{{#Wiki_filter:SRRS: 3D.105 (when utilized for operator initial or continuing training)
{{#Wiki_filter:Exelon Nuclear Job Performance Measure Initiate Standby Liquid Control with Failure to Inject JPM Number: 2014 ILT NRC JPM a Revision Number: 00 Date: 02/27/14 Developed By:
Page 1 of 9 Exelon Nuclear Job Performance Measure Initiate Standby Liquid Control with Failure to Inject JPM Number: 2014 ILT NRC JPM a Revision Number: 00 Date: 02/27/14 Developed By:
Instructor         Date Validated By:
Instructor Date  
SME or Instructor      Date Reviewed By:
Operations Representative    Date Approved By:
Training Department      Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 1 of 9


Validated By:
2014 ILT NRC JPM a - Rev. 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
SME or Instructor Date Reviewed By:
Operations Representative Date Approved By:
Training Department Date
 
2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initia l validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________ 1. Task description and number, JPM description and number are identified. ________ 2. Knowledge and Abilities (K/A) references are included. ________ 3. Performance location specified. (in-plant, control room, simulator, or other) ________ 4. Initial setup conditions are identified. ________ 5. Initiating cue (and terminating cue if required) are properly identified. ________ 6. Task standards identifi ed and verified by SME review. ________ 7. Critical steps meet the criteria for critical st eps and are identified with an asterisk (*). ________ 8. If an alternate path is used, the task standard contai ns criteria for successful completion. ________ 9. Verify the procedure(s) referenced by this JPM re flects the current revision:
________     1. Task description and number, JPM description and number are identified.
Procedure QCOP 1100-02 Rev: 12 Procedure Rev:   Procedure Rev:   ________ 10. Verify cues both verbal and visual are free of conflict. ________ 11. Verify performance time is accurate
________     2. Knowledge and Abilities (K/A) references are included.
________ 12. If the JPM cannot be performed as written wit h proper responses, then revise the JPM. ________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________     3. Performance location specified. (in-plant, control room, simulator, or other)
SME / Instructor Date  
________     4. Initial setup conditions are identified.
 
________     5. Initiating cue (and terminating cue if required) are properly identified.
SME / Instructor Date  
________     6. Task standards identified and verified by SME review.
 
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
SME / Instructor Date  
________     8. If an alternate path is used, the task standard contains criteria for successful completion.
________     9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure QCOP 1100-02                   Rev: 12 Procedure                               Rev:
Procedure                               Rev:
________     10. Verify cues both verbal and visual are free of conflict.
________     11. Verify performance time is accurate
________     12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                 Date SME / Instructor                                 Date SME / Instructor                                 Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 9


2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
2014 ILT NRC JPM a - Rev. 00 Revision Record (Summary)
Page 3 of 9 Revision Record (Summary)
Revision 00, Renamed 2014 ILT NRC JPM a. Restarted revision numbering accordingly.
Revision 00, Renamed 2014 ILT NRC JPM a. Restarted revision numbering accordingly.
Previous changes were:
Previous changes were:
Revision 06, Reworded to match wording of LS
Revision 06, Reworded to match wording of LS-008-I, the non-faulted version of the same JPM.
-008-I, the non-faulted version of the same JPM.
Revision 07, JPM revised to reflect procedure changes.
Revision 07, JPM revised to reflect procedure changes.
Revision 08, JPM revised to reflect simula tor setup commands and new average performance time.
Revision 08, JPM revised to reflect simulator setup commands and new average performance time.
Revision 09, JPM revised to reflect procedure changes.
Revision 09, JPM revised to reflect procedure changes.
Revision 10, JPM revised to reflect single pum p injection, procedure change, and removal of one critical task.
Revision 10, JPM revised to reflect single pump injection, procedure change, and removal of one critical task.
2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS 1. Reset the simulator to any IC at power > 20%
Page 3 of 9
 
