{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 August 11, 2014 Mr. Michael J. Pacilio Senior VP, Exelon Generation Co., LLC President and CNO, Exelon Nuclear 4300 Winfield Road WARRENVILLE, IL 60555
-4352 August 11, 2014 Mr. Michael J. Pacilio Senior VP, Exelon Generation Co., LLC President and CNO, Exelon Nuclear 4300 Winfield Road WARRENVILLE, IL 60555  


==SUBJECT:==
==SUBJECT:==
QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 REQUEST FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION  
QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 REQUEST FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
On November 3, 2014
, the U. S. Nuclear Regulatory Commission (NRC) will begin a T riennial Baseline Component Design Bases Inspection (CDBI) at your Quad Cities Nuclear Power Station, Units 1 and 2
. A team of s ix inspectors will perform this 3-week inspection. This inspection will be performed in accordance with NRC Baseline Inspection Procedure (IP) 71111.21. The CDBI focuses on the design, maintenance, and operation of risk significant components associated with one or more accident scenario or systems. The components to be reviewed during this baseline inspection will be identified during the in-office preparation week that occurs prior to the first on
-site inspection week. In addition, operating experience issues, associated with the component samples, will also be selected for review. The inspection team may request scenarios to be performed on the simulator. This request would require support from you r simulator staff to validate scenarios, simulator time, and a crew to perform the actions which would most likely occur during the second on
-site week. The team will work closely with your staff early on during the inspection process to ensure this activity can be accomplished with minimal impact.
The inspection will include three weeks on-site. The inspection team will consist of s ix NRC inspectors, of which five will focus on engineering/maintenance and one on operations. The current inspection schedule is as follows:
On-site weeks:
November 3
- 7, 2014;  November 17
- 21, 2014; and    December 1
- 5, 2014. The team will be preparing for the inspection, mainly during the week of October 27
- 31, 2014 , as discussed in the attached Enclosure.
Experience with previous baseline design inspections of similar depth and length has shown that th is type of inspection is extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for information needed for the


M. Pacilio inspection.
On November 3, 2014, the U. S. Nuclear Regulatory Commission (NRC) will begin a Triennial Baseline Component Design Bases Inspection (CDBI) at your Quad Cities Nuclear Power Station, Units 1 and 2. A team of six inspectors will perform this 3-week inspection. This inspection will be performed in accordance with NRC Baseline Inspection Procedure (IP) 71111.21.
It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. Insofar as possible, this information should be provided electronically to the lead inspector. The information request has been divided into three groups:
The CDBI focuses on the design, maintenance, and operation of risk significant components associated with one or more accident scenario or systems. The components to be reviewed during this baseline inspection will be identified during the inoffice preparation week that occurs prior to the first on-site inspection week. In addition, operating experience issues, associated with the component samples, will also be selected for review. The inspection team may request scenarios to be performed on the simulator. This request would require support from your simulator staff to validate scenarios, simulator time, and a crew to perform the actions which would most likely occur during the second on-site week. The team will work closely with your staff early on during the inspection process to ensure this activity can be accomplished with minimal impact.
The first group lists information necessary for our initial inspection scoping activities.
The inspection will include three weeks on-site. The inspection team will consist of six NRC inspectors, of which five will focus on engineering/maintenance and one on operations. The current inspection schedule is as follows:
This information should be provided to the lead inspector no later than September 9, 2014. By September 25, 2014, the lead inspector will communicate the initial selected set of approximately 15 components.
* On-site weeks:        November 3 - 7, 2014; November 17 - 21, 2014; and December 1 - 5, 2014.
The second group of documents requested is those items needed to support our in
The team will be preparing for the inspection, mainly during the week of October 27 - 31, 2014, as discussed in the attached Enclosure.
-office preparation activities. This set of documents, including the calculations associated with the initial selected components, should be provided to the lead inspector at the Regional Office no later than October 21, 2014. During the in
Experience with previous baseline design inspections of similar depth and length has shown that this type of inspection is extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for information needed for the
-office preparation activities, the team may identify additional information needed to support the inspection.
 
