DCL-16-086, Owner'S Activity Report for Unit 2 Nineteenth Refueling Outage: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Pacific Gas and | {{#Wiki_filter:Diablo Canyon Power Plant Pacific Gas and Paula Gerfen Station Director Mail Code 104/5/502 Electric Company 0 | ||
P.O. Box 56 Avila Beach, CA 93424 805 .545.4596 Internal: 691.4596 Fax: 805.545.4234 Aug.ust 31, 2016 PG&E Letter DCL-16-086 U.S. Nuclear Regulatory Commission 10 CFR 50.4 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-323, OL-DPR-82 Diablo Canyon Unit 2 Owner's Activity Report for Unit 2 Nineteenth Refueling Outage In accordance with American Society of Mechanical Engineers (ASME) Code Case N-532-5, enclosed is the Owner's Activity Report for inservice inspection (lSI) activities performed at Diablo Canyon Power Plant through the completion of the Unit 2 Nineteenth Refueling Outage. | |||
This code case is used as an alternative to the requirements ofASME Section XI, Article IWA-6000 as listed in Regulatory Guide 1.147, "lnservice Inspection Code Case Acceptability, ASME Section XI, Division 1,"Revision 17, and approved in accordance with 10 CFR 50.55a(b)(5). | |||
There are no new or revised regulatory commitments (as defined by NEI 99-04) in this submittal. | There are no new or revised regulatory commitments (as defined by NEI 99-04) in this submittal. | ||
If you have any questions regarding the information enclosed, or other lSI program activities, please contact Mr. Ken Bych, Manager, Technical Support Engineering, at (805) 545-4241. | If you have any questions regarding the information enclosed, or other lSI program activities, please contact Mr. Ken Bych, Manager, Technical Support Engineering, at (805) 545-4241. | ||
jmsp/4927/64113881-0100 Enclosure cc/enc: Kriss M. Kennedy, NRC Region IV Administrator Balwant K. Singal , NRR Project Manager Christopher W. Newport , NRC Senior Resident Inspector State of California, Pressure Vessel Unit A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway | jmsp/4927/64113881-0100 Enclosure cc/enc: Kriss M. Kennedy, NRC Region IV Administrator Balwant K. Singal, NRR Project Manager Christopher W. Newport, NRC Senior Resident Inspector State of California, Pressure Vessel Unit A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway | ||
* Diablo Canyon | * Diablo Canyon | ||
* Palo Verde | * Palo Verde | ||
* Wolf Creek | * Wolf Creek | ||
Enclosure PG&E Letter DCL-16-086 Pacific Gas and Electric Company Diablo Canyon Power Plant Owner's Activity Report for Unit 2 Nineteenth Refueling Outage | |||
DIABLO CANYON POWER PLANT UNIT 2 REFUELING OUTAGE: 2R19 Operating License No. DPR-82 USNRC Docket No. 50-323 OWNER'S ACTIVITY REPORT Rev. 0 Contents: | |||
== | == | ||
Introduction:== | Introduction:== | ||
OAR-1 Report Number: DCPP-2R19: | OAR-1 Report Number: DCPP-2R19: | ||
Table 1: Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service. Table 2: Abstract of Repair/Replacement Activities Required for Continued Service. NIS-2A: Repair/Replacement Certification Record | Table 1: Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service. | ||
Table 2: Abstract of Repair/Replacement Activities Required for Continued Service. | |||
NIS-2A: Repair/Replacement Certification Record | |||
==Attachment:== | ==Attachment:== | ||
List of Repair/Replacement Plans Prepared By: | |||
Reviewed By: - - - - - = - - + - - - - - - - - - - - - - Date b_,L"--U | |||
____;8::;.......,_/_1 _I_fo_ | |||
Ja es E. Hill, lSI Specialist Approved By: ~___..-:/~~Date Ken Bych, Manager Technical Support Engineering Document Date: 7/30/16 Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 941 06 Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 Page 1 of 6 | |||
INTRODUCTION lnservice inspection (lSI) of scheduled ASME Section XI components and their supports at Pacific Gas and Electric Company's Diablo Canyon Power Plant (DCPP) Unit 2 was completed during the nineteenth refueling outage (2R19) from 05/2016 through 06/2016. | |||
2R19 was the second outage in the third period within the third 10-year lSI interval. | |||
This Owner's Activity Report, OAR-1, complies with the provisions of Code Case N-532-5 as approved by Regulatory Guide 1.147, Revision 17. | |||
The OAR-1 Report covers applicable 2R19 work completed prior to and including June 30,2016 and any mid cycle and 2R18 work completed after December 5, 2014. | |||
Page 2 of 6 | |||
FORM OAR-1 OWNERS ACTIVITY REPORT -- DCPP-2R19 Report Number DCPP-2R19 Plant Diablo Canyon Nuclear Power Plant. P.O. Box 56, Avila Beach, California 93424 Unit No. 2 Commercial service date _ _.:M==a"--'rc""'-h-'----'-13""-','-1;:...:9:....;o8c....=6;.____ Refueling outage no. 2R19 Current inspection interval IWB I IWC I IWD I IWF - 3rd IWE I IWL - 2nd (1st, 2nd , 3rd, 4th , other) | |||
