ML17103A627: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:April 13, 2017 | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
Executive Vice President and CNO | REGION IV | ||
STP Nuclear Operating Company | 1600 E. LAMAR BLVD | ||
P.O. Box 289 | ARLINGTON, TX 76011-4511 | ||
Wadsworth, TX 77483 | April 13, 2017 | ||
Mr. G. T. Powell | |||
Executive Vice President and CNO | |||
EXPERIMENTS INSPECTION (05000498/2017007 | STP Nuclear Operating Company | ||
P.O. Box 289 | |||
Wadsworth, TX 77483 | |||
SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - | |||
NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND | |||
The purpose of this letter is to notify you that | EXPERIMENTS INSPECTION (05000498/2017007 AND 05000499/2017007) | ||
U.S. Nuclear Regulatory Commission (NRC) staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant | AND REQUEST FOR INFORMATION | ||
modifications at your South Texas Project Electric Generating Station | Dear Mr. Powell: | ||
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff | |||
Procedure 71111.17T, | will conduct the baseline inspection of changes, tests, experiments, and permanent plant | ||
modifications at your South Texas Project Electric Generating Station from May 22-26, 2017. | |||
The inspection will consist of three reactor inspectors from the NRCs Region IV office for | |||
Experience has shown that this | one week. The inspection will be conducted in accordance with NRC Inspection | ||
inspection is resource | Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments. | ||
Experience has shown that this inspection is resource intensive for both the NRC inspectors | |||
Please note that the documents are requested to be provided by May 15, 2017. | and your staff. In order to minimize the impact to your on-site resources and to ensure a | ||
is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. | productive inspection, we have enclosed a request for documents needed for this inspection. | ||
Please note that the documents are requested to be provided by May 15, 2017. Upon review of | |||
these documents, the inspectors will select additional documentation for review upon arrival. It | |||
We have discussed the schedule for these inspection activities with your staff and understand | is important that all of these documents are up-to-date and complete in order to minimize the | ||
that our regulatory contact for this inspection will be Rafael Gonzalez of your licensing | number of additional documents requested during the preparation and/or the on-site portions of | ||
organization. | the inspection. | ||
Chris.Smith@nrc.gov. | We have discussed the schedule for these inspection activities with your staff and understand | ||
that our regulatory contact for this inspection will be Rafael Gonzalez of your licensing | |||
organization. If there are any questions about this inspection or the material requested, please | |||
This letter does not contain new or amended information collection requirements subject | contact the lead inspector, Chris Smith, by telephone at 817-200-1095 or by e-mail at | ||
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). | Chris.Smith@nrc.gov. | ||
respond to, a request for information or an information collection requirement unless the | This letter does not contain new or amended information collection requirements subject | ||
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information | |||
collection requirements were approved by the Office of Management and Budget, control | |||
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to | |||
respond to, a request for information or an information collection requirement unless the | |||
G. Powell 2 | |||
requesting document displays a currently valid Office of Management and Budget control | |||
number. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its | |||
enclosure will be available electronically for public inspection in the NRC Public Document | |||
Room or from the Publicly Available Records (PARS) component of NRC's document system | |||
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading- | |||
rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Thomas R. Farnholtz, Chief | |||
Engineering Branch 1 | |||
Division of Reactor Safety | |||
Docket Nos. 50-498 and 50-499 | |||
License Nos. NPF-76 and NPF-80 | License Nos. NPF-76 and NPF-80 | ||
Enclosure: | |||
Enclosure: | Evaluations of Changes, Tests, | ||
Evaluations of Changes, Tests, | and Experiments Inspection | ||
Request for Information | Request for Information | ||
cc: Electronic Distribution for STP | |||
ML17103A627 | |||
SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: | |||
By: TFarnholtz Yes No Publicly Available Sensitive NRC-002 | |||
OFFICE RI:EB1 C:EB1 | |||
Request for Information | NAME CSmith TFarnholtz | ||
Evaluations of Changes, Tests, and Experiments Inspection South Texas Project Electric Generating Station, Units 1 and 2 | SIGNATURE /RA/ /RA/ | ||
DATE 4/12/17 4/13/17 | |||
Inspection Report: | |||
Request for Information | |||
Evaluations of Changes, Tests, and Experiments Inspection | |||
Inspection Dates: | South Texas Project Electric Generating Station, Units 1 and 2 | ||
