{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 April 8, 2016 Mr. Joel Gebbie Senior VP and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 SUBJECT: DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST FOR INFORMATION 05000315/2016009; 05000316/2016009 Dear Mr. Gebbie: On August 1, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial fire protection baseline inspection at your Donald C. Cook Nuclear Power Plant, Units 1 and 2. This inspection will be performed in accordance with Inspection Procedure 71111.05XT, the National Fire Protection Association 805 Fire Protection Inspection Procedure.   Inspection Procedure 71111.05XT requires the fire protection inspection to review your actions to mitigate postulated events that could potentially cause loss of large areas of power reactor facilities due to explosions or fires. This requirement was implemented by the issuance of the Interim Compensatory Measures Order EA-02-026, Section B.5.b and the subsequent requirements of the Title 10 Code of Federal Regulations, Part 50.54(hh)(2), which are collectively referred to as B.5.b requirements. During this inspection, the B.5.b requirements review will be performed during the first onsite week of the inspection starting on August 3, 2016. The schedule for the onsite inspection activity is as follows: Information Gathering Visit: August 1 3, 2016; B.5.b Requirements: August 3 5, 2016; and Fire Protection Inspection: August 15 19 and August 29 September 2, 2016. The purpose of the information gathering visit is: (1) to obtain information and documentation needed to support the inspection; (2) to become familiar with the Donald C. Cook Nuclear Power Fire Protection Program, fire protection features, post-fire safe shutdown capabilities, and plant layout; and (3) to arrange administrative details, such as office space, availability of knowledgeable office personnel, and to ensure unescorted site access privileges.
{{#Wiki_filter:UNITED STATES
J. Gebbie -2- Experience has shown that the baseline fire protection inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both organizations, we have enclosed a request for documents needed for the inspection. These documents have been divided into four groups. The first group lists information necessary to aid the inspection team in choosing specific focus areas for the inspection. It is requested that this information be provided to the lead inspector via mail or electronically no later than July 15, 2016.   The second group also lists information and areas for discussion necessary to aid the inspection team in choosing specific fire protection focus areas for the inspection and to ensure that the inspection team is adequately prepared for the inspection. It is requested this information be available during the information gathering visit (August 1, 2016).   The third group of requested documents consists of those items that the team will review, or need access to, during the inspection. Please have this information available by the first day of the second onsite inspection week (August 15, 2016).   The fourth group lists the information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection.   It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The lead inspector for this inspection is Mr. Dariusz Szwarc. We understand that our regulatory contact for this inspection is Mr. Mr. Richard A. Wynegar of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at 630-829-9803 or via e-mail at Dariusz.Szwarc@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.   In accordance with Title 10 of the Code of Federal Regulations, Part of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in    
                            NUCLEAR REGULATORY COMMISSION
J. Gebbie -3- ble Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/   Dariusz Szwarc, Senior Reactor Inspector Engineering Branch 3 Division of Reactor Safety Docket Nos. 50315; 50316 License Nos. DPR58; DPR74 Enclosure:  Request for Information - Triennial Fire     Protection Inspection cc: Distribution via LISTSERV  
                                                REGION III
REQUEST FOR INFORMATION TRIENNIAL FIRE PROTECTION INSPECTION Enclosure Inspection Report: 05000315/2016009; 05000316/2016009 Onsite Inspection Dates: August 1 3, 2016; Information Gathering Visit August 3 5, 2016; B.5.b Requirements August 15 19, 2016; Fire Protection Inspection August 29 September 2, 2016; Fire Protection Inspection Inspection Procedures: IP 71111.05XT NFPA 805 IP 71152, "Identification and Resolution of Problems" Inspectors: Dariusz Szwarc (Lead) Ijaz Hafeez Senior Reactor Inspector Reactor Inspector 630-829-9803 630-829-9843 Dariusz.Szwarc@nrc.gov Ijaz.Hafeez@nrc.gov Mark Jeffers Reactor Inspector 630-829-9798 Mark.Jeffers@nrc.gov Accompanying Personnel: Harold Barrett Senior Fire Protection Engineer Office of Nuclear Reactor Regulation 301-415-1402 Harold.Barrett@nrc.gov I. Information Requested Prior To the Information Gathering Visit The following information is requested by July 15, 2016. If you have any questions regarding this request, please call the lead inspector as soon as possible. All information should be sent to Mr. Dariusz Szwarc via e-mail (Dariusz.Szwarc@nrc.gov). Electronic media is preferred. The preferre or Microsoft Excel file on a compact disk (CD). The CD should be indexed and hyper-linked to facilitate ease of use, if possible. Please provide three copies of each CD submitted (one for each inspector). 1. Design and Licensing Basis Documents: a. Post-fire Nuclear Safety Capability, Systems, and Separation Analysis; b. Fire Hazards Analysis and/or National Fire Protection Association 805 Design Basis Document; c. Fire Probabilistic Risk Assessment Summary Document or full Probabilistic Risk Assessment Document (if summary document not available); d. NFPA 805 Transition Report, developed in accordance with Nuclear Energy Institute Document 04-02;
                                    2443 WARRENVILLE RD. SUITE 210
REQUEST FOR INFORMATION TRIENNIAL FIRE PROTECTION INSPECTION 2 e. Fire Risk Evaluations (i.e., NFPA 805 Section 2.4.3); f. Plant Change Evaluations (i.e., NFPA 805 Section 2.4.4); g. Analysis that demonstrates nuclear safety performance criteria can be achieved and maintained for those areas that require recovery actions; h. Fire Protection Program and/or Fire Protection Plan; and i. Copies of the current versions of the Facility Operating License and Technical Requirements Manual. 2. Operations: a. Operating procedures to achieve and maintain nuclear safety performance criteria from the control room, with a postulated fire in the selected fire areas; and b. Operating procedures to achieve and maintain nuclear safety performance criteria from outside the control room, with a postulated fire in the control room, cable spreading room, or any area requiring recovery actions (other than recovery actions performed in the control room or primary control stations). II. Information Requested During the Information Gathering Visit (August 1, 2016) The following information is requested to be provided to the inspection team during the onsite information gathering visit. Except for Item 7, it is requested that the following information be provided on three sets of CDs (searchable, if possible) with the B.5.b Mitigating Strategies information (Item 7) provided on one separate CD. 1. One set of hard-copy documents for facility layout drawings which identify plant fire area delineation; areas protected by automatic fire suppression and detection; and locations of fire protection equipment. 2. Design and Licensing Basis Documents: a. List of post-fire safe shutdown components (i.e., safe shutdown equipment list); b. Fire protection system design basis document; c. List of applicable NFPA codes and standards and issuance dates (i.e., codes of record); d. List of deviations from (a) NFPA codes of record, or (b) NFPA 805 fundamental Fire Protection Program and design elements (i.e., NFPA 805, Chapter 3); e. NFPA Compliance Review Report; f. Report or evaluation that compares the fire protection program to the U. S. Nuclear Regulatory Commission (NRC) Branch Technical Position 9.5-1, Appendix A;
                                          LISLE, IL 60532-4352
REQUEST FOR INFORMATION TRIENNIAL FIRE PROTECTION INSPECTION 3 g. Copy of licensee submittals and NRC safety evaluation reports that are specifically listed in the facility operating license for the approved Fire Protection Program; h. Copy of NRC Safety Evaluation Reports that form the licensing basis for the Fire Protection Program and post-fire nuclear safety capability; i. Copy of NRC approved exemptions for plant fire protection and post-fire nuclear safety capability features; j. Copy of exemption requests submitted but not yet approved for plant fire protection and post-fire nuclear safety capability features; and k. List of nuclear safety capability design changes completed in the last 3 years (including their associated Title 10, Code of Federal Regulations (CFR), Part 50.59 and NFPA 805 plant change evaluations). 3. General Plant Design Documents (available onsite for inspector review): a. Piping and instrumentation diagrams (P&IDs) and legend list for components used to achieve and maintain nuclear safety performance criteria for: (C-size paper drawings): i. Fires outside the main control room; and ii. Fires in areas requiring recovery actions at other than primary control stations; b. P&IDs and legend list for fire protection systems, including fire water supply, water suppression sprinklers & deluge, and carbon dioxide and Halon systems (C-size paper drawings); c. Yard layout drawings for underground fire protection buried piping (C-size paper drawings); d. Alternating Current and Direct Current electrical system single line diagrams, from offsite power down to the highest safety-related bus level (typically 4kV, emergency diesel generator bus) (C-size paper drawings); e. Single line diagrams for motor control centers that supply post-fire nuclear safety component loads (only for selected fire areas) (C-size paper drawings); f. Equipment location drawings which identify the physical plant locations of post-fire nuclear safety capability equipment (C-size paper drawings); and g. Logic diagrams showing the components used to achieve and maintain hot standby and cold shutdown. 4. Operations: a. List of calculations and engineering analyses, studies, or evaluations for the nuclear safety capability methodology;  
                                            April 8, 2016
