ML17037B722: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:NRC FORM 195 (2.76)TO: NRC, QLETTER@ORIGINAL Q COP Y 0 NOTOR IZ 6 D g UN C LASS IF I E D FROM: PROP Niagara Moha~7k Power Corp.t Syracuse, NY 13202 R.R.Schnhi er/INPUT FORM t U.S.NUCLEAR REGULATORY C ISSIONl'RC DISTRIBUTION FQR PART 50 DOCKET MATERIAL, DOCKET NUMBER 50-220 FILE NUMBER MONTHLY REPORT DATE OF DOCUMENT:2/2/77 DATE RECEIVED 2/8/77 NUMBER OF COPIES RECEIVED 1 Cy DESCRIPTION LETTER TRANS THE FOLLOWING:
{{#Wiki_filter:NRC FORM 195 (2.76)                                     t           U.S. NUCLEAR REGULATORY C DISTRIBUTION FQR PART 50 DOCKET MATERIAL, l'RC ISSION DOCKET NUMBER 50-220 FILE NUMBER MONTHLY REPORT TO:                                              FROM:                                      DATE OF DOCUMENT NRC,                                              Niagara Moha~7kt Power Corp.          :2/2/77 Syracuse, NY 13202 R. R. Schnhi er                  DATE RECEIVED
ENCLOSU RE MONTHLY REPORT FOR Januar 197 PLANT&COMPONENT OPERABILITY
                                                                          /                          2/8/77 QLETTER                0 NOTOR IZ6 D              PROP                  INPUT FORM          NUMBER OF COPIES RECEIVED
&AVAILABILITY, THIS REPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS&OPERATIONS'ine Mile Point Unit 1 (0 I~,PL)ACgyp~DGgg)DP>PT REMOVE X MIPC CYS FOR AC ON FOR ACTION/INFORMATION INTERNAL DISTRIBUTION PDR-BRANCH CHIEF L arrish EXTERNAL DISTRIBUTION CONTROL NUM BE R 1360 NRC FORM 196 I2.76)  
    @ORIGINAL          g UN C LASS IF I E D                                                          1 Cy Q COP Y DESCRIPTION                                                     ENCLOSU RE LETTER TRANS THE FOLLOWING:                                 MONTHLY REPORT FOR         Januar 197 PLANT & COMPONENT OPERABILITY &
'k'll ,t g+~J\
AVAILABILITY, THIS REPORT TO BE USED                 IN PREPARING GRAY BOOK BY PLANS &
NIAGARA MOHAWK POWER CORPORATION NIAGARA~MOHAWK 300 ERIE BOULEVARD.
( 0 I ~,PL)
WEST SYRACUSE.N.Y.I3202 R'egutatory Docket FiIi Feb~y 2, 1977 0(gce, o$Plane 8 Schedule V~mto~e, of Licerukng Unkted~u Nuef~Regulatory CommQ ak on olaehingkon, V.C.20555.RE: 'Dock&No.50-220 GmtLemen: FEBS)yy.i.~~RHGUMQAE Sub~ed hneuMh.~Che, Oping S~RepoM Joe She, moeth o$3anuaIIIJ 1977 Joe Che,, N~ne KQ!e, Po~Nues~PouIW S~on Unit'l.Very~y you@6, R.R.SckmufeII, VL ce PauM~-Efmtru,c Paodu~on (fAS/atm~chme~
OPERATIONS'ine Mile Point Unit         1 ACgyp~