Current inspection period _ __:. IW.:. . :. . =B:. . . :/_.:1-=-W.:. . :C: . . . :. . _/.:....:.IW....:...=.D-=-/-=-IW'--"-'-F~--3=r'-=d'--_ _ _.:....:.IW-=-=E...:..../...:...;IW:....:....=L_--=2.:....:.nd==----------- | |||
(1 st, 2nd , 3rd) | |||
Edition and Addenda of Section XI applicable to the inspection plans -~2=..:0=0"--'1'--'E=d=i=tio=n'-'....!.!.th.!.!.r=u-=2=0=0=3-=-A=d=d=e-'-'n=da::::___ __ | |||
Date and revision of inspection plans IWB I IWC I IWD I IWF -- 12/28/11 Rev. 1 IWE I IWL -- 11/4/10 Rev. 0 Edition and addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans | |||
. 2007 Edition through 2008 Addenda Code Cases used: N-532-5 N-685 N-722-1 N-770-1 N-798 N-460 N-566-2 (if applicable) | |||
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 2R 19 (refueling outage no) conform to the requirements of Section XI. | |||
Signed - *'2:-/ ~~ I Manager, Technical Support Eng ineering Date _ _ ~ _-_ /_/ _ ..-._/ | |||
---=~=--_ __ | |||
Owner or Owner's designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned , holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employedby_-'T~h=e~H~a=rt~f=o-=-rd~S=~=a=m~B=o~il=e~r=ln=s~p=e=ct~io=n~an~d~ln=s=u~ra=n~c=e~C~o=m~p=a=ny~o~f=C=o=n=ne=c=t=ic=u=t-haveinspected~elemsdescribed in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI. | |||
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore , neither the Inspector nor his employer shall be liable in an Y, manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. | |||
4~ ills~ | |||
Commission NB-15083 ANI CA2184 National Board, State, Province, and Endorsements Date - - - =-.8/ | |||
:. . _17--'-/- | |||
- ~b_ _ | |||
Page 3 of 6 | |||
FORM OAR-1 OWNERS ACTIVITY REPORT -- DCPP-2R19 TABLE 1 ITEMS WITH FLAWS OR REVELANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description Accepted for continued use with: | |||
1} Expanded scope exams of (8} | |||
Line-2-109-14SPL additional welds in 2R19. | |||
CAT R-A Weld, WIB-245. | |||
2} Weld overlay repair during next ITEM R1.11 Rejectable UT indication. | |||
refueling outage (2R20}. | |||
SAPN 50852155 (50852155 Task-28}. | |||
Page 4 of 6 | |||
refueling outage (2R20}. SAPN 50852155 (50852155 Task-28}. | |||
Page 4 of 6 | |||
FORM OAR-1 OWNERS ACTIVITY REPORT -- DCPP-2R19 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Date Repair/Replacement Code Class Item Description Description of Work Completed Plan Number Replace Accumulator 2-2 2 | |||
Accumulator 2-2 nozzle C-1A and associated 60089765-10 LT-952 lower piping. 5/15/16 (Non code 60089765-80 nozzle, C-1A Rejectable UT indication exam) | |||
SAPN 50849012 Accumulator 2-2 Accumulator 2-2 base metal 2 LT-952 lower 5/15/16 60089765-250 repair at nozzle C-1A nozzle, C-1A Page 5 of 6 | |||
FORM OAR-1 OWNERS ACTIVITY REPORT -- DCPP-2R19 FORM NIS-2A REPAIR/REPLACEMENTCERTIFICATION RECORD OWNER'S CERTIFICATE OF CONFORMANCE Post 2R18 thru 2R19 I certify that the (12/06/14 thru 6/30/16) activities represented by Repair/Replacement Plan number _ _,.(=-se=e:;_a=t=ta=c.:....:.hm:...:...:..;:;.e'-'-'ntOL..)_ | |||
conform to the requirements of Section XI necessary to place the item in service. | |||
* Ed~on and~ddenda of Section XI used : _~2~0~0~7~E~d~i~ti~o~n~t~h~ro~u~g~h~2~0~0~8~~~d~d~e~n~da~-------------~ | |||
CodeCasesusedforrepairlrep~cementacUv~es : _~N~-~5~3=2~-5~a~n~d~a~s~l~~~te~d~o~n~a~t~ta~c~h~m~e~n~t~------------~ | |||
(If applicable, including cases modified by Case N-532 and later revisions) | |||
Signed _ _ _ .~ | |||
:;__<' 0wner=-:5'- | |||
__ - =:~ | |||
.or.--Owner's | |||
----'~ | |||
=-~ ~'-----''------------- | |||
designee Date _ _~ __ .-*_ /_ * '? | |||
_ -_/_6_____ | |||
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in Repair/Replacement Plan number (see attachment) , and state that, to the best of my knowledge and belief, the Owner has performed all activities described in the Repair/Replacement Plan in accordance with the requirements of Section XI necessary to place the item in service. | |||
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the activities described in the Repair/Replacement Plan . Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal inju or property damage or loss of any kind arising from or connected with this inspection . | |||
Date_--=...!8/J~/_/~_l_b_ _ | |||
Page 6 of 6 | |||
NIS-2A Attachment Unit-2 Section XI Repair I Replacement 8/17/2016 12/6/14 thru 6/30/16 (2R19) | |||
- | Repair/Replacement I Plan No. | ||