The last group includes the additional information above, as well as plant specific reference material. This information should be available to the team on
M. Pacilio                                     inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. Insofar as possible, this information should be provided electronically to the lead inspector. The information request has been divided into three groups:
-site on November 3, 2014. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the lead inspector as the documents are generated.
* The first group lists information necessary for our initial inspection scoping activities.
The lead inspector for this inspection is Andrew Dunlop. We understand that our licensing contact for this inspection is Tom Peterson of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at (630) 829
This information should be provided to the lead inspector no later than September 9, 2014.
-9726 or via e
By September 25, 2014, the lead inspector will communicate the initial selected set of approximately 15 components.
-mail at andrew.dunlop@nrc.gov
* The second group of documents requested is those items needed to support our in-office preparation activities. This set of documents, including the calculations associated with the initial selected components, should be provided to the lead inspector at the Regional Office no later than October 21, 2014. During the in-office preparation activities, the team may identify additional information needed to support the inspection.
. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget Control Number 3150
* The last group includes the additional information above, as well as plant specific reference material. This information should be available to the team on-site on November 3, 2014. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the lead inspector as the documents are generated.
-0011. The NRC may not conduct or sponsor; and a person is not required to respond to a request for information, or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
The lead inspector for this inspection is Andrew Dunlop. We understand that our licensing contact for this inspection is Tom Peterson of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at (630) 829-9726 or via e-mail at andrew.dunlop@nrc.gov.
M. Pacilio In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget Control Number 3150-0011. The NRC may not conduct or sponsor; and a person is not required to respond to a request for information, or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely, /RA/   Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50
M. Pacilio                                     In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-254 and 50
Sincerely,
-265 License Nos. DPR
                                                /RA/
-29 and DPR
Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-254 and 50-265 License Nos. DPR-29 and DPR-30
-30  


==Enclosure:==
==Enclosure:==


Information Request for Component Design Bases Inspection cc w/encl: Distribution via LISTSERV
Information Request for Component Design Bases Inspection cc w/encl: Distribution via LISTSERV
 
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION Inspection Report:              05000254/2014008; 05000265/2014008 Inspection Dates:                November 3 - 7, 2014; November 17 - 21, 2014; and December 1 - 5, 2014.
Inspection Procedure:            Inspection Procedure 71111.21 Component Design Bases Inspection Lead Inspector:                  Andrew Dunlop, Senior Reactor Engineer (630) 829-9726 andrew.dunlop@nrc.gov I. Information Requested Prior to the On-site Information Gathering/Inspection Week The following information is requested by September 9, 2014, or sooner, to facilitate inspection preparation. If you have any questions regarding this information, please call the team leader as soon as possible. (Please provide the information electronically in pdf files, Excel, or other searchable formats, preferably on some portable electronic media (e.g., CDROM, DVD, flash drive, etc.). The portable electronic media should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use.
Information in lists should contain enough information to be easily understood by someone who has knowledge of light water reactor technology).
: 1.      Risk-ranking of top 250 components from your site specific probabilistic safety analysis (PSA) sorted by Risk-Achievement Worth (RAW). Include values for Birnbaum Importance, Risk-Reduction Worth (RRW), and Fussell-Veseley (FV)
(as applicable).
: 2.      Risk-ranking of top 100 containment-related components from your site specific PSA sorted by Large Early Release Frequency (LERF).
: 3.      Provide a list of the top 200 cut-sets from your PSA.
: 4.      Provide a list of the top 100 cut-sets for each initiator modeled in the PSA that contributes more than 5 percent to the baseline plant core damage frequency (CDF).
: 5.      Copies of PSA system notebooks and latest PSA summary document.
: 6.      List of time critical operator actions. Identify those actions that do not have job performance measures (JPMs).
: 7.      Provide copies of the Emergency Operating Procedures (EOPs).
1                                  Enclosure


INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION Enclosure 1 Inspection Report:
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION
05000 254/20 1 4008; 05000 265/20 1 4008 Inspection Dates:
: 8. If you have an External Events or Fire PSA Model, provide the information requested in Items 1 and 2 for external events and fire. Provide narrative description of each coded event (including fire, flood zone description).
November 3
: 9. Electronic copy of the site IPEEE, if available.
- 7, 2014;    November 17
: 10. Any pre-existing evaluation or list of components and associated calculations with low design margins, (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design required output, heat exchangers close to rated design heat removal etc.).
- 21, 2014; and      December 1
: 11. List of available design (setup) margins in both the open and closed direction (identify safety-related direction) for valves in the motor-operated valve (MOV) and air-operated valve (AOV) programs. Identify the basis for how the margin was determined.
- 5, 2014. Inspection Procedure:
: 12. List of high risk Maintenance Rule systems/components based on engineering or expert panel judgment (i.e., those systems/components not identified in the PRA).
Inspection Procedure 71111.21 "Component Design Bases Inspection" Lead Inspector:
: 13. Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1) category for the last three years.
Andrew Dunlop
: 14. Site top ten issues list (if applicable).
, Senior Reactor Engineer (630) 829-9726      andrew.dunlop@nrc.gov I. Information Requested Prior to the On-site Information Gathering/Inspection Week The following information is requested by September 9, 2014
: 15. A list of operating experience evaluations for the last three years.
, or sooner, to facilitate inspection preparation. If you have any questions regarding this information, please call the team leader as soon as possible.  (Please provide the information electronically in "pdf" files, Excel, or other searchable formats, preferably on some portable electronic media (e.g., CDROM, DVD, flash drive, etc.). The portable electronic media should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information in "lists" should contain enough information to be easily understood by someone who has knowledge of light water reactor technology).
: 16. Information of any common cause failure of components experienced in the last five years at your facility.
: 1. Risk-ranking of top 2 50 components from your site specific probabilistic safety analysis (PSA) sorted by Risk
: 17. List of Root Cause Evaluations associated with component failures or design issues initiated/completed in the last five years.
-Achievement Worth (RAW). Include values for Birnbaum Importance, Risk
: 18. List of open operability evaluations.
-Reduction Worth (RRW), and Fussell
: 19. List of components/systems considered operable but degraded/non-conforming.
-Veseley (FV)
: 20. Current management and engineering organizational chart.
(as applicable)
: 21. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications, Technical Specifications Bases, and Technical Requirements Manual.
. 2. Risk-ranking of top 10 0 containment
: 22. Major one line electrical drawings (ac and dc) and key diagrams (paper copies).
-related components from your site specific PSA sorted by Large Early Release Frequency (LERF).
: 3. Provide a list of the top 200 cut
-sets from your PSA
. 4. Provide a list of the top 100 cut-sets for each initiator modeled in the P SA that contributes more than 5 percent to the baseline plant core damage frequency (CDF). 5. Copies of PSA "system notebooks" and latest PSA summary document.
: 6. List of time critical operator actions. Identify those actions that do not have job performance measures (JPMs).
: 7. Provide copies of the Emergency Operating Procedures (EOPs).
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION 2 8. If you have an External Events or Fire PSA Model, provide the information requested in Items 1 and 2 for external events and fire. Provide narrative description of each coded event (including fire, flood zone description). 9. Electronic copy of the site IPEEE, if available.
: 10. Any pre-existing evaluation or list of components and associated calculations with low design margins, (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design required output, heat exchangers close to rated design heat removal etc.). 11. List of available design (setup) margins in both the open and closed direction (identify safety
-related direction) for valves in the motor
-operated valve (MOV) and air-operated valve (AOV) programs
. Identify the basis for how the margin was determined.
: 12. List of high risk Maintenance Rule systems/components based on engineering or expert panel judgment (i.e., those systems/components not identified in the PRA). 13. Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1) category for the last three years. 14. Site top ten issues list (if applicable)
. 15. A list of operating experience evaluations for the last three years. 16. Information of any common cause failure of components experienced in the last five years at your facility
. 17. List of Root Cause Evaluations associated with component failures or design issues initiated/completed in the last five years. 18. List of open operability evaluations.
: 19. List of components/systems considered operable but degraded/non
-conforming.
: 20. Current management and engineering organizational chart
. 21. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications, Technical Specifications Bases, and Technical Requirements Manual. 22. Major one line electrical drawings (ac and dc) and key diagrams (paper copies).
: 23. Electronic copy of P&IDs (if available).
: 23. Electronic copy of P&IDs (if available).
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION 3 II. Information Requested (for the approximate 15 selected components) to be Available by October 2 1, 2014, (will be reviewed by the team in the Regional office during the week of October 27  
2
- 31, 2014). This information should be separated for each selected component, especially if provided electronically (e.g., folder with component name that includes calculations, condition reports, maintenance history, etc
 
