{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 3, 2013 Mr. Larry Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106
-4352 September 3, 2013 Mr. Larry Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106


==SUBJECT:==
==SUBJECT:==
MID-CYCLE ASSESSMENT LETTER FOR DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000315/2013006 AND 05000316/2013006
MID-CYCLE ASSESSMENT LETTER FOR DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000315/2013006 AND 05000316/2013006)
)


==Dear Mr. Weber:==
==Dear Mr. Weber:==
On August 14, 201 3, the U.S. Nuclear Regulatory Commission (NRC) completed its mid
-cycle performance review of D.C. Cook Nuclear Power Plant, Units 1 and 2.
The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 201 2, through June 30, 201
: 3. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.


The NRC determined the performance at D.C. Cook Nuclear Power Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
On August 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of D.C. Cook Nuclear Power Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2012, through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 201
The NRC determined the performance at D.C. Cook Nuclear Power Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
: 4. Routine inspections performed by resident inspectors are not included in the inspection plan.
The enclosed inspection plan lists the inspections scheduled through December 31, 2014.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end
Routine inspections performed by resident inspectors are not included in the inspection plan.
-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non
-publicly available correspondence.


In addition to the ROP baseline inspections, inspections are planned for Inspection Procedure (IP) 71003, "Post
L. Weber                                      In addition to the ROP baseline inspections, inspections are planned for Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal and Temporary Instruction (TI)
-Approval Site Inspection for License Renewal" and Temporary Instruction (TI)
TI 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping. In addition, team inspections involving IP 71152B, Biennial Problem Identification and Resolution, IP 71111.11B, Licensed Operator Requalification Program and Licensed Operator Performance, and IP 71111.17T, Evaluations of Changes, Tests and Experiments and Permanent Plant Modifications are scheduled.
TI 2515/182, "Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping."
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In addition, team inspection s involving IP 71152B, "Biennial Problem Identification and Resolution," IP 71111.11B, "Licensed Operator Requalification Program and Licensed Operator Performance," and IP 71111.17T, "Evaluations of Changes, Tests and Experiments and Permanent Plant Modifications" are scheduled
Please contact me at 630-829-9619 with any questions you may have regarding this letter or the inspection plan.
. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
Sincerely,
-rm/adams.html (the Public Electronic Reading Room).  
                                              /RA/
 
Jamie C. Benjamin, Acting Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74
Please contact me at 630
-829-9619 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/   Jamie C. Benjamin , Acting Chief Branch 4 Division of Reactor Projects Docket Nos. 50
-315; 50-316 License Nos. DPR
-58; DPR-74


==Enclosure:==
==Enclosure:==
D.C. Cook Inspection/Activity Plan cc w/encl:    Distribution via ListServTM


D.C. Cook Inspection/Activity Plan cc w/encl:
L. Weber                                                                  In addition to the ROP baseline inspections, inspections are planned for Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal and Temporary Instruction (TI)
Distribution via ListServTM In addition to the ROP baseline inspections, inspections are planned for Inspection Procedure (IP) 71003, "Post
TI 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping. In addition, team inspections involving IP 71152B, Biennial Problem Identification and Resolution, IP 71111.11B, Licensed Operator Requalification Program and Licensed Operator Performance, and IP 71111.17T, Evaluations of Changes, Tests and Experiments and Permanent Plant Modifications are scheduled.
-Approval Site Inspection for License Renewal" and Temporary Instruction (TI)
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
TI 2515/182, "Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping.In addition, team inspections involving IP 71152B, "Biennial Problem Identification and Resolution," IP 71111.11B, "Licensed Operator Requalification Program and Licensed Operator Performance," and IP 71111.17T, "Evaluations of Changes, Tests and Experiments and Permanent Plant Modifications" are scheduled
Please contact me at 630-829-9619 with any questions you may have regarding this letter or the inspection plan.
. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
Sincerely,
-rm/adams.html (the Public Electronic Reading Room).  
                                                                          /RA/
 
Jamie C. Benjamin, Acting Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74
Please contact me at 630
-829-9619 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/   Jamie C. Benjamin, Acting Chief Branch 4 Division of Reactor Projects Docket Nos. 50
-315; 50-316 License Nos. DPR
-58; DPR-74