I Sys Class Order Op Item Description Description of Work Code Case Comments Revision Actual finish (date) 3 3 60071787 10 DC-2-03-P-V-FW-2-121 FW-2-121: Replc AFWP2-1 CST Suction VLV 2R19 5/19/2016 3 3 60073994 10 DC-2-03-P-P-LINE-57 4 404-43R: Replace shim plates by welding D1EO 2/10/2015 3 3 60076901 20 DC-2-03-P-P-LINE-57 4 Ln-574 : Weld Repair Thinned Pipe Wall D1EO 11/24/2015 3 3 60076901 30 DC-2-03-P-P-LINE-57 4 404-43R: Install Sppt After Pipe Repairs welding D1EO 11/24/2015 3 2 60077234 15 DC-2-03-P-V-FW-2-377 FW-2-377: Repair Hinge Pin Cover Leak replace cover studs and nuts 2R19 5/19/2016 3 2 60077234 50 DC-2-03-P-V-FW-2-377 FW-377 Machine Hinge Pin Cover 2R19 5/19/2016 3 3 60082569 100 DC-2-03-P-PSL-414-343SL 414-343SL, Drop & Swap like for like AD-71 N-71-15, N-249-11 replace snubber 2R19 5/7/2016 3 3 68025021 10 DC-2-03-P-V-FW-2-124 FW-2-124 Replace Valve replace valve (new s/n 20531560) 2R19 5/19/2016 3 3 68039801 200 DC-2-03-P-V-FW-2-680 Install AFW Crosstie Connection new FLEX vlv and piping (vlv s/n BQ966) 2R19 6/8/2016 3 3 68039860 200 DC-2-03-P-PSL-414-545R 414-545R Modify Support modify support (welding) 2R19 6/14/2016 4 2 60076542 300 DC-2-04-P-VR-MS RV-9 MS RV-9: Offsite Rebuild/Test!RTS Rreplaced disc (s/n AGG11) 2P19 9/23/2015 4 2 60082536 100 DC-2-04-P-PSL-78-574SL #78-574SL: Drop/Swap/Test- New N-71-15, N-249-11 2R19 5/6/2016 4 2 60082541 100 DC-2-04-P-PSL-412-68SL #412-68SL: Drop/Swap/Test- New N-71-15, N-249-11 2R19 5/9/2016 4 2 60082542 100 DC-2-04-P-PSL-412-71 SL #412-71SL: Drop/Swap/Test- New N-71-15, N-249-11 2R19 5/7/2016 4 2 60082576 215 DC-2-04-P-PSL-2033-25SL #2033-25SL: Repair Deformed Load Pin N-71-15, N-249-11 repaired load pin 2R19 5/20/2016 4 2 60085800 400 DC-2-04-P-VR-MS RV-14 MS RV-14: Offsite Rebuild/Test!RTS replaced disc (s/n AGG12) 2P19 5/6/2016 4 2 60085800 500 DC-2-04-P-VR-MS-2-RV-224 MS-2-RV-224: Offsite Rebuild/Test!RTS replaced 3 B/B studs/nuts 2P19 5/6/2016 4 2 60090609 200 DC-2-04-P-PSL-2033-25SL #2033-25SL: Modify Pipe Support mod rear bracket attmnt by welding 2R19 5/26/2016 4 2 64014893 100 DC-2-04-P-VR-MS-2-RV-11 MS-2-RV-11 : Replace RV & Inlet Flng Bol replace inlet fig bolting and spacer 2R19 5/17/2016 4 2 64014894 100 DC-2-04-P-VR-MS-2-RV-12 MS-2-RV-12: Replace RV & Inlet Flng Bol replace inlet fig bolting 2R19 5/17/2016 4 2 64014895 100 DC-2-04-P-VR-MS-2-RV-13 MS-2-RV-13: Replace RV & Inlet Flng Bol replace inlet fig bolting 2R19 5/17/2016 4 2 64014896 100 DC-2-04-P-VR-MS-2-RV-14 MS-2-RV-14: Replace RV & Inlet Flng Bol replace inlet fig bolting 2R19 5/17/2016 4 2 64014897 100 DC-2-04-P-VR-MS-2-RV-224 MS-2-RV-224: Replace RV & Inlet Flng Bol replace inlet fig bolting 2R19 5/17/2016 4 2 64048974 100 DC-2-04-P-V-MS-2-FCV-43 MS-2-FCV-43: Perform Inspection & Repair replaced disc 2R19 5/27/2016 4 2 64048974 150 DC-2-04-P-V- MS-2-FCV-43 MS-2-FCV-43: Weld Disc Retaining Nut pressure boundary attmnt (weld) 2R19 5/25/2016 4 2 64150657 700 DC-2-04-M-HX-SG4 SG 2-4: Replace Cracked Washers/Sect XI replace washer sets 2R19 5/18/2016 7 1 60009354 5010 DC-2-07 -P-V-RCS-2-8050 RCS-2-8050- Q Pipe Base Metal Damage Line-1169-3/4" BMR (missed 2R18 cut-off) 2R18 10/19/2014 7 1 60054523 60 DC-2 P-V-R CS-2-8078C Section XI Parts Tracking Op (SOV-4) (spare) replace Main/Pilot disc set (missed 2R 18 cut-off) D1 2/4/2014 7 1 60054523 70 DC-2-07 -P-V- RCS-2-8078C Section XI Parts Tracking Op (SOV-4) (spare) replaced Bonnet (missed 2R 18 cut-off) D1 2/4/2014 7 1 60075208 10 DC-2-07-P-V-RCS-2-PCV-4 74 RCS-2-PCV-474 Inspect & Rebuild Valve replaced Plug 2R19 6/7/2016 7 1 60079102 10 DC-2-07 -P-V-RCS-2-8000A RCS-2-8000A Inspect and Rebuild Valve replaced wedge 2R19 5/23/2016 7 1 60082547 100 DC-2-07-P-PSL-412-113SL #412-113SL: Replace Snubberw/ Anvil MMD replaced snubber & load pin 2R19 5/16/2016 7 1 60082549 100 DC-2-07-P-PSL-412-154SL #412-154SL: Replace Snubberw/ Anvil MMD replaced snubber 2R19 5/6/2016 7 1 60090155 10 DC-2 P-V-RCS-2-8078C RCS-2-8078C/D: Replace Valve Spool replace existing spool w/ SOV-5 2R19 5/19/2016 7 1 60090187 10 DC-2-07 -P-V-RCS-2-8078A RCS-2-8078NB: Replace Valve Spool replace existing spool w/ SOV-7 2R19 6/13/2016 7 1 60090551 10 DC-2-07 -P-P-LI N E-1 09 TMOD LINE 109: Install Thermoco/Loggers Install Thermoco/Loggers (welding) 2R19 5/27/2016 7 3 64047582 140 DC-2-07 -E-MTR-RCP3 RCP 2-3: UBOC Disassembly-Reassembly replace channel head bolting 2R19 5/10/2016 7 3 68040482 150 DC-2-07 -E-MTR-RCP1 RCP 2-1 : UBOC Disassembly-Reassembly replace channel head bolting 2R19 5/19/2016 7 3 68040484 10 DC-2-07-E-MTR-RCP1 RCP2- 1 Install UBOC Support to Stator replace spt plate to stator (welding) 2R19 6/13/2016 8 2 60054256 10 DC-2-08-P-V-CVCS-2-8149A CVCS-2-8149A Replace Bonnet & Gasket replace bonnet & plug/stem assembly 2R19 5/21/2016 8 2 60077299 10 DC-2-08-P-V-CVCS-2-8458B CVCS-2-8458B: Rebuild Diaphragm Valve replace Body/Bonnet bolting 2R19 5/18/2016 8 2 60077299 50 DC-2-08-P-V-CVCS-2-8458B CVCS-2-8458B Weld Repair sealing surface Base metal repair of sealing suface 2R19 6/13/2016 8 2 60082528 100 DC-2-08-P-PSL-78-139SL #78-139SL: Replace Snubberw/ Anvil MMD replaced snubber 2R19 5/10/2016 8 2 68039803 20 DC-2-08-P-V-CVCS-2-950 Install BAT Pump Suction Crosstie Connec install FLEX conn (s/n 906090-001-002) 2R19 6/8/2016 9 2 60082514 100 DC-2-09-P-,PSL-77-1 OSL #77-10SL: Replace Snubberw/ PSA NF MMD N-71-15, N-249-11 replace snubber 2R19 5/7/2016 9 2 60082551 100 DC-2-09-P-PSL-413-11 SL #413-11SL: Replace Snubberw/ PSA NF MMD N-71-15, N-249-11 replace snubber 2R19 5/12/2016 9 2 60089765 10 DC-2-09-M-TK-AT2 ACCUM 2-2 C1-A NOZZLE Rmv/Rplc Piping replace piping 2R19 6/9/2016 9 2 60089765 80 DC-2-09-M-TK-AT2 Replace Nozzle C1-A Accum 2-2 replace nozzle 2R19 5/15/2016 10 2 60082504 . 