.). 1. List of condition reports (corrective action documents) associated with each of the selected components for the last six years. 2. The maintenance history (corrective, preventive, and elective) associated with each of the selected components for the last 10 years. Identify frequency of preventive maintenance activities. 3. Copies of calculations associated with each of the selected components (if not previously provided), excluding data files. Please review the calculations and also provide copies of important referenced material (such as drawings, engineering requests, and vendor letters)
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION II. Information Requested (for the approximate 15 selected components) to be Available by October 21, 2014, (will be reviewed by the team in the Regional office during the week of October 27 - 31, 2014).
. 4. System Health Reports, System Descriptions, Design Basis Documents, and/or Training Lesson Plans that are associated with each of the selected components.
This information should be separated for each selected component, especially if provided electronically (e.g., folder with component name that includes calculations, condition reports, maintenance history, etc.).
: 5. A list of modifications, including equivalency evaluations and setpoint changes, associated with each of the selected components
: 1.     List of condition reports (corrective action documents) associated with each of the selected components for the last six years.
. This list should include a descriptive paragraph on the purpose of the modification. Please ensure this list only includes design completed (not canceled) modifications.
: 2.     The maintenance history (corrective, preventive, and elective) associated with each of the selected components for the last 10 years. Identify frequency of preventive maintenance activities.
: 6. Copies of operability evaluations (open/closed for last three years) associated with each of the selected components and plans for restoring operability, if applicable
: 3.     Copies of calculations associated with each of the selected components (if not previously provided), excluding data files. Please review the calculations and also provide copies of important referenced material (such as drawings, engineering requests, and vendor letters).
. 7. Copies of selected operator work
: 4.     System Health Reports, System Descriptions, Design Basis Documents, and/or Training Lesson Plans that are associated with each of the selected components.
-around evaluations associated with each of the selected components and plans for resolution, if applicable.
: 5.     A list of modifications, including equivalency evaluations and setpoint changes, associated with each of the selected components. This list should include a descriptive paragraph on the purpose of the modification. Please ensure this list only includes design completed (not canceled) modifications.
: 8. Copies of any open temporary modifications associated with each of the selected components, if applicable.
: 6.     Copies of operability evaluations (open/closed for last three years) associated with each of the selected components and plans for restoring operability, if applicable.
: 9. Trend data on the selected electrical/mechanical components' performance for last three years (For example, pumps' performance including in
: 7.     Copies of selected operator work-around evaluations associated with each of the selected components and plans for resolution, if applicable.
-service testing, other vibration monitoring, oil sample results, etc., for valves: stroke time and leak rate results, etc.
: 8.     Copies of any open temporary modifications associated with each of the selected components, if applicable.
). 10. Copy of latest completed surveillance tests for each component (for example, for pumps this would include: comprehensive test, quarterly test, flow balance, etc. for valves: stroke time testing, diagnostic testing, leak testing, etc.). Acceptance criteria basis calculations should also be included.
: 9.     Trend data on the selected electrical/mechanical components performance for last three years (For example, pumps performance including in-service testing, other vibration monitoring, oil sample results, etc., for valves: stroke time and leak rate results, etc.).
: 11. Provide copies of the normal and abnormal operating procedures associated with the selected components and selected scenarios
: 10. Copy of latest completed surveillance tests for each component (for example, for pumps this would include: comprehensive test, quarterly test, flow balance, etc.
.
for valves: stroke time testing, diagnostic testing, leak testing, etc.). Acceptance criteria basis calculations should also be included.
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION 4 12. A copy of any internal/external self
: 11. Provide copies of the normal and abnormal operating procedures associated with the selected components and selected scenarios.
-assessments and associated corrective action documents generated in preparation for the inspection
3
. 13. A copy of engineering/operations related audits completed in the last two years. III. Additional Information to be Provided on [first on-site week] On-Site (for final selected components)
 