==Enclosure:==
==Enclosure:==
D.C. Cook Inspection/Activity Plan cc w/encl:            Distribution via ListServTM DISTRIBUTION:
See next page DOCUMENT NAME: DCCOOK MOC Letter Publicly Available                          Non-Publicly Available                              Sensitive                  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE              RIII-DRP                        E    RIII-DRP                        RIII                              RIII NAME                JBenjamin:rj DATE                08/29/13 OFFICIAL RECORD COPY


D.C. Cook Inspection/Activity Plan cc w/encl:
Letter to L. Weber from J. Benjamin dated September 3, 2013
Distribution via ListServTM    DISTRIBUTION
: See next page DOCUMENT NAME:  DCCOOK MOC Letter Publicly Available Non-Publicly Available Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII-DRP E RIII-DRP  RIII  RIII  NAME JBenjamin:rj DATE 0 8/29/13    OFFICIAL RECORD COPY Letter to L. Weber from J. Benjamin dated September 3, 2013


==SUBJECT:==
==SUBJECT:==
MID-CYCLE ASSESSMENT LETTER FOR DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000315/2013006 AND 05000316/2013006
MID-CYCLE ASSESSMENT LETTER FOR DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000315/2013006 AND 05000316/2013006)
DISTRIBUTION:
DISTRIBUTION:
Vivian Campbell RidsNrrDorlLpl3
Vivian Campbell RidsNrrDorlLpl3-1 Resource RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov
-1 Resource RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov
 
Page 1 of 2                                                                                D.C. Cook 08/23/2013    13:54:41                                                        Inspection / Activity Plan Report 22 09/01/2013 - 12/31/2014 Unit        Planned Dates                                                                                                                                    No. of Staff Number          Start    End      Inspection Activity                                                                Title                                        on Site BI PI&R      - BIENNIAL PI&R INSPECTION                                                                                              5 1, 2      08/26/2013  09/13/2013  IP 71152B              Problem Identification and Resolution BI ISI        - INSERVICE INSPECTION - UNIT 2                                                                                          4 2      10/07/2013  10/25/2013  IP 7111108P            Inservice Inspection Activities - PWR BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                              1 1          10/07/2013  10/11/2013  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1          10/07/2013  10/11/2013  IP 71124.02            Occupational ALARA Planning and Controls TI 182        - BURIED PIPING TI 182                                                                                                  1 1          12/02/2013  12/06/2013  IP 2515/182            Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                              1 1          12/09/2013  12/13/2013  IP 71124.05            Radiation Monitoring Instrumentation BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                              1 1          01/06/2014  01/10/2014  IP 71124.01            Radiological Hazard Assessment and Exposure Controls BI OLRQ      - BIENNIAL REQUAL PROGRAM INSPECTION                                                                                    2 1, 2      02/10/2014  02/14/2014  IP 7111111B            Licensed Operator Requalification Program BI MODS      - MODIFICATIONS/50.59 INSPECTION                                                                                        3 1, 2      03/03/2014  03/21/2014  IP 7111117T            Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                              1 1          03/17/2014  03/21/2014  IP 71124.05            Radiation Monitoring Instrumentation RENEWAL      - LICENSE RENEWAL U1                                                                                                    6 1          04/28/2014  05/16/2014  IP 71003                Post-Approval Site Inspection for License Renewal BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                              1 1          05/05/2014  05/09/2014  IP 71124.06            Radioactive Gaseous and Liquid Effluent Treatment BI EPR        - EP ROUTINE INSPECTION / PI VERIFICATION                                                                                2 1          06/23/2014  06/27/2014  IP 7111402              Alert and Notification System Testing 1          06/23/2014  06/27/2014  IP 7111403              Emergency Preparedness Organization Staffing and Augmentation System 1          06/23/2014  06/27/2014  IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies 1          06/23/2014  06/27/2014  IP 71151                Performance Indicator Verification OL PREP      - INITIAL EXAM - 08/2014                                                                                                3 1          06/30/2014  07/03/2014      W90305              OL - INITIAL EXAM - 2014 APR/DEC - COOK OL EXAM      - INIT EXAM FOR 07/2014                                                                                                  5 1          07/21/2014  08/01/2014      W90305              OL - INITIAL EXAM - 2014 APR/DEC - COOK This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.


