ML17075A340: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:March 14, 2017 | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
Mr. Michael R. Chisum | REGION IV | ||
Site Vice President | 1600 E. LAMAR BLVD | ||
Entergy Operations, Inc. | ARLINGTON, TX 76011-4511 | ||
March 14, 2017 | |||
Mr. Michael R. Chisum | |||
Site Vice President | |||
Entergy Operations, Inc. | |||
17265 River Road | |||
Killona, LA 70057-0751 | |||
SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3: NRC INITIAL | |||
OPERATOR LICENSING EXAMINATION APPROVAL 05000382/2017301 | |||
Dear Mr. Chisum: | |||
The purpose of this letter is to confirm the final arrangements for the upcoming operator | |||
licensing examinations at the Waterford Steam Electric Station, Unit 3. | |||
The NRC has completed its review of the operator license applications submitted in connection | |||
with this examination and separately provided a list of approved applicants to Mr. Robert | |||
Simpson, Manager, Training and Development. Note that any examination waivers and | |||
application denials have been addressed in separate correspondence. | |||
The U.S. Nuclear Regulatory Commission (NRC) has approved the subject examinations and | |||
you may administer the written examinations in accordance with Revision 10, of NUREG-1021, | |||
Operator Licensing Examination Standards for Power Reactors, on April 5, 2017. The NRC | |||
staff will administer the operating tests during the week of March 27, 2017. This examination | |||
has undergone extensive review by my staff and representatives responsible for licensed | |||
operator training at your facility. Based on this review I have concluded that the examination | |||
meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By | |||
administering this examination, you also agree that it meets NUREG-1021 guidelines, and is | |||
appropriate for measuring the qualifications of licensed operator applicants at your facility. If | |||
you determine that this examination is not appropriate for licensing operators at your facility, do | |||
not administer the examination and contact me at (817) 200-1159. | |||
Please contact your Chief Examiner, Chris Cowdrey, at (817) 200-1545, if you have any | |||
questions or identify any errors or changes in the license level (RO or SRO) or type of | |||
M. Chisum 2 | |||
examination (partial or complete written examination and/or operating test) specified for each | |||
applicant. | |||
Sincerely, | |||
/RA/ | |||
Vincent G. Gaddy, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Docket No. 50-382 | |||
License No. NPF-38 | |||
Enclosure: | |||
ES-201-4 | |||
cc w/enclosure: | |||
Robert Simpson | |||
Manager, Training and Development | |||
Entergy Operations, Inc. | |||
17265 River Road | |||
Killona, LA 70057-0751 | |||
cc w/o enclosure: | |||
Electronic Distribution for Waterford | |||
Steam Electric Station, Unit 3 | |||
ML17075A340 | |||
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: | |||
By: CBC Yes No Publicly Available Sensitive NRR-077 | |||
OFFICE RIV:OB:LA SOE:OB C:OB | |||
NAME JBridges CCowdrey VGaddy | |||
SIGNATURE /RA/ /RA/ /RA/ | |||
DATE 3/14/17 3/14/17 3/14/17 | |||
}} | }} | ||
Revision as of 05:43, 30 October 2019
| ML17075A340 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 03/14/2017 |
| From: | Vincent Gaddy Operations Branch IV |
| To: | Chisum M Entergy Operations |
| Gaddy V | |
| References | |
| 50-382/17-01 50-382/OL-17 | |
| Download: ML17075A340 (3) | |
See also: IR 05000382/2017301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD
ARLINGTON, TX 76011-4511
March 14, 2017
Mr. Michael R. Chisum
Site Vice President
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3: NRC INITIAL
OPERATOR LICENSING EXAMINATION APPROVAL 05000382/2017301
Dear Mr. Chisum:
The purpose of this letter is to confirm the final arrangements for the upcoming operator
licensing examinations at the Waterford Steam Electric Station, Unit 3.
The NRC has completed its review of the operator license applications submitted in connection
with this examination and separately provided a list of approved applicants to Mr. Robert
Simpson, Manager, Training and Development. Note that any examination waivers and
application denials have been addressed in separate correspondence.
The U.S. Nuclear Regulatory Commission (NRC) has approved the subject examinations and
you may administer the written examinations in accordance with Revision 10, of NUREG-1021,
Operator Licensing Examination Standards for Power Reactors, on April 5, 2017. The NRC
staff will administer the operating tests during the week of March 27, 2017. This examination
has undergone extensive review by my staff and representatives responsible for licensed
operator training at your facility. Based on this review I have concluded that the examination
meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By
administering this examination, you also agree that it meets NUREG-1021 guidelines, and is
appropriate for measuring the qualifications of licensed operator applicants at your facility. If
you determine that this examination is not appropriate for licensing operators at your facility, do
not administer the examination and contact me at (817) 200-1159.
Please contact your Chief Examiner, Chris Cowdrey, at (817) 200-1545, if you have any
questions or identify any errors or changes in the license level (RO or SRO) or type of
M. Chisum 2
examination (partial or complete written examination and/or operating test) specified for each
applicant.
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket No. 50-382
License No. NPF-38
Enclosure:
cc w/enclosure:
Robert Simpson
Manager, Training and Development
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
cc w/o enclosure:
Electronic Distribution for Waterford
Steam Electric Station, Unit 3
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: CBC Yes No Publicly Available Sensitive NRR-077
OFFICE RIV:OB:LA SOE:OB C:OB
NAME JBridges CCowdrey VGaddy
SIGNATURE /RA/ /RA/ /RA/
DATE 3/14/17 3/14/17 3/14/17