ML13331A064: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 November 26, 2013 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Resources 5000 Dominion Blvd.
-2713   November 26, 2013 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Resources 5000 Dominion Blvd.
Glen Allen, VA 23060-6711
Glen Allen, VA 23060
-6711


==SUBJECT:==
==SUBJECT:==
INITIAL OPERATOR LICENSING OPERATING TEST AND WRITTEN EXAMINATION APPROVAL
INITIAL OPERATOR LICENSING OPERATING TEST AND WRITTEN EXAMINATION APPROVAL - MILLSTONE UNIT 3
- MILLSTONE UNIT 3 Dear Mr. Heacock
:  The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Millstone Unit 3
.
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to M r. J. Palmer, Director of Training. Note that any examination waivers and application denials have been addressed in separate correspondence.
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with NUREG-1021, "Operator Licensing Examinations Standards for Power Reactors," Revision 9, Supplement 1, during the week of December 9, 2013. The NRC staff will administer the operating tests during the week of December 2, 2013. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review
, I have concluded that the examination meets the guidelines of NUREG
-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG
-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337
-5306. Please contact your Chief Examiner, Mr. P. Presby, at (610) 337-5392, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.


Sincerely, /RA/ Donald E. Jackson , Chief Operations Branch Division of Reactor Safety Docket No. 50
==Dear Mr. Heacock:==
-423 License No. NPF
 
-49 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Resources 5000 Dominion Blvd.
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Millstone Unit 3.
Glen Allen, VA 23060
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. J. Palmer, Director of Training. Note that any examination waivers and application denials have been addressed in separate correspondence.
-6711
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with NUREG-1021, Operator Licensing Examinations Standards for Power Reactors, Revision 9, Supplement 1, during the week of December 9, 2013. The NRC staff will administer the operating tests during the week of December 2, 2013.
This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5306.
Please contact your Chief Examiner, Mr. P. Presby, at (610) 337-5392, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
Sincerely,
                                                    /RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-423 License No. NPF-49
 
Mr. David A. Heacock President and Chief Nuclear Officer Dominion Resources 5000 Dominion Blvd.
Glen Allen, VA 23060-6711


==SUBJECT:==
==SUBJECT:==
INITIAL OPERATOR LICENSING OPERATING TEST AND WRITTEN EXAMINATION APPROVAL MILLSTONE UNIT 3 Dear Mr. Heacock
INITIAL OPERATOR LICENSING OPERATING TEST AND WRITTEN EXAMINATION APPROVAL MILLSTONE UNIT 3
:  The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Millstone Unit 3
.
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to M r. J. Palmer, Director of Training. Note that any examination waivers and application denials have been addressed in separate correspondence.
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with NUREG
-1021, "Operator Licensing Examinations Standards for Power Reactors," Revision 9, Supplement 1, during the week of December 9 , 2013. The NRC staff will administer the operating tests during the week of December 2, 2013. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG
-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337
-5306.
Please contact your Chief Examiner, Mr. P. Presby, at (610) 337-5392, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
Sincerely,  /RA/  Donald E. Jackson, Chief Operations Branch Division of Reactor Safety


Docket No. 50
==Dear Mr. Heacock:==
-423 License No. NPF
-49 cc: via ListServ


D. Heacock 2  Distribution: via email:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Millstone Unit 3.
W. Dean, RA D. Lew, DRA D. Roberts, DRP M. Scott, DRP R. Lorson, DRS J. Trapp, DRS D. Jackson, DRS R. McKinley, DRP S. Shaffer, DRP E. Keighley, DRP J. DeBoer, DRP J. Ambrosini, DRP, SRI B. Haagensen, DRP, RI J. Krafty, DRP, RI C. Kowalyshyn, DRP, AA B. Rini, RI OEDO RidsNrrPMMillstone Resource RidsNrrDorlLpl1
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. J. Palmer, Director of Training. Note that any examination waivers and application denials have been addressed in separate correspondence.
-1 Resource ROPreports Resource Region I Docket Room (with concurrences)
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with NUREG-1021, Operator Licensing Examinations Standards for Power Reactors, Revision 9, Supplement 1, during the week of December 9, 2013. The NRC staff will administer the operating tests during the week of December 2, 2013.
DRS Master Exam File (C. Bixler) (w/concurrences)
This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5306.
P. Presby, Chief Examiner, DRS
Please contact your Chief Examiner, Mr. P. Presby, at (610) 337-5392, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
Sincerely,
                                                      /RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-423 License No. NPF-49 cc: via ListServ