100 DC-2-1 O-P-PSL-72-75SL #72-75SL: Replace Snubber w/ PSA NF MMD N-71-15, N-249-11 replace snubber 2R19 5/12/2016 10 2 60082515 200 DC-2-1O-P-PSL-77-18SL #77-18SL: Replace Snubberw/ PSA NF MMD N-71-15, N-249-11 replace snubber 2R19 5/10/2016 10 2 60082534 100 DC-2-1 O-P-PSL-78-568SL #78-568SL: Drop/Swap w/New Snubber(ND) N-71-15, N-249-11 replace snubber 2R19 5/12/2016 10 2 68039802 200 DC-2-10-P-V-RHR-2-1 028 Install RHR Cross Tie Piping/valve install FLEX connection (s/n 891218-5) 2R19 6/8/2016 13 3 60078233 20 DC-2-13-M-PP-SFPP2 SFPP 2-2: Levelizer/Minim Support Instil Pump Base attachment weld D1EO 4/12/2016 2R 19 R-R Abstract 2.xlsx | |||
: | |||
: | |||
NIS-2A Attachment Unit-2 Section XI Repair I Replacement 8/17/2016 12/6/14 thru 6/30/16 (2R19) | |||
Gland Plate/Bolts CCW-2-601 Replace Check Valve #72-39SL: | Repair/Replacement Plan No. | ||
Replace Snubber Rear Bracket #72-39SL: Replace Snubber w/ Anvil MMD #72-41SL: Replace Snubberw/ | Sys Class Order Op Item Description Description of Work Code Case Comments Revision Actual finish (date) 13 3 60078233 70 DC-2-13-M-PP-SFPP2 Sect XI Replacments: Gland Plate/Bolts replace gland plate and bolting D1EO 4/12/2016 14 3 60075717 10 DC-2-14-P-V-CCW-2-601 CCW-2-601 Replace Check Valve replace valve (new s/n 57591) 2R19 5/21/2016 14 3 60082497 200 DC-2-14-P-PSL-72-39SL #72-39SL: Replace Snubber Rear Bracket replace rear bracket by welding 2R19 5/18/2016 14 3 60082497 300 DC-2-14-P-PSL-72-39SL #72-39SL: Replace Snubber w/ Anvil MMD replace snubber 2R19 5/20/2016 14 3 60082498 100 DC-2-14-P-PSL-72-41 SL #72-41SL: Replace Snubberw/ PSA NF MMD N-71-15, N-249-11 replace snubber 2R19 5/17/2016 14 3 60082539 100 DC-2-14-P-P SL-412-19S L D930927: Replace internals (verge) on AD-41 N-1644-8 replaced internals (verge) on replacemnt snubber 2R19 5/14/2016 14 2 64071753 200 DC-2-14-P-VR-CCW-2-RV-52 M77 CCW-2-RV-52: Replace inlet bolting replace inlet fig bolting 2R19 5/15/2016 16 3 60070942 20 DC-0-16-P-V-MU-0-976 MU-0-976: Replace Check Valve replaced valve (new s/n D9700) D1EO 3/16/2016 17 3 60073532 15 DC-2-17-P-PSL-28-70R 28-70R- Mod ASW2-2 Motor Support modify support by welding 2R19 6/13/2016 17 3 60089664 100 DC-2-17-P-V-SW-2-185 Replace Valve SW-2-185 replace valve (new s/n E3149-1-4) 2R19 5/17/2016 17 3 60089732 10 DC-2-17-P-V-SW-2-186 Replace Valve SW-2-186 replace valve (new s/n E3149-1-1) 2R19 5/11/2016 17 3 64076822 50 DC-2-17-M-PP-ASP2 ASP2-2 Replace I Align I Couple replace pump (new s/n 290602) 2R19 5/13/2016 21 3 60070644 20 DC-2-21-M-HX-JWR1 B DG21: Replace North Radiator Cores replace radiator cores and bolting D1EO 3/31/2016 21 3 60071190 20 DC-2-21-M-HX-JWR2B DG22: Install North Radiator Cores replace radiator cores and bolting D1EO 3/24/2016 21 3 60087800 20 DC-2-21 -M-EN-DEG2 414-636R: Replace U-bolt DG22 replaced U-bolt for 414-636R D1EO 3/24/2016 21 3 60087843 20 DC-2-21-M-HX-JWR2B Weld Repair DEG 2-2 Radiator Tank Flange BMR by welding D1EO 3/16/2016 21 3 60088210 20 DC-2-21-M-PP-JWP3 JWP3: Replace Pump DG23 replace pump ( s/n 122990791JM) D1EO 4/5/2016 21 3 64038680 100 DC-2-21-M-EN-DEG3 DG23: Perform STP M-21-ENG.2 replace Expansion Tank Cap (RV-75) D1EO 3/14/2016 21 3 64039489 100 DC-2-21-M-EN-DEG1 DG21 : Perform STP M-21-ENG.2 replace Expansion Tank Cap (RV-72) D1EO 3/31/2016 21 3 64042239 100 DC-2-21-M-EN-DEG2 DG22: Perform STP M-21-ENG.2 replace Expansion Tank Cap (RV-71) D1EO 3/24/2016 21 3 64046937 100 DC-2-21-M-EN-DEG2 DG22: STP M21-ENG.4 Inspection & Maint replaced Jacket Water couplings D1EO 3/1/2016 21 3 64048412 100 DC-2-21-M-EN-DEG1 DG21 : STP M21-ENG.4 Inspection & Maint replaced Jacket Water couplings D1EO 4/1/2016 21 3 64077107 100 DC-2-21-M-EN-DEG1 TCV-4: Replace Valve M-21-TCV.3 DG21 replace valve (new s/n A961X) D1EO 4/5/2016 21 3 64077813 100 DC-2-21-P-V-DEG-2-TCV-5 TCV-5 : Replace Valve M-21-TCV.3 DG23 replace valve (news/n B9111) D1EO 3/24/2016 21 3 64079958 100 DC-2-21-P-V-DEG-2-TCV-3 TCV-3 : Replace Valve M-21-TCV.3 DG22 replace valve (new s/n D951) D1EO 3/24/2016 25 2 60036936 10 DC-2-25-P-VOA-AI R-1-2-FCV-584 FCV-584 Rebuild Valve & Replace Actuator replaced internals (ball) 2R19 5/12/2016 2R 19 R-R Abstract 2.xlsx 2}} | ||
PSA NF MMD N-71-15, N-249-11 D930927: Replace internals (verge) on AD-41 N-1644-8 | |||