REQUEST FOR INFORMATION TRIENNIAL FIRE PROTECTION INSPECTION 4 b. For recovery actions, provide the following: i. Manual Action Feasibility Study; ii. Operator Time Critical Action Program; iii. Time lines for time-critical recovery actions; and iv. Time line validations; c. Thermal hydraulic calculation or analysis that determines the time requirements for time-critical manual operator actions. 5. Administrative Control, Oversight, and Corrective Action Programs: a. Corrective actions associated with operator actions to achieve and maintain post-fire nuclear safety performance criteria; b. List of open and closed condition reports for the fire protection system for the last 3 years; c. List of open and closed condition reports for post-fire nuclear safety capability issues for the last 3 years. This includes issues affecting the nuclear safety capability analysis, fire hazards analysis, NFPA 805 design basis, fire risk evaluations, plant change evaluations, post-fire operating procedures and/or training, timeline evaluations for operator actions, and supporting engineering evaluations, analysis, or calculations; and d. List of procedures that control the configuration of the Fire Protection Program, features, and post-fire nuclear safety capability methodology and system design. 6. General Information: a. A listing of abbreviations and/or designators for plant systems; b. Organization charts of site personnel down to the level of fire protection staff personnel; and c. A phone list for onsite personnel. 7. B.5.b Mitigating Strategies Documents (provided on one separate compact disk on August 1, 2016): a. List of all changes to regulatory commitments made to meet the requirements of 10 CFR 50.54(hh)(2); b. List of procedures and guidelines that were revised or generated to implement the mitigating strategies. These could be extensive damage mitigation guidelines, severe accident management guidelines, emergency operating procedures, abnormal operating procedures, etc.;
Mr. Joel Gebbie
REQUEST FOR INFORMATION TRIENNIAL FIRE PROTECTION INSPECTION 5 c. A matrix that shows the correlation between the mitigation strategies identified in Nuclear Energy Institute Document 06-12, Revision 2, B.5.b Phase 2 & 3 Submittal Guideline, issued December 2006, and the site-specific procedures or guidelines that are used to implement each strategy; d. List of engineering evaluations or calculations that were used to verify the engineering bases for the mitigating strategies; e. P&IDs and legend list or simplified flow diagrams for systems relied upon in the mitigating strategies. These could be the type used for training (C size paper drawings); f. List of modification packages or summary descriptions of modifications with simplified drawings, for necessary facility changes to implement the mitigating strategies; g. List of routine tests, surveillances, and preventive maintenance for equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies; h. For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies, provide the following: i. Procedures for inventory and inspection; and ii. Most recent inspection and inventory results; i. List of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that differ from that documented in the submittals or the safety evaluation report; j. Site general arrangement drawings that show the majority of buildings and areas referenced in 10 CFR 50.54(hh)(2) documents; k. Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2); l. Copies of memoranda of understanding (e.g., with local fire departments) required to implement any mitigating strategies. 8. Onsite Discussions: In addition, during the information gathering visit, it is requested that licensee staff be available for the following: a. Informal discussion on plant procedures operators would use in the event of fire or explosion (including B.5.b mitigation strategies) and under what conditions would the plant be shutdown using alternative shutdown methodology; b. Iplant-wide cable routing database, as applicable; and c. A tour of fire areas. d. A discussion of scheduling of fire drills which may occur during the inspection so that the inspectors may be able to observe a fire drill, if possible.
Senior VP and Chief Nuclear Officer
REQUEST FOR INFORMATION TRIENNIAL FIRE PROTECTION INSPECTION 6 III. Information Requested to be Available on first Day of the Second Onsite Inspection Week (August 15, 2016) The following information is requested to be provided on the first day of inspection. It is requested that this information be provided on three sets of CDs (searchable, if possible). 1. Classic Fire Protection: a. Copy of fire protection program implementing procedures (e.g., administrative controls, surveillance testing, and fire brigade); b. List of calculations and engineering analyses, studies, or evaluations for the fire protection system, including the fire water system; c. Hydraulic calculations or analyses for fire protection water system; d. Copy of the evaluation or analysis of the effects of fire suppression activities on the ability to achieve the nuclear safety performance criteria (only for selected fire areas), including: i. An automatic or manually actuated suppression system, due to a fire in a single location, will not indirectly cause damage to the success path; ii. Inadvertent actuation or rupture of a suppression system will not indirectly cause damage to the success path; iii. Demonstration of adequate drainage for areas protected by water suppression systems; and iv. Hydrostatic rating of any floor penetration seals installed within the fire areas that are credited with keeping water from leaking into fire areas below; e. Pre-fire plans for selected fire areas; f. List of fire protection system design changes completed in the last 3 years (including their associated 10 CFR 50.59 and NFPA 805 plant change evaluations); g. List of fire protection system NFPA 805 engineering equivalency evaluations completed in the last 3 years; and h. Copy of any test, surveillance, or maintenance procedure (current revision), including any associated data forms, for any requested "last performed" test, surveillance, or maintenance. 2. Electrical: a. Nuclear safety circuit coordination analysis for fuse and breaker coordination of nuclear safety capability components (only for selected fire areas);
Indiana Michigan Power Company
REQUEST FOR INFORMATION TRIENNIAL FIRE PROTECTION INSPECTION 7 b. Administrative or configuration control procedures that govern fuse replacement (e.g., fuse control procedures); c. Maintenance procedures that verify breaker over-current trip settings to ensure coordination remains functional, for post-fire nuclear safety capability components; d. Last surveillance demonstrating operability of those components operated from the primary control stations; e. Schematic or elementary diagrams for circuits to be reviewed (C-size paper drawings); f. Cable routing for components and equipment credited for post-fire nuclear safety capability systems and components (only for selected fire areas); g. List of post-fire nuclear safety capability system and component design changes completed, in the last three years; and h. List of identified fire induced circuit failure analyses (only for selected fire areas). 3. Operations: a. For safe shutdown equipment and tools, provide the following: i. Procedure for inventory and inspection; and ii. Most recent inspection and inventory results; b. List of procedures that implement Cold Shutdown Repairs; c. For Cold Shutdown Repairs, provide the following: i. Procedure for inventory and inspection (i.e., needed tools, material, etc.); and ii. Most recent inspection and inventory results; d. List of licensed operator Job Performance Measures for operator actions required to achieve and maintain post-fire nuclear safety performance criteria; e. List of non-licensed operator training associated with non-licensed operator actions to achieve and maintain post-fire nuclear safety performance criteria (including Job Performance Measures, in-field training walkdowns, simulations, or initial qualification); f. Lesson plans for post-fire nuclear safety capability training for licensed and non-licensed operators; g. For Radio communications, provide the following: i. Communications Plan for firefighting and post-fire safe shutdown manual actions;
Nuclear Generation Group
REQUEST FOR INFORMATION TRIENNIAL FIRE PROTECTION INSPECTION 8 ii. Repeater locations; iii. Cable routing for repeater power supply cables; iv. Radio coverage test results; and v. Radio Dead Spot locations in the plant; h. Environmental and habitability evaluations for post-fire operator actions (temperature, smoke, humidity, SCBAs, etc.). 4. Administrative Control, Oversight, and Corrective Action Programs: a. Self-assessments, peer assessments, and audits of fire protection activities for the last 3 years; b. Self-assessments, peer assessments, and audits of post-fire nuclear safety capability methodology for the last 3 years; and c. List of Fire Event Analysis Reports for the last 3 years. 5. Any updates to information previously provided. IV. Information Requested to Be Provided Throughout the Inspection 1. Copies of any corrective action documents generated as a result of the inspection queries during this inspection; and 2. Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member).  
One Cook Place
  J. Gebbie -3- ble Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/   Dariusz Szwarc, Senior Reactor Inspector Engineering Branch 3 Division of Reactor Safety Docket Nos. 50315; 50316 License Nos. DPR58; DPR74 Enclosure:  Request for Information - Triennial Fire     Protection Inspection cc: Distribution via LISTSERV Jeremy Bowen     Richard Skokowski           ADAMS Accession Number ML16099A296 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME DSzwarc:cl    DATE 04/08/16   OFFICIAL RECORD COPY
Bridgman, MI 49106
SUBJECT: DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NOTIFICATION
              OF NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST
              FOR INFORMATION 05000315/2016009; 05000316/2016009
Dear Mr. Gebbie:
On August 1, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial fire
protection baseline inspection at your Donald C. Cook Nuclear Power Plant, Units 1 and 2.
This inspection will be performed in accordance with Inspection Procedure 71111.05XT, the
NRCs baseline National Fire Protection Association 805 Fire Protection Inspection Procedure.
Inspection Procedure 71111.05XT requires the fire protection inspection to review your
actions to mitigate postulated events that could potentially cause loss of large areas of
power reactor facilities due to explosions or fires. This requirement was implemented by
the issuance of the Interim Compensatory Measures Order EA-02-026, Section B.5.b and
the subsequent requirements of the Title 10 Code of Federal Regulations, Part 50.54(hh)(2),
which are collectively referred to as B.5.b requirements. During this inspection, the B.5.b
requirements review will be performed during the first onsite week of the inspection starting
on August 3, 2016.
The schedule for the onsite inspection activity is as follows:
            Information Gathering Visit: August 1 - 3, 2016;
            B.5.b Requirements: August 3 - 5, 2016; and
            Fire Protection Inspection: August 15 - 19 and August 29 - September 2, 2016.
The purpose of the information gathering visit is: (1) to obtain information and documentation
needed to support the inspection; (2) to become familiar with the Donald C. Cook Nuclear
Power Plants Fire Protection Program, fire protection features, post-fire safe shutdown
capabilities, and plant layout; and (3) to arrange administrative details, such as office space,
availability of knowledgeable office personnel, and to ensure unescorted site access privileges.
 
