ONS-2017-040, Transmittal of Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-003: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:PROPRIETARY INFORMATION -WITHHOLD UNDER 10 CFR 2.390(d) WHEN SEPARATED FROM THE ENCLOSURE, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED J_-,DUKE ENERGY@ ONS-2017-040 10 CFR 50.54(q) May 22, 2017 Attn: Document Control Desk U. S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852- | {{#Wiki_filter:PROPRIETARY INFORMATION -WITHHOLD UNDER 10 CFR 2.390(d) | ||
WHEN SEPARATED FROM THE ENCLOSURE, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED J_-,DUKE | |||
~ ENERGY@ Thomas D. Ray Vice President Oconee Nuclear Station ONS-2017-040 Duke Energy 10 CFR 50.54(q) ON01VP 17800 Rochester Hwy Seneca, SC 29672 o: 864.873.5016 May 22, 2017 f 864.873.4208 Tom.Ray@duke-energy.com Attn: Document Control Desk U. S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852-2746 | |||
==Subject:== | ==Subject:== | ||
Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, -270, ar;id -287 Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-003 | Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, -270, ar;id -287 Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-003 Please find attached for your use and review a copy of the revision to the Oconee Nuclear Station Emergency Plan Implementing Procedures. | ||
This revision is being submitted in accordance with 10 CFR 50.54(q) and does not reduce the effectiveness of the Emergency Plan or the Emergency Plan Implementing Procedures. | This revision is being submitted in accordance with 10 CFR 50.54(q) and does not reduce the effectiveness of the Emergency Plan or the Emergency Plan Implementing Procedures. If there are any questions or concerns pertaining to this revision please call Mac Mcintyre, Emergency Preparedness Manager, at 864-873-3389. | ||
If there are any questions or concerns pertaining to this revision please call Mac Mcintyre, Emergency Preparedness Manager, at 864-873-3389. | By copy of this letter, two copies of this revision are being provided to the NRC, Region II, Atlanta, Georgia. | ||
By copy of this letter, two copies of this revision are being provided to the NRC, Region II, Atlanta, Georgia. Sincerely, Vice President Oconee Nuclear Station Attachments: | Sincerely, 6~~ | ||
Coversheet-EPIP Volume 1 -Revision 2017-003 Instruction page EPIP Procedures AP/O/A/1700/045 Rev 017 50.54(q) Evaluation Screening Evaluation Form 50.54(q) Effectiveness Evaluation Form PROPRIETARY INFORMATION | Vice President Oconee Nuclear Station Attachments: | ||
-WITHHOLD UNDER 10 CFR 2.390(d) WHEN SEPARATED FROM THE ENCLOSURE, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED PROPRIETARY INFORMATION -WITHHOLD UNDER 10 CFR 2.390(d) WHEN SEPARATED FROM THE ENCLOSURE, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED | Coversheet- EPIP Volume 1 - Revision 2017-003 Instruction page EPIP Procedures AP/O/A/1700/045 Rev 017 50.54(q) Evaluation Screening Evaluation Form 50.54(q) Effectiveness Evaluation Form PROPRIETARY INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d) | ||
WHEN SEPARATED FROM THE ENCLOSURE, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED | |||
PROPRIETARY INFORMATION -WITHHOLD UNDER 10 CFR 2.390(d) | |||
,., WHEN SEPARATED FROM THE ENCLOSURE, THIS TRANSMITTAL | |||
:* DOCUMENT IS DECONTROLLED | |||
. ' | |||
ONS-2017-040 U.S. Nuclear Regulatory Commission May 22, 2017 xc: w/2 copies of attachments Ms. Catherine Haney Administrator, Region II Marquis One Tower 245 Peachtree Center., NE Suite 1200 Atlanta GA 30303-1257 w/copy of attachments Ms. Audrey Klett, Project Manager (ONS) | |||
(by electronic m~il only) | |||
U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop '0-8G9A Rockville, MD 20852-2738 w/o attachments Mr. Eddy Crowe NRC Senior Resident Inspector Oconee Nuclear Station ELL- EC2ZF PROPRIETARY INFORMATION -WITHHOLD UNDER 10 CFR 2.390(d) | |||
WHEN SEPARATED FROM THE ENCLOSURE, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED}} | |||
Revision as of 02:46, 30 October 2019
| ML17146B203 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 05/22/2017 |
| From: | Teresa Ray Duke Energy Carolinas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| ONS-2017-040 | |
| Download: ML17146B203 (2) | |
Text
PROPRIETARY INFORMATION -WITHHOLD UNDER 10 CFR 2.390(d)
WHEN SEPARATED FROM THE ENCLOSURE, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED J_-,DUKE
~ ENERGY@ Thomas D. Ray Vice President Oconee Nuclear Station ONS-2017-040 Duke Energy 10 CFR 50.54(q) ON01VP 17800 Rochester Hwy Seneca, SC 29672 o: 864.873.5016 May 22, 2017 f 864.873.4208 Tom.Ray@duke-energy.com Attn: Document Control Desk U. S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852-2746
Subject:
Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, -270, ar;id -287 Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-003 Please find attached for your use and review a copy of the revision to the Oconee Nuclear Station Emergency Plan Implementing Procedures.
This revision is being submitted in accordance with 10 CFR 50.54(q) and does not reduce the effectiveness of the Emergency Plan or the Emergency Plan Implementing Procedures. If there are any questions or concerns pertaining to this revision please call Mac Mcintyre, Emergency Preparedness Manager, at 864-873-3389.
By copy of this letter, two copies of this revision are being provided to the NRC, Region II, Atlanta, Georgia.
Sincerely, 6~~
Vice President Oconee Nuclear Station Attachments:
Coversheet- EPIP Volume 1 - Revision 2017-003 Instruction page EPIP Procedures AP/O/A/1700/045 Rev 017 50.54(q) Evaluation Screening Evaluation Form 50.54(q) Effectiveness Evaluation Form PROPRIETARY INFORMATION - WITHHOLD UNDER 10 CFR 2.390(d)
WHEN SEPARATED FROM THE ENCLOSURE, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED
PROPRIETARY INFORMATION -WITHHOLD UNDER 10 CFR 2.390(d)
,., WHEN SEPARATED FROM THE ENCLOSURE, THIS TRANSMITTAL
- DOCUMENT IS DECONTROLLED
. '
ONS-2017-040 U.S. Nuclear Regulatory Commission May 22, 2017 xc: w/2 copies of attachments Ms. Catherine Haney Administrator, Region II Marquis One Tower 245 Peachtree Center., NE Suite 1200 Atlanta GA 30303-1257 w/copy of attachments Ms. Audrey Klett, Project Manager (ONS)
(by electronic m~il only)
U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop '0-8G9A Rockville, MD 20852-2738 w/o attachments Mr. Eddy Crowe NRC Senior Resident Inspector Oconee Nuclear Station ELL- EC2ZF PROPRIETARY INFORMATION -WITHHOLD UNDER 10 CFR 2.390(d)
WHEN SEPARATED FROM THE ENCLOSURE, THIS TRANSMITTAL DOCUMENT IS DECONTROLLED