{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Hess, Thomas A <tahess@tva.gov>
{{#Wiki_filter:NRR-PMDAPEm Resource From:                                 Hess, Thomas A <tahess@tva.gov>
Sent: Friday, January 15, 2016 2:53 PM To: Hon, Andrew
Sent:                                 Friday, January 15, 2016 2:53 PM To:                                   Hon, Andrew


==Subject:==
==Subject:==
[External_Sender] RE: UH S Slides for Sequoyah?
[External_Sender] RE: UHS Slides for Sequoyah?
Attachments:
Attachments:                         ERCW NRC Presubmittal Call on 1-19-16.pptx; U1 ITS 3 7 8 draft mark-up.pdf From: Hon, Andrew [mailto:Andrew.Hon@nrc.gov]
ERCW NRC Presubmittal Call on 1-19-16.pptx; U1 ITS 3 7 8 draft mark-up.pdf From: Hon, Andrew [mailto:Andrew.Hon@nrc.gov]
Sent: Thursday, January 14, 2016 8:54 AM To: Hess, Thomas A
Sent: Thursday, January 14, 2016 8:54 AM To: Hess, Thomas A  


==Subject:==
==Subject:==
UHS Slides for Sequoyah?
UHS Slides for Sequoyah?
TVA External Message. Please use caution when opening.
TVA External Message. Please use caution when opening.
1


Hearing Identifier: NRR_PMDA Email Number: 2627   Mail Envelope Properties   (AB3647DBA77C034D81332BD4C951CD765636E169)
Hearing Identifier:     NRR_PMDA Email Number:           2627 Mail Envelope Properties     (AB3647DBA77C034D81332BD4C951CD765636E169)


==Subject:==
==Subject:==
[External_Sender] RE: UHS Slides for Sequoyah?   Sent Date:   1/15/2016 2:52:34 PM Received Date: 1/15/2016 2:53:02 PM From:   Hess, Thomas A Created By:   tahess@tva.gov Recipients:     "Hon, Andrew" <Andrew.Hon@nrc.gov> Tracking Status: None  
[External_Sender] RE: UHS Slides for Sequoyah?
Sent Date:             1/15/2016 2:52:34 PM Received Date:         1/15/2016 2:53:02 PM From:                   Hess, Thomas A Created By:             tahess@tva.gov Recipients:
"Hon, Andrew" <Andrew.Hon@nrc.gov>
Tracking Status: None Post Office:            TVACHAXCH9.main.tva.gov Files                          Size                    Date & Time MESSAGE                        225                    1/15/2016 2:53:02 PM ERCW NRC Presubmittal Call on 1-19-16.pptx                    43334 U1 ITS 3 7 8 draft mark-up.pdf                1104726 Options Priority:                      Standard Return Notification:            No Reply Requested:                No Sensitivity:                    Normal Expiration Date:
Recipients Received:


Post Office:  TVACHAXCH9.main.tva.gov Files    Size      Date & Time MESSAGE    225      1/15/2016 2:53:02 PM ERCW NRC Presubmittal Call on 1-19-16.pptx    43334  U1 ITS 3 7 8 draft mark-up.pdf    1104726 
ERCW LAR Pre-submittal Meeting 1/19/16
 
LAR Objective
* To allow 7 Day Completion Time to restore One Train of ERCW to Operable Status to facilitate cleaning Shutdown Boards
 
TS Changes
* TS LCO 3.7.8 will be revised to add Condition A
* Condition A will allow 7 Days to restore One ERCW System train to operable status provided Ultimate Heat Sink Temperature remains below 84 degrees F.
* Condition A is only applicable:
      - during planned maintenance
      - when opposite Unit is defueled or in MODE 6 following defueled with refueling water cavity level  23 ft. above top of reactor vessel flange
 
Technical Basis
* During the cleaning of the SQN Shutdown Boards, one ERCW Pump with not be available.
* The remaining pump on the effected train is available
* Current operability criteria requires two operable ERCW pumps per train (with one pump fed from each shutdown board)
* Engineering Analysis has demonstrated that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit imposed.


Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
ERCW LAR Pre-submittal Meeting 1/19/16 LAR Objective
*To allow 7 Day Completion Time to restore One Train of ERCW to Operable Status to facilitate cleaning Shutdown Boards TS Changes*TS LCO 3.7.8 will be revised to add Condition A*Condition A will allow 7 Days to restore One ERCW System train to operable status provided Ultimate Heat Sink Temperature remains below 84 degrees F. *Condition A is only applicable:-during planned maintenance
-when opposite Unit is defueled or in MODE 6 following defueled with refueling water cavity level  23 ft. above top of reactor vessel flange Technical Basis
*During the cleaning of the SQN Shutdown Boards, one ERCW Pump with not be available.
*The remaining pump on the effected train is available
*Current operability criteria requires two operable ERCW pumps per train (with one pump fed from each shutdown board)
*Engineering Analysis has demonstrated that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit imposed.
TS Bases and FSAR Changes
TS Bases and FSAR Changes
*The TS Bases will be revised to provided additional details regarding the application of condition A.  
* The TS Bases will be revised to provided additional details regarding the application of condition A.
*FSAR will be revised to include details on the system alignments which have been evaluated to support the conclusion that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit is imposed.
* FSAR will be revised to include details on the system alignments which have been evaluated to support the conclusion that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit is imposed.
ERCW System3.7.8SEQUOYAH - UNIT 13.7.8-1 Amendment XXX3.7   PLANT SYSTEMS3.7.8Essential Raw Cooling Water (ERCW) SystemLCO  3.7.8TwoERCW Systemtrains shall be OPERABLE.APPLICABILITY:MODES1, 2, 3, and4.ACTIONSCONDITIONREQUIRED ACTIONCOMPLETION TIME-------------NOTES--------------1.Only applicable duringplanned maintenance.2.Only applicable whenUnit 2 is defueledor inMODE 6 followingdefueled with Unit 2 refueling water cavitylevel 23 ft. above top ofreactor vessel flange.---------------------------------------A. OneERCW Systemtrain inoperableA.1--------------NOTES-------------1.Enter applicableConditions and Required Actions ofLCO3.8.1, "ACSources - Operating,"for emergency dieselgenerator made inoperable by ERCWSystem.2.Enter applicableConditions andRequired Actions ofLCO3.4.6, "RCS Loops
 
- MODE4," for residualheat removal loopsmade inoperable byERCW System.-------------------------------------Restore ERCW Systemtrain to OPERABLE status.7 daysInsertednew conditional ACTIONACompletionTimeof 7daysforplanned maintenancewith oppositeunit defueledor subsequentto
ERCW System 3.7.8 3.7 PLANT SYSTEMS 3.7.8        Essential Raw Cooling Water (ERCW) System LCO 3.7.8                  Two ERCW System trains shall be OPERABLE.
APPLICABILITY:               MODES 1, 2, 3, and 4.
ACTIONS Inserted new conditional            CONDITION                        REQUIRED ACTION                        COMPLETION TIME ACTION A
            -------------NOTES--------------       A.1   --------------NOTES-------------
: 1. Only applicable during                    1. Enter applicable planned maintenance.                          Conditions and Required Actions of
: 2. Only applicable when                            LCO 3.8.1, "AC Unit 2 is defueled or in                      Sources - Operating,"
MODE 6 following                              for emergency diesel defueled with Unit 2                          generator made                          Completion Time of refueling water cavity                        inoperable by ERCW                      7 days for planned level  23 ft. above top of                  System.
reactor vessel flange.                                                                maintenance with
            ---------------------------------------       2. Enter applicable                          opposite unit A. One ERCW System train                          Conditions and                           defueled or inoperable                                  Required Actions of                      subsequent to LCO 3.4.6, "RCS Loops                   defueled.
                                                                - MODE 4," for residual heat removal loops made inoperable by ERCW System.
                                                          -------------------------------------
Restore ERCW System                  7 days train to OPERABLE status.
ADD:                                                                                      +RXU
A.1 Restore ERCW System train to                                                           DQGHYHU\KRXUV OPERABLE status.
AND A.2 Verify Ultimate Heat Sink Temperature is < 84 degrees F SEQUOYAH - UNIT 1                                3.7.8-1                                  Amendment XXX


