station
      7800 Rochester Highway
      Seneca, SC 29672-0752
      SUBJECT:        OCONEE NUCLEAR STATION - NOTIFICATION OF CYBER SECURITY TI
                      MILESTONES 1-7 INSPECTION AND REQUEST FOR INFORMATION (NRC
                      INSPECTION REPORT NO. 05000269/2013406 AND 05000270/2013406 AND
                      05000287/2013406)
      The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
      Region II (RII) staff will conduct an inspection of the Cyber Security Milestones 1-7 requirements
      specified by the conditions of your operating license at the Oconee Nuclear Station on May 20 -
      24, 2013. The inspection team will be led by Mr. Jigar Patel, Reactor Inspector, of the NRC RII
      office. The team will be composed of personnel from the NRC RII office and personnel from the
      NRC office of Nuclear Security and Incident Response (NSIR). The inspection will be
      conducted in accordance with Temporary Instruction (TI) 2201/004, Inspection of
      Implementation of Interim Cyber Security Milestones 1-7. The TI inspection will be performed
      to evaluate and verify your ability to meet the interim milestone requirements of the NRCs
      Cyber Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73, Section 54,
      Protection of Digital Computer and Communication Systems and Networks.
      In accordance with 10 CFR 73.54, each nuclear power plant licensee was required to submit
      a proposed cyber security plan (CSP) and implementation schedule for NRC review and
      approval. On December 14, 2009, by letter (ML093080517) to the Nuclear Energy Institute
      (NEI), the NRC provided their expectations for the proposed implementation schedule. On
      January 5, 2011, by letter (ML110060093) to the NRC, NEI issued an initial Template for the
      Cyber Security Plan Implementation Schedule (ML110060097). On February 28, 2011, by
      letter (ML110600206) to the NRC, NEI provided a revised, Template for the Cyber Security
      Plan Implementation Schedule. The purpose of the letters attachment was to provide the
      licensee with a generically written template to develop their proposed CSP implementation
      schedule. Utilization of the generic template required the licensee to make conforming changes
      to ensure the submitted schedule accurately accounted for site-specific activities. The CSP,
      implementation schedule, and other applicable information for your facility provided the
Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this
transmittal document is decontrolled
transmittal document is decontrolled
 
LIMITED INTERNAL
LIMITED INTERNAL
DISTRIBUTION PERMITTED
DISTRIBUTION PERMITTED
  OFFICIAL USE ONLY  
                  OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
- SECURITY-RELATED INFORMATION
  February 27, 2013
Mr. T. Preston Gillespie, Jr.
Site Vice President
Duke Energy Corporation
Oconee Nuclear Station