J. Gebbie                                       -2-
Experience has shown that the baseline fire protection inspections are extremely resource
intensive, both for the NRC inspectors and the licensee staff. In order to minimize the
inspection impact on the site and to ensure a productive inspection for both organizations,
we have enclosed a request for documents needed for the inspection. These documents
have been divided into four groups.
            The first group lists information necessary to aid the inspection team in choosing
            specific focus areas for the inspection. It is requested that this information be
            provided to the lead inspector via mail or electronically no later than July 15, 2016.
            The second group also lists information and areas for discussion necessary to aid
            the inspection team in choosing specific fire protection focus areas for the inspection
            and to ensure that the inspection team is adequately prepared for the inspection.
            It is requested this information be available during the information gathering visit
            (August 1, 2016).
            The third group of requested documents consists of those items that the team will
            review, or need access to, during the inspection. Please have this information
            available by the first day of the second onsite inspection week (August 15, 2016).
            The fourth group lists the information necessary to aid the inspection team in tracking
            issues identified as a result of the inspection. It is requested that this information be
            provided to the lead inspector as the information is generated during the inspection.
It is important that all of these documents are up to date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection.
The lead inspector for this inspection is Mr. Dariusz Szwarc. We understand that our regulatory
contact for this inspection is Mr. Mr. Richard A. Wynegar of your organization. If there are any
questions about the inspection or the material requested, please contact the lead inspector at
630-829-9803 or via e-mail at Dariusz.Szwarc@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required
to respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
In accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,
Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter,
its enclosure, and your response (if any) will be available electronically for public inspection in
 
