{{#Wiki_filter:ES-301 Control Room/In
{{#Wiki_filter:ES-301                         Control Room/In-Plant Systems Outline                   Form ES-301-2 Facility: Byron NRC 2016                                       Date of Examination: 3/14/2016 Exam Level: RO               SRO-I           SRO-U             Operating Test No.: Byron 2016301 Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title                           Type Code*         Safety Function
-Plant Systems Outline Form ES-301-2   Facility: Byron NRC 2016 Date of Examination: 3/14/201 6 Exam Level:
: a. Realign RCCA                                                       S, D                  1 003AA1.02 Ability to operate and/or monitor the following as they apply to the Dropped Control; Rod: Controls and componenets necessary to recover rod. 3.6/3.4 Bank
RO SRO-I SRO-U Operating Test No.: Byron 2016301 Control Room Systems:
: b. Switch to Hot Leg Recirculation                                     S, P, D, EN,          2 L, A 011EA1.11 Ability to operate and monitor the following as they apply to a Large Break LOCA: Long-term cooling of core. 4.2/4.2 Bank - 2013 NRC
* 8 for RO; 7 for SRO
: c. SI pump ASME startup (with cavitation indication)                   S, D, EN, A            3 006A2.04 Ability to (a) predict the impacts of the following malfunctions or operations on the Emergency Core Cooling System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Improper discharge pressure. 3.4/3.8 Bank
-I; 2 or 3 for SRO-U System / JPM Title Type Code*
: d. Respond to RCP seal malfunction                                     S, D                  4P 015AA1.22 Ability to operate and/or monitor the following as they apply to the Reactor Coolant Pump Malfunctions: RCP seal failure/malfunction. 4.0/4.2 Bank
Safety Function a. Realign RCCA 003AA1.02 Ability to operate and/or monitor the following as they apply to the Dropped Control; Rod: Controls and componenets necessary to recover rod. 3.6/3.4 Bank S, D 1 b. Switch to Hot Leg Recirculation 011EA1.11 Ability to operate and monitor the following as they apply to a Large Break LOCA: Long
: e. Respond to 1A SX Pump Trip (Standby Pump Trips)                     S, D, A              4S 076A4.01 Ability to manually operate and/or monitor in the control room: SWS pumps. 2.9/2.9 Bank
-term cooling of core.
: f. Align the SX towers for LOCA conditions (Require RCFC               S, D, EN, L, A        5 shutdown) 022A4.01 Ability to manually operate and/or monitor in the control room: CCS fans. 3.6/3.6 Bank
4.2/4.2 Bank - 2013 NRC S, P , D, EN , L , A 2 c. SI pump ASME startup (with cavitation indication) 006A2.04 Ability to (a) predict the impacts of the following malfunctions or operations on the Emergency Core Cooling System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Improper discharge pressure. 3.4/3.8 Bank S, D, EN, A 3 d. Respond to RCP seal malfunction 015AA1.22 Ability to operate and/or monitor the following as they apply to the Reactor Coolant Pump Malfunctions: RCP seal failure/malfunction. 4.0/4.2 Bank S, D 4P e. Respond to 1A SX Pump Trip (Standby Pump Trips) 076A4.01 Ability to manually operate and/or monitor in the control room: SWS pumps. 2.9/2.9 Bank S, D , A 4S f. Align the SX towers for LOCA conditions (Require RCFC shutdown) 022A4.01 Ability to manually operate and/or monitor in the control room: CCS fans.
: g. Supply Non-ESF Bus from ESF Bus (Post-LOCA)                                     S, N, EN, L              6 062A4.01 Ability to manually operate and/or monitor in the control room: All breakers (including available switchyard). 3.3/3.1 NEW
3.6/3.6 Bank S, D , EN, L, A 5
: h. CW Pump trip with discharge valve failure to auto close                         S, N                      8 075A2.02 Ability to (a) predict the impacts of the following malfunctions or operations on the Circulating Water System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of circulating water pumps. 2.5/2.7 NEW In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: g. Supply Non-ESF Bus from ESF Bus (Post-LOCA) 062A4.01 Ability to manually operate and/or monitor in the control room: All breakers (including available switchyard)
: i. Trip Reactor outside the MCR (Open MCC breakers)                               M, E, A                  1 029EA1.12 Ability to operate and monitor the following as they apply to an ATWS: M/G set power supply and reactor trip breakers. 4.1/4.0 Modified from 2013 NRC
. 3.3/3.1 NEW S, N, EN, L 6 h. CW Pump trip with discharge valve failure to auto close 075A2.02 Ability to (a) predict the impacts of the following malfunctions or operations on the Circulating Water System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of circulating water pumps. 2.5/2.7 NEW S, N  8 In-Plant Systems
: j. Transfer instrument bus to CVT supply                                           D, E                      6 057AA1.01 Ability to operate and monitor the following as they apply to the Loss of Vital AC Instrument Bus: Manual inverter swapping.
* (3 for RO); (3 for SRO
3.7/3.7 Bank
-I); (3 or 2 for SRO
: k. Manual makeup to CC surge tank from backup SX system                           R, E, N                  8 008K4.02 Knowledge of CCWS design feature(s) and/or interlocks which provide for the following: Operation of the surge tank, including the associated valves and controls. 2.9/2.7 NEW
-U) i. Trip Reactor outside the MCR (Open MCC breakers) 029EA1.12 Ability to operate and monitor the following as they apply to an ATWS: M/G set power supply and reactor trip breakers.
* All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
4.1/4.0 Modified from 2013 NRC M , E, A 1 j. Transfer instrument bus to CVT supply 057AA1.01 Ability to operate and monitor the following as they apply to the Loss of Vital AC Instrument Bus: Manual inverter swapping. 3.7/3.7 Bank D, E 6 k. Manual makeup to CC surge tank from backup SX system 008K4.02 Knowledge of CCWS design feature(s) and/or interlocks which provide for the following: Operation of the surge tank, including the associated valves and controls. 2.9/2.7 NEW R, E, N 8
* Type Codes                                   Criteria for RO / SRO-I / SRO-U (A)lternate path                                         5        4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                       7        9/8/4 (E)mergency or abnormal in-plant                         3        1/1/1 (EN)gineered safety feature                               4        1 / 1 /  1 (control room system)
* All RO and SRO
(L)ow-Power / Shutdown                                   3        1/1/1 (N)ew or (M)odified from bank including 1(A)             4        2/2/1 (P)revious 2 exams                                       1          3 /  3 /  2 (randomly selected)
-I control room (and in
(R)CA                                                     1        1/1/1 (S)imulator
-plant) systems must be different and serve different safety functions; all five SRO
 
