{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 December 20, 2016  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 December 20, 2016 Mr. Keith J. Polson Site Vice-President DTE Electric Company 6400 North Dixie Highway Newport, MI 48166
 
Mr. Keith J. Polson Site Vice-President DTE Electric Company 6400 North Dixie Highway  
 
Newport, MI 48166  


==SUBJECT:==
==SUBJECT:==
ENRICO FERMI ATOMIC POWER PLANT, UNIT 1, MASTER INSPECTION PLAN CALENDAR YEAR 2017  
ENRICO FERMI ATOMIC POWER PLANT, UNIT 1, MASTER INSPECTION PLAN CALENDAR YEAR 2017


==Dear Mr. Polson:==
==Dear Mr. Polson:==


In accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Manual, Chapter 2561, "Decommissioning Power Reactor Inspection Program," the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for Enrico Fermi Atomic Power Plant, Unit 1 (Fermi 1). The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for January through December 2017 (Calendar Year (CY) 17). The plan outlines how we intend to focus our regional inspection resources to provide oversight for any significant decommissioning activities.  
In accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Manual, Chapter 2561, Decommissioning Power Reactor Inspection Program, the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for Enrico Fermi Atomic Power Plant, Unit 1 (Fermi 1). The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for January through December 2017 (Calendar Year (CY) 17). The plan outlines how we intend to focus our regional inspection resources to provide oversight for any significant decommissioning activities.
 
Because this MIP is based, in part, on your proposed schedule of significant decommissioning activities for CY17, the plan and focus of the NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. To ensure that this MIP remains current, we request that you keep the Materials Control, ISFSI, and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the Fermi Unit 1 Inspection Schedule.
Because this MIP is based, in part, on your proposed schedule of significant decommissioning activities for CY17, the plan and focus of the NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. To ensure that this MIP remains current, we request that you keep the Materials Control, ISFSI, and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the Fermi Unit 1 Inspection Schedule.
We currently plan to conduct one routine decommissioning safety inspection at Fermi Unit 1 during CY 17. The inspection procedures we plan to utilize for the inspection are as follows:
 
Inspection Procedure                 Title IP 36801                             Organization, Management, and Cost Control IP 37801                             Safety Reviews, Design Changes and Modifications IP 40801                             Self-Assessment, Auditing and Corrective Action IP 83750                             Occupational Radiation Exposure IP 84750                             Radioactive Waste Treatment, Effluent and Environmental Monitoring IP 86750                             Solid Radioactive Waste Management and Transportation of Radioactive Materials
We currently plan to conduct one routine decommissioning safety inspection at Fermi Unit 1 during CY 17. The inspection procedures we plan to utilize for the inspection are as follows:
 
Inspection Procedure   Title IP 36801   Organization, Management, and Cost Control IP 37801   Safety Reviews, Design Changes and Modifications IP 40801   Self-Assessment, Auditing and Corrective Action IP 83750   Occupational Radiation Exposure IP 84750 Radioactive Waste Treatment, Effluent and Environmental Monitoring IP 86750   Solid Radioactive Waste Management and                                                             Transportation of Radioactive Materials
 
In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRC's  "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC's website at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Peter Lee of my staff at 630-829-9870 or Rhex Edwards at 630-829-9722.
 
Sincerely,
 
/RA/  Michael A. Kunowski, Chief
 
Materials Control, ISFSI, and      Decommissioning Branch Division of Nuclear Materials Safety
 
Docket No. 050-00016 License No. DPR-9
 
cc: Distribution via LISTSERV 
 
In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRC's  "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC's website at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Peter Lee of my staff at 630-829-9870 or Rhex Edwards at 630-829-9722.
 