Page 1 of 2 08/23/2013 13:54:41 Report 22 Unit NumberPlanned Dates Start          EndInspection ActivityTitle No. of Staff on Site D.C. CookInspection / Activity Plan 09/01/2013
Page 2 of 2                                                                               D.C. Cook 08/23/2013     13:54:41                                                         Inspection / Activity Plan Report 22 09/01/2013 - 12/31/2014 Unit          Planned Dates                                                                                          No. of Staff Number          Start      End    Inspection Activity                                                          Title  on Site BI ISI       - INSERVICE INSPECTION - UNIT 1                                              4 2       09/30/2014  10/24/2014  IP 7111108P            Inservice Inspection Activities - PWR BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                   1 1         11/03/2014   11/07/2014   IP 71124.07            Radiological Environmental Monitoring Program 1         11/03/2014   11/07/2014   IP 71151-BI01          Reactor Coolant System Activity 1         11/03/2014   11/07/2014  IP 71151-OR01          Occupational Exposure Control Effectiveness 1         11/03/2014   11/07/2014   IP 71151-PR01          RETS/ODCM Radiological Effluent This report does not include INPO and OUTAGE activities.
-12/31/2014 BI PI&R-BIENNIAL PI&R INSPECTION 5 1, 2  IP Problem Identification and Resolution71152B 08/26/2013 09/13/2013 BI ISI-INSERVICE INSPECTION - UNIT 2 4 2   IP Inservice Inspection Activities - PWR7111108P 10/07/2013 10/25/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1    IP Radiological Hazard Assessment and Exposure Controls71124.01 10/07/201310/11/2013 1    IP Occupational ALARA Planning and Controls71124.02 10/07/201310/11/2013TI 182-BURIED PIPING TI 182 1 1    IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 12/02/2013 12/06/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1    IP Radiation Monitoring Instrumentation71124.05 12/09/2013 12/13/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1    IP Radiological Hazard Assessment and Exposure Controls71124.01 01/06/2014 01/10/2014 BI OLRQ-BIENNIAL REQUAL PROGRAM INSPECTION 2 1, 2   IP Licensed Operator Requalification Program7111111B 02/10/2014 02/14/2014 BI MODS-MODIFICATIONS/50.59 INSPECTION 3 1, 2   IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 03/03/2014 03/21/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1     IP Radiation Monitoring Instrumentation71124.05 03/17/2014 03/21/2014RENEWAL-LICENSE RENEWAL U1 6 1    IP Post-Approval Site Inspection for License Renewal 71003 04/28/2014 05/16/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1    IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 05/05/2014 05/09/2014 BI EPR-EP ROUTINE INSPECTION / PI VERIFICATION 2 1     IP A lert and Notification System Testing7111402 06/23/2014 06/27/2014 1    IP Emergency Preparedness Organization Staffing and Augmentation System7111403 06/23/2014 06/27/2014 1    IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 06/23/2014 06/27/2014 1    IP Performance Indicator Verification71151 06/23/2014 06/27/2014OL PREP-INITIAL EXAM - 08/2014 3 1     OL - INITIAL EXAM - 2014 APR/DEC - COOK W90305 06/30/2014 07/03/2014OL EXAM-INIT EXAM FOR 07/2014 5 1    OL - INITIAL EXAM - 2014 APR/DEC - COOK W90305 07/21/2014 08/01/2014 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.}}
Page 2 of 2 08/23/2013 13:54:41 Report 22 Unit NumberPlanned Dates Start          EndInspection ActivityTitle No. of Staff on Site D.C. CookInspection / Activity Plan 09/01/2013
-12/31/2014 BI ISI-INSERVICE INSPECTION - UNIT 1 4  2   IP Inservice Inspection Activities - PWR7111108P 09/30/2014 10/24/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1    IP Radiological Environmental Monitoring Program71124.0711/03/201411/07/2014 1    IPReactor Coolant System Activity71151-BI0111/03/201411/07/2014 1    IPOccupational Exposure Control Effectiveness71151-OR0111/03/201411/07/2014 1    IPRETS/ODCM Radiological Effluent71151-PR0111/03/201411/07/2014 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.}}

Revision as of 14:00, 4 November 2019

2013 Donald C. Cook Mid-Cycle Letter Combined
ML13246A227
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/03/2013
From: Jamie Benjamin
Division Reactor Projects III
To: Weber L
Indiana Michigan Power Co, Nuclear Generation Group
References
IR-13-006
Download: ML13246A227 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 3, 2013 Mr. Larry Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000315/2013006 AND 05000316/2013006)

Dear Mr. Weber:

