{{#Wiki_filter:From: Chawla, Mahesh Sent: Wednesday, April 10, 2013 5:08 PM To: Alan I Hassoun Cc: Hardgrove, Matthew; Parks, Benjamin; Grover, Ravinder; Widrevitz, Dan
...AR%20-%20MF0446%20-%20To%20Relocate%20Pressure%20and%20Temperature%20Curves%20to%20a%20PTLR%20.htm
[4/11/2013 12:21:11 PM]
From:
Chawla, Mahesh Sent:
Wednesday, April 10, 2013 5:08 PM To:
Alan I Hassoun Cc:
Hardgrove, Matthew; Parks, Benjamin; Grover, Ravinder; Widrevitz, Dan


==Subject:==
==Subject:==
 
Request for Additional Information - Fermi 2 - LAR - MF0446 - To Relocate Pressure and Temperature Curves to a PTLR Sam, I am retransmitting the following message since the numbering of notes in the previous message was not correct:
Request for Additional Information - Fermi 2 - LAR - MF0446 - To Relocate Pressure andTemperature Curves to a PTLR Sam,
By letter dated December 21, 2012 (ADAMS Accession No. ML13004A134), Detroit Edison Co. submitted a license amendment request for Fermi 2 for proposed LAR to relocate Pressure and Temperature Curves to a PTLR. The NRC staff has identified the following additional information which you need to provide in order for them to complete the review. Please arrange a teleconference with the NRC staff to discuss the subject information:
 
: 1. Use of Integrated Surveillance Program Data Page 2 of Enclosure 1 to the December 21, 2012, license amendment request states, The latest information from the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Integrated Surveillance Program (ISP) that is applicable to Fermi 2 has been utilized.
I am retransmitting the following message since the numbering of notes in the previous message was not correct:
Please provide additional information:
 
* Provide specific reference details for the latest information, to which the above statement refers. If it is not available to the NRC, please submit it.
By letter dated December 21, 2012 (ADAMS Accession No. ML13004A134), Detroit Edison Co. submitted a license amendment request for Fermi 2 for proposed LAR to relocate Pressure and Temperature Curves to a PTLR.
* Explain how this information is applicable to Fermi 2.
TheNRC staff has identified the following additional information which you need to provide in order for them to complete the review.
* Explain how the information has been utilized.
Please arrange a teleconference with the NRC staff to discuss the subject information:
: 2. Assumptions Used in Fluence Calculations The information in the following table summarizes significant assumptions regarding the flux over discrete exposure periods, and is developed using data on Page 2 of Enclosure 1 to the December 21, 2012, license amendment request:
: 1. Use of Integrated Surveillance Program Data
Object                  Exposure Period    Power Level        Operating Assumption P/T Curve                12.04 EFPY [1]     3430               CLTP [2]
 
P/T Curve                19.96 EFPY         3952               EPU[3]
Page 2 of Enclosure 1 to the December 21, 2012, license amendment request states, "The latest information fromthe Boiling Water Reactor Vessel and Internals Project (BWRVIP) Integrated Surveillance Program (ISP) that isapplicable to Fermi 2 has been utilized."
WLI[4] Nozzle            3.228 EFPY         3293               OLTP [5]
 
WLI Nozzle              16.35 EFPY         3430               CLTP WLI Nozzle               10.59               3486               MUR [6]
Please provide additional information:         Provide specific reference details for the latest information, to which the above statement refers.
: 1. Explain whether, for any of the above exposure periods, reactor vessel neutron fluence was calculated using any methods other than the referenced General Electric-Hitachi analytic methods described in NEDC-32983P-A.
If it is notavailable to the NRC, please submit it.         Explain how this information is applicable to Fermi 2.         Explain how the information has been utilized.
: 2. For the above exposure periods, explain whether a generalized core flux source was assumed, or whether cycle-specific flux distributions were assumed.
: 2. Assumptions Used in Fluence Calculations
: 3. A measurement uncertainty recapture (MUR) uprate relies largely on analyses that are unaffected by the increase in power level, because the assumed power level includes an uncertainty that bounds both pre-and post-MUR core powers. Explain how the MUR assumptions in the fluence analysis differ from the CLTP assumptions, and whether the uncertainty analysis for the reactor vessel neutron fluence is affected by these assumptions.
 
The information in the following table summarizes significant assumptions regarding the flux over discrete exposureperiods, and is developed using data on Page 2 of Enclosure 1 to the December 21, 2012, license amendment request:
ObjectExposure PeriodPower LevelOperating AssumptionP/T Curve12.04 EFPY
[1]3430 CLTP[2]P/T Curve19.96 EFPY 3952 EPU[3]WLI[4] Nozzle3.228 EFPY 3293 OLTP[5]WLI Nozzle16.35 EFPY 3430 CLTPWLI Nozzle 10.59 3486 MUR[6] 1. Explain whether, for any of the above exposure periods, reactor vessel neutron fluence was calculated usingany methods other than the referenced General Electric-Hitachi analytic methods described in NEDC-32983P-A.2. For the above exposure periods, explain whether a generalized core flux source was assumed, or whethercycle-specific flux distributions were assumed.
: 3. A measurement uncertainty recapture (MUR) uprate relies largely on analyses that are unaffected by theincrease in power level, because the assumed power level includes an uncertainty that bounds both pre-and post-MUR core powers.
Explain how the MUR assumptions in the fluence analysis differ from theCLTP assumptions, and whether the uncertainty analysis for the reactor vessel neutron fluence is affectedby these assumptions.
____________________________
____________________________
[1]
[1]
file:///Cl/
file:///Cl/...AR%20-%20MF0446%20-%20To%20Relocate%20Pressure%20and%20Temperature%20Curves%20to%20a%20PTLR%20.htm[4/11/2013 12:21:11 PM]
...AR%20-%20MF0446%20-%20To%20Relocate%20Pressure%20and%20Temperature%20Curves%20to%20a%20PTLR%20.htm
 