-U systems must serve different safety functions; in
ES-301                        Control Room/In-Plant Systems Outline                  Form ES-301-2 Facility: Byron NRC 2016                                        Date of Examination: 3/14/2016 Exam Level: RO               SRO-I           SRO-U             Operating Test No.: Byron 2016301 Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title                           Type Code*         Safety Function
-plant systems and functions may overlap those tested in the control room.
: a. Realign RCCA                                                       S, D                  1 003AA1.02 Ability to operate and/or monitor the following as they apply to the Dropped Control; Rod: Controls and componenets necessary to recover rod. 3.6/3.4 Bank
* Type Codes Criteria for RO / SRO
: b. Switch to Hot Leg Recirculation                                     S, P, D, EN,          2 L, A 011EA1.11 Ability to operate and monitor the following as they apply to a Large Break LOCA: Long-term cooling of core. 4.2/4.2 Bank - 2013 NRC
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
: c. SI pump ASME startup (with cavitation indication)                   S, D, EN, A            3 006A2.04 Ability to (a) predict the impacts of the following malfunctions or operations on the Emergency Core Cooling System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Improper discharge pressure. 3.4/3.8 Bank
-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
: d. Respond to RCP seal malfunction                                     S, D                  4P 015AA1.22 Ability to operate and/or monitor the following as they apply to the Reactor Coolant Pump Malfunctions: RCP seal failure/malfunction. 4.0/4.2 Bank
(P)revious 2 exams (R)CA (S)imulator 5 4-6 / 4-6 / 2-3 7  3 4  3  4  1  1 ES-301 Control Room/In
: e. Respond to 1A SX Pump Trip (Standby Pump Trips)                     S, D, A              4S 076A4.01 Ability to manually operate and/or monitor in the control room: SWS pumps. 2.9/2.9 Bank
-Plant Systems Outline Form ES-301-2  Facility: Byron NRC 2016 Date of Examination:  3/14/201 6 Exam Level:
: f. Align the SX towers for LOCA conditions (Require RCFC               S, D, EN, L, A        5 shutdown) 022A4.01 Ability to manually operate and/or monitor in the control room: CCS fans. 3.6/3.6 Bank
RO SRO-I SRO-U Operating Test No.: Byron 2016301 Control Room Systems:
: g. Supply Non-ESF Bus from ESF Bus (Post-LOCA)                                     S, N, EN, L              6 062A4.01 Ability to manually operate and/or monitor in the control room: All breakers (including available switchyard). 3.3/3.1 NEW
* 8 for RO; 7 for SRO
: h. CW Pump trip with discharge valve failure to auto close                         S, N                      8 075A2.02 Ability to (a) predict the impacts of the following malfunctions or operations on the Circulating Water System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of circulating water pumps. 2.5/2.7 NEW In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
-I; 2 or 3 for SRO-U System / JPM Title Type Code*
: i. Trip Reactor outside the MCR (Open MCC breakers)                               M, E, A                  1 029EA1.12 Ability to operate and monitor the following as they apply to an ATWS: M/G set power supply and reactor trip breakers. 4.1/4.0 Modified from 2013 NRC
Safety Function a. Realign RCCA 003AA1.02 Ability to operate and/or monitor the following as they apply to the Dropped Control; Rod: Controls and componenets necessary to recover rod. 3.6/3.4 Bank S, D 1 b. Switch to Hot Leg Recirculation 011EA1.11 Ability to operate and monitor the following as they apply to a Large Break LOCA: Long