defueled.A DD: A.1 Restore ERCW System train to OPERABLE status.
ERCW System 3.7.8 CONDITION                REQUIRED ACTION                        COMPLETION TIME B. One ERCW System train      B.1 --------------NOTES-------------
A ND A.2VerifyUltimateHeatSinkTemperatureis<84degreesF ERCW System3.7.8SEQUOYAH - UNIT 13.7.8-2 Amendment XXXCONDITIONREQUIRED ACTIONCOMPLETION TIMEB. OneERCW Systemtrain inoperable for reasons other than Condition A. B.1--------------NOTES-------------1.Enter applicableConditions andRequired Actions ofLCO3.8.1, "ACSources - Operating,"for emergency dieselgenerator madeinoperable by ERCWSystem.2.Enter applicableConditions andRequired Actions ofLCO3.4.6, "RCS Loops- MODE4," for residualheat removal loopsmade inoperable byERCW System.-------------------------------------Restore ERCW Systemtrain to OPERABLE status.72hoursC. Required Action and associated Completion Time of ConditionA not met.C.1Be in MODE3.
inoperable for reasons        1. Enter applicable other than Condition A.            Conditions and Required Actions of LCO 3.8.1, "AC Sources - Operating,"
ANDC.2Be in MODE5.6 hours36 hoursRenumberedfromConditionAtoConditionBRenumberedfromConditionBtoConditionC ERCW System3.7.8SEQUOYAH -UNIT 13.7.8-3Amendment XXXSURVEILLANCE REQUIREMENTSSURVEILLANCE FREQUENCYSR  3.7.8.1-------------------------------NOTE------------------------------Isolation of ERCW Systemflow to individual components does not render the ERCW Systeminoperable.---------------------------------------------------------------------Verify each ERCW Systemmanual, power operated, and automatic valve in the flow path servicing safety related equipment, that is not locked, sealed, or otherwise secured in position, is in the correct position.In accordance with theSurveillance Frequency Control ProgramSR3.7.8.2Verify each ERCW Systemautomatic valve in the flow pathservicing safety related equipmentthat is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.In accordance with theSurveillance Frequency Control ProgramSR3.7.8.3Verify each ERCW Systempump starts automatically on an actual or simulated actuation signal.In accordance with theSurveillance Frequency Control Program 1 NRR-PMDAPEm Resource From: Hess, Thomas A <tahess@tva.gov>
for emergency diesel generator made inoperable by ERCW System.
Sent: Friday, January 15, 2016 2:53 PM To: Hon, Andrew
Renumbered from Condition A to Condition B  2. Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops
                                                  - MODE 4," for residual heat removal loops made inoperable by ERCW System.
                                            -------------------------------------
Restore ERCW System                  72 hours train to OPERABLE status.
C. Required Action and       C.1  Be in MODE 3.                        6 hours associated Completion Time of Condition A not   AND met.
C.2  Be in MODE 5.                         36 hours Renumbered from Condition B to Condition C SEQUOYAH - UNIT 1                      3.7.8-2                                Amendment XXX
 
ERCW System 3.7.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                FREQUENCY SR 3.7.8.1   -------------------------------NOTE------------------------------
Isolation of ERCW System flow to individual components does not render the ERCW System inoperable.
              ---------------------------------------------------------------------
Verify each ERCW System manual, power                                 In accordance operated, and automatic valve in the flow path                       with the servicing safety related equipment, that is not                       Surveillance locked, sealed, or otherwise secured in position, is                 Frequency in the correct position.                                             Control Program SR 3.7.8.2    Verify each ERCW System automatic valve in the                       In accordance flow path servicing safety related equipment that is                 with the not locked, sealed, or otherwise secured in position,                 Surveillance actuates to the correct position on an actual or                     Frequency simulated actuation signal.                                           Control Program SR 3.7.8.3    Verify each ERCW System pump starts                                   In accordance automatically on an actual or simulated actuation                     with the signal.                                                               Surveillance Frequency Control Program SEQUOYAH - UNIT 1                             3.7.8-3                                  Amendment XXX
 
NRR-PMDAPEm Resource From:                                 Hess, Thomas A <tahess@tva.gov>
Sent:                                 Friday, January 15, 2016 2:53 PM To:                                   Hon, Andrew


==Subject:==
==Subject:==
[External_Sender] RE: UH S Slides for Sequoyah?
[External_Sender] RE: UHS Slides for Sequoyah?
Attachments:
Attachments:                         ERCW NRC Presubmittal Call on 1-19-16.pptx; U1 ITS 3 7 8 draft mark-up.pdf From: Hon, Andrew [mailto:Andrew.Hon@nrc.gov]
ERCW NRC Presubmittal Call on 1-19-16.pptx; U1 ITS 3 7 8 draft mark-up.pdf From: Hon, Andrew [mailto:Andrew.Hon@nrc.gov]
Sent: Thursday, January 14, 2016 8:54 AM To: Hess, Thomas A
Sent: Thursday, January 14, 2016 8:54 AM To: Hess, Thomas A  