APPENDIX C OPERATING DATA REPORT DOCKET NO 50-220 UN)T Nine Ni 1 e P DATE 02/03/77 COMPLETED BY T.J.er ins TEI EPHONE 315 343-OPERATING STATUS.1.REPORTING PERIOD: 770101 770131 GROSS HOURS IN REPORTING PERIOD: 744 2.CURRENTLY AUTHORIZED POWER LEVEL (MIN: 5 MAX.DEPEND.CAPACITY (MWe Nei): DESIGN ELECTRICAL RATING (bIWe.Net):
DGgg)
3.POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe.Net):
DP >PT REMOVE FOR ACTION/INFORMATION X   MIPC CYS FOR AC   ON INTERNAL DISTRIBUTION PDR
4.REASONS FOR RESTRICTION (IF ANY): 610 6.NUMBER OF HOURS REACTOR WAS CRITICAL 6.REACTOR RESERVE SHUTDOWN HOURS THIS MONTH 744 YR TO DATE 744 CUMULATI V E 46,469.4 1,188.0 7.HOURS GENERATOR ON LINE 8.UNIT RESERVE SIIUTDOWN HOURS 9.GROSS THERMAL ENERGY GFNERATED (MWH)10.GROSS ELECTRICAL ENERGY GENERATED (MiWH)11 NET ELECTRICAL ENERGY GENERATED (MWH)12.REACTOR SLRVICE FACTOR 13.REACTOR AVAILABILITY FACTOR 14.UNIT SERVICE FACTOR, 16.UNIT AVAILABILITY FACTOR 16.UNIT CAPACITY FACTOR (Using MDC)17.UNIT CAPACITY FACTOR (Using Design 0/IWc)16.UNIT FORCED OUTAGE RATE 744 1338 810 442,689 428,572 100 100 100 94.4 94'428,572 100 100 100 94.4 94.4 22,459,493 75:0 69.6 57.9 5P.9 12.4 744 44,250.8 20.2 1 338 810 70 640 317 442,689 23,180,744 19.SHUTDOWNS SCHEDULED OVER NEXT 6 MiONTHS (TYPE, DATE, AND DURATION OF EACH): REFUELING-'March 6, 1977-12 wee's 20.IF SHUT DOWN AT END OF REPORT PERIOD.ESTIMATED DATE OF STARTUP: 21.UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPF RATION): FORFCAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION NINE>1ILE PODilT NUCLEAR STATION.NT.AG'OHKRX POt'ER CORPORAT.TO l AVERAGE DAILY UbllT PO)VER LEYEL DOCKET"NO.50-220 Nine Mi 1e Point 81 DATE 02/03/77 COMPLETED BY TELEPHONE T.J.'erkins (315)343-2110 ext.1312~fOXTrI Januar 1977 DAY AVERAGE DAILY POWER LEVEL (~I)Ye-X~'et) 1 580.9 584.4 DAY AVERAGE DAILY PONER LFVEL PI%'e-N e t)578.0 576.8 582.7 19 582.1 577.0 574.7 572.8 523.5 20 583.5 23.584.4 582.0 10 13 578.7 582.5 581.1 583.4 582.1 584.5 581.8'S 27 30 31 58 581.8.581.9 581.6 578.2 574.7 NINP.MILE POINT NUCLEAR STATION NIAGARA MOHAMK POWER CORPORATION UN(T SHUTDOWNS AND POWER REDUCT)ONS P@EPOPT MOgT[-(DOCKET NO.50-220 Nine Nile Point 81 DATE COMPLETED BY TELEPpOgp (315)343-2110 ext.1312 NO.DATE TYPE F: FORCED DURATION S: SCHEDULED (HOURS)REASON (1)METHOD OF SHUTTING DOmtN THE REACTOR OR REDUCING POWER (2)COB R ECTIVE ACTIONS/COMMENTS (I)REASON h: Eoulf MEvr FAILURE (Exr LAIN)II: MAINT.OR TEST C: REFUELING.D: REGULhTORY RESTRICrION L: OPERATOR TRAINING AND LICENSE EXAMINATION Pl ADMINIS I'RATIVE G;Ol'LRATlONAf.
    -BRANCH CHIEF   L arrish EXTERNAL DISTRIBUTION                                         CONTROL NUMBE R 1360 NRC FORM 196 I2.76)
ERROR (EXPLAIN)H: OTHER (EXPLAIN)(2)METHOD I: MANUAL 2: MANUAL SCRhibf.3: AUTOMATIC SCRAM 4;OTIIEI<<Exf LAIN)SEIMARY:
 
