{{#Wiki_filter:April 13, 2017  
{{#Wiki_filter:UNITED STATES
  Mr. G. T. Powell  
                            NUCLEAR REGULATORY COMMISSION
Executive Vice President and CNO  
                                              REGION IV
STP Nuclear Operating Company  
                                          1600 E. LAMAR BLVD
P.O. Box 289  
                                        ARLINGTON, TX 76011-4511
Wadsworth, TX 77483  
                                            April 13, 2017
SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION
Mr. G. T. Powell
- NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND  
Executive Vice President and CNO
EXPERIMENTS INSPECTION (05000498/2017007
STP Nuclear Operating Company
AND 05000499/2017007) AND REQUEST FOR INFORMATION  
P.O. Box 289
Dear Mr. Powell:  
Wadsworth, TX 77483
 
SUBJECT:       SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION -
                NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND
The purpose of this letter is to notify you that  
                EXPERIMENTS INSPECTION (05000498/2017007 AND 05000499/2017007)
U.S. Nuclear Regulatory Commission (NRC) staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant  
                AND REQUEST FOR INFORMATION
modifications at your South Texas Project Electric Generating Station
Dear Mr. Powell:
from May 22-26, 2017. The inspection will consist of three reactor inspectors from the NRC's Region IV office for one week. The inspection will be conducted in accordance with NRC Inspection  
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff
Procedure 71111.17T, "Evaluations of Changes, Tests, and Experiments.
will conduct the baseline inspection of changes, tests, experiments, and permanent plant
 
modifications at your South Texas Project Electric Generating Station from May 22-26, 2017.
The inspection will consist of three reactor inspectors from the NRCs Region IV office for
Experience has shown that this  
one week. The inspection will be conducted in accordance with NRC Inspection
inspection is resource intens
Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments.
ive for both the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.
Experience has shown that this inspection is resource intensive for both the NRC inspectors
Please note that the documents are requested to be provided by May 15, 2017. Upon review of these documents, the inspectors will select additional documentation for review upon arrival. It  
and your staff. In order to minimize the impact to your on-site resources and to ensure a
is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.  
productive inspection, we have enclosed a request for documents needed for this inspection.
 
Please note that the documents are requested to be provided by May 15, 2017. Upon review of
these documents, the inspectors will select additional documentation for review upon arrival. It
We have discussed the schedule for these inspection activities with your staff and understand  
is important that all of these documents are up-to-date and complete in order to minimize the
that our regulatory contact for this inspection will be Rafael Gonzalez of your licensing  
number of additional documents requested during the preparation and/or the on-site portions of
organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Chris Smith, by telephone at 817-200-1095 or by e-mail at  
the inspection.
Chris.Smith@nrc.gov.
We have discussed the schedule for these inspection activities with your staff and understand
 
that our regulatory contact for this inspection will be Rafael Gonzalez of your licensing
organization. If there are any questions about this inspection or the material requested, please
This letter does not contain new or amended information collection requirements subject
contact the lead inspector, Chris Smith, by telephone at 817-200-1095 or by e-mail at
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to  
Chris.Smith@nrc.gov.
respond to, a request for information or an information collection requirement unless the  
This letter does not contain new or amended information collection requirements subject
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
G. Powell 2
collection requirements were approved by the Office of Management and Budget, control
requesting document displays a currently valid Office of Management and Budget control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
number.
respond to, a request for information or an information collection requirement unless the
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). 
  Sincerely,    /RA/      Thomas R. Farnholtz, Chief  Engineering Branch 1
Division of Reactor Safety
 
  Docket Nos. 50-498 and 50-499


G. Powell                                        2
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
                                                Sincerely,
                                                /RA/
                                                Thomas R. Farnholtz, Chief
                                                Engineering Branch 1
                                                Division of Reactor Safety
Docket Nos. 50-498 and 50-499
License Nos. NPF-76 and NPF-80
License Nos. NPF-76 and NPF-80
   
Enclosure:
Enclosure:  
Evaluations of Changes, Tests,
Evaluations of Changes, Tests,   and Experiments Inspection
  and Experiments Inspection
   Request for Information  
   Request for Information
cc: Electronic Distribution for STP


cc:  Electronic Distribution for STP


   
ML17103A627
 
  SUNSI Review           ADAMS:           Non-Publicly Available  Non-Sensitive Keyword:
  ML17103A627 SUNSI Review   ADAMS:   Non-Publicly Available  Non-Sensitive Keyword: By: TFarnholtz  Yes    No Publicly Available Sensitive NRC-002 OFFICE RI:EB1 C:EB1     NAME CSmith TFarnholtz     SIGNATURE /RA/ /RA/     DATE 4/12/17 4/13/17    
  By: TFarnholtz         Yes No       Publicly Available     Sensitive     NRC-002
  Enclosure
OFFICE           RI:EB1       C:EB1
Request for Information  
NAME             CSmith       TFarnholtz
Evaluations of Changes, Tests, and Experiments Inspection South Texas Project Electric Generating Station, Units 1 and 2  
SIGNATURE       /RA/         /RA/
 
DATE             4/12/17       4/13/17
Inspection Report:   05000498/2017007; 05000499/2017007  
                                       
 
                                      Request for Information
                  Evaluations of Changes, Tests, and Experiments Inspection
Inspection Dates: May 22-26, 2017  
                South Texas Project Electric Generating Station, Units 1 and 2
 
Inspection Report:             05000498/2017007; 05000499/2017007
Inspection Procedure: IP 71111.17T, "Evaluations of Changes, Tests, and Experiments"
Inspection Dates:               May 22-26, 2017
Inspection Procedure:           IP 71111.17T, Evaluations of Changes, Tests, and Experiments
Lead Inspector: Chris Smith, Reactor Inspector
Lead Inspector:                 Chris Smith, Reactor Inspector
 
Information Requested for the In-Office Preparation Week
Information Requested for the In-Office Preparation Week
  The following information should be sent to the Region IV office in hard copy or electronic  
The following information should be sent to the Region IV office in hard copy or electronic
format (preferred) by May 15, 2017, to the attention of Chris Smith. We request that you  
format (preferred) by May 15, 2017, to the attention of Chris Smith. We request that you
categorize the documents in your response with the numbered list below. If only hard copies of the requested documents are available or if the electronic format is too large, please inform the lead inspector and provide the documents on the first day of the on-site inspection. Also, the  
categorize the documents in your response with the numbered list below. If only hard copies of
inspectors will select specific items from the information requested below and request from your staff additional documents needed during the on-site inspection weeks. We ask that the specific  
the requested documents are available or if the electronic format is too large, please inform the
items requested be available and ready for review on the first day of inspection. If you have any questions regarding this information request, please contact the lead inspector as soon as  
lead inspector and provide the documents on the first day of the on-site inspection. Also, the
possible.  
inspectors will select specific items from the information requested below and request from your
1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.  
staff additional documents needed during the on-site inspection weeks. We ask that the specific
2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully implemented changes, tests, and experiments performed since the last triennial modification inspection that did not result in an evaluation.
items requested be available and ready for review on the first day of inspection. If you have any
3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes, tests, and experiments performed since the last triennial 10 CFR 50.59 inspection that  
questions regarding this information request, please contact the lead inspector as soon as
did not result in an application for a license amendment.  
possible.
4. A list with descriptions of all temporary plant modifications implemented since the last triennial 10 CFR 50.59 inspection.  
    1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
 
    2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully
5. A list with descriptions of all compensatory actions for degraded or non-conforming conditions implemented since the last triennial 10 CFR 50.59 inspection.
        implemented changes, tests, and experiments performed since the last triennial
6. A list with descriptions of all corrective action documents related to 10 CFR 50.59 screenings and evaluations since the last triennial 10 CFR 50.59 inspection.  
        modification inspection that did not result in an evaluation.
7. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, including qualification dates.  
    3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes,
8. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or evaluations, including qualification dates.
        tests, and experiments performed since the last triennial 10 CFR 50.59 inspection that
  2  9. Current revisions of the Technical Specifications and Bases and the Updated Final Safety Analysis Report.
        did not result in an application for a license amendment.
10. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59
    4. A list with descriptions of all temporary plant modifications implemented since the last
programs. 
        triennial 10 CFR 50.59 inspection.
11. A copy of the most recent submittal of the report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each, required by 10 CFR 50.59(d)(2). 
    5. A list with descriptions of all compensatory actions for degraded or non-conforming
12. A list of systems and system designators and a set of one-line (i.e., simplified) system
        conditions implemented since the last triennial 10 CFR 50.59 inspection.
diagrams.
    6. A list with descriptions of all corrective action documents related to 10 CFR 50.59
Note:  Descriptions should be brief but of sufficient detail to ensure that inspectors can determine the safety and/or risk significance of the screenings, evaluations, and modifications.
        screenings and evaluations since the last triennial 10 CFR 50.59 inspection.
 
    7. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,
        including qualification dates.
Inspector Contact Information:
    8. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or
 
        evaluations, including qualification dates.
Chris Smith
                                                                                  Enclosure
Reactor Inspector
 
817-200-1095
Chris.Smith@nrc.gov 
 
Wes Cullum
Reactor Inspector
 
817-200-1563
 
Wes.Cullum@nrc.gov
 
  Nnaerika Okonkwo
Reactor Inspector
 
817-200-1114
 
Nnaerika.Okonkwo@nrc.gov


  Mailing Address:  
    9. Current revisions of the Technical Specifications and Bases and the Updated Final
        Safety Analysis Report.
U.S. NRC, Region IV  
    10. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59
Attn: Chris Smith  
        programs.
1600 East Lamar Blvd. Arlington, TX 76011-4125
    11. A copy of the most recent submittal of the report containing a brief description of any
        changes, tests, and experiments, including a summary of the evaluation of each,
        required by 10 CFR 50.59(d)(2).
    12. A list of systems and system designators and a set of one-line (i.e., simplified) system
        diagrams.
Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can
determine the safety and/or risk significance of the screenings, evaluations, and modifications.
Inspector Contact Information:
Chris Smith                        Wes Cullum                        Nnaerika Okonkwo
Reactor Inspector                  Reactor Inspector                  Reactor Inspector
817-200-1095                      817-200-1563                      817-200-1114
Chris.Smith@nrc.gov                Wes.Cullum@nrc.gov                Nnaerika.Okonkwo@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Chris Smith
1600 East Lamar Blvd.
Arlington, TX 76011-4125
                                                2
}}
}}

Revision as of 04:38, 30 October 2019

Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000498/2017007 and 05000499/2017007) and Request for Information
ML17103A627
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/13/2017
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Gerry Powell
South Texas
References
IR 2017007
Download: ML17103A627 (5)


See also: IR 05000498/2017007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD

ARLINGTON, TX 76011-4511

April 13, 2017

Mr. G. T. Powell

Executive Vice President and CNO

STP Nuclear Operating Company

P.O. Box 289

Wadsworth, TX 77483

SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION -

NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND

EXPERIMENTS INSPECTION (05000498/2017007 AND 05000499/2017007)

AND REQUEST FOR INFORMATION

Dear Mr. Powell:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff

will conduct the baseline inspection of changes, tests, experiments, and permanent plant

modifications at your South Texas Project Electric Generating Station from May 22-26, 2017.

The inspection will consist of three reactor inspectors from the NRCs Region IV office for

one week. The inspection will be conducted in accordance with NRC Inspection

Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments.

Experience has shown that this inspection is resource intensive for both the NRC inspectors

and your staff. In order to minimize the impact to your on-site resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Please note that the documents are requested to be provided by May 15, 2017. Upon review of

these documents, the inspectors will select additional documentation for review upon arrival. It

is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the on-site portions of

the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Rafael Gonzalez of your licensing

organization. If there are any questions about this inspection or the material requested, please

contact the lead inspector, Chris Smith, by telephone at 817-200-1095 or by e-mail at

Chris.Smith@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

G. Powell 2

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos. 50-498 and 50-499

License Nos. NPF-76 and NPF-80

Enclosure:

Evaluations of Changes, Tests,

and Experiments Inspection

Request for Information

cc: Electronic Distribution for STP

ML17103A627

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: TFarnholtz Yes No Publicly Available Sensitive NRC-002

OFFICE RI:EB1 C:EB1

NAME CSmith TFarnholtz

SIGNATURE /RA/ /RA/

DATE 4/12/17 4/13/17

Request for Information

Evaluations of Changes, Tests, and Experiments Inspection

South Texas Project Electric Generating Station, Units 1 and 2

Inspection Report: 05000498/2017007; 05000499/2017007

Inspection Dates: May 22-26, 2017

Inspection Procedure: IP 71111.17T, Evaluations of Changes, Tests, and Experiments

Lead Inspector: Chris Smith, Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (preferred) by May 15, 2017, to the attention of Chris Smith. We request that you

categorize the documents in your response with the numbered list below. If only hard copies of

the requested documents are available or if the electronic format is too large, please inform the

lead inspector and provide the documents on the first day of the on-site inspection. Also, the

inspectors will select specific items from the information requested below and request from your

staff additional documents needed during the on-site inspection weeks. We ask that the specific

items requested be available and ready for review on the first day of inspection. If you have any

questions regarding this information request, please contact the lead inspector as soon as

possible.

1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.

2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully

implemented changes, tests, and experiments performed since the last triennial

modification inspection that did not result in an evaluation.

3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes,

tests, and experiments performed since the last triennial 10 CFR 50.59 inspection that

did not result in an application for a license amendment.

4. A list with descriptions of all temporary plant modifications implemented since the last

triennial 10 CFR 50.59 inspection.

5. A list with descriptions of all compensatory actions for degraded or non-conforming

conditions implemented since the last triennial 10 CFR 50.59 inspection.

6. A list with descriptions of all corrective action documents related to 10 CFR 50.59

screenings and evaluations since the last triennial 10 CFR 50.59 inspection.

7. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,

including qualification dates.

8. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or

evaluations, including qualification dates.

Enclosure

9. Current revisions of the Technical Specifications and Bases and the Updated Final

Safety Analysis Report.

10. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59

programs.

11. A copy of the most recent submittal of the report containing a brief description of any

changes, tests, and experiments, including a summary of the evaluation of each,

required by 10 CFR 50.59(d)(2).

12. A list of systems and system designators and a set of one-line (i.e., simplified) system

diagrams.

Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can

determine the safety and/or risk significance of the screenings, evaluations, and modifications.

Inspector Contact Information:

Chris Smith Wes Cullum Nnaerika Okonkwo

Reactor Inspector Reactor Inspector Reactor Inspector

817-200-1095 817-200-1563 817-200-1114

Chris.Smith@nrc.gov Wes.Cullum@nrc.gov Nnaerika.Okonkwo@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Chris Smith

1600 East Lamar Blvd.

Arlington, TX 76011-4125

2