[4/11/2013 12:21:11 PM] Effective full-power years 2 Current licensed thermal power 3 Extended power uprate 4 Water level instrument 5 Original licensed thermal power 6Measurement uncertainty recapture
Effective full-power years 2 Current licensed thermal power 3 Extended power uprate 4 Water level instrument 5 Original licensed thermal power 6 Measurement uncertainty recapture
[1] Effective full-power years
[1] Effective full-power years
[2] Current licensed thermal power
[2] Current licensed thermal power
Line 59: Line 46:
[4] Water level instrument
[4] Water level instrument
[5] Original licensed thermal power
[5] Original licensed thermal power
[6] Measurement uncertainty recapture}}
[6] Measurement uncertainty recapture file:///Cl/...AR%20-%20MF0446%20-%20To%20Relocate%20Pressure%20and%20Temperature%20Curves%20to%20a%20PTLR%20.htm[4/11/2013 12:21:11 PM]}}

Revision as of 19:40, 4 November 2019

Request for Additional Information - Fermi 2 - LAR - MF0446 - to Relocate Pressure and Temperature Curves to a PTLR
ML13101A195
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/10/2013
From: Mahesh Chawla
Plant Licensing Branch III
To: Hassoun A
Detroit Edison, Co
Chawla M
References
TAC MF0446
Download: ML13101A195 (2)


Text

From: Chawla, Mahesh Sent: Wednesday, April 10, 2013 5:08 PM To: Alan I Hassoun Cc: Hardgrove, Matthew; Parks, Benjamin; Grover, Ravinder; Widrevitz, Dan

Subject:

Request for Additional Information - Fermi 2 - LAR - MF0446 - To Relocate Pressure and Temperature Curves to a PTLR Sam, I am retransmitting the following message since the numbering of notes in the previous message was not correct:

By letter dated December 21, 2012 (ADAMS Accession No. ML13004A134), Detroit Edison Co. submitted a license amendment request for Fermi 2 for proposed LAR to relocate Pressure and Temperature Curves to a PTLR. The NRC staff has identified the following additional information which you need to provide in order for them to complete the review. Please arrange a teleconference with the NRC staff to discuss the subject information:

1. Use of Integrated Surveillance Program Data Page 2 of Enclosure 1 to the December 21, 2012, license amendment request states, The latest information from the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Integrated Surveillance Program (ISP) that is applicable to Fermi 2 has been utilized.

Please provide additional information:

  • Provide specific reference details for the latest information, to which the above statement refers. If it is not available to the NRC, please submit it.
  • Explain how this information is applicable to Fermi 2.
  • Explain how the information has been utilized.
2. Assumptions Used in Fluence Calculations The information in the following table summarizes significant assumptions regarding the flux over discrete exposure periods, and is developed using data on Page 2 of Enclosure 1 to the December 21, 2012, license amendment request:

Object Exposure Period Power Level Operating Assumption P/T Curve 12.04 EFPY [1] 3430 CLTP [2]

P/T Curve 19.96 EFPY 3952 EPU[3]

WLI[4] Nozzle 3.228 EFPY 3293 OLTP [5]

WLI Nozzle 16.35 EFPY 3430 CLTP WLI Nozzle 10.59 3486 MUR [6]

1. Explain whether, for any of the above exposure periods, reactor vessel neutron fluence was calculated using any methods other than the referenced General Electric-Hitachi analytic methods described in NEDC-32983P-A.
2. For the above exposure periods, explain whether a generalized core flux source was assumed, or whether cycle-specific flux distributions were assumed.
3. A measurement uncertainty recapture (MUR) uprate relies largely on analyses that are unaffected by the increase in power level, because the assumed power level includes an uncertainty that bounds both pre-and post-MUR core powers. Explain how the MUR assumptions in the fluence analysis differ from the CLTP assumptions, and whether the uncertainty analysis for the reactor vessel neutron fluence is affected by these assumptions.

____________________________

[1]

file:///Cl/...AR%20-%20MF0446%20-%20To%20Relocate%20Pressure%20and%20Temperature%20Curves%20to%20a%20PTLR%20.htm[4/11/2013 12:21:11 PM]

Effective full-power years 2 Current licensed thermal power 3 Extended power uprate 4 Water level instrument 5 Original licensed thermal power 6 Measurement uncertainty recapture

[1] Effective full-power years

[2] Current licensed thermal power

[3] Extended power uprate

[4] Water level instrument

[5] Original licensed thermal power

[6] Measurement uncertainty recapture file:///Cl/...AR%20-%20MF0446%20-%20To%20Relocate%20Pressure%20and%20Temperature%20Curves%20to%20a%20PTLR%20.htm[4/11/2013 12:21:11 PM]