Inspection Report: 05000498/2017007; 05000499/2017007 | |||
Inspection Dates: May 22-26, 2017 | |||
Inspection Procedure: IP 71111.17T, Evaluations of Changes, Tests, and Experiments | |||
Lead Inspector: | Lead Inspector: Chris Smith, Reactor Inspector | ||
Information Requested for the In-Office Preparation Week | Information Requested for the In-Office Preparation Week | ||
The following information should be sent to the Region IV office in hard copy or electronic | |||
format (preferred) by May 15, 2017, to the attention of Chris Smith. | format (preferred) by May 15, 2017, to the attention of Chris Smith. We request that you | ||
categorize the documents in your response with the numbered list below. | categorize the documents in your response with the numbered list below. If only hard copies of | ||
inspectors will select specific items from the information requested below and request from your staff additional documents needed during the on-site inspection weeks. | the requested documents are available or if the electronic format is too large, please inform the | ||
items requested be available and ready for review on the first day of inspection. | lead inspector and provide the documents on the first day of the on-site inspection. Also, the | ||
possible. | inspectors will select specific items from the information requested below and request from your | ||
staff additional documents needed during the on-site inspection weeks. We ask that the specific | |||
items requested be available and ready for review on the first day of inspection. If you have any | |||
questions regarding this information request, please contact the lead inspector as soon as | |||
did not result in an application for a license amendment. | possible. | ||
1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations. | |||
2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully | |||
implemented changes, tests, and experiments performed since the last triennial | |||
modification inspection that did not result in an evaluation. | |||
3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes, | |||
tests, and experiments performed since the last triennial 10 CFR 50.59 inspection that | |||
did not result in an application for a license amendment. | |||
4. A list with descriptions of all temporary plant modifications implemented since the last | |||
triennial 10 CFR 50.59 inspection. | |||
5. A list with descriptions of all compensatory actions for degraded or non-conforming | |||
conditions implemented since the last triennial 10 CFR 50.59 inspection. | |||
6. A list with descriptions of all corrective action documents related to 10 CFR 50.59 | |||
screenings and evaluations since the last triennial 10 CFR 50.59 inspection. | |||
7. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, | |||
including qualification dates. | |||
8. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or | |||
evaluations, including qualification dates. | |||
Enclosure | |||
9. Current revisions of the Technical Specifications and Bases and the Updated Final | |||
Safety Analysis Report. | |||
U.S. NRC, Region IV | 10. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59 | ||
Attn: | programs. | ||
1600 East Lamar Blvd. Arlington, TX 76011-4125 | 11. A copy of the most recent submittal of the report containing a brief description of any | ||
changes, tests, and experiments, including a summary of the evaluation of each, | |||
required by 10 CFR 50.59(d)(2). | |||
12. A list of systems and system designators and a set of one-line (i.e., simplified) system | |||
diagrams. | |||
Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can | |||
determine the safety and/or risk significance of the screenings, evaluations, and modifications. | |||
Inspector Contact Information: | |||
Chris Smith Wes Cullum Nnaerika Okonkwo | |||
Reactor Inspector Reactor Inspector Reactor Inspector | |||
817-200-1095 817-200-1563 817-200-1114 | |||
Chris.Smith@nrc.gov Wes.Cullum@nrc.gov Nnaerika.Okonkwo@nrc.gov | |||
Mailing Address: | |||
U.S. NRC, Region IV | |||
Attn: Chris Smith | |||
1600 East Lamar Blvd. | |||
Arlington, TX 76011-4125 | |||
2 | |||
}} | }} | ||
Revision as of 04:38, 30 October 2019
| ML17103A627 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 04/13/2017 |
| From: | Thomas Farnholtz Region 4 Engineering Branch 1 |
| To: | Gerry Powell South Texas |
| References | |
| IR 2017007 | |
| Download: ML17103A627 (5) | |
See also: IR 05000498/2017007
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD
ARLINGTON, TX 76011-4511
April 13, 2017
Mr. G. T. Powell
Executive Vice President and CNO
STP Nuclear Operating Company
P.O. Box 289
Wadsworth, TX 77483
SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION -
NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND
EXPERIMENTS INSPECTION (05000498/2017007 AND 05000499/2017007)
AND REQUEST FOR INFORMATION
Dear Mr. Powell:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff
will conduct the baseline inspection of changes, tests, experiments, and permanent plant
modifications at your South Texas Project Electric Generating Station from May 22-26, 2017.
The inspection will consist of three reactor inspectors from the NRCs Region IV office for
one week. The inspection will be conducted in accordance with NRC Inspection
Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments.
Experience has shown that this inspection is resource intensive for both the NRC inspectors
and your staff. In order to minimize the impact to your on-site resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
Please note that the documents are requested to be provided by May 15, 2017. Upon review of
these documents, the inspectors will select additional documentation for review upon arrival. It
is important that all of these documents are up-to-date and complete in order to minimize the
number of additional documents requested during the preparation and/or the on-site portions of
the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Rafael Gonzalez of your licensing
organization. If there are any questions about this inspection or the material requested, please
contact the lead inspector, Chris Smith, by telephone at 817-200-1095 or by e-mail at
Chris.Smith@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
G. Powell 2
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket Nos. 50-498 and 50-499
License Nos. NPF-76 and NPF-80
Enclosure:
Evaluations of Changes, Tests,
and Experiments Inspection
Request for Information
cc: Electronic Distribution for STP
SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: TFarnholtz Yes No Publicly Available Sensitive NRC-002
OFFICE RI:EB1 C:EB1
NAME CSmith TFarnholtz
SIGNATURE /RA/ /RA/
DATE 4/12/17 4/13/17
Request for Information
Evaluations of Changes, Tests, and Experiments Inspection
South Texas Project Electric Generating Station, Units 1 and 2
Inspection Report: 05000498/2017007; 05000499/2017007
Inspection Dates: May 22-26, 2017
Inspection Procedure: IP 71111.17T, Evaluations of Changes, Tests, and Experiments
Lead Inspector: Chris Smith, Reactor Inspector
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
format (preferred) by May 15, 2017, to the attention of Chris Smith. We request that you
categorize the documents in your response with the numbered list below. If only hard copies of
the requested documents are available or if the electronic format is too large, please inform the
lead inspector and provide the documents on the first day of the on-site inspection. Also, the
inspectors will select specific items from the information requested below and request from your
staff additional documents needed during the on-site inspection weeks. We ask that the specific
items requested be available and ready for review on the first day of inspection. If you have any
questions regarding this information request, please contact the lead inspector as soon as
possible.
1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully
implemented changes, tests, and experiments performed since the last triennial
modification inspection that did not result in an evaluation.
3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes,
tests, and experiments performed since the last triennial 10 CFR 50.59 inspection that
did not result in an application for a license amendment.
4. A list with descriptions of all temporary plant modifications implemented since the last
triennial 10 CFR 50.59 inspection.
5. A list with descriptions of all compensatory actions for degraded or non-conforming
conditions implemented since the last triennial 10 CFR 50.59 inspection.
6. A list with descriptions of all corrective action documents related to 10 CFR 50.59
screenings and evaluations since the last triennial 10 CFR 50.59 inspection.
7. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,
including qualification dates.
8. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or
evaluations, including qualification dates.
Enclosure
9. Current revisions of the Technical Specifications and Bases and the Updated Final
Safety Analysis Report.
10. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59
programs.
11. A copy of the most recent submittal of the report containing a brief description of any
changes, tests, and experiments, including a summary of the evaluation of each,
required by 10 CFR 50.59(d)(2).
12. A list of systems and system designators and a set of one-line (i.e., simplified) system
diagrams.
Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can
determine the safety and/or risk significance of the screenings, evaluations, and modifications.
Inspector Contact Information:
Chris Smith Wes Cullum Nnaerika Okonkwo
Reactor Inspector Reactor Inspector Reactor Inspector
817-200-1095 817-200-1563 817-200-1114
Chris.Smith@nrc.gov Wes.Cullum@nrc.gov Nnaerika.Okonkwo@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Chris Smith
1600 East Lamar Blvd.
Arlington, TX 76011-4125
2