: j. Transfer instrument bus to CVT supply                                           D, E                      6 057AA1.01 Ability to operate and monitor the following as they apply to the Loss of Vital AC Instrument Bus: Manual inverter swapping.
-term cooling of core.
3.7/3.7 Bank
4.2/4.2 Bank - 2013 NRC S, P , D, EN , L , A 2 c. SI pump ASME startup (with cavitation indication) 006A2.04 Ability to (a) predict the impacts of the following malfunctions or operations on the Emergency Core Cooling System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Improper discharge pressure. 3.4/3.8 Bank S, D, EN, A 3 d. Respond to RCP seal malfunction 015AA1.22 Ability to operate and/or monitor the following as they apply to the Reactor Coolant Pump Malfunctions: RCP seal failure/malfunction. 4.0/4.2 Bank S, D 4P e. Respond to 1A SX Pump Trip (Standby Pump Trips) 076A4.01 Ability to manually operate and/or monitor in the control room: SWS pumps. 2.9/2.9 Bank S, D , A 4S f. Align the SX towers for LOCA conditions (Require RCFC shutdown) 022A4.01 Ability to manually operate and/or monitor in the control room: CCS fans.
: k. Manual makeup to CC surge tank from backup SX system                           R, E, N                  8 008K4.02 Knowledge of CCWS design feature(s) and/or interlocks which provide for the following: Operation of the surge tank, including the associated valves and controls. 2.9/2.7 NEW
3.6/3.6 Bank S, D , EN, L, A 5
* All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
: g. Supply Non-ESF Bus from ESF Bus (Post-LOCA) 062A4.01 Ability to manually operate and/or monitor in the control room: All breakers (including available switchyard)
* Type Codes                                   Criteria for RO / SRO-I / SRO-U (A)lternate path                                         5        4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                       7        9/8/4 (E)mergency or abnormal in-plant                         3        1/1/1 (EN)gineered safety feature                               4        1 / 1 /  1 (control room system)
. 3.3/3.1 NEW S, N, EN, L 6 h. CW Pump trip with discharge valve failure to auto close 075A2.02 Ability to (a) predict the impacts of the following malfunctions or operations on the Circulating Water System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of circulating water pumps. 2.5/2.7 NEW S, N  8 In-Plant Systems
(L)ow-Power / Shutdown                                   3        1/1/1 (N)ew or (M)odified from bank including 1(A)             4        2/2/1 (P)revious 2 exams                                       1          3 /  3 /  2 (randomly selected)
* (3 for RO); (3 for SRO
(R)CA                                                    1        1/1/1 (S)imulator}}
-I); (3 or 2 for SRO
-U) i. Trip Reactor outside the MCR (Open MCC breakers) 029EA1.12 Ability to operate and monitor the following as they apply to an ATWS: M/G set power supply and reactor trip breakers.
4.1/4.0 Modified from 2013 NRC M , E, A 1 j. Transfer instrument bus to CVT supply 057AA1.01 Ability to operate and monitor the following as they apply to the Loss of Vital AC Instrument Bus: Manual inverter swapping. 3.7/3.7 Bank D, E 6 k. Manual makeup to CC surge tank from backup SX system 008K4.02 Knowledge of CCWS design feature(s) and/or interlocks which provide for the following: Operation of the surge tank, including the associated valves and controls. 2.9/2.7 NEW R, E, N 8
* All RO and SRO
-I control room (and in
-plant) systems must be different and serve different safety functions; all five SRO
-U systems must serve different safety functions; in
-plant systems and functions may overlap those tested in the control room.
* Type Codes Criteria for RO / SRO
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA  (S)imulator 5 4-6 / 4-6 / 2-3 7  3  4  3  4  1  1}}