D1EO 4/5/2016 replace Expansion Tank Cap (RV-75) D1EO 3/14/2016 replace Expansion Tank Cap (RV-72) D1EO 3/31/2016 replace Expansion Tank Cap (RV-71) D1EO 3/24/2016 replaced Jacket Water couplings D1EO 3/1/2016 replaced Jacket Water couplings D1EO 4/1/2016 replace valve (new s/n A961X) D1EO 4/5/2016 replace valve (news/n B9111) D1EO 3/24/2016 replace valve (new s/n D951) D1EO 3/24/2016 replaced internals (ball) 2R19 5/12/2016}} | |||
Revision as of 14:35, 30 October 2019
| ML16244A838 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 08/31/2016 |
| From: | Gerfen P Pacific Gas & Electric Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| DCL-16-086, DCPP-2R19 | |
| Download: ML16244A838 (10) | |
Text
Diablo Canyon Power Plant Pacific Gas and Paula Gerfen Station Director Mail Code 104/5/502 Electric Company 0
P.O. Box 56 Avila Beach, CA 93424 805 .545.4596 Internal: 691.4596 Fax: 805.545.4234 Aug.ust 31, 2016 PG&E Letter DCL-16-086 U.S. Nuclear Regulatory Commission 10 CFR 50.4 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-323, OL-DPR-82 Diablo Canyon Unit 2 Owner's Activity Report for Unit 2 Nineteenth Refueling Outage In accordance with American Society of Mechanical Engineers (ASME) Code Case N-532-5, enclosed is the Owner's Activity Report for inservice inspection (lSI) activities performed at Diablo Canyon Power Plant through the completion of the Unit 2 Nineteenth Refueling Outage.
This code case is used as an alternative to the requirements ofASME Section XI, Article IWA-6000 as listed in Regulatory Guide 1.147, "lnservice Inspection Code Case Acceptability, ASME Section XI, Division 1,"Revision 17, and approved in accordance with 10 CFR 50.55a(b)(5).
There are no new or revised regulatory commitments (as defined by NEI 99-04) in this submittal.
If you have any questions regarding the information enclosed, or other lSI program activities, please contact Mr. Ken Bych, Manager, Technical Support Engineering, at (805) 545-4241.
jmsp/4927/64113881-0100 Enclosure cc/enc: Kriss M. Kennedy, NRC Region IV Administrator Balwant K. Singal, NRR Project Manager Christopher W. Newport, NRC Senior Resident Inspector State of California, Pressure Vessel Unit A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek
Enclosure PG&E Letter DCL-16-086 Pacific Gas and Electric Company Diablo Canyon Power Plant Owner's Activity Report for Unit 2 Nineteenth Refueling Outage
DIABLO CANYON POWER PLANT UNIT 2 REFUELING OUTAGE: 2R19 Operating License No. DPR-82 USNRC Docket No. 50-323 OWNER'S ACTIVITY REPORT Rev. 0 Contents:
==
Introduction:==
OAR-1 Report Number: DCPP-2R19:
Table 1: Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service.
Table 2: Abstract of Repair/Replacement Activities Required for Continued Service.
NIS-2A: Repair/Replacement Certification Record
Attachment:
List of Repair/Replacement Plans Prepared By:
Reviewed By: - - - - - = - - + - - - - - - - - - - - - - Date b_,L"--U
____;8::;.......,_/_1 _I_fo_
Ja es E. Hill, lSI Specialist Approved By: ~___..-:/~~Date Ken Bych, Manager Technical Support Engineering Document Date: 7/30/16 Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 941 06 Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 Page 1 of 6
INTRODUCTION lnservice inspection (lSI) of scheduled ASME Section XI components and their supports at Pacific Gas and Electric Company's Diablo Canyon Power Plant (DCPP) Unit 2 was completed during the nineteenth refueling outage (2R19) from 05/2016 through 06/2016.
2R19 was the second outage in the third period within the third 10-year lSI interval.
This Owner's Activity Report, OAR-1, complies with the provisions of Code Case N-532-5 as approved by Regulatory Guide 1.147, Revision 17.
The OAR-1 Report covers applicable 2R19 work completed prior to and including June 30,2016 and any mid cycle and 2R18 work completed after December 5, 2014.
Page 2 of 6
FORM OAR-1 OWNERS ACTIVITY REPORT -- DCPP-2R19 Report Number DCPP-2R19 Plant Diablo Canyon Nuclear Power Plant. P.O. Box 56, Avila Beach, California 93424 Unit No. 2 Commercial service date _ _.:M==a"--'rc""'-h-'----'-13""-','-1;:...:9:....;o8c....=6;.____ Refueling outage no. 2R19 Current inspection interval IWB I IWC I IWD I IWF - 3rd IWE I IWL - 2nd (1st, 2nd , 3rd, 4th , other)
Current inspection period _ __:. IW.:. . :. . =B:. . . :/_.:1-=-W.:. . :C: . . . :. . _/.:....:.IW....:...=.D-=-/-=-IW'--"-'-F~--3=r'-=d'--_ _ _.:....:.IW-=-=E...:..../...:...;IW:....:....=L_--=2.:....:.nd==-----------
(1 st, 2nd , 3rd)
Edition and Addenda of Section XI applicable to the inspection plans -~2=..:0=0"--'1'--'E=d=i=tio=n'-'....!.!.th.!.!.r=u-=2=0=0=3-=-A=d=d=e-'-'n=da::::___ __
Date and revision of inspection plans IWB I IWC I IWD I IWF -- 12/28/11 Rev. 1 IWE I IWL -- 11/4/10 Rev. 0 Edition and addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans
. 2007 Edition through 2008 Addenda Code Cases used: N-532-5 N-685 N-722-1 N-770-1 N-798 N-460 N-566-2 (if applicable)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 2R 19 (refueling outage no) conform to the requirements of Section XI.