~~h>>}}
'k 'll
              ,t g+ ~
J\
 
NIAGARA MOHAWK POWER CORPORATION NIAGARA
                                            ~     MOHAWK 300 ERIE BOULEVARD. WEST SYRACUSE. N. Y. I3202 R'egutatory Docket FiIi Feb~y   2, 1977 0(gce,   o$ Plane 8 Schedule V~mto~e, of Unkted ~u olaehingkon, V.C.
Licerukng Nuef~ Regulatory 20555 CommQ ak   on
                                                                              ~
FEBS
                                                                          .~
                                                                                  )yy.
RHGUMQAE i
.RE:   'Dock& No. 50-220 GmtLemen:
Sub~ed     hneuMh.   ~ Che, Oping         S~     RepoM Joe She, moeth o$ 3anuaIIIJ 1977 Joe Che,, N~ne KQ!e,   Po~ Nues~         PouIW S~on Unit'l.
Very   ~y   you@6, R.R. SckmufeII, VL ce PauM~-
Efmtru,c Paodu~on (fAS/atm
~chme~
 
APPENDIX C OPERATING DATA REPORT DOCKET NO 50-220 UN) T   Nine Ni 1 e P DATE       02/03/77 COMPLETED BY           T.J. er ins TEI EPHONE       315 343-OPERATING STATUS     .
: 1. REPORTING PERIOD:   770101 770131         GROSS HOURS IN REPORTING PERIOD:         744
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MIN:         5     MAX. DEPEND. CAPACITY (MWe Nei):       610 DESIGN ELECTRICAL RATING (bIWe.Net):
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe.Net):
: 4. REASONS FOR RESTRICTION (IF ANY):
THIS MONTH      YR TO DATE    CUMULATIV E
: 6. NUMBER OF HOURS REACTOR WAS CRITICAL                             744               744     46,469.4
: 6. REACTOR RESERVE SHUTDOWN HOURS 1,188.0
: 7. HOURS GENERATOR ON LINE 744              744      44,250.8
: 8. UNIT RESERVE SIIUTDOWN HOURS 20.2
: 9. GROSS THERMAL ENERGY GFNERATED (MWH)                     1338 810          1 338 810    70 640 317
: 10. GROSS ELECTRICAL ENERGY GENERATED (MiWH)                     442,689            442,689    23,180,744 11 NET ELECTRICAL ENERGY GENERATED (MWH) 428,572            428,572    22,459,493
: 12. REACTOR SLRVICE FACTOR 100                100
: 13. REACTOR   AVAILABILITYFACTOR                                      100                100          75:0
: 14. UNIT SERVICE FACTOR,
: 16. UNIT AVAILABILITY FACTOR                                         100                100          69.6
: 16. UNIT CAPACITY FACTOR (Using MDC)                                   94.4              94.4        57.9 94 '              94.4        5P.9
: 17. UNIT CAPACITY FACTOR (Using Design 0/IWc)
: 16. UNIT FORCED OUTAGE RATE 12.4
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MiONTHS (TYPE, DATE, AND DURATION OF EACH):
REFUELING   -'March 6, 1977 -       12 wee's
: 20. IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
: 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPF RATION):       FORFCAST     ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
 
NINE >1ILE PODilT NUCLEAR STATION
                      . NT.AG 'OHKRX POt'ER     CORPORAT.TO l AVERAGE DAILYUbllT PO)VER LEYEL DOCKET"NO. 50-220 Nine Mi 1e Point 81 DATE 02/03/77 COMPLETED BY     T.J.'erkins TELEPHONE (315) 343-2110 ext. 1312
~
fOXTrI Januar   1977 DAY AVERAGE DAILYPOWER LEVEL                 DAY AVERAGE DAILYPONER LFVEL
(~I)Ye-X~'et)                                       PI%'e-N e t) 1    580.9                                          578.0 584.4                                          576.8 582. 7                             19         582.1 20 577.0                                         583. 5 574.7 572.8                               23
                                                      . 584.4 523.5                                          582.0 10     578.7                             'S          58 582.5                               27        581.8.
581.1                                         581. 9 13    583.4                                          581.6 582.1                                30        578.2 584.5                                31        574.7 581.8
 