J. Gebbie                                   -3-
the NRCs Public Document Room or from the Publicly Available Records (PARS) component
of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room).
                                            Sincerely,
                                            /RA/
                                            Dariusz Szwarc, Senior Reactor Inspector
                                            Engineering Branch 3
                                            Division of Reactor Safety
Docket Nos. 50-315; 50-316
License Nos. DPR-58; DPR-74
Enclosure:
   Request for Information - Triennial Fire
  Protection Inspection
cc: Distribution via LISTSERV
 
      REQUEST FOR INFORMATION - TRIENNIAL FIRE PROTECTION INSPECTION
Inspection Report:             05000315/2016009; 05000316/2016009
Onsite Inspection Dates:       August 1 - 3, 2016; Information Gathering Visit
                                August 3 - 5, 2016; B.5.b Requirements
                                August 15 - 19, 2016; Fire Protection Inspection
                                August 29 - September 2, 2016; Fire Protection Inspection
Inspection Procedures:         IP 71111.05XT, Fire Protection - NFPA 805 (Triennial)
                                IP 71152, "Identification and Resolution of Problems"
Inspectors:                     Dariusz Szwarc (Lead)         Ijaz Hafeez
                                Senior Reactor Inspector     Reactor Inspector
                                630-829-9803                 630-829-9843
                                Dariusz.Szwarc@nrc.gov       Ijaz.Hafeez@nrc.gov
                                Mark Jeffers
                                Reactor Inspector
                                630-829-9798
                                Mark.Jeffers@nrc.gov
Accompanying Personnel: Harold Barrett
                                Senior Fire Protection Engineer
                                Office of Nuclear Reactor Regulation
                                301-415-1402
                                Harold.Barrett@nrc.gov
  I.   Information Requested Prior To the Information Gathering Visit
      The following information is requested by July 15, 2016. If you have any questions
      regarding this request, please call the lead inspector as soon as possible. All
      information should be sent to Mr. Dariusz Szwarc via e-mail (Dariusz.Szwarc@nrc.gov).
      Electronic media is preferred. The preferred file format is a searchable pdf or Microsoft
      Excel file on a compact disk (CD). The CD should be indexed and hyper-linked to
      facilitate ease of use, if possible. Please provide three copies of each CD submitted
      (one for each inspector).
      1. Design and Licensing Basis Documents:
          a. Post-fire Nuclear Safety Capability, Systems, and Separation Analysis;
          b. Fire Hazards Analysis and/or National Fire Protection Association 805 Design
                Basis Document;
          c. Fire Probabilistic Risk Assessment Summary Document or full Probabilistic Risk
                Assessment Document (if summary document not available);
          d. NFPA 805 Transition Report, developed in accordance with Nuclear Energy
                Institute Document 04-02;
                                                                                        Enclosure
 
    REQUEST FOR INFORMATION - TRIENNIAL FIRE PROTECTION INSPECTION
        e. Fire Risk Evaluations (i.e., NFPA 805 Section 2.4.3);
        f. Plant Change Evaluations (i.e., NFPA 805 Section 2.4.4);
        g. Analysis that demonstrates nuclear safety performance criteria can be achieved
            and maintained for those areas that require recovery actions;
        h. Fire Protection Program and/or Fire Protection Plan; and
        i. Copies of the current versions of the Facility Operating License and Technical
            Requirements Manual.
    2. Operations:
        a. Operating procedures to achieve and maintain nuclear safety performance
            criteria from the control room, with a postulated fire in the selected fire areas; and
        b. Operating procedures to achieve and maintain nuclear safety performance
            criteria from outside the control room, with a postulated fire in the control room,
            cable spreading room, or any area requiring recovery actions (other than
            recovery actions performed in the control room or primary control stations).
II. Information Requested During the Information Gathering Visit (August 1, 2016)
    The following information is requested to be provided to the inspection team during the
    onsite information gathering visit. Except for Item 7, it is requested that the following
    information be provided on three sets of CDs (searchable, if possible) with the B.5.b
    Mitigating Strategies information (Item 7) provided on one separate CD.
    1. One set of hard-copy documents for facility layout drawings which identify plant fire
        area delineation; areas protected by automatic fire suppression and detection; and
        locations of fire protection equipment.
    2. Design and Licensing Basis Documents:
        a. List of post-fire safe shutdown components (i.e., safe shutdown equipment list);
        b. Fire protection system design basis document;
        c. List of applicable NFPA codes and standards and issuance dates (i.e., codes
            of record);
        d. List of deviations from (a) NFPA codes of record, or (b) NFPA 805 fundamental
            Fire Protection Program and design elements (i.e., NFPA 805, Chapter 3);
        e. NFPA Compliance Review Report;
        f. Report or evaluation that compares the fire protection program to the
            U. S. Nuclear Regulatory Commission (NRC) Branch Technical Position 9.5-1,
            Appendix A;
                                                2
 
REQUEST FOR INFORMATION - TRIENNIAL FIRE PROTECTION INSPECTION
    g. Copy of licensee submittals and NRC safety evaluation reports that are
      specifically listed in the facility operating license for the approved Fire Protection
      Program;
    h. Copy of NRC Safety Evaluation Reports that form the licensing basis for the Fire
      Protection Program and post-fire nuclear safety capability;
    i. Copy of NRC approved exemptions for plant fire protection and post-fire nuclear
      safety capability features;
    j. Copy of exemption requests submitted but not yet approved for plant fire
      protection and post-fire nuclear safety capability features; and
    k. List of nuclear safety capability design changes completed in the last 3 years
      (including their associated Title 10, Code of Federal Regulations (CFR),
      Part 50.59 and NFPA 805 plant change evaluations).
3. General Plant Design Documents (available onsite for inspector review):
    a. Piping and instrumentation diagrams (P&IDs) and legend list for components
      used to achieve and maintain nuclear safety performance criteria for: (C-size
      paper drawings):
              i. Fires outside the main control room; and
              ii. Fires in areas requiring recovery actions at other than primary control
                  stations;
    b. P&IDs and legend list for fire protection systems, including fire water supply,
      water suppression sprinklers & deluge, and carbon dioxide and Halon systems
      (C-size paper drawings);
    c. Yard layout drawings for underground fire protection buried piping (C-size
      paper drawings);
    d. Alternating Current and Direct Current electrical system single line diagrams,
      from offsite power down to the highest safety-related bus level (typically 4kV,
      emergency diesel generator bus) (C-size paper drawings);
    e. Single line diagrams for motor control centers that supply post-fire nuclear safety
      component loads (only for selected fire areas) (C-size paper drawings);
    f. Equipment location drawings which identify the physical plant locations of post-
      fire nuclear safety capability equipment (C-size paper drawings); and
    g. Logic diagrams showing the components used to achieve and maintain hot
      standby and cold shutdown.
4. Operations:
    a. List of calculations and engineering analyses, studies, or evaluations for the
      nuclear safety capability methodology;
                                            3
 