Signed - *'2:-/ ~~ I Manager, Technical Support Eng ineering Date _ _ ~ _-_ /_/ _ ..-._/
---=~=--_ __
Owner or Owner's designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned , holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employedby_-'T~h=e~H~a=rt~f=o-=-rd~S=~=a=m~B=o~il=e~r=ln=s~p=e=ct~io=n~an~d~ln=s=u~ra=n~c=e~C~o=m~p=a=ny~o~f=C=o=n=ne=c=t=ic=u=t-haveinspected~elemsdescribed in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore , neither the Inspector nor his employer shall be liable in an Y, manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
4~ ills~
Commission NB-15083 ANI CA2184 National Board, State, Province, and Endorsements Date - - - =-.8/
- . . _17--'-/-
- ~b_ _
Page 3 of 6
FORM OAR-1 OWNERS ACTIVITY REPORT -- DCPP-2R19 TABLE 1 ITEMS WITH FLAWS OR REVELANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description Accepted for continued use with:
1} Expanded scope exams of (8}
Line-2-109-14SPL additional welds in 2R19.
CAT R-A Weld, WIB-245.
2} Weld overlay repair during next ITEM R1.11 Rejectable UT indication.
refueling outage (2R20}.
SAPN 50852155 (50852155 Task-28}.
Page 4 of 6
FORM OAR-1 OWNERS ACTIVITY REPORT -- DCPP-2R19 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Date Repair/Replacement Code Class Item Description Description of Work Completed Plan Number Replace Accumulator 2-2 2
Accumulator 2-2 nozzle C-1A and associated 60089765-10 LT-952 lower piping. 5/15/16 (Non code 60089765-80 nozzle, C-1A Rejectable UT indication exam)
SAPN 50849012 Accumulator 2-2 Accumulator 2-2 base metal 2 LT-952 lower 5/15/16 60089765-250 repair at nozzle C-1A nozzle, C-1A Page 5 of 6
FORM OAR-1 OWNERS ACTIVITY REPORT -- DCPP-2R19 FORM NIS-2A REPAIR/REPLACEMENTCERTIFICATION RECORD OWNER'S CERTIFICATE OF CONFORMANCE Post 2R18 thru 2R19 I certify that the (12/06/14 thru 6/30/16) activities represented by Repair/Replacement Plan number _ _,.(=-se=e:;_a=t=ta=c.:....:.hm:...:...:..;:;.e'-'-'ntOL..)_
conform to the requirements of Section XI necessary to place the item in service.
- Ed~on and~ddenda of Section XI used : _~2~0~0~7~E~d~i~ti~o~n~t~h~ro~u~g~h~2~0~0~8~~~d~d~e~n~da~-------------~
CodeCasesusedforrepairlrep~cementacUv~es : _~N~-~5~3=2~-5~a~n~d~a~s~l~~~te~d~o~n~a~t~ta~c~h~m~e~n~t~------------~
(If applicable, including cases modified by Case N-532 and later revisions)
Signed _ _ _ .~
- __<' 0wner=-
- 5'-
__ - =:~
.or.--Owner's
'~
=-~ ~'------------------
designee Date _ _~ __ .-*_ /_ * '?
_ -_/_6_____
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in Repair/Replacement Plan number (see attachment) , and state that, to the best of my knowledge and belief, the Owner has performed all activities described in the Repair/Replacement Plan in accordance with the requirements of Section XI necessary to place the item in service.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the activities described in the Repair/Replacement Plan . Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal inju or property damage or loss of any kind arising from or connected with this inspection .
Date_--=...!8/J~/_/~_l_b_ _
Page 6 of 6
NIS-2A Attachment Unit-2 Section XI Repair I Replacement 8/17/2016 12/6/14 thru 6/30/16 (2R19)
Repair/Replacement I Plan No.
I Sys Class Order Op Item Description Description of Work Code Case Comments Revision Actual finish (date) 3 3 60071787 10 DC-2-03-P-V-FW-2-121 FW-2-121: Replc AFWP2-1 CST Suction VLV 2R19 5/19/2016 3 3 60073994 10 DC-2-03-P-P-LINE-57 4 404-43R: Replace shim plates by welding D1EO 2/10/2015 3 3 60076901 20 DC-2-03-P-P-LINE-57 4 Ln-574 : Weld Repair Thinned Pipe Wall D1EO 11/24/2015 3 3 60076901 30 DC-2-03-P-P-LINE-57 4 404-43R: Install Sppt After Pipe Repairs welding D1EO 11/24/2015 3 2 60077234 15 DC-2-03-P-V-FW-2-377 FW-2-377: Repair Hinge Pin Cover Leak replace cover studs and nuts 2R19 5/19/2016 3 2 60077234 50 DC-2-03-P-V-FW-2-377 FW-377 Machine Hinge Pin Cover 2R19 5/19/2016 3 3 60082569 100 DC-2-03-P-PSL-414-343SL 414-343SL, Drop & Swap like for like AD-71 N-71-15, N-249-11 replace snubber 2R19 5/7/2016 3 3 68025021 10 DC-2-03-P-V-FW-2-124 FW-2-124 Replace Valve replace valve (new s/n 20531560) 2R19 5/19/2016 3 3 68039801 200 DC-2-03-P-V-FW-2-680 Install AFW Crosstie Connection new FLEX vlv and piping (vlv s/n BQ966) 2R19 6/8/2016 3 3 68039860 200 DC-2-03-P-PSL-414-545R 414-545R Modify Support modify support (welding) 2R19 6/14/2016 4 2 60076542 300 DC-2-04-P-VR-MS RV-9 MS RV-9: Offsite Rebuild/Test!RTS Rreplaced disc (s/n AGG11) 2P19 9/23/2015 4 2 60082536 100 DC-2-04-P-PSL-78-574SL #78-574SL: Drop/Swap/Test- New N-71-15, N-249-11 2R19 5/6/2016 4 2 60082541 100 DC-2-04-P-PSL-412-68SL #412-68SL: Drop/Swap/Test- New N-71-15, N-249-11 2R19 5/9/2016 4 2 60082542 100 DC-2-04-P-PSL-412-71 SL #412-71SL: Drop/Swap/Test- New N-71-15, N-249-11 2R19 5/7/2016 4 2 60082576 215 DC-2-04-P-PSL-2033-25SL #2033-25SL: Repair Deformed Load Pin N-71-15, N-249-11 repaired load pin 2R19 5/20/2016 4 2 60085800 400 DC-2-04-P-VR-MS RV-14 MS RV-14: Offsite Rebuild/Test!RTS replaced disc (s/n AGG12) 2P19 5/6/2016 4 2 60085800 500 DC-2-04-P-VR-MS-2-RV-224 MS-2-RV-224: Offsite Rebuild/Test!RTS replaced 3 B/B studs/nuts 2P19 5/6/2016 4 2 60090609 200 DC-2-04-P-PSL-2033-25SL #2033-25SL: Modify Pipe Support mod rear bracket attmnt by welding 2R19 5/26/2016 4 2 64014893 100 DC-2-04-P-VR-MS-2-RV-11 MS-2-RV-11 : Replace RV & Inlet Flng Bol replace inlet fig bolting and spacer 2R19 5/17/2016 4 2 64014894 100 DC-2-04-P-VR-MS-2-RV-12 MS-2-RV-12: Replace RV & Inlet Flng Bol replace inlet fig bolting 2R19 5/17/2016 4 2 64014895 100 DC-2-04-P-VR-MS-2-RV-13 MS-2-RV-13: Replace RV & Inlet Flng Bol replace inlet fig bolting 2R19 5/17/2016 4 2 64014896 100 DC-2-04-P-VR-MS-2-RV-14 MS-2-RV-14: Replace RV & Inlet Flng Bol replace inlet fig bolting 2R19 5/17/2016 4 2 64014897 100 DC-2-04-P-VR-MS-2-RV-224 MS-2-RV-224: Replace RV & Inlet Flng Bol replace inlet fig bolting 2R19 5/17/2016 4 2 64048974 100 DC-2-04-P-V-MS-2-FCV-43 MS-2-FCV-43: Perform Inspection & Repair replaced disc 2R19 5/27/2016 4 2 64048974 150 DC-2-04-P-V- MS-2-FCV-43 MS-2-FCV-43: Weld Disc Retaining Nut pressure boundary attmnt (weld) 2R19 5/25/2016 4 2 64150657 700 DC-2-04-M-HX-SG4 SG 2-4: Replace Cracked Washers/Sect XI replace washer sets 2R19 5/18/2016 7 1 60009354 5010 DC-2-07 -P-V-RCS-2-8050 RCS-2-8050- Q Pipe Base Metal Damage Line-1169-3/4" BMR (missed 2R18 cut-off) 2R18 10/19/2014 7 1 60054523 60 DC-2 P-V-R CS-2-8078C Section XI Parts Tracking Op (SOV-4) (spare) replace Main/Pilot disc set (missed 2R 18 cut-off) D1 2/4/2014 7 1 60054523 70 DC-2-07 -P-V- RCS-2-8078C Section XI Parts Tracking Op (SOV-4) (spare) replaced Bonnet (missed 2R 18 cut-off) D1 2/4/2014 7 1 60075208 10 DC-2-07-P-V-RCS-2-PCV-4 74 RCS-2-PCV-474 Inspect & Rebuild Valve replaced Plug 2R19 6/7/2016 7 1 60079102 10 DC-2-07 -P-V-RCS-2-8000A RCS-2-8000A Inspect and Rebuild Valve replaced wedge 2R19 5/23/2016 7 1 60082547 100 DC-2-07-P-PSL-412-113SL #412-113SL: Replace Snubberw/ Anvil MMD replaced snubber & load pin 2R19 5/16/2016 7 1 60082549 100 DC-2-07-P-PSL-412-154SL #412-154SL: Replace Snubberw/ Anvil MMD replaced snubber 2R19 5/6/2016 7 1 60090155 10 DC-2 P-V-RCS-2-8078C RCS-2-8078C/D: Replace Valve Spool replace existing spool w/ SOV-5 2R19 5/19/2016 7 1 60090187 10 DC-2-07 -P-V-RCS-2-8078A RCS-2-8078NB: Replace Valve Spool replace existing spool w/ SOV-7 2R19 6/13/2016 7 1 60090551 10 DC-2-07 -P-P-LI N E-1 09 TMOD LINE 109: Install Thermoco/Loggers Install Thermoco/Loggers (welding) 2R19 5/27/2016 7 3 64047582 140 DC-2-07 -E-MTR-RCP3 RCP 2-3: UBOC Disassembly-Reassembly replace channel head bolting 2R19 5/10/2016 7 3 68040482 150 DC-2-07 -E-MTR-RCP1 RCP 2-1 : UBOC Disassembly-Reassembly replace channel head bolting 2R19 5/19/2016 7 3 68040484 10 DC-2-07-E-MTR-RCP1 RCP2- 1 Install UBOC Support to Stator replace spt plate to stator (welding) 2R19 6/13/2016 8 2 60054256 10 DC-2-08-P-V-CVCS-2-8149A CVCS-2-8149A Replace Bonnet & Gasket replace bonnet & plug/stem assembly 2R19 5/21/2016 8 2 60077299 10 DC-2-08-P-V-CVCS-2-8458B CVCS-2-8458B: Rebuild Diaphragm Valve replace Body/Bonnet bolting 2R19 5/18/2016 8 2 60077299 50 DC-2-08-P-V-CVCS-2-8458B CVCS-2-8458B Weld Repair sealing surface Base metal repair of sealing suface 2R19 6/13/2016 8 2 60082528 100 DC-2-08-P-PSL-78-139SL #78-139SL: Replace Snubberw/ Anvil MMD replaced snubber 2R19 5/10/2016 8 2 68039803 20 DC-2-08-P-V-CVCS-2-950 Install BAT Pump Suction Crosstie Connec install FLEX conn (s/n 906090-001-002) 2R19 6/8/2016 9 2 60082514 100 DC-2-09-P-,PSL-77-1 OSL #77-10SL: Replace Snubberw/ PSA NF MMD N-71-15, N-249-11 replace snubber 2R19 5/7/2016 9 2 60082551 100 DC-2-09-P-PSL-413-11 SL #413-11SL: Replace Snubberw/ PSA NF MMD N-71-15, N-249-11 replace snubber 2R19 5/12/2016 9 2 60089765 10 DC-2-09-M-TK-AT2 ACCUM 2-2 C1-A NOZZLE Rmv/Rplc Piping replace piping 2R19 6/9/2016 9 2 60089765 80 DC-2-09-M-TK-AT2 Replace Nozzle C1-A Accum 2-2 replace nozzle 2R19 5/15/2016 10 2 60082504 . 100 DC-2-1 O-P-PSL-72-75SL #72-75SL: Replace Snubber w/ PSA NF MMD N-71-15, N-249-11 replace snubber 2R19 5/12/2016 10 2 60082515 200 DC-2-1O-P-PSL-77-18SL #77-18SL: Replace Snubberw/ PSA NF MMD N-71-15, N-249-11 replace snubber 2R19 5/10/2016 10 2 60082534 100 DC-2-1 O-P-PSL-78-568SL #78-568SL: Drop/Swap w/New Snubber(ND) N-71-15, N-249-11 replace snubber 2R19 5/12/2016 10 2 68039802 200 DC-2-10-P-V-RHR-2-1 028 Install RHR Cross Tie Piping/valve install FLEX connection (s/n 891218-5) 2R19 6/8/2016 13 3 60078233 20 DC-2-13-M-PP-SFPP2 SFPP 2-2: Levelizer/Minim Support Instil Pump Base attachment weld D1EO 4/12/2016 2R 19 R-R Abstract 2.xlsx
NIS-2A Attachment Unit-2 Section XI Repair I Replacement 8/17/2016 12/6/14 thru 6/30/16 (2R19)
Repair/Replacement Plan No.