2014 ILT NRC JPM a - Rev. 00 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to any IC at power > 20%
: 2. Manual Actuation:
: 2. Manual Actuation:
Ensure the SBLC key is in the Control switch.
Ensure the SBLC key is in the Control switch.
: 3. Malfunctions (contained in caep file "A caep.cae")
: 3. Malfunctions (contained in caep file A caep.cae)
Setup for a jpml00:00:00l00 Fail the SBLC pumps to work (2 commands)l00:00:00l01  
Setup for a jpml00:00:00l00 Fail the SBLC pumps to work (2 commands)l00:00:00l01 imf SL01Al00:00:02l02 imf SL01Bl00:00:04l03 Set triggers 1 and 2 true when both squib lights are outl00:00:04l04 trgset 1(.NOT. ZLOHS11130301(2)) .AND. (.NOT. ZLOHS11130301(4)) l00:00:06l05 trgset 2(.NOT. ZLOHS11130301(2)) .AND. (.NOT. ZLOHS11130301(4)) l00:00:08l06 When triggers 1 and 2 true, delete the pump tripsl00:00:00l07 trg 1 dmf sl01a l00:00:10l08 trg 2 dmf sl01b l00:00:12l09
: 4. Remotes:
NONE
: 5. Overrides:
NONE
: 6. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
: 7. This completes the setup for this JPM.
A caep.cae      JPM A QCOP 1100-02, Rev 012, IN SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 9


imf SL01Al00:00:02l02
2014 ILT NRC JPM a - Rev. 00 INITIAL CONDITIONS U-1 has experienced an ATWS. The following conditions exist:
 
imf SL01Bl00:00:04l03
 
Set triggers 1 and 2 true when both squib lights are outl00:00:04l04 trgset 1"(.NOT. ZLOHS11130301(2)) .AND.
(.NOT. ZLOHS11130301(4))" l00:00:06l05 trgset 2"(.NOT. ZLOHS11130301(2)) .AND. (.NOT. ZLOHS11130301(4))" l00:00:08l06 When triggers 1 and 2 true, delet e the pump tripsl00:00:00l07 trg 1 "dmf sl01a" l00:00:10l08
 
trg 2 "dmf sl01b" l00:00:12l09
: 4. Remotes:  NONE
: 5. Overrides:  NONE
: 6. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist. 7. This completes the setup for this JPM.
A caep.caeJPM A QCOP 1100-02, Rev 012, I N
2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 9 INITIAL CONDITIONS U-1 has experienced an ATWS. The following conditions exist:
o Reactor power > 5%.
o Reactor power > 5%.
o Both Recirc pumps were tripped per QGA 101.
o Both Recirc pumps were tripped per QGA 101.
Line 74: Line 76:
The Unit Supervisor has determined that SBLC must be initiated per QGA 101.
The Unit Supervisor has determined that SBLC must be initiated per QGA 101.
This JPM is not time critical.
This JPM is not time critical.
INITIATING CUE Inject the Standby Liquid Cont rol System per the hard card.
INITIATING CUE Inject the Standby Liquid Control System per the hard card.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
* Denotes critical elemen ts of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Nu mber" column on the following pages. Then annotate that comment in the "C omments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, ma rginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment i ssues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Some operations that are perform ed from outside of the contro l room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to per form groups of procedure steps instead of calling for each individual item to be performed.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 6 of 9 JPM Start Time:
Page 5 of 9
STEP ELEMENT STANDARD SAT UNSAT Comment Number  Obtain procedure to be used. Obtains procedure QCOP 1100-02 hard card for injecting SBLC. ___ ______F.1. Select Syst em 1 or 2 with keylock switch A and B SELECT. Positions SBLC keylock switch to System 1 or 2. ___ ______EVALUATOR NOTE:  Initial cue states "no LOCA in progress," candidate should only inject with one pump at a time.
*F.2. *Determines SBLC NOT injecting.
* Determines SBLC NOT injecting by any one or more of