: 1. During the in
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION
-office preparation activities, the team will be making final selections and may identify additional information needed to support the inspection. The lead inspector will provide a list of the additional information needed during the week of October 27  
: 12. A copy of any internal/external self-assessments and associated corrective action documents generated in preparation for the inspection.
- 31, 2014. 2. Schedule of any testing/maintenance activities to be conducted on the selected components during the three on-site inspection weeks.
: 13. A copy of engineering/operations related audits completed in the last two years.
III. Additional Information to be Provided on [first on-site week] On-Site (for final selected components)
: 1. During the in-office preparation activities, the team will be making final selections and may identify additional information needed to support the inspection. The lead inspector will provide a list of the additional information needed during the week of October 27 - 31, 2014.
: 2. Schedule of any testing/maintenance activities to be conducted on the selected components during the three on-site inspection weeks.
IV. Information Requested to be Provided Throughout the Inspection
IV. Information Requested to be Provided Throughout the Inspection
: 1. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection
: 1. Copies of any corrective action documents generated as a result of the teams questions or queries during this inspection.
. 2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member)
: 2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member).
. 3. One complete set of P&IDs (paper copies)
: 3. One complete set of P&IDs (paper copies).
. 4. Reference materials. (make available if needed during all on
: 4. Reference materials. (make available if needed during all on-site weeks):
-site weeks):
* IPE/PRA report;
IPE/PRA report
* Procurement documents for components selected (verify retrievable);
Procurement documents for components selected (verify retrievable);
* Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
Plant procedures (normal, abnormal, emergency, surveillance, etc.); and Vendor manuals.
* Vendor manuals.
If you have questions regarding the information requested, please contact the lead inspector.
If you have questions regarding the information requested, please contact the lead inspector.
M. Pacilio In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
4
-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely, /RA/
M. Pacilio                                                                 In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50
Sincerely,
-254 and 50
                                                                          /RA/
-265 License Nos. DPR
Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-254 and 50-265 License Nos. DPR-29 and DPR-30
-29 and DPR
-30  


==Enclosure:==
==Enclosure:==


Information Request for Component Design Bases Inspection cc w/encl: Distribution via LISTSERV
Information Request for Component Design Bases Inspection cc w/encl: Distribution via LISTSERV DISTRIBUTION:
 
See next page DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr                                          081114 QuadCities CDBI RFI AXD.docx Publicly Available                  Non-Publicly Available  Sensitive                          Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE                  RIII                      RIII NAME                    ADunlop:ls                AMStone DATE                    08/11/14                  08/11/14 OFFICIAL RECORD COPY
DISTRIBUTION
: See next page  


DOCUMENT NAME:
Letter to Michael J. Pacilio from Ann Marie Stone dated August 11, 2014.
G:\DRSIII\DRS\Work in Progress
\Ltr 08 1114 QuadCities CDBI RFI AXD.docx
  -Publicly Available
  -Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII  RIII        NAME ADunlop:ls AMStone    DATE 08/11/14 08/11/14    OFFICIAL RECORD COPY Letter to Michael J. Pacilio from A nn Marie Stone dated August 11, 2014.  


==SUBJECT:==
==SUBJECT:==
QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 REQUEST FOR INFORMATION FOR AN NRC TRIENNIAL BASELIN E COMPONENT DESIGN BASES INSPECTION DISTRIBUTION
QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 REQUEST FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION DISTRIBUTION:
: Anthony Bowers RidsNrrDorlLpl3
Anthony Bowers RidsNrrDorlLpl3-2 Resource RidsNrrPMQuadCities Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Carmen Olteanu}}
-2 Resource RidsNrrPMQuadCities Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Carmen Olteanu}}

Revision as of 01:35, 4 November 2019

Ltr 08/11/14 Quad Cities CDBI Request for Information
ML14223B216
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 08/11/2014
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
Andrew Dunlop
References
Download: ML14223B216 (9)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 August 11, 2014 Mr. Michael J. Pacilio Senior VP, Exelon Generation Co., LLC President and CNO, Exelon Nuclear 4300 Winfield Road WARRENVILLE, IL 60555

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 REQUEST FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION

Dear Mr. Pacilio:

On November 3, 2014, the U. S. Nuclear Regulatory Commission (NRC) will begin a Triennial Baseline Component Design Bases Inspection (CDBI) at your Quad Cities Nuclear Power Station, Units 1 and 2. A team of six inspectors will perform this 3-week inspection. This inspection will be performed in accordance with NRC Baseline Inspection Procedure (IP) 71111.21.