Sys Class Order Op Item Description Description of Work Code Case Comments Revision Actual finish (date) 13 3 60078233 70 DC-2-13-M-PP-SFPP2 Sect XI Replacments: Gland Plate/Bolts replace gland plate and bolting D1EO 4/12/2016 14 3 60075717 10 DC-2-14-P-V-CCW-2-601 CCW-2-601 Replace Check Valve replace valve (new s/n 57591) 2R19 5/21/2016 14 3 60082497 200 DC-2-14-P-PSL-72-39SL #72-39SL: Replace Snubber Rear Bracket replace rear bracket by welding 2R19 5/18/2016 14 3 60082497 300 DC-2-14-P-PSL-72-39SL #72-39SL: Replace Snubber w/ Anvil MMD replace snubber 2R19 5/20/2016 14 3 60082498 100 DC-2-14-P-PSL-72-41 SL #72-41SL: Replace Snubberw/ PSA NF MMD N-71-15, N-249-11 replace snubber 2R19 5/17/2016 14 3 60082539 100 DC-2-14-P-P SL-412-19S L D930927: Replace internals (verge) on AD-41 N-1644-8 replaced internals (verge) on replacemnt snubber 2R19 5/14/2016 14 2 64071753 200 DC-2-14-P-VR-CCW-2-RV-52 M77 CCW-2-RV-52: Replace inlet bolting replace inlet fig bolting 2R19 5/15/2016 16 3 60070942 20 DC-0-16-P-V-MU-0-976 MU-0-976: Replace Check Valve replaced valve (new s/n D9700) D1EO 3/16/2016 17 3 60073532 15 DC-2-17-P-PSL-28-70R 28-70R- Mod ASW2-2 Motor Support modify support by welding 2R19 6/13/2016 17 3 60089664 100 DC-2-17-P-V-SW-2-185 Replace Valve SW-2-185 replace valve (new s/n E3149-1-4) 2R19 5/17/2016 17 3 60089732 10 DC-2-17-P-V-SW-2-186 Replace Valve SW-2-186 replace valve (new s/n E3149-1-1) 2R19 5/11/2016 17 3 64076822 50 DC-2-17-M-PP-ASP2 ASP2-2 Replace I Align I Couple replace pump (new s/n 290602) 2R19 5/13/2016 21 3 60070644 20 DC-2-21-M-HX-JWR1 B DG21: Replace North Radiator Cores replace radiator cores and bolting D1EO 3/31/2016 21 3 60071190 20 DC-2-21-M-HX-JWR2B DG22: Install North Radiator Cores replace radiator cores and bolting D1EO 3/24/2016 21 3 60087800 20 DC-2-21 -M-EN-DEG2 414-636R: Replace U-bolt DG22 replaced U-bolt for 414-636R D1EO 3/24/2016 21 3 60087843 20 DC-2-21-M-HX-JWR2B Weld Repair DEG 2-2 Radiator Tank Flange BMR by welding D1EO 3/16/2016 21 3 60088210 20 DC-2-21-M-PP-JWP3 JWP3: Replace Pump DG23 replace pump ( s/n 122990791JM) D1EO 4/5/2016 21 3 64038680 100 DC-2-21-M-EN-DEG3 DG23: Perform STP M-21-ENG.2 replace Expansion Tank Cap (RV-75) D1EO 3/14/2016 21 3 64039489 100 DC-2-21-M-EN-DEG1 DG21 : Perform STP M-21-ENG.2 replace Expansion Tank Cap (RV-72) D1EO 3/31/2016 21 3 64042239 100 DC-2-21-M-EN-DEG2 DG22: Perform STP M-21-ENG.2 replace Expansion Tank Cap (RV-71) D1EO 3/24/2016 21 3 64046937 100 DC-2-21-M-EN-DEG2 DG22: STP M21-ENG.4 Inspection & Maint replaced Jacket Water couplings D1EO 3/1/2016 21 3 64048412 100 DC-2-21-M-EN-DEG1 DG21 : STP M21-ENG.4 Inspection & Maint replaced Jacket Water couplings D1EO 4/1/2016 21 3 64077107 100 DC-2-21-M-EN-DEG1 TCV-4: Replace Valve M-21-TCV.3 DG21 replace valve (new s/n A961X) D1EO 4/5/2016 21 3 64077813 100 DC-2-21-P-V-DEG-2-TCV-5 TCV-5 : Replace Valve M-21-TCV.3 DG23 replace valve (news/n B9111) D1EO 3/24/2016 21 3 64079958 100 DC-2-21-P-V-DEG-2-TCV-3 TCV-3 : Replace Valve M-21-TCV.3 DG22 replace valve (new s/n D951) D1EO 3/24/2016 25 2 60036936 10 DC-2-25-P-VOA-AI R-1-2-FCV-584 FCV-584 Rebuild Valve & Replace Actuator replaced internals (ball) 2R19 5/12/2016 2R 19 R-R Abstract 2.xlsx 2