Sincerely,
 
/RA/  Michael A. Kunowski, Chief
 
Materials Control, ISFSI, and      Decommissioning Branch Division of Nuclear Materials Safety
 
Docket No. 050-00016 License No. DPR-9
 
cc: Distribution via LISTSERV
 
DISTRIBUTION:
Bruce Watson
 
Theodore Smith John Giessner Christine Lipa Billy Dickson Brian Kemker Phillip Smagacz Allan Barker
 
Harral Logaras
 
Carole Ariano


Linda Linn MCID Branch  
K. Polson                                        In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html.
We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Peter Lee of my staff at 630-829-9870 or Rhex Edwards at 630-829-9722.
Sincerely,
                                                /RA/
Michael A. Kunowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00016 License No. DPR-9 cc: Distribution via LISTSERV


ADAMS Accession Number: ML16355A367 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII-DNMS   RIII-DNMS RIII-DNMS   NAME PLee:cl MKunowski for REdwards MKunowski DATE 12/20/2016 12/20/2016 12/20/2016 OFFICIAL RECORD COPY}}
K. Polson                                                                  In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html.
We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Peter Lee of my staff at 630-829-9870 or Rhex Edwards at 630-829-9722.
Sincerely,
                                                                          /RA/
Michael A. Kunowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00016 License No. DPR-9 cc: Distribution via LISTSERV DISTRIBUTION:
Bruce Watson Theodore Smith John Giessner Christine Lipa Billy Dickson Brian Kemker Phillip Smagacz Allan Barker Harral Logaras Carole Ariano Linda Linn MCID Branch ADAMS Accession Number: ML16355A367 Publicly Available                           Non-Publicly Available                     Sensitive               Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl N" = No copy OFFICE             RIII-DNMS                           RIII-DNMS                         RIII-DNMS NAME               PLee:cl MKunowski for                 REdwards                         MKunowski DATE               12/20/2016                           12/20/2016                       12/20/2016 OFFICIAL RECORD COPY}}

Revision as of 10:07, 30 October 2019

Enrico Fermi Atomic Power Plant, Unit 1, Master Inspection Plan Calendar Year 2017
ML16355A367
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/20/2016
From: Michael Kunowski
NRC/RGN-III/DNMS/MCID
To: Polson K
DTE Electric Company
Edwards R
References
Download: ML16355A367 (8)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 December 20, 2016 Mr. Keith J. Polson Site Vice-President DTE Electric Company 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

ENRICO FERMI ATOMIC POWER PLANT, UNIT 1, MASTER INSPECTION PLAN CALENDAR YEAR 2017

Dear Mr. Polson:

In accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Manual, Chapter 2561, Decommissioning Power Reactor Inspection Program, the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for Enrico Fermi Atomic Power Plant, Unit 1 (Fermi 1). The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for January through December 2017 (Calendar Year (CY) 17). The plan outlines how we intend to focus our regional inspection resources to provide oversight for any significant decommissioning activities.

Because this MIP is based, in part, on your proposed schedule of significant decommissioning activities for CY17, the plan and focus of the NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. To ensure that this MIP remains current, we request that you keep the Materials Control, ISFSI, and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the Fermi Unit 1 Inspection Schedule.

We currently plan to conduct one routine decommissioning safety inspection at Fermi Unit 1 during CY 17. The inspection procedures we plan to utilize for the inspection are as follows:

Inspection Procedure Title IP 36801 Organization, Management, and Cost Control IP 37801 Safety Reviews, Design Changes and Modifications IP 40801 Self-Assessment, Auditing and Corrective Action IP 83750 Occupational Radiation Exposure IP 84750 Radioactive Waste Treatment, Effluent and Environmental Monitoring IP 86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials

K. Polson In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Peter Lee of my staff at 630-829-9870 or Rhex Edwards at 630-829-9722.

Sincerely,

/RA/

Michael A. Kunowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00016 License No. DPR-9 cc: Distribution via LISTSERV

K. Polson In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Peter Lee of my staff at 630-829-9870 or Rhex Edwards at 630-829-9722.

Sincerely,

/RA/

Michael A. Kunowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00016 License No. DPR-9 cc: Distribution via LISTSERV DISTRIBUTION:

Bruce Watson Theodore Smith John Giessner Christine Lipa Billy Dickson Brian Kemker Phillip Smagacz Allan Barker Harral Logaras Carole Ariano Linda Linn MCID Branch ADAMS Accession Number: ML16355A367 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl N" = No copy OFFICE RIII-DNMS RIII-DNMS RIII-DNMS NAME PLee:cl MKunowski for REdwards MKunowski DATE 12/20/2016 12/20/2016 12/20/2016 OFFICIAL RECORD COPY