On August 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of D.C. Cook Nuclear Power Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2012, through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at D.C. Cook Nuclear Power Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2014.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

L. Weber In addition to the ROP baseline inspections, inspections are planned for Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal and Temporary Instruction (TI)

TI 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping. In addition, team inspections involving IP 71152B, Biennial Problem Identification and Resolution, IP 71111.11B, Licensed Operator Requalification Program and Licensed Operator Performance, and IP 71111.17T, Evaluations of Changes, Tests and Experiments and Permanent Plant Modifications are scheduled.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9619 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Jamie C. Benjamin, Acting Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74

Enclosure:

D.C. Cook Inspection/Activity Plan cc w/encl: Distribution via ListServTM

L. Weber In addition to the ROP baseline inspections, inspections are planned for Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal and Temporary Instruction (TI)

TI 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping. In addition, team inspections involving IP 71152B, Biennial Problem Identification and Resolution, IP 71111.11B, Licensed Operator Requalification Program and Licensed Operator Performance, and IP 71111.17T, Evaluations of Changes, Tests and Experiments and Permanent Plant Modifications are scheduled.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9619 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Jamie C. Benjamin, Acting Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74

Enclosure:

D.C. Cook Inspection/Activity Plan cc w/encl: Distribution via ListServTM DISTRIBUTION:

See next page DOCUMENT NAME: DCCOOK MOC Letter Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII-DRP E RIII-DRP RIII RIII NAME JBenjamin:rj DATE 08/29/13 OFFICIAL RECORD COPY

Letter to L. Weber from J. Benjamin dated September 3, 2013

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000315/2013006 AND 05000316/2013006)

DISTRIBUTION:

Vivian Campbell RidsNrrDorlLpl3-1 Resource RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov

Page 1 of 2 D.C. Cook 08/23/2013 13:54:41 Inspection / Activity Plan Report 22 09/01/2013 - 12/31/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site BI PI&R - BIENNIAL PI&R INSPECTION 5 1, 2 08/26/2013 09/13/2013 IP 71152B Problem Identification and Resolution BI ISI - INSERVICE INSPECTION - UNIT 2 4 2 10/07/2013 10/25/2013 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 10/07/2013 10/11/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/07/2013 10/11/2013 IP 71124.02 Occupational ALARA Planning and Controls TI 182 - BURIED PIPING TI 182 1 1 12/02/2013 12/06/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 12/09/2013 12/13/2013 IP 71124.05 Radiation Monitoring Instrumentation BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 01/06/2014 01/10/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls BI OLRQ - BIENNIAL REQUAL PROGRAM INSPECTION 2 1, 2 02/10/2014 02/14/2014 IP 7111111B Licensed Operator Requalification Program BI MODS - MODIFICATIONS/50.59 INSPECTION 3 1, 2 03/03/2014 03/21/2014 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 03/17/2014 03/21/2014 IP 71124.05 Radiation Monitoring Instrumentation RENEWAL - LICENSE RENEWAL U1 6 1 04/28/2014 05/16/2014 IP 71003 Post-Approval Site Inspection for License Renewal BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 05/05/2014 05/09/2014 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment BI EPR - EP ROUTINE INSPECTION / PI VERIFICATION 2 1 06/23/2014 06/27/2014 IP 7111402 Alert and Notification System Testing 1 06/23/2014 06/27/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 06/23/2014 06/27/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 06/23/2014 06/27/2014 IP 71151 Performance Indicator Verification OL PREP - INITIAL EXAM - 08/2014 3 1 06/30/2014 07/03/2014 W90305 OL - INITIAL EXAM - 2014 APR/DEC - COOK OL EXAM - INIT EXAM FOR 07/2014 5 1 07/21/2014 08/01/2014 W90305 OL - INITIAL EXAM - 2014 APR/DEC - COOK This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 D.C. Cook 08/23/2013 13:54:41 Inspection / Activity Plan Report 22 09/01/2013 - 12/31/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site BI ISI - INSERVICE INSPECTION - UNIT 1 4 2 09/30/2014 10/24/2014 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 11/03/2014 11/07/2014 IP 71124.07 Radiological Environmental Monitoring Program 1 11/03/2014 11/07/2014 IP 71151-BI01 Reactor Coolant System Activity 1 11/03/2014 11/07/2014 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 11/03/2014 11/07/2014 IP 71151-PR01 RETS/ODCM Radiological Effluent This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.