Revision as of 20:41, 30 October 2019

2016 Byron Nuclear Station Initial License Examination Form ES-301-2 RO Rev 1
ML16116A080
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/23/2016
From: Bielby M
Operations Branch III
To:
Exelon Generation Co
References
Download: ML16116A080 (2)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Byron NRC 2016 Date of Examination: 3/14/2016 Exam Level: RO SRO-I SRO-U Operating Test No.: Byron 2016301 Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code* Safety Function

a. Realign RCCA S, D 1 003AA1.02 Ability to operate and/or monitor the following as they apply to the Dropped Control; Rod: Controls and componenets necessary to recover rod. 3.6/3.4 Bank
b. Switch to Hot Leg Recirculation S, P, D, EN, 2 L, A 011EA1.11 Ability to operate and monitor the following as they apply to a Large Break LOCA: Long-term cooling of core. 4.2/4.2 Bank - 2013 NRC
c. SI pump ASME startup (with cavitation indication) S, D, EN, A 3 006A2.04 Ability to (a) predict the impacts of the following malfunctions or operations on the Emergency Core Cooling System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Improper discharge pressure. 3.4/3.8 Bank
d. Respond to RCP seal malfunction S, D 4P 015AA1.22 Ability to operate and/or monitor the following as they apply to the Reactor Coolant Pump Malfunctions: RCP seal failure/malfunction. 4.0/4.2 Bank
e. Respond to 1A SX Pump Trip (Standby Pump Trips) S, D, A 4S 076A4.01 Ability to manually operate and/or monitor in the control room: SWS pumps. 2.9/2.9 Bank
f. Align the SX towers for LOCA conditions (Require RCFC S, D, EN, L, A 5 shutdown) 022A4.01 Ability to manually operate and/or monitor in the control room: CCS fans. 3.6/3.6 Bank
g. Supply Non-ESF Bus from ESF Bus (Post-LOCA) S, N, EN, L 6 062A4.01 Ability to manually operate and/or monitor in the control room: All breakers (including available switchyard). 3.3/3.1 NEW
h. CW Pump trip with discharge valve failure to auto close S, N 8 075A2.02 Ability to (a) predict the impacts of the following malfunctions or operations on the Circulating Water System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of circulating water pumps. 2.5/2.7 NEW In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. Trip Reactor outside the MCR (Open MCC breakers) M, E, A 1 029EA1.12 Ability to operate and monitor the following as they apply to an ATWS: M/G set power supply and reactor trip breakers. 4.1/4.0 Modified from 2013 NRC
j. Transfer instrument bus to CVT supply D, E 6 057AA1.01 Ability to operate and monitor the following as they apply to the Loss of Vital AC Instrument Bus: Manual inverter swapping.