The CDBI focuses on the design, maintenance, and operation of risk significant components associated with one or more accident scenario or systems. The components to be reviewed during this baseline inspection will be identified during the inoffice preparation week that occurs prior to the first on-site inspection week. In addition, operating experience issues, associated with the component samples, will also be selected for review. The inspection team may request scenarios to be performed on the simulator. This request would require support from your simulator staff to validate scenarios, simulator time, and a crew to perform the actions which would most likely occur during the second on-site week. The team will work closely with your staff early on during the inspection process to ensure this activity can be accomplished with minimal impact.

The inspection will include three weeks on-site. The inspection team will consist of six NRC inspectors, of which five will focus on engineering/maintenance and one on operations. The current inspection schedule is as follows:

  • On-site weeks: November 3 - 7, 2014; November 17 - 21, 2014; and December 1 - 5, 2014.

The team will be preparing for the inspection, mainly during the week of October 27 - 31, 2014, as discussed in the attached Enclosure.

Experience with previous baseline design inspections of similar depth and length has shown that this type of inspection is extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for information needed for the

M. Pacilio inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. Insofar as possible, this information should be provided electronically to the lead inspector. The information request has been divided into three groups:

  • The first group lists information necessary for our initial inspection scoping activities.

This information should be provided to the lead inspector no later than September 9, 2014.

By September 25, 2014, the lead inspector will communicate the initial selected set of approximately 15 components.

  • The second group of documents requested is those items needed to support our in-office preparation activities. This set of documents, including the calculations associated with the initial selected components, should be provided to the lead inspector at the Regional Office no later than October 21, 2014. During the in-office preparation activities, the team may identify additional information needed to support the inspection.
  • The last group includes the additional information above, as well as plant specific reference material. This information should be available to the team on-site on November 3, 2014. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the lead inspector as the documents are generated.

The lead inspector for this inspection is Andrew Dunlop. We understand that our licensing contact for this inspection is Tom Peterson of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at (630) 829-9726 or via e-mail at andrew.dunlop@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget Control Number 3150-0011. The NRC may not conduct or sponsor; and a person is not required to respond to a request for information, or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.

M. Pacilio In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-254 and 50-265 License Nos. DPR-29 and DPR-30

Enclosure:

Information Request for Component Design Bases Inspection cc w/encl: Distribution via LISTSERV

INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION Inspection Report: 05000254/2014008; 05000265/2014008 Inspection Dates: November 3 - 7, 2014; November 17 - 21, 2014; and December 1 - 5, 2014.

Inspection Procedure: Inspection Procedure 71111.21 Component Design Bases Inspection Lead Inspector: Andrew Dunlop, Senior Reactor Engineer (630) 829-9726 andrew.dunlop@nrc.gov I. Information Requested Prior to the On-site Information Gathering/Inspection Week The following information is requested by September 9, 2014, or sooner, to facilitate inspection preparation. If you have any questions regarding this information, please call the team leader as soon as possible. (Please provide the information electronically in pdf files, Excel, or other searchable formats, preferably on some portable electronic media (e.g., CDROM, DVD, flash drive, etc.). The portable electronic media should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use.

Information in lists should contain enough information to be easily understood by someone who has knowledge of light water reactor technology).

1. Risk-ranking of top 250 components from your site specific probabilistic safety analysis (PSA) sorted by Risk-Achievement Worth (RAW). Include values for Birnbaum Importance, Risk-Reduction Worth (RRW), and Fussell-Veseley (FV)

(as applicable).

2. Risk-ranking of top 100 containment-related components from your site specific PSA sorted by Large Early Release Frequency (LERF).
3. Provide a list of the top 200 cut-sets from your PSA.
4. Provide a list of the top 100 cut-sets for each initiator modeled in the PSA that contributes more than 5 percent to the baseline plant core damage frequency (CDF).
5. Copies of PSA system notebooks and latest PSA summary document.
6. List of time critical operator actions. Identify those actions that do not have job performance measures (JPMs).
7. Provide copies of the Emergency Operating Procedures (EOPs).