7800 Rochester Highway
                  OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
Seneca, SC  29672-0752
T. Preston Gillespie, Jr.                       2
  SUBJECT:  OCONEE NUCLEAR STATION - NOTIFICATION OF CYBER SECURITY TI MILESTONES 1-7  INSPECTION AND REQUEST FOR INFORMATION (NRC
implementation aspects, including the key intermediate milestone attributes and dates as well
INSPECTION REPORT NO. 05000269/2013406 AND 05000270/2013406 AND
as the full implementation dates. The implementation aspects were described based, in part, on
05000287/2013406)
letters to the NRC dated November 20, 2009 (ML093410249), August 16, 2010
(ML1023001680, ML1023001681) and supplemented by letters dated September 27, 2010,
March 7, 2011, April 15, 2011 (ML111090627), and August 9, 2011 (ML11109A0741). By
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
reference to letter dated August 31, 2011 (ML11216A064), license condition 3.E was modified
Region II (RII) staff will conduct an inspection of the Cyber Security Milestones 1-7 requirements specified by the conditions of your operating license at the Oconee Nuclear Station on May 20 - 24, 2013.  The inspection team will be led by Mr. Jigar Patel, Reactor Inspector, of the NRC RII office.  The team will be composed of personnel from the NRC RII office and personnel from the
for facility operating licenses DPR-38, DPR-47, and DPR-55 for Oconee Units 1, 2, and 3 to
NRC office of Nuclear Security and Incident Response (NSIR).  The inspection will be
ensure that the CSP would be implemented and maintained consistent with NRC requirements.
conducted in accordance with Temporary Instruction (TI) 2201/004, "Inspection of
On February 21, 2013, during a conversation between Ms. Judy Smith of your staff, and
Implementation of Interim Cyber Security Milestones 1-7."  The TI inspection will be performed
Mr. Jigar Patel, NRC RII, our respective staffs confirmed arrangements for a three day
to evaluate and verify your ability to meet the interim milestone requirements of the NRC's Cyber Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73, Section 54, "Protection of Digital Computer and Communication Systems and Networks." In accordance with 10 CFR 73.54, each nuclear power plant licensee was required to submit a proposed cyber security plan (CSP) and implementation schedule for NRC review and approval.  On December 14, 2009, by letter (ML093080517) to the Nuclear Energy Institute
information gathering onsite visit and a one-week onsite inspection. The subject TI inspection
(NEI), the NRC provided their expectations for the proposed implementation schedule.  On
provides a programmatic level review and verification of the licensees site-specific
January 5, 2011, by letter (ML110060093) to the NRC, NEI issued an initial "Template for the
implementation of Interim Milestones 1 through 7. The schedule for the onsite TI Inspection for
Cyber Security Plan Implementation Schedule" (ML110060097).  On February 28, 2011, by
the Interim Milestones 1 through 7 is as follows:
letter (ML110600206) to the NRC, NEI provided a revised, "Template for the Cyber Security Plan Implementation Schedule."  The purpose of the letter's attachment was to provide the
    *  Information gathering visit: May 7 - 9, 2013
licensee with a generically written templat
    *  Onsite inspection: May 20 - 24, 2013
e to develop their proposed CSP implementation schedule.  Utilization of the generic template required the licensee to make conforming changes to ensure the submitted schedule accurately accounted for site-specific activities.  The CSP,
The purpose of the information gathering visit is to: (1) obtain information and documentation
implementation schedule, and other applicable information for your facility provided the 
needed to support the TI inspection; (2) become familiar with the Oconee Nuclear Station Cyber
OFFICIAL USE ONLY  
Security Program and plant layout; and (3) arrange administrative details, such as office space,
- SECURITY RELATED INFORMATION
availability of knowledgeable office personnel and to ensure unescorted site access privileges.
T. Preston Gillespie, Jr. 2  
In order to assure a productive TI inspection, we have enclosed a request for documents
OFFICIAL USE ONLY
needed to ensure the inspectors are adequately prepared. These documents have been
- SECURITY RELATED INFORMATION
divided into three groups (I, II, & III). Group I lists information necessary to aid the inspectors in
  implementation aspects, including the key intermediate milestone attributes and dates as well as the full implementation dates. The implementation aspects were described based, in part, on  
planning for the TI inspection prior to the information gathering visit. It is requested that this
letters to the NRC dated November 20, 2009 (ML093410249), August 16, 2010  
information be provided to the lead inspector via mail no later than April 10, 2013. Group II lists
(ML1023001680, ML1023001681) and supplemented by letters dated September 27, 2010, March 7, 2011, April 15, 2011 (ML111090627), and August 9, 2011 (ML11109A0741). By  
information and possible areas for discussion necessary to assist the inspectors during the
reference to letter dated August 31, 2011 (ML11216A064), license condition 3.E was modified for facility operating licenses DPR-38, DPR-47, and DPR-55 for Oconee Units 1, 2, and 3 to ensure that the CSP would be implemented and maintained consistent with NRC requirements.  
TI inspection. It is requested this information be available during the information gathering visit
 
(May 7, 2013). Group III consists of those items that the inspectors will review, or need access
On February 21, 2013, during a conversation between Ms. Judy Smith of your staff, and
to, during the TI inspection. Group III also lists the information necessary to aid the inspectors
Mr. Jigar Patel, NRC RII, our respective staffs confirmed arrangements for a three day information gathering onsite visit and a one-week onsite inspection. The subject TI inspection provides a programmatic level review and verification of the licensee's site-specific  
in tracking questions and answers identified as a result of the TI inspection. It is requested that
implementation of Interim Milestones 1 through 7. The schedule for the onsite TI Inspection for  
this information be provided to the lead inspector as the information is generated during the
the Interim Milestones 1 through 7 is as follows:
TI inspection. It is important that all of these documents are up to date and complete in order to
minimize the number of additional documents requested during the preparation and/or the
onsite portions of the TI inspection.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
Your cooperation and support during this inspection will be appreciated. If you have questions
concerning this inspection, or the inspection team's information or logistical needs, please
contact Mr. Patel at (404) 997-4577, or me at (404) 997-4511.
                  OFFICIAL USE ONLY - SECURITY RELATED INFORMATION