NINP. MILE POINT NUCLEAR STATION NIAGARA MOHAMK POWER CORPORATION DOCKET NO. 50-220 UN(T SHUTDOWNS AND POWER REDUCT)ONS                                 Nine Nile Point 81 DATE COMPLETED BY TELEPpOgp (315)343-2110 ext. 1312 P
                                                      @EPOPT MOgT[-(
METHOD OF TYPE                                   SHUTTING DOmtN F: FORCED   DURATION                     THE REACTOR OR NO.      DATE    S: SCHEDULED   (HOURS)       REASON (1)   REDUCING POWER (2)       COB R ECTIVE ACTIONS/COMMENTS (I)   REASON h: Eoulf MEvr FAILURE (Exr LAIN) (2)  METHOD II: MAINT. OR TEST                     I: MANUAL                          SEIMARY:
C: REFUELING                           2: MANUALSCRhibf.
    . D: REGULhTORY RESTRICrION             3: AUTOMATICSCRAM L: OPERATOR TRAININGAND                4; OTIIEI<<ExfLAIN)
LICENSE EXAMINATION Pl ADMINISI'RATIVE G; Ol'LRATlONAf.ERROR (EXPLAIN)
H: OTHER (EXPLAIN)
 
~ ~ h>>}}

Revision as of 08:20, 30 October 2019

Letter Submitting the January 1977 Operating Status Report
ML17037B722
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/02/1977
From: Schneider R
Niagara Mohawk Power Corp
To:
Office of Nuclear Reactor Regulation
References
Download: ML17037B722 (7)


Text

NRC FORM 195 (2.76) t U.S. NUCLEAR REGULATORY C DISTRIBUTION FQR PART 50 DOCKET MATERIAL, l'RC ISSION DOCKET NUMBER 50-220 FILE NUMBER MONTHLY REPORT TO: FROM: DATE OF DOCUMENT NRC, Niagara Moha~7kt Power Corp. :2/2/77 Syracuse, NY 13202 R. R. Schnhi er DATE RECEIVED

/ 2/8/77 QLETTER 0 NOTOR IZ6 D PROP INPUT FORM NUMBER OF COPIES RECEIVED

@ORIGINAL g UN C LASS IF I E D 1 Cy Q COP Y DESCRIPTION ENCLOSU RE LETTER TRANS THE FOLLOWING: MONTHLY REPORT FOR Januar 197 PLANT & COMPONENT OPERABILITY &

AVAILABILITY, THIS REPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS &

( 0 I ~,PL)

OPERATIONS'ine Mile Point Unit 1 ACgyp~

DGgg)

DP >PT REMOVE FOR ACTION/INFORMATION X MIPC CYS FOR AC ON INTERNAL DISTRIBUTION PDR

-BRANCH CHIEF L arrish EXTERNAL DISTRIBUTION CONTROL NUMBE R 1360 NRC FORM 196 I2.76)

'k 'll

,t g+ ~

J\

NIAGARA MOHAWK POWER CORPORATION NIAGARA

~ MOHAWK 300 ERIE BOULEVARD. WEST SYRACUSE. N. Y. I3202 R'egutatory Docket FiIi Feb~y 2, 1977 0(gce, o$ Plane 8 Schedule V~mto~e, of Unkted ~u olaehingkon, V.C.

Licerukng Nuef~ Regulatory 20555 CommQ ak on

~

FEBS

.~

)yy.

RHGUMQAE i

.RE: 'Dock& No. 50-220 GmtLemen:

Sub~ed hneuMh. ~ Che, Oping S~ RepoM Joe She, moeth o$ 3anuaIIIJ 1977 Joe Che,, N~ne KQ!e, Po~ Nues~ PouIW S~on Unit'l.