the following indications: SBLC flow light NOT lit.
2014 ILT NRC JPM a - Rev. 00 JPM Start Time:
SBLC tank level is NOT decreasing. (LI-1-1140-2) Pump discharge press < Rx press. (PI-1-1140-1) Verify neutron flux NOT decreasing. (APRM recorders) ___ ______EVALUATOR NOTE: Alternate path starts here.  
Comment SAT  UNSAT STEP                    ELEMENT                                  STANDARD Number Obtain procedure to be used.              Obtains procedure QCOP 1100-      ___  ___    ___
*F.3. *Attempt to inject SBLC with the opposite switch position.
02 hard card for injecting SBLC.
* Repositions SBLC keylock switch to the opposite position  
F.1. Select System 1 or 2 with                  Positions SBLC keylock switch      ___  ___    ___
 
keylock switch A and B                    to System 1 or 2.
that was initially selected. ___ ______SIMULATOR OPERATOR NOTE: When operator takes switch to the opposite position, verify triggers 1 and 2 go true and malfunctions SL01A and SL01B are deleted. Reports SBLC is injecting. Informs US that SBLC is injecting. ___ ______EVALUATOR: The candidate should inform you that the task is complete.
SELECT.
JPM Stop Time:
EVALUATOR NOTE: Initial cue states no LOCA in progress, candidate should only inject with one pump at a time.
*F.2.    *Determines SBLC NOT                      Determines SBLC NOT                ___  ___    ___
injecting.*                                injecting by any one or more of the following indications:
SBLC flow light NOT lit.
SBLC tank level is NOT decreasing. (LI-1-1140-2)
Pump discharge press < Rx press. (PI-1-1140-1)
Verify neutron flux NOT decreasing. (APRM recorders)
EVALUATOR NOTE: Alternate path starts here.
*F.3.   *Attempt to inject SBLC with the Repositions SBLC keylock                    ___  ___    ___
opposite switch position.*       switch to the opposite position that was initially selected.
SIMULATOR OPERATOR NOTE: When operator takes switch to the opposite position, verify triggers 1 and 2 go true and malfunctions SL01A and SL01B are deleted.
Reports SBLC is injecting.                 Informs US that SBLC is           ___  ___    ___
injecting.
EVALUATOR: The candidate should inform you that the task is complete.
JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 6 of 9


2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
2014 ILT NRC JPM a - Rev. 00 JPM  
Page 7 of 9 JPM  


==SUMMARY==
==SUMMARY==
Operator's Name
:  Job Title:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title: Initiate Standby Liquid Control with Failure to Inject JPM Number: 2014 ILT NRC JPM a  Revision Number: 00 Task Number and Title:
SR-1100-P02  (Freq: LIC=A) (ILT-MP)  Gi ven a reactor plant with an ATWS, inject boron prior to exceeding 110 degrees torus water temperature OR if core instability is observed in acco rdance with QGA 101 and QCOP 1100-02.  (Important PRA Operator Action - starting SBLC terminates 1 of the top 100 most probable Core Damage Seq uences and has a RAW of 17.3)
K/A Number and Importance:
K/A: 211000 A4.02 Rating: 4.2/4.2 Suggested Testing Environment: Simulator


Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOP 1100-02, Rev. 12, INJECTION OF STANDBY LIQUID CONTROL Actual Testing Environment:
Operators Name:                                                                        Job Title:            EO            RO          SRO          FS STA/IA                  SRO Cert JPM Title:                  Initiate Standby Liquid Control with Failure to Inject JPM Number:                  2014 ILT NRC JPM a                                                        Revision Number: 00 Task Number and Title:
Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 6.0 minutes Actual Time Used:
SR-1100-P02 (Freq: LIC=A) (ILT-MP) Given a reactor plant with an ATWS, inject boron prior to exceeding 110 degrees torus water temperature OR if core instability is observed in accordance with QGA 101 and QCOP 1100-02.
minutes EVALUATION  
(Important PRA Operator Action - starting SBLC terminates 1 of the top 100 most probable Core Damage Sequences and has a RAW of 17.3)
K/A Number and Importance:                              K/A:        211000 A4.02                      Rating:                4.2/4.2 Suggested Testing Environment: Simulator Alternate Path:               Yes           No         SRO Only:             Yes           No         Time Critical:             Yes           No Reference(s): QCOP 1100-02, Rev. 12, INJECTION OF STANDBY LIQUID CONTROL Actual Testing Environment:                               Simulator                   Control Room                     In-Plant                 Other Testing Method:                       Simulate                 Perform Estimated Time to Complete: 6.0 minutes                                               Actual Time Used:                             minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily? Yes No The operator's performance wa s evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?                                                     Yes                       No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                                                     Satisfactory               Unsatisfactory Comments:
Evaluator's Name
Evaluators Name:                                                                                             (Print)
:   (Print) Evaluator's Signature
Evaluators Signature:                                                                                     Date:
:   Date:   [If this page is an odd numbered page, a blank page is automatically generated after this page to keep the student cue sheet separate from this page]  
[If this page is an odd numbered page, a blank page is automatically generated after this page to keep the student cue sheet separate from this page]
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 7 of 9


SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS U-1 has experienced an ATWS. The following conditions exist:
INITIAL CONDITIONS U-1 has experienced an ATWS. The following conditions exist:
o Reactor power > 5%.
o Reactor power > 5%.
Line 125: Line 137:
The Unit Supervisor has determined that SBLC must be initiated per QGA 101.
The Unit Supervisor has determined that SBLC must be initiated per QGA 101.
This JPM is not time critical.
This JPM is not time critical.
INITIATING CUE Inject the Standby Liquid Cont rol System per the hard card.}}
INITIATING CUE Inject the Standby Liquid Control System per the hard card.
SRRS: 3D.105 (when utilized for operator initial or continuing training)}}

Revision as of 01:27, 4 November 2019

Systems JPM a
ML14225A608
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 04/27/2013
From:
NRC/RGN-III
To:
Exelon Generation Co
Bruce Palagi
Shared Package
ML13093A388 List:
References
Download: ML14225A608 (9)


Text

Exelon Nuclear Job Performance Measure Initiate Standby Liquid Control with Failure to Inject JPM Number: 2014 ILT NRC JPM a Revision Number: 00 Date: 02/27/14 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 9

2014 ILT NRC JPM a - Rev. 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure QCOP 1100-02 Rev: 12 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 9

2014 ILT NRC JPM a - Rev. 00 Revision Record (Summary)

Revision 00, Renamed 2014 ILT NRC JPM a. Restarted revision numbering accordingly.

Previous changes were:

Revision 06, Reworded to match wording of LS-008-I, the non-faulted version of the same JPM.

Revision 07, JPM revised to reflect procedure changes.

Revision 08, JPM revised to reflect simulator setup commands and new average performance time.

Revision 09, JPM revised to reflect procedure changes.

Revision 10, JPM revised to reflect single pump injection, procedure change, and removal of one critical task.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 9

2014 ILT NRC JPM a - Rev. 00 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC at power > 20%
2. Manual Actuation:

Ensure the SBLC key is in the Control switch.

3. Malfunctions (contained in caep file A caep.cae)

Setup for a jpml00:00:00l00 Fail the SBLC pumps to work (2 commands)l00:00:00l01 imf SL01Al00:00:02l02 imf SL01Bl00:00:04l03 Set triggers 1 and 2 true when both squib lights are outl00:00:04l04 trgset 1(.NOT. ZLOHS11130301(2)) .AND. (.NOT. ZLOHS11130301(4)) l00:00:06l05 trgset 2(.NOT. ZLOHS11130301(2)) .AND. (.NOT. ZLOHS11130301(4)) l00:00:08l06 When triggers 1 and 2 true, delete the pump tripsl00:00:00l07 trg 1 dmf sl01a l00:00:10l08 trg 2 dmf sl01b l00:00:12l09

4. Remotes:

NONE

5. Overrides:

NONE

6. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
7. This completes the setup for this JPM.

A caep.cae JPM A QCOP 1100-02, Rev 012, IN SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 9

2014 ILT NRC JPM a - Rev. 00 INITIAL CONDITIONS U-1 has experienced an ATWS. The following conditions exist:

o Reactor power > 5%.

o Both Recirc pumps were tripped per QGA 101.

There is no LOCA in progress.

The SBLC system is in standby lineup.

The Unit Supervisor has determined that SBLC must be initiated per QGA 101.

This JPM is not time critical.

INITIATING CUE Inject the Standby Liquid Control System per the hard card.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 9

2014 ILT NRC JPM a - Rev. 00 JPM Start Time:

Comment SAT UNSAT STEP ELEMENT STANDARD Number Obtain procedure to be used. Obtains procedure QCOP 1100- ___ ___ ___

02 hard card for injecting SBLC.

F.1. Select System 1 or 2 with Positions SBLC keylock switch ___ ___ ___

keylock switch A and B to System 1 or 2.

SELECT.

EVALUATOR NOTE: Initial cue states no LOCA in progress, candidate should only inject with one pump at a time.

  • F.2. *Determines SBLC NOT Determines SBLC NOT ___ ___ ___

injecting.* injecting by any one or more of the following indications:

SBLC flow light NOT lit.

SBLC tank level is NOT decreasing. (LI-1-1140-2)

Pump discharge press < Rx press. (PI-1-1140-1)

Verify neutron flux NOT decreasing. (APRM recorders)

EVALUATOR NOTE: Alternate path starts here.

  • F.3. *Attempt to inject SBLC with the Repositions SBLC keylock ___ ___ ___

opposite switch position.* switch to the opposite position that was initially selected.

SIMULATOR OPERATOR NOTE: When operator takes switch to the opposite position, verify triggers 1 and 2 go true and malfunctions SL01A and SL01B are deleted.

Reports SBLC is injecting. Informs US that SBLC is ___ ___ ___

injecting.

EVALUATOR: The candidate should inform you that the task is complete.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 9

2014 ILT NRC JPM a - Rev. 00 JPM

SUMMARY

Operators Name: Job Title: EO RO SRO FS STA/IA SRO Cert JPM Title: Initiate Standby Liquid Control with Failure to Inject JPM Number: 2014 ILT NRC JPM a Revision Number: 00 Task Number and Title:

SR-1100-P02 (Freq: LIC=A) (ILT-MP) Given a reactor plant with an ATWS, inject boron prior to exceeding 110 degrees torus water temperature OR if core instability is observed in accordance with QGA 101 and QCOP 1100-02.

(Important PRA Operator Action - starting SBLC terminates 1 of the top 100 most probable Core Damage Sequences and has a RAW of 17.3)

K/A Number and Importance: K/A: 211000 A4.02 Rating: 4.2/4.2 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOP 1100-02, Rev. 12, INJECTION OF STANDBY LIQUID CONTROL Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 6.0 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

[If this page is an odd numbered page, a blank page is automatically generated after this page to keep the student cue sheet separate from this page]

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 9

INITIAL CONDITIONS U-1 has experienced an ATWS. The following conditions exist:

o Reactor power > 5%.

o Both Recirc pumps were tripped per QGA 101.

o There is no LOCA in progress The SBLC system is in standby lineup.

The Unit Supervisor has determined that SBLC must be initiated per QGA 101.

This JPM is not time critical.

INITIATING CUE Inject the Standby Liquid Control System per the hard card.

SRRS: 3D.105 (when utilized for operator initial or continuing training)