* Information gathering visit:  May 7 - 9, 2013 
                  OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
* Onsite inspection:  May 20 - 24, 2013
T. Preston Gillespie, Jr.                      3
The purpose of the information gathering visit is to: (1) obtain information and documentation needed to support the TI inspection; (2) become familiar with the Oconee Nuclear Station Cyber
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
Security Program and plant layout; and (3) arrange administrative details, such as office space, availability of knowledgeable office personnel and to ensure unescorted site access privileges.  
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC's document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room). However, because of the security-related concerns
contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters
enclosure will not be available for public inspection.
                                                Sincerely,
                                                /RA/
                                                Michael F. King, Chief
                                                Engineering Branch 2
                                                Division of Reactor Safety
Docket No.: 50-269, 50-270, 50-287
License No.: DPR-38, DPR-47, DPR-55
Enclosure:
Document Request For Cyber Security Temporary
Instruction (TI) 2201/004 Interim Milestones 1-7 Inspection
(OFFICIAL USE ONLY)
cc: (See page 4)
                  OFFICIAL USE ONLY - SECURITY RELATED INFORMATION


In order to assure a productive TI inspection, we have enclosed a request for documents
needed to ensure the inspectors are adequately prepared.  These documents have been divided into three groups (I, II, & III).  Group I lists information necessary to aid the inspectors in planning for the TI inspection prior to the information gathering visit.  It is requested that this
information be provided to the lead inspector via mail no later than April 10, 2013.  Group II lists
information and possible areas for discussion necessary to assist the inspectors during the
TI inspection.  It is requested this information be available during the information gathering visit (May 7, 2013).  Group III consists of those items that the inspectors will review, or need access to, during the TI inspection.  Group III also lists the information necessary to aid the inspectors
in tracking questions and answers identified as a result of the TI inspection.  It is requested that
this information be provided to the lead inspector as the information is generated during the
TI inspection.  It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the TI inspection.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection
requirements were approved by the Office
of Management and Budget, control number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number. 
Your cooperation and support during this inspection will be appreciated.  If you have questions concerning this inspection, or the inspection team's information or logistical needs, please
contact Mr. Patel at (404) 997-4577, or me at (404) 997-4511. 
OFFICIAL USE ONLY
- SECURITY RELATED INFORMATION
T. Preston Gillespie, Jr. 3
OFFICIAL USE ONLY
- SECURITY RELATED INFORMATION
  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component
of NRC's document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).  However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. 
Sincerely, 
      /RA/  Michael F. King, Chief
Engineering Branch 2
Division of Reactor Safety 
Docket No.:  50-269, 50-270, 50-287 License No.:  DPR-38, DPR-47, DPR-55
Enclosure: Document Request For Cyber Security Temporary
Instruction
(TI) 2201/004 Interim Milestones 1-7 Inspection
  (OFFICIAL USE ONLY)
  cc:  (See page 4) 


_________________________ x
_________________________               xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED
G SUNSI REVIEW COMPLETE  
OFFICE             RII:DRS       RII:DRS       RII:DRS
G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS     SIGNATURE     *RA RA RA     NAME PATEL FANNER KING     DATE 2/25/2013 2/25/2013 2/27/2013     E-MAIL COPY?    YES NO       YES NO       YES NO       YES NO       YES NO       YES NO       YES NO    
SIGNATURE           *RA         RA           RA
OFFICIAL USE ONLY  
NAME               PATEL         FANNER       KING
- SECURITY RELATED INFORMATION
DATE                   2/25/2013     2/25/2013     2/27/2013
T. Preston Gillespie, Jr. 4  
E-MAIL COPY?         YES     NO   YES     NO   YES     NO     YES   NO     YES     NO   YES   NO     YES   NO
OFFICIAL USE ONLY
       