1 Enclosure

INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION

8. If you have an External Events or Fire PSA Model, provide the information requested in Items 1 and 2 for external events and fire. Provide narrative description of each coded event (including fire, flood zone description).
9. Electronic copy of the site IPEEE, if available.
10. Any pre-existing evaluation or list of components and associated calculations with low design margins, (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design required output, heat exchangers close to rated design heat removal etc.).
11. List of available design (setup) margins in both the open and closed direction (identify safety-related direction) for valves in the motor-operated valve (MOV) and air-operated valve (AOV) programs. Identify the basis for how the margin was determined.
12. List of high risk Maintenance Rule systems/components based on engineering or expert panel judgment (i.e., those systems/components not identified in the PRA).
13. Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1) category for the last three years.
14. Site top ten issues list (if applicable).
15. A list of operating experience evaluations for the last three years.
16. Information of any common cause failure of components experienced in the last five years at your facility.
17. List of Root Cause Evaluations associated with component failures or design issues initiated/completed in the last five years.
18. List of open operability evaluations.
19. List of components/systems considered operable but degraded/non-conforming.
20. Current management and engineering organizational chart.
21. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications, Technical Specifications Bases, and Technical Requirements Manual.
22. Major one line electrical drawings (ac and dc) and key diagrams (paper copies).
23. Electronic copy of P&IDs (if available).

2

INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION II. Information Requested (for the approximate 15 selected components) to be Available by October 21, 2014, (will be reviewed by the team in the Regional office during the week of October 27 - 31, 2014).

This information should be separated for each selected component, especially if provided electronically (e.g., folder with component name that includes calculations, condition reports, maintenance history, etc.).

1. List of condition reports (corrective action documents) associated with each of the selected components for the last six years.
2. The maintenance history (corrective, preventive, and elective) associated with each of the selected components for the last 10 years. Identify frequency of preventive maintenance activities.
3. Copies of calculations associated with each of the selected components (if not previously provided), excluding data files. Please review the calculations and also provide copies of important referenced material (such as drawings, engineering requests, and vendor letters).
4. System Health Reports, System Descriptions, Design Basis Documents, and/or Training Lesson Plans that are associated with each of the selected components.
5. A list of modifications, including equivalency evaluations and setpoint changes, associated with each of the selected components. This list should include a descriptive paragraph on the purpose of the modification. Please ensure this list only includes design completed (not canceled) modifications.
6. Copies of operability evaluations (open/closed for last three years) associated with each of the selected components and plans for restoring operability, if applicable.
7. Copies of selected operator work-around evaluations associated with each of the selected components and plans for resolution, if applicable.
8. Copies of any open temporary modifications associated with each of the selected components, if applicable.
9. Trend data on the selected electrical/mechanical components performance for last three years (For example, pumps performance including in-service testing, other vibration monitoring, oil sample results, etc., for valves: stroke time and leak rate results, etc.).
10. Copy of latest completed surveillance tests for each component (for example, for pumps this would include: comprehensive test, quarterly test, flow balance, etc.

for valves: stroke time testing, diagnostic testing, leak testing, etc.). Acceptance criteria basis calculations should also be included.

11. Provide copies of the normal and abnormal operating procedures associated with the selected components and selected scenarios.

3

INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION

12. A copy of any internal/external self-assessments and associated corrective action documents generated in preparation for the inspection.
13. A copy of engineering/operations related audits completed in the last two years.

III. Additional Information to be Provided on [first on-site week] On-Site (for final selected components)

1. During the in-office preparation activities, the team will be making final selections and may identify additional information needed to support the inspection. The lead inspector will provide a list of the additional information needed during the week of October 27 - 31, 2014.
2. Schedule of any testing/maintenance activities to be conducted on the selected components during the three on-site inspection weeks.

IV. Information Requested to be Provided Throughout the Inspection

1. Copies of any corrective action documents generated as a result of the teams questions or queries during this inspection.
2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member).
3. One complete set of P&IDs (paper copies).
4. Reference materials. (make available if needed during all on-site weeks):
  • IPE/PRA report;
  • Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
  • Vendor manuals.

If you have questions regarding the information requested, please contact the lead inspector.

4

M. Pacilio In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-254 and 50-265 License Nos. DPR-29 and DPR-30

Enclosure:

Information Request for Component Design Bases Inspection cc w/encl: Distribution via LISTSERV DISTRIBUTION:

See next page DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 081114 QuadCities CDBI RFI AXD.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME ADunlop:ls AMStone DATE 08/11/14 08/11/14 OFFICIAL RECORD COPY

Letter to Michael J. Pacilio from Ann Marie Stone dated August 11, 2014.