{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 04, 2014 Mr. Ernie Kapopoulos Site Vice President Duke Energy Progress, Inc.
-1257 March 04, 201 4    Mr. Ernie Kapopoulos Site Vice President Duke Energy Progress, Inc.
Shearon Harris Nuclear Power Plant P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165
Shearon Harris Nuclear Power Plant P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562
-0165


==SUBJECT:==
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORT 0 5000400/2013 001 Dear Mr. Kapopoulous
ANNUAL ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000400/2013001
:  On February 1 8, 201 4, the Nuclear Regulatory Commission (NRC) completed its end
-of-cycle performance review of Shearon Harris Nuclear Power Plant
. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 through December 31, 201 3. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. 


The NRC determined that overall, Shearon Harris Nuclear Power Plant
==Dear Mr. Kapopoulous:==
, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Shearon Harris Nuclear Power Plant
, during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
Plant performance for the first quarter of the assessment period was within the Regulatory Response column of the NRC's ROP Action Matrix based on one inspection finding being classified as having low-to-moderate safety significance (i.e., White) and all PIs indicated that your performance was within the nominal, expected range (i.e., Green).
The White finding involved the failure to adequately maintain the ventilation system equipment of the Emergency Operations Facility for protracted periods of time.
This White finding was closed on March 22, 2013, as documented in our letter to you dated April 23, 2013 (ADAMS Accession No. ML13114A069). Unit 1 returned to the Licensee Response Column of the ROP Action Matrix in the second quarter of 2013.


E. Kapopoulos 2  The enclosed inspection plan lists the inspections scheduled through June 30, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid
On February 18, 2014, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Shearon Harris Nuclear Power Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 through December 31, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non
This performance review and enclosed inspection plan do not include security information.
-publicly available correspondence.
The NRC determined that overall, Shearon Harris Nuclear Power Plant, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Shearon Harris Nuclear Power Plant, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
Plant performance for the first quarter of the assessment period was within the Regulatory Response column of the NRCs ROP Action Matrix based on one inspection finding being classified as having low-to-moderate safety significance (i.e., White) and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). The White finding involved the failure to adequately maintain the ventilation system equipment of the Emergency Operations Facility for protracted periods of time. This White finding was closed on March 22, 2013, as documented in our letter to you dated April 23, 2013 (ADAMS Accession No. ML13114A069). Unit 1 returned to the Licensee Response Column of the ROP Action Matrix in the second quarter of 2013.


Additionally, an NRC audit of licensee efforts towards compliance with Order EA 049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond
E. Kapopoulos                                  2 The enclosed inspection plan lists the inspections scheduled through June 30, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
-Design-Basis External Events" is ongoing.
Additionally, an NRC audit of licensee efforts towards compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events is ongoing. This audit includes an onsite component in order for the NRC to evaluate mitigating strategies as described in licensee submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.
This audit includes an onsite component in order for the NRC to evaluate mitigating strategies as described in licensee submittals, and to receive and review information relative to associated open items.
As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 will reflect this revision to Inspection Manual Chapter (IMC) 0310. The calendar year (CY) 2013 end-of-cycle assessments were conducted using the IMC 0310 guidance in effect in CY 2013 (dated October 28, 2011). Cross-cutting aspects identified in 2013 using the 2013 terminology will be converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.
This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The date for the onsite component at your site is being coordinated with your staff
. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.
As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross
-cutting aspects identified during inspections conducted in calendar year 2014 will reflect this revision to Inspection Manual Chapter (IMC) 0310. The calendar year (CY) 2013 end-of-cycle assessments were conducted using the IMC 0310 guidance in effect in CY 2013 (dated October 28, 2011). Cross
-cutting aspects identified in 2013 using the 2013 terminology will be converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid
-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross
-cutting issues in accordance with IMC 0305.
In accordance with 10 CFR 2.390 of the NRC
's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room
).
E. Kapopoulos 3  Please contact George Hopper at 404-997-4645 with any questions you may have regarding this letter.
Sincerely,        /RA/
Richard P. Croteau , Director      Division of Reactor Projects


Docket No.:
E. Kapopoulos                                3 Please contact George Hopper at 404-997-4645 with any questions you may have regarding this letter.
50-400 License No.:
Sincerely,
NPF-63
                                              /RA/
Richard P. Croteau, Director Division of Reactor Projects Docket No.: 50-400 License No.: NPF-63


==Enclosure:==
==Enclosure:==
Harris Inspection/Activity Plan (03/01/2014 - 06/30/2015) cc Distribution via ListServ


Harris Inspection/Activity Plan (03/01/201 4 - 06/30/201 5) cc Distribution via ListServ
_________________________                    SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE              RII:DRP        RII:DRP      RII:DRP        RII:DRP SIGNATURE          JSD /RA/       GTH /RA/                    RPC /RA/
NAME                JDodson        GHopper      WJones        RCroteau DATE                  02/25/2014      02/25/2014                  02/26/2014 E-MAIL COPY?          YES    NO    YES      NO  YES    NO      YES      NO    YES    NO    YES  NO    YES    NO


_________________________
E. Kapopoulos                             4 Letter to Ernie Kapopoulos from Richard P. Croteau dated March 4, 2014
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP    SIGNATURE JSD /RA/ GTH /RA/  RPC /RA/    NAME JDodson GHopper WJones RCroteau    DATE 02/25/2014 02/25/2014 02/26/2014 E-MAIL COPY?
YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO E. Kapopoulos 4 Letter to Ernie Kapopoulos from Richard P. Croteau dated March 4, 2014


==SUBJECT:==
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000400/2013001 Distribution w/encl
ANNUAL ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000400/2013001 Distribution w/encl:
: C. Evans, RII L. Douglas, RII R. Hannah, RII J. Ledford, RII J. Pelchat, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMShearonHarris Resource Institute of Nuclear Power Operations (INPO)
C. Evans, RII L. Douglas, RII R. Hannah, RII J. Ledford, RII J. Pelchat, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMShearonHarris Resource Institute of Nuclear Power Operations (INPO)
ROP Assessment
ROP Assessment


Page 1 of 2 03/04/2014 08:42:48 Report 22 Unit NumberPlanned Dates Start          EndInspection ActivityTitle No. of Staff on Site HarrisInspection / Activity Plan 03/01/2014
Page 1 of 2                                                                                   Harris 03/04/2014     08:42:48                                                         Inspection / Activity Plan Report 22 03/01/2014 - 06/30/2015 Unit          Planned Dates                                                                                                                                  No. of Staff Number          Start    End      Inspection Activity                                                              Title                                      on Site TFPI         - TRIENNIAL FIRE PROTECTION INSP                                                                                     10 1         04/21/2014   04/25/2014   IP 7111105x            Fire Protection - NFPA 805 (Triennial) 1          05/05/2014   05/09/2014   IP 7111105x            Fire Protection - NFPA 805 (Triennial)
-06/30/2015 TFPI-TRIENNIAL FIRE PROTECTION INSP 10 1     IP Fire Protection - NFPA 805 (Triennial)7111105x 04/21/2014 04/25/2014 1    IP Fire Protection - NFPA 805 (Triennial)7111105x 05/05/2014 05/09/2014 EP-EP PROGRAM INSPECTION 3 1     IP A lert and Notification System Testing7111402 04/07/201404/11/2014 1    IP Emergency Preparedness Organization Staffing and Augmentation System7111403 04/07/201404/11/2014 1    IP Emergency Action Level and Emergency Plan Changes7111404 04/07/201404/11/2014 1    IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 04/07/201404/11/2014 1    IP Performance Indicator Verification71151 04/07/201404/11/2014 CDBI-COMPONENT DESIGN BASES INSPECTION 7 1     IP Component Design Bases Inspection7111121 05/19/2014 05/23/2014 1    IP Component Design Bases Inspection7111121 06/23/2014 06/27/2014 1    IP Component Design Bases Inspection7111121 07/07/201407/11/2014 1    IP Component Design Bases Inspection7111121 07/21/2014 07/25/2014 RP-RP PUBLIC RADIATION SAFETY BASELINE 3 1     IP Radiological Hazard Assessment and Exposure Controls71124.01 08/18/2014 08/22/2014 1    IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 08/18/2014 08/22/2014 1    IP Radiological Environmental Monitoring Program71124.07 08/18/2014 08/22/2014 1    IP Performance Indicator Verification71151 08/18/2014 08/22/2014 RP-TRANSPORTATION 1 1    IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 10/27/2014 10/31/2014 EP-EP EXERCISE 1 1     IP Emergency Action Level and Emergency Plan Changes7111404 03/09/2015 03/13/2015 1    IP Exercise Evaluation - Hostile Action (HA) Event7111407 03/09/2015 03/13/2015 1    IP Performance Indicator Verification71151 03/09/2015 03/13/2015 ISI-UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 2 1     IP Inservice Inspection Activities - PWR7111108P 04/27/2015 05/01/2015 RP-RP OCCUPATIONAL BASELINE WEEK 1 3 1     IP Radiological Hazard Assessment and Exposure Controls71124.01 04/27/2015 05/01/2015 1    IP Occupational ALARA Planning and Controls71124.02 04/27/2015 05/01/2015 1    IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 04/27/2015 05/01/2015 1    IP Occupational Dose Assessment71124.04 04/27/2015 05/01/2015 1    IP Radiation Monitoring Instrumentation71124.05 04/27/2015 05/01/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
EP           - EP PROGRAM INSPECTION                                                                                               3 1         04/07/2014  04/11/2014  IP 7111402              Alert and Notification System Testing 1          04/07/2014  04/11/2014   IP 7111403              Emergency Preparedness Organization Staffing and Augmentation System 1          04/07/2014  04/11/2014   IP 7111404              Emergency Action Level and Emergency Plan Changes 1          04/07/2014  04/11/2014   IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies 1          04/07/2014  04/11/2014   IP 71151                Performance Indicator Verification CDBI         - COMPONENT DESIGN BASES INSPECTION                                                                                   7 1         05/19/2014   05/23/2014   IP 7111121              Component Design Bases Inspection 1          06/23/2014   06/27/2014   IP 7111121              Component Design Bases Inspection 1          07/07/2014  07/11/2014   IP 7111121              Component Design Bases Inspection 1          07/21/2014   07/25/2014   IP 7111121              Component Design Bases Inspection RP           - RP PUBLIC RADIATION SAFETY BASELINE                                                                                 3 1         08/18/2014  08/22/2014  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1          08/18/2014   08/22/2014   IP 71124.06            Radioactive Gaseous and Liquid Effluent Treatment 1          08/18/2014   08/22/2014   IP 71124.07            Radiological Environmental Monitoring Program 1          08/18/2014   08/22/2014   IP 71151                Performance Indicator Verification RP            - TRANSPORTATION                                                                                                      1 1          10/27/2014   10/31/2014   IP 71124.08            Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EP           - EP EXERCISE                                                                                                         1 1         03/09/2015  03/13/2015  IP 7111404              Emergency Action Level and Emergency Plan Changes 1          03/09/2015   03/13/2015   IP 7111407              Exercise Evaluation - Hostile Action (HA) Event 1          03/09/2015   03/13/2015   IP 71151                Performance Indicator Verification ISI           - UNIT 1 IN-SERVICE INSPECTION & RVH EXAM                                                                             2 1         04/27/2015   05/01/2015   IP 7111108P            Inservice Inspection Activities - PWR RP           - RP OCCUPATIONAL BASELINE WEEK 1                                                                                     3 1         04/27/2015  05/01/2015  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1          04/27/2015   05/01/2015   IP 71124.02            Occupational ALARA Planning and Controls 1          04/27/2015   05/01/2015   IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 1          04/27/2015   05/01/2015   IP 71124.04            Occupational Dose Assessment 1          04/27/2015   05/01/2015   IP 71124.05            Radiation Monitoring Instrumentation This report does not include INPO and OUTAGE activities.
Page 2 of 2 03/04/2014 08:42:48 Report 22 Unit NumberPlanned Dates Start          EndInspection ActivityTitle No. of Staff on Site HarrisInspection / Activity Plan 03/01/2014
This report shows only on-site and announced inspection procedures.
-06/30/2015 RP-RP OCCUPATIONAL BASELINE WEEK 1 3 1     IP Performance Indicator Verification71151 04/27/2015 05/01/2015 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1     IP Inservice Inspection Activities - PWR7111108P 05/04/2015 05/09/2015 RP-RP OCCUPATIONAL BASELINE WEEK 2 2 1     IP Radiological Hazard Assessment and Exposure Controls71124.0105/11/2015 05/15/2015 1    IP Occupational ALARA Planning and Controls71124.0205/11/2015 05/15/2015 1    IP In-Plant Airborne Radioactivity Control and Mitigation71124.0305/11/2015 05/15/2015 1    IP Occupational Dose Assessment71124.0405/11/2015 05/15/2015 1    IP Radiation Monitoring Instrumentation71124.0505/11/2015 05/15/2015 1    IP Performance Indicator Verification7115105/11/2015 05/15/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.}}
Enclosure
 
Page 2 of 2                                                                                   Harris 03/04/2014     08:42:48                                                         Inspection / Activity Plan Report 22 03/01/2014 - 06/30/2015 Unit          Planned Dates                                                                                            No. of Staff Number          Start    End      Inspection Activity                                                              Title  on Site RP           - RP OCCUPATIONAL BASELINE WEEK 1                                               3 1         04/27/2015   05/01/2015   IP 71151                Performance Indicator Verification SGISI         - UNIT 1 SG IN-SERVICE INSPECTION                                               1 1         05/04/2015   05/09/2015   IP 7111108P            Inservice Inspection Activities - PWR RP           - RP OCCUPATIONAL BASELINE WEEK 2                                               2 1         05/11/2015  05/15/2015  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1          05/11/2015   05/15/2015   IP 71124.02            Occupational ALARA Planning and Controls 1          05/11/2015   05/15/2015   IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 1          05/11/2015   05/15/2015   IP 71124.04            Occupational Dose Assessment 1          05/11/2015   05/15/2015   IP 71124.05            Radiation Monitoring Instrumentation 1          05/11/2015   05/15/2015   IP 71151                Performance Indicator Verification This report does not include INPO and OUTAGE activities.                     Enclosure This report shows only on-site and announced inspection procedures.}}

Revision as of 07:24, 4 November 2019

2013 Annual Assessment Letter for Shearon Harris Nuclear Plant
ML14063A149
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/04/2014
From: Croteau R
Division Reactor Projects II
To: Kapopoulos E
Duke Energy Progress
References
IR-13-001
Download: ML14063A149 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 04, 2014 Mr. Ernie Kapopoulos Site Vice President Duke Energy Progress, Inc.

Shearon Harris Nuclear Power Plant P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000400/2013001

Dear Mr. Kapopoulous:

On February 18, 2014, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Shearon Harris Nuclear Power Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 through December 31, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information.

The NRC determined that overall, Shearon Harris Nuclear Power Plant, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Shearon Harris Nuclear Power Plant, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

Plant performance for the first quarter of the assessment period was within the Regulatory Response column of the NRCs ROP Action Matrix based on one inspection finding being classified as having low-to-moderate safety significance (i.e., White) and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). The White finding involved the failure to adequately maintain the ventilation system equipment of the Emergency Operations Facility for protracted periods of time. This White finding was closed on March 22, 2013, as documented in our letter to you dated April 23, 2013 (ADAMS Accession No. ML13114A069). Unit 1 returned to the Licensee Response Column of the ROP Action Matrix in the second quarter of 2013.

E. Kapopoulos 2 The enclosed inspection plan lists the inspections scheduled through June 30, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

Additionally, an NRC audit of licensee efforts towards compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events is ongoing. This audit includes an onsite component in order for the NRC to evaluate mitigating strategies as described in licensee submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 will reflect this revision to Inspection Manual Chapter (IMC) 0310. The calendar year (CY) 2013 end-of-cycle assessments were conducted using the IMC 0310 guidance in effect in CY 2013 (dated October 28, 2011). Cross-cutting aspects identified in 2013 using the 2013 terminology will be converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

E. Kapopoulos 3 Please contact George Hopper at 404-997-4645 with any questions you may have regarding this letter.

Sincerely,

/RA/

Richard P. Croteau, Director Division of Reactor Projects Docket No.: 50-400 License No.: NPF-63

Enclosure:

Harris Inspection/Activity Plan (03/01/2014 - 06/30/2015) cc Distribution via ListServ

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE JSD /RA/ GTH /RA/ RPC /RA/

NAME JDodson GHopper WJones RCroteau DATE 02/25/2014 02/25/2014 02/26/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

E. Kapopoulos 4 Letter to Ernie Kapopoulos from Richard P. Croteau dated March 4, 2014

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000400/2013001 Distribution w/encl:

C. Evans, RII L. Douglas, RII R. Hannah, RII J. Ledford, RII J. Pelchat, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMShearonHarris Resource Institute of Nuclear Power Operations (INPO)

ROP Assessment

Page 1 of 2 Harris 03/04/2014 08:42:48 Inspection / Activity Plan Report 22 03/01/2014 - 06/30/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site TFPI - TRIENNIAL FIRE PROTECTION INSP 10 1 04/21/2014 04/25/2014 IP 7111105x Fire Protection - NFPA 805 (Triennial) 1 05/05/2014 05/09/2014 IP 7111105x Fire Protection - NFPA 805 (Triennial)

EP - EP PROGRAM INSPECTION 3 1 04/07/2014 04/11/2014 IP 7111402 Alert and Notification System Testing 1 04/07/2014 04/11/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 04/07/2014 04/11/2014 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 04/07/2014 04/11/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 04/07/2014 04/11/2014 IP 71151 Performance Indicator Verification CDBI - COMPONENT DESIGN BASES INSPECTION 7 1 05/19/2014 05/23/2014 IP 7111121 Component Design Bases Inspection 1 06/23/2014 06/27/2014 IP 7111121 Component Design Bases Inspection 1 07/07/2014 07/11/2014 IP 7111121 Component Design Bases Inspection 1 07/21/2014 07/25/2014 IP 7111121 Component Design Bases Inspection RP - RP PUBLIC RADIATION SAFETY BASELINE 3 1 08/18/2014 08/22/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 08/18/2014 08/22/2014 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 08/18/2014 08/22/2014 IP 71124.07 Radiological Environmental Monitoring Program 1 08/18/2014 08/22/2014 IP 71151 Performance Indicator Verification RP - TRANSPORTATION 1 1 10/27/2014 10/31/2014 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EP - EP EXERCISE 1 1 03/09/2015 03/13/2015 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 03/09/2015 03/13/2015 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event 1 03/09/2015 03/13/2015 IP 71151 Performance Indicator Verification ISI - UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 2 1 04/27/2015 05/01/2015 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL BASELINE WEEK 1 3 1 04/27/2015 05/01/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/27/2015 05/01/2015 IP 71124.02 Occupational ALARA Planning and Controls 1 04/27/2015 05/01/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 04/27/2015 05/01/2015 IP 71124.04 Occupational Dose Assessment 1 04/27/2015 05/01/2015 IP 71124.05 Radiation Monitoring Instrumentation This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 Harris 03/04/2014 08:42:48 Inspection / Activity Plan Report 22 03/01/2014 - 06/30/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RP OCCUPATIONAL BASELINE WEEK 1 3 1 04/27/2015 05/01/2015 IP 71151 Performance Indicator Verification SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 05/04/2015 05/09/2015 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL BASELINE WEEK 2 2 1 05/11/2015 05/15/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 05/11/2015 05/15/2015 IP 71124.02 Occupational ALARA Planning and Controls 1 05/11/2015 05/15/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 05/11/2015 05/15/2015 IP 71124.04 Occupational Dose Assessment 1 05/11/2015 05/15/2015 IP 71124.05 Radiation Monitoring Instrumentation 1 05/11/2015 05/15/2015 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.