- SECURITY RELATED INFORMATION
                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
  cc: Robert H. Guy  
T. Preston Gillespie, Jr.             4
Organizational Effectiveness Manager  
cc:                                         David G. Black
Oconee Nuclear Station  
Robert H. Guy                               Fleet Security Manager
Duke Energy Corporation  
Organizational Effectiveness Manager       General Office
Oconee Nuclear Station                      Duke Energy Corporation
Duke Energy Corporation                    P. O. Box 1006
7800 Rochester Highway                      526 S. Church Street
Seneca, SC 29672                            Charlotte, NC 28201-1006
Terry L. Patterson                          Timothy J. Wadsworth
Safety Assurance Manager                    Security Specialist
Duke Energy Corporation                    General Office
Oconee Nuclear Station                      Duke Energy Corporation
7800 Rochester Highway                      P. O. Box 1006
Seneca, SC 29672                            526 S. Church St., EC05P
                                            Charlotte, NC 28201-1006
Kent Alter
Regulatory Compliance Manager              David A. Cummings
Oconee Nuclear Station                      Associate General Counsel
Duke Energy Corporation                    General Office
ON03RC                                      Duke Energy Corporation
7800 Rochester Highway                      P.O. Box 1006
Seneca, SC 29672                            526 S. Church St., EC07H
                                            Charlotte, NC 28201-1006
Terry W. King
Security Manager
Oconee Nuclear Station
Duke Energy Corporation
7800 Rochester Highway
Seneca, SC 29672
Daniel C. Durham
Security Safeguards Administrator
Oconee Nuclear Station
Duke Energy Corporation
7800 Rochester Highway
Seneca, SC 29672
M. Christopher Nolan
Director - Regulatory Affairs
General Office
Duke Energy Corporation
P. O. Box 1006
526 S. Church Street
Charlotte, NC 28201-1006
                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION


7800 Rochester Highway
                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
Seneca, SC  29672
Letter to T. Preston Gillespie, Jr. from Michael F. King dated February 27, 2013.
SUBJECT:       OCONEE NUCLEAR STATION - NOTIFICATION OF CYBER SECURITY TI
Terry L. Patterson
                MILESTONES 1-7 INSPECTION AND REQUEST FOR INFORMATION (NRC
 
                INSPECTION REPORT NO. 05000269/2013406 AND 05000270/2013406 AND
Safety Assurance Manager
                05000287/2013406)
Duke Energy Corporation Oconee Nuclear Station
7800 Rochester Highway
 
Seneca, SC  29672
 
Kent Alter
Regulatory Compliance Manager Oconee Nuclear Station
Duke Energy Corporation
ON03RC
7800 Rochester Highway
 
Seneca, SC  29672
Terry W. King
Security Manager
Oconee Nuclear Station
Duke Energy Corporation
7800 Rochester Highway
Seneca, SC  29672
 
Daniel C. Durham
 
Security Safeguards Administrator
Oconee Nuclear Station Duke Energy Corporation
7800 Rochester Highway
 
Seneca, SC  29672
 
M. Christopher Nolan
Director - Regulatory Affairs
General Office
Duke Energy Corporation
P. O. Box 1006
 
526 S. Church Street
 
Charlotte, NC  28201-1006
 
  David G. Black Fleet Security Manager
 
General Office
Duke Energy Corporation
P. O. Box 1006
 
526 S. Church Street
Charlotte, NC  28201-1006
Timothy J. Wadsworth
Security Specialist
 
General Office Duke Energy Corporation P. O. Box 1006
 
526 S. Church St., EC05P
 
Charlotte, NC  28201-1006
 
David A. Cummings Associate General Counsel
 
General Office
Duke Energy Corporation
P.O. Box 1006
 
526 S. Church St., EC07H
Charlotte, NC  28201-1006
 
OFFICIAL USE ONLY  
- SECURITY RELATED INFORMATION
    OFFICIAL USE ONLY
- SECURITY RELATED INFORMATION
  Letter to T. Preston Gillespie, Jr. from Michael F. King dated February 27, 2013.  
SUBJECT: OCONEE NUCLEAR STATION - NOTIFICATION OF CYBER SECURITY TI MILESTONES 1-7 INSPECTION AND REQUEST FOR INFORMATION (NRC  
INSPECTION REPORT NO. 05000269/2013406 AND 05000270/2013406 AND  
05000287/2013406)  
Distribution:
Distribution:
RidsNrrPMOconee Resource
RidsNrrPMOconee Resource
B. Westreich, NSIR (hard copy w/ encl) RIDSNRRDIRS  
B. Westreich, NSIR (hard copy w/ encl)
RIDSNRRDIRS
Distribution w/encl:
Distribution w/encl:
PUBLIC
PUBLIC
                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
}}
}}