3.7/3.7 Bank

k. Manual makeup to CC surge tank from backup SX system R, E, N 8 008K4.02 Knowledge of CCWS design feature(s) and/or interlocks which provide for the following: Operation of the surge tank, including the associated valves and controls. 2.9/2.7 NEW
  • All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 5 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 7 9/8/4 (E)mergency or abnormal in-plant 3 1/1/1 (EN)gineered safety feature 4 1 / 1 / 1 (control room system)

(L)ow-Power / Shutdown 3 1/1/1 (N)ew or (M)odified from bank including 1(A) 4 2/2/1 (P)revious 2 exams 1 3 / 3 / 2 (randomly selected)

(R)CA 1 1/1/1 (S)imulator

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Byron NRC 2016 Date of Examination: 3/14/2016 Exam Level: RO SRO-I SRO-U Operating Test No.: Byron 2016301 Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code* Safety Function

a. Realign RCCA S, D 1 003AA1.02 Ability to operate and/or monitor the following as they apply to the Dropped Control; Rod: Controls and componenets necessary to recover rod. 3.6/3.4 Bank
b. Switch to Hot Leg Recirculation S, P, D, EN, 2 L, A 011EA1.11 Ability to operate and monitor the following as they apply to a Large Break LOCA: Long-term cooling of core. 4.2/4.2 Bank - 2013 NRC
c. SI pump ASME startup (with cavitation indication) S, D, EN, A 3 006A2.04 Ability to (a) predict the impacts of the following malfunctions or operations on the Emergency Core Cooling System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Improper discharge pressure. 3.4/3.8 Bank
d. Respond to RCP seal malfunction S, D 4P 015AA1.22 Ability to operate and/or monitor the following as they apply to the Reactor Coolant Pump Malfunctions: RCP seal failure/malfunction. 4.0/4.2 Bank
e. Respond to 1A SX Pump Trip (Standby Pump Trips) S, D, A 4S 076A4.01 Ability to manually operate and/or monitor in the control room: SWS pumps. 2.9/2.9 Bank
f. Align the SX towers for LOCA conditions (Require RCFC S, D, EN, L, A 5 shutdown) 022A4.01 Ability to manually operate and/or monitor in the control room: CCS fans. 3.6/3.6 Bank
g. Supply Non-ESF Bus from ESF Bus (Post-LOCA) S, N, EN, L 6 062A4.01 Ability to manually operate and/or monitor in the control room: All breakers (including available switchyard). 3.3/3.1 NEW
h. CW Pump trip with discharge valve failure to auto close S, N 8 075A2.02 Ability to (a) predict the impacts of the following malfunctions or operations on the Circulating Water System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of circulating water pumps. 2.5/2.7 NEW In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. Trip Reactor outside the MCR (Open MCC breakers) M, E, A 1 029EA1.12 Ability to operate and monitor the following as they apply to an ATWS: M/G set power supply and reactor trip breakers. 4.1/4.0 Modified from 2013 NRC
j. Transfer instrument bus to CVT supply D, E 6 057AA1.01 Ability to operate and monitor the following as they apply to the Loss of Vital AC Instrument Bus: Manual inverter swapping.

3.7/3.7 Bank

k. Manual makeup to CC surge tank from backup SX system R, E, N 8 008K4.02 Knowledge of CCWS design feature(s) and/or interlocks which provide for the following: Operation of the surge tank, including the associated valves and controls. 2.9/2.7 NEW
  • All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 5 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 7 9/8/4 (E)mergency or abnormal in-plant 3 1/1/1 (EN)gineered safety feature 4 1 / 1 / 1 (control room system)

(L)ow-Power / Shutdown 3 1/1/1 (N)ew or (M)odified from bank including 1(A) 4 2/2/1 (P)revious 2 exams 1 3 / 3 / 2 (randomly selected)

(R)CA 1 1/1/1 (S)imulator