REQUEST FOR INFORMATION - TRIENNIAL FIRE PROTECTION INSPECTION
    b. For recovery actions, provide the following:
                i. Manual Action Feasibility Study;
              ii. Operator Time Critical Action Program;
              iii. Time lines for time-critical recovery actions; and
            iv.   Time line validations;
    c. Thermal hydraulic calculation or analysis that determines the time requirements
      for time-critical manual operator actions.
5. Administrative Control, Oversight, and Corrective Action Programs:
    a. Corrective actions associated with operator actions to achieve and maintain
      post-fire nuclear safety performance criteria;
    b. List of open and closed condition reports for the fire protection system for the
      last 3 years;
    c. List of open and closed condition reports for post-fire nuclear safety capability
      issues for the last 3 years. This includes issues affecting the nuclear safety
      capability analysis, fire hazards analysis, NFPA 805 design basis, fire risk
      evaluations, plant change evaluations, post-fire operating procedures and/or
      training, timeline evaluations for operator actions, and supporting engineering
      evaluations, analysis, or calculations; and
    d. List of procedures that control the configuration of the Fire Protection Program,
      features, and post-fire nuclear safety capability methodology and system design.
6. General Information:
    a. A listing of abbreviations and/or designators for plant systems;
    b. Organization charts of site personnel down to the level of fire protection staff
      personnel; and
    c. A phone list for onsite personnel.
7. B.5.b Mitigating Strategies Documents (provided on one separate compact disk on
    August 1, 2016):
    a. List of all changes to regulatory commitments made to meet the requirements
      of 10 CFR 50.54(hh)(2);
    b. List of procedures and guidelines that were revised or generated to implement
      the mitigating strategies. These could be extensive damage mitigation
      guidelines, severe accident management guidelines, emergency operating
      procedures, abnormal operating procedures, etc.;
                                          4
 
REQUEST FOR INFORMATION - TRIENNIAL FIRE PROTECTION INSPECTION
    c. A matrix that shows the correlation between the mitigation strategies identified
        in Nuclear Energy Institute Document 06-12, Revision 2, B.5.b Phase 2 & 3
        Submittal Guideline, issued December 2006, and the site-specific procedures
        or guidelines that are used to implement each strategy;
    d. List of engineering evaluations or calculations that were used to verify the
        engineering bases for the mitigating strategies;
    e. P&IDs and legend list or simplified flow diagrams for systems relied upon in the
        mitigating strategies. These could be the type used for training (C size paper
        drawings);
    f. List of modification packages or summary descriptions of modifications with
        simplified drawings, for necessary facility changes to implement the mitigating
        strategies;
    g. List of routine tests, surveillances, and preventive maintenance for equipment
        and tools needed to implement 10 CFR 50.54(hh)(2) strategies;
    h. For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,
        provide the following:
                i.   Procedures for inventory and inspection; and
              ii.   Most recent inspection and inventory results;
    i. List of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details
        that differ from that documented in the submittals or the safety evaluation report;
    j. Site general arrangement drawings that show the majority of buildings and areas
        referenced in 10 CFR 50.54(hh)(2) documents;
    k. Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2);
    l. Copies of memoranda of understanding (e.g., with local fire departments) required
        to implement any mitigating strategies.
8. Onsite Discussions:
    In addition, during the information gathering visit, it is requested that licensee staff be
    available for the following:
    a. Informal discussion on plant procedures operators would use in the event of fire
        or explosion (including B.5.b mitigation strategies) and under what conditions
        would the plant be shutdown using alternative shutdown methodology;
    b. Informal discussion on the plants safe shutdown cable routing database and the
        plant-wide cable routing database, as applicable; and
    c. A tour of fire areas.
    d. A discussion of scheduling of fire drills which may occur during the inspection
        so that the inspectors may be able to observe a fire drill, if possible.
                                          5
 
    REQUEST FOR INFORMATION - TRIENNIAL FIRE PROTECTION INSPECTION
III. Information Requested to be Available on first Day of the Second Onsite
      Inspection Week (August 15, 2016)
          The following information is requested to be provided on the first day of inspection.
          It is requested that this information be provided on three sets of CDs (searchable, if
          possible).
      1. Classic Fire Protection:
          a. Copy of fire protection program implementing procedures (e.g., administrative
              controls, surveillance testing, and fire brigade);
          b. List of calculations and engineering analyses, studies, or evaluations for the fire
              protection system, including the fire water system;
          c. Hydraulic calculations or analyses for fire protection water system;
          d. Copy of the evaluation or analysis of the effects of fire suppression activities on
              the ability to achieve the nuclear safety performance criteria (only for selected fire
              areas), including:
                      i.   An automatic or manually actuated suppression system, due to a fire
                            in a single location, will not indirectly cause damage to the success
                            path;
                      ii.   Inadvertent actuation or rupture of a suppression system will not
                            indirectly cause damage to the success path;
                    iii.   Demonstration of adequate drainage for areas protected by water
                            suppression systems; and
                    iv.     Hydrostatic rating of any floor penetration seals installed within the fire
                            areas that are credited with keeping water from leaking into fire areas
                            below;
          e. Pre-fire plans for selected fire areas;
          f.   List of fire protection system design changes completed in the last 3 years
              (including their associated 10 CFR 50.59 and NFPA 805 plant change
              evaluations);
          g. List of fire protection system NFPA 805 engineering equivalency evaluations
              completed in the last 3 years; and
          h. Copy of any test, surveillance, or maintenance procedure (current revision),
              including any associated data forms, for any requested "last performed" test,
              surveillance, or maintenance.
      2. Electrical:
          a. Nuclear safety circuit coordination analysis for fuse and breaker coordination of
              nuclear safety capability components (only for selected fire areas);
                                                    6
 
REQUEST FOR INFORMATION - TRIENNIAL FIRE PROTECTION INSPECTION
    b. Administrative or configuration control procedures that govern fuse replacement
      (e.g., fuse control procedures);
    c. Maintenance procedures that verify breaker over-current trip settings to ensure
      coordination remains functional, for post-fire nuclear safety capability
      components;
    d. Last surveillance demonstrating operability of those components operated from
      the primary control stations;
    e. Schematic or elementary diagrams for circuits to be reviewed (C-size paper
      drawings);
    f. Cable routing for components and equipment credited for post-fire nuclear safety
      capability systems and components (only for selected fire areas);
    g. List of post-fire nuclear safety capability system and component design changes
      completed, in the last three years; and
    h. List of identified fire induced circuit failure analyses (only for selected fire areas).
3. Operations:
    a. For safe shutdown equipment and tools, provide the following:
              i.   Procedure for inventory and inspection; and
              ii.   Most recent inspection and inventory results;
    b. List of procedures that implement Cold Shutdown Repairs;
    c. For Cold Shutdown Repairs, provide the following:
              i.   Procedure for inventory and inspection (i.e., needed tools, material,
                    etc.); and
              ii.   Most recent inspection and inventory results;
    d. List of licensed operator Job Performance Measures for operator actions
      required to achieve and maintain post-fire nuclear safety performance criteria;
    e. List of non-licensed operator training associated with non-licensed operator
      actions to achieve and maintain post-fire nuclear safety performance criteria
      (including Job Performance Measures, in-field training walkdowns, simulations,
      or initial qualification);
    f. Lesson plans for post-fire nuclear safety capability training for licensed and non-
      licensed operators;
    g. For Radio communications, provide the following:
              i.   Communications Plan for firefighting and post-fire safe shutdown
                    manual actions;
                                          7
 