Very ~y you@6, R.R. SckmufeII, VL ce PauM~-

Efmtru,c Paodu~on (fAS/atm

~chme~

APPENDIX C OPERATING DATA REPORT DOCKET NO 50-220 UN) T Nine Ni 1 e P DATE 02/03/77 COMPLETED BY T.J. er ins TEI EPHONE 315 343-OPERATING STATUS .

1. REPORTING PERIOD: 770101 770131 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (MIN: 5 MAX. DEPEND. CAPACITY (MWe Nei): 610 DESIGN ELECTRICAL RATING (bIWe.Net):
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe.Net):
4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIV E

6. NUMBER OF HOURS REACTOR WAS CRITICAL 744 744 46,469.4
6. REACTOR RESERVE SHUTDOWN HOURS 1,188.0
7. HOURS GENERATOR ON LINE 744 744 44,250.8
8. UNIT RESERVE SIIUTDOWN HOURS 20.2
9. GROSS THERMAL ENERGY GFNERATED (MWH) 1338 810 1 338 810 70 640 317
10. GROSS ELECTRICAL ENERGY GENERATED (MiWH) 442,689 442,689 23,180,744 11 NET ELECTRICAL ENERGY GENERATED (MWH) 428,572 428,572 22,459,493
12. REACTOR SLRVICE FACTOR 100 100
13. REACTOR AVAILABILITYFACTOR 100 100 75:0
14. UNIT SERVICE FACTOR,
16. UNIT AVAILABILITY FACTOR 100 100 69.6
16. UNIT CAPACITY FACTOR (Using MDC) 94.4 94.4 57.9 94 ' 94.4 5P.9
17. UNIT CAPACITY FACTOR (Using Design 0/IWc)
16. UNIT FORCED OUTAGE RATE 12.4
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MiONTHS (TYPE, DATE, AND DURATION OF EACH):

REFUELING -'March 6, 1977 - 12 wee's

20. IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPF RATION): FORFCAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

NINE >1ILE PODilT NUCLEAR STATION

. NT.AG 'OHKRX POt'ER CORPORAT.TO l AVERAGE DAILYUbllT PO)VER LEYEL DOCKET"NO. 50-220 Nine Mi 1e Point 81 DATE 02/03/77 COMPLETED BY T.J.'erkins TELEPHONE (315) 343-2110 ext. 1312

~

fOXTrI Januar 1977 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPONER LFVEL

(~I)Ye-X~'et) PI%'e-N e t) 1 580.9 578.0 584.4 576.8 582. 7 19 582.1 20 577.0 583. 5 574.7 572.8 23

. 584.4 523.5 582.0 10 578.7 'S 58 582.5 27 581.8.

581.1 581. 9 13 583.4 581.6 582.1 30 578.2 584.5 31 574.7 581.8

NINP. MILE POINT NUCLEAR STATION NIAGARA MOHAMK POWER CORPORATION DOCKET NO. 50-220 UN(T SHUTDOWNS AND POWER REDUCT)ONS Nine Nile Point 81 DATE COMPLETED BY TELEPpOgp (315)343-2110 ext. 1312 P

@EPOPT MOgT[-(

METHOD OF TYPE SHUTTING DOmtN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) COB R ECTIVE ACTIONS/COMMENTS (I) REASON h: Eoulf MEvr FAILURE (Exr LAIN) (2) METHOD II: MAINT. OR TEST I: MANUAL SEIMARY:

C: REFUELING 2: MANUALSCRhibf.

. D: REGULhTORY RESTRICrION 3: AUTOMATICSCRAM L: OPERATOR TRAININGAND 4; OTIIEI<<ExfLAIN)

LICENSE EXAMINATION Pl ADMINISI'RATIVE G; Ol'LRATlONAf.ERROR (EXPLAIN)

H: OTHER (EXPLAIN)