Revision as of 21:43, 4 November 2019

IR 05000269-13-406, 05000270-13-406 and 05000287-13-406, on May 20-24, 2013, Oconee Nuclear Station - Notification of Cyber Security Milestones 1-7 Inspection and Request for Information
ML13058A319
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/27/2013
From: Mark King
NRC/RGN-II/DRS/EB2
To: Gillespie T
Duke Energy Corp
References
IR-13-406
Download: ML13058A319 (6)


See also: IR 05000269/2013406

Text

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

February 27, 2013

Mr. T. Preston Gillespie, Jr.

Site Vice President

Duke Energy Corporation

Oconee Nuclear Station

7800 Rochester Highway

Seneca, SC 29672-0752

SUBJECT: OCONEE NUCLEAR STATION - NOTIFICATION OF CYBER SECURITY TI

MILESTONES 1-7 INSPECTION AND REQUEST FOR INFORMATION (NRC

INSPECTION REPORT NO. 05000269/2013406 AND 05000270/2013406 AND

05000287/2013406)

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II (RII) staff will conduct an inspection of the Cyber Security Milestones 1-7 requirements

specified by the conditions of your operating license at the Oconee Nuclear Station on May 20 -

24, 2013. The inspection team will be led by Mr. Jigar Patel, Reactor Inspector, of the NRC RII

office. The team will be composed of personnel from the NRC RII office and personnel from the

NRC office of Nuclear Security and Incident Response (NSIR). The inspection will be

conducted in accordance with Temporary Instruction (TI) 2201/004, Inspection of

Implementation of Interim Cyber Security Milestones 1-7. The TI inspection will be performed

to evaluate and verify your ability to meet the interim milestone requirements of the NRCs

Cyber Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73, Section 54,

Protection of Digital Computer and Communication Systems and Networks.

In accordance with 10 CFR 73.54, each nuclear power plant licensee was required to submit

a proposed cyber security plan (CSP) and implementation schedule for NRC review and

approval. On December 14, 2009, by letter (ML093080517) to the Nuclear Energy Institute

(NEI), the NRC provided their expectations for the proposed implementation schedule. On

January 5, 2011, by letter (ML110060093) to the NRC, NEI issued an initial Template for the

Cyber Security Plan Implementation Schedule (ML110060097). On February 28, 2011, by

letter (ML110600206) to the NRC, NEI provided a revised, Template for the Cyber Security

Plan Implementation Schedule. The purpose of the letters attachment was to provide the

licensee with a generically written template to develop their proposed CSP implementation

schedule. Utilization of the generic template required the licensee to make conforming changes

to ensure the submitted schedule accurately accounted for site-specific activities. The CSP,

implementation schedule, and other applicable information for your facility provided the

Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this

transmittal document is decontrolled

LIMITED INTERNAL

DISTRIBUTION PERMITTED

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

T. Preston Gillespie, Jr. 2

implementation aspects, including the key intermediate milestone attributes and dates as well

as the full implementation dates. The implementation aspects were described based, in part, on

letters to the NRC dated November 20, 2009 (ML093410249), August 16, 2010

(ML1023001680, ML1023001681) and supplemented by letters dated September 27, 2010,

March 7, 2011, April 15, 2011 (ML111090627), and August 9, 2011 (ML11109A0741). By

reference to letter dated August 31, 2011 (ML11216A064), license condition 3.E was modified

for facility operating licenses DPR-38, DPR-47, and DPR-55 for Oconee Units 1, 2, and 3 to

ensure that the CSP would be implemented and maintained consistent with NRC requirements.