DOCUMENT NAME:
D. Heacock                                2 Distribution: via email:
G:\DRS\Operations Branch
W. Dean, RA D. Lew, DRA                                        J. Krafty, DRP, RI D. Roberts, DRP                                    C. Kowalyshyn, DRP, AA M. Scott, DRP                                      B. Rini, RI OEDO R. Lorson, DRS                                    RidsNrrPMMillstone Resource J. Trapp, DRS                                      RidsNrrDorlLpl1-1 Resource D. Jackson, DRS                                    ROPreports Resource R. McKinley, DRP                                  Region I Docket Room (with concurrences)
\PRESBY\Exam FY14-MS3 Dec 13 (U01874)\ExamApproval
S. Shaffer, DRP                                    DRS Master Exam File (C. Bixler)
-W-O-Ltr.docx ADAMS PKG: ML13164A263 ADAMS ACCESSION NO.: ML13331A064 SUNSI Review Non-Sensitive Sensitive  Publicly Available Non-Publicly Available OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB   NAME PPresby/PP CBixler/CB DJackson/DJ   DATE 11/26/2013 11/26/2013 11/26/2013   OFFICIAL RECORD CO PY}}
E. Keighley, DRP                                  (w/concurrences)
J. DeBoer, DRP                                    P. Presby, Chief Examiner, DRS J. Ambrosini, DRP, SRI B. Haagensen, DRP, RI DOCUMENT NAME: G:\DRS\Operations Branch\PRESBY\Exam FY14-MS3 Dec 13 (U01874)\ExamApproval-W-O-Ltr.docx ADAMS PKG: ML13164A263                     ADAMS ACCESSION NO.: ML13331A064 Non-Sensitive                       Publicly Available SUNSI Review Sensitive                          Non-Publicly Available OFFICE                 RI/DRS/OB     RI/DRS/OB               RI/DRS/OB NAME                   PPresby/PP   CBixler/CB             DJackson/DJ DATE                   11/26/2013   11/26/2013             11/26/2013 OFFICIAL RECORD COPY}}

Revision as of 10:52, 4 November 2019

Initial Operator Licensing Operating Test and Written Exam Approval Millstone 3
ML13331A064
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/26/2013
From: Diane Jackson
Operations Branch I
To: Heacock D
Dominion Resources
Jackson D
Shared Package
ML13164A263 List:
References
Download: ML13331A064 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 November 26, 2013 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Resources 5000 Dominion Blvd.

Glen Allen, VA 23060-6711

SUBJECT:

INITIAL OPERATOR LICENSING OPERATING TEST AND WRITTEN EXAMINATION APPROVAL - MILLSTONE UNIT 3

Dear Mr. Heacock:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Millstone Unit 3.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. J. Palmer, Director of Training. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with NUREG-1021, Operator Licensing Examinations Standards for Power Reactors, Revision 9, Supplement 1, during the week of December 9, 2013. The NRC staff will administer the operating tests during the week of December 2, 2013.

This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5306.

Please contact your Chief Examiner, Mr. P. Presby, at (610) 337-5392, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-423 License No. NPF-49

Mr. David A. Heacock President and Chief Nuclear Officer Dominion Resources 5000 Dominion Blvd.

Glen Allen, VA 23060-6711

SUBJECT:

INITIAL OPERATOR LICENSING OPERATING TEST AND WRITTEN EXAMINATION APPROVAL MILLSTONE UNIT 3

Dear Mr. Heacock:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Millstone Unit 3.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. J. Palmer, Director of Training. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with NUREG-1021, Operator Licensing Examinations Standards for Power Reactors, Revision 9, Supplement 1, during the week of December 9, 2013. The NRC staff will administer the operating tests during the week of December 2, 2013.

This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5306.

Please contact your Chief Examiner, Mr. P. Presby, at (610) 337-5392, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-423 License No. NPF-49 cc: via ListServ

D. Heacock 2 Distribution: via email:

W. Dean, RA D. Lew, DRA J. Krafty, DRP, RI D. Roberts, DRP C. Kowalyshyn, DRP, AA M. Scott, DRP B. Rini, RI OEDO R. Lorson, DRS RidsNrrPMMillstone Resource J. Trapp, DRS RidsNrrDorlLpl1-1 Resource D. Jackson, DRS ROPreports Resource R. McKinley, DRP Region I Docket Room (with concurrences)

S. Shaffer, DRP DRS Master Exam File (C. Bixler)

E. Keighley, DRP (w/concurrences)

J. DeBoer, DRP P. Presby, Chief Examiner, DRS J. Ambrosini, DRP, SRI B. Haagensen, DRP, RI DOCUMENT NAME: G:\DRS\Operations Branch\PRESBY\Exam FY14-MS3 Dec 13 (U01874)\ExamApproval-W-O-Ltr.docx ADAMS PKG: ML13164A263 ADAMS ACCESSION NO.: ML13331A064 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME PPresby/PP CBixler/CB DJackson/DJ DATE 11/26/2013 11/26/2013 11/26/2013 OFFICIAL RECORD COPY