      REQUEST FOR INFORMATION - TRIENNIAL FIRE PROTECTION INSPECTION
                      ii. Repeater locations;
                      iii. Cable routing for repeater power supply cables;
                      iv.   Radio coverage test results; and
                      v.   Radio Dead Spot locations in the plant;
            h. Environmental and habitability evaluations for post-fire operator actions
                (temperature, smoke, humidity, SCBAs, etc.).
        4. Administrative Control, Oversight, and Corrective Action Programs:
            a. Self-assessments, peer assessments, and audits of fire protection activities for
                the last 3 years;
            b. Self-assessments, peer assessments, and audits of post-fire nuclear safety
                capability methodology for the last 3 years; and
            c. List of Fire Event Analysis Reports for the last 3 years.
        5. Any updates to information previously provided.
  IV.   Information Requested to Be Provided Throughout the Inspection
        1. Copies of any corrective action documents generated as a result of the inspection
            teams questions or queries during this inspection; and
        2. Copies of the list of questions submitted by the inspection team members and the
            status/resolution of the information requested (provided daily during the inspection to
            each inspection team member).
If you have questions regarding the information requested, please contact the lead inspector.
                                                  8
 
J. Gebbie                                                                 -3-
the NRCs Public Document Room or from the Publicly Available Records (PARS) component
of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room).
                                                                          Sincerely,
                                                                          /RA/
                                                                          Dariusz Szwarc, Senior Reactor Inspector
                                                                          Engineering Branch 3
                                                                          Division of Reactor Safety
Docket Nos. 50-315; 50-316
License Nos. DPR-58; DPR-74
Enclosure:
   Request for Information - Triennial Fire
    Protection Inspection
cc: Distribution via LISTSERV
DISTRIBUTION:
Jeremy Bowen
RidsNrrDorlLpl3-1 Resource
RidsNrrPMDCCook Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
Darrell Roberts
Richard Skokowski
Allan Barker
Carole Ariano
Linda Linn
DRPIII
DRSIII
Jim Clay
Carmen Olteanu
ADAMS Accession Number ML16099A296
    Publicly Available                       Non-Publicly Available                       Sensitive                 Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
  OFFICE             RIII                                 RIII                           RIII                               RIII
  NAME               DSzwarc:cl
   DATE               04/08/16
                                                          OFFICIAL RECORD COPY
}}
}}

Revision as of 21:07, 30 October 2019

Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information 05000315/2016009; 05000316/2016009
ML16099A296
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/08/2016
From: Dariusz Szwarc
Engineering Branch 3
To: Gebbie J
Indiana Michigan Power Co
References
IR 2016009
Download: ML16099A296 (12)


See also: IR 05000315/2016009

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

April 8, 2016

Mr. Joel Gebbie

Senior VP and Chief Nuclear Officer

Indiana Michigan Power Company

Nuclear Generation Group

One Cook Place

Bridgman, MI 49106

SUBJECT: DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NOTIFICATION

OF NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST

FOR INFORMATION 05000315/2016009; 05000316/2016009

Dear Mr. Gebbie:

On August 1, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial fire

protection baseline inspection at your Donald C. Cook Nuclear Power Plant, Units 1 and 2.

This inspection will be performed in accordance with Inspection Procedure 71111.05XT, the

NRCs baseline National Fire Protection Association 805 Fire Protection Inspection Procedure.

Inspection Procedure 71111.05XT requires the fire protection inspection to review your

actions to mitigate postulated events that could potentially cause loss of large areas of

power reactor facilities due to explosions or fires. This requirement was implemented by

the issuance of the Interim Compensatory Measures Order EA-02-026, Section B.5.b and

the subsequent requirements of the Title 10 Code of Federal Regulations, Part 50.54(hh)(2),

which are collectively referred to as B.5.b requirements. During this inspection, the B.5.b

requirements review will be performed during the first onsite week of the inspection starting

on August 3, 2016.

The schedule for the onsite inspection activity is as follows:

Information Gathering Visit: August 1 - 3, 2016;

B.5.b Requirements: August 3 - 5, 2016; and

Fire Protection Inspection: August 15 - 19 and August 29 - September 2, 2016.

The purpose of the information gathering visit is: (1) to obtain information and documentation

needed to support the inspection; (2) to become familiar with the Donald C. Cook Nuclear

Power Plants Fire Protection Program, fire protection features, post-fire safe shutdown

capabilities, and plant layout; and (3) to arrange administrative details, such as office space,

availability of knowledgeable office personnel, and to ensure unescorted site access privileges.

J. Gebbie -2-

Experience has shown that the baseline fire protection inspections are extremely resource

intensive, both for the NRC inspectors and the licensee staff. In order to minimize the

inspection impact on the site and to ensure a productive inspection for both organizations,

we have enclosed a request for documents needed for the inspection. These documents

have been divided into four groups.

The first group lists information necessary to aid the inspection team in choosing

specific focus areas for the inspection. It is requested that this information be

provided to the lead inspector via mail or electronically no later than July 15, 2016.

The second group also lists information and areas for discussion necessary to aid

the inspection team in choosing specific fire protection focus areas for the inspection

and to ensure that the inspection team is adequately prepared for the inspection.

It is requested this information be available during the information gathering visit

(August 1, 2016).

The third group of requested documents consists of those items that the team will

review, or need access to, during the inspection. Please have this information

available by the first day of the second onsite inspection week (August 15, 2016).

The fourth group lists the information necessary to aid the inspection team in tracking

issues identified as a result of the inspection. It is requested that this information be

provided to the lead inspector as the information is generated during the inspection.

It is important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection.

The lead inspector for this inspection is Mr. Dariusz Szwarc. We understand that our regulatory

contact for this inspection is Mr. Mr. Richard A. Wynegar of your organization. If there are any

questions about the inspection or the material requested, please contact the lead inspector at

630-829-9803 or via e-mail at Dariusz.Szwarc@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required

to respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

In accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,

Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter,

its enclosure, and your response (if any) will be available electronically for public inspection in

J. Gebbie -3-

the NRCs Public Document Room or from the Publicly Available Records (PARS) component

of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Sincerely,

/RA/

Dariusz Szwarc, Senior Reactor Inspector

Engineering Branch 3

Division of Reactor Safety

Docket Nos. 50-315; 50-316

License Nos. DPR-58; DPR-74

Enclosure:

Request for Information - Triennial Fire

Protection Inspection

cc: Distribution via LISTSERV

REQUEST FOR INFORMATION - TRIENNIAL FIRE PROTECTION INSPECTION

Inspection Report: 05000315/2016009; 05000316/2016009

Onsite Inspection Dates: August 1 - 3, 2016; Information Gathering Visit

August 3 - 5, 2016; B.5.b Requirements

August 15 - 19, 2016; Fire Protection Inspection

August 29 - September 2, 2016; Fire Protection Inspection

Inspection Procedures: IP 71111.05XT, Fire Protection - NFPA 805 (Triennial)

IP 71152, "Identification and Resolution of Problems"

Inspectors: Dariusz Szwarc (Lead) Ijaz Hafeez

Senior Reactor Inspector Reactor Inspector

630-829-9803 630-829-9843

Dariusz.Szwarc@nrc.gov Ijaz.Hafeez@nrc.gov

Mark Jeffers

Reactor Inspector

630-829-9798

Mark.Jeffers@nrc.gov

Accompanying Personnel: Harold Barrett

Senior Fire Protection Engineer

Office of Nuclear Reactor Regulation

301-415-1402

Harold.Barrett@nrc.gov

I. Information Requested Prior To the Information Gathering Visit

The following information is requested by July 15, 2016. If you have any questions

regarding this request, please call the lead inspector as soon as possible. All

information should be sent to Mr. Dariusz Szwarc via e-mail (Dariusz.Szwarc@nrc.gov).