On February 21, 2013, during a conversation between Ms. Judy Smith of your staff, and

Mr. Jigar Patel, NRC RII, our respective staffs confirmed arrangements for a three day

information gathering onsite visit and a one-week onsite inspection. The subject TI inspection

provides a programmatic level review and verification of the licensees site-specific

implementation of Interim Milestones 1 through 7. The schedule for the onsite TI Inspection for

the Interim Milestones 1 through 7 is as follows:

  • Information gathering visit: May 7 - 9, 2013
  • Onsite inspection: May 20 - 24, 2013

The purpose of the information gathering visit is to: (1) obtain information and documentation

needed to support the TI inspection; (2) become familiar with the Oconee Nuclear Station Cyber

Security Program and plant layout; and (3) arrange administrative details, such as office space,

availability of knowledgeable office personnel and to ensure unescorted site access privileges.

In order to assure a productive TI inspection, we have enclosed a request for documents

needed to ensure the inspectors are adequately prepared. These documents have been

divided into three groups (I, II, & III). Group I lists information necessary to aid the inspectors in

planning for the TI inspection prior to the information gathering visit. It is requested that this

information be provided to the lead inspector via mail no later than April 10, 2013. Group II lists

information and possible areas for discussion necessary to assist the inspectors during the

TI inspection. It is requested this information be available during the information gathering visit

(May 7, 2013). Group III consists of those items that the inspectors will review, or need access

to, during the TI inspection. Group III also lists the information necessary to aid the inspectors

in tracking questions and answers identified as a result of the TI inspection. It is requested that

this information be provided to the lead inspector as the information is generated during the

TI inspection. It is important that all of these documents are up to date and complete in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the TI inspection.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact Mr. Patel at (404) 997-4577, or me at (404) 997-4511.

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

T. Preston Gillespie, Jr. 3

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room). However, because of the security-related concerns

contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters

enclosure will not be available for public inspection.

Sincerely,

/RA/

Michael F. King, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No.: 50-269, 50-270, 50-287

License No.: DPR-38, DPR-47, DPR-55

Enclosure:

Document Request For Cyber Security Temporary

Instruction (TI) 2201/004 Interim Milestones 1-7 Inspection

(OFFICIAL USE ONLY)

cc: (See page 4)

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

_________________________ xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS RII:DRS

SIGNATURE *RA RA RA

NAME PATEL FANNER KING

DATE 2/25/2013 2/25/2013 2/27/2013

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

T. Preston Gillespie, Jr. 4

cc: David G. Black

Robert H. Guy Fleet Security Manager

Organizational Effectiveness Manager General Office

Oconee Nuclear Station Duke Energy Corporation

Duke Energy Corporation P. O. Box 1006

7800 Rochester Highway 526 S. Church Street

Seneca, SC 29672 Charlotte, NC 28201-1006

Terry L. Patterson Timothy J. Wadsworth

Safety Assurance Manager Security Specialist

Duke Energy Corporation General Office

Oconee Nuclear Station Duke Energy Corporation

7800 Rochester Highway P. O. Box 1006

Seneca, SC 29672 526 S. Church St., EC05P

Charlotte, NC 28201-1006

Kent Alter

Regulatory Compliance Manager David A. Cummings

Oconee Nuclear Station Associate General Counsel

Duke Energy Corporation General Office

ON03RC Duke Energy Corporation

7800 Rochester Highway P.O. Box 1006

Seneca, SC 29672 526 S. Church St., EC07H

Charlotte, NC 28201-1006

Terry W. King

Security Manager

Oconee Nuclear Station

Duke Energy Corporation

7800 Rochester Highway

Seneca, SC 29672

Daniel C. Durham

Security Safeguards Administrator

Oconee Nuclear Station

Duke Energy Corporation

7800 Rochester Highway

Seneca, SC 29672

M. Christopher Nolan

Director - Regulatory Affairs

General Office

Duke Energy Corporation

P. O. Box 1006

526 S. Church Street

Charlotte, NC 28201-1006

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

Letter to T. Preston Gillespie, Jr. from Michael F. King dated February 27, 2013.

SUBJECT: OCONEE NUCLEAR STATION - NOTIFICATION OF CYBER SECURITY TI

MILESTONES 1-7 INSPECTION AND REQUEST FOR INFORMATION (NRC

INSPECTION REPORT NO. 05000269/2013406 AND 05000270/2013406 AND

05000287/2013406)

Distribution:

RidsNrrPMOconee Resource

B. Westreich, NSIR (hard copy w/ encl)

RIDSNRRDIRS

Distribution w/encl:

PUBLIC

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION