On July 17, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Turkey Point Nuclear Generation Station, Units 3 and 4. On July 17, 2014, the NRC inspectors discussed the results of this inspection with you and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.
On July 17, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Turkey Point Nuclear Generation Station, Units 3 and 4. On July 17, 2014, the NRC inspectors discussed the results of this inspection with you and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.


NRC inspectors documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirements.
NRC inspectors documented one finding of very low security significance (Green) in this report.
 
This finding involved a violation of NRC requirements.


If you contest the violation or the significance of this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington.
If you contest the violation or the significance of this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington.
Line 32: Line 34:
DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at Turkey Point Nuclear Generation Station.
DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at Turkey Point Nuclear Generation Station.


If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your  
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region II; and the NRC resident inspector at the Turkey Point Nuclear Generation Station.
 
disagreement, to the Regional Administrator, Region II; and the NRC resident inspector at the Turkey Point Nuclear Generation Station.
 
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding,"
of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


The enclosure transmitted herewith contains Safeguards Information. When separated from the enclosure
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains safeguards information as defined by 10 CFR 73.21, Protection of Safeguards Information: Performance Requirements, and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if security-related information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
, this transmittal document is decontrolled. However, the material enclosed herewith contains safeguards information as defined by 10 CFR 73.21, "Protection of Safeguards Information: Performance Requirements," and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if security-related information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information-Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.


Sincerely,
Sincerely,
/RA/ Robert C. Johnson, Chief  
/RA/
 
Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos. 05000250, 05000251 License Nos. DPR-31, DPR-41 Nonpublic Enclosure: Inspection Report 05000250/2014201 and 05000251/2014201 w/Attachment: Supplemental Information cc w/encl: T. Eck, Security Manager cc w/o encl: M. Nazar, CNO ML14198A492 OFFICE NSIR/DSO/SPEB NSIR/DSO/SPEB NSIR/DSO/SPEB RII  NSIR/DSO/SPEB NAME P. Negrete J. Curry K. Brooks B. Desai C. Johnson DATE 7/14/14 7/17/14 7/30/14 7/15/14 8/4/14
Security Performance Evaluation Branch  
 
Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos. 05000250, 05000251 License Nos. DPR-31, DPR-41  
 
Nonpublic Enclosure: Inspection Report 05000250/2014201 and 05000251/2014201 w/Attachment: Supplemental Information  
 
cc w/encl: T. Eck, Security Manager  
 
cc w/o encl: M. Nazar, CNO  
: ML14198A492 OFFICE NSIR/DSO/SPEB NSIR/DSO/SPEBNSIR/DSO/SPEBRII NSIR/DSO/SPEB NAME P. Negrete J. Curry K. Brooks B. Desai C. Johnson DATE 7/14/14 7/17/14 7/30/14 7/15/14 8/4/14
}}
}}

Latest revision as of 02:22, 4 November 2019

IR 05000250-14-201 and 05000251-14-201, on 07/14/2014, Turkey Point Units 3 and 4 - NRC Security Inspection Report Cover Letter
ML14198A492
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/04/2014
From: Rachel Johnson
Division of Security Operations
To: Kiley M
Florida Power & Light Co
Brooks K
References
IR-14-201
Download: ML14198A492 (3)


Text

ust 4, 2014

SUBJECT:

TURKEY POINT UNITS 3 AND 4 - NRC SECURITY INSPECTION REPORT 05000250/2014201 AND 05000251/2014201

Dear Mr. Kiley:

On July 17, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Turkey Point Nuclear Generation Station, Units 3 and 4. On July 17, 2014, the NRC inspectors discussed the results of this inspection with you and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.

NRC inspectors documented one finding of very low security significance (Green) in this report.

This finding involved a violation of NRC requirements.

If you contest the violation or the significance of this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington.

DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at Turkey Point Nuclear Generation Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region II; and the NRC resident inspector at the Turkey Point Nuclear Generation Station.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains safeguards information as defined by 10 CFR 73.21, Protection of Safeguards Information: Performance Requirements, and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if security-related information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos. 05000250, 05000251 License Nos. DPR-31, DPR-41 Nonpublic Enclosure: Inspection Report 05000250/2014201 and 05000251/2014201 w/Attachment: Supplemental Information cc w/encl: T. Eck, Security Manager cc w/o encl: M. Nazar, CNO ML14198A492 OFFICE NSIR/DSO/SPEB NSIR/DSO/SPEB NSIR/DSO/SPEB RII NSIR/DSO/SPEB NAME P. Negrete J. Curry K. Brooks B. Desai C. Johnson DATE 7/14/14 7/17/14 7/30/14 7/15/14 8/4/14