ML17075A340: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:March 14, 2017  
{{#Wiki_filter:UNITED STATES
 
                            NUCLEAR REGULATORY COMMISSION
Mr. Michael R. Chisum  
                                              REGION IV
Site Vice President  
                                          1600 E. LAMAR BLVD
Entergy Operations, Inc.  
                                      ARLINGTON, TX 76011-4511
                                          March 14, 2017
Mr. Michael R. Chisum
Site Vice President
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
SUBJECT:        WATERFORD STEAM ELECTRIC STATION, UNIT 3: NRC INITIAL
                OPERATOR LICENSING EXAMINATION APPROVAL 05000382/2017301
Dear Mr. Chisum:
The purpose of this letter is to confirm the final arrangements for the upcoming operator
licensing examinations at the Waterford Steam Electric Station, Unit 3.
The NRC has completed its review of the operator license applications submitted in connection
with this examination and separately provided a list of approved applicants to Mr. Robert
Simpson, Manager, Training and Development. Note that any examination waivers and
application denials have been addressed in separate correspondence.
The U.S. Nuclear Regulatory Commission (NRC) has approved the subject examinations and
you may administer the written examinations in accordance with Revision 10, of NUREG-1021,
Operator Licensing Examination Standards for Power Reactors, on April 5, 2017. The NRC
staff will administer the operating tests during the week of March 27, 2017. This examination
has undergone extensive review by my staff and representatives responsible for licensed
operator training at your facility. Based on this review I have concluded that the examination
meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By
administering this examination, you also agree that it meets NUREG-1021 guidelines, and is
appropriate for measuring the qualifications of licensed operator applicants at your facility. If
you determine that this examination is not appropriate for licensing operators at your facility, do
not administer the examination and contact me at (817) 200-1159.
Please contact your Chief Examiner, Chris Cowdrey, at (817) 200-1545, if you have any
questions or identify any errors or changes in the license level (RO or SRO) or type of


17265 River Road Killona, LA  70057-0751
M. Chisum                                    2
examination (partial or complete written examination and/or operating test) specified for each
SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3:  NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL 05000382/2017301 
applicant.
Dear Mr. Chisum:
                                              Sincerely,
                                              /RA/
The purpose of this letter is to confirm the final arrangements for the upcoming operator
                                              Vincent G. Gaddy, Chief
licensing examinations at the Waterford Steam Electric Station, Unit 3.
                                              Operations Branch
                                              Division of Reactor Safety
The NRC has completed its review of the operat
Docket No. 50-382
or license applications
License No. NPF-38
submitted in connection
Enclosure:
with this examination and separately provided a list of approved applicants to Mr. Robert Simpson, Manager, Training and Development.  Note that any examination waivers and application denials have been addressed in separate correspondence.
ES-201-4
cc w/enclosure:
Robert Simpson
Manager, Training and Development
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
cc w/o enclosure:
Electronic Distribution for Waterford
  Steam Electric Station, Unit 3


The U.S. Nuclear Regulatory Commission (NRC) has approved the subject examinations and you may administer the written examinations in accordance with Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for Powe
r Reactors," on April 5, 2017.  The NRC staff will administer the operating tests during the week of March 27, 2017.  This examination
has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility.  Based on this review I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity.  By
administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility.  If
you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (817) 200-1159. 


  Please contact your Chief Examiner, Chris Cowdrey, at (817) 200-1545, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of 
  ML17075A340
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 
  SUNSI Review:           ADAMS:           Non-Publicly Available  Non-Sensitive Keyword:
M. Chisum 2 examination (partial or complete written examination and/or operating test) specified for each
  By: CBC                 Yes No       Publicly Available     Sensitive     NRR-077
applicant.
OFFICE         RIV:OB:LA     SOE:OB         C:OB
 
NAME           JBridges       CCowdrey       VGaddy
  Sincerely, 
SIGNATURE       /RA/           /RA/           /RA/
  /RA/   
DATE           3/14/17           3/14/17     3/14/17
Vincent G. Gaddy, Chief  Operations Branch  Division of Reactor Safety
 
Docket No. 50-382
License No. NPF-38
Enclosure: 
 
ES-201-4
cc w/enclosure: Robert Simpson Manager, Training and Development
Entergy Operations, Inc.
 
17265 River Road
Killona, LA  70057-0751
 
cc w/o enclosure:  Electronic Distribution for Waterford 
  Steam Electric Station, Unit 3
 
   
 
 
  ML17075A340  SUNSI Review:   ADAMS:   Non-Publicly Available  Non-Sensitive Keyword: By: CBC  Yes    No Publicly Available Sensitive NRR-077 OFFICE RIV:OB:LA SOE:OB C:OB   NAME JBridges CCowdrey VGaddy   SIGNATURE /RA/ /RA/ /RA/   DATE 3/14/17 3/14/17 3/14/17
}}
}}

Revision as of 05:43, 30 October 2019

NRC Initial Operator Licensing Examination Approval 05000382/2017301
ML17075A340
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/14/2017
From: Vincent Gaddy
Operations Branch IV
To: Chisum M
Entergy Operations
Gaddy V
References
50-382/17-01 50-382/OL-17
Download: ML17075A340 (3)


See also: IR 05000382/2017301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD

ARLINGTON, TX 76011-4511

March 14, 2017

Mr. Michael R. Chisum

Site Vice President

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3: NRC INITIAL

OPERATOR LICENSING EXAMINATION APPROVAL 05000382/2017301

Dear Mr. Chisum:

The purpose of this letter is to confirm the final arrangements for the upcoming operator

licensing examinations at the Waterford Steam Electric Station, Unit 3.

The NRC has completed its review of the operator license applications submitted in connection

with this examination and separately provided a list of approved applicants to Mr. Robert

Simpson, Manager, Training and Development. Note that any examination waivers and

application denials have been addressed in separate correspondence.

The U.S. Nuclear Regulatory Commission (NRC) has approved the subject examinations and

you may administer the written examinations in accordance with Revision 10, of NUREG-1021,

Operator Licensing Examination Standards for Power Reactors, on April 5, 2017. The NRC

staff will administer the operating tests during the week of March 27, 2017. This examination

has undergone extensive review by my staff and representatives responsible for licensed

operator training at your facility. Based on this review I have concluded that the examination

meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By

administering this examination, you also agree that it meets NUREG-1021 guidelines, and is

appropriate for measuring the qualifications of licensed operator applicants at your facility. If

you determine that this examination is not appropriate for licensing operators at your facility, do

not administer the examination and contact me at (817) 200-1159.

Please contact your Chief Examiner, Chris Cowdrey, at (817) 200-1545, if you have any

questions or identify any errors or changes in the license level (RO or SRO) or type of

M. Chisum 2

examination (partial or complete written examination and/or operating test) specified for each

applicant.

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket No. 50-382

License No. NPF-38

Enclosure:

ES-201-4

cc w/enclosure:

Robert Simpson

Manager, Training and Development

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

cc w/o enclosure:

Electronic Distribution for Waterford

Steam Electric Station, Unit 3

ML17075A340

SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: CBC Yes No Publicly Available Sensitive NRR-077

OFFICE RIV:OB:LA SOE:OB C:OB

NAME JBridges CCowdrey VGaddy

SIGNATURE /RA/ /RA/ /RA/

DATE 3/14/17 3/14/17 3/14/17