Electronic media is preferred. The preferred file format is a searchable pdf or Microsoft

Excel file on a compact disk (CD). The CD should be indexed and hyper-linked to

facilitate ease of use, if possible. Please provide three copies of each CD submitted

(one for each inspector).

1. Design and Licensing Basis Documents:

a. Post-fire Nuclear Safety Capability, Systems, and Separation Analysis;

b. Fire Hazards Analysis and/or National Fire Protection Association 805 Design

Basis Document;

c. Fire Probabilistic Risk Assessment Summary Document or full Probabilistic Risk

Assessment Document (if summary document not available);

d. NFPA 805 Transition Report, developed in accordance with Nuclear Energy

Institute Document 04-02;

Enclosure

REQUEST FOR INFORMATION - TRIENNIAL FIRE PROTECTION INSPECTION

e. Fire Risk Evaluations (i.e., NFPA 805 Section 2.4.3);

f. Plant Change Evaluations (i.e., NFPA 805 Section 2.4.4);

g. Analysis that demonstrates nuclear safety performance criteria can be achieved

and maintained for those areas that require recovery actions;

h. Fire Protection Program and/or Fire Protection Plan; and

i. Copies of the current versions of the Facility Operating License and Technical

Requirements Manual.

2. Operations:

a. Operating procedures to achieve and maintain nuclear safety performance

criteria from the control room, with a postulated fire in the selected fire areas; and

b. Operating procedures to achieve and maintain nuclear safety performance

criteria from outside the control room, with a postulated fire in the control room,

cable spreading room, or any area requiring recovery actions (other than

recovery actions performed in the control room or primary control stations).

II. Information Requested During the Information Gathering Visit (August 1, 2016)

The following information is requested to be provided to the inspection team during the

onsite information gathering visit. Except for Item 7, it is requested that the following

information be provided on three sets of CDs (searchable, if possible) with the B.5.b

Mitigating Strategies information (Item 7) provided on one separate CD.

1. One set of hard-copy documents for facility layout drawings which identify plant fire

area delineation; areas protected by automatic fire suppression and detection; and

locations of fire protection equipment.

2. Design and Licensing Basis Documents:

a. List of post-fire safe shutdown components (i.e., safe shutdown equipment list);

b. Fire protection system design basis document;

c. List of applicable NFPA codes and standards and issuance dates (i.e., codes

of record);

d. List of deviations from (a) NFPA codes of record, or (b) NFPA 805 fundamental

Fire Protection Program and design elements (i.e., NFPA 805, Chapter 3);

e. NFPA Compliance Review Report;

f. Report or evaluation that compares the fire protection program to the

U. S. Nuclear Regulatory Commission (NRC) Branch Technical Position 9.5-1,

Appendix A;

2

REQUEST FOR INFORMATION - TRIENNIAL FIRE PROTECTION INSPECTION

g. Copy of licensee submittals and NRC safety evaluation reports that are

specifically listed in the facility operating license for the approved Fire Protection

Program;

h. Copy of NRC Safety Evaluation Reports that form the licensing basis for the Fire

Protection Program and post-fire nuclear safety capability;

i. Copy of NRC approved exemptions for plant fire protection and post-fire nuclear

safety capability features;

j. Copy of exemption requests submitted but not yet approved for plant fire

protection and post-fire nuclear safety capability features; and

k. List of nuclear safety capability design changes completed in the last 3 years

(including their associated Title 10, Code of Federal Regulations (CFR),

Part 50.59 and NFPA 805 plant change evaluations).

3. General Plant Design Documents (available onsite for inspector review):

a. Piping and instrumentation diagrams (P&IDs) and legend list for components

used to achieve and maintain nuclear safety performance criteria for: (C-size

paper drawings):

i. Fires outside the main control room; and

ii. Fires in areas requiring recovery actions at other than primary control

stations;

b. P&IDs and legend list for fire protection systems, including fire water supply,

water suppression sprinklers & deluge, and carbon dioxide and Halon systems

(C-size paper drawings);

c. Yard layout drawings for underground fire protection buried piping (C-size

paper drawings);

d. Alternating Current and Direct Current electrical system single line diagrams,

from offsite power down to the highest safety-related bus level (typically 4kV,

emergency diesel generator bus) (C-size paper drawings);

e. Single line diagrams for motor control centers that supply post-fire nuclear safety

component loads (only for selected fire areas) (C-size paper drawings);

f. Equipment location drawings which identify the physical plant locations of post-

fire nuclear safety capability equipment (C-size paper drawings); and

g. Logic diagrams showing the components used to achieve and maintain hot

standby and cold shutdown.

4. Operations:

a. List of calculations and engineering analyses, studies, or evaluations for the

nuclear safety capability methodology;

3

REQUEST FOR INFORMATION - TRIENNIAL FIRE PROTECTION INSPECTION

b. For recovery actions, provide the following:

i. Manual Action Feasibility Study;

ii. Operator Time Critical Action Program;

iii. Time lines for time-critical recovery actions; and

iv. Time line validations;

c. Thermal hydraulic calculation or analysis that determines the time requirements

for time-critical manual operator actions.

5. Administrative Control, Oversight, and Corrective Action Programs:

a. Corrective actions associated with operator actions to achieve and maintain

post-fire nuclear safety performance criteria;

b. List of open and closed condition reports for the fire protection system for the

last 3 years;

c. List of open and closed condition reports for post-fire nuclear safety capability

issues for the last 3 years. This includes issues affecting the nuclear safety

capability analysis, fire hazards analysis, NFPA 805 design basis, fire risk

evaluations, plant change evaluations, post-fire operating procedures and/or

training, timeline evaluations for operator actions, and supporting engineering

evaluations, analysis, or calculations; and

d. List of procedures that control the configuration of the Fire Protection Program,

features, and post-fire nuclear safety capability methodology and system design.

6. General Information:

a. A listing of abbreviations and/or designators for plant systems;

b. Organization charts of site personnel down to the level of fire protection staff

personnel; and

c. A phone list for onsite personnel.

7. B.5.b Mitigating Strategies Documents (provided on one separate compact disk on

August 1, 2016):

a. List of all changes to regulatory commitments made to meet the requirements

of 10 CFR 50.54(hh)(2);

b. List of procedures and guidelines that were revised or generated to implement

the mitigating strategies. These could be extensive damage mitigation

guidelines, severe accident management guidelines, emergency operating

procedures, abnormal operating procedures, etc.;

4

REQUEST FOR INFORMATION - TRIENNIAL FIRE PROTECTION INSPECTION

c. A matrix that shows the correlation between the mitigation strategies identified

in Nuclear Energy Institute Document 06-12, Revision 2, B.5.b Phase 2 & 3

Submittal Guideline, issued December 2006, and the site-specific procedures

or guidelines that are used to implement each strategy;

d. List of engineering evaluations or calculations that were used to verify the

engineering bases for the mitigating strategies;

e. P&IDs and legend list or simplified flow diagrams for systems relied upon in the

mitigating strategies. These could be the type used for training (C size paper

drawings);

f. List of modification packages or summary descriptions of modifications with

simplified drawings, for necessary facility changes to implement the mitigating

strategies;

g. List of routine tests, surveillances, and preventive maintenance for equipment

and tools needed to implement 10 CFR 50.54(hh)(2) strategies;

h. For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,

provide the following:

i. Procedures for inventory and inspection; and

ii. Most recent inspection and inventory results;

i. List of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details

that differ from that documented in the submittals or the safety evaluation report;

j. Site general arrangement drawings that show the majority of buildings and areas

referenced in 10 CFR 50.54(hh)(2) documents;

k. Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2);

l. Copies of memoranda of understanding (e.g., with local fire departments) required

to implement any mitigating strategies.

8. Onsite Discussions:

In addition, during the information gathering visit, it is requested that licensee staff be

available for the following:

a. Informal discussion on plant procedures operators would use in the event of fire

or explosion (including B.5.b mitigation strategies) and under what conditions

would the plant be shutdown using alternative shutdown methodology;

b. Informal discussion on the plants safe shutdown cable routing database and the

plant-wide cable routing database, as applicable; and

c. A tour of fire areas.

d. A discussion of scheduling of fire drills which may occur during the inspection

so that the inspectors may be able to observe a fire drill, if possible.

5

REQUEST FOR INFORMATION - TRIENNIAL FIRE PROTECTION INSPECTION

III. Information Requested to be Available on first Day of the Second Onsite

Inspection Week (August 15, 2016)

The following information is requested to be provided on the first day of inspection.

It is requested that this information be provided on three sets of CDs (searchable, if

possible).

1. Classic Fire Protection:

a. Copy of fire protection program implementing procedures (e.g., administrative

controls, surveillance testing, and fire brigade);

b. List of calculations and engineering analyses, studies, or evaluations for the fire

protection system, including the fire water system;

c. Hydraulic calculations or analyses for fire protection water system;

d. Copy of the evaluation or analysis of the effects of fire suppression activities on

the ability to achieve the nuclear safety performance criteria (only for selected fire

areas), including:

i. An automatic or manually actuated suppression system, due to a fire

in a single location, will not indirectly cause damage to the success

path;

ii. Inadvertent actuation or rupture of a suppression system will not

indirectly cause damage to the success path;

iii. Demonstration of adequate drainage for areas protected by water

suppression systems; and

iv. Hydrostatic rating of any floor penetration seals installed within the fire

areas that are credited with keeping water from leaking into fire areas

below;

e. Pre-fire plans for selected fire areas;

f. List of fire protection system design changes completed in the last 3 years

(including their associated 10 CFR 50.59 and NFPA 805 plant change

evaluations);

g. List of fire protection system NFPA 805 engineering equivalency evaluations

completed in the last 3 years; and

h. Copy of any test, surveillance, or maintenance procedure (current revision),

including any associated data forms, for any requested "last performed" test,

surveillance, or maintenance.

2. Electrical:

a. Nuclear safety circuit coordination analysis for fuse and breaker coordination of

nuclear safety capability components (only for selected fire areas);

6

REQUEST FOR INFORMATION - TRIENNIAL FIRE PROTECTION INSPECTION

b. Administrative or configuration control procedures that govern fuse replacement

(e.g., fuse control procedures);

c. Maintenance procedures that verify breaker over-current trip settings to ensure

coordination remains functional, for post-fire nuclear safety capability

components;

d. Last surveillance demonstrating operability of those components operated from

the primary control stations;

e. Schematic or elementary diagrams for circuits to be reviewed (C-size paper

drawings);

f. Cable routing for components and equipment credited for post-fire nuclear safety

capability systems and components (only for selected fire areas);

g. List of post-fire nuclear safety capability system and component design changes

completed, in the last three years; and

h. List of identified fire induced circuit failure analyses (only for selected fire areas).

3. Operations:

a. For safe shutdown equipment and tools, provide the following:

i. Procedure for inventory and inspection; and

ii. Most recent inspection and inventory results;

b. List of procedures that implement Cold Shutdown Repairs;

c. For Cold Shutdown Repairs, provide the following:

i. Procedure for inventory and inspection (i.e., needed tools, material,

etc.); and

ii. Most recent inspection and inventory results;

d. List of licensed operator Job Performance Measures for operator actions

required to achieve and maintain post-fire nuclear safety performance criteria;

e. List of non-licensed operator training associated with non-licensed operator

actions to achieve and maintain post-fire nuclear safety performance criteria

(including Job Performance Measures, in-field training walkdowns, simulations,

or initial qualification);

f. Lesson plans for post-fire nuclear safety capability training for licensed and non-

licensed operators;

g. For Radio communications, provide the following:

i. Communications Plan for firefighting and post-fire safe shutdown

manual actions;

7

REQUEST FOR INFORMATION - TRIENNIAL FIRE PROTECTION INSPECTION

ii. Repeater locations;

iii. Cable routing for repeater power supply cables;

iv. Radio coverage test results; and

v. Radio Dead Spot locations in the plant;

h. Environmental and habitability evaluations for post-fire operator actions

(temperature, smoke, humidity, SCBAs, etc.).

4. Administrative Control, Oversight, and Corrective Action Programs:

a. Self-assessments, peer assessments, and audits of fire protection activities for

the last 3 years;

b. Self-assessments, peer assessments, and audits of post-fire nuclear safety

capability methodology for the last 3 years; and

c. List of Fire Event Analysis Reports for the last 3 years.

5. Any updates to information previously provided.

IV. Information Requested to Be Provided Throughout the Inspection

1. Copies of any corrective action documents generated as a result of the inspection

teams questions or queries during this inspection; and

2. Copies of the list of questions submitted by the inspection team members and the

status/resolution of the information requested (provided daily during the inspection to

each inspection team member).

If you have questions regarding the information requested, please contact the lead inspector.

8

J. Gebbie -3-

the NRCs Public Document Room or from the Publicly Available Records (PARS) component

of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Sincerely,

/RA/

Dariusz Szwarc, Senior Reactor Inspector

Engineering Branch 3

Division of Reactor Safety

Docket Nos. 50-315; 50-316

License Nos. DPR-58; DPR-74

Enclosure:

Request for Information - Triennial Fire

Protection Inspection

cc: Distribution via LISTSERV

DISTRIBUTION:

Jeremy Bowen

RidsNrrDorlLpl3-1 Resource

RidsNrrPMDCCook Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Jim Clay

Carmen Olteanu

ADAMS Accession Number ML16099A296

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII RIII RIII

NAME DSzwarc:cl

DATE 04/08/16

OFFICIAL RECORD COPY