==Subject:==
==Subject:==
UHS Slides for Sequoyah?
UHS Slides for Sequoyah?
TVA External Message. Please use caution when opening.
TVA External Message. Please use caution when opening.
1


Hearing Identifier: NRR_PMDA Email Number: 2627   Mail Envelope Properties   (AB3647DBA77C034D81332BD4C951CD765636E169)
Hearing Identifier:     NRR_PMDA Email Number:           2627 Mail Envelope Properties     (AB3647DBA77C034D81332BD4C951CD765636E169)


==Subject:==
==Subject:==
[External_Sender] RE: UHS Slides for Sequoyah?   Sent Date:   1/15/2016 2:52:34 PM Received Date: 1/15/2016 2:53:02 PM From:   Hess, Thomas A Created By:   tahess@tva.gov Recipients:     "Hon, Andrew" <Andrew.Hon@nrc.gov> Tracking Status: None  
[External_Sender] RE: UHS Slides for Sequoyah?
Sent Date:             1/15/2016 2:52:34 PM Received Date:         1/15/2016 2:53:02 PM From:                   Hess, Thomas A Created By:             tahess@tva.gov Recipients:
"Hon, Andrew" <Andrew.Hon@nrc.gov>
Tracking Status: None Post Office:            TVACHAXCH9.main.tva.gov Files                          Size                    Date & Time MESSAGE                        225                    1/15/2016 2:53:02 PM ERCW NRC Presubmittal Call on 1-19-16.pptx                    43334 U1 ITS 3 7 8 draft mark-up.pdf                1104726 Options Priority:                      Standard Return Notification:            No Reply Requested:                No Sensitivity:                    Normal Expiration Date:
Recipients Received:


Post Office:  TVACHAXCH9.main.tva.gov Files    Size      Date & Time MESSAGE    225      1/15/2016 2:53:02 PM ERCW NRC Presubmittal Call on 1-19-16.pptx    43334  U1 ITS 3 7 8 draft mark-up.pdf    1104726 
ERCW LAR Pre-submittal Meeting 1/19/16
 
LAR Objective
* To allow 7 Day Completion Time to restore One Train of ERCW to Operable Status to facilitate cleaning Shutdown Boards
 
TS Changes
* TS LCO 3.7.8 will be revised to add Condition A
* Condition A will allow 7 Days to restore One ERCW System train to operable status provided Ultimate Heat Sink Temperature remains below 84 degrees F.
* Condition A is only applicable:
      - during planned maintenance
      - when opposite Unit is defueled or in MODE 6 following defueled with refueling water cavity level  23 ft. above top of reactor vessel flange
 
Technical Basis
* During the cleaning of the SQN Shutdown Boards, one ERCW Pump with not be available.
* The remaining pump on the effected train is available
* Current operability criteria requires two operable ERCW pumps per train (with one pump fed from each shutdown board)
* Engineering Analysis has demonstrated that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit imposed.


Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
ERCW LAR Pre-submittal Meeting 1/19/16 LAR Objective
*To allow 7 Day Completion Time to restore One Train of ERCW to Operable Status to facilitate cleaning Shutdown Boards TS Changes*TS LCO 3.7.8 will be revised to add Condition A*Condition A will allow 7 Days to restore One ERCW System train to operable status provided Ultimate Heat Sink Temperature remains below 84 degrees F. *Condition A is only applicable:-during planned maintenance
-when opposite Unit is defueled or in MODE 6 following defueled with refueling water cavity level  23 ft. above top of reactor vessel flange Technical Basis
*During the cleaning of the SQN Shutdown Boards, one ERCW Pump with not be available.
*The remaining pump on the effected train is available
*Current operability criteria requires two operable ERCW pumps per train (with one pump fed from each shutdown board)
*Engineering Analysis has demonstrated that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit imposed.
TS Bases and FSAR Changes
TS Bases and FSAR Changes
*The TS Bases will be revised to provided additional details regarding the application of condition A.  
* The TS Bases will be revised to provided additional details regarding the application of condition A.
*FSAR will be revised to include details on the system alignments which have been evaluated to support the conclusion that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit is imposed.
* FSAR will be revised to include details on the system alignments which have been evaluated to support the conclusion that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit is imposed.
ERCW System3.7.8SEQUOYAH - UNIT 13.7.8-1 Amendment XXX3.7   PLANT SYSTEMS3.7.8Essential Raw Cooling Water (ERCW) SystemLCO  3.7.8TwoERCW Systemtrains shall be OPERABLE.APPLICABILITY:MODES1, 2, 3, and4.ACTIONSCONDITIONREQUIRED ACTIONCOMPLETION TIME-------------NOTES--------------1.Only applicable duringplanned maintenance.2.Only applicable whenUnit 2 is defueledor inMODE 6 followingdefueled with Unit 2 refueling water cavitylevel 23 ft. above top ofreactor vessel flange.---------------------------------------A. OneERCW Systemtrain inoperableA.1--------------NOTES-------------1.Enter applicableConditions and Required Actions ofLCO3.8.1, "ACSources - Operating,"for emergency dieselgenerator made inoperable by ERCWSystem.2.Enter applicableConditions andRequired Actions ofLCO3.4.6, "RCS Loops
 
- MODE4," for residualheat removal loopsmade inoperable byERCW System.-------------------------------------Restore ERCW Systemtrain to OPERABLE status.7 daysInsertednew conditional ACTIONACompletionTimeof 7daysforplanned maintenancewith oppositeunit defueledor subsequentto
ERCW System 3.7.8 3.7 PLANT SYSTEMS 3.7.8        Essential Raw Cooling Water (ERCW) System LCO 3.7.8                  Two ERCW System trains shall be OPERABLE.
APPLICABILITY:               MODES 1, 2, 3, and 4.
ACTIONS Inserted new conditional            CONDITION                        REQUIRED ACTION                        COMPLETION TIME ACTION A
            -------------NOTES--------------       A.1  --------------NOTES-------------
: 1. Only applicable during                    1. Enter applicable planned maintenance.                         Conditions and Required Actions of
: 2. Only applicable when                            LCO 3.8.1, "AC Unit 2 is defueled or in                      Sources - Operating,"
MODE 6 following                              for emergency diesel defueled with Unit 2                         generator made                          Completion Time of refueling water cavity                        inoperable by ERCW                      7 days for planned level  23 ft. above top of                  System.
reactor vessel flange.                                                                 maintenance with
            ---------------------------------------      2. Enter applicable                          opposite unit A. One ERCW System train                          Conditions and                          defueled or inoperable                                  Required Actions of                      subsequent to LCO 3.4.6, "RCS Loops                    defueled.
                                                                - MODE 4," for residual heat removal loops made inoperable by ERCW System.
                                                          -------------------------------------
Restore ERCW System                  7 days train to OPERABLE status.
ADD:                                                                                      +RXU
A.1 Restore ERCW System train to                                                          DQGHYHU\KRXUV OPERABLE status.
AND A.2 Verify Ultimate Heat Sink Temperature is < 84 degrees F SEQUOYAH - UNIT 1                                 3.7.8-1                                  Amendment XXX
 
ERCW System 3.7.8 CONDITION                REQUIRED ACTION                        COMPLETION TIME B. One ERCW System train      B.1  --------------NOTES-------------
inoperable for reasons        1. Enter applicable other than Condition A.            Conditions and Required Actions of LCO 3.8.1, "AC Sources - Operating,"
for emergency diesel generator made inoperable by ERCW System.
Renumbered from Condition A to Condition B  2. Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops
                                                  - MODE 4," for residual heat removal loops made inoperable by ERCW System.
                                            -------------------------------------
Restore ERCW System                  72 hours train to OPERABLE status.
C. Required Action and        C.1  Be in MODE 3.                        6 hours associated Completion Time of Condition A not  AND met.
C.2  Be in MODE 5.                        36 hours Renumbered from Condition B to Condition C SEQUOYAH - UNIT 1                      3.7.8-2                                Amendment XXX


defueled.A DD: A.1 Restore ERCW System train to OPERABLE status.
ERCW System 3.7.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                FREQUENCY SR 3.7.8.1   -------------------------------NOTE------------------------------
A ND A.2VerifyUltimateHeatSinkTemperatureis<84degreesF ERCW System3.7.8SEQUOYAH - UNIT 13.7.8-2 Amendment XXXCONDITIONREQUIRED ACTIONCOMPLETION TIMEB. OneERCW Systemtrain inoperable for reasons other than Condition A. B.1--------------NOTES-------------1.Enter applicableConditions andRequired Actions ofLCO3.8.1, "ACSources - Operating,"for emergency dieselgenerator madeinoperable by ERCWSystem.2.Enter applicableConditions andRequired Actions ofLCO3.4.6, "RCS Loops- MODE4," for residualheat removal loopsmade inoperable byERCW System.-------------------------------------Restore ERCW Systemtrain to OPERABLE status.72hoursC. Required Action and associated Completion Time of ConditionA not met.C.1Be in MODE3.
Isolation of ERCW System flow to individual components does not render the ERCW System inoperable.
ANDC.2Be in MODE5.6 hours36 hoursRenumberedfromConditionAtoConditionBRenumberedfromConditionBtoConditionC ERCW System3.7.8SEQUOYAH -UNIT 13.7.8-3Amendment XXXSURVEILLANCE REQUIREMENTSSURVEILLANCE FREQUENCYSR  3.7.8.1-------------------------------NOTE------------------------------Isolation of ERCW Systemflow to individual components does not render the ERCW Systeminoperable.---------------------------------------------------------------------Verify each ERCW Systemmanual, power operated, and automatic valve in the flow path servicing safety related equipment, that is not locked, sealed, or otherwise secured in position, is in the correct position.In accordance with theSurveillance Frequency Control ProgramSR3.7.8.2Verify each ERCW Systemautomatic valve in the flow pathservicing safety related equipmentthat is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.In accordance with theSurveillance Frequency Control ProgramSR3.7.8.3Verify each ERCW Systempump starts automatically on an actual or simulated actuation signal.In accordance with theSurveillance Frequency Control Program}}
              ---------------------------------------------------------------------
Verify each ERCW System manual, power                                 In accordance operated, and automatic valve in the flow path                       with the servicing safety related equipment, that is not                       Surveillance locked, sealed, or otherwise secured in position, is                 Frequency in the correct position.                                             Control Program SR 3.7.8.2    Verify each ERCW System automatic valve in the                       In accordance flow path servicing safety related equipment that is                 with the not locked, sealed, or otherwise secured in position,                 Surveillance actuates to the correct position on an actual or                     Frequency simulated actuation signal.                                           Control Program SR 3.7.8.3    Verify each ERCW System pump starts                                   In accordance automatically on an actual or simulated actuation                     with the signal.                                                               Surveillance Frequency Control Program SEQUOYAH - UNIT 1                              3.7.8-3                                  Amendment XXX}}

Revision as of 01:21, 31 October 2019

(External_Sender) UHS Slides for Sequoyah?
ML16029A063
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/15/2016
From: Hess T
Tennessee Valley Authority
To: Andrew Hon
Plant Licensing Branch II
References
Download: ML16029A063 (10)


Text

NRR-PMDAPEm Resource From: Hess, Thomas A <tahess@tva.gov>

Sent: Friday, January 15, 2016 2:53 PM To: Hon, Andrew

Subject:

[External_Sender] RE: UHS Slides for Sequoyah?

Attachments: ERCW NRC Presubmittal Call on 1-19-16.pptx; U1 ITS 3 7 8 draft mark-up.pdf From: Hon, Andrew [1]

Sent: Thursday, January 14, 2016 8:54 AM To: Hess, Thomas A

Subject:

UHS Slides for Sequoyah?

TVA External Message. Please use caution when opening.

1

Hearing Identifier: NRR_PMDA Email Number: 2627 Mail Envelope Properties (AB3647DBA77C034D81332BD4C951CD765636E169)

Subject:

[External_Sender] RE: UHS Slides for Sequoyah?

Sent Date: 1/15/2016 2:52:34 PM Received Date: 1/15/2016 2:53:02 PM From: Hess, Thomas A Created By: tahess@tva.gov Recipients:

"Hon, Andrew" <Andrew.Hon@nrc.gov>

Tracking Status: None Post Office: TVACHAXCH9.main.tva.gov Files Size Date & Time MESSAGE 225 1/15/2016 2:53:02 PM ERCW NRC Presubmittal Call on 1-19-16.pptx 43334 U1 ITS 3 7 8 draft mark-up.pdf 1104726 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

ERCW LAR Pre-submittal Meeting 1/19/16

LAR Objective

  • To allow 7 Day Completion Time to restore One Train of ERCW to Operable Status to facilitate cleaning Shutdown Boards

TS Changes

  • TS LCO 3.7.8 will be revised to add Condition A
  • Condition A is only applicable:

- during planned maintenance

- when opposite Unit is defueled or in MODE 6 following defueled with refueling water cavity level 23 ft. above top of reactor vessel flange

Technical Basis

  • During the cleaning of the SQN Shutdown Boards, one ERCW Pump with not be available.
  • The remaining pump on the effected train is available
  • Current operability criteria requires two operable ERCW pumps per train (with one pump fed from each shutdown board)
  • Engineering Analysis has demonstrated that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit imposed.

TS Bases and FSAR Changes

  • The TS Bases will be revised to provided additional details regarding the application of condition A.
  • FSAR will be revised to include details on the system alignments which have been evaluated to support the conclusion that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit is imposed.

ERCW System 3.7.8 3.7 PLANT SYSTEMS 3.7.8 Essential Raw Cooling Water (ERCW) System LCO 3.7.8 Two ERCW System trains shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS Inserted new conditional CONDITION REQUIRED ACTION COMPLETION TIME ACTION A


NOTES-------------- A.1 --------------NOTES-------------

1. Only applicable during 1. Enter applicable planned maintenance. Conditions and Required Actions of
2. Only applicable when LCO 3.8.1, "AC Unit 2 is defueled or in Sources - Operating,"

MODE 6 following for emergency diesel defueled with Unit 2 generator made Completion Time of refueling water cavity inoperable by ERCW 7 days for planned level 23 ft. above top of System.

reactor vessel flange. maintenance with


2. Enter applicable opposite unit A. One ERCW System train Conditions and defueled or inoperable Required Actions of subsequent to LCO 3.4.6, "RCS Loops defueled.

- MODE 4," for residual heat removal loops made inoperable by ERCW System.


Restore ERCW System 7 days train to OPERABLE status.

ADD: +RXU

A.1 Restore ERCW System train to DQGHYHU\KRXUV OPERABLE status.

AND A.2 Verify Ultimate Heat Sink Temperature is < 84 degrees F SEQUOYAH - UNIT 1 3.7.8-1 Amendment XXX

ERCW System 3.7.8 CONDITION REQUIRED ACTION COMPLETION TIME B. One ERCW System train B.1 --------------NOTES-------------

inoperable for reasons 1. Enter applicable other than Condition A. Conditions and Required Actions of LCO 3.8.1, "AC Sources - Operating,"

for emergency diesel generator made inoperable by ERCW System.

Renumbered from Condition A to Condition B 2. Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops

- MODE 4," for residual heat removal loops made inoperable by ERCW System.


Restore ERCW System 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> train to OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not AND met.

C.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Renumbered from Condition B to Condition C SEQUOYAH - UNIT 1 3.7.8-2 Amendment XXX

ERCW System 3.7.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.8.1 -------------------------------NOTE------------------------------

Isolation of ERCW System flow to individual components does not render the ERCW System inoperable.


Verify each ERCW System manual, power In accordance operated, and automatic valve in the flow path with the servicing safety related equipment, that is not Surveillance locked, sealed, or otherwise secured in position, is Frequency in the correct position. Control Program SR 3.7.8.2 Verify each ERCW System automatic valve in the In accordance flow path servicing safety related equipment that is with the not locked, sealed, or otherwise secured in position, Surveillance actuates to the correct position on an actual or Frequency simulated actuation signal. Control Program SR 3.7.8.3 Verify each ERCW System pump starts In accordance automatically on an actual or simulated actuation with the signal. Surveillance Frequency Control Program SEQUOYAH - UNIT 1 3.7.8-3 Amendment XXX

NRR-PMDAPEm Resource From: Hess, Thomas A <tahess@tva.gov>

Sent: Friday, January 15, 2016 2:53 PM To: Hon, Andrew

Subject:

[External_Sender] RE: UHS Slides for Sequoyah?

Attachments: ERCW NRC Presubmittal Call on 1-19-16.pptx; U1 ITS 3 7 8 draft mark-up.pdf From: Hon, Andrew [2]

Sent: Thursday, January 14, 2016 8:54 AM To: Hess, Thomas A

Subject:

UHS Slides for Sequoyah?

TVA External Message. Please use caution when opening.

1

Hearing Identifier: NRR_PMDA Email Number: 2627 Mail Envelope Properties (AB3647DBA77C034D81332BD4C951CD765636E169)

Subject:

[External_Sender] RE: UHS Slides for Sequoyah?

Sent Date: 1/15/2016 2:52:34 PM Received Date: 1/15/2016 2:53:02 PM From: Hess, Thomas A Created By: tahess@tva.gov Recipients:

"Hon, Andrew" <Andrew.Hon@nrc.gov>

Tracking Status: None Post Office: TVACHAXCH9.main.tva.gov Files Size Date & Time MESSAGE 225 1/15/2016 2:53:02 PM ERCW NRC Presubmittal Call on 1-19-16.pptx 43334 U1 ITS 3 7 8 draft mark-up.pdf 1104726 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

ERCW LAR Pre-submittal Meeting 1/19/16

LAR Objective

  • To allow 7 Day Completion Time to restore One Train of ERCW to Operable Status to facilitate cleaning Shutdown Boards

TS Changes

  • TS LCO 3.7.8 will be revised to add Condition A
  • Condition A is only applicable:

- during planned maintenance

- when opposite Unit is defueled or in MODE 6 following defueled with refueling water cavity level 23 ft. above top of reactor vessel flange

Technical Basis

  • During the cleaning of the SQN Shutdown Boards, one ERCW Pump with not be available.
  • The remaining pump on the effected train is available
  • Current operability criteria requires two operable ERCW pumps per train (with one pump fed from each shutdown board)
  • Engineering Analysis has demonstrated that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit imposed.

TS Bases and FSAR Changes

  • The TS Bases will be revised to provided additional details regarding the application of condition A.
  • FSAR will be revised to include details on the system alignments which have been evaluated to support the conclusion that ERCW will continue to perform its design function with one pump functional provided a more restrictive UHS temperature limit is imposed.

ERCW System 3.7.8 3.7 PLANT SYSTEMS 3.7.8 Essential Raw Cooling Water (ERCW) System LCO 3.7.8 Two ERCW System trains shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS Inserted new conditional CONDITION REQUIRED ACTION COMPLETION TIME ACTION A


NOTES-------------- A.1 --------------NOTES-------------

1. Only applicable during 1. Enter applicable planned maintenance. Conditions and Required Actions of
2. Only applicable when LCO 3.8.1, "AC Unit 2 is defueled or in Sources - Operating,"

MODE 6 following for emergency diesel defueled with Unit 2 generator made Completion Time of refueling water cavity inoperable by ERCW 7 days for planned level 23 ft. above top of System.

reactor vessel flange. maintenance with


2. Enter applicable opposite unit A. One ERCW System train Conditions and defueled or inoperable Required Actions of subsequent to LCO 3.4.6, "RCS Loops defueled.

- MODE 4," for residual heat removal loops made inoperable by ERCW System.


Restore ERCW System 7 days train to OPERABLE status.

ADD: +RXU

A.1 Restore ERCW System train to DQGHYHU\KRXUV OPERABLE status.

AND A.2 Verify Ultimate Heat Sink Temperature is < 84 degrees F SEQUOYAH - UNIT 1 3.7.8-1 Amendment XXX

ERCW System 3.7.8 CONDITION REQUIRED ACTION COMPLETION TIME B. One ERCW System train B.1 --------------NOTES-------------

inoperable for reasons 1. Enter applicable other than Condition A. Conditions and Required Actions of LCO 3.8.1, "AC Sources - Operating,"

for emergency diesel generator made inoperable by ERCW System.

Renumbered from Condition A to Condition B 2. Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops

- MODE 4," for residual heat removal loops made inoperable by ERCW System.


Restore ERCW System 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> train to OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not AND met.

C.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Renumbered from Condition B to Condition C SEQUOYAH - UNIT 1 3.7.8-2 Amendment XXX

ERCW System 3.7.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.8.1 -------------------------------NOTE------------------------------

Isolation of ERCW System flow to individual components does not render the ERCW System inoperable.


Verify each ERCW System manual, power In accordance operated, and automatic valve in the flow path with the servicing safety related equipment, that is not Surveillance locked, sealed, or otherwise secured in position, is Frequency in the correct position. Control Program SR 3.7.8.2 Verify each ERCW System automatic valve in the In accordance flow path servicing safety related equipment that is with the not locked, sealed, or otherwise secured in position, Surveillance actuates to the correct position on an actual or Frequency simulated actuation signal. Control Program SR 3.7.8.3 Verify each ERCW System pump starts In accordance automatically on an actual or simulated actuation with the signal. Surveillance Frequency Control Program SEQUOYAH - UNIT 1 3.7.8-3 Amendment XXX